Rfviewfr Namf: Adam Bordfn, Env. Sptcialist Projfd NamflEnv. DatabaSf No: Abramson High School-Modular Building ## 4 (Facility) FEMA·1603/1607·DR·LA PW##l1896 Parish: Orlnns Record of Environmental Consideration REVISED FOR FEMA ENVIRONMENTAL -LOUISIANA -2006 See 44 Code of Federal Regulation Part 10 Proiect NamelNumber: Abramson High School-Modular Building # 4 (Facility) / PW# 12896 FIPS#071-UFTI3-00 Project Location: 5552 Read Blvd, New Orleans, LA 70127 Latitude: 30.02947, Longitude: -89.97108 Project Description: Heavy rains and high winds from Hurricane Katrina (DR-1603) caused significant exterior and interior damage to Abramson High School-Modular Building # 4 (Facility) ofthe Orleans Parish School Board. This pw reimburses the eligible applicant for replacement ofthe building within the pre-disaster footprint. The new building will be replaced according to codes and standards upgrades. All work will be performed in a previously disturbed area with no indication ofnearby waterways or other bodies ofwater. Documentation Reg uirements o (Short version) All consultation and agreements implemented to comply with the National Historic Preservation Act, Endangered Species Act, and Executive Orders 11988, 11990 and 12898 are completed and no other laws apply. (Review Concluded) 18I (Long version) All applicable laws and executive orders were reviewed. Additional information for compliance is attached to this REC and/or included in project files, as applicable. National Environmental Policy Act (NEP A) Determination o Statutorily excluded from NEPA review. (Review Concluded) o Programmatic Categorical Exclusion -Category (Reference PCE in comments) (Review Concluded) o Categorical Exclusion -Category o No Extraordinary Circumstances exist. Are project conditions required? 0 Yes (see section V) 0 No (Review Concluded) o Extraordinary Circumstances exist (See Section IV). o Extraordinary Circumstances mitigated. (See Section IV comments) Are project conditions required? 0 Yes (see section V) 0 No (Review Concluded) o Environmental Assessment o Supplemental Environmental Assessment (Reference EA or PEA in comments) IZI Environmental Impact Statement Comments: This project meets the criteria for an Alternative Arrangement (Permanent Schools) type of project. This project has conditions and requires mitigation under the other Environmental and Historic Preservation (EHP) laws which are listed under the NEPA level ofenvironmental review in the project worksheet. Any changes to this approved scope of work will require submission to, and evaluation and approval by, the state and FEMA prior to initiation ofany work, for compliance with the National Environmental Policy Act. The applicant is required to obtain and comply with all local, state and federal permits and requirements. Non-compliance with the requirements noted above may jeopardize the receipt of federal funding. Reviewer and Approvals o Project is Non-Compliant (See attached documentation justifYing selection). Reviewer Name: Adam Borden, Env. Sptc:laUst Project Name!Env. Database No: Abramson High School·Modular Building II 4 (Facility) FEMA·1603/1607·0R·LA PWIII1896 Parish: Orleans Signature _~~~~~~....-....::--___Date _~_-_3.,£--.1..(_-_O...:......gb,-,--....:. FEMA Regional Environmental Officer or Delegated Approving Official: Name: Howard R. Bush, Environmental Liason Officer Signature ?~~ ;~ Date __i_"_l_'_.o_~__....:. I. Compliance Review for Environmental Laws (other than NEPAl A. National Historic Preservation Act (NHP A) 181 Not type of activity with potential to affect historic properties. D Activity meets Programmatic Agreement, December 3, 2004. Appendix A: Are project conditions required? D Yes (see Section V) D No D Programmatic Agreement not applicable, must conduct standard Section 106 Review. HISTORIC BUILDINGS AND STRUCTURES 181 No historic properties that are listed or 45/50 years or older in project area. (Review Concluded) D Building or structure listed or 45/50 years or older in project area and activity not exempt from review. D Determination ofNo Historic Properties Affected (FEMA fmding/SHPOrrHPO concurrence on file) Are project conditions required? D Yes (see Section V) D No (Review Concluded) D Determination of Historic Properties Affected (FEMA fmding/SHPOrrHPO concurrence on file) D Property a National Historic Landmark and National Park Service was provided early notification during the consultation process. Ifnot, explain in comments D No Adverse Effect Determination (FEMA fmding/SHPOrrHPO concurrence on file). Are project conditions required? D Yes (see Section V) D No (Review Concluded) D Adverse Effect Determination (FEMA fmding/SHPOrrHPO concurrence on file) D Resolution ofAdverse Effect completed. (MOA on file) Are project conditions required D Yes (see Section V) D No (Review Concluded) ARCHEOLOGICAL RESOURCES 181 Project affects only previously disturbed ground. (Review Concluded) D Project affects undisturbed ground. D Project area has no potential for presence ofarcheological resources D Determination ofno historic properties affected (FEMA finding/SHPOrrHPO concurrence or consultation on file). (Review Concluded) D Project area has potential for presence ofarcheological resources D Determination ofno historic properties affected (FEMA finding/SHPOrrHPO concurrence on file) Are project conditions required D Yes (see Section V) D No (Review Concluded) D Determination ofhistoric properties affected D NR eligible resources not present (FEMA fmding/SHPOrrHPO concurrence on file). Are project conditions required DYes (see Section V) D No (Review Concluded) D NR eligible resources present in