The Department of Homeland Security (DHS) Notice of Funding Opportunity (NOFO) Fiscal Year 2022 Intercity Passenger Rail Program

Release Date:
mayo 13, 2022

Download a PDF copy of this webpage.

Effective April 4, 2022, the Federal Government transitioned from using the Data Universal Numbering System or DUNS number, to a new, non-proprietary identifier known as a Unique Entity Identifier or UEI. For entities that have an active registration in the System for Award Management (SAM) prior to this date, the UEI has automatically been assigned and no action is necessary. For all entities filing a new registration in SAM.gov on or after April 4, 2022, the UEI will be assigned to that entity as part of the SAM.gov registration process.

UEI registration information is available on GSA.gov at Unique Entity Identifier Update | GSA.

Visit Grants.gov for registration information. Detailed information regarding UEI and SAM is also provided in Section D of this funding notice.

Table of Contents

A.    Program Description

  1. Issued By
  2. Assistance Listings Number
  3. Assistance Listings Title
  4. Funding Opportunity Title
  5. Funding Opportunity Number
  6. Authorizing Authority for Program
  7. Appropriation Authority for Program
  8. Announcement Type
  9. Program Category
  10. Program Overview, Objectives and Priorities
  11. Performance Measures

B.    Federal Award Information

  1. Available Funding: $10 million
  2. Period of Performance: 36 months   
  3. Projected Period of Performance Start Date(s): September 1, 2022
  4. Projected Period of Performance End Date(s): August 31, 2025
  5. Funding Instrument Type: Cooperative Agreement

C.    Eligibility Information

  1. Eligible Applicants
  2. Applicant Eligibility Criteria
  3. Other Eligibility Criteria
  4. Cost Share or Match

D.    Application and Submission Information

  1. Key Dates and Times
  2. Agreeing to Terms and Conditions of the Award
  3. Address to Request Application Package
  4. Steps Required to Obtain a Unique Entity Identifier, Register in the System for Award Management (SAM), and Submit an Application
  5. Electronic Delivery
  6. How to Register to Apply through Grants.gov
  7. How to Submit an Initial Application to FEMA via Grants.gov
  8. Submitting the Final Application in ND Grants
  9. Timely Receipt Requirements and Proof of Timely Submission
  10. Content and Form of Application Submission
  11. Other Submission Requirements
  12. Intergovernmental Review
  13. Funding Restrictions and Allowable Cost

E.    Application Review Information

  1. Application Evaluation Criteria
  2. Review and Selection Process

F.    Federal Award Administration Information

  1. Notice of Award
  2. Administrative and National Policy Requirements
  3. Reporting
  4. Monitoring and Oversight 

G.    DHS Awarding Agency Contact Information

  1. Contact and Resource Information
  2. Systems Information

H.    Additional Information

  1. Termination Provisions
  2. Program Evaluation
  3. Period of Performance Extensions

A.    Program Description

1.    Issued By

U.S. Department of Homeland Security (DHS)/Federal Emergency Management Agency (FEMA)/Grant Programs Directorate (GPD)

2.    Assistance Listings Number

97.075

3.    Assistance Listings Title

Rail and Transit Security Grant Program 

4.    Funding Opportunity Title

Fiscal Year 2022 Intercity Passenger Rail Program (IPR)

5.    Funding Opportunity Number

DHS-22-GPD-075-000-01

6.    Authorizing Authority for Program

Section 1513 of the Implementing Recommendations of the 9/11 Commission Act of 2007 (Pub. L. No. 110-53) (6 U.S.C. § 1163)

7.    Appropriation Authority for Program

Department of Homeland Security Appropriations Act, 2022 (Pub. L. No. 117-103)

8.    Announcement Type

Initial

9.    Program Category

Preparedness: Infrastructure Security

10.    Program Overview, Objectives and Priorities

a.    Overview

The Fiscal Year (FY) 2022 Intercity Passenger Rail (IPR) – Amtrak program is one of four grant programs that constitute DHS/FEMA’s focus on transportation infrastructure security activities. These grant programs are part of a comprehensive set of measures authorized by Congress and implemented by DHS to help strengthen the Nation’s critical infrastructure against potential terrorist attacks. The IPR provides funds to Amtrak to protect critical surface transportation infrastructure and the traveling public from acts of terrorism. Among the five basic homeland security missions noted in the DHS Strategic Plan, the IPR supports the goal to Strengthen Preparedness and Resilience.

The 2022-2026 FEMA Strategic Plan outlines three bold, ambitious goals in order to position FEMA to address the increasing range and complexity of disasters, support the diversity of communities we serve, and complement the nation’s growing expectations of the emergency management community. The IPR supports the goal to Promote and Sustain a Ready FEMA and Prepared Nation. We invite our stakeholders and partners to also adopt these priorities and join us in building a more prepared and resilient nation.

Finally, for FY 2022, DHS is focused on the criticality of information sharing and collaboration to building a national culture of preparedness and protecting against terrorism and other threats to our national security. DHS and its homeland security mission were born from the “failures among federal agencies and between the federal agencies and state and local authorities to share critical information related to the threat of terrorism” prior to the September 11, 2001, attacks.[1] The threat profile has changed in the last two decades – we now face continuous cyber threats by sophisticated actors, threats to soft targets and crowded places, threats to our democratic election process and threats from new and emerging technologies. But information sharing and cooperation between state, local, and tribal authorities, and federal agencies, including all DHS officials, is just as vital, and perhaps even more vital, today. Therefore, for FY 2022, we have identified two priority areas, tied to some of the most serious threats that Amtrak should address with IPR funds. Perhaps most importantly, DHS will be focused on forging partnerships to strengthen information sharing and collaboration in each of these priority areas.

[1] Homeland Security Act of 2002: Report Together with Minority and Dissenting Views 222, Select Committee on Homeland Security: 107th Congress, U.S. House of Representatives (2002) (H. Rpt. 107-609).

b.    Objectives

The objective of the FY 2022 IPR is to provide funds to the National Railroad Passenger Corporation (Amtrak) to protect critical transportation infrastructure and the travelling public from terrorism, as well as to increase the resilience of the transportation infrastructure itself. 

c.    Priorities

Given the evolving threat landscape, it is incumbent upon DHS/FEMA to continuously evaluate the national risk profile and set priorities that help ensure the appropriate allocation of scarce security dollars. In assessing the national risk profile for FY 2022, two areas attract the most concern. As a result, DHS is requiring a minimum percentage of the FY 2022 IPR be spent in the following areas:

  1. Enhancing cybersecurity – (no minimum percent); and
  2. Enhancing the protection of soft targets/crowded places – 5%.

