This page provides the status of the Pre-Disaster Mitigation (PDM) planning and project subapplications that were submitted to FEMA for the Fiscal Year (FY) 2018 application cycle. FEMA's Hazard Mitigation Assistance (HMA) grant programs provide funding to protect life and property from future natural disasters. The PDM grant program is designed to implement a sustained predisaster natural hazard mitigation program to reduce overall risk to the population and structures from future hazard events, while also reducing reliance on Federal funding in future disasters.

For FY 2018, $250 million was appropriated for PDM. FEMA made available $250 million for grants. On August 3, 2018, FEMA announced the application period from October 1, 2018-January 31, 2019 in the Notice of Funding Opportunity (NOFO) posted on www.grants.gov. The agency’s priorities for the FY 2018 PDM program are:

FEMA will select eligible subapplications up to the available PDM funding amount of
$250 million in the following order:

  1. Statutory allocation of $575,000 federal share for States, Territories and the District of Columbia (DC).

    To meet the statutory requirement, FEMA will select eligible planning and project subapplications from each state, territory and DC in order of the applicant’s rank (#1–x) to the lowest ranked subapplication that brings the total federal share to no more than $575,000 (see Other Eligibility Criteria subsection under section C of this NOFO).

For example, an Applicant’s #1 ranked subapplication for $200,000 Federal share and #2 ranked subapplication for $340,000 would be selected for the allocation; however, the #3 ranked subapplication for $575,000 and any other eligible subapplications would be considered on a competitive basis in priority category 3 below.

  1. Tribal set aside of $15 million for federally-recognized tribes, not to exceed $575,000 federal share per tribal applicant.

    FEMA will set aside $15 million for federally-recognized tribes applying directly to FEMA as applicants.  FEMA will select eligible planning and project subapplications for each tribal applicant in order of the tribe’s rank (#1–x) to the lowest ranked subapplication that brings the total federal share to no more than $575,000, not to exceed a total of $15 million.

  2. Competitive Funding.

    After meeting the statutory requirement for state/territory allocations and the tribal set aside, FEMA will select from the remaining eligible planning and project subapplications from all applicants on a competitive basis up to the available amount of funding.

If an applicant submits projects in excess of the limit for competitive consideration (see Other Eligibility Criteria subsection under section C of this NOFO), then FEMA will only review the highest ranked competitive project subapplications up to the limit.

FEMA will select subapplications for competitive funding in the following order:

  1. Multi-state/tribal mitigation initiatives.

    FEMA will select one eligible multi-state/tribal mitigation planning or project subapplication per applicant.

  2. Planning subapplications from applicants that have less than $400,000 Hazard Mitigation Grant Program (HMGP) planning funds available.

    FEMA will select eligible planning subapplications from applicants that have less than $400,000 HMGP planning funds available (see Hazard Mitigation Grant Program subsection in Section H of this NOFO).

  3. Project subapplications from applicants that have less than $4 million HMGP regular project funds available.

    FEMA will select eligible project subapplications from applicants that have less than $4 million HMGP regular project funds in the following order:

    1. Non-flood hazard (e.g., seismic, wildfire, landslide, wind and drought) mitigation projects

    2. Flood mitigation activities except acquisition, elevation, or mitigation reconstruction (e.g., stormwater management and flood control measures)

    3. Acquisition, elevation and mitigation reconstruction projects

    4. Generators for critical facilities identified in a FEMA-approved Mitigation Plan

  4. Planning subapplications from applicants that have $400,000 or more HMGP planning funds available.

    FEMA will select eligible planning subapplications from applicants that have $400,000 or more HMGP planning funds available.

  5. Project subapplications from applicants that have $4 million or more HMGP regular project funds available.

    FEMA will select eligible project subapplications from applicants that have $4 million or more HMGP regular project funds available in the following order:

    1. Non-flood hazard mitigation projects

    2. Flood mitigation activities except acquisition, elevation, or mitigation reconstruction

    3. Acquisition, elevation and mitigation reconstruction projects

    4. Generators for critical facilities identified in a FEMA-approved Mitigation Plan

FEMA will further prioritize planning and project subapplications in priority categories 2 and 3 above, as needed, in the following order:

  1. Subapplicant’s small impoverished community status (see Cost Share or Match subsection under section C of this NOFO);
  2. Indication of public-private partnership (i.e., whether private sector funding is included in the required non-federal cost share);
  3. Subapplicant’s FEMA-validated residential or commercial Building Code Effectiveness Grading Schedule (BCEGS) rating, as appropriate to the activity type, from a grade of 1 to 10;
  4. FEMA-validated Benefit Cost Ratio (BCR) for projects (see Benefit Cost Analysis for Mitigation Projects subsection under section D of this NOFO); and
  5. The applicant’s rank of subapplications (see Content and Form of Application Submission subsection under Section D of this NOFO).

For more information on BCEGS, please visit the Insurance Services Office - Mitigation website:  https://www.isomitigation.com/bcegs/iso-s-building-code-effectiveness-grading-schedule-bcegs.htm.

FEMA may select a subapplication out of priority order based upon one or more of the following factors:

  • Availability of funding;

  • Duplication of subapplications;

  • Program priorities and policy factors; and,

  • Other pertinent information.

To be eligible for the state/territory allocation or the tribal set aside, the applicant’s highest ranked planning or project subapplication must not have exceeded $575,000 Federal share.  There was no limit to the number of planning and project subapplications that applicants could have submitted for the state/territory allocation or tribal set aside up to $575,000 federal share, but the applicant must have ranked them higher than subapplications for competitive consideration. Applicants could not have included more than nine (9) project subapplications for competitive consideration over and above any project(s) submitted for the state/territory allocation or tribal set aside. 

Any applicant agency that was willing to serve as the applicant for multi-state or multi-tribal mitigation activities must have included one multi-state/tribal project subapplication(s) in their grant application for a maximum of ten (10) competitive projects, notwithstanding any project(s) that were submitted towards their state/territory allocation or tribal set aside.  Applicants who included multi-state/tribal subapplication(s) in their grant application must have clearly identified how the effort was coordinated.

FEMA received 579 subapplications from 90 applicants (42 of which were federally-recognized Indian Tribal Governments) totaling $512.5 million: 226 planning, 298 projects, and 55 applicant management costs. FEMA has completed its eligibility review to ensure compliance with HMA Guidance and has made selections based on the agency’s priorities and available funding. FEMA has identified for further review 359 PDM subapplications from 72 applicants (27 of which are Indian Tribal Governments): 190 planning, 120 projects, and 49 associated applicant management costs totaling $247.3 million.  FEMA selected (identified for further review) all eligible subapplications in priorities 1 through 3cii. Eligible subapplications in priority 3 were ranked in order by project type; small, impoverished community status; BCEGS rating; and BCR for selection. FEMA is unable to fund (not selected) the remaining eligible subapplications in priority 3.  The table below lists the submitted planning and project subapplications and the status of each alphabetically by applicant. Further explanation of the status is provided below the table.

