The Building Resilient Infrastructure and Communities (BRIC) grant program provides proactive investment in resilience for communities so they are better prepared and remain resilient prior to a natural disaster. BRIC provides funds annually for hazard mitigation planning and projects to reduce risk of damage before a disaster.
On Aug. 28, FEMA announced the selection of 124 projects for this year’s BRIC National Competition. In addition, this is a follow-up from May 19, when FEMA announced the BRIC initial selections for the Tribal Set-Aside and the State and Territory Allocation.
The BRIC program also offers help to communities in the form of non-financial direct technical assistance. For this grant cycle, 20 tribal nations and 26 communities (46 total) from more than 100 applications have been selected to receive subject matter expertise and partnership collaboration to bolster a community’s success with project development.
Visit the BRIC Direct Technical Assistance webpage for more information.
Summary of Fiscal Year 2022 Subapplications
FEMA made $2.295 billion available for the Building Resilient Infrastructure and Communities (BRIC) grant program in fiscal year 2022. BRIC received 803 subapplications totaling more than $4.6 billion from 55 states, territories, and the District of Columbia. The agency also received requests from 37 tribal governments totaling more than $56.2 million in the Tribal Set-Aside funds.
Reminder: As in previous years, BRIC funding requests exceeded the amounts available for Hazard Mitigation Assistance grant programs. This trend shows the need for more funding to reduce hazards in the United States.
Summary of Initial Selections Announced in May 2023
For the BRIC initial selections announced in May, FEMA selected 325 subapplications totaling $136 million across 55 states and territories, and 34 tribes.
This funding opportunity provided up to $2 million for every state and territory. This is double the amount of federal funding available in the previous year and a significant increase from the $600,000 available in 2020.
Subapplication Selections for the BRIC National Competition
In August, FEMA announced competitive projects from 38 states, including the District of Columbia, across all 10 FEMA Regions. The selected projects have met the basic eligibility requirements and will enter the next phase of the awards review process. FEMA will provide funding through these selections for states, local communities, and the District of Columbia for critical mitigation projects and activities.
These selection announcements are not awards. FEMA will work with applicants “Identified for Further Review” to conduct programmatic reviews of the selected subapplications before making a final decision for funding.
More Information about the BRIC Total Grant Cycle
FEMA received 803 subapplications totaling more than $4.6 billion from 55 states, territories, and the District of Columbia. Of these submissions, FEMA received subapplications from 127 Economically Disadvantaged Rural Communities, a 15% increase from last year.
Through the National Competition, FEMA selected 124 competitive projects based on the highest composite score until the funding amount available had been reached. These projects are across all 10 FEMA regions in 115 of communities, including one tribe, in 38 states and territories, and the District of Columbia.
Geography Summary
- Of the 38 states and territories selected for an FY22 BRIC competitive grant, 23 states or 60% of all states will be first-time recipients for competitive BRIC funding.
- Fifty-five states and territories across all 10 FEMA Regions will receive funding through the National Competition, State/Territory Allocation or the Tribal Set-Aside.
- For the third year, the increase in tribal nation requests continued to rise. In total, 34 tribes were selected in the Tribal Set-Aside for an estimated $54 million in funding.
Nature-Based Solutions
In the FY22 National Competition, 64 projects included nature-based solutions from 19 states and 8 regions. 69% of those projects were Economically Disadvantaged Rural Communities or disadvantaged communities.
Building Codes
- Of the 124 FY22 National Competition selections, 100 of them come from states that have mandatory building code adoption.
- FEMA will continue to prioritize the adoption and enforcement of modern building codes in the BRIC program and encourage the submission of capability- and capacity-building activities related to building codes to assist states and local communities in being more competitive in accessing funding.
DIsadvantaged Communities
61% of federal share is benefitting Justice40 disadvantaged communities. Eighty-nine subapplications were selected, totaling $152 million, to support Economically Disadvantaged Rural Communities.
BRIC Direct Technical Assistance Highlights
Highlights
FEMA announced in May 2023 the selection of 46 diverse communities, tribal nations and territories set to receive non-financial direct technical assistance to help build community-wide resilience. In total, there are now 74 communities and tribes participating in this initiative.
The initiative has proven successful and one BRIC Direct Technical Assistance (BRIC DTA) community from fiscal year 2020 has been selected under the BRIC National Competition for a project with a total amount of $23 million in federal cost share.
An additional 15 BRIC DTA communities and tribal nations (five communities and 10 tribal nations) were selected in May to receive fiscal year 2022 funding for project scoping or mitigation plan development to enhance disaster resiliency.
The project types include riverine and inland flooding, coastal flooding, drought, wildfire, tornado, dam and all-hazards.
For example, the Oneida Nation in Wisconsin had a subapplication selected for more than $9 million in funding for an innovative microgrid project to address the major risks of prolonged electrical outages for the tribes' main health care facilities.
Types of Subapplications for Fiscal Year 2022
This includes data from state and territory allocations and set-aside for tribes.
Uses of BRIC Assistance | Number of Subapplications Selected | Total Amount of Federal Cost Share |
---|---|---|
Mitigation Projects | 194 | $1,913,634,611 |
Capability and Capacity Building Activities | 255 | $70,059,908 |
Management Costs | 69 | $296,634,361 |
Direct Technical Assistance | 46 | N/A |
Totals | 518 | $2,280,328,880 |
Project Activity Types Summary
There are various types of projects eligible for BRIC funding. The lists below reflect the top five project types by federal cost share requested and the number of subapplications requested and the number of subapplications (not including management costs).
Review definitions for these project types.
TOP FIVE PROJECT TYPES BY FEDERAL SHARE REQUESTED
- Flood Control = $699 million
- Utility/Infrastructure Protection = $537 million
- Stabilization and Restoration = $175 million
- Wildfire Management = $126 million
- Saferoom/Shelter = $79 million
TOP FIVE PROJECT TYPES BY NUMBER OF SUBAPPLICATIONS
- Flooding = 53 subapplications
- Infrastructure Failure = 24 subapplications
- Fire = 9 subapplications
- Drought = 4 subapplications
- Dam/Levee Break = 4 subapplications
For additional information or to ask questions, grant applicants should contact their FEMA regional offices.
Highlights of the Fiscal Year 2022 BRIC Subapplications
Justice40
The BRIC program is one of several federal agency programs participating in Justice40, a Biden-Harris Administration initiative to prioritize federal investments benefitting disadvantaged communities. The Fiscal Year 2021 grant cycle focused on advancing support and access for underserved communities.
FEMA set a baseline to achieving the Justice40 Initiative goals which prioritize delivering at least 40% of the overall benefits to disadvantaged communities. This year FEMA established a baseline within the BRIC and Flood Mitigation Assistance grant programs to achieve that goal and will continue to build on the work we have done to ensure equitable outcomes.
FEMA anticipates continued coordination with the Biden Administration and other federal agencies with Justice40 covered programs.
Two examples of FEMA's commitment to prioritize equity include:
This was one of the first recipients of BRIC DTA in fiscal year 2020. After heavy rain in 2008, several neighborhood roads in the village of DePue were flooded. The increased flow at the wastewater treatment plant caused raw sewage to back up into the basements of homes.
As an Economically Disadvantaged Rural Community, the village will build a new wastewater treatment plant on village property outside of the floodway and floodplain. The old plant will be demolished and left as open space.
The two north-south levee sections will be leveled, and the site will become a riparian habitat. The project also includes building two lift stations to get the influent into the new facility. All building finished floors and doorways will be built above the 500-year flood level.
Danville is an Economically Disadvantaged Rural Community and Danville School District has no protection for its students during severe wind and tornado events. The community plans to build a multi-purpose safe room next to the elementary school. The proposed safe room will have space for 1,126 faculty, staff and students; it will have six wheelchair spaces and be ADA-compliant.
The project includes adding roof materials that will be standing seam metal or single ply and steel exterior doors, frames, and offset doors will be used to prevent assault from flying projectiles (as required by FEMA 361). The HVAC system will be built to meet FEMA’s minimum ventilation ratio. By including nature-based solutions such as permeable pavement, the project should also help improve stormwater management and reduce future risk of flash flooding.
Fiscal Year 2022 Subapplicant Status
The below table shows each subapplication status by state. For this grant cycle, FEMA made two announcements. In May, the status of subapplication selections for BRIC Direct Technical Assistance, the Tribal Set-Aside and State/Territory Allocation were announced. In August, FEMA announced the National Competition selections for BRIC.