Likewise, there are several enduring security needs that crosscut the homeland security enterprise. The following are second-tier priorities that help recipients implement a comprehensive approach to securing critical transportation infrastructure:

  1. Effective planning;
  2. Training and awareness campaigns;
  3. Equipment and capital projects; and
  4. Exercises.

The table below provides a breakdown of these priority areas for the FY 2022 IPR, showing both the core capabilities enhanced and lifelines supported, as well as examples of eligible project types for each area. A detailed description of allowable investments for each project type is included in the Preparedness Grants Manual.

FY 2022 IPR Funding Priorities

National Priorities

Priorities Core Capabilities Lifelines Example Project Types
Enhancing Cybersecurity

Cybersecurity

Intelligence and information sharing

Planning

Public information and warning

Operational coordination

Screening, search, and detection

Access control and identity verification

Supply chain integrity and security

Risk management for protection programs and activities

Long-term vulnerability reduction

Situational assessment

Infrastructure systems

Operational communications

Safety and Security

Transportation

Cybersecurity risk assessments

Projects that address vulnerabilities identified in cybersecurity risk assessments

Improving cybersecurity of critical infrastructure to meet minimum levels identified by the Cybersecurity and Infrastructure Security Agency (CISA), and the National Institute of Standards and Technology Cybersecurity Framework

Cybersecurity training and planning
Enhancing the Protection of Soft Targets/ Crowded Places

Operational coordination

Public information and warning

Intelligence and information sharing

Interdiction and disruption

Screening, search, and detection

Access control and identity verification

Physical protective measures

Risk management for protection programs and activities

Safety and Security

Transportation

Physical security enhancements at Amtrak-owned stations 

Closed-circuit television security cameras

Security screening equipment and technology for people and baggage

Access controls: Fencing, gates, barriers, etc.

Use of visible, unpredictable deterrence, to include Operational Packages:
- Explosives Detection Canine Teams
- Mobile Explosives Detection Screening Teams
- Anti-Terrorism Teams

Directed/Surge Patrols on Overtime

Enduring Needs

Priorities Core Capabilities Lifelines Example Project Types
Planning

Planning

Risk management for protection programs and activities

Risk and disaster resilience assessment

Threats and hazards identification

Operational coordination

Safety and Security

Transportation

Development of:

- System-wide Security Risk
Management Plans
- Continuity of Operations Plans
- Response Plans/Station Action Plans
- System-wide and/or asset-specific vulnerability assessments

Efforts to strengthen governance integration between/among regional partners

Assessment of capabilities and gaps in planning for the needs of persons with disabilities and others with access and functional needs

Training & Awareness

Long-term vulnerability reduction

Public information and warning

Safety and Security

Transportation

Active shooter training, including integrating the needs of persons with disabilities

Security training for employees

Public awareness/preparedness campaigns

Equipment & Capital Projects

Long-term vulnerability reduction

Infrastructure systems

Operational communications

Interdiction and disruption

Screening, search and detection

Access control and identity verification

Physical protective measures

Safety and Security

Transportation

Top Transit Asset List risk remediation

Protection of other high-risk, high-consequence areas or systems that have been identified through system-wide risk assessments

Chemical, Biological, Radiological, Nuclear and Explosive detection, prevention, response and recovery equipment

Explosives Detection Canine Teams

Security screening equipment and technology for people and baggage

Unmanned Aircraft System detection technologies

Exercise

Long-term vulnerability reduction

Safety and Security

Transportation

Response exercises

11.    Performance Measures

Performance metrics for this program are as follows:

  • Percentage of funding allocated by the recipient to core capabilities to build or sustain the national priorities identified in the section above.

B.    Federal Award Information

1.    Available Funding 

$10 million

2.    Period of Performance 

36 months

Extensions to the period of performance are allowed. For additional information on period of performance extensions, please refer to Section H of this NOFO or the Preparedness Grants Manual.

FEMA awards under most programs, including this program, only include one budget period, so it will be same as the period of performance. See 2 C.F.R. § 200.1 for definitions of “budget period” and “period of performance.”

3.    Projected Period of Performance Start Date(s)

September 1, 2022

4.    Projected Period of Performance End Date(s)

August 31, 2025

5.    Funding Instrument Type

Cooperative Agreement

Program authority and responsibility under this Cooperative Agreement reside with DHS/FEMA. DHS/FEMA retains the right to terminate all or part of the Cooperative Agreement as permitted by 2 C.F.R. § 200.340 and may conduct site visits and monitoring throughout the period of performance.

DHS/FEMA will work with Amtrak to develop and refine the details of executing this award, for example, including work plans, goals and objectives, timelines, deliverables and effectiveness measures, selection of key partners, development of outreach or educational materials, coordination of multistate efforts, and defining eligible and ineligible tasks to ensure that the program is effectively implemented. Amtrak shall not develop or engage in the development of tasks not approved in the application without prior approval and the issuance of an amendment to the award by DHS/FEMA.

IPR Program Management: Roles and Responsibilities at DHS (Substantial Role of Agency)

Effective management of the IPR program entails a collaborative effort and partnership within DHS/FEMA. For the FY 2022 IPR program, DHS/FEMA is responsible for designing and operating the required administrative mechanisms to implement and manage the grant program. The Transportation Security Administration (TSA) within DHS provides programmatic subject matter expertise for the transportation industry. TSA assists by coordinating the intelligence information and risk/vulnerability assessments resulting in ranking and rating rail and mass transit assets nationwide against threats associated with potential terrorist attacks and in defining the parameters for identifying, protecting, deterring, responding, and recovering from such incidents. Together, these two DHS agencies, with additional assistance and cooperation of the Federal Railroad Administration (FRA), determine the primary security architecture of the IPR program.

DHS/FEMA and DHS/TSA provide substantial federal involvement with the following activities:

  • Review and approve the Investment Justifications before submitting the formal application;
  • Retain the authority to halt Amtrak’s funded activity immediately if Amtrak does not meet all conditions as listed in the award;
  • Review Amtrak’s project management plans and decisions;
  • Require Amtrak to maintain close collaboration with federal program staff for the purpose of controlling all aspects of Amtrak’s performance of grant program activities; and
  • On a quarterly basis, review Amtrak’s progress towards resolution of identified project issues.

C.    Eligibility Information

1.    Eligible Applicants

The National Railroad Passenger Corporation (Amtrak) is the only eligible entity per the Department of Homeland Security Appropriations Act, 2022, Pub. L. No. 117-103.

2.    Applicant Eligibility Criteria

Sections 1512 and 1513 of the Implementing Recommendations of the 9/11 Commission Act of 2007 (6 U.S.C. §§ 1162 and 1163) require a recipient to complete a vulnerability assessment and develop a security plan.  To be eligible for the FY 2022 IPR, Amtrak must have developed, or updated, its security plan. The security plan must be based on a security assessment, such as the Baseline Assessment for Security Enhancement, which is performed by the Transportation Security Inspectors-Surface of the Transportation Security Administration (TSA). This security assessment must have been conducted within the last three years prior to receiving the FY 2022 IPR award. A copy of the security plan and security assessment must be provided to DHS/FEMA upon request. Please see the Preparedness Grants Manual for more information on security plan requirements.

