Pre-Disaster Mitigation Program FY 2017 Subapplication Status

This page provides the status of the Pre-Disaster Mitigation (PDM) planning and project subapplications that were submitted to FEMA for the Fiscal Year (FY) 2017 application cycle. FEMA's Hazard Mitigation Assistance (HMA) grant programs provide funding to protect life and property from future natural disasters. The PDM grant program is designed to implement a sustained predisaster natural hazard mitigation program to reduce overall risk to the population and structures from future hazard events, while also reducing reliance on Federal funding in future disasters.

For FY 2017, $100 million was appropriated for PDM. FEMA made available $90 million for grants. In March 2017, FEMA announced the application period from August 14-November 14, 2017 in the Notice of Funding Opportunity (NOFO) posted on www.grants.gov. The agency’s priorities for the FY 2017 PDM program are:

FEMA will select eligible subapplications up to the available PDM funding amount of
$90 million in the following order:

  1. Statutory allocation of $575,000 federal share for States, Territories and the District of Columbia (DC).

    To meet the statutory requirement, FEMA will select eligible planning and project subapplications from each state, territory and DC in order of the applicant’s rank (#1–x) to the lowest ranked subapplication that brings the total federal share to no more than $575,000 (see Other Eligibility Criteria subsection under section C of this NOFO).

For example, an Applicant’s #1 ranked subapplication for $200,000 Federal share and #2 ranked subapplication for $340,000 would be selected for the allocation; however, the #3 ranked subapplication for $575,000 and any other eligible subapplications would be considered on a competitive basis in priority category 3 below.

  1. Tribal set aside of $10 million for federally-recognized tribes, not to exceed $575,000 federal share per tribal applicant.

    FEMA will set aside $10 million for federally-recognized tribes applying directly to FEMA as applicants.  FEMA will select eligible planning and project subapplications for each tribal applicant in order of the tribe’s rank (#1–x) to the lowest ranked subapplication that brings the total federal share to no more than $575,000, not to exceed a total of $10 million.

  2. Competitive Funding.

    After meeting the statutory requirement for state/territory allocations and the tribal set aside, FEMA will select from the remaining eligible planning and project subapplications from all applicants on a competitive basis up to the available amount of funding.

If an applicant submits projects in excess of the limit for competitive consideration (see Other Eligibility Criteria subsection under section C of this NOFO), then FEMA will only review the highest ranked competitive project subapplications up to the limit.

FEMA will select subapplications for competitive funding in the following order:

  1. Multi-state/tribal mitigation initiatives.

    FEMA will select one eligible multi-state/tribal mitigation planning or project subapplication per applicant.

  2. Planning subapplications from applicants that have less than $400,000 Hazard Mitigation Grant Program (HMGP) planning funds available.

    FEMA will select eligible planning subapplications from applicants that have less than $400,000 HMGP planning funds available (see Hazard Mitigation Grant Program subsection in Section H of this NOFO).

  3. Project subapplications from applicants that have less than $4 million HMGP regular project funds available.

    FEMA will select eligible project subapplications from applicants that have less than $4 million HMGP regular project funds in the following order:

    1. Non-flood hazard (e.g., seismic, wildfire, landslide, wind and drought) mitigation projects

    2. Flood mitigation activities except acquisition, elevation, or mitigation reconstruction (e.g., stormwater management and flood control measures)

    3. Acquisition, elevation and mitigation reconstruction projects

    4. Generators for critical facilities identified in a FEMA-approved Mitigation Plan

  4. Planning subapplications from applicants that have $400,000 or more HMGP planning funds available.

    FEMA will select eligible planning subapplications from applicants that have $400,000 or more HMGP planning funds available.

  5. Project subapplications from applicants that have $4 million or more HMGP regular project funds available.

    FEMA will select eligible project subapplications from applicants that have $4 million or more HMGP regular project funds available in the following order:

    1. Non-flood hazard mitigation projects

    2. Flood mitigation activities except acquisition, elevation, or mitigation reconstruction

    3. Acquisition, elevation and mitigation reconstruction projects

    4. Generators for critical facilities identified in a FEMA-approved Mitigation Plan

FEMA will further prioritize planning and project subapplications in priority categories 2 and 3 above, as needed, in the following order:

  1. Subapplicant’s small impoverished community status (see Cost Share or Match subsection under section C of this NOFO);
  2. Indication of public-private partnership (i.e., whether private sector funding is included in the required non-federal cost share);
  3. Subapplicant’s FEMA-validated residential or commercial Building Code Effectiveness Grading Schedule (BCEGS) rating, as appropriate to the activity type, from a grade of 1 to 10;
  4. FEMA-validated Benefit Cost Ratio (BCR) for projects (see Benefit Cost Analysis for Mitigation Projects subsection under section D of this NOFO); and
  5. The applicant’s rank of subapplications (see Content and Form of Application Submission subsection under Section D of this NOFO).

For more information on BCEGS, please visit the Insurance Services Office - Mitigation website:  https://www.isomitigation.com/bcegs/iso-s-building-code-effectiveness-grading-schedule-bcegs.htm.

FEMA may select a subapplication out of priority order based upon one or more of the following factors:

  • Availability of funding;

  • Duplication of subapplications;

  • Program priorities and policy factors; and,

  • Other pertinent information.

To be eligible for the state/territory allocation or the tribal set aside, the applicant’s highest ranked planning or project subapplication must not have exceeded $575,000 Federal share.  There was no limit to the number of planning and project subapplications that applicants could have submitted for the state/territory allocation or tribal set aside up to $575,000 federal share, but the applicant must have ranked them higher than subapplications for competitive consideration. Applicants could not have included more than nine (9) project subapplications for competitive consideration over and above any project(s) submitted for the state/territory allocation or tribal set aside. 

Any applicant agency that was willing to serve as the applicant for multi-state or multi-tribal mitigation activities must have included one multi-state/tribal project subapplication(s) in their grant application for a maximum of ten (10) competitive projects, notwithstanding any project(s) that were submitted towards their state/territory allocation or tribal set aside.  Applicants who included multi-state/tribal subapplication(s) in their grant application must have clearly identified how the effort was coordinated.

FEMA received 532 subapplications from 88 applicants (35 of which were federally-recognized Indian Tribal Governments) totaling $261.6 million: 218 planning, 254 projects, and 60 applicant management costs. FEMA has completed its eligibility review to ensure compliance with HMA Guidance and has made selections based on the agency’s priorities and available funding. FEMA has identified for further review 346 PDM subapplications from 76 applicants (27 of which are Indian Tribal Governments): 204 planning, 87 projects, and 55 associated applicant management costs totaling $88.8 million.  FEMA selected (identified for further review) all eligible subapplications in priorities 1 through 3cii. Eligible subapplications in priority 3 were ranked in order by project type; small, impoverished community status; BCEGS rating; and BCR for selection. FEMA is unable to fund (not selected) the remaining eligible subapplications in priority 3.  The table below lists the submitted planning and project subapplications and the status of each alphabetically by applicant. Further explanation of the status is provided below the table.