Learn about the definition of each status description:
State | Subgrant Identification | Subapplication Title | Federal Cost Share | Subapplication Status |
---|---|---|---|---|
Alabama | EMA-2022-BR-003-0002 | Community Safe Room Site 1 | $86,625 | Identified for Further Review |
Alabama | EMA-2022-BR-003-0004 | Community Safe Room Site 2 | $86,625 | Identified for Further Review |
Alabama | EMA-2022-BR-003-0003 | State Management Costs | $205,023 | Identified for Further Review |
Alabama | EMA-2022-BR-003-0001 | Jackson County Highlands Medical Center Generator | $1,320,075 | Identified for Further Review |
Alaska | EMS-2022-BR-039-0002 | Central Council Tlingit & Haida Indian Tribes of Alaska Management Costs | $6,300 | Identified for Further Review |
Alaska | EMS-2022-BR-034-0001 | The Native Village of Ouzinkie Tribal Multi-Jurisdictional Hazard Mitigation Plan | $26,406 | Identified for Further Review |
Alaska | EMS-2022-BR-039-0001 | Central Council Tlingit & Haida Indian Tribes of Alaska Hazard Mitigation Plan | $57,000 | Identified for Further Review |
Alaska | EMS-2022-BR-011-0003 | Tsunami Evacuation Facility - Project Scoping - Lowell Point Alaska | $135,000 | Identified for Further Review |
Alaska | EMS-2022-BR-020-0001 | Purple Lake Hydro Sea Level Rise Feasibility Study | $159,894 | Identified for Further Review |
Alaska | EMS-2022-BR-011-0006 | Wi | $217,451.70 | Identified for Further Review |
Alaska | EMS-2022-BR-040-0001 | Ninilchik Village Tribe Tribal Hazard Mitigation Plan Project Scoping | $292,746.06 | Identified for Further Review |
Alaska | EMS-2022-BR-011-0004 | City of Homer Adoption and Implementation of International Building Code Edition 2021 | $352,500 | Identified for Further Review |
Alaska | EMS-2022-BR-011-0001 | 8 Hazard Mitigation Plan Updates | $438,624 | Identified for Further Review |
Alaska | EMS-2022-BR-042-0001 | Unit 4 Multi-jurisdiction Hazard Mitigation Plan and Planning Activities | $706,500 | Identified for Further Review |
Alaska | EMS-2022-BR-020-0003 | Management Costs | $1,475,257.20 | Identified for Further Review |
Alaska | EMS-2022-BR-011-0005 | Alaska State Management Costs | $2,995,075.55 | Identified for Further Review |
Alaska | EMS-2022-BR-038-0001 | Shishmaref Protect-In-Place: Shoreline Protection | $5,397,500 | Identified for Further Review |
Alaska | EMS-2022-BR-020-0002 | Chester Lake Reservoir Project Phase I | $13,117,420.75 | Identified for Further Review |
Alaska | EMS-2022-BR-011-0002 | Rockslide Mitigation to Protect Skagway's Critical Port Economy Phased project in Skagway, AK | $19,903,888.16 | Identified for Further Review |
Alaska | EMS-2022-BR-045-0002 | Native Village of Hooper Bay Management Costs | Not Selected | Does Not Meet HMA Requirements |
Alaska | EMS-2022-BR-045-0001 | The Native Village of Hooper Bay Mitigation Plan | Not Selected | Does Not Meet HMA Requirements |
Alaska | EMS-2022-BR-019-0001 | Hazard Mitigation Plan and Emergency Planning | Not Selected | Does Not Meet HMA Requirements |
American Samoa | EMF-2022-BR-040-0009 | State Management Costs | $1,428,042 | Identified for Further Review |
American Samoa | EMF-2022-BR-040-0005 | 2022 Shoreline Protection Projects - Scoping | $1,890,360 | Identified for Further Review |
American Samoa | EMF-2022-BR-040-0008 | Faga'alu Shoreline Project | $10,350,000 | Identified for Further Review |
American Samoa | EMF-2022-BR-040-0001 | Backup Generators | Not Selected | Not Selected for Further Review |
American Samoa | EMF-2022-BR-040-0002 | Route 014 Flood Mitigation | Not Selected | Not Selected for Further Review |
American Samoa | EMF-2022-BR-040-0003 | Aunu'u Wharf Reconstruction - Phase 2 | Not Selected | Does Not Meet HMA Requirements |
American Samoa | EMF-2022-BR-040-0004 | Communication Tower Replacement | Not Selected | Not Selected for Further Review |
American Samoa | EMF-2022-BR-040-0006 | Outreach | Not Selected | Does Not Meet HMA Requirements |
American Samoa | EMF-2022-BR-040-0007 | Central Office Hardening | Not Selected | Not Selected for Further Review |
American Samoa | EMF-2022-BR-040-0010 | Office of Disaster Assistance and Petroleum Management (ODAPM) Disaster Resilience Summit | Not Selected | Does Not Meet HMA Requirements |
Arizona | EMF-2022-BR-005-0006 | Spring Valley Area Drainage Master Study | $150,000 | Identified for Further Review |
Arizona | EMF-2022-BR-005-0007 | Dewey-Humboldt Area Drainage Master Study | $150,000 | Identified for Further Review |
Arizona | EMF-2022-BR-005-0014 | Wilhoit Area Drainage Master Study | $150,000 | Identified for Further Review |
Arizona | EMF-2022-BR-005-0015 | Lonesome Valley Area Drainage Master Study | $150,000 | Identified for Further Review |
Arizona | EMF-2022-BR-005-0017 | Salt Mine Road Drainage Mitigation Study | $150,000 | Identified for Further Review |
Arizona | EMF-2022-BR-005-0001 | Willcox Regional Flood Mitigation and Groundwater Recharge Project Scoping | $200,000 | Identified for Further Review |
Arizona | EMF-2022-BR-005-0024 | Urban Heat Leadership Academy: Heat Mitigation Planning with Underserved Communities | $360,000 | Identified for Further Review |
Arizona | EMF-2022-BR-005-0008 | Town of Miami Flood Control and Wash Improvement Study | $513,000 | Identified for Further Review |
Arizona | EMF-2022-BR-005-0005 | State of Arizona Management Costs | $847,347.70 | Identified for Further Review |
Arizona | EMF-2022-BR-005-0021 | City of Buckeye Historic Downtown Storm Water Flood Mitigation Project | $4,567,482.75 | Identified for Further Review |
Arizona | EMF-2022-BR-005-0002 | East Lafayette Storm Drain | Not Selected | Does Not Meet HMA Requirements |
Arizona | EMF-2022-BR-005-0003 | City of Phoenix, Critical Services Power Redundancy | Not Selected | Not Selected for Further Review |
Arizona | EMF-2022-BR-005-0004 | City of Phoenix Wate Services Department (WSD) Power Redundancy 24th St | Not Selected | Not Selected for Further Review |
Arizona | EMF-2022-BR-005-0009 | Government Tank Flood Post-Wildfire Flood Mitigation Project | Not Selected | Does Not Meet HMA Requirements |
Arizona | EMF-2022-BR-005-0010 | Fountain Hills - El Pueblo Boulevard Culvert Crossing | Not Selected | Not Selected for Further Review |
Arizona | EMF-2022-BR-005-0011 | City of Phoenix, Heat Respite Centers Emergency Generators | Not Selected | Not Selected for Further Review |
Arizona | EMF-2022-BR-005-0012 | Westwood Storm Drain | Not Selected | Does Not Meet HMA Requirements |
Arizona | EMF-2022-BR-005-0013 | City of Phoenix Water Services Department (WSD) Power Redundancy Bulk Power System (BPS) | Not Selected | Does Not Meet HMA Requirements |
Arizona | EMF-2022-BR-005-0016 | City of Phoenix Water Services Department (WSD) Power Redundancy Variable Voltage | Not Selected | Not Selected for Further Review |
Arizona | EMF-2022-BR-005-0018 | Fountain Hills - McDowell Mountain Road Culvert Crossing | Not Selected | Not Selected for Further Review |
Arizona | EMF-2022-BR-005-0019 | Fountain Hills - Del Cambre Avenue Culvert Crossing | Not Selected | Not Selected for Further Review |
Arizona | EMF-2022-BR-005-0020 | Weekes Wash Regional Flood Control Facility Application | Not Selected | Not Selected for Further Review |
Arizona | EMF-2022-BR-005-0022 | Hacienda Estates Stormwater Improvements | Not Selected | Not Selected for Further Review |
Arizona | EMF-2022-BR-005-0023 | Bisbee Reducing Water Loss in Bisbee's Aging Drinking Water System | Not Selected | Does Not Meet HMA Requirements |
Arkansas | EMT-2022-BR-014-0002 | Yell County Hazard Mitigation Plan Update | $30,000 | Identified for Further Review |
Arkansas | EMT-2022-BR-014-0001 | Dallas County Hazard Mitigation Plan | $37,219.50 | Identified for Further Review |
Arkansas | EMT-2022-BR-014-0006 | Columbia County Hazard Mitigation Plan | $37,476 | Identified for Further Review |
Arkansas | EMT-2022-BR-014-0011 | Town Ditch Engineering Study | $73,760 | Identified for Further Review |
Arkansas | EMT-2022-BR-014-0010 | 2023 Little Rock RLP BRIC Mitigation Project | $371,280 | Identified for Further Review |
Arkansas | EMT-2022-BR-014-0007 | City of North Little Rock - Dixie Addition Stormwater Lift Station Project Scoping | $377,919.50 | Identified for Further Review |
Arkansas | EMT-2022-BR-014-0012 | FY 2022 Management Costs | $551,202.88 | Identified for Further Review |
Arkansas | EMT-2022-BR-014-0003 | City of Greenwood Acquisition | $1,072,345 | Identified for Further Review |
Arkansas | EMT-2022-BR-014-0008 | Danville School District Safe Room | $2,511,537.91 | Identified for Further Review |
Arkansas | EMT-2022-BR-014-0004 | City of Beebe Drainage Improvements | Not Selected | Does Not Meet HMA Requirements |
Arkansas | EMT-2022-BR-014-0005 | Clarendon Infrastructure Project 2022 | Not Selected | Not Selected for Further Review |
Arkansas | EMT-2022-BR-014-0009 | Cabot Drainage Study and Project 2022 | Not Selected | Does Not Meet HMA Requirements |
California | EMF-2022-BR-008-0003 | Cahuilla Band of Indians Management Costs | $89,888 | Identified for Further Review |
California | EMF-2022-BR-015-0001 | North Fork Rancheria Tribal Multi-Hazard Mitigation Plan Update | $94,766.40 | Identified for Further Review |
California | EMF-2022-BR-008-0004 | Development & Enforcement of Tribal Building Codes | $95,832 | Identified for Further Review |
California | EMF-2022-BR-002-0003 | Karuk Tribe Housing Authority MicroGrid Green Energy Mitigation Management Cost | $113,190 | Identified for Further Review |
California | EMF-2022-BR-020-0002 | Cher-Ae Heights Indian Community of the Trinidad Rancheria Multi-Hazard Mitigation Plan Update | $135,000 | Identified for Further Review |
California | EMF-2022-BR-002-0001 | Karuk Tribe Housing Authority Micro Grid Green Energy Mitigation Orleans | $395,100 | Identified for Further Review |
California | EMF-2022-BR-044-0010 | Plumas County Round Valley Reservoir Climate Adaptation and NBS Project Scoping | $452,320 | Identified for Further Review |
California | EMF-2022-BR-011-0001 | Morongo Reservation Hydrologic and Hydraulic Study | $488,071.50 | Identified for Further Review |
