Pre-Disaster Mitigation FY2019 Subapplication Status

This page provides the status of the Pre-Disaster Mitigation (PDM) planning and project subapplications that were submitted to FEMA for the Fiscal Year (FY) 2019 application cycle. FEMA's Hazard Mitigation Assistance (HMA) grant programs provide funding to protect life and property from future natural disasters. The PDM grant program is designed to implement a sustained predisaster natural hazard mitigation program to reduce overall risk to the population and structures from future hazard events, while also reducing reliance on Federal funding in future disasters.

For FY 2019, as FEMA transitions from the legacy Pre-Disaster Mitigation program to the Building Resilient Infrastructure Communities program, there is no gap in mitigation assistance to our grant applicants.  FEMA is using the funding set aside for BRIC to advance the objective of reducing disaster risk. The agency made $250 million available for grants. On August 26, 2019, FEMA announced the application period from September 30, 2019 - January 31, 2020 in the Notice of Funding Opportunity (NOFO) posted on www.grants.gov.

FY2019 Pre-Disaster Mitigation Program Priorities

FEMA will select eligible subapplications up to the available PDM funding amount of $250 million in the following order:

1. Statutory Allocation of $575,000 Federal Share for States, Territories and the District of Columbia (DC)

To meet the statutory requirement, FEMA will select eligible planning and project subapplications from each state, territory and DC in order of the applicant’s rank (#1–x) to the lowest ranked subapplication that brings the total federal share to no more than $575,000 (see Other Eligibility Criteria subsection under section C of this NOFO).

For example, an Applicant’s #1 ranked subapplication for $200,000 Federal share and #2 ranked subapplication for $340,000 would be selected for the allocation; however, the #3 ranked subapplication for $575,000 and any other eligible subapplications would be considered on a competitive basis in priority category 3 below.

2. Tribal Set Aside of $20 Million for Federally-Recognized Tribes, Not to Exceed $575,000 Federal Share Per Tribal Applicant

FEMA will set aside $20 million for federally-recognized tribes applying directly to FEMA as applicants.  FEMA will select eligible planning and project subapplications for each tribal applicant in order of the tribe’s rank (#1–x) to the lowest ranked subapplication that brings the total federal share to no more than $575,000, not to exceed a total of $20 million.

3. Competitive Funding

After meeting the statutory requirement for state/territory allocations and the tribal set aside, FEMA will select from the remaining eligible planning and project subapplications from all applicants on a competitive basis up to the available amount of funding.

If an applicant submits projects in excess of the limit for competitive consideration (see Other Eligibility Criteria subsection under section C of this NOFO), then FEMA will only review the highest ranked competitive project subapplications up to the limit.

FEMA will select subapplications for competitive funding in the following order:

  1. Multi-state/tribal mitigation initiatives.
    FEMA will select one eligible multi-state/tribal mitigation planning or project subapplication per applicant.
  2. Planning subapplications from applicants that have less than $400,000 Hazard Mitigation Grant Program (HMGP) planning funds available.
    FEMA will select eligible planning subapplications from applicants that have less than $400,000 HMGP planning funds available (see Hazard Mitigation Grant Program subsection in Section H of this NOFO).
  3. Project subapplications from applicants that have less than $4 million HMGP regular project funds available.
    FEMA will select eligible project subapplications from applicants that have less than $4 million HMGP regular project funds in the following order:
    1. Mitigation projects that reduce risk to any natural hazard (e.g., seismic, wildfire, landslide, wind, flood, drought)
    2. Generators for critical facilities identified in a FEMA-approved mitigation plan and meet the standards set by local building codes
  4. Planning subapplications from applicants that have $400,000 or more HMGP planning funds available. FEMA will select eligible planning subapplications from applicants that have $400,000 or more HMGP planning funds available.
  5. Project subapplications from applicants that have $4 million or more HMGP regular project funds available.
    FEMA will select eligible project subapplications from applicants that have $4 million or more HMGP regular project funds available in the following order:
    1. Mitigation projects that reduce risk to any natural hazard (e.g., seismic, wildfire, landslide, wind, flood, drought)
    2. Generators for critical facilities identified in a FEMA-approved mitigation plan and meet the standards set by local building codes

FEMA will further prioritize planning and project subapplications in priority categories 2 and 3 above, as needed, in the following order:

  1. Subapplicant’s small impoverished community status (see Cost Share or Match subsection under section C of this NOFO);
  2. Indication of public-private partnership (i.e., whether private sector funding is included in the required non-federal cost share);
  3. Subapplicant’s FEMA-validated residential or commercial Building Code Effectiveness Grading Schedule (BCEGS) rating, as appropriate to the activity type, from a grade of 1 to 10;
  4. FEMA-validated Benefit Cost Ratio (BCR) for projects (see Benefit Cost Analysis for Mitigation Projects subsection under section D of this NOFO); and
  5. The applicant’s rank of subapplications (see Content and Form of Application Submission subsection under Section D of this NOFO).

For more information on BCEGS, please visit the Insurance Services Office - Mitigation website.

FEMA may select a subapplication out of priority order based upon one or more of the following factors:

  • Availability of funding;
  • Duplication of subapplications;
  • Program priorities and policy factors; and,
  • Other pertinent information.

To be eligible for the state/territory allocation or the tribal set aside, the applicant’s highest ranked planning or project subapplication must not have exceeded $575,000 Federal share.  There was no limit to the number of planning and project subapplications that applicants could have submitted for the state/territory allocation or tribal set aside up to $575,000 federal share, but the applicant must have ranked them higher than subapplications for competitive consideration. Applicants could not have included more than nine (9) project subapplications for competitive consideration over and above any project(s) submitted for the state/territory allocation or tribal set aside.

Any applicant agency that was willing to serve as the applicant for multi-state or multi-tribal mitigation activities must have included one multi-state/tribal project subapplication(s) in their grant application for a maximum of ten (10) competitive projects, notwithstanding any project(s) that were submitted towards their state/territory allocation or tribal set aside.  Applicants who included multi-state/tribal subapplication(s) in their grant application must have clearly identified how the effort was coordinated.

FEMA received 665 subapplications from 97 applicants (44 of which were federally-recognized Indian Tribal Governments) totaling $539.2 million: 194 planning, 294 projects, 85 Advance Assistance, 27 Resilient Infrastructure projects, and 65 applicant management costs. FEMA has completed its eligibility review to ensure compliance with HMA Guidance and has made selections based on the agency’s priorities and available funding.

FEMA has identified for further review 448 PDM subapplications from 90 applicants (39 of which are Indian Tribal Governments): 182 planning, 133 projects, 59 Advance Assistance, 12 Resilient Infrastructure projects, and 62 associated applicant management costs totaling $244.6 million. 

FEMA selected (identified for further review) all eligible subapplications in priorities 1 through 3ci. Eligible subapplications in priority 3 were ranked in order by project type; small, impoverished community status; BCEGS rating; and BCR for selection. FEMA is unable to fund (not selected) the remaining eligible subapplications in priority 3. 

FY2019 Pre-Disaster Mitigation Subapplicant Status

The below table lists the submitted planning and project subapplications and the status of each alphabetically by applicant.

Learn about the definition of each status description:

Applicant Subapplication Number Subapplication Title Submitted Federal Share Status
CT PDMC-PJ-01-CT-2019-004 Town of East Lyme - Generator for Public Safety Emergency Backup Power $131,250.00 Did Not Meet HMA Requirements
CT PDMC-PL-01-CT-2019-005 Advanced Assistance Project Stratford PDM 2019 $90,129.37 Did Not Meet HMA Requirements
CT PDMC-PJ-01-CT-2019-002 Stratford PDM 2019 Structure Raising Project- 95 Washington Parkway $209,062.50 Not Selected
CT PDMC-PJ-01-CT-2019-006 Resilient Infrastructure: Coastal Flood Protection for Bridgeport Connecticut $10,000,000.00 Identified for Further Review
CT PDMC-PJ-01-CT-2019-003 Stratford PDM 2019 Structure Raising Project- 65 and 105 Washington Parkway $419,250.00 Did Not Meet HMA Requirements
CT PDMC-PJ-01-CT-2019-001 Shoreline Stabilization - Town of Branford - Linden Avenue $2,070,686.71 Not Selected
CT PDMC-MC-01-CT-2019-007 State of CT FY2019 PDM Management and Administration Application $1,290,658.06 Identified for Further Review
ME PDMC-PJ-01-ME-2019-001 Vassalboro ME Comm. School Shelter Generator Project $71,486.25 Identified for Further Review
ME PDMC-PL-01-ME-2019-003 Aroostook County Hazard Mitigation Plan - Update $15,000.00 Identified for Further Review
ME PDMC-PL-01-ME-2019-007 Kennebec County Hazard Mitigation Plan - Update $15,000.00 Identified for Further Review
ME PDMC-PL-01-ME-2019-005 Sagadahoc County Hazard Mitigation Plan - Update $15,000.00 Identified for Further Review
ME PDMC-PL-01-ME-2019-006 Lincoln County Hazard Mitigation Plan - Update $15,000.00 Identified for Further Review
ME PDMC-PL-01-ME-2019-004 York County Hazard Mitigation Plan - Update $15,000.00 Identified for Further Review
ME PDMC-PL-01-ME-2019-002 Chases Pond Breach Analysis Advance Assistance $29,526.75 Did Not Meet HMA Requirements
ME PDMC-MC-01-ME-2019-008 2019 Maine Management Costs $17,601.30 Identified for Further Review
Mashpee Wampanoag Tribe PDMC-PJ-01-MAIT001-2019-001 Mashpee Wampanoag Tribe Hazard Mitigation Plan Project Activities $517,500.00 Did Not Meet HMA Requirements
MA PDMC-PL-01-MA-2019-007 2019 PDM Local MultiJurisdictional Planning Grant Massachusetts $161,450.00 Identified for Further Review
MA PDMC-PL-01-MA-2019-014 2019 PDM Town of Lakeville HMP $7,500.00 Identified for Further Review
MA PDMC-PJ-01-MA-2019-003 Town of Montague, MA Montague City Road Flooding Relief $237,287.02 Identified for Further Review
MA PDMC-PJ-01-MA-2019-006 Town of Hardwick Fire Department/EOC Generator Upgrade $26,850.00 Identified for Further Review
MA PDMC-PJ-01-MA-2019-002 Millville Hazard Mitigation Project $14,723.25 Identified for Further Review
MA PDMC-PJ-01-MA-2019-005 City of Methuen Power Generator for Critical Water System Facility $375,000.00 Not Selected
MA PDMC-PJ-01-MA-2019-004 Godfrey Brook Capacity Improvements-West Street to Water Street, Milford, MA $733,425.00 Identified for Further Review
MA PDMC-PJ-01-MA-2019-008 Melrose, MA Public Safety Communications/City Hall Generator - Critical Facility $385,800.00 Did Not Meet HMA Requirements
MA PDMC-PJ-01-MA-2019-010 City of Boston East Boston Lewis Street Mitigation Project $2,599,242.71 Did Not Meet HMA Requirements
MA PDMC-PJ-01-MA-2019-011 Town of Edgartown Memorial Wharf Waterfront Rehabilitation $2,277,186.00 Did Not Meet HMA Requirements
MA PDMC-PJ-01-MA-2019-009 Tiffany Street Stream Channel Improvements $284,366.02 Identified for Further Review
MA PDMC-PJ-01-MA-2019-013 Natick Police & Fire Departments Generator Upgrades $638,457.75 Did Not Meet HMA Requirements
MA PDMC-PJ-01-MA-2019-001 Town of Oak Bluffs Resilient Infrastructure for East Chop Drive $10,000,000.00 Identified for Further Review
MA PDMC-PL-01-MA-2019-012 Walker Brook Culvert - Advance Assistance $150,000.00 Identified for Further Review
MA PDMC-MC-01-MA-2019-015 2019 PDM State Management Costs - Massachusetts $750,000.00 Identified for Further Review
NH PDMC-PL-01-NH-2019-005 FFY 2019 Local Hazard Mitigation Plan Updates $147,997.50 Identified for Further Review
NH PDMC-PL-01-NH-2019-006 FFY 2019 Local Hazard Mitigation Plan Updates (2) $148,999.50 Identified for Further Review
NH PDMC-PL-01-NH-2019-007 FFY 2019 Local Hazard Mitigation Plan Updates (3) $83,998.50 Identified for Further Review
NH PDMC-PJ-01-NH-2019-009 Town of Peterborough Flood Risk Reduction Project $200,250.00 Did Not Meet HMA Requirements
NH PDMC-PJ-01-NH-2019-001 Webber Hill Road Stabilization $937,500.00 Identified for Further Review
NH PDMC-PL-01-NH-2019-003 ADVANCED ASSISTANCE: NH Seacoast - Mapping Sea-Level Induced Groundwater Rise $52,543.50 Did Not Meet HMA Requirements
NH PDMC-PL-01-NH-2019-004 Hampton Advanced Assistance Flood Mitigation Process Development $42,000.00 Did Not Meet HMA Requirements
NH PDMC-PL-01-NH-2019-002 ADVANCED ASSISTANCE: Quantifying First Finished Floor Elevation in Coastal NH $27,234.00 Did Not Meet HMA Requirements
NH PDMC-MC-01-NH-2019-008 FFY 2019 State of NH Management Costs $164,052.28 Identified for Further Review
RI PDMC-PL-01-RI-2019-003 Newport Hazard Mitigation Plan Update $30,817.50 Identified for Further Review
RI PDMC-PL-01-RI-2019-016 Town of East Greenwich RI Hazard Mitigation Plan Update $8,250.00 Identified for Further Review
RI PDMC-PL-01-RI-2019-011 Town of Lincoln Natural Hazard Mitigation Plan Update $25,267.50 Identified for Further Review
RI PDMC-PL-01-RI-2019-002 City of Cranston, RI Muoltihazard Mitigation Strategy $27,732.00 Identified for Further Review
RI PDMC-PL-01-RI-2019-004 Town of Smithfield Hazard Mitigation Plan $26,250.00 Did Not Meet HMA Requirements
RI PDMC-PL-01-RI-2019-014 State of RI Hazard Mitigation Plan Update 2019 $7,875.00 Identified for Further Review
RI PDMC-PJ-01-RI-2019-015 riscon generator upgrades $177,187.50 Did Not Meet HMA Requirements
RI PDMC-PJ-01-RI-2019-010 Narragansett Scarborough Wastwater Treatment Plant Drainage Improvements $131,250.00 Identified for Further Review
RI PDMC-PL-01-RI-2019-006 Harbour Island Causeway Concept Study - Advanced Assistance $37,500.00 Identified for Further Review
RI PDMC-PL-01-RI-2019-013 City of Woonsocket Stormwater Project - Advance Assistance 904.2 $96,240.00 Identified for Further Review
RI PDMC-PJ-01-RI-2019-005 Westerly Resilient Infrastructure - WWTF Berm $3,174,399.61 Did Not Meet HMA Requirements
RI PDMC-PJ-01-RI-2019-009 Town of Narragansett Spring Brook Culvert $93,750.00 Did Not Meet HMA Requirements
RI PDMC-PL-01-RI-2019-012 Town of North Smithfield - Cherry Brook Watershed Flood Analysis - Advance Assis $10,500.00 Identified for Further Review
RI PDMC-PL-01-RI-2019-007 Town of Lincoln Water backup water supply connection advance assistance $187,500.00 Did Not Meet HMA Requirements
RI PDMC-PL-01-RI-2019-008 Advanced Assistance: BCA Study on Atwells Avenue Fire House $150,000.00 Did Not Meet HMA Requirements
RI PDMC-PL-01-RI-2019-001 University of Rhode Island Hazard Mitigation Plan $34,998.38 Identified for Further Review
RI PDMC-MC-01-RI-2019-017 RI State Managment Costs PDM $363,241.48 Identified for Further Review
VT PDMC-PJ-01-VT-2019-006 Landslide Acquisition - Bolton, VT $150,629.25 Identified for Further Review
VT PDMC-PL-01-VT-2019-003 State of Vermont Local Hazard Mitigation Plan Development $190,312.50 Identified for Further Review
VT PDMC-PL-01-VT-2019-004 Chittenden County Multi-Jurisdictional Hazard Mitigation Plan Update $96,000.00 Identified for Further Review
VT PDMC-PL-01-VT-2019-002 Chester Route 35 Advance Assistance Application $55,650.00 Identified for Further Review
VT PDMC-PJ-01-VT-2019-001 Huntington Neighborhood Buyouts $1,940,690.00 Did Not Meet HMA Requirements
VT PDMC-MC-01-VT-2019-005 State of Vermont Management Costs $54,375.00 Identified for Further Review
NJ PDMC-PL-02-NJ-2019-004 County of Camden Multi-hazard Mitigation Plan $123,942.00 Identified for Further Review
NJ PDMC-PL-02-NJ-2019-001 Mercer County Multi-Jurisdictional Hazard Mitigation Plan Update $125,000.25 Identified for Further Review
NJ PDMC-PJ-02-NJ-2019-003 FY 2019 PDM City of Somers Point Gulph Mill Road Stormwater Pump Station $308,286.56 Did Not Meet HMA Requirements
NJ PDMC-PL-02-NJ-2019-006 Advanced Assistance NJTA Garden State Parkway (Cheesequake) $200,000.00 Identified for Further Review
NJ PDMC-PJ-02-NJ-2019-002 Brick Reservoir Resilient Infrastructure Mitigation Improvements $2,826,104.12 Identified for Further Review
NJ PDMC-PJ-02-NJ-2019-013 Borough of Wildwood Crest Flood Mitigation Bayside Improvements $3,543,750.00 Did Not Meet HMA Requirements
NJ PDMC-PJ-02-NJ-2019-010 Borough of Tuckerton Coastal Mitigation Project $1,082,250.00 Did Not Meet HMA Requirements
NJ PDMC-PJ-02-NJ-2019-009 (PDM) City of Sea Isle City 46th Street Pump Station Mitigation Project $2,066,812.50 Did Not Meet HMA Requirements
NJ PDMC-PJ-02-NJ-2019-005 NHSA 13th St Primary Flood Mitigation Project $3,629,167.62 Did Not Meet HMA Requirements
NJ PDMC-PJ-02-NJ-2019-014 Pleasant Valley Road Streambank Stabilization Project, Phase III $1,278,816.00 Not Selected
NJ PDMC-PJ-02-NJ-2019-012 Tuckerton Main Street Bulkhead Mitigation Project $522,150.00 Did Not Meet HMA Requirements
NJ PDMC-PJ-02-NJ-2019-007 2019 PDM - Township of Stafford Multihazard Mitigation Project - Neptune Basin $3,478,505.25 Did Not Meet HMA Requirements
NJ PDMC-PJ-02-NJ-2019-008 Ventnor PDM Winchester Avenue Flood Protection $1,482,453.89 Not Selected
NJ PDMC-PJ-02-NJ-2019-011 FY 2019 Borough of Seaside Park Bayview Avenue Mitigation $3,862,035.00 Did Not Meet HMA Requirements
NJ PDMC-MC-02-NJ-2019-015 2019 PDM State Management Costs $2,455,354.82 Identified for Further Review
NY PDMC-PJ-02-NY-2019-016 Purchase of 257 Springtown Road PDM $232,726.72 Identified for Further Review
NY PDMC-PL-02-NY-2019-014 Schuyler County NY Multihazard Mitigation Plan Update $58,489.94 Identified for Further Review
NY PDMC-PL-02-NY-2019-005 Syracuse Advance Assistance PDM Onondaga Creek - Arsenal Park $199,500.00 Identified for Further Review
NY PDMC-PJ-02-NY-2019-002 NYSDOT SR 54A PDM/Resilient Infrastructure $9,975,000.00 Identified for Further Review
NY PDMC-PL-02-NY-2019-006 Niagara County Multi-Jurisdiction Multihazard Mitigation Plan Update $116,250.00 Not Selected
NY PDMC-PJ-02-NY-2019-012 DSS/DHS Catherine St. Shelter PDM Flood Mitigation $4,000,000.00 Not Selected
NY PDMC-PL-02-NY-2019-018 Monroe County Multi-Jurisdictional Hazard Mitigation Plan Update $124,500.00 Not Selected
NY PDMC-PJ-02-NY-2019-001 US Route 6 over Putnam Creek Pre-Disaster Mitigation $4,000,000.00 Did Not Meet HMA Requirements
NY PDMC-PL-02-NY-2019-009 Warren County Multijurisdictional Hazard Mitgation Update Plan $112,500.00 Not Selected
NY PDMC-PJ-02-NY-2019-003 NY 110 at Hill Place Bypass Culvert & Stream Corridor PDM Project $2,932,500.00 Did Not Meet HMA Requirements
NY PDMC-PJ-02-NY-2019-007 Philips Creek Streambank Stabilization $150,000.00 Not Selected
NY PDMC-PJ-02-NY-2019-015 PDM Village of Island Park Suffolk Rd. Residential Elevationn $160,296.37 Not Selected
NY PDMC-PJ-02-NY-2019-010 FDNY Marine 1 Pre-Disaster Mitigation $635,770.68 Did Not Meet HMA Requirements
NY PDMC-PJ-02-NY-2019-017 Brooklyn Marine Terminal: Shore Power Service Substation Flood Mitigation PDM $1,463,914.20 Did Not Meet HMA Requirements
NY PDMC-PJ-02-NY-2019-011 Town of Somers, NY Pre-Disaster Mitigation Project-Generators $91,716.00 Not Selected
NY PDMC-PL-02-NY-2019-013 Town of Hempstead Advance Assistance Flood Mitigation Home Raising Project - PDM $200,000.00 Did Not Meet HMA Requirements