ApplicantSubapplication Title Submitted Federal Share  Status 
AlabamaWalter Volunteer Fire Department Community Safe Room Site 1 $                    75,487.50Did Not Meet HMA Requirements
AlabamaSardis Volunteer Fire Department Community Shelter $                    75,600.00 Did Not Meet HMA Requirements
AlabamaNew Canaan Community Center Storm Shelter $                    76,237.50 Identified for Further Review 
AlabamaWalter Volunteer Fire Department Community Safe Room Site 2 $                    75,918.75 Did Not Meet HMA Requirements
AlabamaMadison County 2017 Community Safe Room OXR $                  116,250.00 Identified for Further Review 
Alabama501 Pierce St. Acquisition/Demolition $                    54,600.00 Identified for Further Review 
Alabama410 Scott Drive Acquisition/Demolition $                    84,600.00 Identified for Further Review 
AlaskaCity of Fairbanks Public Works Facility Emergency Generator $                  457,575.00 Did Not Meet HMA Requirements 
Alaska2017 LHMP Updates Block 1  $                  149,999.99 Identified for Further Review 
Alaska2017 LHMP Updates Block 2  $                  150,000.00 Identified for Further Review 
American SamoaFagaima Flood Mitigation Project $              4,000,000.00 Did Not Meet HMA Requirements 
Arizona2017-PDM-Clifton-Flood Wall Gate $                    83,250.00 Did Not Meet HMA Requirements 
Arizona2018 PDM St Johns LCR Channel Improvements $                  520,898.00 Did Not Meet HMA Requirements 
Arizona2017-PDM-Pinal County Sunland Gin Road Drainage Improvements $              1,208,625.00 Did Not Meet HMA Requirements 
ArizonaCatalina Ridge Channel Reconstruction $              1,296,571.23 Did Not Meet HMA Requirements 
Arizona2018 PDM Taylor Pinedale Wash $                  479,806.00 Identified for Further Review 
Arizona2017 PDM Snowflake Fire Station High School $                  403,539.00 Identified for Further Review 
Arizona2017-PDM-Phoenix_Mandan Street Flood Control Project   $                  692,377.50 Identified for Further Review 
Arizona2017-PDM-Phoenix_Palm Lane Storm Drain Mitigation Project $              1,597,234.00 Not Selected 
ArkansasCedar Ridge School District Safe Room $                  575,000.00 Identified for Further Review 
ArkansasCarroll County Educational Cooperative Hazard Mitigation Plan $                    26,250.00 Identified for Further Review 
ArkansasYell County Hazard Mitigation Plan Update $                    26,250.00 Identified for Further Review 
ArkansasOmaha K-12 Safe Room $                  859,911.96 Identified for Further Review 
ArkansasCutter Morning Star Public School Safe-room $                  847,200.00 Identified for Further Review 
ArkansasSafe Room Construction at UCA Bear Village, Conway, AR $                  975,000.00 Identified for Further Review 
Bear River Band of the Rohnerville RancheriaBear River Band of the Rohnerville Rancheria Multi-Hazard Mitigation Plan $                  135,036.65 Identified for Further Review 
Blue Lake RancheriaBlue Lake Rancheria Mitigation Plan Update $                  110,136.75 Identified for Further Review 
Bristol Bay Native Association  Phase II Tribal Multi-Hazard Mitigation Plans $                  352,209.75 Identified for Further Review 
Bristol Bay Native Association  BBNA Phase II Tribal Multi-Hazard Mitigation Plans $                  240,747.19 Identified for Further Review 
CaliforniaCity of Buellton Emergency Generator $                    46,950.00 Did Not Meet HMA Requirements 
CaliforniaRD 108 Main Office Emergency Back Up Generator $                    48,749.99 Did Not Meet HMA Requirements 
CaliforniaYolo County Housing Emergency Operations Center Generator Project $                    94,200.00 Did Not Meet HMA Requirements 
CaliforniaInstallation of emergency generator at City Hall in the City of Galt. $                  112,500.00 Did Not Meet HMA Requirements 
CaliforniaInstallation of Emergency Generator at the Police Department in the City of Galt $                  112,500.00 Did Not Meet HMA Requirements 
CaliforniaCity of Watsonville Levee Embankment Stabilization Project $              1,646,890.22 Did Not Meet HMA Requirements 
CaliforniaConstruction of Fullerton Creek Channel (A03) from Beach Blvd to d/s I-5 Freeway $              4,000,000.00 Did Not Meet HMA Requirements 
CaliforniaConstruction of C05 from d/s Edwards Street to d/s Goldenwest Street $              4,000,000.00 Did Not Meet HMA Requirements 
CaliforniaConstruction of C05 from Warner Avenue to 1000' d/s Edwards Street $              4,000,000.00 Did Not Meet HMA Requirements 
CaliforniaCity of San Bernardino City Hall Annex & Parking Structure Seismic Retrofitting  $              3,748,680.00 Did Not Meet HMA Requirements 
CaliforniaCity of Redlands Hazard Mitigation Plan $                  112,500.00 Identified for Further Review 
CaliforniaCity of Fountain  Valley Mutihazard Mitigation Plan $                    22,848.00 Identified for Further Review 
CaliforniaSan Luis Obispo County Multi-Jurisdictional Local Hazard Mitigation Plan $                  200,750.00 Identified for Further Review 
CaliforniaYolo County Hazard Mitigation Plan Update 2018 $                  250,000.00 Identified for Further Review 
CaliforniaCity of Garden Grove Local Hazard Mitigation Plan  $                    75,000.00 Identified for Further Review 
CaliforniaVallejo Local Hazard Mitigation Plan $                    87,160.80 Identified for Further Review 
CaliforniaCity of Villa Park Local Hazard Mitigation Plan $                    90,000.00 Identified for Further Review 
CaliforniaCity of Watsonville Local Hazard Mitigation Plan $                  112,500.00 Identified for Further Review 
CaliforniaSTPUD WWTP Emergency Generator Replacement Project $              1,142,986.00 Not Selected 
CaliforniaCity of Santa Barbara Scour Protection for Desalination Intake Pump Platforms $                  975,000.00 Not Selected 
CaliforniaSeismic Rehabilitation and Retrofit of Secondary Treatment Clarifiers  $              2,266,485.00 Not Selected 
CaliforniaCity of Chula Vista Emergency Management Program WUI Vegetation Management Proj. $              3,459,375.00 Not Selected 
Chemehuevi Indian TribeChemehuevi Mitigation Plan Update $                  148,500.00 Identified for Further Review 
Cherokee Nation Emergency ManagementCN Will Rogers Clinic Generator Project $                  144,751.87 Did Not Meet HMA Requirements 
Cherokee Nation Emergency ManagementCNEP Kenwood School Mitigation $                  126,111.75 Did Not Meet HMA Requirements 
Cherokee Nation Emergency ManagementStorm Safe Shelter $                  222,484.32 Identified for Further Review 
Chippewa Cree Tribe of Rocky Boy's ReservationChippewa Cree Tribe Pre-Disaster Mitigation Program CCTPDMP $                    28,873.00 Identified for Further Review 
ColoradoCity of Colorado Springs, Park Vista/Siferd Channel Improvements Project $              2,964,750.00 Did Not Meet HMA Requirements 
ColoradoRBC Hazard Mitigation Plan Update $                    36,000.00 Identified for Further Review 
ColoradoRoutt County Hazard Mitigation Plan Update $                    45,022.35 Identified for Further Review 
ColoradoThe City of Leadville and Lake County Hazard Mitigation Plan Update $                    37,500.00 Identified for Further Review 
ColoradoSE Colorado Regional Hazard Mitigation Plan Update $                    73,182.55 Identified for Further Review 
ColoradoAdams County Colorado Mitigation Plan Update $                    45,000.00 Identified for Further Review 
ColoradoOuray County Multi-Hazard Mitigation Plan Update $                    45,470.32 Identified for Further Review 
ColoradoHinsdale County / Town of Lake City Hazard Mitigation Planning Grant $                    37,500.00 Identified for Further Review 
ColoradoBoulder County Fire Adapted Communities $              1,215,630.82 Identified for Further Review 
ColoradoBoulder County Heil- Lichen Fuels Reduction Project $                  960,000.00 Identified for Further Review 
ColoradoRisk Reduction Spillway and Dam Safety Modifications at Lower Beaver Brook $              3,987,750.00 Identified for Further Review 
ColoradoCity of Colorado Springs, Pine Creek Stabilization and Restoration Project $              2,005,125.00 Identified for Further Review 
ColoradoCity of Colorado Springs, N Douglas Creek Stabilization Project $              2,612,325.00 Identified for Further Review 
ColoradoCOS Landslide Property Acquisition $              4,000,000.00 Not Selected 
ConnecticutPurchase and Installation of Generator at Sheehan EM, Wallingford-PDM2017 $                  335,899.00 Did Not Meet HMA Requirements 
ConnecticutTown of Madison Emergency Generator Replacement $                  105,029.10 Did Not Meet HMA Requirements 
ConnecticutBeach Street Raising $              3,973,502.14 Did Not Meet HMA Requirements 
ConnecticutRiverside Cleaners Dry Floodproofing, Watertown, CT $                    97,200.00 Did Not Meet HMA Requirements 
ConnecticutFairfield Beach Road Sanitary Pump Station $                  256,666.61 Did Not Meet HMA Requirements 
ConnecticutGreater Bridgeport Natural Hazard Mitigation Plan Update $                  112,500.00 Identified for Further Review 
Connecticutin Stratford-PDM2017  $              2,729,770.90 Identified for Further Review 