California | EMF-2022-BR-020-0001 | Management Costs Stabilization | $569,940 | Identified for Further Review |
California | EMF-2022-BR-002-0002 | Karuk Tribe Housing Authority Micro Grid Green Energy Mitigation Happy Camp | $575,100 | Identified for Further Review |
California | EMF-2022-BR-008-0002 | Cahuilla Flood Control Drainage Improvements | $713,160 | Identified for Further Review |
California | EMF-2022-BR-020-0003 | Slope Stabilization Scenic | $1,283,400 | Identified for Further Review |
California | EMF-2022-BR-011-0002 | Morongo Flood Mitigation- Culvert Upsizing Project | $1,471,282.60 | Identified for Further Review |
California | EMF-2022-BR-044-0005 | Moulton Niguel Water District (MNWD) Aliso Creek Watershed Capture & Reuse Project Scoping | $1,547,680 | Identified for Further Review |
California | EMF-2022-BR-020-0004 | Stabilization Tribal Housing | $3,466,800 | Identified for Further Review |
California | EMF-2022-BR-044-0008 | El Dorado Irrigation District Critical Water System Infrastructure Protection Project | $6,995,310 | Identified for Further Review |
California | EMF-2022-BR-044-0011 | City of Santa Cruz Pump Station Mitigation Project | $11,250,000 | Identified for Further Review |
California | EMF-2022-BR-044-0004 | Karuk Tribe Fire-Adaptive Community Resilience Project | $11,499,744 | Identified for Further Review |
California | EMF-2022-BR-044-0009 | City of Shafter-Nature Based Drought Mitigation Project | $12,368,624.99 | Identified for Further Review |
California | EMF-2022-BR-044-0002 | City of Sacramento Beach Lake N. Levee Community Resiliency Nature-Based Habitat Project | $14,977,251 | Identified for Further Review |
California | EMF-2022-BR-044-0007 | San Bernardino County - Cable Creek Basin (Upper) Flood Mitigation Project | $15,000,000 | Identified for Further Review |
California | EMF-2022-BR-044-0021 | City of Auburn Fire Department-Community Hardening for Wildfire Project | $17,338,105.60 | Identified for Further Review |
California | EMF-2022-BR-044-0001 | California Earthquake Authority (CEA) Statewide Multi-Family Soft-Story Seismic Retrofit Program | $20,200,000 | Identified for Further Review |
California | EMF-2022-BR-044-0003 | Santa Cruz County Wildfire Resilient Communities Home Hardening and Nature-Based Mitigations | $21,441,810.81 | Identified for Further Review |
California | EMF-2022-BR-044-0020 | Kern Valley Healthcare District Hospital Seismic Retrofitting Project | $22,700,633.80 | Identified for Further Review |
California | EMF-2022-BR-044-0013 | Rancho Palos Verdes Portuguese Mud/Landslide Community Infrastructure Resilience Project | $23,329,850 | Identified for Further Review |
California | EMF-2022-BR-044-0023 | City of Hillsborough Potable Water Multi-Hazard Resilience via Highline Pipeline Project | $23,379,428.95 | Identified for Further Review |
California | EMF-2022-BR-044-0016 | Yuba County Climate Change Resiliency Project | $29,662,197 | Identified for Further Review |
California | EMF-2022-BR-044-0015 | Napa Community-wide Comprehensive Wildfire Mitigation Program | $37,500,000 | Identified for Further Review |
California | EMF-2022-BR-044-0006 | Mendocino County-Wildfire Community Resilience Project | $37,855,212 | Identified for Further Review |
California | EMF-2022-BR-044-0018 | Inland Empire Recycled Water Intertie and Aquifer Storage Project | $46,330,320 | Identified for Further Review |
California | EMF-2022-BR-044-0012 | City of Riverbank Recycled Water and Water Supply Resiliency Project | $50,000,000 | Identified for Further Review |
California | EMF-2022-BR-044-0014 | Port of San Francisco Downtown Coastal Resilience Project | $50,000,000 | Identified for Further Review |
California | EMF-2022-BR-044-0019 | City of Pacifica Beach Blvd. Infrastructure Resiliency Project | $50,000,000 | Identified for Further Review |
California | EMF-2022-BR-044-0022 | Cal OES State Management Costs | $77,792,250.56 | Identified for Further Review |
California | EMF-2022-BR-008-0001 | Fuel Reduction & Defensible Space Fire Mitigation | Not Selected | Does Not Meet HMA Requirements |
California | EMF-2022-BR-044-0017 | Yuba County Water Agency - Atmospheric River Control (ARC) Spillway Project | Not Selected | Not Selected for Further Review |
Colorado | EMD-2022-BR-003-0003 | City of Loveland Development Services Accreditation | $56,117.25 | Identified for Further Review |
Colorado | EMD-2022-BR-003-0008 | Crestone Fire Fuel Mitigation Project | $104,738 | Identified for Further Review |
Colorado | EMD-2022-BR-003-0002 | Protecting America's Mountain - Electric Line Clearing -- Colorado Springs Utilities | $1,499,997.80 | Identified for Further Review |
Colorado | EMD-2022-BR-003-0005 | State Management Costs | $2,064,026.61 | Identified for Further Review |
Colorado | EMD-2022-BR-003-0001 | Gold Hill Pipeline | $13,819,346.46 | Identified for Further Review |
Colorado | EMD-2022-BR-003-0004 | Creede Flood Infrastructure Mitigation Project | Not Selected | Not Selected for Further Review |
Colorado | EMD-2022-BR-003-0006 | Denver Department of Transportation and Infrastructure (DOTI) - Skeel Reservoir, High Risk Dam Mitigation | Not Selected | Not Selected for Further Review |
Colorado | EMD-2022-BR-003-0007 | Avon Flood Mitigation Project / 331 Nottingham Road & 414 W. Beaver Creek Blvd | Not Selected | Not Selected for Further Review |
Connecticut | EMB-2022-BR-013-0001 | North and South Meadows Stormwater Pumping Station Non-localized Flood Risk Reduction | $176,250 | Identified for Further Review |
Connecticut | EMB-2022-BR-013-0002 | City of Stamford Pump Station Improvements -FY2022 | $2,732,203.50 | Identified for Further Review |
Connecticut | EMB-2022-BR-013-0008 | Connecticut Division of Emergency Management and Homeland Security Management Costs | $8,351,914.43 | Identified for Further Review |
Connecticut | EMB-2022-BR-013-0006 | City of West Haven Flood Hardening Wastewater Treatment Facilities | $11,430,680.25 | Identified for Further Review |
Connecticut | EMB-2022-BR-013-0004 | Resilient Bridgeport Coastal Flood Defense System | $47,583,267.76 | Identified for Further Review |
Connecticut | EMB-2022-BR-013-0003 | Police Generator | Not Selected | Does Not Meet HMA Requirements |
Connecticut | EMB-2022-BR-013-0005 | High Street Extension Culvert Replacement | Not Selected | Does Not Meet HMA Requirements |
Connecticut | EMB-2022-BR-013-0007 | Town of Coventry Microgrid | Not Selected | Does Not Meet HMA Requirements |
Delaware | EMP-2022-BR-007-0002 | 12th Street Bulkhead Replacement Project Management Costs | $57,087.77 | Identified for Further Review |
Delaware | EMP-2022-BR-007-0003 | Public Drinking Water and Wastewater Database Development to Facilitate Mitigation Actions | $434,954.40 | Identified for Further Review |
Delaware | EMP-2022-BR-007-0004 | Public Drinking Water & Wastewater Database Development to Facilitate Mitigation Actions Mgmt Costs | Not Selected | Does Not Meet HMA Requirements |
Delaware | EMP-2022-BR-007-0001 | 12th Street Bulkhead Replacement Project | Not Selected | Does Not Meet HMA Requirements |
District of Columbia | EMP-2022-BR-010-0001 | DC Water Hazard Mitigation Plan Update | $120,000 | Identified for Further Review |
District of Columbia | EMP-2022-BR-010-0005 | DC Management Costs | $440,245.34 | Identified for Further Review |
District of Columbia | EMP-2022-BR-010-0004 | Eastern Avenue Stormwater Pump Station Resiliency Improvements | $670,749 | Identified for Further Review |
District of Columbia | EMP-2022-BR-010-0003 | Deane Avenue Stormwater Pump Station Resiliency Improvements | $816,124 | Identified for Further Review |
District of Columbia | EMP-2022-BR-010-0002 | Outreach and Engineering Technical Assistance | $1,063,876 | Identified for Further Review |
Florida | EMA-2022-BR-009-0010 | Standby Generators for Jefferson County Volunteer Fire Department Stations | $31,768.51 | Identified for Further Review |
Florida | EMA-2022-BR-009-0006 | City of Atlantic Beach, 20th Street Lift Station Generator | $75,520 | Identified for Further Review |
Florida | EMA-2022-BR-009-0004 | Seminole County Emergency Generator | $304,755.93 | Identified for Further Review |
Florida | EMA-2022-BR-009-0017 | City of Hialeah - Critical Facility Backup Generator | $409,397.25 | Identified for Further Review |
Florida | EMA-2022-BR-009-0009 | Sumter County SECO Energy Utility Backfeed Loops | $499,216 | Identified for Further Review |
Florida | EMA-2022-BR-009-0002 | Franklin County Board of Commisioners (BOCC) - Weems Memorial Hospital Wind Retrofit | $994,570.11 | Identified for Further Review |
Florida | EMA-2022-BR-009-0001 | Sumter County SECO Energy Utility Hardening Project | $2,485,785.77 | Identified for Further Review |
Florida | EMA-2022-BR-009-0013 | City of Homestead - Pump Station Hardening | $2,511,724.95 | Identified for Further Review |
Florida | EMA-2022-BR-009-0005 | Marion County SECO Energy Utility Hardening Project | $3,733,902.81 | Identified for Further Review |
Florida | EMA-2022-BR-009-0011 | City of North Miami Arch Creek North/Arch Creek South Community Flood Protection Project | $3,837,226.33 | Identified for Further Review |
Florida | EMA-2022-BR-009-0018 | 8th Street Flood Improvement Project | $7,336,083.75 | Identified for Further Review |
Florida | EMA-2022-BR-009-0007 | City of Key West: FEMA 361 Hurricane Community Safe Room for First Responders and Emergency Managers | $11,251,347.62 | Identified for Further Review |
Florida | EMA-2022-BR-009-0003 | State of Florida BRIC Management Costs | $18,585,376.89 | Identified for Further Review |
Florida | EMA-2022-BR-009-0014 | Building Resiliency with Gray & Green Infrastructure, C-9 Basin, Broward & Miami-Dade CNTY FY22 BRIC | $49,636,312 | Identified for Further Review |
Florida | EMA-2022-BR-009-0020 | Building Resiliency with Gray and Green Infrastructure, C7 Basin of Miami-Dade County, FY22 BRIC | $49,997,694 | Identified for Further Review |
Florida | EMA-2022-BR-009-0008 | Sweetwater Branch Creek Stabilization | Not Selected | Not Selected for Further Review |