Entities providing transit security (e.g., city/county police department or a transportation agency’s own police department) must approve the security plan. The signature of a responsible official from the agency’s railroad security provider serves as this approval. Associated documentation of this approval must be provided to DHS/FEMA upon request. In addition, the agency’s railroad security provider is encouraged to review the Investment Justifications prior to submission.

Amtrak, in receiving funds through this program, must participate in Regional Transit Security Working Groups (RTSWGs) in participating urban areas. The RTSWG should serve as the forum for regional partners to discuss risk, planning efforts, and mitigation strategies. These discussions should be held regardless of funding to continue enhancing the overall security of the region. Regional working groups are a best practice for enhancing security and are encouraged for all jurisdictions.

An application submitted by an otherwise eligible non-federal entity (i.e., the applicant) may be deemed ineligible when the person that submitted the application is not: 1) a current employee, personnel, official, staff or leadership of the non-federal entity; and 2) duly authorized to apply for an award on behalf of the non-federal entity at the time of application.

Further, the Authorized Organization Representative and Signatory Authority must be a duly authorized current employee, personnel, official, staff or leadership of the recipient and provide an email address unique to the recipient at the time of application and upon any change in assignment during the period of performance. Consultants or contractors of the recipient are not permitted to be the AOR or the SA of the recipient. It is the sole responsibility of the recipient to keep their points of contact for the organization up-to-date and accurate in all federal systems.

The AOR is responsible for submitting programmatic and financial performance reports, accepting award packages, signing assurances and certifications, and submitting award amendments.

3.    Other Eligibility Criteria

a.    National Incident Management System (NIMS) Implementation

Prior to allocation of any federal preparedness awards, recipients must ensure and maintain adoption and implementation of NIMS. The list of objectives used for progress and achievement reporting is on FEMA’s website at https://www.fema.gov/emergency-managers/nims/implementation-training.

Please see the Preparedness Grants Manual for more information on NIMS.

4.    Cost Share or Match

There is no cost share or cost match requirement for the FY 2022 IPR program.

D.  Application and Submission Information

1.   Key Dates and Times

a.   Application Start Date:                                                 

May 13, 2022

b.   Application Submission Deadline:                                  

June 13, 2022 at 5 p.m. ET

All applications must be received by the established deadline.

The Non-Disaster (ND) Grants System has a date stamp that indicates when an application is submitted. Applicants will receive an electronic message confirming receipt of their submission. For additional information on how an applicant will be notified of application receipt, see the subsection titled “Timely Receipt Requirements and Proof of Timely Submission” in Section D of this funding notice.

FEMA will not review applications that are received after the deadline or consider these late applications for funding. FEMA may, however, extend the application deadline on request for any applicant who can demonstrate that good cause exists to justify extending the deadline. Good cause for an extension may include technical problems outside of the applicant’s control that prevent submission of the application by the deadline, other exigent or emergency circumstances, or statutory requirements for FEMA to make an award.

Applicants experiencing technical problems outside of their control must notify FEMA as soon as possible and before the application deadline. Failure to timely notify FEMA of the issue that prevented the timely filing of the application may preclude consideration of the award. “Timely notification” of FEMA means, “prior to the application deadline and within 48 hours after the applicant became aware of the issue.”

A list of FEMA contacts can be found in Section G of this NOFO, “DHS Awarding Agency Contact Information.” For additional assistance using the ND Grants System, please contact the ND Grants Service Desk at (800) 865-4076 or NDGrants@fema.dhs.gov. The ND Grants Service Desk is available Monday through Friday, 9 a.m. – 6 p.m. ET. For programmatic or grants management questions, please contact your Preparedness Officer or Grants Specialist. If applicants do not know who to contact or if there are programmatic questions or concerns, please contact the FEMA Grants Information Desk by e-mail at fema-grants-news@fema.dhs.gov OR by phone at (800) 368-6498, Monday through Friday, 9 a.m. – 5 p.m. ET.

c.   Anticipated Funding Selection Date:                                    

No later than August 17, 2022

D. Anticipated Award Date:

No later than September 30, 2022

d.   Other Key Dates

Event Suggested Deadline for Completion Date for FY 2022 Cycle
Obtaining an UEI number Four weeks before actual submission deadline May 16, 2022
Obtaining a valid Employer Identification Number (EIN) Four weeks before actual submission deadline May 16, 2022
Creating an account with login.gov Four weeks before actual submission deadline May 16, 2022
Registering in SAM or updating SAM registration Four weeks before actual submission deadline May 16, 2022
Registering in Grants.gov Four weeks before actual submission deadline May 16, 2022
Starting application in Grants.gov Three weeks before actual submission deadline May 23, 2022
Submitting application in Grants.gov Two weeks before actual submission deadline May 31, 2022
Submitting the final application in ND Grants Three days before actual submission deadline June 10, 2022

2. Agreeing to Terms and Conditions of the Award

By submitting an application, applicants agree to comply with the requirements of this NOFO and the terms and conditions of the award, should they receive an award.

3.   Address to Request Application Package

See the Preparedness Grants Manual for requesting and submitting an application.

Initial applications are processed through the Grants.gov portal. Final applications are completed and submitted through FEMA’s Non-Disaster Grants (ND Grants) System. Application forms and instructions are available at Grants.gov. To access these materials, go to http://www.grants.gov.

4.   Steps Required to Obtain a Unique Entity Identifier, Register in the System for Award Management (SAM), and Submit an Application

Applying for an award under this program is a multi-step process and requires time to complete. Applicants are encouraged to register early as the registration process can take four weeks or more to complete. Therefore, registration should be done in sufficient time to ensure it does not impact your ability to meet required submission deadlines.

Please review the table above for estimated deadlines to complete each of the steps listed. Failure of an applicant to comply with any of the required steps before the deadline for submitting an application may disqualify that application from funding.

To apply for an award under this program, all applicants must:

a.   Apply for, update, or verify their UEI number from SAM.gov and Employer Identification Number (EIN) from the Internal Revenue Service;

b.   In the application, provide an UEI number;

c.   Have an account with login.gov;

d.   Register for, update, or verify their SAM account and ensure the account is active before submitting the application;

e.   Create a Grants.gov account;

f.    Add a profile to a Grants.gov account;

g.   Establish an Authorized Organizational Representative (AOR) in Grants.gov;

h.   Register in ND Grants;

i.    Submit an initial application in Grants.gov;

j.    Submit the final application in ND Grants, including electronically signing applicable forms; and

k.   Continue to maintain an active SAM registration with current information at all times during which it has an active federal award or an application or plan under consideration by a federal awarding agency. As part of this, applicants must also provide information on an applicant’s immediate and highest-level owner and subsidiaries, as well as on all predecessors that have been awarded federal contracts or federal financial assistance within the last three years, if applicable.