ApplicantSubapplication Title Submitted Federal Share  Status 

AK

LHMP Updates $        89,100.00 Identified for Further Review
AKLHMP Updates 2 $      129,780.00 Identified for Further Review
AKLHMP Updates 3 $      146,580.00 Identified for Further Review
AKPort of Alaska Strengthen Fender Assemblies $   4,000,000.00 Identified for Further Review
AKFY2018 SMC $   1,024,998.00 Identified for Further Review
AKYakutat's Water & Sanitation Service Infrastructure Planning Project $      187,497.02 Identified for Further Review
AKPort of Alaska Resilient Infrastructure - Petroleum Cement Terminal $ 10,000,000.00 Did Not Meet HMA Requirements
AL2018 AEMA SMC $          9,435.65 Identified for Further Review
ALDivision D Multi-Jurisdictional Multihazard Mitigation Plan $      100,019.79 Identified for Further Review
ALHazard Mitigation Plan Update - Division B $        75,000.00 Identified for Further Review
ALFayette County Multi-Hazard Mitigation Plan Update $        20,000.00 Identified for Further Review
ALTuscaloosa County Multi-Hazrd Mitigation Plan Update $        20,000.00 Identified for Further Review
ALMarshall County Multi-Hazard Mitigation Plan Update $        20,000.00 Identified for Further Review
ALCommunity of Hulaco - Safe Room/Storm Shelter Construction $        74,944.35 Identified for Further Review
ARMount Ida School District $      510,000.00 Identified for Further Review
ARStone County Multi-Jurisdictional All Hazard Mitigation Plan $        22,500.00 Identified for Further Review
ARVan Buren County Mitigation Plan Update $        30,000.00 Identified for Further Review
ARGrant County Hazard Mitigation Plan $        18,000.00 Identified for Further Review
ARPope County Mitigation Plan $        36,750.00 Identified for Further Review
ARMarshall High School Safe Room $   1,097,568.44 Identified for Further Review
ARArkansas 2018 PDM Management Costs $      651,900.00 Identified for Further Review
ARPerryville School District Safe-room $      960,000.00  Not Selected 
ARCotter School District $   1,380,462.27  Not Selected 
ARHarmony Grove Safe Room $   2,464,242.75  Not Selected 
ARMississippi COunty Hazard Mitigation Plan Update $          7,125.00 Did Not Meet HMA Requirements
AZ2018-PDM Advance Assistance: Pre-wildfire Assessment $      194,792.67 Identified for Further Review
AZMaricopa County Multi-Jurisdictional Hazard Mitigation Plan 2020 $        82,000.00 Identified for Further Review
AZ2018-PDM-Coconino-Coconino County Blue Ridge Community Wildfire Protection Plan $        16,125.00 Identified for Further Review
AZ2018-PDM-Coconino-Coconino County City of Williams Community Wildfire Protection $        19,850.00 Identified for Further Review
AZ2018 PDM Apache County D2-Kinlichee Red Clay Wash $      170,895.00 Identified for Further Review
AZ2018-PDM-Taylor Railroad Grade Wash $      409,461.00 Identified for Further Review
AZ2018-PDM-Apache County D2-Tanner Springs $      330,920.00 Identified for Further Review
AZ2018-PDM-Snowflake Boulevard $      224,586.00 Identified for Further Review
AZ2018-PDM-Sunland Gin Road Flood Mitigation $   1,200,000.00 Identified for Further Review
AZ2018 PDM State of Arizona Management Costs $   1,351,440.40 Identified for Further Review
AZ2018-PDM-Oro Valley-Generator Project $        90,984.00  Not Selected 
AZ2018 PDM Reslient Infrasturcture - Ephraim Canyon Flood Control $   8,487,533.96 Did Not Meet HMA Requirements
AZ2018-PDM-Pinetop FD Hazardous Fuels Mitigation $      153,900.00 Did Not Meet HMA Requirements
AZ2018-PDM-Yarnell Fire Station Generator Project $        23,250.00 Did Not Meet HMA Requirements
AZ2018 PDM Flood Control District of Maricopa County Floodplain Management Plan $        37,500.00 Did Not Meet HMA Requirements
AZ2018-PDM-Catalina Ridge Channel Reconstruction $   1,599,976.78 Did Not Meet HMA Requirements
AZ2018-PDM-Christensen Road at Lower Magma Channel Drainage Improvements $      486,806.00 Did Not Meet HMA Requirements
AZ2018-PDM-Gila Bend Structural Mitigation Projects $   2,520,000.00 Did Not Meet HMA Requirements
AZ2018-PDM-Cottonwood-Old Town" Flood Improvements" $   1,970,625.00 Did Not Meet HMA Requirements
Bad RiverBad River Flood Study Advance Assistance $      144,543.18 Did Not Meet HMA Requirements
Barona Band of Mission IndiansBarona Band of Mission Indians Hazard Mitigation Plan Update $        42,750.00 Identified for Further Review
Blue Lake RancheriaBlue Lake Rancheria Wildfire Mitigation Project $      272,842.50 Identified for Further Review
Blue Lake RancheriaBlue Lake Rancheria Wildfire Mitigation Project Management Costs $        26,949.42 Identified for Further Review
CACahuilla Reservation Fuels Reduction and Defensible Space Fire Mitigation Projec $      248,458.26 Identified for Further Review
CARedwood City - Easter Bowl and Glenloch Tanks Seismic Improvements Project $      306,584.25 Identified for Further Review
CAAdvance Assistance - Anaheim Hills Innovative Fire Mitigation Feasibility Study $        75,000.00 Identified for Further Review
CAEast Valley Water District Seismic Reservoir Study Advance Assistance Project $      124,918.98 Identified for Further Review
CACalifornia 2018 PDM Management Cost $   3,287,177.25 Identified for Further Review
CAChula Vista WUI Hazardous Fuel Reduction and Defensible Space Project $   2,081,940.00  Not Selected 
CACity of San Bernardino Seismic Retrofitting of Civic Center Parking Structure  $   4,000,000.00  Not Selected 
CACity of San Bernardino Seismic Retrofitting of City Hall Main Building  $   4,000,000.00  Not Selected 
CAGood Samaritan PDM Seismic Bracing of Hospital Equipment and Utilities  $   1,740,458.18  Not Selected 
CAGood Samaritan PDM Seismic Bracing of Kitchen  $      422,953.18  Not Selected 
CASan Bernardino Municipal Water Department Seismic Retrofit Concrete Reservoirs $   1,360,760.00  Not Selected 
CACity of Redwood City Main City Area Water Distribution System Retrofit Project  $   3,000,000.00  Not Selected 
CAStatewide Resilient Infrastructure Multi-family Seismic Retrofit Program $ 10,000,000.00 Did Not Meet HMA Requirements
CABuena Vista Creek Debris Basin Project $   2,971,237.42 Did Not Meet HMA Requirements
CACedar Creek Canal and Monte Vista Spill Design and Improvements to reduce the po $   1,841,419.59 Did Not Meet HMA Requirements
Cher-Ae Heights of the Trinidad RancheriaCher-Ae Lane Slope Stabilization $      574,821.00 Identified for Further Review
Cher-Ae Heights of the Trinidad RancheriaTrinidad Rancheria Management Costs $        19,755.00 Identified for Further Review
Cherokee NationCherokee Nation Mitigation Plan Update  $      140,301.47 Identified for Further Review
Cherokee NationCherokee Nation Community Storm Safe Project $      259,375.26 Identified for Further Review
Cherokee NationCherokee Nation M & A of PDM Grant and Projects $        39,967.67 Identified for Further Review
Cheyenne & Arapaho TribeCheyenne & Arapaho Tribes Public Safety Project $      575,000.00 Did Not Meet HMA Requirements
Cheyenne & Arapaho TribeCheyenne & Arapaho Tribes Public Safety Project $        57,507.00 Did Not Meet HMA Requirements
COGrand County Hazard Mitigation Plan $        41,500.00 Identified for Further Review
COLarimer County Multi-Jurisdictional Hazard Mitigation Plan Update $        75,000.00 Identified for Further Review
COEl Paso County Hazard Mitigation Plan Update $      108,000.00 Identified for Further Review
CONortheast Colorado Regional Hazard Mitigation Plan $        90,000.00 Identified for Further Review
COWeld County Hazard Mitigation Plan Update $        60,000.00 Identified for Further Review
COUpdate the Hazard Mitigation Plan For Montezuma County, CO.   $        32,250.00 Identified for Further Review
COChaffee County HMP Update $        41,378.00 Identified for Further Review
COJefferson County Hazard Mitigation Plan Update $        70,000.00 Identified for Further Review
COCity of Aurora Hazard Mitigation Plan Update $        54,000.00 Identified for Further Review
COBoulder County FY18 PDM-Community Pre-Disaster Program Advance Assistance $      197,821.50 Identified for Further Review
COResilient Infrastructure Dam Safety Mitigation at Goose Pasture Tarn Dam  $ 10,000,000.00 Identified for Further Review
COSugarloaf Road Mitigation Project $   2,680,823.70 Identified for Further Review
COChaffee County Wildfire Mitigation Project $      247,500.00 Identified for Further Review
COCottonwood Creek at Woodmen and Austin Bluffs $   2,981,770.00 Identified for Further Review
COBear Creek at 8th Street $      505,930.00 Identified for Further Review
COPine River Ranches Bridge Replacement $      825,000.00 Identified for Further Review
CO2018 PDM State Management Cost Application $   1,830,153.00 Identified for Further Review
COTown of Estes Park Flood Mitigation 2018 PDM $   1,019,350.50 Did Not Meet HMA Requirements
COCity of Aurora Upper Westerly Creek  $   4,000,000.00 Did Not Meet HMA Requirements
ConnecticutCity of Norwalk Five Mile River Pump Station Upgrade-PDM2018 $      135,000.00 Did Not Meet HMA Requirements
ConnecticutFY 2019 PDM Grant - Barkhamsted $      113,653.00 Did Not Meet HMA Requirements
ConnecticutDaniels Farm Road Mitigation Project $      373,998.75 Did Not Meet HMA Requirements
ConnecticutNorfolk Sewer District - WWTP Emer. Generator $        88,300.00 Did Not Meet HMA Requirements
ConnecticutEmergency Shelter Generator Project. 10 East St, Morris, CT $        90,000.00 Did Not Meet HMA Requirements
Coquille Indian TribeCIT - Backup Generator Mitigation Project $      147,060.00 Did Not Meet HMA Requirements
