U.S. flag

An official website of the United States government

Dot gov

The .gov means it’s official.

Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you’re on a federal government site.

Https

The site is secure.

The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

Subdivision

A community must review subdivision proposals and other proposed new development including manufactured home parks or subdivisions, to determine whether such proposals will be reasonably safe from flooding.

If a subdivision proposal or other proposed new development is in a flood-prone area, any such proposals shall be reviewed to assure that:

  1. All such proposals are consistent with the need to minimize flood damage within the flood-prone area;
  2. All public utilities and facilities, such as sewer, gas, electrical, and water systems are located and constructed to minimize or eliminate flood damage; and
  3. Adequate drainage is provided to reduce exposure to flood hazards.

BASE FLOOD ELEVATION (BFE) DATA REQUIREMENT: Communities must require that all new subdivision proposals and other proposed development (including proposals for manufactured home parks and subdivisions) greater than 50 lots or 5 acres, whichever is the lesser, must include within such proposals, BFE data.

National Flood Insurance Program Requirements

  • 60.3 - Flood plain management criteria for flood-prone areas
    • (a) (4) - Subdivision Review
    • (b) (3) - BFE Data Requirement

Other Applicable NFIP Regulations

  • 60.3 - Flood plain management criteria for flood-prone areas
    • (c) (6)
    • (c) (12)
Glossary Section
NFIP - National Flood Insurance Program
Last updated Jul 8, 2020