 

Specific instructions on how to apply for, update, or verify an UEI number or SAM registration or establish an AOR are included below in the steps for applying through Grants.gov.

Applicants are advised that FEMA may not make a federal award until the applicant has complied with all applicable SAM requirements. Therefore, an applicant’s SAM registration must be active not only at the time of application, but also during the application review period and when FEMA is ready to make a federal award. Further, as noted above, an applicant’s or recipient’s SAM registration must remain active for the duration of an active federal award. If an applicant’s SAM registration is expired at the time of application, expires during application review, or expires any other time before award, FEMA may determine that the applicant is not qualified to receive a federal award and use that determination as a basis for making a federal award to another applicant.

Per 2 C.F.R. § 25.110(c)(2)(iii), if an applicant is experiencing exigent circumstances that prevents it from obtaining an UEI number and completing SAM registration prior to receiving a federal award, the applicant must notify FEMA as soon as possible by contacting fema-grants-news@fema.dhs.gov and providing the details of the circumstances that prevent completion of these requirements. If FEMA determines that there are exigent circumstances and FEMA has decided to make an award, the applicant will be required to obtain an UEI number, if applicable, and complete SAM registration within 30 days of the federal award date.

5.   Electronic Delivery

DHS is participating in the Grants.gov initiative to provide the grant community with a single site to find and apply for grant funding opportunities. DHS encourages or requires applicants to submit their applications online through Grants.gov, depending on the funding opportunity.

For this funding opportunity, FEMA requires applicants to submit initial applications through Grants.gov and a final application through ND Grants.

6.   How to Register to Apply through Grants.gov

For information on how to register to apply through Grants.gov, please see the Preparedness Grants Manual.

7.   How to Submit an Initial Application to FEMA via Grants.gov

Standard Form 424 (SF-424) is the initial application for this NOFO.

Grants.gov applicants can apply online using a workspace. A workspace is a shared, online environment where members of a grant team may simultaneously access and edit different web forms within an application. For each NOFO you can create individual instances of a workspace. Applicants are encouraged to submit their initial applications in Grants.gov at least seven days before the application deadline, or for this NOFO June 6, 2022.

In Grants.gov, applicants need to submit the following forms:

  • SF-424, Application for Federal Assistance
  • Grants.gov Lobbying Form, Certification Regarding Lobbying

For further information on how to submit an initial application via Grants.gov, please see the Preparedness Grants Manual.

8.   Submitting the Final Application in ND Grants

After submitting the initial application in Grants.gov, eligible applicants will be notified by FEMA and asked to proceed with submitting their complete application package in ND Grants. Applicants can register early with ND Grants and are encouraged to begin their ND Grants registration at the time of this announcement or, at the latest, seven days before the application deadline (June 13, 2022). Early registration will allow applicants to have adequate time to start and complete their applications.

Applicants needing assistance registering for the ND Grants system should contact ndgrants@fema.dhs.gov or (800) 865-4076. For step-by-step directions on using the ND Grants system and other guides, please see https://www.fema.gov/grants/guidance-tools/non-disaster-grants-management-system.

In ND Grants, applicants will be prompted to submit the standard application information and any program-specific information required as described in Section D.10 of this NOFO, “Content and Form of Application Submission.” The Standard Forms (SF) are auto generated in ND Grants, but applicants may access these forms in advance through the Forms tab under the SF-424 family on Grants.gov. Applicants should review these forms before applying to ensure they have all the information required.

For additional application submission requirements, including program-specific requirements, please refer to the subsection titled “Content and Form of Application Submission” under Section D of this NOFO.

9.   Timely Receipt Requirements and Proof of Timely Submission

As the application submission is a two-step process, the applicant with the AOR role who submitted the application in Grants.gov will receive an acknowledgement of receipt and a tracking number (GRANTXXXXXXXX) from Grants.gov with the successful transmission of its initial application. This notification does not serve as proof of timely submission, as the application is not complete until it is submitted in ND Grants. Applicants can also view the ND Grants Agency Tracking Number by accessing the Details tab in the submitted workspace section in Grants.gov, under the Agency Tracking Number column. Should the Agency Tracking Number not appear, the application has not yet migrated from Grants.gov into the ND Grants System. Please allow 24 hours for your ND Grants application tracking number to migrate.

All applications must be received in ND Grants by 5 p.m. ET on the application deadline (June 13, 2022). Proof of timely submission is automatically recorded by ND Grants. An electronic date/time stamp is generated within the system when the application is successfully received by ND Grants. Additionally, the applicant(s) listed as contacts on the application will receive a system-generated email to confirm receipt.

10. Content and Form of Application Submission

a.   Standard Required Application Forms and Information

The following forms or information are required to be submitted in either Grants.gov or ND Grants. The Standard Forms (SF) are submitted either through Grants.gov, through forms generated in ND Grants, or as an attachment in ND Grants. Applicants may also access the SFs at https://www.grants.gov/web/grants/forms/sf-424-family.html.

i.    Grants.Gov

  • SF-424, Application for Federal Assistance, initial application submitted through Grants.gov
  • Grants.gov Lobbying Form, Certification Regarding Lobbying, submitted through Grants.gov

ii.   ND Grants

  • SF-424A, Budget Information (Non-Construction), submitted via the forms generated by ND Grants
    • For construction under an award, submit SF-424C, Budget Information (Construction), submitted via the forms generated by ND Grants, in addition to or instead of SF-424A
  • SF-424B, Standard Assurances (Non-Construction), submitted via the forms generated by ND Grants
    • For construction under an award, submit SF-424D, Standard Assurances (Construction), submitted via the forms generated by ND Grants, in addition to or instead of SF-424B
  • SF-LLL, Disclosure of Lobbying Activities, submitted via the forms generated by ND Grants
  • Indirect Cost Agreement or Proposal, submitted as an attachment in ND Grants if the budget includes indirect costs and the applicant is required to have an indirect cost rate agreement or proposal. If the applicant does not have or is not required to have an indirect cost rate agreement or proposal, please see Section D.13 of this NOFO, “Funding Restrictions and Allowable Costs,” for further information regarding allowability of indirect costs and whether alternatives to an indirect cost rate agreement or proposal might be available, or contact the relevant FEMA staff identified in Section G of this NOFO, “DHS Awarding Agency Contact Information” for further instructions.