Coquille Indian TribeCIT - Backup Generator Mitigation Project $                      -   Did Not Meet HMA Requirements
CTNW Hills NHMP Update $        65,879.67 Identified for Further Review
CTLower Connecticut River Valley Multijurisdictional Natural Hazard Mitigation Pla $      187,500.00 Identified for Further Review
CTWestCOG Local MultiJurisdictional MultiHazard Mitigation Plan $      186,197.93 Identified for Further Review
CTNaugatuck Valley Council of Governments-PDM18 $      300,000.00 Identified for Further Review
CTFY 2018 PDM Management Costs $      137,105.24 Identified for Further Review
DEBayview Home Elevation $      423,150.00 Identified for Further Review
DENCC Multi Jurisdiction AHMP 5 Yr Revision $        56,250.00 Identified for Further Review
DEKent County Delaware All Hazards Mitigation Plan $        37,500.00 Identified for Further Review
DETown of Fenwick Island FEMA Project - Arendal $        90,877.50 Identified for Further Review
DEWest Cedar Avenue Flood Mitigation Planning Study - Lewes, Delaware $        88,500.00 Identified for Further Review
DEFlood study at the Indian River Marina campground in Rehoboth Beach Delaware $        45,090.00 Identified for Further Review
DEWein Home Elevation Project-PDM $      123,750.00  Not Selected 
DE63 Meadow Road New Castle Acquisition $      104,250.00  Not Selected 
DEKCLC Pump Station LS1 Emergency Generator $        25,950.00  Not Selected 
DEKCLC Pump Station LS11C Emergency Generator $        25,575.00  Not Selected 
DEKCLC Pump Station 30B Emergency Generator $        29,475.00  Not Selected 
DEKCLC Pump Station 45 Emergency Generator $        25,200.00  Not Selected 
DEKCLC Pump Station 30A Emergency Generator $        25,500.00  Not Selected 
DEKent County DPS Generator Project $        84,750.00 Did Not Meet HMA Requirements
Fallon Paiute-Shoshone TribeFallon Paiute-Shoshone Tribe Advanced Assistance $      141,921.00 Identified for Further Review
FLFY2019-PDM-Monroe County - Guidance Care Center - Emergency Generator $        75,930.00 Identified for Further Review
FLFY2018-PDM Orange City-Installation of 8 Generators at Critical Need LiftStation $      297,710.25 Identified for Further Review
FLManatee County/Cedar Hammock Fire Rescue Mitigation Generator Project $        44,970.00 Identified for Further Review
FLFlagler Co. Health Department Wind Retrofit $        59,145.00 Identified for Further Review
FLFY2019-PDM-Miami-Dade County, FL: North Central Branch Library Hardening Project $        26,470.27 Identified for Further Review
FLFY2019-PDM-Miami-Dade County, FL: Allapattah Branch Library Hardening Project $        52,412.57 Identified for Further Review
FLFY 2018 PDM - Broward County  - Mast Arm Conversion - Broward Blvd @E. 15th Ave. $      341,025.35 Identified for Further Review
FLFY2019-PDM-Miami-Dade County, FL: North Dade Regional Library Hardening Project $      166,139.32 Identified for Further Review
FLFY2019-PDM-Miami-Dade County, FL: Coral Gables Branch Library Hardening Project $      311,254.57 Identified for Further Review
FLFY2019-PDM-Miami-Dade County, FL: South Dade Regional Library Hardening Project $      609,561.38 Identified for Further Review
FLFY2019 PDM - Walton Co, Florida - Hazard Mitigation Plan Update  $        56,625.00 Identified for Further Review
FLFY 2019 PDM - Monroe County Hazard Mitigation Strategy Update $      298,500.00 Identified for Further Review
FLBroward County PDM Advance Assistance $      150,000.00 Identified for Further Review
FLFY2018 HMA - Pre-Disaster Mitigation Program Management Cost   $   1,854,744.22 Identified for Further Review
FLPDM FL-2019-053  City of Jacksonville Nemours Childrens Specialty Care Generator $   2,282,406.00 Did Not Meet HMA Requirements
FLFY2018 PDM, City of Jacksonville-PW Pump Station Generator Landon Avenue  $      236,347.73 Did Not Meet HMA Requirements
FL7th Street Drainage Improvement Project $      337,500.00 Did Not Meet HMA Requirements
FLFY2018 PDM City of St. Petersburg North Basin Seawall Mitigation Project $   4,000,000.00 Did Not Meet HMA Requirements
FLCity of St Petersburg Central Basin Seawall Mitigation Project $   4,000,000.00 Did Not Meet HMA Requirements
FLFY 2019 PDM - City of Miami Beach - Par 3 Resilient Infrastructure Project $   1,617,443.25 Did Not Meet HMA Requirements
Fort Peck Assiniboine & Sioux TribesFort Peck Tribes PDM Plan Update $        30,000.00 Identified for Further Review
GAGeorgia PDMC18 Portable Generator Application $      543,751.50 Identified for Further Review
GAPDM 2018 Management Grant $        54,375.00 Identified for Further Review
HIState of Hawaii Emergency Management Agency $        56,607.75 Did Not Meet HMA Requirements
HIHigh Resolution Numerical Simulation of April 2018 Flooding at Kauai & Oahu  $      297,167.00 Did Not Meet HMA Requirements
HIHawaii County: Integration of Climate Change Adaption Plan into Mitigation Plan  $        75,000.00 Did Not Meet HMA Requirements
HIAnalysis to Establish Research-Based Shoreline and Riparian Setbacks for Hawaii  $      146,225.00 Did Not Meet HMA Requirements
HIMauna Kea Fire Mitigation Project $      217,500.00 Did Not Meet HMA Requirements
HIUnv. of Hawaii: Hurricane/Cyclone Return Period & Intensity Study $      225,749.00 Did Not Meet HMA Requirements
Hoh Indian TribeHoh Indian Tribe Pre-Disaster Mitigation Planning Grant 2019 $        90,000.00 Identified for Further Review
Hydaburg Cooperative AssociationHydaburg Cooperative Association PDMC 18 Grant Sub-Application: High Wind Damage $      232,200.00 Identified for Further Review
Hydaburg Cooperative AssociationAdvanced Assistance - PDMC18.HCA.Tsunami Evac. Proj. $      147,375.00 Identified for Further Review
Hydaburg Cooperative AssociationHydaburg Cooperative Association PDMC 18 Grant Application.Project Mgmt. Sub-App $        37,957.00 Identified for Further Review
IAState of Iowa PDM 2018 Management Cost $      845,758.00 Identified for Further Review
IADes Moines County Multi-Jurisdictional Hazard Mitigation Plan Update $        11,700.00 Identified for Further Review
IAHarrison Shelby Joint Hazard Mitigation Plan $        30,186.00 Identified for Further Review
IASioux, O'Brien and Osceola County Multijurisdictional HM Plan Update $        56,250.00 Identified for Further Review
IATIP Mitigation for Electric Distribution Lines $      443,286.00 Identified for Further Review
IAState of Iowa PDM 2018 Advanced Assistance $      196,976.00 Identified for Further Review
IACity of Ames Squaw Creek Resilient Infrastructure Flood Mitigation Project $   3,747,450.00 Identified for Further Review
IACedar Rapids Gatewell Structures Flood Mitigation Project $      862,946.00  Not Selected 
IAButler County REC 2018 PDM Infrastructure Strengthening $      837,000.00  Not Selected 
IAWest Fork CSD Middle School Safe Room $      909,786.00  Not Selected 
IADike-New Hartford Tornado Safe Room, Wrestling Room, Weight Room $      707,411.00  Not Selected 
IARRMU Generator Project - Water Treatment Plant $        80,558.00 Did Not Meet HMA Requirements
IABSA Mitigwa Scout Camp Safe Rooms Project $      401,448.00 Did Not Meet HMA Requirements
IDBannock County Multi-Jurisdictional All Hazard Mitigation Plan $        67,399.59 Identified for Further Review
ID2018 PDM State of Idaho MTA $        57,450.00 Identified for Further Review
IDCity of Eagle Pathway Mitigation Project $      679,493.80 Identified for Further Review
IDLemhi County Multi-Jurisdiction Hazard Mitigation Plan Update $        26,063.00 Identified for Further Review
IDDriggs Liftstation Generator Project $        53,456.25  Not Selected 
IDTeton EOC Generator PDM18 $      127,500.00  Not Selected 
IDWendell Highway District, 2018 Niagara Springs Grade Hazard Mitigation $      123,543.75 Did Not Meet HMA Requirements
IDCity of Weippe Flood Mitigation along Grasshopper Creek $      329,258.70 Did Not Meet HMA Requirements
IDCity of Cottonwood Culvert Relocation Project $   2,947,065.00 Did Not Meet HMA Requirements
INCamp ToPeNeBee Shelter Plan $      458,325.00 Identified for Further Review
INIndiana County MHMP Updates - PDMC 18 $      291,867.00 Identified for Further Review
INSalem High School Safe Room $   3,879,644.25 Identified for Further Review
INCity of Decatur 2018 PDM Flood Acquisition Project $      660,204.00 Identified for Further Review
INMorgan Co Acq PDMC 2018 $   1,820,550.00 Identified for Further Review
INCity of Greenwood 2018 PHMG $   2,690,826.18 Identified for Further Review
INCity of Fort Wayne 2018 Flood Acquisition Project $      347,424.00 Identified for Further Review
INSalem Middle School Safe Room $   3,614,700.00 Identified for Further Review
INSt. Joseph County Floodplain Home Buyout Program $   2,199,580.49 Identified for Further Review
INIndiana Management Cost Application - PDMC 18  $   1,596,312.00 Identified for Further Review
Karuk TribeHappy Camp Wellness Center $        98,995.00 Did Not Meet HMA Requirements
Karuk TribeFamily Service Center $        80,969.00 Did Not Meet HMA Requirements
Karuk TribeKingfisher Market $        80,969.00 Did Not Meet HMA Requirements
Karuk TribeYreka Housing Tribal Programs Office $        80,969.25 Did Not Meet HMA Requirements
Karuk TribeWellness Center, Yreka $        80,969.00 Did Not Meet HMA Requirements
Karuk TribeHappy Camp Fencing Replacement $        45,299.00 Did Not Meet HMA Requirements
Karuk TribeOrleans Housing Fence Replacement $        67,949.00 Did Not Meet HMA Requirements
Karuk TribeManagement Cost $        38,868.00 Did Not Meet HMA Requirements