DelawareCity of Newark, DE Northwest Booster Station Mitigation Project $                    78,126.00 Identified for Further Review 
District of ColumbiaSolid Waste Transfer Station Back-up generators  $                  467,972.25 Did Not Meet HMA Requirements 
District of ColumbiaDistrict Hazard Mitigation Plan Microgrid Addendum $                  150,000.00 Did Not Meet HMA Requirements 
District of Columbia12th St and ME Ave Pump Station Hardening $                  818,078.94 Did Not Meet HMA Requirements 
District of ColumbiaFY17 DC State Hazard Mitigation Plan Update $                  150,000.00 Did Not Meet HMA Requirements 
FloridaFY 2017 PDM-Palm Beach County-EOC Retrofit $                    16,203.93 Did Not Meet HMA Requirements 
FloridaBroward County Mast Arm Conversion at Dixie Highway and Johnson Street $                  497,377.14 Identified for Further Review 
FloridaMiami-Dade County, FL Public Housing Palm Court Hardening Project   $              1,052,372.10 Not Selected 
FloridaMiami-Dade County, FL: Coral Reef Branch Library Hardening Project $                    64,317.60 Not Selected 
FloridaMiami-Dade County, FL: West Dade Regional Library Hardening Project $                  737,656.31 Not Selected 
FloridaMiami-Dade County, FL: Kendall Branch Library Hardening Project $                    90,251.29 Not Selected 
FloridaMiami-Dade County, FL: Miami Lakes Branch Library Hardening Project  $                  303,818.63 Not Selected 
FloridaMiami-Dade County, FL Public Housing Edison Plaza Hardening Project  $                  897,345.16 Not Selected 
FloridaMiami-Dade County, FL Public Housing Biscayne Plaza Hardening Project $                  778,024.50 Not Selected 
FloridaCalhoun County Local Mitigation Strategy and 510 Floodplain Management Planning $                    41,737.50 Identified for Further Review 
FloridaFY2017 PDM - Pasco County LMS Update $                  120,085.53 Identified for Further Review 
GeorgiaCobb County 2017 PDM Acquisition Project $                  441,365.00 Identified for Further Review 
Grand Traverse Band of Ottawa and Chippewa IndiansGTB PDM Project: Generators $                  569,500.00 Did Not Meet HMA Requirements 
GuamGCC Building 600  $              1,487,960.67 Did Not Meet HMA Requirements 
GuamPort Authority of Guam Mitigation Project $              1,123,186.11 Did Not Meet HMA Requirements 
GuamUpdate of 2014 Guam Hazard Mitigation Plan $                  187,344.83 Identified for Further Review 
HawaiiCity and County of Honolulu Mitigation Project $                    52,500.00 Did Not Meet HMA Requirements 
HawaiiCounty of Maui Multi-Hazard Mitigation Plan Update 2020 $                  121,000.00 Identified for Further Review 
HawaiiCounty of Kauai Hazard Mitigation Plan Update $                    75,000.00 Identified for Further Review 
HawaiiCounty of Hawaii Mitigation Plan Update $                  114,750.00 Identified for Further Review 
HawaiiWilcox Medical Center Generators $              4,000,000.00 Identified for Further Review 
IdahoBonner County Generator & Transfer Switch Project $                    79,872.37 Did Not Meet HMA Requirements 
IdahoCity of Coeur d'Alene, Veteran's Centennial Park Fuel Reduction Park Project $                    14,057.70 Did Not Meet HMA Requirements 
IdahoCity of Cottonwood Culvert Improvement Project $              2,413,053.00 Did Not Meet HMA Requirements 
IdahoStormwater Management Project, Hailey, Idaho $                  698,695.50 Did Not Meet HMA Requirements 
Idaho2017 Teton Critical Power PDM $                  374,775.00 Did Not Meet HMA Requirements 
IdahoInstallation of Backup Generators for Lake Water Treatment Facilities $                  241,077.00 Did Not Meet HMA Requirements 
IdahoAll Hazards Mitigation Plan Update $                    72,060.00 Identified for Further Review 
IdahoCanyon County AHMP Update $                    52,008.00 Identified for Further Review 
IdahoFY 2017 Pre-Disaster Mitigation Program $                    55,125.00 Identified for Further Review 
IdahoMadison County Multi-Jurisdiction All Hazard Mitigation Plan $                    26,250.00 Identified for Further Review 
IdahoWashington County, Idaho Multi Hazard Mitigation Plan $                    43,476.93 Identified for Further Review 
Illinois2017  Multijurisdictional Henderson County Mitigation Update $                    17,993.33 Identified for Further Review
IllinoisVillage of Carbon Cliff Pre-Disaster Mitigation Program  $                  574,999.80 Did Not Meet HMA Requirements 
IllinoisCity of Streator Riverside Area Flood Disaster Rehabilitation Project $                  315,237.00 Did Not Meet HMA Requirements 
IllinoisOttawa YMCA Floodwall $              1,159,114.00 Did Not Meet HMA Requirements 
IllinoisCook County Hazard Mitigation Plan Update 2019 $                  187,500.74 Identified for Further Review 
IllinoisChristian County Natural Hazard Mitigation Plan $                    45,887.72 Identified for Further Review 
IllinoisCarroll County Natural Hazard Mitigation Plan Update $                    56,170.37 Identified for Further Review 
IllinoisLivingston County Multi-Hazard Mitigation Plan $                    46,213.92 Identified for Further Review 
IllinoisCalhoun County Natural Hazard Mitigation Plan $                    35,008.32 Identified for Further Review 
IllinoisCity of Des Plaines FY2017 FMA Fire Station $              1,508,655.00 Identified for Further Review 
Illinois2017 Lake County Multi-Hazard Acquisition Project $              1,196,983.50 Identified for Further Review 
IllinoisCity of Des Plaines FY2017 FMA Buyout $              3,722,297.98 Identified for Further Review 
IllinoisMason Co. Flood Mitigation Buy-Out $                  430,675.02 Identified for Further Review 
IllinoisCrestwood: Gardens Subdivision Drainage/Stormwater Management Project $              2,500,000.00 Identified for Further Review 
IllinoisVillage of Robbins Flood Mitigation and Renewal Project $              4,000,000.00 Identified for Further Review 
Indian Tribal GovernmentSisseton Wahpeton Sioux Tribe PDM Plan $                    13,408.80 Identified for Further Review 
IndianaCity of Decatur 2017 Evergreen Court Flood Mitigation Project $                  448,500.00 Identified for Further Review - Reconsideration
IndianaMorgan Co Acq PDMC 2017 $              1,820,550.00 Did Not Meet HMA Requirements 
IndianaIndiana State Multi-Hazard Mitigation Plan Update $                  297,000.00 Identified for Further Review 
IndianaIndiana County MHMP Updates - PDMC 17 $                  254,344.78 Identified for Further Review 
IndianaMaumee Scout Reservation Community Safe Room $              1,159,150.50 Identified for Further Review 
IndianaDecatur 2017-1 PDM Acquisition Project $                  707,493.75 Identified for Further Review 
IndianaCity of Fort Wayne 2017 Junk Ditch Flood Acquisition Project $                  745,560.00 Identified for Further Review 
IndianaDecatur 2017-2 PDM Acquisition Project  $                  610,818.75 Identified for Further Review 
IndianaCity of Fort Wayne 2017 St. Marys River Flood Acquisition Project  $                  481,462.50 Identified for Further Review 
IowaTIP Mitigation for Electrical Distribution Lines $                  353,137.00 Did Not Meet HMA Requirements 
IowaAdair, Audubon and Guthrie County Multi Jurisdiction Hazard Mitigation Plan $                    30,000.00 Identified for Further Review 
IowaPlymouth, Cherokee, Woodbury, Ida, and Monona Counties Regional Mitigation Plan $                    90,015.00 Identified for Further Review 
IowaCrawford, Carroll, Greene, and Sac County Multi-J Hazard Mitigation Plan $                    66,750.00 Identified for Further Review 
Jamestown S'Klallam TribeJamestown S'Klallam Tribe Multi-Hazard Mitigation Plan Update $                    29,100.24 Identified for Further Review 
Jicarilla Apache NationJicarilla Apache Nation Multi Hazard Mitigation Plan $                  206,000.00 Identified for Further Review 
KansasCrawford County State Park Safe Room $                  262,500.00 Identified for Further Review 
KansasAnderson County/Harris Saferoom Project $                    30,000.00 Identified for Further Review 
KansasLucas-Sylvan safe room $                  178,425.00 Identified for Further Review 
KansasState of Kansas Regional Multihazard Mitigation Plan Updates $                  253,249.50 Identified for Further Review 
Kaw NationKaw Nation Pre-Disaster Storm Shelter and Preparedness Project $                  213,750.75 Identified for Further Review 
Kenaitze Indian Tribe (IRA)Kenaitze PDM Planning $                  111,371.40 Identified for Further Review 
KentuckyBuffalo Trace Regional Hazard Mitigation Plan Update $                    56,250.00 Identified for Further Review 
KentuckyGRADD Hazard Mitigation Plan Update $                    75,000.00 Identified for Further Review 
KentuckyUniversity of Louisville Hazard Mitigation Plan Update 2018 $                    89,744.00 Identified for Further Review 
KentuckyCity of Shepherdsville $                    46,785.00 Identified for Further Review 
KentuckyKentucky Community & Technical College System Hazard Mitigation Plan Update $                  300,000.00 Identified for Further Review 
KentuckyMulti-Jurisdictional Hazard Mitigation Plan for Landslides for the Big Sandy ADD $                  300,212.00 Identified for Further Review 