NY PDMC-PL-02-NY-2019-004 Advanced Assistance of Schenectady County Pre-Disaster Mitigation-PDM $200,000.00 Did Not Meet HMA Requirements
NY PDMC-PL-02-NY-2019-008 Advance Assistance for NYCDOT Cool Corridors: Model Urban Heat Island Streets $200,000.00 Did Not Meet HMA Requirements
NY PDMC-MC-02-NY-2019-019 NYSDHSES FY2019 PDM Management Cost Application $2,615,378.25 Identified for Further Review
USVI PDMC-PJ-02-VI-2019-001 VI Department of Agriculture St. Thomas Abattoir Wind Retrofit $129,384.82 Identified for Further Review
DE PDMC-PJ-03-DE-2019-001 City of Dover Resilient Infrastructure Project $6,494,696.84 Did Not Meet HMA Requirements
DE PDMC-PL-03-DE-2019-005 Sussex County Multi-hazard Mitigation Plan Update $56,250.00 Identified for Further Review
DE PDMC-PL-03-DE-2019-006 City of New Castle Data Acquisition and Assessment $99,000.00 Identified for Further Review
DE PDMC-PJ-03-DE-2019-004 Bayview Beach Home Elevation Additional Homes $552,600.00 Did Not Meet HMA Requirements
DE PDMC-PJ-03-DE-2019-003 Town of Ocean View - Hudson Avenue Flood Mitigation Project $75,000.00 Did Not Meet HMA Requirements
DE PDMC-PL-03-DE-2019-007 Advanced assistance - Pilottown Road - Planning $102,590.00 Identified for Further Review
DE PDMC-PL-03-DE-2019-002 Town of Middletown Water System Vulnerability Assessment $17,999.97 Did Not Meet HMA Requirements
DC PDMC-PJ-03-DC-2019-003 Lafayette Park $575,000.00 Did Not Meet HMA Requirements
DC PDMC-PL-03-DC-2019-001 Advance Assistance for Georgetown Waterfront Resilience Plan $123,500.00 Did Not Meet HMA Requirements
DC PDMC-PL-03-DC-2019-006 Advance Assistance for Microgrid Connections $76,500.00 Did Not Meet HMA Requirements
DC PDMC-PJ-03-DC-2019-002 Resilience Infrastructure for Utility Undergrounding Project $10,000,000.00 Did Not Meet HMA Requirements
DC PDMC-PJ-03-DC-2019-004 9th Street and D Street Storm Water Pump Station Mitigation $2,519,473.47 Did Not Meet HMA Requirements
DC PDMC-MC-03-DC-2019-005 DC 2019 PDM Management Costs $847,085.51 Did Not Meet HMA Requirements
MD PDMC-PL-03-MD-2019-004 Wicomico County 2022 Hazard Mitigation Plan Update $37,500.00 Identified for Further Review
MD PDMC-PL-03-MD-2019-003 Cecil County Hazard Mitigation Plan 2022 Update $30,000.00 Identified for Further Review
MD PDMC-PL-03-MD-2019-002 Talbot County Hazard Mitigation Plan Update $37,500.00 Identified for Further Review
MD PDMC-PL-03-MD-2019-001 Dorchester County 2022 Multi-Hazard Mitigation Plan Update $25,200.00 Identified for Further Review
MD PDMC-PJ-03-MD-2019-006 Cove Road Acquisition Project $188,819.10 Identified for Further Review
MD PDMC-PJ-03-MD-2019-008 3600 Green Point Road Elevation $68,743.09 Did Not Meet HMA Requirements
MD PDMC-PJ-03-MD-2019-010 7950 Riverview Road Home Elevation $84,307.50 Identified for Further Review
MD PDMC-PJ-03-MD-2019-005 11528 Long Point Road Home Elevation $52,438.50 Identified for Further Review
MD PDMC-PL-03-MD-2019-012 Advance Assistance for Twin Point Cove Shoreline Resiliency Plan $37,500.00 Identified for Further Review
MD PDMC-PJ-03-MD-2019-015 Crisfield Tide Gates, Culvert Modification and Pumping Stations $1,241,526.60 Identified for Further Review
MD PDMC-PJ-03-MD-2019-014 Maryland Avenue Culverts $3,600,003.49 Did Not Meet HMA Requirements
MD PDMC-PJ-03-MD-2019-013 City of Laurel Emergency Back-up Generators $337,671.00 Not Selected
MD PDMC-PJ-03-MD-2019-011 City of Bowie Generator Project $1,243,503.75 Not Selected
MD PDMC-PJ-03-MD-2019-009 Tri-County Council Multi-Purpose Center Generator $453,769.85 Did Not Meet HMA Requirements
MD PDMC-PJ-03-MD-2019-007 20417 Nanticoke Drive Elevation $130,843.50 Identified for Further Review
MD PDMC-MC-03-MD-2019-016 FY19 PDM MEMA Management Cost $736,260.78 Identified for Further Review
PA PDMC-PL-03-PA-2019-006 Monroe County 2021 Hazard Mitigation Plan $42,000.00 Identified for Further Review
PA PDMC-PL-03-PA-2019-012 Beaver County Hazard Mitigation Plan $50,324.19 Identified for Further Review
PA PDMC-PL-03-PA-2019-022 Butler County Hazard Mitigation Plan Project $45,000.00 Identified for Further Review
PA PDMC-PL-03-PA-2019-021 Cambria County $37,500.00 Identified for Further Review
PA PDMC-PL-03-PA-2019-020 Delaware County Natural Hazard Mitigation Planning $24,398.00 Identified for Further Review
PA PDMC-PL-03-PA-2019-009 Columbia County HM plan update $45,000.00 Identified for Further Review
PA PDMC-PL-03-PA-2019-017 City of Philadelphia Pre Disaster Mitigation $75,000.00 Identified for Further Review
PA PDMC-PL-03-PA-2019-013 County Hazard Mitigation Plan Update $45,000.00 Identified for Further Review
PA PDMC-PL-03-PA-2019-015 Cameron County Hazard Mitigation Plan $29,850.00 Identified for Further Review
PA PDMC-PL-03-PA-2019-003 Pike County Hazard Mitigation Plan 2022 Update $36,637.50 Identified for Further Review
PA PDMC-PL-03-PA-2019-005 Tioga County Hazard Mitigation Plan Update $33,750.00 Identified for Further Review
PA PDMC-PL-03-PA-2019-011 Bedford County Hazard Mitigation Plan Update 91.5 $41,250.00 Identified for Further Review
PA PDMC-PJ-03-PA-2019-002 West Mead Township Emergency Generator $32,184.75 Identified for Further Review
PA PDMC-PL-03-PA-2019-023 2019 PDM Advance Assistance $129,375.32 Identified for Further Review
PA PDMC-PJ-03-PA-2019-019 Resilient Infrastructure: Mount Washington Landslide Mitigation $9,998,250.00 Identified for Further Review
PA PDMC-PJ-03-PA-2019-001 PDM Shamokin Coal Township Sewer Authority Mitigation $711,000.00 Did Not Meet HMA Requirements
PA PDMC-PL-03-PA-2019-007 Pennsylvania Hazard Mitigation Plan Update $300,000.00 Identified for Further Review
PA PDMC-PJ-03-PA-2019-008 Municipality of Penn Hills 2019 Pre-Disaster Mitigation Grant Program $731,196.00 Identified for Further Review
PA PDMC-PJ-03-PA-2019-014 Sky View Dam High Hazard Dam Improvements $123,000.00 Did Not Meet HMA Requirements
PA PDMC-PJ-03-PA-2019-004 LTMA Standby Generators for Three Sewage Pump Stations $202,500.00 Not Selected
PA PDMC-PJ-03-PA-2019-016 Forks Township Hazard Mitigation Project $105,750.00 Not Selected
PA PDMC-PJ-03-PA-2019-010 Palmer Township Generator Project $273,093.75 Did Not Meet HMA Requirements
PA PDMC-PJ-03-PA-2019-018 Emergency Generators for Lehigh Township $28,987.50 Did Not Meet HMA Requirements
PA PDMC-MC-03-PA-2019-024 PDM 2019 Management Cost $1,275,000.00 Identified for Further Review
VA PDMC-PL-03-VA-2019-001 Commonwealth of Virginia Hazard Mitigation Plan Update $225,000.00 Identified for Further Review
VA PDMC-PL-03-VA-2019-003 2019 Local Strategic Planning Application $262,500.00 Identified for Further Review
VA PDMC-PJ-03-VA-2019-012 Town of Victoria Generator for Sewer Pump Station $26,913.00 Identified for Further Review
VA PDMC-PL-03-VA-2019-002 Advance Assistance City of Danville Apple Branch Watershed Engineering Study $150,000.00 Identified for Further Review
VA PDMC-PJ-03-VA-2019-005 Resilient Infrastructure-Loudoun Water Community Water Storage Project $10,000,000.00 Identified for Further Review
VA PDMC-PJ-03-VA-2019-008 City of Roanoke Acquisition of 1 Property (Cee-Breeze) $573,930.00 Identified for Further Review
VA PDMC-PJ-03-VA-2019-006 Town of Vinton Acquisition and Demolition of Floodprone properties $674,217.00 Identified for Further Review
VA PDMC-PJ-03-VA-2019-010 City of Roanoke - Acquisition of 1 RL Property and Stream Restoration (PDM) $3,876,649.50 Identified for Further Review
VA PDMC-PL-03-VA-2019-007 2019 DRU Strategic Planning Application $261,513.00 Identified for Further Review
VA PDMC-PJ-03-VA-2019-004 City of Hampton Installation of 2 Generators at Pumping Stations $82,500.00 Not Selected
VA PDMC-PJ-03-VA-2019-009 City of Roanoke Acquisition of 5 Residential Properties/Wetland Creation (PDM) $3,671,316.00 Identified for Further Review
VA PDMC-PJ-03-VA-2019-011 City of Hopewell Cattail Creek Tributary Stabilization Project $840,750.00 Identified for Further Review
VA PDMC-PL-03-VA-2019-013 Enhancement of Landslide Hazard Risk Information in the TJPDC Plan $137,073.00 Identified for Further Review
VA PDMC-MC-03-VA-2019-014 PDM 2019 Management Costs $2,077,182.00 Identified for Further Review
WV PDMC-PL-03-WV-2019-001 Belomar Regional Council Hazard Mitigation Planning Grant $97,441.08 Identified for Further Review
WV PDMC-PL-03-WV-2019-002 Multi-jurisdictional Hazard Mitigation Plan for Morgan and Ber $60,562.50 Identified for Further Review
WV PDMC-PL-03-WV-2019-003 BCKP RIC HMP Update $75,000.00 Identified for Further Review
WV PDMC-PJ-03-WV-2019-004 Logan County Mud Fork Wastewater Infrastructure Project $4,218,817.50 Did Not Meet HMA Requirements
WV PDMC-PJ-03-WV-2019-005 Beckley Sanitary Board Robert C. Byrd Drive / Ewart Avenue Stormwater Project $2,833,500.00 Did Not Meet HMA Requirements
WV PDMC-PJ-03-WV-2019-006 Town of Sophia New Wastewater Treatment Plant $4,200,285.00 Did Not Meet HMA Requirements
WV PDMC-PJ-03-WV-2019-007 Town of Alderson Water Treatment Plant Partial Relocation $658,500.00 Did Not Meet HMA Requirements
AL PDMC-MC-04-AL-2019-011 FY 2019 PDM SMC $1,449,998.20 Identified for Further Review
AL PDMC-PJ-04-AL-2019-006 Smiths Station Safe Room (CSR) $574,912.00 Identified for Further Review
AL PDMC-PJ-04-AL-2019-009 Cartersville Safe Room $208,496.25 Not Selected
AL PDMC-PJ-04-AL-2019-001 County Line CSR $422,464.49 Not Selected
AL PDMC-PJ-04-AL-2019-005 Autauga County, Alabama PDM Resilient Infrastructure Project New Construction $6,500,000.00 Did Not Meet HMA Requirements
AL PDMC-PJ-04-AL-2019-007 University of Alabama CSR Facilities $826,107.97 Identified for Further Review
AL PDMC-PJ-04-AL-2019-004 Town of Falkville Storm Shelter Construction $262,009.24 Did Not Meet HMA Requirements
AL PDMC-PJ-04-AL-2019-008 University of Alabama CSR University Services $2,099,964.03 Identified for Further Review
AL PDMC-PJ-04-AL-2019-010 University of Alabama CSR - Bryce Lawn $3,565,669.27 Identified for Further Review
AL PDMC-PJ-04-AL-2019-003 Union Community Safe Room $103,500.00 Identified for Further Review
AL PDMC-PJ-04-AL-2019-002 Town of Camp Hill Community Safe Room $121,950.00 Identified for Further Review
Catawba Indian Nation PDMC-PL-04-SCIT001-2019-001 Catawba Indian Nation Plan Update York County, South Carolina $131,644.00 Identified for Further Review
Catawba Indian Nation PDMC-MC-04-SCIT001-2019-002 Catawba Indian Nation Management Costs, York County, South Carolina $12,471.00 Identified for Further Review
FL PDMC-PJ-04-FL-2019-004 PDM-Installation of 9 Generators at Critical Needs Facilities at Lift Stations $334,923.75 Identified for Further Review
FL PDMC-PJ-04-FL-2019-003 FY2019-PDM-Miami-Dade County, FL: Lemon City Branch Library Hardening Project $146,064.74 Identified for Further Review
FL PDMC-PJ-04-FL-2019-001 FY2019-PDM-Miami-Dade County, FL: South Miami Branch Library Hardening Project $86,353.33 Identified for Further Review
FL PDMC-PJ-04-FL-2019-011 Utility Board of the City of Key West Electric Resilient Infrastructure Project $2,375,469.23 Identified for Further Review
FL PDMC-PJ-04-FL-2019-008 City of Panama City Utility Safe Room $659,631.87 Not Selected
FL PDMC-PJ-04-FL-2019-012 Duval County Public Schools Wind Retrofit Activities $569,999.02 Not Selected
FL PDMC-PJ-04-FL-2019-013 FY2019PDM -Broward- Water Treatment Plan Above Code Mitigation $649,687.50 Not Selected
FL PDMC-PJ-04-FL-2019-009 PDM projects - FY2019 PDM - Santa Rosa County - Metron Estates Subd. Drainage $2,562,226.78 Not Selected