Florida | EMA-2022-BR-009-0012 | City of Miami Beach North Beach Town Center Neighborhood Resilience Project | Not Selected | Does Not Meet HMA Requirements |
Florida | EMA-2022-BR-009-0015 | Additional Storage and High Service Pumping Capacity for Panama City Beach, FL | Not Selected | Not Selected for Further Review |
Florida | EMA-2022-BR-009-0016 | St. Lucie County Bryn Mawr MLS Companion Wet Well and Emergency Backup Generator Project | Not Selected | Not Selected for Further Review |
Florida | EMA-2022-BR-009-0019 | Pinecrest Stormwater Master Plan Implementation | Not Selected | Not Selected for Further Review |
Georgia | EMA-2022-BR-015-0004 | University of Georgia (UGA) Marine Institute Campus Resiliency Project Planning | $59,451 | Identified for Further Review |
Georgia | EMA-2022-BR-015-0002 | Habersham County Drainage Structures | $75,224.62 | Identified for Further Review |
Georgia | EMA-2022-BR-015-0001 | Rocky Creek Road Culvert | $106,312.50 | Identified for Further Review |
Georgia | EMA-2022-BR-015-0007 | Finding Our Flow 2023 | $176,625 | Identified for Further Review |
Georgia | EMA-2022-BR-015-0014 | Georgia Emergency Management and Homeland Security Agency Management Costs | $194,873.34 | Identified for Further Review |
Georgia | EMA-2022-BR-015-0009 | Chatham County Hardin Drainage Basin Analysis & Planning | $281,250 | Identified for Further Review |
Georgia | EMA-2022-BR-015-0011 | City of Hartwell Water Treatment Plant Fixed Generator | $349,728.10 | Identified for Further Review |
Georgia | EMA-2022-BR-015-0008 | Port Wentworth Comprehensive Stormwater Master Plan | $357,375 | Identified for Further Review |
Georgia | EMA-2022-BR-015-0003 | Elkins Creek Bridge on Dripping Rock Road | Not Selected | Does Not Meet HMA Requirements |
Georgia | EMA-2022-BR-015-0005 | City of Tennille Flood Mitigation Project | Not Selected | Not Selected for Further Review |
Georgia | EMA-2022-BR-015-0006 | St. Marys Sea Wall and Nature-Based Solution Mitigation | Not Selected | Does Not Meet HMA Requirements |
Georgia | EMA-2022-BR-015-0010 | Mitchell County Stormwater Project | Not Selected | Not Selected for Further Review |
Georgia | EMA-2022-BR-015-0012 | Lazar Creek Dam Mitigation | Not Selected | Not Selected for Further Review |
Georgia | EMA-2022-BR-015-0013 | DeKalb County 2022 Property Acquisitions | Not Selected | Does Not Meet HMA Requirements |
Guam | EMF-2022-BR-007-0004 | State Management Costs | $175,883.69 | Identified for Further Review |
Guam | EMF-2022-BR-007-0001 | Underground Utility Infrastructure Relocation and Power Generation - Phase II | $267,360 | Identified for Further Review |
Guam | EMF-2022-BR-007-0002 | GCC Building 600 Project Application 2022 | $1,038,399.67 | Identified for Further Review |
Guam | EMF-2022-BR-007-0005 | Hazard Mitigation Grant Program (Barrigada Captain Reyes Way) | Not Selected | Does Not Meet HMA Requirements |
Guam | EMF-2022-BR-007-0003 | Namo Flood Control and Bank Stabilization | Not Selected | Does Not Meet HMA Requirements |
Guam | EMF-2022-BR-007-0006 | Hazard Mitigation Grant Program (Barrigada Mayor Office / Community Center | Not Selected | Does Not Meet HMA Requirements |
Hawaii | EMF-2022-BR-014-0003 | Advance Assistance 2.0 - Kauai, Maui, and Hawaii Counties Energy System Resiliency Assessment | $450,000 | Identified for Further Review |
Hawaii | EMF-2022-BR-014-0002 | Statewide Building Code Technical Assistance Program | $1,120,000 | Identified for Further Review |
Hawaii | EMF-2022-BR-014-0001 | State Management Costs | $1,459,397.63 | Identified for Further Review |
Hawaii | EMF-2022-BR-014-0004 | Koʻolaupoko Critical Customer Hubs | $8,329,317.51 | Identified for Further Review |
Idaho | EMS-2022-BR-005-0005 | Disaster Mitigation Response Capacity Enhancement (Project Scoping & Partnerships) | $107,513.60 | Identified for Further Review |
Idaho | EMS-2022-BR-005-0006 | Rexburg Wastewater Treatment Plant - Power Reliability Improvements Scoping | $135,000 | Identified for Further Review |
Idaho | EMS-2022-BR-005-0002 | Kamiah Project Storm Water Drainage and Catch Basin Scoping | $385,054 | Identified for Further Review |
Idaho | EMS-2022-BR-005-0003 | Idaho Office of Emergency Management (IOEM) Management Costs | $901,902.96 | Identified for Further Review |
Idaho | EMS-2022-BR-005-0007 | Custer County Mackay Dam | $7,082,856 | Identified for Further Review |
Idaho | EMS-2022-BR-005-0001 | Environmental Site Design Flood Mitigation, River Habitat Improvement, and Critical Infrastructure Power Microgrid Project | Not Selected | Does Not Meet HMA Requirements |
Idaho | EMS-2022-BR-005-0004 | Cascade Stormwater Improvement Scoping Project | Not Selected | Does Not Meet HMA Requirements |
Illinois | EMC-2022-BR-012-0010 | Generator for City Critical Infrastructure Public Works Building | $263,812.50 | Identified for Further Review |
Illinois | EMC-2022-BR-012-0007 | Illinois Residential Safe Room Program 2023 | $278,896.45 | Identified for Further Review |
Illinois | EMC-2022-BR-012-0006 | Historic Kamp Store Relocation Project | $282,074.95 | Identified for Further Review |
Illinois | EMC-2022-BR-012-0004 | MWRD Glenwood Lakes Project Scoping | $487,760.10 | Identified for Further Review |
Illinois | EMC-2022-BR-012-0003 | Sheridan WWTP flood protection Jan23 | $687,456 | Identified for Further Review |
Illinois | EMC-2022-BR-012-0019 | State Management Costs | $3,597,258.02 | Identified for Further Review |
Illinois | EMC-2022-BR-012-0015 | Metropolitan Water Reclamation District (MWRD) City of Harvey Stormwater Management Project | $5,073,250.07 | Identified for Further Review |
Illinois | EMC-2022-BR-012-0008 | DePue Waste Water Treatment Plant (WWTP) Relocation | $23,004,209.70 | Identified for Further Review |
Illinois | EMC-2022-BR-012-0001 | Village of Palatine Willow Walk Subdivision Drainage Improvements, Phase II | Not Selected | Does Not Meet HMA Requirements |
Illinois | EMC-2022-BR-012-0002 | 80th Ave Hospital Pump Station | Not Selected | Not Selected for Further Review |
Illinois | EMC-2022-BR-012-0005 | Turf, Countryside, and Ranch Drainage Improvement Project | Not Selected | Not Selected for Further Review |
Illinois | EMC-2022-BR-012-0009 | The City of Wheaton Pershing East Drainage Improvement Project | Not Selected | Not Selected for Further Review |
Illinois | EMC-2022-BR-012-0011 | Village of Palatine Salt Creek Streambank Stabilization Project DPW-1971 | Not Selected | Does Not Meet HMA Requirements |
Illinois | EMC-2022-BR-012-0012 | 2022 Crow Island - Climate Change Project | Not Selected | Does Not Meet HMA Requirements |
Illinois | EMC-2022-BR-012-0013 | Iroquois County Community Unit School District 9 Saferoom | Not Selected | Not Selected for Further Review |
Illinois | EMC-2022-BR-012-0014 | La Grange 50th Street Relief Storm Sewer Flood Mitigation Project | Not Selected | Not Selected for Further Review |
Illinois | EMC-2022-BR-012-0016 | Critical Infrastructure Resilience & Risk Mitigation Project- Energy | Not Selected | Not Selected for Further Review |
Illinois | EMC-2022-BR-012-0017 | City of Rock Island Mississippi River Levee Pump Stations | Not Selected | Does Not Meet HMA Requirements |
Illinois | EMC-2022-BR-012-0018 | Metropolitan Water Reclamation District (MWRD) Farmers Prairie Creek | Not Selected | Not Selected for Further Review |
Illinois | EMC-2022-BR-012-0020 | Village of Hillsdale Wastewater Treatment Facility Flood Protection | Not Selected | Not Selected for Further Review |
Illinois | EMC-2022-BR-012-0021 | Levee Certification Improvements | Not Selected | Not Selected for Further Review |
Indiana | EMC-2022-BR-023-0006 | Indiana Department of Homeland Security (IDHS) Drone Purchase Project | $105,000 | Identified for Further Review |
Indiana | EMC-2022-BR-023-0003 | Indiana County MHMP Updates | $284,263.84 | Identified for Further Review |
Indiana | EMC-2022-BR-023-0002 | Indiana Department of Homeland Security (IDHS) State Management Costs | $988,237.77 | Identified for Further Review |
Indiana | EMC-2022-BR-023-0004 | Mars Hill Flood Control Improvement District Project | $6,224,934.80 | Identified for Further Review |
Indiana | EMC-2022-BR-023-0005 | Rock Creek Community Academy Safe Room Project | Not Selected | Does Not Meet HMA Requirements |
Indiana | EMC-2022-BR-023-0001 | Rush County Drainage Improvement | Not Selected | Does Not Meet HMA Requirements |
Iowa | EMK-2022-BR-009-0001 | Management Cost Plan Update Hazard Mitigation 2023 | $18,113.90 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0010 | Linn County Hazard Mitigation Plan Update | $30,375 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0009 | 2023 City of Salix Project Scoping BRIC for Stormwater Drainage | $50,250 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0007 | Regional Multi-Jurisdictional Local Hazard Mitigation Plan | $103,252.50 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0005 | Iowa Statewide Comprehensive Flood Mitigation Strategy | $112,500 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0002 | Building Code Adoption, Administration, and Enforcement Activities | $126,111.75 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0006 | Project Scoping for Concrete 3D Printed Community Safe Rooms | $127,950 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0011 | Grant Street South Realignment and Storm Water Improvements | $160,000 | Identified for Further Review |
Iowa | EMK-2022-BR-009-0002 | Meskwaki Hazard Mitigation Plan Update 2023 | $163,025.09 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0012 | City of Kalona Yoder Property Stormwater Management | $175,908.75 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0003 | University Boulevard Flood Mitigation (Project Scoping) | $262,500 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0008 | Comprehensive Resilience Strategy, Capacity- and Capability-Building, Project Scoping | $851,152 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0013 | BRIC Recipient Management Cost | $2,254,594.21 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0014 | Coralville Utility Resilience | $13,872,342.23 | Identified for Further Review |