KentuckyCity of Paintsville Hazard Mitigation Plan for Mitigation Strategy Alternatives $                  150,000.00 Identified for Further Review 
KentuckyLouisville Metro Hazard Mitigation Plan Risk Assessment Plan Update $                    86,167.50 Identified for Further Review 
LouisianaSecond Harvest Food Bank Wind Retrofit $                  600,000.00 Did Not Meet HMA Requirements 
LouisianaMarvin Braud Pump Station Storm Surge Protection $              2,925,000.00 Did Not Meet HMA Requirements 
LouisianaAbbeville General Hospital - Rural/Women's Clinic Generator $                  263,594.00 Did Not Meet HMA Requirements 
LouisianaSt. Charles Parish Multi-Hazard Mitigation Plan Update $                    63,450.00 Identified for Further Review 
LouisianaTangipahoa Parish Stormwater Project Development Plan $                    56,250.00 Identified for Further Review 
LouisianaOrleans Parish Multi-Jurisdictional Hazard Mitigation Plan Project $                  327,450.00 Identified for Further Review 
LouisianaAbbeville General Hospital - Main Hospital Generator $                  814,673.00 Not Selected 
Lower Brule Sioux TribeLower Brule Sioux Tribe Multi-Hazard Mitigation Plan $                    36,878.25 Identified for Further Review 
MaineGood Shepherd Food Bank Generator $                  123,750.00 Did Not Meet HMA Requirements 
MaineUniversity of Maine System HM Plan - 2018 Update $                    15,000.00 Identified for Further Review 
MarylandCrisfield Tide Gates, Stormwater Infrastructure Repairs, and Pumping Stations $                  987,610.50 Did Not Meet HMA Requirements 
MarylandTown of Betterton Shoreline Erosion Mitigation Project $                  481,908.96 Identified for Further Review 
MarylandTown of Union Bridge Emergency Generator $                    73,387.50 Identified for Further Review 
MassachusettsCity of Brockton Generator for Critical Facility  $                    61,779.37 Did Not Meet HMA Requirements 
MassachusettsPeabody Russell Street Pump Station Improvements $                  586,425.00 Did Not Meet HMA Requirements 
MassachusettsHull, MA 2017 PDM WWTP Resiliency Project  $              4,000,000.00 Did Not Meet HMA Requirements 
MassachusettsAdams Shore and Houghs Neck Seawall Improvements $              3,992,340.00 Did Not Meet HMA Requirements 
MassachusettsLevel of Protection Improvements for the Moon Island Sea Wall  $              3,699,059.25 Did Not Meet HMA Requirements 
MassachusettsTisbury MA, Beach Road Seawall Improvments $              3,988,616.00 Did Not Meet HMA Requirements 
MassachusettsWestern Region Multi Hazard Mitigation Planning $                  215,875.00 Identified for Further Review 
MassachusettsCommonwealth of Massachusetts PDM17 Local Hazard Mitigaiton Planning $                  210,933.28 Identified for Further Review 
MassachusettsTown of Conway-Delabarre Avenue Slope Stabilization $                  252,207.51 Not Selected 
MassachusettsTiffany Street Stream Channel Improvements  $                  230,265.00 Not Selected 
MassachusettsSouth Branch Parkway Drainage Improvements $                  577,552.50 Not Selected 
MassachusettsTown of Hopkinton MA - Lake Maspenock Dam Upgrades $              1,780,653.75 Not Selected 
MichiganCounty of Bay Hazard Mitigation Plan Update $                    43,213.50 Identified for Further Review 
MichiganUpdate Hazard Mitigation Plans for Chippewa, Luce & Mackinac Counties $                    30,000.00 Identified for Further Review 
MichiganHuron County MI Hazard Mitigation $                    27,656.25 Identified for Further Review 
MichiganKalamazoo County Hazard Mitigation Plan Update $                    22,837.50 Identified for Further Review 
Michigan2018 City of Luna Pier Elevation Project  $                  252,135.00 Identified for Further Review 
MichiganNE Michigan Hazard Mitigation Plans - 5 Year Update $                    99,840.00 Identified for Further Review 
MichiganUpdate to the Wayne County Hazard Mitigation Plan $                    83,759.00 Identified for Further Review 
MichiganDual-Use Safe Rooms and Toilet/Shower Buildings in Various State Parks $              1,124,348.00 Identified for Further Review 
MichiganCentral Michigan University South Campus Mitigation Project $                  680,913.00 Identified for Further Review 
MichiganPhase 4 Storm Shelter2017 $              2,876,617.56 Identified for Further Review 
MichiganCity of Monroe River Raisin Heritage Corridor Pre-Disaster Mitigation Project $                  493,325.43 Identified for Further Review 
MichiganLittle Tobacco Intercounty Drain $              1,653,220.00 Identified for Further Review 
MichiganEstral Beach 2017 PDM   $                  923,473.50 Identified for Further Review 
Minnesota2017 HSEM Plan Updates for 10 Counties $                  283,500.00 Identified for Further Review 
Mississippi Forrest Heights Levee Project-#2 $              3,999,999.98 Did Not Meet HMA Requirements 
MissouriNeosho School District Safe Room-Goodman Elementary $              1,125,000.00 Identified for Further Review 
MissouriSparta R-III School District Community Safe Room $              1,458,000.00 Identified for Further Review 
MissouriMiller R-II School District - Miller High School Community Safe Room $                  924,750.00 Identified for Further Review 
Moapa Band of PaiutesMoapa Band of Paiutes Generator Installation Construction Project $                    77,940.00 Did Not Meet HMA Requirements 
MontanaNinemile Creek Drought Mitigation Project $              1,200,000.00 Did Not Meet HMA Requirements 
MontanaSanders/Lake County Mitigation Plan update $                    37,500.00 Identified for Further Review 
MontanaFallon County and Carter County Mitigation Plan Update  $                    49,999.99 Identified for Further Review 
MontanaCarbon County Montana PDM Plan Update $                    25,000.00 Identified for Further Review 
MontanaFort Belknap Indian Community $                    25,000.00 Identified for Further Review 
MontanaLincoln County PDM Grant $                    24,999.67 Identified for Further Review 
MontanaGranite County PDM Plan $                    24,999.99 Identified for Further Review 
MontanaCity of Deer Lodge Cottonwood Creek Property Acquisition $                  232,500.00 Identified for Further Review 
Muscogee (Creek) NationMuscogee Creek Nation Mitigation Project $                  283,298.25 Did Not Meet HMA Requirements 
Native Village of KwigillingokNative Village of Kwigillingok Pre Disaster Mitigation Project $                  253,190.00 Identified for Further Review 
NebraskaHamilton-Seward-York Multihazard Mitigation Project $                    60,000.00 Identified for Further Review 
NebraskaLower Elkhorn Natural Resources District Hazard Mitigation Plan Update $                  150,000.43 Identified for Further Review 
NebraskaLPNNRD Hazard Mitigation Project $                  200,038.50 Identified for Further Review 
NebraskaUpper Loup NRD Multihazard Mitigation Project $                    64,935.00 Identified for Further Review 
NebraskaLower Platte South NRD Hazard Mitigation Plan Update $                    60,000.00 Identified for Further Review 
NevadaPDM - CNLV Oak Island Storm Drain Mitigation Project $              1,493,250.00 Did Not Meet HMA Requirements 
NevadaDouglas County - Smelter Creek Regional Flood Control Project PDM Nov 9 2017 $              2,473,650.00 Did Not Meet HMA Requirements 
NevadaNye County Multihazard Mitigation Plan Update $                    77,462.29 Identified for Further Review 
NevadaDouglas County Hazard Mitigaton Plan Update $                    45,173.31 Identified for Further Review 
NevadaWashoe County Multi-Jurisdictional Hazard Mitigation Planning $                  225,000.00 Identified for Further Review 
NevadaMulti-Jurisdictional Hazard Mitigation Plan; Humboldt, Pershing, Lander Counties $                    60,000.01 Identified for Further Review 
New HampshireKnights Brook Culvert Replacement $                  221,250.00 Did Not Meet HMA Requirements 
New HampshireTuttle Road Culvert Replacement and Bank Stabilization $                  381,656.25 Did Not Meet HMA Requirements 
New HampshirePecor Road and Old Cheshire Turnpike Culvert Replacment $                  203,962.50 Did Not Meet HMA Requirements 
New HampshireFFY 2017 Local Hazard Mitigation Plan Updates  $                  250,497.75 Identified for Further Review 
New HampshireCity of Somersworth, Emergency Backup Generator-DPW Facility $                    43,500.00 Identified for Further Review 
New JerseyOceanport Flood Reduction Initiative $                  855,876.37 Did Not Meet HMA Requirements 
New JerseyCity of Somers Point Pump Station Replacement $                  169,275.00 Did Not Meet HMA Requirements 
New JerseyCity of Somers Point Exton Road Pump Station $                  260,172.00 Did Not Meet HMA Requirements 
New JerseyVentnor Pump Station $                    15,187.50 Did Not Meet HMA Requirements 
New JerseyBrigantine PDM Project $                  140,211.75 Did Not Meet HMA Requirements 
New Jersey2017 PDM Carteret Middle School Generator $                  223,969.00 Did Not Meet HMA Requirements 
New JerseyMorris County Hazard Mitigation Plan Update $                  126,000.00 Identified for Further Review 