FL PDMC-PJ-04-FL-2019-002 FY2019-PDM-Miami-Dade County-Coconut Grove Branch Library Hardening Project $168,515.56 Not Selected
FL PDMC-PJ-04-FL-2019-007 City of Plantation Mitigation Project $382,499.97 Not Selected
FL PDMC-PJ-04-FL-2019-005 FY2019-PDM-Miami-Dade County, FL: West Dade Regional Library Hardening Project $737,656.33 Not Selected
FL PDMC-PJ-04-FL-2019-010 FY2019 PDM- Broward County- L Shaped Building Hardening $663,477.07 Not Selected
FL PDMC-PJ-04-FL-2019-006 PDM Bayshore Park (Par 3) Retention Pond Resiliency Project $1,617,443.25 Did Not Meet HMA Requirements
FL PDMC-MC-04-FL-2019-014 State of Florida PDM Management Cost $1,114,970.71 Identified for Further Review
GA PDMC-PJ-04-GA-2019-002 Cobb County 2019 PDM Acquisition Project $575,000.00 Identified for Further Review
GA PDMC-PL-04-GA-2019-001 City of Tybee Island Master Stormwater Management Plan (Advance Assistance) $189,375.00 Identified for Further Review
GA PDMC-MC-04-GA-2019-003 2019 PDM Management Grant $76,437.00 Identified for Further Review
KY PDMC-PL-04-KY-2019-004 Western Kentucky University Multi-Hazard Mitigation Plan Development $168,778.00 Identified for Further Review
KY PDMC-PL-04-KY-2019-007 Paintsville Flooding Hazard Mitigation Plan for Stormwater $75,000.00 Identified for Further Review
KY PDMC-PL-04-KY-2019-001 City of Ravenna 6th and 7th Street Drainage Improvement Advance Assistance $89,775.00 Identified for Further Review
KY PDMC-PL-04-KY-2019-005 Pikeville Pond Project Advance Assistance $112,500.00 Identified for Further Review
KY PDMC-PJ-04-KY-2019-002 Hillaire Drive Acquisition $129,307.97 Not Selected
KY PDMC-PJ-04-KY-2019-003 City of Morganfield Exposed Gas Line $219,784.25 Not Selected
KY PDMC-PJ-04-KY-2019-006 City of Clay $50,368.48 Did Not Meet HMA Requirements
KY PDMC-PL-04-KY-2019-008 Kentucky Water Infrastructure Vulnerability Assessment for Risk Informed Invests $378,852.00 Not Selected
KY PDMC-MC-04-KY-2019-009 PDM2019 Kentucky Management Costs $120,989.00 Identified for Further Review
NC PDMC-PL-04-NC-2019-007 Town of Windsor Advanced Assistance $146,250.00 Identified for Further Review
NC PDMC-PL-04-NC-2019-009 City of New Bern - Hazard Mitigation and Resiliency Plan $62,000.00 Identified for Further Review
NC PDMC-PJ-04-NC-2019-004 City of Gastonia Pump Station Mitigation $1,492,950.00 Identified for Further Review
NC PDMC-PJ-04-NC-2019-008 City of Lumberton - PDM19 (Lift Stations Floodproofing) $742,500.00 Did Not Meet HMA Requirements
NC PDMC-PJ-04-NC-2019-012 Town of Lake Waccamaw Project PDM2019 $281,250.00 Did Not Meet HMA Requirements
NC PDMC-PJ-04-NC-2019-003 Hoke County PDM 2019 $183,537.00 Did Not Meet HMA Requirements
NC PDMC-PJ-04-NC-2019-005 Dare County Generator 2020 $157,500.00 Did Not Meet HMA Requirements
NC PDMC-PJ-04-NC-2019-002 County of Lenoir Generator Project $525,000.00 Did Not Meet HMA Requirements
NC PDMC-PJ-04-NC-2019-010 City of Lumberton - PDM19 (Waste Water Treatment Plant Emergency Generator) $637,500.00 Did Not Meet HMA Requirements
NC PDMC-PJ-04-NC-2019-006 City of Lumberton - PDM19 (Railroad Culvert Replacements) $2,250,000.00 Did Not Meet HMA Requirements
NC PDMC-PJ-04-NC-2019-011 City of Lumberton - PDM19 (Tanglewood Drainage Extension) $8,800,000.00 Did Not Meet HMA Requirements
NC PDMC-PJ-04-NC-2019-001 Beaufort County NC Multi Hazard Mitigation Project $816,929.36 Did Not Meet HMA Requirements
NC PDMC-MC-04-NC-2019-013 NCEM: PDMC FY19 Management Cost $1,199,659.95 Identified for Further Review
Seminole Tribe of Florida PDMC-PJ-04-FLIT001-2019-001 Hollywood Tribal Center Building Hardening Sub Ap 1 Windows $575,000.00 Did Not Meet HMA Requirements
Seminole Tribe of Florida PDMC-PJ-04-FLIT001-2019-003 IT Data Center Generators Sub Ap 2 $286,875.00 Not Selected
Seminole Tribe of Florida PDMC-PJ-04-FLIT001-2019-002 Hollywood Tribal Center Building Hardening Sub Ap 3 Building Envelope $2,198,056.20 Identified for Further Review
SC PDMC-PL-04-SC-2019-002 Chester Co Local Multi-jurisdictional Plan Update 2021 $18,000.00 Identified for Further Review
SC PDMC-PL-04-SC-2019-011 Spartanburg County Mitigation Plan Update $36,460.75 Identified for Further Review
SC PDMC-PJ-04-SC-2019-001 Colleton County SC SMN/Gen Pop Mitigation Project $290,066.83 Identified for Further Review
SC PDMC-PJ-04-SC-2019-003 Hilton Head Island 911 Communications Tower Generator at 486 Wm. Hilton Pkwy. $36,637.83 Identified for Further Review
SC PDMC-PJ-04-SC-2019-007 Sumter County EMS / Coroner Headquarters Backup Power $61,031.25 Identified for Further Review
SC PDMC-PJ-04-SC-2019-008 Town of Ridgeland - Engine Driven Emergency Power Supply System Project $109,500.00 Identified for Further Review
SC PDMC-PL-04-SC-2019-006 State Hazard Mitigation Plan Update $92,250.00 Identified for Further Review
SC PDMC-PJ-04-SC-2019-005 Marion County Hurricane Safe Room for First Responders $1,750,000.00 Identified for Further Review
SC PDMC-PJ-04-SC-2019-010 Bamberg County EOC Backup Power Project $128,380.40 Not Selected
SC PDMC-PJ-04-SC-2019-004 SCDMV Exterior Hurricane Shutters Project $165,213.89 Identified for Further Review
SC PDMC-PJ-04-SC-2019-009 Lexington County Fire Service Generator upgrade $220,460.62 Did Not Meet HMA Requirements
SC PDMC-PJ-04-SC-2019-012 City of Columbia Resilient Water Supply $9,958,152.74 Did Not Meet HMA Requirements
SC PDMC-MC-04-SC-2019-013 SC PDM 2019 Management Cost $2,078,532.00 Identified for Further Review
TN PDMC-PJ-04-TN-2019-003 City of Fayetteville Tornado Safe Room $3,750,319.50 Identified for Further Review
TN PDMC-PJ-04-TN-2019-002 Flood Hazard Mitigation Project - Smyrna, TN $3,310,595.86 Did Not Meet HMA Requirements
TN PDMC-PJ-04-TN-2019-001 Shelby County Schools PDM Safe Room Project $1,847,530.88 Identified for Further Review
TN PDMC-PJ-04-TN-2019-004 East Tennessee State University Geotechnical Analysis Mitigation Strategies $243,950.00 Did Not Meet HMA Requirements
TN PDMC-MC-04-TN-2019-005 FY2019 State of Tennessee PDM MC Application $917,952.00 Identified for Further Review
Bad River Band of Lake Superior Tribe of Chippewa Indians PDMC-PL-05-WIIT001-2019-001 Advanced Assistance $165,683.61 Identified for Further Review
IL PDMC-PL-05-IL-2019-012 First Washington County wide Hazard Mitigation Plan $47,244.29 Identified for Further Review
IL PDMC-PL-05-IL-2019-025 McLean County, IL Multi-Hazard Mitigation Plan $44,693.60 Identified for Further Review
IL PDMC-PL-05-IL-2019-026 Pike County, IL Multi-Hazard Mitigation Plan $42,486.60 Identified for Further Review
IL PDMC-PL-05-IL-2019-016 McDonough County, IL Natural Hazard Mitigation Plan $43,651.99 Identified for Further Review
IL PDMC-PL-05-IL-2019-007 Henry and Stark Counties Hazard Mitigation Plan Update $26,845.51 Identified for Further Review
IL PDMC-PL-05-IL-2019-027 Mason County, IL Multi-Hazard Mitigation Plan $44,005.89 Identified for Further Review
IL PDMC-PL-05-IL-2019-021 Jackson County, Illinois Multi-Hazard Mitigation Plan $24,996.35 Identified for Further Review
IL PDMC-PL-05-IL-2019-020 Williamson County, Illinois Multi-Hazard Mitigation Plan $24,996.35 Identified for Further Review
IL PDMC-PL-05-IL-2019-017 Jefferson County, Illinois Multi-Hazard Mitigation Plan $24,996.35 Identified for Further Review
IL PDMC-PL-05-IL-2019-023 Perry County, Illinois Multi-Hazard Mitigation Plan $24,996.35 Identified for Further Review
IL PDMC-PL-05-IL-2019-022 Franklin County, Illinois Multi-Hazard Mitigation Plan $24,996.35 Identified for Further Review
IL PDMC-PL-05-IL-2019-004 Whiteside County, IL Multi-Hazard Mitigation Plan $48,102.00 Identified for Further Review
IL PDMC-PL-05-IL-2019-013 Stephenson County MJMH Mitigation Plan Update $15,000.00 Identified for Further Review
IL PDMC-PL-05-IL-2019-024 2019 Adams County Mitigation Planning Grant $46,136.20 Identified for Further Review
IL PDMC-PL-05-IL-2019-011 Richland County Multi-Hazard Mitigation Plan Update $45,000.22 Identified for Further Review
IL PDMC-PL-05-IL-2019-015 DuPage County Advance Assistance Code 904.2 $74,960.00 Did Not Meet HMA Requirements
IL PDMC-PL-05-IL-2019-014 Northlake Illinois - Advance Assistance code 904.2 $37,500.00 Identified for Further Review
IL PDMC-PL-05-IL-2019-008 McHenry-Lake Counties Nippersink Creek Advance Assistance Code 904.2 $85,838.00 Did Not Meet HMA Requirements
IL PDMC-PJ-05-IL-2019-001 City of Ottawa Green Street Resilient Infrastructure Project 402.3 $3,428,239.00 Identified for Further Review
IL PDMC-PJ-05-IL-2019-006 2019 Machesney Park PDM Property Acquisition Project $3,000,000.00 Did Not Meet HMA Requirements
IL PDMC-PJ-05-IL-2019-002 Freeport Census Tract 7 Pre-Flood Mitigation Purchase and Demolition Project $3,835,725.00 Identified for Further Review
IL PDMC-PJ-05-IL-2019-009 Flood Control - Floodwall $788,411.25 Identified for Further Review
IL PDMC-PJ-05-IL-2019-028 Village of Villa Park Community Flood Mitigation - Sugar Creek Watershed $4,000,000.00 Identified for Further Review
IL PDMC-PJ-05-IL-2019-018 City of Marshall Big Creek Stream Restoration & Wellfield Protection Phase II $480,885.00 Did Not Meet HMA Requirements
IL PDMC-PJ-05-IL-2019-005 Crestwood Gardens Subdivision Drainage/Stormwater Management Project $1,239,363.75 Did Not Meet HMA Requirements
IL PDMC-PJ-05-IL-2019-010 Village of Harwood Heights Flood Mitigation Project $1,234,634.25 Not Selected
IL PDMC-PJ-05-IL-2019-003 Village of Robbins Flood Mitigation and Renewal Project $4,000,000.00 Did Not Meet HMA Requirements
IL PDMC-PJ-05-IL-2019-019 Emergency Back-up Generator $75,000.00 Did Not Meet HMA Requirements
IL PDMC-MC-05-IL-2019-029 FY19- PDM State Management Costs-2020 $2,353,506.80 Identified for Further Review
IN PDMC-PL-05-IN-2019-004 Indiana County MHMP Updates - PDMC 19 $291,867.00 Identified for Further Review
IN PDMC-PJ-05-IN-2019-001 Town of Holton Storm Shelter $224,145.00 Identified for Further Review
IN PDMC-PL-05-IN-2019-005 Rush Co. Drainage Study - Advance Assistance PDMC 19 $67,055.61 Identified for Further Review
IN PDMC-PJ-05-IN-2019-002 City of Decatur FFY2019 Flood Acquisition Project $374,400.00 Identified for Further Review
IN PDMC-PJ-05-IN-2019-003 City of Fort Wayne FFY2019 Flood Mitigation Project $479,070.00 Identified for Further Review
IN PDMC-MC-05-IN-2019-006 Indiana Management Cost Application - PDMC 19 $143,649.48 Identified for Further Review
MI PDMC-PL-05-MI-2019-001 Clare County Hazard Mitigation Plan Update, Clare County Michigan $40,000.08 Identified for Further Review
MI PDMC-PL-05-MI-2019-009 Create/Update Ionia County Hazard Mitigation Plan $29,999.58 Identified for Further Review
MI PDMC-PL-05-MI-2019-006 Isabella County 2019 Hazard Mitigation Plan Project $37,875.00 Identified for Further Review
MI PDMC-PL-05-MI-2019-003 Muskegon County Hazard Mitigation Plan Update $29,999.40 Identified for Further Review
MI PDMC-PL-05-MI-2019-014 Little River Band of Ottawa Indians Hazard Mitigation Plan $32,999.60 Identified for Further Review
MI PDMC-PL-05-MI-2019-007 Northwest Michigan Natural Hazard Mitigation Plan $296,999.20 Identified for Further Review
MI PDMC-PL-05-MI-2019-002 Update Hazard Mitigation Plans for Lake Mason & Oceana Counties $117,937.50 Identified for Further Review
MI PDMC-PJ-05-MI-2019-004 Thomas Township Pump Station #6 Relocation $425,858.47 Did Not Meet HMA Requirements
MI PDMC-PJ-05-MI-2019-008 East China Township Mitigation Project $207,690.30 Did Not Meet HMA Requirements
MI PDMC-PJ-05-MI-2019-011 Texas Township Lake Flood Mitigation $772,275.00 Did Not Meet HMA Requirements
