Environmental Assessment for City of Peabody, Goldthwaite Brook Flood Mitigation Project, Peabody, Massachusetts (November 2009)

In response to recurrent flooding since the 1950s, the City of Peabody has applied for FEMA funding under the Pre-Disaster Mitigation Grant Program for a flood mitigation project. In accordance with the National Environmental Policy Act (NEPA) and FEMA’s regulations for implementing NEPA (44 CFR Part 10), an Environmental Assessment has been prepared to evaluate the potential impacts of the proposed project on the human environment.
SizePublication Date
Icon for file of type text/plainAppendix A
1.41K
Icon for file of type application/pdfAppendix A
1.20M
Icon for file of type text/plainAppendix B
8.47K
Icon for file of type application/pdfAppendix B
2.83M
Icon for file of type text/plainREVISED FINAL DRAFT ENVIRONMENTAL ASSESSMENT (12-17-09)
0.07M
Icon for file of type application/pdfREVISED FINAL DRAFT ENVIRONMENTAL ASSESSMENT (12-17-09)
0.21M
Icon for file of type text/plainAppendix C - Chapter / Section Number: Appendix C
7.77K
Icon for file of type application/pdfAppendix C - Chapter / Section Number: Appendix C
0.03M
Icon for file of type text/plainEnvironmental Assessment for City of Peabody, Goldthwaite Brook Flood Mitigation Project, Peabody, Massachusetts (November 2009)
0.07M
Icon for file of type application/pdfEnvironmental Assessment for City of Peabody, Goldthwaite Brook Flood Mitigation Project, Peabody, Massachusetts (November 2009)
0.30M