New JerseyPassaic County And All Municipalities Hazard Mitigation Plan Update 2020 $                  126,000.00 Identified for Further Review 
New JerseyAtlantic County Multi-Jurisdictional Hazard Mitigation Plan Update $                  126,000.00 Identified for Further Review 
New JerseyUnion County Multi-Jursticitional Hazard Mitigation Plan $                  126,000.00 Identified for Further Review 
New Jersey Stream Bank Stabilization to protect Pleasant Valley Road in Marlboro Township $                  420,236.00 Identified for Further Review 
New JerseyRehabilitation of the Laurel Brook Wastewater Pump Station $                  393,000.00 Identified for Further Review 
New JerseyPleasantville PDM Pump generator $                  187,500.00 Identified for Further Review 
New MexicoUpper Bosque de Bernalillo Flood Control  $                  395,604.91 Identified for Further Review - Reconsideration 
New MexicoChaves County Hazard Mitigation Plan $                    37,500.00 Identified for Further Review 
New MexicoDona Ana County Hazard Mitigation Plan $                    60,000.00 Identified for Further Review 
New MexicoMcKinley County Hazard Mitigation Plan $                    37,500.00 Identified for Further Review 
New MexicoSan Juan County Hazard Mitigation Plan $                    48,727.43 Identified for Further Review 
New MexicoSan Miguel County HMP $                    41,250.00 Identified for Further Review 
New MexicoCity of Santa Fe Hazard Mitigation Plan Update $                    37,500.00 Identified for Further Review 
New MexicoUnion County HMP $                    37,499.98 Identified for Further Review 
New YorkVillage of Freeport PDM Infrastructure Flood Protection Project $                  282,837.30 Identified for Further Review 
New YorkOrleans County Multijurisdictional Multihazard Mitigation Plan $                  112,500.00 Identified for Further Review 
New YorkFallsburg Water Well Auxiliary Power Initiative $                    52,500.00 Identified for Further Review 
New YorkJefferson County Multi-Jurisdictional Hazard Mitigation Plan $                  225,000.00 Identified for Further Review 
New YorkCortland County Multi- Jurisdictional All- Hazard Mitigation Plan $                  112,500.00 Identified for Further Review 
New YorkCattaraugus County Multi-Jurisdictional Hazard Mitigation Plan $                  112,500.00 Identified for Further Review 
New YorkTompkins County (NY) Hazard Mitigation Plan Update $                    93,750.00 Identified for Further Review 
New YorkPre-Disaster Mitigation-PDM Cayuga County $                    84,375.00 Identified for Further Review 
New YorkWyoming County Multi-Jurisdictinal All-Hazard Plan $                    75,000.00 Identified for Further Review 
New YorkSuffolk County Multi-Jurisdiction Hazard Mitigation Plan Update $                  300,000.00 Identified for Further Review 
New YorkNassau County Natural Hazard Mitigation Plan Update  $                  206,250.00 Identified for Further Review 
New YorkWayne County Multi-Hazard Plan Update $                  112,500.00 Identified for Further Review 
New YorkOneida County Hazard Mitigation Plan Update $                    97,500.00 Identified for Further Review 
New YorkClinton County Pre-Disaster Multi-Jurisdictional Hazard Mitigation Plan $                    75,000.00 Identified for Further Review 
New YorkPutnam County Ny Pre-Disaster Mitigation-PDM plan $                  112,500.00 Identified for Further Review 
New YorkSchenectady County Pre-Disaster Mitigation-PDM $                  112,725.00 Identified for Further Review 
New YorkPDM - NYC Hazard Mitigation Plan Enhancements 2019 $                  300,000.00 Identified for Further Review 
New York2017 PDM Town of East Fishkill Acquisition of 3 Properties $                  628,256.25 Identified for Further Review 
Newtok Village CouncilNewtok-Mertarvik Relocation Housing Construction  $                  517,499.97 Identified for Further Review 
North CarolinaUniversity of North Carolina - Western Campuses Multi-jurisdictional HM Plan  $                  250,000.00 Identified for Further Review - Reconsideration 
North CarolinaUniversity of North Carolina - Eastern Campuses Multi-jurisdictional HM Plan $                  250,000.00 Identified for Further Review 
North DakotaNDDES Alt SEOC, State Radio, and NDDoH Facility Generator $                  263,290.23 Did Not Meet HMA Requirements 
North DakotaNDDES Critical Facility Generators (EOC, FD, PD, EMS) $                  819,433.59 Did Not Meet HMA Requirements 
North DakotaMcIntosh County Generators $                  133,629.75 Did Not Meet HMA Requirements 
North DakotaCity of Fargo Raw Water Intake Flood Mitigation $              4,000,000.00 Did Not Meet HMA Requirements 
North DakotaCity of Flasher Lift Station Generator $                    10,818.00 Identified for Further Review 
North DakotaCity of Grafton 2017 PDM Project  $                  168,765.00 Identified for Further Review - Second Selection
North DakotaNelson County -- Nodak Electric Line Burial $                    80,775.00 Identified for Further Review 
North DakotaCass County Multi-Hazard Mitigation Plan Update $                    40,500.00 Identified for Further Review 
North DakotaOliver County MHMP Update $                    18,819.61 Identified for Further Review 
North DakotaDickey County MHMP Update $                    20,500.00 Identified for Further Review 
North DakotaHettinger County MHMP Update $                    25,300.00 Identified for Further Review 
North DakotaBillings-Dunn-Golden Valley-Stark Counties MHMP $                    75,000.00 Identified for Further Review 
North DakotaLaMoure County MHMP Update $                    26,707.15 Identified for Further Review 
North DakotaAdams County MHMP Update $                    24,000.00 Identified for Further Review 
North DakotaBurke-Divide Multijurisdictional Hazard Mitigation Plan $                    42,900.00 Identified for Further Review 
North DakotaStorm Shelters $                  157,320.00 Identified for Further Review 
North DakotaUniversity of Mary Slope Stability Project $              2,844,888.75 Identified for Further Review 
North DakotaUnity Medical Center - 2017 Generator Project $                  390,798.00 Did Not Meet HMA Requirements
North DakotaGenerator for the Main Lift Station - Jamestown, North Dakota $                  190,360.43 Identified for Further Review 
North DakotaGenerator for the Central Valley Health District - Jamestown, North Dakota $                    74,094.10 Identified for Further Review 
North DakotaWashburn Intake Improvements $              1,026,025.00 Identified for Further Review 
Northern Mariana Islands Rota Health Center Building Structural Exterior Hardening- Windows and Doors $                    48,516.04 Identified for Further Review 
Northern Mariana IslandsTinian Health Center Storm Readiness Project  $                    30,000.00 Identified for Further Review 
Northern Mariana IslandsCNMI Department of Labor Storm Shutter Protection Project $                    12,297.60 Identified for Further Review 
Northern Mariana IslandsPedro P. Tenorio Multi-Purpose Center Storm Readiness Project  $                    90,951.00 Identified for Further Review 
Northern Mariana IslandsDepartment of Public Safety Storm Shutter Project $                    13,612.50 Identified for Further Review 
Northern Mariana IslandsSadog Tasi Wastewater Facility Storm Shutter Project $                    21,795.95 Identified for Further Review 
Northern Mariana Islands Aging Center (Man Amko)  Storm Shutter Project  $                    24,952.50 Identified for Further Review 
Northern Mariana Islands Tinian Youth Center  Storm Shutter Project  $                    28,957.51 Identified for Further Review 
OhioVillage of Hebron: PDM Sunny Acres Floodplain Restoration and Wetland Creation $                  207,000.00 Identified for Further Review 
OhioVillage of Ottawa PDM FY17 Flood Mitigation $                  237,265.46 Identified for Further Review 
OhioCity of North Olmsted PDM Acquisition Project $                  101,340.00 Identified for Further Review 
OhioOhio Safe Room Rebate Program PDM 17 (Set-A-Side) $                    29,394.53 Identified for Further Review 
OhioState of Ohio Hazard Mitigation Plan Update $                  299,950.08 Identified for Further Review 
OhioState of Ohio 18-County Hazard Mitigation Plan Update- Part 1, Contractual $                  380,224.34 Identified for Further Review 
OhioState of Ohio 18-County Hazard Mitigation Plan Update- Part 2, In-house $                    34,661.93 Identified for Further Review 
OhioOhio Safe Room Rebate Program PDM 17 (Competitive) $                  563,190.00 Identified for Further Review 
OhioDefiance County PDM Community Safe Room Project $                  607,955.62 Identified for Further Review 
OhioCity of Euclid Erosion Mitigation Project $              2,670,712.50 Identified for Further Review 
OhioVillage of Valley View 2017 PDM Project $              2,452,005.00 Identified for Further Review 
OhioZimber Ditch Flood Mitigation Assistance Project $                  737,090.62 Identified for Further Review 
OhioDelhi Township Rapid Run #3 PDM FY17 Acquisition Project $              2,974,944.00 Identified for Further Review 