MI PDMC-PJ-05-MI-2019-012 City of Luna Pier Mitigation Project PDM 2019 $652,152.66 Identified for Further Review
MI PDMC-PJ-05-MI-2019-010 Estral Beach 2019 PDM 5 Home Elevation Project $399,746.25 Identified for Further Review
MI PDMC-PJ-05-MI-2019-005 Generator Installation at Water Pump Stations $2,074,102.50 Not Selected
MI PDMC-MC-05-MI-2019-013 State of Michigan-FY 2019 PDM Management Cost $290,686.66 Identified for Further Review
MN PDMC-PL-05-MN-2019-002 HSEM 9 County Plan Updates $288,000.00 Identified for Further Review
MN PDMC-PJ-05-MN-2019-001 Metropolitan Airports Commission Safety and Security Center $4,521,233.75 Did Not Meet HMA Requirements
OH PDMC-PJ-05-OH-2019-003 Village of Wellsville PDM 19 Flood Mitigation Project $48,712.00 Identified for Further Review
OH PDMC-PJ-05-OH-2019-004 Ohio Safe Room Rebate Program FY 19 (Set-A-Side) $526,125.00 Identified for Further Review
OH PDMC-PL-05-OH-2019-001 Hunter's Run Conservancy District Mitigation Project - Advanced Assistance $199,500.00 Did Not Meet HMA Requirements
OH PDMC-MC-05-OH-2019-002 PDM FY2019 State of Ohio Recipient Management Cost Application $77,433.75 Identified for Further Review
Prairie Island Indian Community PDMC-PJ-05-MNIT001-2019-001 Prairie Island Indian Community $457,024.25 Did Not Meet HMA Requirements
WI PDMC-PJ-05-WI-2019-005 Cadiz Township/Green County - Acquisition/Demolition Project $167,439.49 Identified for Further Review
WI PDMC-PL-05-WI-2019-013 Fox (IL) River Watershed - Multi-Jurisdictional Multihazard Mitigation Plan $149,890.40 Identified for Further Review
WI PDMC-PL-05-WI-2019-008 Black Earth Creek Watershed Green Infrastructure Plan $150,000.00 Did Not Meet HMA Requirements
WI PDMC-PL-05-WI-2019-017 Integrating Hazard Mitigation Planning into Monroe County's Planning Efforts $63,768.75 Identified for Further Review
WI PDMC-PL-05-WI-2019-002 Waushara County Mitigation Plan Update $31,468.32 Identified for Further Review
WI PDMC-PL-05-WI-2019-003 Door County Hazard Mitigation Plan Update $15,815.24 Identified for Further Review
WI PDMC-PL-05-WI-2019-016 Wisconsin State Hazard Mitigation Enhanced Plan Update $197,051.90 Identified for Further Review
WI PDMC-PJ-05-WI-2019-019 Fox Point, Village - RESILIENT INFRASTRUCTURE 2019 $1,626,337.50 Identified for Further Review
WI PDMC-PJ-05-WI-2019-006 Jefferson County - Acquisition/Demolition Mitigation Project $1,708,613.24 Identified for Further Review
WI PDMC-PJ-05-WI-2019-009 Abbotsford, City - Community Safe Room Project $2,188,461.34 Identified for Further Review
WI PDMC-PJ-05-WI-2019-012 Owen, City - Community Safe Room Project $1,923,411.79 Identified for Further Review
WI PDMC-PJ-05-WI-2019-011 Luck, Village - Community Safe Room Project $2,221,811.15 Identified for Further Review
WI PDMC-PL-05-WI-2019-014 Waukesha County Hazard Mitigation Plan Update $41,280.00 Identified for Further Review
WI PDMC-PL-05-WI-2019-004 Buffalo County Multi-Hazards Mitigation Plan Update $29,464.23 Identified for Further Review
WI PDMC-PL-05-WI-2019-001 Douglas County Hazard Mitigation Plan Update $30,902.20 Identified for Further Review
WI PDMC-PL-05-WI-2019-010 Marathon County All Hazards Mitigation Plan Update $39,375.00 Identified for Further Review
WI PDMC-PL-05-WI-2019-007 Village of LaValle Advanced Assistance $103,260.00 Identified for Further Review
WI PDMC-PL-05-WI-2019-015 Sauk County PDM Advance Assistance (Baraboo River Study) $60,000.00 Did Not Meet HMA Requirements
WI PDMC-MC-05-WI-2019-018 PDM 2019 State Management Costs $1,075,182.86 Identified for Further Review
AR PDMC-PJ-06-AR-2019-001 Garland County Safe-room Retrofit $364,427.25 Did Not Meet HMA Requirements
AR PDMC-PL-06-AR-2019-003 Fulton County Multi-Jurisdictional Mitigation Plan 2019 $30,000.00 Identified for Further Review
AR PDMC-PL-06-AR-2019-004 Baxter County Multi-jurisdictional Hazard Mitigation Plan Update $30,000.00 Identified for Further Review
AR PDMC-PJ-06-AR-2019-010 Black River Technical College Randolph County Resilient Infrastructure Project $1,158,562.50 Did Not Meet HMA Requirements
AR PDMC-PJ-06-AR-2019-006 Perryville School District Safe-room $960,000.00 Not Selected
AR PDMC-PJ-06-AR-2019-005 City of Clarksville Mitigation Project $1,720,500.00 Did Not Meet HMA Requirements
AR PDMC-PJ-06-AR-2019-002 Harmony Grove Safe Room $2,962,775.37 Identified for Further Review
AR PDMC-PJ-06-AR-2019-007 Cotter School District $1,380,462.27 Not Selected
AR PDMC-PJ-06-AR-2019-008 Black River Technical College Randolph County Pre-Disaster Mitigation Project $1,158,562.50 Did Not Meet HMA Requirements
AR PDMC-MC-06-AR-2019-009 Arkansas 2019 PDM Management Costs $860,672.25 Identified for Further Review
Cherokee Nation Emergency Management PDMC-PJ-06-OKIT004-2019-001 Cherokee Immersion Storm Safe Shelter $227,167.50 Identified for Further Review
Cherokee Nation Emergency Management PDMC-PJ-06-OKIT004-2019-002 Hulbert Community Storm Safe Shelter $227,167.50 Identified for Further Review
Cherokee Nation Emergency Management PDMC-MC-06-OKIT004-2019-003 Cherokee Nation Community Shelters M & A $37,647.96 Identified for Further Review
Choctaw Nation of Oklahoma PDMC-PJ-06-OKIT002-2019-001 Choctaw Nation Mitigation Project Storm Shelter Rebates $571,875.00 Identified for Further Review
Choctaw Nation of Oklahoma PDMC-PL-06-OKIT002-2019-002 Choctaw Nation Advanced Assistance Wind Feasibility Study $150,000.00 Identified for Further Review
Coushatta Tribe of Louisiana PDMC-PL-06-LAIT001-2019-001 Coushatta Hazard Mitigation Plan Update $131,706.00 Identified for Further Review
Coushatta Tribe of Louisiana PDMC-PL-06-LAIT001-2019-003 Coushatta Advance Assistance Flood Study $162,810.00 Identified for Further Review
Coushatta Tribe of Louisiana PDMC-MC-06-LAIT001-2019-002 Coushatta Tribal Hazard Mitigation Plan Update $28,035.00 Identified for Further Review
LA PDMC-PL-06-LA-2019-011 GOHSEP Statewide Planning Application (1 of 3) $236,249.97 Identified for Further Review
LA PDMC-PL-06-LA-2019-012 GOHSEP Statewide Planning Application (2 of 3) $270,000.00 Identified for Further Review
LA PDMC-PL-06-LA-2019-013 GOHSEP Statewide Planning Application (3 of 3) $67,500.00 Identified for Further Review
LA PDMC-PL-06-LA-2019-002 Advanced Assistance Chappepeela Creek Stormwater Retention Planning Project $98,136.00 Identified for Further Review
LA PDMC-PJ-06-LA-2019-006 TPCG - Resilient Infrastructure - Bayou Black - PDM $9,670,659.00 Identified for Further Review
LA PDMC-PJ-06-LA-2019-008 Hardening Claiborne Pumping Station $183,727.50 Did Not Meet HMA Requirements
LA PDMC-PJ-06-LA-2019-010 District 4 Fire Station Safe Room Project - Walker North Road Location $847,097.25 Not Selected
LA PDMC-PJ-06-LA-2019-001 LUMCON Roof Replacement $878,215.50 Did Not Meet HMA Requirements
LA PDMC-PJ-06-LA-2019-003 TPCG - Elevation of Floodprone Structures - PDM $738,517.16 Identified for Further Review
LA PDMC-PJ-06-LA-2019-009 Lafourche Parish 2019 PDM Elevation Project 1 $785,468.25 Not Selected
LA PDMC-PJ-06-LA-2019-007 Hardening Carrollton Water Plant Engineering Bldg $1,303,090.50 Did Not Meet HMA Requirements
LA PDMC-PJ-06-LA-2019-005 Lafitte PDM-E $1,320,855.00 Identified for Further Review
LA PDMC-PJ-06-LA-2019-004 Monroe City Schools, Lexington Elementary Tornado Shelter Project $3,507,975.00 Not Selected
LA PDMC-MC-06-LA-2019-014 GOHSEP PDM MC FY2019 Application $1,216,506.10 Identified for Further Review
Muscogee (Creek) Nation PDMC-PL-06-OKIT001-2019-001 Tribal Complex Master Drainage Plan $399,927.00 Identified for Further Review
Muscogee (Creek) Nation PDMC-PL-06-OKIT001-2019-002 HMP Update $150,000.00 Identified for Further Review
NM PDMC-PL-06-NM-2019-002 Cibola County All Hazard Mitigation Plan Update $41,250.00 Identified for Further Review
NM PDMC-PL-06-NM-2019-004 De Baca Jurisdictional All Hazard Mitigation Plan Up-Date $37,500.00 Identified for Further Review
NM PDMC-PL-06-NM-2019-003 Guadalupe County Hazard Mitigation Plan $41,250.00 Identified for Further Review
NM PDMC-PL-06-NM-2019-005 Los Alamos County Local Hazard Mitigation Plan $37,500.00 Identified for Further Review
NM PDMC-PL-06-NM-2019-001 Advanced Assistance - Riparia Pond Drainage Improvements $195,338.61 Identified for Further Review
NM PDMC-MC-06-NM-2019-006 State Management Costs $35,283.85 Identified for Further Review
OK PDMC-PJ-06-OK-2019-001 City of Oklahoma City Water Treatment Plant Emergency Power Generation Project $4,000,000.00 Not Selected
OK PDMC-PL-06-OK-2019-002 City of Stillwater Master Drainage Plan: Boomer, East Boomer, West Boomer Creek $375,220.00 Identified for Further Review
OK PDMC-PJ-06-OK-2019-004 River West Phase I Community Safe Room Tulsa $222,711.75 Identified for Further Review
OK PDMC-PJ-06-OK-2019-003 SoonerSafe ISR Phase 25 $574,500.00 Identified for Further Review
OK PDMC-MC-06-OK-2019-005 OEM PDM 2019 SMC $38,017.50 Identified for Further Review
Otoe-Missouria Tribe of Indians PDMC-PJ-06-OKIT003-2019-001 OMT Safe Room TDLC Project $134,855.00 Identified for Further Review
Otoe-Missouria Tribe of Indians PDMC-PJ-06-OKIT003-2019-003 generator project TDLC/Pipestem $57,975.00 Identified for Further Review
Otoe-Missouria Tribe of Indians PDMC-PJ-06-OKIT003-2019-002 OMT BLue Meadows SR $73,211.25 Identified for Further Review
Pueblo of Sandia PDMC-PL-06-NMIT001-2019-001 Pueblo of Sandia Hazard Mitigation Plan $102,473.43 Identified for Further Review
Pueblo of Sandia PDMC-PJ-06-NMIT001-2019-002 Bobcat Ranch Wildfire Mitigation Measures $321,654.37 Did Not Meet HMA Requirements
Pueblo of Sandia PDMC-MC-06-NMIT001-2019-003 Applicant Management Costs $42,393.74 Identified for Further Review
TX PDMC-PL-06-TX-2019-001 Burleson County Multi-Hazard Mitigation Plan $75,000.00 Identified for Further Review
TX PDMC-PL-06-TX-2019-008 HazMAP Updates for Johnson, Somervell, and Wise Counties $270,900.00 Identified for Further Review
TX PDMC-PL-06-TX-2019-009 HazMAP Updates for Ellis and Navarro Counties $226,800.00 Identified for Further Review
TX PDMC-PL-06-TX-2019-010 County of Galveston $90,000.00 Identified for Further Review
TX PDMC-PJ-06-TX-2019-005 EPC - County Flood Resilient Infrastructure Project $542,500.00 Did Not Meet HMA Requirements
TX PDMC-PL-06-TX-2019-012 Denton County Hazard Mitigation Action Plan Update $258,000.00 Identified for Further Review
TX PDMC-PL-06-TX-2019-002 Refugio Multi-Jurisdictional Hazard Mitigation Plan $108,000.00 Identified for Further Review
TX PDMC-PL-06-TX-2019-011 City of Weslaco Multihazard Mitigation Plan $60,000.00 Identified for Further Review
TX PDMC-PL-06-TX-2019-007 PDM- GCWA Hazard Mitigation Plan $63,750.00 Identified for Further Review
TX PDMC-PJ-06-TX-2019-013 UTMB B.64 Trauma Center MEP Elevation $2,391,338.00 Identified for Further Review
TX PDMC-PJ-06-TX-2019-003 City of Farmers Branch PDM Floodway Mitigation Project $2,447,975.25 Identified for Further Review
TX PDMC-PJ-06-TX-2019-004 City of Edinburg Northeast Holding Pond Project $1,500,000.00 Did Not Meet HMA Requirements
TX PDMC-PL-06-TX-2019-006 Pampa/Gray Wildfire Mitigation Planning Project $28,875.00 Identified for Further Review
TX PDMC-MC-06-TX-2019-014 PDM FY19 Management Costs $1,043,813.06 Identified for Further Review
Ysleta del Sur Pueblo PDMC-PL-06-TXIT001-2019-001 Ysleta del Sur Pueblo Hazard Mitigation Plan $74,314.00 Identified for Further Review
IA PDMC-PJ-07-IA-2019-005 City of Burt Energency Shelter Generator $11,425.27 Identified for Further Review