project area. (FEMA finding/ SHPOffHPO concurrence on file) D No Adverse Effect Determination. (FEMA finding/ SHPOrrHPO concurrence on file) Are project conditions required? D Yes (see Section V) D No . o Project is on or connected to CBRA Unit or Otherwise Protected Area. (FEMA determinationlUSFWS consultation on file) o Proposed action an exception under Section 3505.a.6 (Review Concluded) o Proposed action not excepted under Section 3505.a.6. Are project conditions required? D YES (see Section V) 0 NO (Review Concluded) Comments: Project is not within a CBRA zone. Correspondence/ConsultationIRej'erences: Louisiana Coastal Barrier Resource System Maps referenced 08/31106. D. Clean Water Act 181 Project would not affect any waters ofthe U.S. (Review Concluded) o Project would affect waters, including wetlands, of the U.S. o Project exempted as in kind replacement or other exemption. (Review Concluded) o Project requires Section 404/401/or Section 9110 (Rivers and Harbors Act) permit, including qualification under Nationwide Permits. Record of Environmental Consideration (Version 08/31106) Comments: No jurisdictional waters ofthe U.S., including wetlands, occur in or near the project area. Correspondence/Consultation/References: USFWS National Wetlands Inventory map (http://www.fws.gov/nwil)queried on 08/31106. Reviewer Name: Adam Borden, Env. Specialist Project NamelEnv. Database No: Abramson High School·Modular Building 1# 4 (Facility) FEMA·1603/1607·DR·LA PW1#12896 Parish: Orleans Are project conditions required? D YES (see Section V) D NO (Review Concluded) E. Coastal Zone Management Act D Project is not located in a coastal zone area and does not affect a coastal zone area (Review concluded) I:8l Project is located in a coastal zone area and/or affects the coastal zone I:8l State administering agency does not require consistency review. (Review Concluded). D State administering agency requires consistency review. Are project conditions required? D YES (see Section V) D NO (Review Concluded) Comments: This project is located within the Louisiana Coastal Management Zone. LA Department ofNatural Resources (DNR) has determined that receipt of federal assistance is consistent with the Louisiana Coastal Resource Program. Projects within the coastal zone may still require a coastal use permit or other authorization from DNR. Projects may be coordinated by contacting LA DNR at 1-800-276-4019. Correspondence/Consultation/References: LDNR Louisiana Coastal Zone map 2002. F. Fish and Wildlife Coordination Act I:8l Project does not affect, control, or modify a waterway/body of water. (Review Concluded) D Project affects controls or modifies a waterway/body of water. D Coordination with USFWS conducted D No Recommendations offered by USFWS. (Review Concluded) D Recommendations provided by USFWS. Are project conditions required? D YES (see Section V) D NO (Review Concluded) Comments: No streams or water bodies are located in or near the project area. Correspondence/Consultation/References: Louisiana Map (http://wwwlamap.doa.louisiana.govD queried 08/31/06. G. Clean Air Act D Project will not result in permanent air emissions. (Review Concluded) I:8l Project is located in an attainment area. (Review Concluded) D Project is located in a non-attainment area. D Coordination required with applicable state administering agency. Are project conditions required? D YES (see section V) D NO (Review Concluded) Comments: This project involves the demolition or renovation of a public structure. Regardless of the asbestos content, the applicant is responsible for ensuring that renovation or demolition activities are coordinated with the Louisiana Department ofEnvironmental Quality (LDEQ) in accordance with the LDEQ "Sixth Amended Declaration ofEmergency and Administrative Order" dated March 31, 2006, and the LESHAP protocol dated March 1, 2006, incorporating the provisions of EPA's National Emission Standards for Hazardous Air Pollutants (NESHAP) and the Louisiana Administrative Code (LAC) 33.III.SlS1 and Chapter 27. Should Asbestos Containing Materials (ACMs) be present at the project site, the applicant is also responsible for ensuring proper disposal in accordance with the previously referenced administrative orders. CorrespondenceiConsultation/References: EPA Region 6 Non-attainment Map. H. Farmland Protection Policy Act ~Project does not affect designated prime or unique fannland. (Review Concluded) D Project causes unnecessary or irreversible conversion of designated prime or unique fannland. D Coordination with Natural Resource Conservation Commission required. D Fannland Conversion Impact Rating, Form AD-I 006, completed. Are project conditions required? D YES (see section V) D NO (Review Concluded) Reviewer Name: Adam Borden, Env. Spec:lalist Project NamtlEnv. Database No: Abramson High School-Modular Building II 4 (Fac:llity) FEMA·1603/1607·0R-LA PWIII2896 Parish: Orleans Comments: The project site is in a developed urbanized area and Farmland Protection Policy Act (FPPA) is precluded. No prime or unique farmland present. CorrespondenceiConsultatlonIRe/erences: National Resource Conservation Service, Web Soil Survey (htto:llwebsoilsurvev.nrcs.usda.20v/aool )referenced 08/31/06. I. Migratory Bird Treaty Act o Project not located within a flyway zone. (Review Concluded) [81 Project located within a flyway zone. [81 Project does not have potential to take migratory birds. (Review Concluded) Are project conditions required? 0 Yes (see section V) [81 No (Review Concluded) o Project has potential to take migratory birds. o Contact made with USFWS Are project conditions required? 0 YES (see section V) 0 NO