Ohio2017 Tinkers Creek PDM Hazard Mitigation Project $                  267,720.71 Identified for Further Review 
OhioMarion County Multihazard Mitigation Project $                    41,700.00 Identified for Further Review 
OhioCity of Sharonville Flood Mitigation Project $              1,927,027.02 Not Selected 
OregonPDM 17 Oregon NHMP Update $                  300,000.00 Identified for Further Review 
OregonPDM17 Planning Regions 1 and 7 $                  270,091.00 Identified for Further Review 
OregonSeismic Retrofit of Grand Butte Reservoir and Pipeline $              2,216,198.40 Identified for Further Review 
Paskenta Band of Nomlaki IndiansPaskenta Band of Nomlaki Indians Mitigation Plan $                  126,928.00 Identified for Further Review 
PennsylvaniaWest Mead Township Emergency Generator Project $                    30,834.75 Did Not Meet HMA Requirements 
Pennsylvania2017 PDM City of Coatesville Generator $                    43,500.00 Did Not Meet HMA Requirements 
PennsylvaniaProposed Closure Structure Modifications Project $                  540,543.75 Did Not Meet HMA Requirements 
Pennsylvania2017 - PDM  $                  251,775.00 Did Not Meet HMA Requirements 
PennsylvaniaNew Brighton Borough Streambank Restoration Project $                    93,393.75 Did Not Meet HMA Requirements 
PennsylvaniaSullivan County HMGP - All Hazards Plan Update $                    33,750.00 Identified for Further Review 
PennsylvaniaPerry County Multi-Hazard Mitigation Plan $                    29,250.00 Identified for Further Review 
PennsylvaniaForest County Hazard Mitigation Plan Update $                    11,062.50 Identified for Further Review 
PennsylvaniaWestmoreland County Hazard Mitigation Plan Update $                    65,001.00 Identified for Further Review 
PennsylvaniaMifflin County Multihazard Plan $                    30,000.00 Identified for Further Review 
PennsylvaniaBradford County Hazard Mitigation Plan Update $                    45,000.00 Identified for Further Review 
PennsylvaniaUnion County Hazard Mitigation Plan Update $                    33,750.00 Identified for Further Review 
PennsylvaniaJuniata County Hazard Mitigation Plan Update $                    37,500.00 Identified for Further Review 
PennsylvaniaAdams County Hazard Mitigation Plan Update $                    45,000.00 Identified for Further Review 
PennsylvaniaCumberland County Hazard Mitigation Plan Update $                    37,500.00 Identified for Further Review 
PennsylvaniaFulton County Hazard Mitigation Plan Update $                    30,000.00 Identified for Further Review 
PennsylvaniaLuzerne County Hazard Mitigation Plan 2019 Update  $                    56,250.00 Identified for Further Review 
Port Gamble S'Klallam TribePGST Plan Update with Coastal Storm and Landslide Risk including Sea Level Rise $                  150,000.00 Identified for Further Review 
Pueblo of IsletaHazard Mitigation Planning $                    85,000.00 Identified for Further Review 
Puerto RicoGenerators for ASEM services $                  484,987.82 Did Not Meet HMA Requirements 
Quapaw Tribe of OklahomaQuapaw Tribe Community Saferooms $                  289,306.50 Did Not Meet HMA Requirements 
Quileute TribeQuileute Emergency Generators Mitigation Project $                  291,349.53 Identified for Further Review 
Quinault Indian NationQuinault Indian Nation Pre-Disaster Mitigation Project $                  477,764.08 Did Not Meet HMA Requirements 
Sac and Fox Tribe of the Mississippi in IowaAssessment of the groundwater and surface water resources within the Settlement $                  134,346.83 Did Not Meet HMA Requirements 
Saginaw Chippewa Indian Tribe of MichiganSaginaw Chippewa Indian Tribe of Michigan Pre Disaster Mitigation Planning Grant $                    97,087.39 Identified for Further Review 
Santa Clara PuebloSanta Clara Pueblo PK Crossing Culvert and Stream Restoration $                  431,249.94 Did Not Meet HMA Requirements 
Scotts Valley Band of Pomo IndiansScotts Valley Band of Pomo Indians Multi-Tribal Hazard Mitigation Plan $                  400,000.00 Identified for Further Review 
Seldovia Village TribeSeldovia Village Tribe: Tribal Mitigation Planning Project  $                  128,578.42 Identified for Further Review 
Shoalwater Bay Indian TribeVertical Evacuation Tower $              2,281,860.00 Identified for Further Review 
Shoalwater Bay Indian TribeDefensible Spaces Project $                    69,200.52 Identified for Further Review 
Shoalwater Bay Indian TribeGenerator Backup Systems $                  143,430.00 Identified for Further Review 
Soboba Band of Luiseño IndiansSoboba Band of Luiseno Indians Mitigation Project Line J $                  552,392.96 Identified for Further Review 
South CarolinaCity of West Columbia Soil Stabiliazation Project $                  229,500.00 Did Not Meet HMA Requirements 
South CarolinaMarion County Back Up Power Source $                  274,323.00 Did Not Meet HMA Requirements 
South CarolinaTown of Edisto Beach Myrtle Street Pre Disaster Mitigation Project $                  548,456.55 Did Not Meet HMA Requirements 
South CarolinaPurchase Mobile Generators & Install Exterior Docking Stations $                    99,123.28 Did Not Meet HMA Requirements 
South CarolinaWinthrop University All-Hazard Mitigation Plan $                    82,500.00 Identified for Further Review 
South CarolinaSumter County SC Water Systems Backup Power $                    75,325.50 Identified for Further Review 
South CarolinaDaufuskie Island Fire Department Retrofit Mitigation Project $                    62,090.56 Identified for Further Review - Reconsideration 
South CarolinaLLCS Lift Station/Grinder Pump $                    76,500.00 Identified for Further Review 
South CarolinaSCDMV Pre-Disaster Mitigation Grant- Install Exterior Hurricane Shutters $                  138,090.75 Identified for Further Review 
South DakotaHungry Hollow Storm Sewer Improvements $                  974,906.25 Did Not Meet HMA Requirements 
South DakotaCrow Creek Sioux Tribe Tornado Safe Rooms $                    24,600.00 Identified for Further Review 
South DakotaCity of Faulkton Storm Shelter $                  138,881.25 Identified for Further Review 
South DakotaFlandreau Safe Room Number 2 $                  167,766.00 Identified for Further Review 
South DakotaGann Valley Tornado Safe Room $                      3,075.00 Identified for Further Review 
South DakotaParkston Depot Street Structure Relocation $                    24,037.00 Identified for Further Review 
South DakotaTodd County/Rosebud Sioux Tribe PDM Plan Update  $                    11,250.00 Identified for Further Review 
South DakotaBennett County PDM Plan Update $                      7,500.00 Identified for Further Review 
South DakotaClay County PDM Plan Update  $                    12,900.00 Identified for Further Review 
South DakotaWarhawk District PDM Plan Update $                    35,250.00 Identified for Further Review 
South DakotaMcCook County PDM Plan Update $                    12,900.00 Identified for Further Review 
South DakotaMellette County PDM Plan Update $                      6,000.00 Identified for Further Review 
South DakotaTurner County PDM Plan Update $                    12,900.00 Identified for Further Review 
South DakotaUnion County PDM Plan Update $                    12,900.00 Identified for Further Review 
South DakotaClark County PDM Plan Update  $                    13,102.50 Identified for Further Review 
South DakotaSpink County PDM Plan Update $                    11,250.00 Identified for Further Review 
South DakotaMiner County PDM Plan Update $                    11,602.50 Identified for Further Review 
South DakotaBrookings County PDM Plan Update $                    11,283.75 Identified for Further Review 
South DakotaKingsbury County PDM Plan Update $                    11,782.50 Identified for Further Review 
South DakotaRoberts County PDM Plan Update $                    11,643.75 Identified for Further Review 
South DakotaHamlin County PDM Plan Update $                    10,777.50 Identified for Further Review 
South DakotaMarshall County PDM Plan Update $                    11,250.00 Identified for Further Review 
South DakotaMcPherson County PDM Plan Update $                    11,250.00 Identified for Further Review 
South DakotaRapid City Fire Department Ignition Resistant Roofing Project $                  140,886.96 Identified for Further Review 
Stillaguamish Tribe of IndiansStillaguamish Tribe of Indians of Washington Pre-disaster Planning $                    74,808.00 Identified for Further Review 
TennesseeMadison County Safe Room Project $              1,085,702.25 Did Not Meet HMA Requirements 
TennesseeSequatchie County Multi-Jurisdictional Hazard Mitigation Plan Update - 2018 $                    49,434.00 Identified for Further Review 
TexasPDM - Leon County Generator $                  255,543.75 Did Not Meet HMA Requirements 
TexasCity of Fort Worth Central Arlington Heights PDM $              4,000,000.00 Did Not Meet HMA Requirements 
TexasHill County Hazard Mitigation Plan Project $                    49,500.00 Identified for Further Review 
TexasLimestone County Texas Hazard Mitigation Plan Project $                    40,500.00 Identified for Further Review 
TexasFalls County Hazard Mitigation Plan Project $                    30,000.00 Identified for Further Review 