IA PDMC-PJ-07-IA-2019-001 City of Frederika Generator for Fire Station and Community Building $23,076.83 Identified for Further Review
IA PDMC-PJ-07-IA-2019-006 Union County EOC Generator $11,463.75 Identified for Further Review
IA PDMC-PL-07-IA-2019-010 Poweshiek Multi-hazard Mitigation Plan Update $17,818.72 Identified for Further Review
IA PDMC-PL-07-IA-2019-011 Marion County Hazard Mitigation Plan Update $22,500.00 Identified for Further Review
IA PDMC-PL-07-IA-2019-014 Iowa Wood State Contract Multi County Planning $117,947.25 Identified for Further Review
IA PDMC-PL-07-IA-2019-013 Iowa ECICOG State Contract Multi County Planning $207,837.00 Identified for Further Review
IA PDMC-PJ-07-IA-2019-002 RRMU Generator Project - Water Treatment Plant $81,548.25 Identified for Further Review
IA PDMC-PJ-07-IA-2019-007 City of Clinton Beaver Channel Pump Station Generator $338,137.00 Not Selected
IA PDMC-PJ-07-IA-2019-008 Washington County Dogwood Ave. Flood Mitigation $220,137.75 Not Selected
IA PDMC-PJ-07-IA-2019-004 MI Energy Cooperative 14 Mile Retrofit Project $423,000.00 Identified for Further Review
IA PDMC-PJ-07-IA-2019-003 Atchison-Holt Electric Cooperative Northboro Conversion Project $559,890.00 Not Selected
IA PDMC-PL-07-IA-2019-009 Council Bluffs Advanced Assistance $187,500.00 Did Not Meet HMA Requirements
IA PDMC-MC-07-IA-2019-012 PDM 2019 Recipient Management Cost Application $222,227.21 Identified for Further Review
KS PDMC-PJ-07-KS-2019-002 USD 463 Udall, KS Schools weather shelter $450,000.00 Identified for Further Review
KS PDMC-PJ-07-KS-2019-001 Garnett Safe Room Project $36,000.00 Identified for Further Review
KS PDMC-PJ-07-KS-2019-003 Fanestil Meat Floodplain Acquisition $1,818,045.00 Identified for Further Review
KS PDMC-MC-07-KS-2019-004 PDM Management Grant $229,804.00 Identified for Further Review
MO PDMC-PL-07-MO-2019-010 FY19 PDM Set-Aside Hazard Mitigation Planning #1 $299,607.24 Identified for Further Review
MO PDMC-PL-07-MO-2019-011 FY19 PDM Set-Aside Hazard Mitigation Planning #2 $267,450.31 Identified for Further Review
MO PDMC-PJ-07-MO-2019-009 PDM FY-19 Howell Co. Resilient Infrastructure Culvert Project $231,771.00 Did Not Meet HMA Requirements
MO PDMC-PJ-07-MO-2019-001 PDM FY19 Competitive Priorities - Summersville R-II Community Safe Room $1,088,370.00 Identified for Further Review
MO PDMC-PJ-07-MO-2019-002 PDM FY19 Competitive Priorities-Hickory Co. R-I School District Safe Room $1,620,000.00 Not Selected
MO PDMC-PJ-07-MO-2019-007 FY19 PDM Hartville R-II Competitive Safe Room Project $2,024,316.00 Identified for Further Review
MO PDMC-PJ-07-MO-2019-008 FY19 PDM Gainesville R-V Competitive Safe Room Project $2,046,816.00 Identified for Further Review
MO PDMC-PJ-07-MO-2019-003 PDM FY19 Competitive Priorities - Lakeland R-III School District Safe Room $1,206,000.00 Identified for Further Review
MO PDMC-PJ-07-MO-2019-005 FY19-PDM Cabool R-IV Middle School Competitive Safe Room Project $877,175.10 Identified for Further Review
MO PDMC-PJ-07-MO-2019-004 PDM FY19 Competitive Priorities - Holcomb R-III School Dist Community Safe Room $1,833,975.00 Identified for Further Review
MO PDMC-PJ-07-MO-2019-006 FY19 PDM Willow Sprngs R-IV Elem. Competitive Safe Room Project $2,686,500.00 Not Selected
NE PDMC-PL-07-NE-2019-002 North Platte NRD Regional Multihazard Mitigaiton Plan update $74,775.00 Identified for Further Review
NE PDMC-PL-07-NE-2019-003 Lower Loup Natural Resources District Multijurisdictional Hazard Mitigation Plan $105,000.00 Identified for Further Review
NE PDMC-PL-07-NE-2019-001 South Platte NRD Regional Multihazard Mitigation Plan Update $57,450.00 Identified for Further Review
NE PDMC-PL-07-NE-2019-004 Central Platte NRD Multijurisdictional Hazard Mitigation Plan Update $150,000.00 Identified for Further Review
Ponca Tribe of Nebraska PDMC-PL-07-NEIT002-2019-001 Tribal Multi-Hazard Mitigation Plan $67,500.00 Identified for Further Review
Prairie Band Potawatomi Nation PDMC-PJ-07-KSIT001-2019-004 Prairie Band Potawatomi - Tornado Sirens 2020 $236,694.30 Did Not Meet HMA Requirements
Prairie Band Potawatomi Nation PDMC-PL-07-KSIT001-2019-002 Prairie Band Potawatomi - BARA Assessment 2020 $54,000.00 Identified for Further Review
Prairie Band Potawatomi Nation PDMC-PJ-07-KSIT001-2019-001 Prairie Band Potawatomi - Comm Tower Generator 2020 $35,250.00 Did Not Meet HMA Requirements
Prairie Band Potawatomi Nation PDMC-PL-07-KSIT001-2019-003 Prairie Band Potawatomi - Administrative Costs 2020 $24,185.25 Identified for Further Review
Sac and Fox Tribe of the Mississippi in Iowa PDMC-PL-07-IAIT001-2019-001 2019 Advance Assistance Meskwaki Groundwater Recharge Study $199,896.30 Identified for Further Review
Santee Sioux Nation PDMC-PL-07-NEIT001-2019-001 Santee Sioux Nation Disaster Mitigation Plan $112,500.00 Identified for Further Review
CO PDMC-PL-08-CO-2019-013 Custer County Hazard Mitigation Plan Update $36,000.00 Identified for Further Review
CO PDMC-PL-08-CO-2019-010 LAS ANIMAS COUNTY HAZARD MITIGATION PLAN UPDATE $38,250.00 Identified for Further Review
CO PDMC-PL-08-CO-2019-007 Clear Creek County Hazard Mitigation Plan Update $35,999.95 Identified for Further Review
CO PDMC-PL-08-CO-2019-009 Gilpin County Hazard Mitigation Plan Update $36,000.00 Identified for Further Review
CO PDMC-PL-08-CO-2019-011 Elbert County Hazard Mitigation Plan Update $39,000.00 Identified for Further Review
CO PDMC-PL-08-CO-2019-012 City of Thornton 2022 Multi-hazard Mitigation Plan $52,500.00 Identified for Further Review
CO PDMC-PL-08-CO-2019-014 Garfield County Hazard Mitigation Plan Update $37,800.00 Identified for Further Review
CO PDMC-PL-08-CO-2019-008 2022 City of Denver Hazard Mitigation Plan Updated $94,000.00 Identified for Further Review
CO PDMC-PL-08-CO-2019-005 Advanced Assistance - Storm Drainage Master Plan $56,250.00 Identified for Further Review
CO PDMC-PL-08-CO-2019-004 Advanced Assistance - Douglas Wash $150,000.00 Identified for Further Review
CO PDMC-PJ-08-CO-2019-001 Sand Creek, Palmer Park to Galley $2,479,218.75 Did Not Meet HMA Requirements
CO PDMC-PJ-08-CO-2019-003 Cottonwood Creek at Powers $3,645,141.00 Did Not Meet HMA Requirements
CO PDMC-PJ-08-CO-2019-002 Monument Branch $2,241,297.75 Did Not Meet HMA Requirements
CO PDMC-MC-08-CO-2019-006 2019 PDM State Management Cost $851,100.00 Identified for Further Review
Flandreau Santee Sioux Tribe of South Dakota PDMC-PL-08-SDIT001-2019-001 Flandreau Santee Sioux Tribe Hazard Mitigation Plan $35,000.00 Identified for Further Review
MT PDMC-PJ-08-MT-2019-009 Town of Plains - Resilient Infrastructure Project $5,148,500.00 Identified for Further Review
MT PDMC-PJ-08-MT-2019-002 Floodplain Restoring Bridge Project $476,841.59 Identified for Further Review
MT PDMC-PJ-08-MT-2019-003 Ravalli County Como Dam Mutithazard Mitigation Project $1,788,859.00 Did Not Meet HMA Requirements
MT PDMC-PJ-08-MT-2019-004 Missoula Rock Creek Fire Mitigation Project $919,950.00 Did Not Meet HMA Requirements
MT PDMC-PJ-08-MT-2019-005 City of Great Falls Missouri River Shoreline Mitigation Project 2019 $397,749.75 Identified for Further Review
MT PDMC-PJ-08-MT-2019-006 Northwest Toston Storm Water Mitigation Project PDM Grant $243,675.00 Did Not Meet HMA Requirements
MT PDMC-PL-08-MT-2019-012 Montana Regional Multi-Hazard Mitigation Plans $257,512.50 Identified for Further Review
MT PDMC-PJ-08-MT-2019-001 Sand Creek Canal ADVANCE ASSISTANCE $15,000.00 Did Not Meet HMA Requirements
MT PDMC-PJ-08-MT-2019-007 Red Lodge Mountain Hazardous Fuel Mitigation / Defensible Space Project $259,600.00 Did Not Meet HMA Requirements
MT PDMC-MC-08-MT-2019-013 State of Montana PDM Management Costs 2019 $877,200.00 Identified for Further Review
MT PDMC-PL-08-MT-2019-011 Garfield County Multihazard Migitation Plan $25,000.00 Identified for Further Review
MT PDMC-PJ-08-MT-2019-008 Huntley Project Irrigation District Bank Stabilization Project $857,525.45 Not Selected
MT PDMC-PJ-08-MT-2019-010 ADVANCED ASSISTANCE for acquisition evaluation $7,550.00 Identified for Further Review
ND PDMC-PJ-08-ND-2019-001 City of Beulah Floodway Property Remediation Project $64,639.20 Identified for Further Review
ND PDMC-PJ-08-ND-2019-011 Unity Medical Center - FY2019 Generator Project $458,207.00 Identified for Further Review
ND PDMC-PJ-08-ND-2019-004 Walsh County PDM Project - Administrative Building Emergency Generator $37,883.25 Identified for Further Review
ND PDMC-PL-08-ND-2019-014 Williams County MHMP Update $45,000.00 Identified for Further Review
ND PDMC-PL-08-ND-2019-006 Ramsey County MHMP Update $22,200.00 Identified for Further Review
ND PDMC-PL-08-ND-2019-010 Walsh County MHMP Update $32,760.00 Identified for Further Review
ND PDMC-PL-08-ND-2019-005 Mountrail County MHMP Update $30,455.00 Identified for Further Review
ND PDMC-PL-08-ND-2019-012 Foster County MHMP Update $25,988.00 Identified for Further Review
ND PDMC-PL-08-ND-2019-008 Renville County MHMP Update $19,200.00 Identified for Further Review
ND PDMC-PL-08-ND-2019-015 State of North Dakota Advance Assistance Project $88,496.30 Identified for Further Review
ND PDMC-PL-08-ND-2019-013 State of North Dakota Enhanced Mitigation Plan Addendum - Space Weather/EMP $197,020.33 Did Not Meet HMA Requirements
ND PDMC-PJ-08-ND-2019-016 State of North Dakota Storm Shelters $945,696.74 Not Selected
ND PDMC-PJ-08-ND-2019-009 2019 PDM NDDES Critical Facility Generators $945,445.44 Not Selected
ND PDMC-PJ-08-ND-2019-003 Walsh Rural Water District Emergency Generators Project $312,000.00 Not Selected
ND PDMC-PJ-08-ND-2019-002 University of Mary Slope Stability Project - Phase III $1,637,212.50 Identified for Further Review
ND PDMC-PJ-08-ND-2019-007 2019 PDM Cass County Acquisitions $2,105,428.50 Not Selected
ND PDMC-MC-08-ND-2019-017 2019 PDM State Management Costs $719,673.57 Identified for Further Review
SD PDMC-PJ-08-SD-2019-001 Custer Floodway Structure Removal, Acquisition and Open Space Project $159,610.50 Identified for Further Review
SD PDMC-PJ-08-SD-2019-009 City of Mitchell Ash Street Property Acquisition $37,200.00 Identified for Further Review
SD PDMC-PJ-08-SD-2019-010 Vibrog Drainage Improvement $234,825.00 Did Not Meet HMA Requirements
SD PDMC-PJ-08-SD-2019-011 Kingsbury County Emergency Management (KEC Line 6) $73,421.91 Identified for Further Review
SD PDMC-PL-08-SD-2019-003 Edmunds County PDM Plan Update $11,250.00 Identified for Further Review
SD PDMC-PL-08-SD-2019-004 Meade County PDM Plan Update $12,000.00 Identified for Further Review
SD PDMC-PL-08-SD-2019-006 Hanson County PDM Plan Update $6,000.00 Identified for Further Review
SD PDMC-PL-08-SD-2019-005 Perkins County PDM Plan Update $7,500.00 Identified for Further Review
SD PDMC-PL-08-SD-2019-008 Brown County PDM Plan Update $14,625.00 Identified for Further Review
SD PDMC-PL-08-SD-2019-007 Buffalo County and Crow Creek Sioux Tribe PDM Plan Update $6,000.00 Identified for Further Review
SD PDMC-PL-08-SD-2019-002 Deuel County PDM Plan Update $11,985.00 Identified for Further Review
SD PDMC-PL-08-SD-2019-013 Town of Keystone (Advance Assistance) $101,250.00 Identified for Further Review
SD PDMC-PL-08-SD-2019-014 Engineering Study of Hiddenwood Creek & Salt Lake (Advanced Assistance) $36,000.00 Identified for Further Review
SD PDMC-PL-08-SD-2019-015 Engineering Study of Snake Creek (Advance Assistance) $37,500.00 Identified for Further Review
SD PDMC-PL-08-SD-2019-016 City of Salem Snake Creek H & H Study (Advance Assistance) $24,375.00 Identified for Further Review