Iowa | EMK-2022-BR-003-0001 | Davenport Waste Water Control Plant (WPCP) Flood Protection Northern Levee System | Not Selected | Not Selected for Further Review |
Iowa | EMK-2022-BR-003-0004 | Storm Lake Water Infrastructure Mitigation Project | Not Selected | Does Not Meet HMA Requirements |
Kansas | EMK-2022-BR-001-0003 | Hays Kansas High School - Safe Room | $943,269.86 | Identified for Further Review |
Kansas | EMK-2022-BR-001-0004 | Centre Safe Room | $1,056,730.14 | Identified for Further Review |
Kansas | EMK-2022-BR-001-0001 | North Residential 1 & 2 Reconstruction | $2,039,649.66 | Identified for Further Review |
Kansas | EMK-2022-BR-001-0002 | The Plymouth Pond Dam Replacement Project | Not Selected | Not Selected for Further Review |
Kansas | EMK-2022-BR-001-0005 | City of Wichita Calfskin Flood Mitigation | Not Selected | Not Selected for Further Review |
Kentucky | EMA-2022-BR-014-0001 | KY Management Costs | $13,650 | Identified for Further Review |
Kentucky | EMA-2022-BR-014-0005 | Harris Fork Creek Flood Mitigation Scoping Project | $123,500 | Identified for Further Review |
Kentucky | EMA-2022-BR-014-0002 | Owensboro Grain Bank Stabilization Project | Not Selected | Not Selected for Further Review |
Kentucky | EMA-2022-BR-014-0003 | Western Flood Pump Station Resiliency Project | Not Selected | Not Selected for Further Review |
Kentucky | EMA-2022-BR-014-0004 | Great Crossing Dam | Not Selected | Does Not Meet HMA Requirements |
Kentucky | EMA-2022-BR-014-0006 | Louisa Flood Mitigation - Sewer Treatment Plant - 2023 | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2022-BR-021-0025 | Tangipahoa Regional Detention Pond B Project Scoping | $149,834.71 | Identified for Further Review |
Louisiana | EMT-2022-BR-021-0024 | Vermilion Parish Safe Room: Project Scoping | $280,500 | Identified for Further Review |
Louisiana | EMT-2022-BR-021-0013 | Burt Allen Ditch Detention | $594,864 | Identified for Further Review |
Louisiana | EMT-2022-BR-021-0011 | Cut Off - Hung Dao Local Drainage Improvement Project Scoping | $834,960 | Identified for Further Review |
Louisiana | EMT-2022-BR-021-0026 | State Management Costs | $8,006,259.87 | Identified for Further Review |
Louisiana | EMT-2022-BR-021-0022 | JP BRIC 2022-Entergy Grid Hardening of Power Distribution to Support Resiliency | $19,001,201.13 | Identified for Further Review |
Louisiana | EMT-2022-BR-021-0001 | Terrebonne Parish 2022 BRIC Criminal Justice Center Safe Room Construction Project | $31,871,053.19 | Identified for Further Review |
Louisiana | EMT-2022-BR-021-0002 | Terrebonne Parish 2022 BRIC Justice Complex Internal Saferoom | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0003 | Town of Golden Meadow Drainage Improvements | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2022-BR-021-0004 | JCK-20 - Lively Bayou Upstream Detention | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0005 | Cameron Parish Breakwaters | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0006 | HED-01 - Diversion Culvert and Detention Pond | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0008 | Marty Buratt Lateral Drainage Improvements | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0009 | Jefferson Parish Westbank Safe Room | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2022-BR-021-0010 | Taylor Bayou Regional Improvements (Phase 1) | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0012 | BRIC Louisiana State Fire Marshal's Office | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0014 | Town of Vidalia - Wastewater Improvements | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0015 | Sibley Lake Lift Station Emergency Power System Replacement | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0016 | Jefferson Parish Sewerage Lift Station Improvements | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2022-BR-021-0017 | Jefferson Parish Segmented Rock Breakwaters (Grand Isle) | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0018 | Terrebonne Parish North Campus Public Works Safe Room | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2022-BR-021-0019 | Hazard Mitigation Pumps | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2022-BR-021-0020 | Phased Project to Harden Electrical Distribution Feeders | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2022-BR-021-0021 | Denham Spring Long Slash Drainage Improvement | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0023 | New Orleans Community Lighthouse Resilience Hubs Project | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0027 | St. Tammany Parish Living Shorelines - Slidell Breakwaters Project | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0028 | Ironton-Project Scoping | Not Selected | Does Not Meet HMA Requirements |
Louisiana | EMT-2022-BR-021-0029 | Terrebonne Parish North Treatment Plant Safe Room | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2022-BR-021-0030 | Terrebonne Parish 2022 Saferoom | Not Selected | Not Selected for Further Review |
Louisiana | EMT-2022-BR-021-0031 | Bayou Lafourche to Allied Shipyard Interim Flood Protection Improvements | Not Selected | Not Selected for Further Review |
Maine | EMB-2022-BR-011-0006 | Town Of Cornish, Maine: Hessian Hill Emergency Communications Tower (HECTor) Project | $13,440 | Identified for Further Review |
Maine | EMB-2022-BR-011-0004 | Eveleth Hill Drainage Improvements | $30,400 | Identified for Further Review |
Maine | EMB-2022-BR-011-0002 | Islesboro Hazard Mitigation Plan | $39,150 | Identified for Further Review |
Maine | EMB-2022-BR-014-0001 | Passamaquoddy Tribe at Pleasant Point Hazard Mitigation Plan | $150,838.20 | Identified for Further Review |
Maine | EMB-2022-BR-011-0009 | North Haven Thorofare Waterfront | $160,000 | Identified for Further Review |
Maine | EMB-2022-BR-011-0001 | The City of Bentley Williams Park Storm Shelter Project | $209,931 | Identified for Further Review |
Maine | EMB-2022-BR-011-0012 | Phase 2 Capacity Building and Technical Assistance | $218,050 | Identified for Further Review |
Maine | EMB-2022-BR-011-0011 | Phase 1 Statewide Asset Inventory and Risk Assessment | $590,550 | Identified for Further Review |
Maine | EMB-2022-BR-011-0003 | Mitigating Community Hazards Posed by Climate Change through Building Code Enforcement | $625,209.41 | Identified for Further Review |
Maine | EMB-2022-BR-011-0010 | State of Maine Management Costs | $1,779,146.76 | Identified for Further Review |
Maine | EMB-2022-BR-011-0008 | Saco, Maine Water Resource Recovery Project | $9,387,572.35 | Identified for Further Review |
Maine | EMB-2022-BR-011-0005 | Wastewater and Critical Infrastructure Portable Generators Request | Not Selected | Does Not Meet HMA Requirements |
Maine | EMB-2022-BR-011-0007 | Phased Project: Water main extension, Southport, Maine | Not Selected | Not Selected for Further Review |
Maryland | EMP-2022-BR-009-0002 | Brunswick Crossing Pond #13 Retrofit | $62,598.04 | Identified for Further Review |
Maryland | EMP-2022-BR-009-0012 | Hazard Mitigation Plan 2025 Update | $70,000 | Identified for Further Review |
Maryland | EMP-2022-BR-009-0006 | City of Hagerstown - Hydraulic model of storm drainage system | $75,000 | Identified for Further Review |
Maryland | EMP-2022-BR-009-0009 | Brunswick Shopping Center and Apartments Pond Retrofit - 40 Souder Rd, Brunswick, MD 21716 | $79,059.48 | Identified for Further Review |
Maryland | EMP-2022-BR-009-0005 | West Patrick St Flood Improvements CIP 350013 | $197,500 | Identified for Further Review |
Maryland | EMP-2022-BR-009-0001 | Maryland Department of Emergency Management (MDEM) Management Costs | $273,404.85 | Identified for Further Review |
Maryland | EMP-2022-BR-009-0004 | Downtown Flood Improvements CIP 350011 | $381,175 | Identified for Further Review |
Maryland | EMP-2022-BR-009-0003 | 35th Street and Hillen Road Flood Mitigation | $525,000 | Identified for Further Review |
Maryland | EMP-2022-BR-009-0013 | Stormwater Infrastructure to Address Frederick Ave Flooding | $600,000 | Identified for Further Review |
Maryland | EMP-2022-BR-009-0007 | 2022 North Beach, Maryland - Pump Station Improvements- 7th and 9th Streets | Not Selected | Does Not Meet HMA Requirements |
Maryland | EMP-2022-BR-009-0008 | Sludge Management Sustainability and Resiliency | Not Selected | Does Not Meet HMA Requirements |
Maryland | EMP-2022-BR-009-0010 | Howard County Government Campus-Roger Carter Center Microgrid | Not Selected | Does Not Meet HMA Requirements |
Maryland | EMP-2022-BR-009-0011 | Mobile Home Severe Storm Damage Mitigation | Not Selected | Does Not Meet HMA Requirements |
Massachusetts | EMB-2022-BR-012-0017 | Swansea Hailes Hill Road Culvert Upgrade Project Scoping | $31,500 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0002 | Danvers Crane River Shoreline Restoration Analysis | $43,556.25 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0001 | Hopkinton-Regulation and Bylaw Review Related to Climate Change Adaptation & Nature-Based Solutions | $50,662.50 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0019 | Acton - Jenks Conservation Land Culvert Improvement | $67,500 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0007 | Flood Damage Reduction in Scituate Harbor District | $71,250 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0016 | Granite Ave Pump Station Design | $120,750 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0010 | Rockport - Vulnerability Assessment of Coastal Wastewater Infrastructure | $150,000 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0004 | Marshfield Dyke Road Sluiceway Improvements Project Scoping | $165,000 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0006 | River Street and Parking Lot Scoping | $186,750 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0005 | Blue/Green Downtown Fitchburg | $187,500 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0012 | Melrose - Burnett and Laurel Streets Stormwater Management Project | $251,685 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0011 | Flood and Drought Protection for the Briggsville Water District, Clarksburg, MA | $445,590 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0020 | Avon Emergency Interconnection Pump Station FY 2022 BRIC | $754,500 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0021 | Massachusetts Recipient Management Costs | $9,541,302.37 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0003 | Metropolitan Boston Transit Authority (MBTA) Blue Line Tunnel Airport Portal Flood Protection Project | $10,742,744 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0013 | Cities of Chelsea and Everett - Island End River Coastal Flood Resilience Project | $49,999,000 | Identified for Further Review |