Generally, applicants have to submit either the non-construction forms (i.e., SF-424A and SF-424B) or construction forms (i.e., SF-424C and SF-424D), meaning that applicants that only have construction work and do not have any non-construction work need only submit the construction forms (i.e., SF-424C and SF-424D) and not the non-construction forms (i.e., SF-424A and SF-424B), and vice versa. However, applicants who have both construction and non-construction work under this program need to submit both the construction and non-construction forms.

b.   Program-Specific Required Forms and Information

The following program-specific forms or information are required to be submitted in ND Grants as file attachments:

  • Associated Investment Justifications
  • Detailed budgets
  • Associated Memoranda of Understanding/Memoranda of Agreement

I. Priority Investments

  • Cybersecurity (no minimum percentage)
    Cybersecurity investments must support the security and functioning of critical infrastructure and core capabilities as they relate to achieving target capabilities related to preventing, preparing for, protecting against, or responding to acts of terrorism. Additional resources and information regarding cybersecurity are available through the Cybersecurity and Infrastructure Security Agency and the National Institute of Standards and Technology.
  • Soft Targets and Crowded Places (5% minimum)
    Soft targets and crowded places are increasingly appealing to terrorists and other violent extremist actors because of their relative accessibility and the large number of potential targets. This challenge is complicated by the prevalent use of simple tactics and less sophisticated attacks. Segments of our society are inherently open to the general public, and by nature of their purpose do not incorporate strict security measures. Given the increased emphasis by terrorists and other violent extremist actors to leverage less sophisticated methods to inflict harm in public areas, it is vital that the public and private sectors collaborate to enhance security of locations such as transportation centers, parks, restaurants, shopping centers, special event venues, and similar facilities. Additional resources and information regarding securing soft targets and crowded places are available through the Cybersecurity and Infrastructure Security Agency.

II. Investment Justification (IJ)

As part of the FY 2022 IPR application process, applicants must develop a formal IJ that addresses each initiative being proposed for funding, including a project’s management and administration (M&A) costs. Applicants may submit up to eight IJs. IJs must demonstrate how proposed projects address gaps and deficiencies in current programs and capabilities and link to one or more core capabilities identified in the National Preparedness Goal. Applicants are encouraged to submit a separate IJ for each proposed project. IPR projects must be: 1) feasible and effective at reducing the risks for which the project was designed, and 2) able to be fully completed within the 3-year period of performance. Applicants must ensure that the IJs are consistent with all applicable requirements outlined in this NOFO. IJs must be submitted with the grant application as a file attachment within ND Grants. Applicants must use the following file naming convention when submitting IJ attachments through ND Grants as part of the FY 2022 IPR program:

Name of Applicant_IJ Number (Example: Amtrak_IJ 1)

Applicants must provide information in the following categories for each proposed investment:

  1. Background
  2. Strategic and Program Priorities
  3. Impact
  4. Funding/Implementation Plan

III. Operational Packages (OPacks)

Applicants that meet basic OPack eligibility requirements may elect to pursue OPack funding for Canine Teams, Mobile Explosives Detection Screening Teams, and Anti-Terrorism Teams, for new capabilities as well as to sustain existing OPacks. Applicants pursuing both new OPacks and sustainment funding for existing OPacks must indicate in their IJs which option is the higher priority for their agency. Additionally, applicants pursuing either new teams or sustainment of existing teams must include the number of OPack teams already in place (either funded by the agency or by IPR). In addition, recipients must commit to minimum training standards for all federally funded OPack positions. Please refer to the Preparedness Grants Manual for OPack Team-specific training requirements. In order for an application for an OPack to be considered eligible, it must include a Five-Year Security Capital and Operational Sustainment Plan. Please see www.grants.gov for the required template.

IV. Detailed Budget

Applicants must provide detailed budgets for the funds requested. The detailed budgets must be submitted with the grant application as a file attachment within ND Grants. The budgets must be complete, reasonable, and cost-effective in relation to the proposed projects. The budgets should provide the basis of computation of all project-related costs, any appropriate narrative, and a detailed justification of M&A costs. Applicants receiving funds may not obligate, expend, or draw down funds until budgets and budget narratives have been approved by DHS/FEMA. The budget detail worksheet may be used as a guide to assist applicants in the preparation of budgets and budget narratives. Note: Design and Planning/Engineering costs must be clearly identified in a separate line item in order for partial funding to be released prior to Environmental Planning and Historic Preservation (EHP) review and approval. Please see the Preparedness Grants Manual for information on the EHP review process.

Detailed budgets must be submitted with the grant application as a file attachment within ND Grants. Applicants must use the following file naming convention when submitting detailed budgets as part of the IPR application process:

Agency Name_IJ Number_Budget (Example: Amtrak IJ _1_Budget)

11. Other Submission Requirements

Sensitive Security Information (SSI) Requirements

A portion of the information that is routinely submitted in the course of applying for funding, reporting under certain programs, or that is provided in the course of an entity’s grant management activities under those programs that are under federal control may be subject to protection under an SSI marking and must be properly identified and marked accordingly. SSI is a control designation used by DHS/FEMA to protect transportation security-related information. It is applied to information about security programs; vulnerability and threat assessments; screening processes; technical specifications of certain screening equipment and objects used to test screening equipment; and equipment used for communicating security information relating to air, land, or maritime transportation. Further information can be found at 49 C.F.R. Part 1520, Protection of Sensitive Security Information. For the purposes of the IPR, and due to the high frequency of SSI found in IPR-related IJs, all IPR IJs shall be considered SSI and treated as such until they have been subject to review for SSI by DHS/FEMA. Therefore, applicants shall label all application documents as SSI in accordance with 49 C.F.R. § 1520.13.

12. Intergovernmental Review

An intergovernmental review may be required. Applicants must contact their state’s Single Point of Contact (SPOC) to comply with the state’s process under Executive Order 12372

(See https://www.archives.gov/federal-register/codification/executive-order/12372.html; https://www.whitehouse.gov/wp-content/uploads/2020/04/SPOC-4-13-20.pdf).

13. Funding Restrictions and Allowable Costs

All costs charged to awards covered by this NOFO must comply with the Uniform Administrative Requirements, Cost Principles, and Audit Requirements at 2 C.F.R. Part 200, unless otherwise indicated in the NOFO, the terms and conditions of the award, or the Preparedness Grants Manual. This includes, among other requirements, that costs must be incurred, and products and services must be delivered, within the period of performance of the award. See 2 C.F.R. § 200.403(h) (referring to budget periods, which for FEMA awards under most programs, including this program, is the same as the period of performance).

Federal funds made available through this award may be used for the purpose set forth in this NOFO, the Preparedness Grants Manual, and the terms and conditions of the award and must be consistent with the statutory authority for the award. Award funds may not be used for matching funds for any other federal awards, lobbying, or intervention in federal regulatory or adjudicatory proceedings. In addition, federal funds may not be used to sue the Federal Government or any other government entity. See the Preparedness Grants Manual for more information on funding restrictions and allowable costs.

Additionally, costs charged to an IPR award must also be consistent with the cost principles in the Federal Acquisition Regulation (FAR) Part 31.2 in lieu of 2 C.F.R. Part 200, Subpart E. Any conflicts between FAR Part 31.2 and 2 C.F.R. Part 200, Subpart E shall be resolved in favor of the applicable provision in FAR Part 31.2.

a.   Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services

Recipients and subrecipients of FEMA federal financial assistance are subject to the prohibitions described in section 889 of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (FY 2019 NDAA), Pub. L. No. 115-232 (2018) and 2 C.F.R. §§ 200.216, 200.327, 200.471, and Appendix II to 2 C.F.R. Part 200. Beginning August 13, 2020, the statute – as it applies to FEMA recipients, subrecipients, and their contractors and subcontractors – prohibits obligating or expending federal award funds on certain telecommunications and video surveillance products and contracting with certain entities for national security reasons.

