Reviewer Name: Adam Borden, Env. Specialist Project NamelEnv. Database No: Woodson, Carter G. Middle Scbool, Bldg B1 FEMA-1603I1607-DR-LA PWlf14179 Parish: Orleans Record of Environmental Consideration REVISED FOR FEMA ENVIRONMENTAL -LOmSIANA -2006 See 44 Code of Federal Regulation Part 10 Project NamelNumber: Woodson, Carter G. Middle School, Bldg B2/ PW#14179 FIPS#033-UA9M2-OO Proiect Location: 2514 Third Street, New Orleans, LA 70113 Latitude: 29.93956, Longitude: -90.09008 Project Description: Heavy rains and high winds from Hurricane Katrina (DR-l 603) caused significant exterior and interior damage to Woodson, Carter G. Middle School, Bldg B2 ofthe Recovery School District. This pw reimburses the eligible applicant for replacement ofcontents, flooring, wall panels, doors, framing, ceiling tiles, lighting, roofing/components, and windows.. Cleaning/pressure washing activities are also associated with this project. All new building material will be replaced according to codes and standards upgrades. All work will be performed in a previously disturbed area with no indication ofnearby waterways or other bodies ofwater. Documentation Requirements D (Short version) All consultation and agreements implemented to comply with the National Historic Preservation Act, Endangered Species Act, and Executive Orders 11988, 11990 and 12898 are completed and no other laws apply. (Review Concluded) I8l (Long version) All applicable laws and executive orders were reviewed. Additional information for compliance is attached to this REC and/or included in project files, as applicable. National Environmental Policy Act (NEPAl Determination D Statutorily excluded from NEPA review. (Review Concluded) D Programmatic Categorical Exclusion -Category (Reference PCE in comments) (Review Concluded) D Categorical Exclusion -Category D No Extraordinary Circumstances exist. Are project conditions required? D Yes (see section V) D No (Review Concluded) D Extraordinary Circumstances exist (See Section IV). D Extraordinary Circumstances mitigated. (See Section IV comments) Are project conditions required? D Yes (see section V) D No (Review Concluded) D Environmental Assessment D Supplemental Environmental Assessment (Reference EA or PEA in comments) t8] Environmental Impact Statement Comments: Although this project would have qualified as a catex (xv) under 44 CFR part 10.8 (dX2), this project meets the definition ofcritical infrastructure (permanent schools) under the alternative arrangements for NEPA compliance. This project has conditions and requires mitigation under the other Environmental and Historic Preservation (EHP) laws which are listed under the NEPA level ofenvironmental review in the project worksheet. Any changes to this approved scope of work will require submission to, and evaluation and approval by, the state and FEMA prior to initiation of any work, for compliance with the National Environmental Policy Act. The applicant is required to obtain and comply with all local, state and federal permits and requirements. Non-compliance with the requirements noted above may jeopardize the receipt of federal funding. Reviewer and Approvals D Project is Non-Compliant (See attached documentation justifying selection). Record ofEnvironmental Consideration (Version 09/27/06) Reviewer Name: Adam Borden, Env. Specialist Project NamtlEnv. Databast No: Woodson, Carter G. Middle School, Bldg B2 FEMA·1603/1607·DR·LA PW#14179 Pari.b: Orion. Specialist FEMA Regional Environmental Omcer or Delegated Approving Omcial: Name: Howard R. Bush, Environmental Liason Officer Signature ~?3 ~ Date df. :;l7. ()