TexasFreestone County Hazard Mitigation Plan Project $                    40,125.00 Identified for Further Review 
TexasHazMAP Updates for Erath, Hood, and Hunt Counties $                  184,499.95 Identified for Further Review 
TexasHazMAP Update for Palo Pinto and Parker Counties $                  139,500.00 Identified for Further Review 
TexasTravis County Texas 2017 Wildfire $                  453,307.50 Not Selected 
Tulalip Tribes of WashingtonTulalip Tribes of Washington Hazard Mitigation Plan Update $                  110,432.22 Identified for Further Review 
Turtle Mountain Band of ChippewaTurtle Mountain Multihazard Mitigation Update $                    37,500.00 Identified for Further Review 
Upper Sioux Community (Indian Reservation)Upper Sioux Community Storm Safe Shelter $                  564,754.50 Did Not Meet HMA Requirements 
Upper Skagit Indian TribeUpper Skagit Indian Tribe Hazard Mitigation Plan Update $                  150,000.00 Identified for Further Review 
Upper Skagit Indian TribeWater System Seismic Retrofits $                  306,315.00 Identified for Further Review 
UtahCity of Woods Cross Land Subsidence Project $                  386,920.00 Did Not Meet HMA Requirements 
UtahPerry City Flood Control District Debris Flow Mitigation Project  $                  675,937.50 Did Not Meet HMA Requirements 
UtahCarbon Count Generator Project  $                    84,000.00 Did Not Meet HMA Requirements 
UtahEaglepointe Landslide Mitigation in the City of North Salt Lake $              2,143,093.14 Did Not Meet HMA Requirements 
UtahCity of Saratoga Springs Emergency Generators for Water Infrastructure  $                  171,000.00 Identified for Further Review 
UtahSalt Lake City Fix the Bricks $              1,916,395.50 Identified for Further Review 
UtahCity of North Ogden Flashflood/Runoff Mitigation Project $                  874,695.00 Identified for Further Review 
UtahSalt Lake County Multi-Jurisdiction Multi-Hazard Mitigation Plan $                    76,500.00 Identified for Further Review 
UtahSix County Association of Governments Hazard Mitigation Plan Update $                    78,562.50 Identified for Further Review 
UtahPre-Disaster Mitigation Plan Update for the Bear River Region, Utah $                    90,000.00 Identified for Further Review 
UtahWest Haven City Flood Mitigation Grant $                  615,249.00 Identified for Further Review 
UtahCity of Saratoga Springs Flood Hazard Mitigation  $                  916,719.75 Identified for Further Review 
VermontNewton Road Flood Mitigation $                  376,661.25 Identified for Further Review 
VermontState of Vermont Local Hazard Mitigation Plan Development $                  117,187.50 Identified for Further Review 
VermontTown of Wardsboro Buyout Mitigation Project $                    58,575.00 Identified for Further Review 
VermontBrownington Generator 2017 $                    22,500.53 Identified for Further Review 
VermontNewton Road Acquisitions (2) $                  306,933.75 Not Selected 
Virgin IslandsTank #2 Hurricane Mitigation Project $                  219,600.00 Did Not Meet HMA Requirements 
Virgin IslandsFeeder 11 Upgrade at St. Thomas USVI $                  995,081.25 Did Not Meet HMA Requirements 
Virgin IslandsCharlotte Amalie High School Underground Project Phase 1 $                  558,355.52 Did Not Meet HMA Requirements 
Virgin IslandsUSVI Standard State Hazard Mitigation Plan Update $                  150,000.00 Identified for Further Review 
Virgin IslandsHurricane Shutters, Rollup Doors & Generator Installation $                    57,661.50 Identified for Further Review 
Virgin IslandsKing Street, Frederiksted Underground Electrical Distribution $              3,228,237.45 Identified for Further Review 
Virgin IslandsQueen Street, Christiansted Underground Electrical Distribution $              2,730,723.86 Identified for Further Review 
VirginiaTown of Pound-Church Street Landslide Remediation Project $                  419,490.00 Did Not Meet HMA Requirements 
VirginiaRockingham County Lake Shenandoah Stormwater Management Project $                  547,500.00 Did Not Meet HMA Requirements 
VirginiaCity of Virginia Beach Generator for Fire Station 11 $                  243,750.00 Did Not Meet HMA Requirements 
VirginiaVirginia Beach Central Plant Generator $              1,125,000.00 Did Not Meet HMA Requirements 
VirginiaCumberland Plateau PDC All Hazards Mitigation Plan Update $                    30,000.00 Identified for Further Review 
VirginiaEnhancement of Landslide Hazard Risk in State and Local Hazard Mitigation Plans $                    85,648.50 Identified for Further Review 
VirginiaEssex County Elevation of 1 Property $                  131,250.00 Identified for Further Review 
VirginiaEssex County Elevation of 3 Properties $                  393,750.00 Identified for Further Review 
WashingtonMVSD Old Main High School Seismic Upgrade Project $              2,567,732.79 Did Not Meet HMA Requirements 
WashingtonAsotin County Hazard Mitigation Plan $                    37,500.00 Identified for Further Review 
WashingtonGarfield County Hazard Mitigation Plan $                    40,424.00 Identified for Further Review 
WashingtonUpdate exisitng FEMA-approved Multi-Hazard Mitigation Plan City/Town Adoption  $                    37,500.00 Identified for Further Review 
WashingtonWhitman County Hazard Mitigation Plan $                    48,750.00 Identified for Further Review 
Washington5-Year Update of current, unexpired Hazard Mitigation Plan $                    48,750.00 Identified for Further Review 
WashingtonKitsap County WA MultiJurisdictional Multihazard Mitigation Plan $                    37,485.00 Identified for Further Review 
WashingtonIsland County WA Multi-Jurisdiction Hazard Mitigation Plan $                    94,777.50 Identified for Further Review 
WashingtonRegion 5 All Hazard Mitigation Plan Update $                  116,827.50 Identified for Further Review 
WashingtonSnohomish County 2020 Hazard Mitigation Plan Update $                  112,497.13 Identified for Further Review 
WashingtonSkagit County Natural Hazard Mitigation Plan Update Project $                    85,500.00 Identified for Further Review 
WashingtonSpokane County Multi-Jurisdictional Mitigation Plan Update $                  150,000.00 Identified for Further Review 
WashingtonUpgrade/Relocate existing watermain $                  780,743.95 Identified for Further Review 
WashingtonSlide Ridge Retrofit Construction $              1,281,856.33 Identified for Further Review 
WashingtonMann Road Flood Mitigation  $              1,642,350.00 Identified for Further Review 
WisconsinChippewa County Natural Hazards Mitigation Plan Update $                    24,000.00 Identified for Further Review 
WisconsinBrown County WI Mitigation Plan $                    57,330.00 Identified for Further Review 
WisconsinLanglade County All Hazard Mitigation Plan Update $                    30,000.00 Identified for Further Review 
WisconsinMarinette County, Wisconsin Hazard Mitigation Plan $                    24,980.74 Identified for Further Review 
WisconsinDodge County, WI - All Hazard Mitigation Plan Update 2018  $                    25,626.59 Identified for Further Review 
WisconsinKewaunee County  $                    20,785.00 Identified for Further Review 
WisconsinSheboygan County, Wisconsin Hazard Mitigation Plan $                    24,936.68 Identified for Further Review 
WisconsinWood County PDM Plan $                    17,250.00 Identified for Further Review 
WisconsinManitowoc County, Wisconsin Hazard Mitigation Plan $                    24,980.80 Identified for Further Review 
WisconsinJackson County Mitigation Plan Update 2017 $                    30,375.19 Identified for Further Review 
WisconsinLa Crosse County Haz Mit Update 2017 $                    31,331.19 Identified for Further Review 
WisconsinPrairie Lake Estates Community Safe Room, Barron County, WI $                  204,517.00 Identified for Further Review 
WisconsinRegional Hazard Mitigation Plan Update2 $                    78,147.50 Identified for Further Review 
WisconsinAdams County All Hazards Mitigation Plan Update $                    30,000.00 Identified for Further Review 
WisconsinHazard Mitigation Grant Program Planning Grant $                    28,500.00 Identified for Further Review 
WisconsinColumbia County WI PDM Plan Update $                    11,424.00 Identified for Further Review 
WisconsinFond du Lac County Natural Hazard Mitigation Project $                    21,953.79 Identified for Further Review 
WisconsinForest County All Hazards Mitigation Plan Update $                    30,000.00 Identified for Further Review 
WisconsinClark County Multi-Hazard Mitigation Plan Update $                    28,800.00 Identified for Further Review 
WisconsinWaupaca Co WI PDM Plan Update $                    23,230.00 Identified for Further Review 
WisconsinEast End Estates Community Safe Room Project, Barron County, WI $                  111,616.00 Identified for Further Review 
WisconsinOzaukee County - Flood Mitigation -1980 Edgewater Drive $                    82,796.25 Identified for Further Review 
WyomingNorth Platte River Restoration and Flood Mitigation, Saratoga, WY at Boozer Cr.  $                  825,000.00 Did Not Meet HMA Requirements 