Guidance is available at Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services (Interim) FEMA Policy  #405-143-1, or superseding document.

Additional guidance is available Contract Provisions Guide: Navigating Appendix II to Part 200 - Contract Provisions for Non-Federal Entity Contracts Under Federal Awards (fema.gov).

Effective August 13, 2020, FEMA recipients and subrecipients may not use any FEMA funds under open or new awards to:

  1. Procure or obtain any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology of any system;
  2. Enter into, extend, or renew a contract to procure or obtain any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology of any system; or
  3. Enter into, extend, or renew contracts with entities that use covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.

i.    Replacement Equipment and Services

FEMA grant funding may be permitted to procure replacement equipment and services impacted by this prohibition, provided the costs are otherwise consistent with the requirements of the NOFO and the Preparedness Grants Manual.

ii.   Definitions

Per section 889(f)(2)-(3) of the FY 2019 NDAA and 2 C.F.R. § 200.216, covered telecommunications equipment or services means:

  1. Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation, (or any subsidiary or affiliate of such entities);
  2. For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
  3. Telecommunications or video surveillance services provided by such entities or using such equipment; or
  4. Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the People’s Republic of China.

Examples of the types of products covered by this prohibition include phones, internet, video surveillance, and cloud servers when produced, provided, or used by the entities listed in the definition of “covered telecommunications equipment or services.” See 2 C.F.R. § 200.471.

B. Pre-Award Costs

Pre-award costs are not allowable and will not be approved.

C.   Management and Administration (M&A) Costs

M&A costs are allowed. Recipients may use up to 5% of the award for their M&A. M&A activities are those defined as directly relating to the management and administration of IPR funds, such as financial management and monitoring. M&A expenses must be based on actual expenses or known contractual costs. M&A requests that are simple percentages of the award, without supporting justification, will not be allowed or considered for reimbursement.

M&A costs are not operational costs. They are the necessary costs incurred in direct support of the grant or as a consequence of the grant and should be allocated across the entire lifecycle of the grant. Examples include preparing and submitting required programmatic and financial reports, establishing and/or maintaining equipment inventory, documenting operational and equipment expenditures for financial accounting purposes, responding to official informational requests from state and federal oversight authorities, including completing the Civil Rights Evaluation Tool as require by DHS; and grant performance measurement or evaluation activities. Please see the Preparedness Grants Manual for additional information on Direct Costs.

D. Indirect Facilities & Administrative (F&A) Costs

Indirect costs are allowable under this program as described in the Federal Acquisition Regulation (FAR).

E. Other Direct Costs

Recipients that are using IPR funds to support emergency communications equipment activities must comply with the SAFECOM Guidance on Emergency Communications Grants, including provisions on technical standards that ensure and enhance interoperable communications.

I. Construction and Renovation

Construction and renovation costs to achieve capability targets related to preventing, preparing for, protecting against, or responding to acts of terrorism are allowed under this program. For construction costs to be allowed, they must be specifically approved by DHS/FEMA in writing prior to the use of any program funds for construction or renovation. See the Preparedness Grants Manual for additional information. Additionally, recipients are required to submit an SF-424C Form and budget detail citing the project costs.

II. Operational Overtime

Operational Overtime costs are allowed under this program. Please see the Preparedness Grants Manual for additional details.

III. Travel

Domestic travel costs are allowed under this program as described in this NOFO and the Preparedness Grants Manual. International travel is not an allowable cost under this program unless approved in advance by DHS/FEMA.

IV. Maintenance and Sustainment

Maintenance- and sustainment-related costs, such as maintenance contracts, warranties, repair or replacement costs, upgrades, and user fees are allowable. Please see the Preparedness Grants Manual for additional details.

F.    Excess Funds

After completing the initial project proposed in the recipient’s application, some recipients may have unexpended funds remaining in their budgets. These excess funds may result from any combination of under-budget acquisition activities or competitive procurement processes. In such cases, excess funds must be returned to FEMA upon project completion. Please also see Section C.4 of this NOFO regarding cost share requirements, including the implications if the project costs are less than what was applied for.

E.  Application Review Information

1.   Application Evaluation Criteria

a.   Programmatic Criteria

The FY 2022 IPR application will be evaluated through a review process for completeness, adherence to programmatic guidelines, and anticipated effectiveness of the proposed investments. Amtrak is the only entity eligible to submit an application for IPR and must comply with all administrative requirements described herein ― including the submission of IJs, budgets and other application materials as required. IJs will be reviewed and selected based on the following criteria:

  1. Funding priorities. Projects will be evaluated and prioritized based on the extent to which they address the priorities contained in this funding notice.
  2. Ability to reduce risk of catastrophic events. Projects will be evaluated and prioritized on their ability to reduce risks associated with potential terrorist attacks and all other types of hazards. For projects where an applicant’s collaboration with others is relevant to the project’s ability to reduce risks, projects will be evaluated based on the degree to which the proposal adequately details how the applicant will use investments to overcome existing logistical, technological, legal, policy and other impediments to collaborating, networking, sharing information, cooperating and fostering a culture of national preparedness with federal, state, regional and nonprofit partners. In evaluating an applicant’s ability to collaborate, FEMA will consider any information provided by the applicant and may also consider relevant information from other sources.
  3. Sustainability without additional federal funds and leveraging of other funding. Projects will be evaluated and prioritized regarding the extent to which they exhibit a likelihood of success or continued success without requiring additional federal assistance.
  4. Timeline. Projects will be evaluated and prioritized based on Amtrak’s ability to complete the proposed project within submitted timeframes.

Grant projects must be both (1) feasible and effective at reducing the risks for which the project was designed, and (2) able to be fully completed within the three-year period of performance. DHS/FEMA will use the information provided in the application and any supporting documentation to determine the feasibility and effectiveness of proposed grant projects. Information that would assist in this feasibility and effectiveness determination includes the following:

  • Scope of work (purpose and objectives of the project, identification of what is being protected);
  • Desired outcomes, including expected long-term impact where applicable;
  • Summary of status of planning and design accomplished to date (e.g., included in a capital improvement plan); and
  • Project schedule.