Massachusetts | EMB-2022-BR-012-0008 | Somerville - Mystic River Outfall / Foss Park Area Sewer Separation | Not Selected | Does Not Meet HMA Requirements |
Massachusetts | EMB-2022-BR-012-0009 | Gloucester - Haskell pond Dam Design Storm and Seismic Improvements | Not Selected | Not Selected for Further Review |
Massachusetts | EMB-2022-BR-012-0014 | Stafford Square Flood Mitigation Project | Not Selected | Does Not Meet HMA Requirements |
Massachusetts | EMB-2022-BR-012-0015 | Brockton Study of Essential Workforce after Disasters | Not Selected | Does Not Meet HMA Requirements |
Massachusetts | EMB-2022-BR-012-0018 | Berkshire Medical Center - Generator Upgrade | Not Selected | Not Selected for Further Review |
Massachusetts | EMB-2022-BR-012-0022 | Downtown Clinton Stormwater Improvements Project | Not Selected | Does Not Meet HMA Requirements |
Massachusetts | EMB-2022-BR-012-0023 | Ipswich Town Wharf Sewer Pump Station Flood Mitigation Project | Not Selected | Not Selected for Further Review |
Michigan | EMC-2022-BR-021-0011 | City of Grand Rapids - Project Scoping - Woodlawn Cemetery Green Infrastructure | $14,557.50 | Identified for Further Review |
Michigan | EMC-2022-BR-021-0009 | City of Mt Pleasant - Project Scoping - Westside Storm Sewer Relief | $270,000 | Identified for Further Review |
Michigan | EMC-2022-BR-021-0006 | City of Detroit - Project Scoping - West Chicago | $312,000 | Identified for Further Review |
Michigan | EMC-2022-BR-021-0005 | City of Detroit - Project Scoping - Schoolcraft | $468,000 | Identified for Further Review |
Michigan | EMC-2022-BR-021-0002 | Allegan/Salem Twp/Sandy Pines, Burnips, MI - Project -Safe Room | $935,300 | Identified for Further Review |
Michigan | EMC-2022-BR-021-0001 | Michigan State Police Emergency Management and Homeland Security Division (MSP/EMHSD) - Recipient Management Costs | $3,086,523.98 | Identified for Further Review |
Michigan | EMC-2022-BR-021-0007 | City of Hamtramck Phase 1B Sewer Relief Construction Project | $9,353,094.30 | Identified for Further Review |
Michigan | EMC-2022-BR-021-0003 | City of Detroit - Project - Jefferson Chalmers Implementation | $11,277,299.25 | Identified for Further Review |
Michigan | EMC-2022-BR-021-0004 | Michigan Department of Natural Resources Project -Trail Flood Control Structures | Not Selected | Not Selected for Further Review |
Michigan | EMC-2022-BR-021-0008 | Michigant Safe Room Project Allegan, Salem Twp, Sandy Pines, and Burnips | Not Selected | Not Selected for Further Review |
Michigan | EMC-2022-BR-021-0010 | Great Lakes Water Authority Project Oakwood District Intercommunity Relief Sewer Modification | Not Selected | Not Selected for Further Review |
Michigan | EMC-2022-BR-021-0012 | City of Detroit Project - Harding Canal | Not Selected | Does Not Meet HMA Requirements |
Michigan | EMC-2022-BR-021-0013 | Michigan Department of Transportation 2023 Statewide Infrastructure - Permanent Pump Station Generators | Not Selected | Not Selected for Further Review |
Minnesota | EMC-2022-BR-025-0002 | Management Costs | $71,873.10 | Identified for Further Review |
Minnesota | EMC-2022-BR-007-0004 | Regional Management Costs | $521,386.11 | Identified for Further Review |
Minnesota | EMC-2022-BR-025-0001 | Scoping a Resilient Solar Microgrid for Resilience Red Lake Nation in Red Lake/Redby, MN | $650,281 | Identified for Further Review |
Minnesota | EMC-2022-BR-007-0001 | County and Tribal Plan Updates | $753,750 | Identified for Further Review |
Minnesota | EMC-2022-BR-007-0003 | City of Lamberton Community Safe Room Project | $3,485,312.16 | Identified for Further Review |
Minnesota | EMC-2022-BR-007-0002 | Minneapolis Water Works Pump Station 5 Added Fuel for Generators | Not Selected | Not Selected for Further Review |
Mississippi | EMA-2022-BR-006-0001 | Emergency Shelter Generator Project | $315,000 | Identified for Further Review |
Mississippi | EMA-2022-BR-006-0012 | State of Mississippi Management Costs | $1,411,750.40 | Identified for Further Review |
Mississippi | EMA-2022-BR-006-0003 | Comprehensive Planning and Design Study for Water Treatment Facilities for the City of Jackson, MS | $2,000,000 | Identified for Further Review |
Mississippi | EMA-2022-BR-006-0002 | City of Canton MLK South Stormwater Improvement Project | Not Selected | Not Selected for Further Review |
Mississippi | EMA-2022-BR-006-0004 | Mound Bayou Drainage | Not Selected | Not Selected for Further Review |
Mississippi | EMA-2022-BR-006-0005 | Desoto County Community Safe Room | Not Selected | Not Selected for Further Review |
Mississippi | EMA-2022-BR-006-0006 | Nettleton Stormwater System | Not Selected | Does Not Meet HMA Requirements |
Mississippi | EMA-2022-BR-006-0007 | Mississippi Department of Health (MSDH) Standby Power Systems Project-Phase III | Not Selected | Does Not Meet HMA Requirements |
Mississippi | EMA-2022-BR-006-0008 | Pump Station 20 Improvement Project | Not Selected | Does Not Meet HMA Requirements |
Mississippi | EMA-2022-BR-006-0009 | Mississippi Department of Health (MSDH) Standby Power Systems Project - Phase I | Not Selected | Does Not Meet HMA Requirements |
Mississippi | EMA-2022-BR-006-0010 | Mississippi Department of Health (MSDH) Standby Power Systems Project - Phase II | Not Selected | Does Not Meet HMA Requirements |
Mississippi | EMA-2022-BR-006-0011 | Holmes County Saferoom | Not Selected | Not Selected for Further Review |
Missouri | EMK-2022-BR-002-0001 | East-West Gateway (St. Louis) Reg. HMP-FY22 State Allocated | $147,613.30 | Identified for Further Review |
Missouri | EMK-2022-BR-002-0002 | State Allocation-City of Marionville WWTP-Box Culverts | $496,683 | Identified for Further Review |
Missouri | EMK-2022-BR-002-0005 | State Allocation-Clarksburg C-II School District Community Safe Room | $1,354,700 | Identified for Further Review |
Missouri | EMK-2022-BR-002-0006 | Missouri State Management Costs | $1,475,582.86 | Identified for Further Review |
Missouri | EMK-2022-BR-002-0003 | City Utilities of Springfield-Blackman Water Treatment Plan Back-Up Power with Enclosure | $9,375,000 | Identified for Further Review |
Missouri | EMK-2022-BR-002-0004 | Marion Cnty on behalf of NE MO Elec Pwr Coop-Electric Transmissn Line Hardening | Not Selected | Not Selected for Further Review |
Montana | EMD-2022-BR-016-0002 | Management Grant Application | $62,137.90 | Identified for Further Review |
Montana | EMD-2022-BR-014-0001 | Northern Cheyenne Management Costs | $157,372.84 | Identified for Further Review |
Montana | EMD-2022-BR-016-0001 | Scoping Microgrid Ciritical Clearing Time (CCT) | $559,241.10 | Identified for Further Review |
Montana | EMD-2022-BR-014-0002 | Northern Cheyenne Reservation CCD, Bighorn County - 2023 BRIC Scoping Project | $686,667 | Identified for Further Review |
Montana | EMD-2022-BR-014-0003 | Northern Cheyenne Reservation CCD, Rosebud County - 2023 BRIC Scoping Project | $702,850 | Identified for Further Review |
Montana | EMD-2022-BR-001-0003 | State Management Costs | $878,396.40 | Identified for Further Review |
Montana | EMD-2022-BR-001-0001 | Sidney Meadows Drainage Improvements Project | $1,192,506 | Identified for Further Review |
Montana | EMD-2022-BR-001-0002 | Lincoln Electric Overhead to Underground Hazard Reduction Project | $6,230,738 | Identified for Further Review |
Nebraska | EMK-2022-BR-006-0004 | Region 23 Hazard Mitigation Plan Update | $41,250 | Identified for Further Review |
Nebraska | EMK-2022-BR-006-0001 | Lower Platte South Natural Resources District (NRD) Multi-Jurisdictional Hazard Mitigation Plan Update | $90,000 | Identified for Further Review |
Nebraska | EMK-2022-BR-007-0003 | Niobrara Market Generator Project: C16 | $95,786.18 | Identified for Further Review |
Nebraska | EMK-2022-BR-007-0004 | Niobrara Housing Facility 6-Plex Generator Project: CF17 | $97,768.43 | Identified for Further Review |
Nebraska | EMK-2022-BR-006-0009 | Nemaha Natural Resources District Hazard Mitigation Plan Update | $133,312.50 | Identified for Further Review |
Nebraska | EMK-2022-BR-007-0001 | Tribal Headquarters &Transit Facility Generator Project: CF4 | $163,200.65 | Identified for Further Review |
Nebraska | EMK-2022-BR-007-0005 | Generator Agency and Ponca Exercise Facility: CF1 | $167,691.65 | Identified for Further Review |
Nebraska | EMK-2022-BR-007-0002 | Norfolk Health Center Generator Project: CF14 | $172,238 | Identified for Further Review |
Nebraska | EMK-2022-BR-006-0007 | Lower Platte North Natural Resources District 2025 Hazard Mitigation Plan Update | $187,500 | Identified for Further Review |
Nebraska | EMK-2022-BR-006-0010 | Management Costs | $253,206.41 | Identified for Further Review |
Nebraska | EMK-2022-BR-006-0008 | Lancaster County Nebraska BRIC Mitigation: Hazards | $256,046.70 | Identified for Further Review |
Nebraska | EMK-2022-BR-007-0006 | Prairie Flower Casino Generator Project: CF2 | $507,703.36 | Identified for Further Review |
Nebraska | EMK-2022-BR-006-0002 | St. Edward Beaver Creek Stabilization | $1,402,002.90 | Identified for Further Review |
Nebraska | EMK-2022-BR-006-0003 | Washington County AG Scoping Project | Not Selected | Does Not Meet HMA Requirements |
Nebraska | EMK-2022-BR-006-0005 | Polk County Rural Public Power District (PCRPPD) Sub-transmission Eastern Loop | Not Selected | Not Selected for Further Review |
Nebraska | EMK-2022-BR-006-0006 | City of Ponca First/East ST Flood Mitigation Project | Not Selected | Does Not Meet HMA Requirements |