KSCity of Harper Safe Room $      354,974.25 Identified for Further Review
KYLewis County Landslide Acquisition (38.575909 -83.325257) $      183,018.00 Identified for Further Review
KYMulti-Jurisdictional Hazard Mitigation Plan for Karst for the LTADD $      293,994.01 Identified for Further Review
KYPDM 2018 Management Costs - Kentucky $   1,170,973.00 Identified for Further Review
KYFIVCO ADD Regional Multihazard Mitigation Plan $      100,000.00  Not Selected 
KYBluegrass Area Development District Regional Hazard Mitigation Plan Update $      150,000.00  Not Selected 
KYLouisville MSD - 2018 PDM Waldoah Beach $      842,683.87  Not Selected 
KYLouisville Metro Hazard Mitigation Plan Update PDM 2018 $      137,985.00  Not Selected 
KYUniversity of Kentucky Hazard Mitigation Plan Update PDM 2018 $      199,221.00  Not Selected 
KYWestern Kentucky University Pre-Disaster Mitigation $      175,392.00  Not Selected 
KYAdams Ridge Road Elevation Project $   2,625,000.00  Not Selected 
KYMenifee County Rockfall Mitigation 2 $   3,999,900.00 Did Not Meet HMA Requirements
KYMenifee County Rockfall Mitigation $   3,000,000.00 Did Not Meet HMA Requirements
KYHillaire Drive Hazard Mitigation Project $      129,307.97 Did Not Meet HMA Requirements
LAGOHSEP Statewide Planning  Application (1 of 2) $      284,998.50 Identified for Further Review
LAGOHSEP Statewide Planning Application (2 of 2) $      284,998.50 Identified for Further Review
LAAdvance Assistance - Street Level Imagery in St. Tammany Parish $      200,000.00 Identified for Further Review
LATerrebonne Hazard Mitigation Plan Update 2020 $        65,108.00 Identified for Further Review
LATerrebonne Parish 2018 PDM St. Louis Canal Road (Westside/Alma) Drainage  $   1,334,477.57 Identified for Further Review
LAGOHSEP PDM SMC FY2018 Application $      998,503.62 Identified for Further Review
LAJefferson Parish/Gretna 25th Street Resilient Infrastructure Project - FY18 PDM $ 10,000,000.00  Not Selected 
LALivingston Parish Fire Protection District #4 - Safe Room Project $      847,097.25  Not Selected 
LAJean Lafitte PDM-E $   1,734,943.50  Not Selected 
LAJean Lafitte PDM-R $      652,755.84  Not Selected 
LAJP PDM 2018 - Second Harvest Food Bank Wind Retrofit $      856,000.00 Did Not Meet HMA Requirements
LALUMCON Pre-Disaster Mitigation Grant $   1,748,219.77 Did Not Meet HMA Requirements
LAIberville Parish Flood Barrier Wall $   2,439,039.75 Did Not Meet HMA Requirements
LAOysterbed Surge Protection and Floodplain Restoration $   3,999,378.00 Did Not Meet HMA Requirements
Leech Lake Band Of OjibweAdvanced Assistance for Leech Lake Energy Resilient Response and Recovery $      180,100.50 Did Not Meet HMA Requirements
MA2018 PDM Local Multi Jurisdictional Planning Grant Massachusetts $      243,581.00 Identified for Further Review
MASouth Branch Parkway Drainage Improvements $      550,000.11 Identified for Further Review
MATown of Conway - Delabarre Avenue Erosion Repair $      261,461.25 Identified for Further Review
MACity of Boston Resilient Fort Point Channel Infrastructure Project $   9,999,999.99 Identified for Further Review
MATown of Clinton FMA Advance Assistance Project $        99,930.00 Identified for Further Review
MAAdvance Assistance: Moon Island/Causeway: Developing a Mitigation Plan $        75,000.00 Identified for Further Review
MA2018 PDM State Management Costs - Massachusetts $      942,000.69 Identified for Further Review
MAGLSD Riverside Pump Station Emergency Generator, North Andover, MA $   2,677,500.00  Not Selected 
MAQuincy, MA Coastal Flood Mitigation $   2,138,250.00 Did Not Meet HMA Requirements
Makah TribeMakah Tribal Hazard Mitigation Plan Update $      134,881.20 Identified for Further Review
MassachuetsWildfire Planning for Dukes County Mitigation Plan Update $        22,500.00 Did Not Meet HMA Requirements
Match-E-Be-Nash-She-Wish Band of Pottawatomi IndiansGun Lake Tribe Mitigation Plan $        49,852.50 Identified for Further Review
MDTown of Hebron Generator for Water Tower 201 Culver Street $        78,375.00 Identified for Further Review
MDAcquisition of Multi-Structure Chester River Beach Property for Flood Mitigation $      171,431.25 Identified for Further Review
MDFY18 PDM MEMA Management Cost $   1,147,872.47 Identified for Further Review
MDCanal Woods Flood Mitigation Project $        75,000.00  Not Selected 
MDBaltimore County Hazard Mitigation Update Plan $        36,415.57  Not Selected 
MDFrederick County, MD MultiJurisdictional Hazard Mitigation Plan Update $      112,500.00  Not Selected 
MDKent County Maryland, Hazard Mitigation Plan Update $        70,875.00  Not Selected 
MDCrisfield Tide Gates, Culvert Modification, and Pumping Stations $   1,241,526.60  Not Selected 
MDBack-up Power Generator, Ground Water Treatment Plant, Port of Baltimore $      181,013.25 Did Not Meet HMA Requirements
MDPratt Road Watershed Drainage Project - Phase 1 $        42,618.74 Did Not Meet HMA Requirements
MDQueen Annes Generator Project $        42,750.00 Did Not Meet HMA Requirements
MDEastern Shore Innovation Center -  Generator Project $        41,414.25 Did Not Meet HMA Requirements
MDThurmont Municipal Building Generator $        29,625.00 Did Not Meet HMA Requirements
MDResilient Infrastructure- H7 Dry Flood Mitigation Facility $   3,600,000.00 Did Not Meet HMA Requirements
MDChurch/Emory Street Drain Improvements $      900,000.00 Did Not Meet HMA Requirements
MDMullen Avenue Landslide, Luke, MD $      512,436.40 Did Not Meet HMA Requirements
MDMaryland Avenue Culverts $   2,925,000.00 Did Not Meet HMA Requirements
MDCity of Gaithersburg Pre-Disaster Mitigation Project $   1,436,427.25 Did Not Meet HMA Requirements
MDAcquisition of River Beach Property to Mitigate Against Flood Impact $      273,545.58 Did Not Meet HMA Requirements
METown of Houlton Morningstar Road Culvert Replacement/Upsizing  $      585,000.00 Identified for Further Review
MEAdvance Assistance Machias Flood Protection $      200,000.00 Identified for Further Review
ME2018 Maine PDM Grant $        79,899.00 Identified for Further Review
MICounty of Allegan; Multi Hazard Mitigation Plan Update $        25,750.00 Identified for Further Review
MIUpdate Hazard Mitigation Plans- Alger, Delta, Menominee & Schoolcraft Counties $        58,500.00 Identified for Further Review
MIHazard Mitigation Plan Update, City of Detroit $        51,840.00 Identified for Further Review
MIGLS Region V mitigation plan updates - Genesee & Lapeer $      117,187.17 Identified for Further Review
MITRI-COUNTY REGIONAL HAZARD MITIGATION PLAN $      164,910.00 Identified for Further Review
MIJackson County Hazard Mitigation Plan Update $        34,477.00 Identified for Further Review
MICounty of Newaygo Hazard Management Plan Project $        46,861.39 Identified for Further Review
MICity of Lansing 2018 HMA Floodplain Acquisition and Demolition $      507,307.00 Identified for Further Review
MILakeshore Boulevard Coastal Resilient Infrastructure Project  $   2,025,000.00 Identified for Further Review
MIState of Michigan-FY 2018 PDM Management Cost   $      251,781.00 Identified for Further Review
MILakeshore Boulevard Coastal Flood Mitigation Project $   2,025,000.00  Not Selected 
MIEstral Beach 2019 PDM 5 Home Elevation grant $      397,482.75 Did Not Meet HMA Requirements
MITWMITW Pre Disaster Mitigation Grant $      516,819.26 Did Not Meet HMA Requirements
MN2019 expiring plans $      154,500.00 Identified for Further Review
MN2020 plan updates $      294,000.00 Identified for Further Review
MNCity of Newport Advanced Assistance $        28,980.00 Identified for Further Review
MNHighbanks Neighborhood Mitigation $   2,388,580.00 Did Not Meet HMA Requirements
MNCOL City of Blaine Saferoom $   1,506,569.40 Did Not Meet HMA Requirements
MOPDM FY18 - Mo. State Allocations Project-S. Pemiscot R-5 School Dist. Safe Room  $      574,992.00 Identified for Further Review
MOFY18PDM Competitive Priorities Local MultiJur MultiHazard Mitigation PlngUpdates $      228,121.50 Identified for Further Review
MOPDMFY18 Competitive Priorities - City of Truesdale Safe Room $   1,682,883.00 Identified for Further Review
MOPDM FY18 Competitive Priorities - Potosi R-III School District-Elem. Safe Room $   1,462,500.00 Identified for Further Review
MOPDM FY18 Competitive Priorities-Rockwood R-VI / Wildwood MIddle Sch Safe Room $   1,218,750.00 Identified for Further Review
MOPDM FY18 Competitive Priorities - Hickory Co R-I School District Comm. Safe Room $   1,536,975.00  Not Selected 
MOPDM FY18 Competitive Priorities - Woodland R-4 School District Safe Room $   2,070,000.00  Not Selected 
MOPDM FY18 Competitive Priorities - Hartville R-II Safe Room $   2,025,000.00  Not Selected 
MOPDM FY18 Competitive Priorities - Summersville R-II Community Safe Room $   1,004,400.00  Not Selected 
MOPDM FY18 Competitive Priorities - City of Clarksdale Comm. Safe Room $      702,000.00  Not Selected 
MOPDM FY18 Resilient Infrastructure Grundy Electric $   1,209,000.00 Did Not Meet HMA Requirements
MPSaipan Office on Aging Storm Readiness Project $      120,505.00 Identified for Further Review
MPRota Guesthouse Storm Readiness Project- PDM FY18 $      113,605.00 Identified for Further Review
MPCNMI FY18 Pre-Disaster Mitigation $        99,446.00 Identified for Further Review
MPFY18 CNMI PDM Management Cost $        48,355.58 Identified for Further Review
MPDisaster Risk Reduction Planning Update-Garapan District $      150,000.00 Did Not Meet HMA Requirements
MSForrest Heights Levee Project  $   4,000,000.38 Did Not Meet HMA Requirements