SD PDMC-PL-08-SD-2019-018 Grey Goose Hydrology Study (Advance Assistance) $40,031.25 Did Not Meet HMA Requirements
SD PDMC-PL-08-SD-2019-019 Corona Flooding Project Engineering Study (Advance Assistance) $47,250.00 Did Not Meet HMA Requirements
SD PDMC-PL-08-SD-2019-017 Dell Rapids H & H Study (Advanced Assistance) $42,000.00 Did Not Meet HMA Requirements
SD PDMC-PL-08-SD-2019-020 Six-Mile Creek Study in Brookings (Advance Assistance) $78,553.12 Did Not Meet HMA Requirements
SD PDMC-PL-08-SD-2019-021 Parkston Ash Street Bridge Study (Advance Assistance) $24,000.00 Did Not Meet HMA Requirements
SD PDMC-PL-08-SD-2019-022 Mitchell Dry Run Creek Drainage Study (Advance Assistance) $154,350.00 Did Not Meet HMA Requirements
SD PDMC-PL-08-SD-2019-023 Estelline Flood Water Engineering Study (Advance Assistance) $94,500.00 Did Not Meet HMA Requirements
SD PDMC-PJ-08-SD-2019-012 Rapid City Fire Department Ignition Resistant Roofing Project #2 $319,276.40 Identified for Further Review
SD PDMC-MC-08-SD-2019-024 PDM 2019 Management Cost $156,675.32 Identified for Further Review
UT PDMC-PJ-08-UT-2019-007 UFA Earthquake Emergency Generators $114,558.00 Identified for Further Review
UT PDMC-PJ-08-UT-2019-004 Saratoga Springs Emergency Generator/Seismic Retrofit $375,000.00 Did Not Meet HMA Requirements
UT PDMC-PJ-08-UT-2019-012 Interlaken Township Water System Emergency Generator $40,575.00 Identified for Further Review
UT PDMC-PL-08-UT-2019-014 Morgan County Mitigation Plan Update $22,500.00 Identified for Further Review
UT PDMC-PJ-08-UT-2019-006 UFA Earthquake Hazard Mitigation of Fire Stations $1,945,147.75 Identified for Further Review
UT PDMC-PJ-08-UT-2019-010 Thistle Stream Flood Control $3,900,000.00 Did Not Meet HMA Requirements
UT PDMC-PJ-08-UT-2019-016 Fix the Bricks $3,768,091.00 Identified for Further Review
UT PDMC-PJ-08-UT-2019-013 WBWCD,Seismic Mitigation,Parallel Aqueduct $4,000,000.00 Identified for Further Review
UT PDMC-PJ-08-UT-2019-011 Eureka Flood Control Basin Project $2,164,939.00 Did Not Meet HMA Requirements
UT PDMC-PJ-08-UT-2019-003 Bountiful Critical Facilities Generators $326,386.50 Not Selected
UT PDMC-PJ-08-UT-2019-005 Kanab City Flood Mitigation Basin Project $4,000,000.00 Did Not Meet HMA Requirements
UT PDMC-PJ-08-UT-2019-002 City of West Jordan Flooding Mitigation Project $292,500.00 Did Not Meet HMA Requirements
UT PDMC-PL-08-UT-2019-009 Millcreek Debris Basin Advance Assistance $124,999.87 Identified for Further Review
UT PDMC-PL-08-UT-2019-001 Honeyville Flooding Mitigation Advance Assistance $75,000.00 Identified for Further Review
UT PDMC-PJ-08-UT-2019-008 Penstock Waterlines Resilient Infrastructure Project $8,072,625.00 Did Not Meet HMA Requirements
UT PDMC-PL-08-UT-2019-017 Utah Climate Adaptation Plan $75,000.00 Did Not Meet HMA Requirements
UT PDMC-PL-08-UT-2019-018 URM Implementation and Educational Outreach $375,000.00 Did Not Meet HMA Requirements
UT PDMC-MC-08-UT-2019-015 Utah 2019 PDM Management $1,162,500.00 Identified for Further Review
WY PDMC-PL-08-WY-2019-004 Goshen-Gering Ft. Laramie Irrigation District Tunnels Design and Planning $200,000.00 Identified for Further Review
WY PDMC-PL-08-WY-2019-002 Upper North Platte River Planning at Boozer Creek $84,400.00 Did Not Meet HMA Requirements
WY PDMC-PJ-08-WY-2019-001 Weston County Mitigation Project $73,368.75 Did Not Meet HMA Requirements
WY PDMC-PL-08-WY-2019-005 Town of Mills Riverbank Stabilization & Restoration Advance Assistance Project $56,250.00 Did Not Meet HMA Requirements
WY PDMC-PL-08-WY-2019-003 City of Torrington WY Advance Assistance 2019 $198,900.00 Did Not Meet HMA Requirements
WY PDMC-PJ-08-WY-2019-006 North Fork Hydro-Mitigation Improvement Project $967,314.07 Did Not Meet HMA Requirements
AZ PDMC-PL-09-AZ-2019-008 2019-PDM-Advanced Assistance- City of Bisbee Fire Suppression System $197,250.00 Identified for Further Review
AZ PDMC-PJ-09-AZ-2019-001 2019 - PDM - Resilient Infrastructure - Ephraim Canyon Flood Project $8,606,283.96 Identified for Further Review
AZ PDMC-PJ-09-AZ-2019-002 2019-PDM-Oro Valley-Generator $93,750.00 Identified for Further Review
AZ PDMC-PJ-09-AZ-2019-003 2019 - PDM - Navajo County/Pinetop FD Hazardous Fuels Mitigation $155,400.00 Identified for Further Review
AZ PDMC-PJ-09-AZ-2019-006 2019-PDM-Pinetop Lakeside Public Works Emergency Generator $47,148.34 Did Not Meet HMA Requirements
AZ PDMC-PJ-09-AZ-2019-005 2019 PDM Standby Generators-Show Low Municipal Wells $201,900.00 Identified for Further Review
AZ PDMC-PJ-09-AZ-2019-016 2019 - PDM - Flagstaff Urban Trail Low Water Crossing Repair $19,671.00 Identified for Further Review
AZ PDMC-PJ-09-AZ-2019-007 2019-PDM-ACD2 Cottonwood $283,952.00 Identified for Further Review
AZ PDMC-PJ-09-AZ-2019-009 2019-PDM-ACD2 Blue Canyon $542,765.00 Did Not Meet HMA Requirements
AZ PDMC-PJ-09-AZ-2019-011 2019 - PDM - Project/Yarnell - Looka Way Flood Mitigation Project $114,419.25 Did Not Meet HMA Requirements
AZ PDMC-PJ-09-AZ-2019-012 2019 - PDM - Project/Rimrock - Floodplain Property Acquisition and Demolition $486,338.25 Identified for Further Review
AZ PDMC-PJ-09-AZ-2019-004 2019-PDM-ACD2 Houck $193,782.00 Identified for Further Review
AZ PDMC-PJ-09-AZ-2019-013 2019 - PDM - Havasupai Wash #3 - Wash Stabilization Improvements $1,694,135.00 Did Not Meet HMA Requirements
AZ PDMC-PJ-09-AZ-2019-014 2019 - PDM - Lower Highland Wash Flood Control Project. $2,554,112.81 Did Not Meet HMA Requirements
AZ PDMC-PJ-09-AZ-2019-010 2019-PDM-Eagar Robertson Hollow $1,103,549.00 Identified for Further Review
AZ PDMC-PJ-09-AZ-2019-015 2019 - PDM - Project/Yarnell - Stoneway Flood Mitigation Project $616,858.00 Identified for Further Review
AZ PDMC-MC-09-AZ-2019-017 2019 PDM State of Arizona Management Costs $1,706,575.91 Identified for Further Review
Augustine Band of Cahuilla Indians PDMC-PL-09-CAIT003-2019-001 Augustine Tribe Pre Disaster Mitigation Planning $37,558.50 Identified for Further Review
Big Sandy Rancheria PDMC-PL-09-CAIT007-2019-001 Big Sandy Rancheria Hazard Mitigation Plan $104,658.82 Identified for Further Review
Blue Lake Rancheria PDMC-PJ-09-CAIT002-2019-001 Blue Lake Rancheria Generator Project for Critical Facilities $513,343.20 Identified for Further Review
Blue Lake Rancheria PDMC-MC-09-CAIT002-2019-002 Blue Lake Rancheria Generator Project for Critical Facilities $49,012.50 Identified for Further Review
Cahto Tribe of the Laytonville Rancheria PDMC-PL-09-CAIT001-2019-001 Cahto Tribe Tribal Hazard Mitigation Plan Planning subgrant $73,480.10 Identified for Further Review
Cahto Tribe of the Laytonville Rancheria PDMC-MC-09-CAIT001-2019-002 Cahto Tribe Tribal Mitigation Hazard Plan Management Subgrant $7,414.70 Identified for Further Review
Cahuilla Band of Indians PDMC-PJ-09-CAIT006-2019-001 Cahuilla Band of Indians $431,133.76 Did Not Meet HMA Requirements
CA PDMC-PL-09-CA-2019-011 Stanislaus County Multi-Jurisdictional Hazard Mitigation Plan $225,000.00 Identified for Further Review
CA PDMC-PL-09-CA-2019-003 Elsinore Valley Municipal Water District Local Hazard Mitigation Plan $124,999.75 Identified for Further Review
CA PDMC-PL-09-CA-2019-012 City of Stanton Local Hazard Mitigation Plan $37,500.00 Identified for Further Review
CA PDMC-PL-09-CA-2019-013 City of Paramount Hazard Mitigation Plan Update $37,500.00 Identified for Further Review
CA PDMC-PL-09-CA-2019-006 San Luis Coastal Unified School District Multi-Hazard Mitigation Plan $39,407.22 Identified for Further Review
CA PDMC-PL-09-CA-2019-015 City of Simi Valley Multi-Hazard Mitigation Plan Update $30,375.00 Identified for Further Review
CA PDMC-PL-09-CA-2019-016 New Local Hazard Mitigation Plan - City of Laguna Hills $30,000.00 Identified for Further Review
CA PDMC-PL-09-CA-2019-004 904.2 Advance Assistance for Villa Grande Flood Mitigation Plan $60,000.00 Identified for Further Review
CA PDMC-PJ-09-CA-2019-002 Resilient Infrastructure 402.3 - Sweetwater Dam and South Dike Improvements $5,436,022.80 Did Not Meet HMA Requirements
CA PDMC-PL-09-CA-2019-008 Marin Municipal Water District Local Hazard Mitigation Plan $150,000.00 Identified for Further Review
CA PDMC-PL-09-CA-2019-014 Pajaro/Sunny Mesa CSD Local Hazard Mitigation Plan $112,500.00 Identified for Further Review
CA PDMC-PJ-09-CA-2019-007 Santa Clara River Levee 3 Completion Project $2,500,000.00 Identified for Further Review
CA PDMC-PJ-09-CA-2019-010 PDM19-0023 Sacramento County House Elevation Program Phase 7 $1,124,646.45 Identified for Further Review
CA PDMC-PJ-09-CA-2019-009 RCWD Emergency Power Generation Project; Temecula,CA $1,411,840.00 Not Selected
CA PDMC-PJ-09-CA-2019-001 Cavedale & Trinity Roads Fuels Reduction $321,150.00 Identified for Further Review
CA PDMC-PJ-09-CA-2019-005 Rio Nido Culvert Installations to Reduce Flooding $127,500.00 Did Not Meet HMA Requirements
CA PDMC-MC-09-CA-2019-017 California 2019 PDM Technical Assistance $882,632.92 Identified for Further Review
Cher-Ae Heights Indian Community of the Trinidad Rancheria PDMC-PJ-09-CAIT004-2019-002 Trinidad Harbor and Trinidad Tribal Operations Generators $339,930.00 Identified for Further Review
Cher-Ae Heights Indian Community of the Trinidad Rancheria PDMC-PL-09-CAIT004-2019-001 Trinidad Rancheria Advance Assistance Scenic Drive Slope Stabilization $200,000.00 Identified for Further Review
Cher-Ae Heights Indian Community of the Trinidad Rancheria PDMC-MC-09-CAIT004-2019-003 Trinidad Rancheria Management Costs $28,485.00 Identified for Further Review
IndianFederated Indians ofGraton Rancheria PDMC-PL-09-CAIT008-2019-001 Graton Rancheria 2020 TribalHazard Mitigation Plan $119,487.00 Identified for Further Review
Karuk Tribe Housing Authority PDMC-PJ-09-CAIT010-2019-003 Karuk Tribe Housing Authority, Defensible Space Orleans $146,346.30 Identified for Further Review
Karuk Tribe Housing Authority PDMC-PJ-09-CAIT010-2019-001 Karuk Tribe Housing Authority, Generator Project $428,462.10 Identified for Further Review
Karuk Tribe Housing Authority PDMC-PL-09-CAIT010-2019-002 Advanced Assistance, Karuk Tribe Housing Authority, 2019 $162,360.00 Identified for Further Review
Karuk Tribe Housing Authority PDMC-PJ-09-CAIT010-2019-005 Karuk Tribe Housing Authority, Yreka Catastrophic Wildfire Mitigation Project $3,020,016.75 Did Not Meet HMA Requirements
Karuk Tribe Housing Authority PDMC-MC-09-CAIT010-2019-004 Karuk Tribe Housing Authority, Management Cost Recovery $347,122.80 Identified for Further Review
La Jolla Band of Luiseno Indians PDMC-PJ-09-CAIT009-2019-004 La Jolla Tribal Fuel Suppression Mitigation Project $454,788.00 Did Not Meet HMA Requirements
La Jolla Band of Luiseno Indians PDMC-PJ-09-CAIT009-2019-003 La Jolla Tribal Asset Generator Program $54,900.00 Did Not Meet HMA Requirements
La Jolla Band of Luiseno Indians PDMC-MC-09-CAIT009-2019-002 La Jolla Tribal PDM Management $48,600.00 Identified for Further Review
La Jolla Band of Luiseno Indians PDMC-PL-09-CAIT009-2019-001 La Jolla Pre Disaster Mitigation $154,800.00 Identified for Further Review
Pauma Band Of Mission Indians PDMC-PJ-09-CAIT011-2019-001 Pauma Community Water System Hardening Project $126,000.00 Identified for Further Review
GU PDMC-PJ-09-GU-2019-003 Tumon Bay Underground Lateral Conversion - Guam Predisaster Mitigation Project $2,774,999.89 Did Not Meet HMA Requirements
GU PDMC-PJ-09-GU-2019-002 2020 Building 600 Mitigation Project $1,529,216.35 Did Not Meet HMA Requirements