Recipients are expected to conform, as applicable, with accepted engineering practices, established codes, standards, modeling techniques, and best practices.

b.   Financial Integrity Criteria

Prior to making a federal award, FEMA is required by 31 U.S.C. § 3354, as enacted by the Payment Integrity Information Act of 2019, Pub. L. No. 116-117 (2020); 41 U.S.C. § 2313; and 2 C.F.R. § 200.206 to review information available through any Office of Management and Budget (OMB)-designated repositories of governmentwide eligibility qualification or financial integrity information, including whether the applicant is suspended or debarred. FEMA may also pose additional questions to the applicant to aid in conducting the pre-award risk review. Therefore, application evaluation criteria may include the following risk-based considerations of the applicant:

  1. Financial stability;
  2. Quality of management systems and ability to meet management standards;
  3. History of performance in managing federal award;
  4. Reports and findings from audits; and
  5. Ability to effectively implement statutory, regulatory, or other requirements.

c.   Supplemental Financial Integrity Criteria and Review

Prior to making a federal award where the anticipated total federal share will be greater than the simplified acquisition threshold, currently $250,000:

  1. FEMA is required to review and consider any information about the applicant, including information on the applicant’s immediate and highest-level owner, subsidiaries, and predecessors, if applicable, that is in the designated integrity and performance system accessible through the System for Award Management (SAM), which is currently the Federal Awardee Performance and Integrity Information System (FAPIIS).
  2. An applicant, at its option, may review information in FAPIIS and comment on any information about itself that a federal awarding agency previously entered.
  3. FEMA will consider any comments by the applicant, in addition to the other information in FAPIIS, in making a judgment about the applicant’s integrity, business ethics, and record of performance under federal awards when completing the review of risk posed by applicants as described in 2 C.F.R. § 200.206.

2.   Review and Selection Process

Amtrak is the only eligible entity for the FY 2022 IPR program. The application will be reviewed in accordance with the criteria laid out in the sections above.

F.   Federal Award Administration Information

1.   Notice of Award

Before accepting the award, the AOR and recipient should carefully read the award package. The award package includes instructions on administering the grant award and the terms and conditions associated with responsibilities under federal awards. Recipients must accept all conditions in this NOFO and the Preparedness Grants Manual as well as any specific terms and conditions in the Notice of Award to receive an award under this program.

See the Preparedness Grants Manual for information on Notice of Award.

2.   Administrative and National Policy Requirements

In addition to the requirements of in this section and in this NOFO, FEMA may place specific terms and conditions on individual awards in accordance with 2 C.F.R. Part 200.

In addition to the information regarding DHS Standard Terms and Conditions and Ensuring the Protection of Civil Rights, see the Preparedness Grants Manual for additional information on administrative and national policy requirements, including the following:

a.   DHS Standard Terms and Conditions

All successful applicants for DHS grant and cooperative agreements are required to comply with DHS Standard Terms and Conditions, which are available online at: DHS Standard Terms and Conditions.

The applicable DHS Standard Terms and Conditions will be those in effect at the time the award was made. What terms and conditions will apply for the award will be clearly stated in the award package at the time of award.

b.   Ensuring the Protection of Civil Rights

As the Nation works towards achieving the National Preparedness Goal, it is important to continue to protect the civil rights of individuals. Recipients and subrecipients must carry out their programs and activities, including those related to the building, sustainment, and delivery of core capabilities, in a manner that respects and ensures the protection of civil rights for protected populations.

Federal civil rights statutes, such as Section 504 of the Rehabilitation Act of 1973 and Title VI of the Civil Rights Act of 1964, along with DHS and FEMA regulations, prohibit discrimination on the basis of race, color, national origin, sex, religion, age, disability, limited English proficiency, or economic status in connection with programs and activities receiving federal financial assistance from FEMA.

Recipients must complete the DHS Civil Rights Evaluation Tool within 30 days of receipt of the Notice of Award. Information about this requirement and a fuller list of the civil rights provisions that apply to recipients can be found in the DHS Standard Terms and Conditions. Additional information on civil rights provisions is available at https://www.dhs.gov/civil-rights-resources-recipients-dhs-financial-assistance and https://www.fema.gov/about/offices/equal-rights/civil-rights.

Monitoring and oversight requirements in connection with recipient compliance with federal civil rights laws are also authorized pursuant to 44 C.F.R. Part 7.

In accordance with civil rights laws and regulations, recipients and subrecipients ust ensure the consistent and systematic fair, just, and impartial treatment of all individuals, including individuals who belong to underserved communities that have been denied such treatment.

c.   Environmental Planning and Historic Preservation (EHP) Compliance

As a federal agency, FEMA is required to consider the effects of its actions on the environment and historic properties to ensure that all activities and programs funded by FEMA, including grant-funded projects, comply with federal EHP laws, Executive Orders, regulations, and policies, as applicable.

FEMA grant funding for new construction or substantial improvement must comply with Executive Order (EO) 14030, Climate-Related Financial Risk and applicable FEMA implementing policies in place at the time of disbursement, including FEMA Policy #-206-21-0003, Partial Implementation of the Federal Flood Risk Management Standard for Hazard Mitigation Assistance Programs (Interim) (fema.gov) or superseding policies.

Recipients and subrecipients proposing projects that have the potential to impact the environment, including, but not limited to, the construction of communication towers, modification or renovation of existing buildings, structures, and facilities, or new construction including replacement of facilities, must participate in the FEMA EHP review process. The EHP review process involves the submission of a detailed project description along with any supporting documentation requested by FEMA to determine whether the proposed project has the potential to impact environmental resources or historic properties.

In some cases, FEMA is also required to consult with other regulatory agencies and the public in order to complete the review process. Federal law requires EHP review to be completed before federal funds are released to carry out proposed projects. FEMA may not be able to fund projects that are not incompliance with applicable EHP laws, Executive Orders, regulations and policies.

DHS and FEMA EHP policy is found in directives and instructions available on the FEMA.gov EHP page, the FEMA website page that includes documents regarding EHP responsibilities and program requirements, including implementation of the National Environmental Policy Act and other EHP regulations and Executive Orders.

The GPD EHP screening form is located at https://www.fema.gov/media-library/assets/documents/90195. Additionally, all recipients under this funding opportunity are required to comply with the FEMA GPD EHP Policy Guidance, FEMA Policy #108-023-1, available at https://www.fema.gov/media-library/assets/documents/85376.

3.   Reporting

Recipients are required to submit various financial and programmatic reports as a condition of award acceptance. Future awards and funds drawdown may be withheld if these reports are delinquent.

See the Preparedness Grants Manual for information on reporting requirements.

4.   Monitoring and Oversight

Per 2 C.F.R. § 200.337, FEMA, through its authorized representatives, has the right, at all reasonable times, to make site visits or conduct desk reviews to review project accomplishments and management control systems to review award progress and to provide any required technical assistance. During site visits or desk reviews, FEMA will review recipients’ files related to the award. As part of any monitoring and program evaluation activities, recipients must permit FEMA, upon reasonable notice, to review grant-related records and to interview the organization’s staff and contractors regarding the program. Recipients must respond in a timely and accurate manner to FEMA requests for information relating to the award.

See the Preparedness Grants Manual for information on monitoring and oversight.