MTMontana Region 5 MHMP Update $      199,999.98 Identified for Further Review
MTDawson County PDM Planning  $      100,000.00 Identified for Further Review
MTState of Montana PDM Management Costs 2018 $        64,014.75 Identified for Further Review
MTNinemile Creek Mitigation Project $   1,200,000.00 Identified for Further Review
MTCity of Great Falls Missouri River Shoreline Mitigation Project 2018 $      340,151.85 Did Not Meet HMA Requirements
Native Village of EagleEvacuation route PS&E $      111,000.00 Did Not Meet HMA Requirements
Native Village of EagleWildfire mitigation $        63,880.00 Did Not Meet HMA Requirements
Native Village of EagleEagle AK HMP update $        34,725.00 Did Not Meet HMA Requirements
Native Village of EyakEyak Village Infrastructure Pre-Disaster Resiliency Project $      409,766.80 Did Not Meet HMA Requirements
Native Village of Klut KaahKluti-Kaah Memorial Hall Seismic and Clean air retrofit. $        41,010.00 Identified for Further Review
Native Village of Klut KaahCopper River Erosion Project $        60,880.00 Identified for Further Review
Native Village of Klut Kaah2019-2022 Hazardous Fuel & Wildfire Management Plan $      267,162.00 Did Not Meet HMA Requirements
Native Village of ShaktoolikAdvanced Assistance: Shaktoolik Environmental Hazard Strategy Development $      193,650.00 Identified for Further Review
NDCity of Beulah Storm Shelter $        73,946.25 Identified for Further Review
NDMcKenzie County Storm Shelters $        88,149.75 Identified for Further Review
NDCity of Mandan Emergency Generators Project $      358,875.00 Identified for Further Review
NDGrand Forks County MHMP Update $        46,987.00 Identified for Further Review
NDStutsman County Multi-Hazard Mitigation Plan Update $        29,700.00 Identified for Further Review
NDRichland County MHMP $        35,400.00 Identified for Further Review
NDMcKenzie County MHMP Update $        34,800.00 Identified for Further Review
NDBarnes County MHMP Update $        27,000.00 Identified for Further Review
NDBottineau County MHMP Update $        32,482.00 Identified for Further Review
NDRansom County MHMP Update $        24,500.00 Identified for Further Review
NDSargent County MHMP $        30,000.00 Identified for Further Review
NDNelson County MHMP Update $        23,500.00 Identified for Further Review
NDKidder County MHMP Update $        16,000.00 Identified for Further Review
NDTowner County MHMP Update $        26,400.00 Identified for Further Review
NDND Resilient Infrastructure Project - Fargo Pump Station Flood Mitigation $   4,311,502.50 Identified for Further Review
NDUniversity of Mary Slope Stability Project - Phase II $   3,965,216.85 Identified for Further Review
NDCity of Fargo WWTP Flood Protection Plan $   3,679,792.50 Identified for Further Review
NDCity of Jamestown James River Riverbank Restoration Project $      831,921.73 Identified for Further Review
ND2018 PDM State Management Costs $   1,543,183.00 Identified for Further Review
NDUnity Medical Center - 2018 Generator Project $      446,990.00  Not Selected 
NDTri-County Water District Reservoir Generators  $      196,920.00  Not Selected 
NDMcIntosh County Generators $        81,173.92  Not Selected 
ND2018 PDM NDDES Critical Facility Generators $   1,007,947.19 Did Not Meet HMA Requirements
NDKirkelie Township Bank Stablization Project $        62,625.00 Did Not Meet HMA Requirements
NEPerkins, Chase, and Dundy Counties Multi-Jurisdiction Hazard Mitigation Plan $        40,717.50 Identified for Further Review
NERegion 23 HMP Update $        47,250.00 Identified for Further Review
NENemaha Natural Resources District Hazard Mitigation Plan Update $      101,850.00 Identified for Further Review
NECedar and Dixon Counties Multihazard Mitigation Plan Update $        71,250.00 Identified for Further Review
NEPapio-Missouri River Natural Resources District Hazard Mitigation Plan $      150,000.00 Identified for Further Review
NETwin Platte Natural Resources District Multihazard Mitigation Plan Update $        55,125.00 Identified for Further Review
NEQuad County Hazard Mitigation Plan Update $        48,750.00 Identified for Further Review
NELower Big Blue/Little Blue NRD Multi-hazard Mitigation Plan Update $      225,000.00  Not Selected 
NECentral City Safe Room $   2,707,473.42  Not Selected 
NE2018 Adams County Little Blue River Bank Stabilization Projects $      566,877.75  Not Selected 
NEForest Lake Boulevard Drainage Improvement Project $      486,000.00  Not Selected 
NEImperial Community Safe Room Project $      878,199.50 Did Not Meet HMA Requirements
Newtok Village Council2020 Resilient Home Mitigation  $   1,215,580.00 Identified for Further Review
Newtok Village Council2020 Resilient Water Systems $   3,679,934.00 Identified for Further Review
NHFFY 2018 Local Hazard Mitigation Plan Updates $      163,499.25 Identified for Further Review
NHFFY 2018 Local Hazard Mitigation Plan Updates_2 $      173,999.25 Identified for Further Review
NHTown of Salem - Main Street & South Broadway  $   3,172,500.00 Identified for Further Review
NHFFY 2018 State of NH Management Costs $      325,143.21 Identified for Further Review
NHTown of Plymouth, NH - Loon Lake Road Flood Mitigation Project $      380,273.25  Not Selected 
NHHollis Rocky Pond Road Well Generator $        61,350.00  Not Selected 
NHSurry Pond Road Culvert Project $      148,875.00 Did Not Meet HMA Requirements
NHTown of Lee Tuttle Road Project $      234,750.00 Did Not Meet HMA Requirements
NJGloucester County Pre-Disaster Mitigation Planning Grant 2018 $      125,000.00 Identified for Further Review
NJCumberland County Pre-Disaster Mitigation Planning Grant 2018 $      125,000.00 Identified for Further Review
NJCape May County Multi-Jurisdictional All Hazards Mitigation Plan Update $      125,000.00 Identified for Further Review
NJWarren County Mitigation Plan $      125,000.00 Identified for Further Review
NJSussex County Multi-Juridictional All-Hazard Mitigation Update $      124,998.50 Identified for Further Review
NJCity of Lambertville Swan Creek Embankment Erosion Mitigation Project 2 $      345,000.00 Identified for Further Review
NJH6-H7 Stormwater System Hoboken NJ $   4,000,000.00 Identified for Further Review
NJAtlantic City Flood Control $   3,596,088.97 Identified for Further Review
NJExton Road Pump Station PDM $      287,887.50 Identified for Further Review
NJNorthwest Hoboken Resilient Infrastructure Park  $ 10,000,000.00 Identified for Further Review
NJNJOEM - PDM Advanced Assistance 2018 $      199,999.91 Identified for Further Review
NJ2018 PDM State Management Costs  $   7,744,549.35 Identified for Further Review
NJ5th Street Pumping Station Mitigation Hoboken NJ $   1,338,750.00  Not Selected 
NJWindsor Avenue Elevation $   1,606,500.00 Did Not Meet HMA Requirements
NJSeaside Heights Flood Mitigation Project (Water Treatment Plant) $   1,317,997.75 Did Not Meet HMA Requirements
NJRehabilitation of Greenbriar I Wastewater Pump Station  $      186,825.00 Did Not Meet HMA Requirements
NMLea County Mitigation Plan Update $        52,350.00 Identified for Further Review
NMLuna County Mitigation Plan Update $        41,250.00 Identified for Further Review
NMCurry County Mitigation Plan Update $        48,750.00 Identified for Further Review
NMValencia County Mitigation Plan Update $        56,250.00 Identified for Further Review
NMVillage of Pecos Generator Project $        50,362.50 Identified for Further Review
NMBelen Aragon Pond Advanced Assistance $      199,929.00 Identified for Further Review
NMState Management Costs $      377,158.21 Identified for Further Review
NMLower Montoyas Arroyo Bank Stabilization Flood Mitigation $   3,238,690.68 Identified for Further Review
NMQuay County Generator Project $        84,000.00 Did Not Meet HMA Requirements
Northern Cheyenne TribeNorthern Cheyenne Pre-Disaster Mitigation Plan Update $      150,000.00 Identified for Further Review
NVReno Purchasing Warehouse Emergency Generator Project $      575,000.00 Identified for Further Review
NVHobart Reservoir Dam Advance Assistance $      198,149.34 Identified for Further Review
NVMarlette Lake Dam Resilient Infrastructure Project $ 10,000,000.00 Identified for Further Review
NVPDM 2018 NDEM Management Costs $   1,474,814.93 Identified for Further Review
NVCity of Reno City Hall Seismic Retrofits $   3,975,000.00 Did Not Meet HMA Requirements
NYPDM Acquisition #1 on Lovers Lane in Town of New Albion  $      304,500.00 Identified for Further Review
NYErie County Multi-Jurisdictional Hazard Mitigation Plan Update (PDM) $      225,000.00 Identified for Further Review
NYNYCHA Flooding Risk Reduction Project, NYC,PDM Advance Assistance 904.2  $      198,719.25 Identified for Further Review
NYPDM/Resilient Infrastructure by NYSDOT: Interstate 88 over Schoharie Creek $   5,046,544.50 Identified for Further Review
NYLivingston County Multi Jurisdictional All Hazards Mitigation Plan $        67,500.00 Identified for Further Review
NYPDM by NYSDOT: US 9 over Ausable River - Clinton County $   3,606,892.50 Identified for Further Review
NYSt. Lawrence County NY Multi-Jurisdictional All Hazard Mitigation Plan $      225,000.00 Identified for Further Review
NYWestchester County Multi-jurisdictional Hazard Mitigation $      172,500.00 Identified for Further Review
NYFranklin County Multi-Jurisdictional Hazard Mitigation Plan Update $        48,750.00 Identified for Further Review
NYChenango County All Hazards Multi-Jurisdictional Mitigation Plan $      112,500.00 Identified for Further Review