Identified for Further Review

An application which is listed as “identified for further review” is not a notification of award. This means that a subapplication has met the requirements specified in the NOFO and the HMA Guidance.  At this time, the applicants are required to work with a FEMA Regional Office to complete the pre-award activities for subapplications. Regional Offices will also complete the Environmental Planning and Historic Preservation (EHP) compliance review for projects prior to award.  Applicant management costs will be awarded based on the planning and project subapplications that are “identified for further review” and will not be awarded in excess of 10 percent of the total grant award.  Additionally, awards will be subject to the availability of funds. FEMA may, at its discretion, request additional information or documentation regarding administrative or procedural requirements and conduct additional programmatic reviews before making a final decision.

Identified for Further Review - Second Selection

An additional FY17 PDM subapplication that has been Identified for Further Review.  Due to a small number of overturned reconsiderations and recoveries provided by the Office of the Chief Financial Officer, FEMA Headquarters was able to make additional selections.  An application which is listed as "identified for further review - second selection" is not a notification of award.  This means that a subapplication has met the requirements specified in the NOFO and the HMA Guidance.  At this time, the applicants are required to work with a FEMA Regional Office to complete the pre-award activities for subapplications.  Regional Offices will also complete the Environmental Planning and Historic Preservation (EHP) compliance review for projects prior to award.  Applicant management costs will be awarded based on the planning and project subapplications that are "identified for further review - second selection" and will not be awarded in excess of 10 percent of the total grant award.  Additionally, awards will be subject to the availability of funds.  FEMA may, at its discretion, request additional information or documentation regarding administrative or procedural requirements and conduct additional programmatic reviews before making a final decision. 

Not Selected

Each year, the number of applicants for grant funding exceeds what is available.  FEMA offers two recommendations for subapplications that met the program requirements but are not selected due to limited program funding. One recommendation is that the applicant may re-submit the subapplication during the open period of the FY 2018 PDM or Flood Mitigation Assistance grant program. Or, if funding is available, an application can be submitted to the HMGP.

Did Not Meet Hazard Mitigation Assistance Requirements

For applications submitted that are identified as “Did not meet HMA requirements”, the FEMA Regional Office will provide further information to applicants on why subapplications did not meet these requirements.

Request for Reconsideration

FEMA will reconsider its determination of a subapplication only when there is an indication of a substantive technical or procedural error by FEMA.  Only information provided in the submitted subapplication is considered supporting documentation for the request for reconsideration.  The amount of funding available for applicant management costs will not be reconsidered. 

Applicants must send requests for reconsideration based upon technical or procedural error to their FEMA Regional Office within 60 days of the posting of subapplication status.  The Regional Office will review the information received from an applicant and submit the regional recommendation to FEMA’s Headquarters.  FEMA Headquarters will make a final determination to overturn or uphold the original decision and send the response to the applicant.  A FEMA decision to uphold or overturn a decision regarding a subapplication is final.

Last Updated: 
08/22/2018 - 16:25