Nevada | EMF-2022-BR-010-0007 | Mineral - Esmeralda Multijurisdictional Hazard Mitigation Plan Update | $120,000 | Identified for Further Review |
Nevada | EMF-2022-BR-010-0006 | Eureka - White Pine regional HMP update | $126,000 | Identified for Further Review |
Nevada | EMF-2022-BR-010-0005 | Dayton Valley Scoping Project | $128,727.18 | Identified for Further Review |
Nevada | EMF-2022-BR-010-0011 | Truckee Meadows Fire District (TMFPD) Solar Power Station #40 | $165,195 | Identified for Further Review |
Nevada | EMF-2022-BR-010-0010 | Truckee Meadows Fire District (TMFPD) Solar Power Station #36 | $185,341.50 | Identified for Further Review |
Nevada | EMF-2022-BR-010-0002 | Topaz Ranch Estates Generator | $185,381.04 | Identified for Further Review |
Nevada | EMF-2022-BR-010-0004 | Truckee Meadows Fire District (TMFPD) Solar Power Station # 33 | $301,738.50 | Identified for Further Review |
Nevada | EMF-2022-BR-010-0001 | TMFPD Solar Power Admin/HQ Building | $382,363.39 | Identified for Further Review |
Nevada | EMF-2022-BR-010-0003 | Douglas County Kahle Community Center Generator | $395,957.46 | Identified for Further Review |
Nevada | EMF-2022-BR-010-0009 | State Management Costs | $1,719,601.41 | Identified for Further Review |
Nevada | EMF-2022-BR-010-0008 | Hobart Creek Reservoir Dam Resilient Infrastructure Project | $10,582,155 | Identified for Further Review |
New Hampshire | EMB-2022-BR-001-0003 | Management Costs | $46,095 | Identified for Further Review |
New Hampshire | EMB-2022-BR-001-0002 | Town of Rye Sewer Infrastructure Vulnerability Assessment | $55,500 | Identified for Further Review |
New Hampshire | EMB-2022-BR-001-0004 | Maplewood Hill Road BRIC Project Scoping | $123,750 | Identified for Further Review |
New Hampshire | EMB-2022-BR-001-0005 | Twin Culvert Replacement - Claremont, NH | $180,000 | Identified for Further Review |
New Hampshire | EMB-2022-BR-001-0001 | Town of Rye Generator & Three Pump Station External Hookup Connections | Not Selected | Does Not Meet HMA Requirements |
New Hampshire | EMB-2022-BR-001-0006 | Saco Headwaters Municipal Capacity & Capability Building Program to Modernize All Culverts-in-Need | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0002 | Project Scoping - Borough of Seaside Heights - Flood Mitigation | $135,000 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0019 | Project Scoping - Town of Kearny - Garfield and John Hay Pump Station | $139,239 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0031 | Bergenfield Project Scoping Application | $142,584 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0024 | Two Rivers Water Reclamation Authority - EPS and Outfall Replacement | $500,000 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0034 | Port Authority of New York and New Jersey - Marine Terminals CRA | $500,000 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0029 | New Jersery Office of Environmental Management (NJOEM) Capability- and Capacity-Building - Project Scoping | $583,177 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0025 | Bergen County Utilities Authority - Flood Mitigation of Pink Street Pump Station | $1,390,928.41 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0009 | Township of Rochelle Park - Reconstruction of Sanitary Sewer Pump Station | $1,946,359.50 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0026 | Seaside Park Wave Energy Dissipation/Erosion Control Project | $2,062,290 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0010 | Jersey City McGovern Park Resilience Project | $3,841,954.39 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0011 | City of Hoboken - Southwest Park Expansion Project | $6,241,493.29 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0007 | New Jersey Office of Emergency Management Management Costs (technical assistance and administration) | $11,130,692.64 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0033 | Highlands & Monmouth Hills Flood Mitigation and Green Infrastructure Project | $12,193,960 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0008 | Cape May County Municipal Utilities Authority (CMCMUA) - Ocean City Wastewater Treatment Facility Floodwall | $20,727,125 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0001 | New Jersey Water Supply Authority (NJWSA Spruce Run Dam Foundation Grouting Project | $22,571,166.63 | Identified for Further Review |
New Jersey | EMN-2022-BR-002-0003 | City of Northfield - Public Works Generator | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0004 | Borough of West Wildwood - Living Shoreline | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2022-BR-002-0005 | Ventnor City - Lower Ventnor Heights Flood Mitigation Project | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0006 | Cape May City Seawall Project | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2022-BR-002-0012 | City of Northfield - Revere Ave - Stormwater Management | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0013 | City of Northfield - Madison Ave Stormwater Management | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0014 | Township of Stafford and Ocean County Utilities Authority (OCUA) - Erosion Control Project | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0015 | Margate - Adams Avenue Community Flood Mitigation Project (Pump Station) | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0016 | Atlantic Highlands - Upper Prospect Road Landslide Stabilization Project | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0017 | Borough of Carteret - Community Health Center Elevation | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0018 | Township of Marlboro - Nolan Road Streambank Stabilization | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2022-BR-002-0020 | Township of Woodbridge - Stafford Road Sanitary Sewer Upgrades | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0021 | Port Authority New York and New Jersey (PANYNJ) - Newark Terminal B Drainage | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0022 | Ewing-Lawrence sewerage Authority (ELSA) Flood Mitigation of Fackler Road and Lower Ferry Pump Station | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2022-BR-002-0023 | Brick Township Municiple Utility Authority (MUA) - Redundant Finished Water Transmission Main | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0027 | Brick Township Municiple Utility Authority (MUA) - Parallel Force Main at Lanes Mill and Laurelbrook WWPSs | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0028 | ownship of Neptune - South Riverside Flood Pumps | Not Selected | Does Not Meet HMA Requirements |
New Jersey | EMN-2022-BR-002-0030 | Brick Township Municiple Utility Authority (MUA) - Emergency Generator at 3 Pump Stations Upgrade Project | Not Selected | Not Selected for Further Review |
New Jersey | EMN-2022-BR-002-0032 | Secaucus - Huber Street Flood Wall Project | Not Selected | Not Selected for Further Review |
New Mexico | EMT-2022-BR-019-0001 | Pueblo de San Ildefonso Hazard Mitigation Plan | $54,570 | Identified for Further Review |
New Mexico | EMT-2022-BR-011-0001 | Pueblo of Laguna (POL) Hazard Mitigation Plan Update | $120,000 | Identified for Further Review |
New Mexico | EMT-2022-BR-001-0003 | State Management Costs | $123,424.19 | Identified for Further Review |
New Mexico | EMT-2022-BR-033-0002 | SCP Building Codes - Resilient Community Building Codes | $290,475 | Identified for Further Review |
New Mexico | EMT-2022-BR-001-0001 | Critical Infrastructure Microgrids Scoping | $375,024.75 | Identified for Further Review |
New Mexico | EMT-2022-BR-001-0002 | Cerrillos Rd Stormwater Infiltration at Ashbaugh Park | $506,576.60 | Identified for Further Review |
New Mexico | EMT-2022-BR-033-0001 | SCP Project Scoping - Canyon Flood Mitigation | $1,670,139 | Identified for Further Review |
New York | EMN-2022-BR-004-0006 | Hazard Mitigation Plan | $120,000 | Identified for Further Review |
New York | EMN-2022-BR-004-0019 | Town of Mamaroneck Comprehensive Flood Mitigation Planning Initiative | $225,000 | Identified for Further Review |
New York | EMN-2022-BR-004-0015 | City of Rye - Codes and Ordinances | $252,299.18 | Identified for Further Review |
New York | EMN-2022-BR-004-0010 | NYC Small Business Services (SBS) - Resilient South Street Stormwater Corridor (Project Scoping) | $640,000 | Identified for Further Review |
New York | EMN-2022-BR-004-0018 | NYC Parks and Recreation - Green Infrastructure Stormwater Flood Hazard Reduction (Project Scoping) | $736,304 | Identified for Further Review |
New York | EMN-2022-BR-004-0009 | NYC Housing Authority - Stormwater Protections for Nostrand & Sheepshead Bay Houses (Project) | $23,078,517 | Identified for Further Review |
New York | EMN-2022-BR-004-0012 | NYPA Vischer Ferry Dam Ice Jam and Flood Mitigation Project | $24,223,000 | Identified for Further Review |
New York | EMN-2022-BR-004-0022 | State Management Cost Application | $34,962,055.58 | Identified for Further Review |
New York | EMN-2022-BR-004-0016 | NYC Department of Environmental Protection (DEP) - Corona East Cloudburst Hub (Project) | $49,995,177.60 | Identified for Further Review |
New York | EMN-2022-BR-004-0001 | NYC Small Business Services (SBS) - Coney Island Creek Shoreline Protection (Project) | $50,000,000 | Identified for Further Review |
New York | EMN-2022-BR-004-0008 | NYC Department of Environmental Protection (DEP) - Kissena Corridor Cloudburst Hub (Project) | $50,000,000 | Identified for Further Review |
New York | EMN-2022-BR-004-0002 | Shandaken Phoenicia Water District Improvements | Not Selected | Does Not Meet HMA Requirements |
New York | EMN-2022-BR-004-0003 | Town of Brookhaven - Auxiliary Power Initiative | Not Selected | Not Selected for Further Review |
New York | EMN-2022-BR-004-0004 | Tompkins County Flood Risk Education and Outreach | Not Selected | Does Not Meet HMA Requirements |
New York | EMN-2022-BR-004-0005 | V-Dryden Wastewater Treatment Plant Flood Protection | Not Selected | Not Selected for Further Review |