GU PDMC-PJ-09-GU-2019-001 GMHA Emergency Backup Server Hotsite Project $300,000.00 Did Not Meet HMA Requirements
GU PDMC-MC-09-GU-2019-004 Guam 2019 Technical Assistance $460,772.42 Did Not Meet HMA Requirements
HI PDMC-PL-09-HI-2019-004 State of Hawaii Hazard Mitigation Plan Update $225,000.00 Identified for Further Review
HI PDMC-PL-09-HI-2019-002 Honolulu Board of Water Supply Emergency Power Master Plan $75,000.00 Did Not Meet HMA Requirements
HI PDMC-PL-09-HI-2019-001 Advance Assistance - City Facility Retrofits $125,000.00 Identified for Further Review
HI PDMC-PJ-09-HI-2019-003 State of Hawaii Department of Commerce and Consumer Affairs $6,627,173.92 Did Not Meet HMA Requirements
HI PDMC-MC-09-HI-2019-005 State Management Cost - HI-EMA $965,666.00 Identified for Further Review
NV PDMC-PL-09-NV-2019-004 Carson City HMP Update $86,250.00 Identified for Further Review
NV PDMC-PL-09-NV-2019-005 Churchill County Multi-Jurisdictional HMP Update $61,500.00 Identified for Further Review
NV PDMC-PL-09-NV-2019-002 Clark County Hazard Mitigation Plan Update $225,000.00 Identified for Further Review
NV PDMC-PJ-09-NV-2019-007 Douglas County Emergency Back-up Generator $90,000.00 Identified for Further Review
NV PDMC-PL-09-NV-2019-008 City of Caliente Flood Control Application for Advance Assistance $179,837.40 Identified for Further Review
NV PDMC-PJ-09-NV-2019-001 City of Reno City Hall Seismic Upgrade $4,000,000.00 Identified for Further Review
NV PDMC-PJ-09-NV-2019-003 City of Henderson Generator Project $2,129,801.25 Did Not Meet HMA Requirements
NV PDMC-MC-09-NV-2019-006 PDM 2019 Management Costs $766,218.75 Identified for Further Review
CNMI PDMC-PL-09-MP-2019-001 CNMI Standard State Mitigation Plan Update 2020 $225,000.00 Identified for Further Review
CNMI PDMC-MC-09-MP-2019-002 FY19 PDM State Management Cost $22,500.00 Identified for Further Review
SHOSHONE PAIUTE TRIBES PDMC-PJ-09-NVIT001-2019-001 Duck Valley Reservation Lift Station $370,062.00 Did Not Meet HMA Requirements
Soboba Band of Luiseno Indians PDMC-PL-09-CAIT005-2019-002 Soboba Residential Stormwater Mitigation Plan-Advance Assistance $78,750.00 Identified for Further Review
Soboba Band of Luiseno Indians PDMC-PJ-09-CAIT005-2019-001 Soboba Master Drainage Line G Mitigation Project $534,846.00 Did Not Meet HMA Requirements
Soboba Band of Luiseno Indians PDMC-MC-09-CAIT005-2019-003 Soboba Management Costs $51,750.00 Identified for Further Review
AK PDMC-PL-10-AK-2019-002 2019 Plans Block I $172,981.75 Identified for Further Review
AK PDMC-PL-10-AK-2019-003 2019 Plans Block II $180,213.75 Identified for Further Review
AK PDMC-PL-10-AK-2019-001 Advanced Assistance - Akiak Home Relocation and Managed Retreat Project $150,000.00 Identified for Further Review
AK PDMC-MC-10-AK-2019-004 2019 State Management Costs $50,500.34 Identified for Further Review
Chitina Traditional Indian Village Council PDMC-PL-10-AKIT009-2019-001 Chitina HMP update $10,116.00 Identified for Further Review
Ekwok Village Council PDMC-PL-10-AKIT006-2019-001 Native Village of Ekwok - Advance Assistance - Water Resource Planning Study $34,218.00 Identified for Further Review
Ekwok Village Council PDMC-PL-10-AKIT006-2019-002 Native Village of Ekwok - Advance Assistance - Fuel Farm Flood Mit. Assessment $78,633.00 Identified for Further Review
Ekwok Village Council PDMC-PL-10-AKIT006-2019-003 Native Village of Ekwok - Community Hydrology Study $44,788.50 Identified for Further Review
Ekwok Village Council PDMC-MC-10-AKIT006-2019-004 Native Village of Ekwok - Grant Management $15,763.95 Identified for Further Review
ID PDMC-PJ-10-ID-2019-005 Idaho Dept of Lands, North Idaho Shared Stewarship Wildfire Mitigation $465,000.00 Identified for Further Review
ID PDMC-PL-10-ID-2019-002 Oneida County Multihazard Mitigation Plan $15,960.00 Identified for Further Review
ID PDMC-PL-10-ID-2019-003 Teton County, Idaho AHMP Revision 2020 $18,750.00 Identified for Further Review
ID PDMC-PL-10-ID-2019-007 Boundary County Multi-Jurisdictional AHMP Update $23,433.75 Identified for Further Review
ID PDMC-PJ-10-ID-2019-004 City of Driggs PDM South Lift Station Generator $53,456.25 Not Selected
ID PDMC-PJ-10-ID-2019-008 Mt. Harrison Comm. Site Upgrade (Cassia County Idaho) $97,725.00 Did Not Meet HMA Requirements
ID PDMC-PJ-10-ID-2019-001 City of Hayden Generator and Transfer Switch Project $38,625.00 Not Selected
ID PDMC-MC-10-ID-2019-006 2019 PDM State of Idaho MTA $43,125.00 Identified for Further Review
Kalispel Indian Community of the Kalispel Reservation PDMC-PL-10-WAIT003-2019-001 Kalispel Community of the Kalispel Indian Reservation Flood Mitigation Project $68,361.00 Identified for Further Review
Kalispel Indian Community of the Kalispel Reservation PDMC-MC-10-WAIT003-2019-002 Kalispel Community of the Kalispel Indian Reservation Flood Mitigation Project- $6,373.80 Identified for Further Review
Klawock Cooperative Association PDMC-PL-10-AKIT005-2019-001 Klawock Cooperative Association $69,618.91 Identified for Further Review
Metlakatla Indian Community PDMC-PL-10-AKIT004-2019-001 Advance Assistance for Chester Lake Dam Improvement $39,375.00 Identified for Further Review
Metlakatla Indian Community PDMC-PJ-10-AKIT004-2019-002 Defensible Space around Water Treatment Tanks on Annette Islands Reserve $57,280.00 Identified for Further Review
Native Village of Ekuk PDMC-PL-10-AKIT002-2019-001 Native Village of Ekuk - Advance Assistance - Evacuation Route Assessment $162,900.00 Did Not Meet HMA Requirements
Native Village of Ekuk PDMC-MC-10-AKIT002-2019-002 Native Village of Ekuk - Grant Management $16,290.00 Did Not Meet HMA Requirements
Native Village of Ekuk PDMC-PL-10-AKIT007-2019-001 Native Village of Ekuk - Advance Assistance - Evacuation Route Assessment $162,900.00 Identified for Further Review
Native Village of Ekuk PDMC-MC-10-AKIT007-2019-002 Native Village of Ekuk - Grant Management $16,290.00 Identified for Further Review
New Stuyahok Village PDMC-PL-10-AKIT011-2019-001 New Stuyahok Village - Advance Assistance - Emergency Shelter Assessment $76,763.70 Identified for Further Review
New Stuyahok Village PDMC-PL-10-AKIT011-2019-002 New Stuyahok Village - Advance Assistance - Community Hydrology Study $47,538.00 Identified for Further Review
New Stuyahok Village PDMC-PL-10-AKIT011-2019-003 New Stuyahok Village - Advance Assistance - Back-Up Clinic Generator Design $38,403.90 Identified for Further Review
New Stuyahok Village PDMC-MC-10-AKIT011-2019-004 New Stuyahok Village - Grant Management $16,270.56 Identified for Further Review
Newtok Village Council PDMC-PJ-10-AKIT001-2019-001 2021 Resilient Power Distribution Mitigation Newtok to Mertarvik Relocation $443,479.00 Identified for Further Review
Newtok Village Council PDMC-PJ-10-AKIT001-2019-002 2021 Resilient Washeteria Mitigation Newtok to Mertarvik Relocation $1,362,141.00 Identified for Further Review
Newtok Village Council PDMC-PJ-10-AKIT001-2019-003 2021 Resilient Home Mitigation Newtok to Mertarvik Relocation $787,195.00 Identified for Further Review
Nulato Village PDMC-PL-10-AKIT003-2019-001 Nulato Tribal FEMA Plan $46,260.00 Identified for Further Review
OR PDMC-PL-10-OR-2019-003 NHMP Updates - Cities of Albany and Cottage Grove, Marion and Tillamook Counties $275,000.00 Identified for Further Review
OR PDMC-PL-10-OR-2019-002 Washington County OR Multijurisdiction Natural Hazard Mitigation Plan 2022 Update $114,750.00 Identified for Further Review
OR PDMC-PJ-10-OR-2019-001 Johnson Creek Aerial Sewer Seismic Retrofit $438,741.00 Identified for Further Review
OR PDMC-MC-10-OR-2019-004 OMD-OEM State Management Cost for PDM 2019 $59,668.66 Identified for Further Review
Puyallup Tribe of Indians PDMC-PJ-10-WAIT004-2019-001 Generator Project at Critical Tribal Facilities $285,136.00 Identified for Further Review
Squaxin Island Tribe PDMC-PJ-10-WAIT001-2019-001 Squaxin Emergency Power Generators $496,225.00 Identified for Further Review
Twin Hills Village Council PDMC-PL-10-AKIT010-2019-001 Twin Hills Village - Advance Assistance - Beach Road Drainage Project $125,100.00 Identified for Further Review
Twin Hills Village Council PDMC-PL-10-AKIT010-2019-002 Twin Hills Village - Advance Assistance - Back-Up Clinic Generator Design $38,403.90 Identified for Further Review
Twin Hills Village Council PDMC-MC-10-AKIT010-2019-003 Twin Hills Village - Grant Management $16,350.39 Identified for Further Review
Upper Skagit Indian Tribe PDMC-PJ-10-WAIT002-2019-001 Single Family Zone Water Line Seismic Retrofit $575,000.00 Identified for Further Review
Upper Skagit Indian Tribe PDMC-PL-10-WAIT002-2019-002 Advance Assistance: Helmick Wildfire Mitigation and Wastewater Pods Stormwater $153,000.00 Identified for Further Review
Upper Skagit Indian Tribe PDMC-MC-10-WAIT002-2019-003 Management Costs $80,550.00 Identified for Further Review
Village of Clarks Point PDMC-PL-10-AKIT008-2019-001 Village of Clarks Point - Advance Assistance - Coastal Mitigation Project $155,823.30 Identified for Further Review
Village of Clarks Point PDMC-MC-10-AKIT008-2019-002 Village of Clarks Point - Grant Management $15,582.33 Identified for Further Review
WA PDMC-PJ-10-WA-2019-010 3rd Street Stormwater Pump Station Generator $91,395.00 Did Not Meet HMA Requirements
WA PDMC-PJ-10-WA-2019-019 Carbonado WTP Raw Water Reservoir Project $270,000.00 Did Not Meet HMA Requirements
WA PDMC-PJ-10-WA-2019-016 Kitsap County Emergency Operations & 911 Center Uninterruptible Power Source $215,330.00 Did Not Meet HMA Requirements
WA PDMC-PJ-10-WA-2019-009 Vancouver Water Station 5 Reservoir/Pump Station Project $10,000,000.00 Did Not Meet HMA Requirements
WA PDMC-PJ-10-WA-2019-001 City of Seattle Hiawatha Community Center Seismic Retrofit $528,473.28 Identified for Further Review
WA PDMC-PJ-10-WA-2019-007 Lake Meridian Water District 1.9 MG Reservoir and Seismic Regrofit $4,000,000.00 Did Not Meet HMA Requirements
WA PDMC-PJ-10-WA-2019-004 Shaw Creek Relocation Project $3,975,000.00 Did Not Meet HMA Requirements
WA PDMC-PJ-10-WA-2019-014 City of Redmond Washington Hazard Mitigation Project Fire Station 16 $2,442,861.75 Identified for Further Review
WA PDMC-PJ-10-WA-2019-005 William R. Fairchild Airport Runway Earthquake Resilience $3,750,000.00 Did Not Meet HMA Requirements
WA PDMC-PJ-10-WA-2019-008 Covington Water District Tank Replacement Project $4,000,000.00 Did Not Meet HMA Requirements
WA PDMC-PJ-10-WA-2019-017 Sheridan Beach Loop Seismic Upgrade $3,375,000.00 Did Not Meet HMA Requirements
WA PDMC-PJ-10-WA-2019-013 No. 1 Canyon Flood Debris Facility $976,362.65 Identified for Further Review
WA PDMC-PJ-10-WA-2019-011 Chelan County Fire District 1 Wildland Urban Interface Resilient Infrastructure $712,338.49 Identified for Further Review
WA PDMC-PL-10-WA-2019-006 Chelan County Fire District 1 Advance Assistance-Wildfire Mitigation Project $30,042.20 Identified for Further Review
WA PDMC-PL-10-WA-2019-002 Advance Assistance for Tacoma-Pierce County EOC Soil Stabilization $52,500.00 Identified for Further Review
WA PDMC-PL-10-WA-2019-003 Advance Assistance for Tacoma Residential Seismic Retrofit Program $21,000.00 Identified for Further Review
WA PDMC-PL-10-WA-2019-018 Lewis County Multi-Jurisdictional Hazard Mitigation Plan Update $145,173.83 Identified for Further Review
WA PDMC-PL-10-WA-2019-012 Thurston County, WA Region Multi-Jurisdiction Hazards Mitigation Plan Update $166,611.97 Identified for Further Review
WA PDMC-MC-10-WA-2019-015 WA State FY 2019 PDM SMC Grant $1,703,660.49 Identified for Further Review