G.  DHS Awarding Agency Contact Information

1.   Contact and Resource Information

a.   Program Office Contact

FEMA has assigned state-specific Preparedness Offices for the HSGP. If you do not know your Preparedness Officer, contact the FEMA Grants Information Desk by e-mail at fema-grants-news@fema.dhs.gov OR by phone at (800) 368-6498, Monday through Friday, 9 a.m. – 5 p.m. ET.

b.   FEMA Grants News

FEMA Grants News is a non-emergency comprehensive management and information resource developed by FEMA for grants stakeholders. This channel provides general information on all FEMA grant programs and maintains a comprehensive database containing key personnel contact information at the federal, state, and local levels. When necessary, recipients will be directed to a federal point of contact who can answer specific programmatic questions or concerns. FEMA Grants Information Desk can be reached by e-mail at fema-grants-news@fema.dhs.gov OR by phone at (800) 368-6498, Monday through Friday, 9 a.m. – 5 p.m. ET.

c.   Grant Programs Directorate (GPD) Award Administration Division

GPD’s Award Administration Division (AAD) provides support regarding financial matters and budgetary technical assistance. Additional guidance and information can be obtained by contacting the AAD’s Help Desk via e-mail at ASK-GMD@fema.dhs.gov.

d.   Equal Rights

The FEMA Office of Equal Rights (OER) in coordination with the DHS Office for Civil Rights and Civil Liberties is responsible for compliance with and enforcement of federal civil rights obligations in connection with programs and services conducted by FEMA and recipients of FEMA financial assistance. All inquiries and communications about federal civil rights compliance for FEMA grants under this NOFO should be sent to FEMA-CivilRightsOffice@fema.dhs.gov.

E.    Environmental Planning and Historic Preservation

GPD’s EHP Team provides guidance and information about the EHP review process to recipients and subrecipients. All inquiries and communications about GPD projects under this NOFO or the EHP review process, including the submittal of EHP review materials, should be sent to gpdehpinfo@fema.dhs.gov.

2.   Systems Information

a.   Grants.gov

For technical assistance with Grants.gov, call the customer support hotline 24 hours per day, 7 days per week (except federal holidays) at (800) 518-4726 or e-mail at support@grants.gov.

b.   Non-Disaster (ND) Grants

For technical assistance with the ND Grants system, please contact the ND Grants Helpdesk at ndgrants@fema.dhsgov or (800) 865-4076, Monday through Friday, 9 a.m. – 6 p.m. ET. User resources are available at https://www.fema.gov/grants/guidance-tools/non-disaster-grants-management-system

c.   Payment and Reporting System (PARS)

FEMA uses the Payment and Reporting System (PARS) for financial reporting, invoicing, and tracking payments. FEMA uses the Direct Deposit/Electronic Funds Transfer (DD/EFT) method of payment to recipients. To enroll in the DD/EFT, recipients must complete a Standard Form 1199A, Direct Deposit Form. If you have questions about the online system, please call the Customer Service Center at (866) 927-5646 or email ask-GMD@fema.dhs.gov.

H.  Additional Information

GPD has developed the Preparedness Grants Manual to guide applicants and recipients of grant funding on how to manage their grants and other resources. Recipients seeking guidance on policies and procedures for managing preparedness grants should reference the Preparedness Grants Manual for further information. Examples of information contained in the Preparedness Grants Manual include:

  • Actions to Address Noncompliance
  • Audits
  • Case Studies and Use of Grant-Funded Resources During Real-World Incident Operations
  • Community Lifelines
  • Conflicts of Interest in the Administration of Federal Awards and Subawards
  • Disability Integration
  • National Incident Management System
  • Payment Information
  • Period of Performance Extensions
  • Procurement Integrity
  • Record Retention
  • Whole Community Preparedness
  • Other Post-Award Requirements

1.   Termination Provisions

FEMA may terminate a federal award in whole or in part for one of the following reasons. FEMA and the recipient must still comply with closeout requirements at 2 C.F.R. §§ 200.344-200.345 even if an award is terminated in whole or in part. To the extent that subawards are permitted under this NOFO, pass-through entities should refer to 2 C.F.R. § 200.340 for additional information on termination regarding subawards.

a.   Noncompliance

If a recipient fails to comply with the terms and conditions of a federal award, FEMA may terminate the award in whole or in part. If the noncompliance can be corrected, FEMA may first attempt to direct the recipient to correct the noncompliance. This may take the form of a Compliance Notification. If the noncompliance cannot be corrected or the recipient is non-responsive, FEMA may proceed with a Remedy Notification, which could impose a remedy for noncompliance per 2 C.F.R. § 200.339, including termination. Any action to terminate based on noncompliance will follow the requirements of 2 C.F.R. §§ 200.341-200.342 as well as the requirement of 2 C.F.R. § 200.340(c) to report in FAPIIS the recipient’s material failure to comply with the award terms and conditions. See also the section on Actions to Address Noncompliance in the Preparedness Grants Manual.

b.   With the Consent of the Recipient

FEMA may also terminate an award in whole or in part with the consent of the recipient, in which case the parties must agree upon the termination conditions, including the effective date, and in the case of partial termination, the portion to be terminated.

c.   Notification by the Recipient

The recipient may terminate the award, in whole or in part, by sending written notification to FEMA setting forth the reasons for such termination, the effective date, and in the case of partial termination, the portion to be terminated. In the case of partial termination, FEMA may determine that a partially terminated award will not accomplish the purpose of the federal award, so FEMA may terminate the award in its entirety. If that occurs, FEMA will follow the requirements of 2 C.F.R. §§ 200.341-200.342 in deciding to fully terminate the award.

2.  Program Evaluation

Recipients and subrecipients are encouraged to incorporate program evaluation activities from the outset of their program design and implementation to meaningfully document and measure their progress towards meeting an agency priority goal(s). Title I of the Foundations for Evidence-Based Policymaking Act of 2018 (Evidence Act), Pub. L. No. 115-435 (2019) urges federal awarding agencies and federal assistance recipients and subrecipients to use program evaluation as a critical tool to learn, to improve equitable delivery, and to elevate program service and delivery across the program lifecycle. Evaluation means “an assessment using systematic data collection and analysis of one or more programs, policies, and organizations intended to assess their effectiveness and efficiency.” Evidence Act § 101 (codified at 5 U.S.C. § 311). Evaluation costs are allowable costs (either as direct or indirect), unless prohibited by statute or regulation.

3.   Period of Performance Extensions

Extensions to the period of performance (POP) for this program are allowed. Extensions to the POP identified in the award will only be considered through formal, written requests to the recipient’s FEMA Preparedness Officer and must contain specific and compelling justifications as to why an extension is required. Recipients are advised to coordinate with the FEMA Preparedness Officer as needed when preparing an extension request. Please refer to the Preparedness Grants Manual for more detail on the requirements for submitting a POP extension request.