NYNYSDHSES PDM Management Cost Application $   1,383,468.00 Identified for Further Review
NYFY18 PDM NYC DOE Emergency Power for 6 Schools $   3,568,970.25  Not Selected 
NYPDM Village/Town of Mount Kisco Branch Brook Hydrology Study Advance Assistance  $      112,500.00 Did Not Meet HMA Requirements
NYVillage of Deposit Flood Mitigation Study - Advance Assistance $      112,500.00 Did Not Meet HMA Requirements
NYPDM Advance Assistance V Newark Valley Slosson Creek, Cook Street Hydraulic Eval $        32,812.50 Did Not Meet HMA Requirements
OH Miamisburg Fourth Street Sycamore Creek Mitigation Project $      190,350.00 Identified for Further Review
OH Village of Ottawa Ohio PDM Acquisition Project $      347,550.00 Identified for Further Review
OH Ohio Safe Room Rebate Program PDM 18 (Set-A-Side) $        37,100.00 Identified for Further Review
OH City of Rittman Advance Assistance Landis Ditch Study PDM18 $      112,100.00 Identified for Further Review
OH Village of Valley View 2018 PDM Project $   1,545,562.50 Identified for Further Review
OH State of Ohio PDM 2018 Management Cost Application $      420,875.37 Identified for Further Review
OH City of Lancaster OH Miller Park Emergency Generator Project $        48,000.00  Not Selected 
OH St. Marys Residential PDM Project $   1,496,290.53  Not Selected 
OH Lateral B Stream Restoration $      430,618.50 Did Not Meet HMA Requirements
OKCity of Tulsa Fulton Creek Flood Control - Advanced Assistance $      150,000.00 Identified for Further Review
OKOEM SoonerSafe ISR Phase 24 $      574,500.00 Identified for Further Review
OKPDM FFY 2018 SMC $        14,796.00 Identified for Further Review
OROMD-OEM State Management Cost $      336,787.50 Identified for Further Review
ORNHMP Updates - Coos, Curry, and Wallowa Counties and the City of Sweet Home, OR $      300,000.00 Identified for Further Review
ORCity of Portland Mitigation Action Plan Update $      150,000.00 Identified for Further Review
ORAdvance Assistance Basin G2 Drainage Planning, Wheeler, Oregon $      119,371.50 Identified for Further Review
ORCity of Reedsport Resilient Infrastructure  $   4,000,000.00 Identified for Further Review
ORCity of Ashland Wildfire Mitigation Project $   3,000,000.00 Identified for Further Review
ORSeismic Retrofit of Sanitary Sewer Pipe Aerial Crossings on Johnson Creek $      422,775.00 Did Not Meet HMA Requirements
PALackawanna County Hazard Mitigation Plan Update $        39,000.00 Identified for Further Review
PAWashington County Mitigation Plan Update 2020 $        42,600.00 Identified for Further Review
PACounty Hazard Mitigation Plan Update $        37,875.00 Identified for Further Review
PACounty of Chester Hazard Mitigation Plan Update  $        56,250.00 Identified for Further Review
PAVenango County $        37,500.00 Identified for Further Review
PALawrence County Hazard Mitigation Plan Update $        44,400.00 Identified for Further Review
PALycoming County Hazard Mitigation Plan 2020 $        45,000.00 Identified for Further Review
PAWarren County Hazard Mitigation Plan Update $        37,500.00 Identified for Further Review
PACentre County Hazard Mitigation Plan Update $        50,250.00 Identified for Further Review
PADauphin County-Wide All-Hazards Mitigation Plan $        56,250.00 Identified for Further Review
PABucks County Hazard Mitigation Plan Update $        60,000.00 Identified for Further Review
PACarbon County, Pennsylvania $        45,000.00 Identified for Further Review
PA2018 PDM Management Cost $      412,500.00 Identified for Further Review
PAAdvanced Assistance Upper Delaware River and Lackawaxen Watershed Mitigation  $      100,000.00 Identified for Further Review
PAHMA 2018 Advanced Assistance Silver Creek Corridor Flood Reduction Study/Design $        75,000.00 Identified for Further Review
PAResilient Infrastructure Luzerne County Closure Structure Mitigation $      813,900.00 Identified for Further Review
PAWest Mead Township Generator $        26,595.00  Not Selected 
PAPDM 2018 Shamokin Coal Township Sewer Mitigation $      711,000.00  Not Selected 
PALTMA Standby Generators For Three Sewage Pump Stations $      202,500.00  Not Selected 
PAWhite Township and Indiana Borough Flood Mitigation Projects $   1,489,875.00 Did Not Meet HMA Requirements
PALigonier Township Linn Run Flood Mitigation Project $      333,000.00 Did Not Meet HMA Requirements
PABethel Park Flood Mitigation Project $      693,750.00 Did Not Meet HMA Requirements
PACoffeetown Road Infrastructure Mitigation $      187,794.74 Did Not Meet HMA Requirements
PANCEMA Generator and Lugs $      102,186.16 Did Not Meet HMA Requirements
Pala Band of Mission IndiansPala Flood Mitigation Planning Advance Assistance $      127,320.00 Identified for Further Review
Pala Band of Mission IndiansPala Hazard Mitigation Plan Update $        65,658.35 Identified for Further Review
Pala Band of Mission IndiansPala Management Costs $          7,575.00 Identified for Further Review
Pokagon Band of PotawatomiPokagon Band Tribal Mitigation Planning Project $        30,060.00 Identified for Further Review
Pueblo of PojoaquePueblo of Pojoaque, Pre-Disaster Planning Project $      204,963.00 Did Not Meet HMA Requirements
Puyallup Tribe of IndiansPuyallup Tribe of Indians Pre-Disaster Mitigation Grant Application $      117,000.00 Did Not Meet HMA Requirements
Pyramid Lake Paiute TribeMitigation Grant 2019 PLPT $      199,456.00 Identified for Further Review
Quapaw Tribe of OklahomaOLC Saferoom $      573,187.00 Identified for Further Review
Quapaw Tribe of OklahomaAdvance Assistance - Saferoom Planning $      115,843.00 Identified for Further Review
Quapaw Tribe of Oklahoma2018 PDM M&A $        67,676.00 Identified for Further Review
Quinault Indian NationTaholah - Aalis Dr Realignment Planning $      112,500.00 Identified for Further Review
Quinault Indian NationFire Station - Generator $        29,023.50 Did Not Meet HMA Requirements
Quinault Indian NationQueets Clinic - Generator $        29,023.50 Did Not Meet HMA Requirements
Quinault Indian NationRSHC - DIVVY $        19,387.50 Did Not Meet HMA Requirements
Red Cliff Band of Lake Superior ChippewaHazard Mitigation Plan - new $        84,524.43 Identified for Further Review
RI93.1 - Local Hazard Mitigation Plan Update  $        25,264.99 Identified for Further Review
RIRI Mangagement Costs $        57,504.00 Identified for Further Review
RINarragansett Scarborough Wastewater Treatment Facility Groin Rehabilitation $   1,075,832.15 Did Not Meet HMA Requirements
RIBHDDH - Generator for Group Homes $      150,000.00 Did Not Meet HMA Requirements
RINewport RI Advanced Modeling and Simulation Technology $      150,000.00 Did Not Meet HMA Requirements
Sac and Fox of MissouriSac and Fox Storm Shelters $      125,047.50 Did Not Meet HMA Requirements
Sac and Fox Tribe of the MississippiCattail Creek Drainage Basin Advance Assistance $      178,964.43 Identified for Further Review
Samish Indian NationSamish Multi-Hazard Mitigation Plan $        82,941.94 Identified for Further Review
Samish Indian NationSamish Multi-Hazard Mitigation Plan Management Costs $          3,522.53 Identified for Further Review
San Manuel Band of Mission IndiansEnergy Storage System (ESS)/Generator San Manuel Indian Reservation $      575,000.00 Did Not Meet HMA Requirements
Sandia PuebloPueblo of Sandia Hazard Mitigation Plan $        78,093.75 Identified for Further Review
Sandia PuebloPueblo of Sandia Hazard Mitigation Plan Management Costs $          7,809.37 Identified for Further Review
SCHazard Mitigation Plan Update for Beaufort, Colleton, Hampton, Jasper Counties $        35,358.79 Identified for Further Review
SCLower Savannah Regional Multihazard Mitigation Plan $        78,208.30 Identified for Further Review
SCCity of Myrtle Beach FMP Update $        44,191.50 Identified for Further Review
SCTown of Nichols - Elevation Project $      287,970.00 Identified for Further Review
SCCity of Tega Cay, City Hall Generator $        51,502.50 Identified for Further Review
SCSHMP Update - Critical Infrastructure Mapping $      210,929.24 Identified for Further Review
SCMoncks Corner Acquisition Project $   1,514,947.50 Identified for Further Review
SCSC PDM 2018 Management Cost $      567,111.00 Identified for Further Review
SCColleton County Special Medical Needs Project $      270,000.00  Not Selected 
SCAiken County Pre-Hazard Mitigation Project $      225,000.00 Did Not Meet HMA Requirements
SCCity of Simpsonville Generator Grant $      171,120.00 Did Not Meet HMA Requirements
SCMount Pleasant Generator $      365,565.00 Did Not Meet HMA Requirements
SCTown of James Island Mitigation Grant $      215,253.00 Did Not Meet HMA Requirements
SCCity of Folly Beach Water Resilience Project $   2,303,664.75 Did Not Meet HMA Requirements
SDAurora County Safe Rooms Project $      118,875.00 Identified for Further Review
SDCity of Brookings Structure Acquisition Project $      147,525.00 Identified for Further Review
SDStanley County Acquisition Project, Moore Property $      226,419.42 Identified for Further Review
SDAurora County PDM Plan Update $          6,000.00 Identified for Further Review
SDJones County PDM Plan Update $        13,125.00 Identified for Further Review
SDMoody County PDM Plan Update $        11,936.25 Identified for Further Review
SDGrant County PDM Plan Update $        13,905.00 Identified for Further Review
SDCharles Mix County PDM Plan Update $          6,000.00 Identified for Further Review
SDLyman County PDM Plan Update $          7,500.00 Identified for Further Review
SDJerauld County PDM Plan Update $          6,000.00 Identified for Further Review
SDHutchinson County PDM Plan Update $          6,000.00 Identified for Further Review
SDBon Homme County PDM Plan Update $          6,000.00 Identified for Further Review
SDDavison County PDM Plan Update $          6,000.00 Identified for Further Review
SDDouglas County PDM Plan Update $          6,000.00 Identified for Further Review
SDBrule County PDM Plan Update $          6,000.00 Identified for Further Review
SDArmour Storm Water Collector Evaluation (Advanced Assistance) $        22,500.00 Identified for Further Review
SDPDM 2018 Management Cost $      111,388.50 Identified for Further Review
SDCity of Waubay Safe Room $      504,104.25 Identified for Further Review
Seminole Tribe of FloridaSeminole Tribe of Florida All Hazard Mitigation Plan Update $      150,692.57 Identified for Further Review
Seminole Tribe of FloridaSeminole Tribe of Florida Forestry and Wildland Program  $      278,938.97 Identified for Further Review
Shoalwater Bay Indian TribeWater Tower Retrofit $        37,464.30 Did Not Meet HMA Requirements
Shoalwater Bay Indian TribeGenerator Backup Systems Final $      361,386.00 Did Not Meet HMA Requirements
Soboba Band of Luiseno IndiansWater Conveyance Project $      576,000.00 Did Not Meet HMA Requirements
Soboba Band of Luiseno IndiansWater Conveyance Project $        57,600.00 Did Not Meet HMA Requirements
Swinomish Indian Tribal CommunityAdvance Assistance for Swinomish Tribe Pre-Disaster Mitigation Project $      105,211.11 Identified for Further Review
Swinomish Indian Tribal CommunityAdvance Assistance Swinomish Indian Tribal Community  $        10,439.10 Identified for Further Review
TNTennessee Management Cost Application $      248,295.00 Did Not Meet HMA Requirements
TNFlood Hazard Mitigation Project - Smyrna, TN $   3,310,595.86 Did Not Meet HMA Requirements
Tonkawa Tribe of Indians of OklahomaTonkawa Tribe Planning Project Advance Assistance $        81,750.00 Identified for Further Review
TXRGCOG_Update Comprehensive Far West Texas Hazard Mitigation Plans $      264,317.00 Identified for Further Review
TXPDM FY18 Management Costs $   3,251,079.00 Identified for Further Review
TXHazard Mitigation Plans City of Texarkana, Titus and Red River County $        90,000.00  Not Selected 
TXCounty of El Paso Texas Multihazard Mitigation Plan $        45,000.00  Not Selected 
TXHazMAP Updates for Johnson, Somervell, and Wise Counties $      270,900.00  Not Selected 
TXHazMAP Updates for Ellis and Navarro Counties $      226,800.00  Not Selected 
TXUniversity of Texas at Arlington Hazard Mitigation Plan $        60,000.00  Not Selected 
TXCountywide Resilient Infrastructure Program Improvements $   7,125,000.00 Did Not Meet HMA Requirements
TXHays County Community Flood Mitigation Project - PDM $   7,921,747.50 Did Not Meet HMA Requirements
TXTown of Prosper Drainage Improvement $   1,391,625.00 Did Not Meet HMA Requirements
TXResilient Infastructure: C147-00-00 Flood Risk Reduction Project $ 10,000,000.00 Did Not Meet HMA Requirements
TXCity of Farmers Branch PDM Floodway Mitigation Project $   2,426,712.75 Did Not Meet HMA Requirements
Upper Skagit Indian TribeUSIT Wastewater Disposal Field Stormwater Retrofit $      522,728.00 Identified for Further Review
Upper Skagit Indian TribeUSIT Management Costs $        52,272.00 Identified for Further Review
Upper Skagit Indian TribeUSIT Advance Assistance for Water Line Seismic Retrofit and Red Creek Erosion $      200,000.00 Identified for Further Review
UTBrigham City Hall/Sewer Lift Stations Generators $      411,628.50 Identified for Further Review
UTSalt Lake City Fix the Bricks $   3,923,012.07 Identified for Further Review
UTPineview Estates Erosion Hazards Mitigation $   1,217,250.00 Identified for Further Review
UTCUWCD DVWTP Process Improvement Project $   4,000,000.00 Identified for Further Review
UTFCAOG Nat. Haz. Mitigation Plan Update 2022 $        99,000.00 Identified for Further Review
UTMAG Hazard Mitigation Plan Update $        71,250.00 Identified for Further Review
UTTooele County Hazard Mitigation Plan Update $        45,000.00 Identified for Further Review
UTDavis County Mitigation Plan Update 2021 $        22,500.00 Identified for Further Review
UTProvo City Advanced Assistance - Levee Evaluation $        90,000.00 Identified for Further Review
UTSalt Lake City Advance Assistance Surplus Levee $        75,000.00 Identified for Further Review
UTUtah 2018 PDM Management  $      918,724.43 Identified for Further Review
UTNorth Salt Lake Eaglepointe Landslide Mitigation $   2,290,965.00 Did Not Meet HMA Requirements
UTMulti-Jurisdictional, Multi-use Power Generation $      225,000.00 Did Not Meet HMA Requirements
UTKanab City Flood Mitigation Project $   4,000,000.00 Did Not Meet HMA Requirements
UTPenstock Waterlines Resilient Infrastructure Project $   9,742,800.00 Did Not Meet HMA Requirements
VAVirginia 2018 Strategic Local Mitigation Planning $      300,000.00 Identified for Further Review
VAPDM 2018 Portsmouth Infrastructure Improvements and Mitigation Strategies $      137,812.50 Identified for Further Review
VAResilient Infrastructure - Chesterfield Co. Water Treatment Plant  $   8,671,959.00 Identified for Further Review
VAVirginia PDM Management Costs $   1,082,676.00 Identified for Further Review
VAPDM 2018 CRC - Drakes Branch Municipal Building/Fire Department $      205,699.50  Not Selected 
VACity of Martinsville-Nationwide Homes Drainage Improvement Project  $   1,146,150.00  Not Selected 
VANewport News Harwood¿s Mill Reservoir Dam Improvements  $   2,051,250.00  Not Selected 
VAPDM 2018 Chesapeake - Install Fixed Generators at 3 Wastewater Pump Stations $      225,000.00  Not Selected 
VAGreene County Acquisition and Demolition of 1 Property $      515,811.00  Not Selected 
VAAssessment of Landslide Hazard Risk in King William County $        58,832.91  Not Selected 
VAPDM 2018 Acquisition of 1 Property (Nottoway Lane) $      203,395.50  Not Selected 
VIUSVI Housing Authority Simmons Senior Center Wind Retrofit  $        81,221.00 Did Not Meet HMA Requirements
VTState of Vermont Local Hazard Mitigation Plan Development $      170,475.00 Identified for Further Review
VTHuntington Landslide Acquisition/Demolition $      292,713.75 Identified for Further Review
VTVT Route 9 Whetstone Brook Flood Mitigation Project $   3,588,800.49 Identified for Further Review
VTState of Vermont 2018 PDM (MC) $        64,162.50 Identified for Further Review
VTTown of Duxbury Culvert Replacement - Advance Assistance $        63,000.00 Did Not Meet HMA Requirements
VTJeffersonville Drought Mitigation Water Source Upgrades -- Advanced Assistance $        86,436.00 Did Not Meet HMA Requirements
VTAdvance Assistance Town of Danby Green Hill Road/Purchase Brook Culvert $        27,745.00 Did Not Meet HMA Requirements
VTAdvance Assistance:Town of Weathersfield Culvert Replacements Engineering/Design $        22,500.00 Did Not Meet HMA Requirements
WAYakima County Hazard Mitigation Plan Update $        52,500.00 Identified for Further Review
WAPacific County Hazard Mitigation PDM Application $        63,750.00 Identified for Further Review
WAWhatcom County Natural Hazard Mitigation Plan Update $        75,000.00 Identified for Further Review
WATown of Carbonado Generator for Water Treatment Plant $      182,716.62 Identified for Further Review
WACity of Ocean ShoresTsunami Vertical Evacuation Project $   3,592,141.50 Identified for Further Review
WAStevens Elementary Tsunami Evacuation Shelter $   2,976,137.25 Identified for Further Review
WATacoma Water System Seismic Resiliency Project $   4,000,000.00 Identified for Further Review
WACapitol Hill Housing Bremer Apartments Seismic Retrofit $   3,762,234.36 Identified for Further Review
WAMVSD Old Main High School Seismic Upgrade Project $   3,024,138.00 Identified for Further Review
WACity of Westport Vertical Evacuation Project -Advance Assistance $      103,140.00 Identified for Further Review
WAAdvance Assistance for San Juan County Courthouse Earthquake Retrofit   $        73,500.00 Identified for Further Review
WAWashington State FY 2018 PDM Management Costs Subapplication $   1,703,660.49 Identified for Further Review
WACity of Walla Walla Generators for Critical Facilities $      159,076.50 Did Not Meet HMA Requirements
WAPierce County Lower White River Resilient Infrastructure $   7,927,233.96 Did Not Meet HMA Requirements
WACity of Seattle Hiawatha Community Center Seismic Retrofit $      435,425.16 Did Not Meet HMA Requirements
WALake Whatcom Water and Sewer District Water Reservoir Seismic Project $   3,132,044.00 Did Not Meet HMA Requirements
WISt.Croix Co (WI) Fairgrounds Community Safe Room $      524,295.00 Identified for Further Review
WICalumet County, Wisconsin Hazard Mitigation Plan $        20,400.00 Identified for Further Review
WICity of Superior All Hazard Mitigation Update $        29,619.60 Identified for Further Review
WIVillage of Spencer Pre-Disaster Mitigation Project $   3,019,928.03 Identified for Further Review
WIAdvanced Assistance - Data Collection and Rebuilding Natural Infrastructure $      199,999.86 Identified for Further Review
WIPDM 2018 State Management Costs  $      320,355.52 Identified for Further Review
WYLaramie County Child's Draw Basin Advance Assistance Drainage Master Plan $      199,999.50 Identified for Further Review
WYUpper North Platte River Restoration and Flood Mitigation Project, Saratoga WY a $      877,911.75 Did Not Meet HMA Requirements

Identified for Further Review

An application which is listed as “identified for further review” is not a notification of award. This means that a subapplication has met the requirements specified in the NOFO and the HMA Guidance.  At this time, the applicants are required to work with a FEMA Regional Office to complete the pre-award activities for subapplications. Regional Offices will also complete the Environmental Planning and Historic Preservation (EHP) compliance review for projects prior to award.  Applicant management costs will be awarded based on the planning and project subapplications that are “identified for further review” and will not be awarded in excess of 10 percent of the total grant award.  Additionally, awards will be subject to the availability of funds. FEMA may, at its discretion, request additional information or documentation regarding administrative or procedural requirements and conduct additional programmatic reviews before making a final decision.

Identified for Further Review - Second Selection

An additional FY18 PDM subapplication that has been Identified for Further Review.  Due to a small number of overturned reconsiderations and recoveries provided by the Office of the Chief Financial Officer, FEMA Headquarters was able to make additional selections.  An application which is listed as "identified for further review - second selection" is not a notification of award.  This means that a subapplication has met the requirements specified in the NOFO and the HMA Guidance.  At this time, the applicants are required to work with a FEMA Regional Office to complete the pre-award activities for subapplications.  Regional Offices will also complete the Environmental Planning and Historic Preservation (EHP) compliance review for projects prior to award.  Applicant management costs will be awarded based on the planning and project subapplications that are "identified for further review - second selection" and will not be awarded in excess of 10 percent of the total grant award.  Additionally, awards will be subject to the availability of funds.  FEMA may, at its discretion, request additional information or documentation regarding administrative or procedural requirements and conduct additional programmatic reviews before making a final decision. 

Not Selected

Each year, the number of applicants for grant funding exceeds what is available.  FEMA offers two recommendations for subapplications that met the program requirements but are not selected due to limited program funding. One recommendation is that the applicant may re-submit the subapplication during the open period of the FY 2019 PDM or Flood Mitigation Assistance grant program. Or, if funding is available, an application can be submitted to the Hazard Mitigation Grant Program.

Did Not Meet Hazard Mitigation Assistance Requirements

For applications submitted that are identified as “Did not meet HMA requirements”, the FEMA Regional Office will provide further information to applicants on why subapplications did not meet these requirements.

Request for Reconsideration

FEMA will reconsider its determination of a subapplication only when there is an indication of a substantive technical or procedural error by FEMA.  Only information provided in the submitted subapplication is considered supporting documentation for the request for reconsideration.  The amount of funding available for applicant management costs will not be reconsidered. 

Applicants must send requests for reconsideration based upon technical or procedural error to their FEMA Regional Office within 60 days of the posting of subapplication status.  The Regional Office will review the information received from an applicant and submit the regional recommendation to FEMA’s Headquarters.  FEMA Headquarters will make a final determination to overturn or uphold the original decision and send the response to the applicant.  A FEMA decision to uphold or overturn a decision regarding a subapplication is final.