New York | EMN-2022-BR-004-0007 | Vestal Robert Street Storm Water Pump Station | Not Selected | Not Selected for Further Review |
New York | EMN-2022-BR-004-0011 | Erie County-Ellicott Creek Slope Stabilization | Not Selected | Not Selected for Further Review |
New York | EMN-2022-BR-004-0013 | Town of Ulysses Public Facilities Backup Generator Project | Not Selected | Does Not Meet HMA Requirements |
New York | EMN-2022-BR-004-0014 | City of Ithaca Flood Mitigation Project | Not Selected | Does Not Meet HMA Requirements |
New York | EMN-2022-BR-004-0017 | Ellenville Fantine Kill GOSR | Not Selected | Does Not Meet HMA Requirements |
New York | EMN-2022-BR-004-0020 | City of Rye - State University of New York (SUNY) Berms Flood Mitigation | Not Selected | Not Selected for Further Review |
New York | EMN-2022-BR-004-0021 | Generator for County Buildings | Not Selected | Not Selected for Further Review |
New York | EMN-2022-BR-004-0023 | NYC Department of Social Services (DSS) - Borden Avenue Veterans Shelter Flood Resilience (Project) | Not Selected | Does Not Meet HMA Requirements |
North Carolina | EMA-2022-BR-001-0041 | Project Scoping for Anson County Flood Risk | $60,000 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0013 | 4th Street Drainage Capacity-and Capability-Building Project | $89,600 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0015 | Comprehensive Vegetative Waste and Emergency Debris Management Plan | $120,000 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0016 | Upper Cashie River Hydrologic Assessment and Drainage and Water Management Plan | $120,000 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0019 | County of Hertford Hydrologic Watershed Assessment | $120,000 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0002 | City of Gastonia Project Scoping Activity Water & Wastewater Energy Resilience | $138,800 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0047 | Huntersville Downtown Stormwater Master Plan (Asset Inventory & Analysis) | $150,000 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0022 | Drainage Improvement Study - Town of Calypso, NC | $190,000 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0008 | May's Lake Regional Stormwater Project | $200,000 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0035 | Columbus County Watershed Drainage Management Plan | $240,000 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0028 | Restoration of Duffyfield Canal Planning and Project Scoping | $279,800 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0031 | City of Lexington - Swearing Creek Watershed Pump Station Consolidation Project | $291,800 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0024 | Grove Circle Lift Station | $839,600 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0026 | Mount Pleasant Road Pump Station Relocation | $883,605 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0029 | Scotland County Mitigation Reconstruction | $983,449.94 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0020 | Patterson Street and East Prospect Avenue Storm Drainage Improvements | $999,370.40 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0033 | Wilkesboro Cub Creek Phase III | $1,273,050 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0007 | Surry County Flood Hazard Mitigation Project in the Yadkin Valley | $1,892,150 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0014 | Robeson County Resilient Power Project | $2,152,500 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0011 | Town of Benson Driving Branch Stream Restoration Project | $2,181,202.73 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0046 | Mebane - Sewer Rehab Projects | $2,250,000 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0030 | Indian Hills Sub Station | $2,400,126 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0003 | Happy Hill Pump Station and North Walnut Street Pump Station Relocations | $2,479,132.50 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0017 | Sewer Force Main, Raw Water Intake, & Stream Bank Stabilization | $2,598,450 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0004 | Whiteville Floodprint: Mollie's Branch Stream Restoration and Infrastructure Improvements | $3,695,649.75 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0025 | Downtown Utility Duct Bank and Stormwater | $4,069,494.48 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0043 | City of Gastonia Water Treatment Plant – Resilient Power | $4,785,600 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0001 | Hominy Swamp Stormwater Park | $6,387,362.35 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0045 | City of Dunn Raw Water Electrical Relocation and 24" line replacement | $6,438,975 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0034 | Upper Yadkin River Floodplain Resiliency Initiative for Jonesville | $7,215,129.42 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0048 | Resilient Inner-City High Point thru Rehabilitation, Restoration & Enhancement | $7,457,064.17 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0044 | Bay River Metropolitan Sewer District Facultative Lagoon System Renovation and Capacity Upgrades | $7,651,325 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0018 | City of Greenville-Drainage Improvements and Stream Restoration at East Firetower Road | $9,205,611 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0039 | Management Costs | $12,885,375.34 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0036 | Fayetteville, NC - Person & Russell St Bridge and Stream Improvement Project | $15,400,875 | Identified for Further Review |
North Carolina | EMA-2022-BR-001-0005 | Jones County Regional Water System Resiliency Project | Not Selected | Does Not Meet HMA Requirements |
North Carolina | EMA-2022-BR-001-0006 | Collection Sewer Replacement - Cordova Community | Not Selected | Does Not Meet HMA Requirements |
North Carolina | EMA-2022-BR-001-0009 | Wrightsville Goddard Interceptor | Not Selected | Does Not Meet HMA Requirements |
North Carolina | EMA-2022-BR-001-0010 | City of Dunn HWY 301 Sewer Project | Not Selected | Does Not Meet HMA Requirements |
North Carolina | EMA-2022-BR-001-0012 | Morehead City - Sugarloaf Island Shoreline Stabilization Project | Not Selected | Does Not Meet HMA Requirements |
North Carolina | EMA-2022-BR-001-0021 | Craven County - Mitigate Aerial Water Line | Not Selected | Not Selected for Further Review |
North Carolina | EMA-2022-BR-001-0023 | Mebane Water Resource Recovery Facility Flood Wall | Not Selected | Not Selected for Further Review |
North Carolina | EMA-2022-BR-001-0027 | Hoke County McCain Resilient Water Supply | Not Selected | Does Not Meet HMA Requirements |
North Carolina | EMA-2022-BR-001-0032 | Priority Aerial Crossings Replacement Project | Not Selected | Does Not Meet HMA Requirements |
North Carolina | EMA-2022-BR-001-0037 | Landfill Scale and Solid Waste Facility Improvements | Not Selected | Does Not Meet HMA Requirements |
North Carolina | EMA-2022-BR-001-0038 | Relocation of Sewer Pump Station | Not Selected | Not Selected for Further Review |
North Carolina | EMA-2022-BR-001-0040 | Town of Kure Beach Stormwater Infiltration for 7 Sites | Not Selected | Does Not Meet HMA Requirements |
North Carolina | EMA-2022-BR-001-0042 | Noble Canal and Railroad St. Storm Water Rehab Project | Not Selected | Does Not Meet HMA Requirements |
North Carolina | EMA-2022-BR-001-0049 | Craighead-Tryon Flood Mitigation Initiative | Not Selected | Does Not Meet HMA Requirements |
North Dakota | EMD-2022-BR-017-0002 | Spirit Lake Management Costs | $189,000 | Identified for Further Review |
North Dakota | EMD-2022-BR-012-0007 | State Management Costs | $1,335,306.04 | Identified for Further Review |
North Dakota | EMD-2022-BR-017-0001 | Spirit Lake Tribe Comprehensive Flood Protection and Interior Drainage Scoping Project | $1,620,000 | Identified for Further Review |
North Dakota | EMD-2022-BR-012-0001 | City of Fessenden, North Dakota Wastewater Lagoon System Retrofit/Upgrade | $1,995,000 | Identified for Further Review |
North Dakota | EMD-2022-BR-012-0002 | City of Lincoln, North Dakota Wastewater Pond System Regionalization Retrofit/Upgrade | $7,764,750 | Identified for Further Review |
North Dakota | EMD-2022-BR-012-0003 | South Bismarck Flood Control | Not Selected | Not Selected for Further Review |
North Dakota | EMD-2022-BR-012-0004 | Schwan Lake Outlet | Not Selected | Not Selected for Further Review |
North Dakota | EMD-2022-BR-012-0005 | Mandan Master Lift Station | Not Selected | Does Not Meet HMA Requirements |
North Dakota | EMD-2022-BR-012-0006 | Lower Heart River Flood Risk Reduction and Community Resilience Project | Not Selected | Not Selected for Further Review |
Northern Mariana Islands | EMF-2022-BR-045-0003 | Commonwealth of the Northern Marina Islands (CNMI) Management Costs | $45,297.11 | Identified for Further Review |
Northern Mariana Islands | EMF-2022-BR-045-0001 | Gapgap Road Scoping Project | $150,512 | Identified for Further Review |
Northern Mariana Islands | EMF-2022-BR-045-0002 | Building Code Enforcement and Capacity Enhancement for the CNMI | $173,038.50 | Identified for Further Review |
Ohio | EMC-2022-BR-020-0004 | Shelby County - Project Scoping - BRIC Set A Side | $25,125 | Identified for Further Review |
Ohio | EMC-2022-BR-020-0007 | Village of Hebron - Project Scoping - BRIC Set A Side | $157,500 | Identified for Further Review |
Ohio | EMC-2022-BR-020-0012 | State of Ohio Eight-County Hazard Mitigation Plan Update | $236,070.34 | Identified for Further Review |
Ohio | EMC-2022-BR-020-0005 | City of Lakewood - Project Scoping - BRIC Set A Side | $287,794.11 | Identified for Further Review |
Ohio | EMC-2022-BR-020-0008 | City of Jackson - Project Scoping - BRIC Set a Side | $296,994 | Identified for Further Review |
Ohio | EMC-2022-BR-020-0009 | City of Columbiana - Court and Herbster Drainage Project - BRIC Set a Side | $996,516.54 | Identified for Further Review |
Ohio | EMC-2022-BR-020-0002 | REgional Management Costs (RMC) State of Ohio | $5,735,870.53 | Identified for Further Review |
Ohio | EMC-2022-BR-020-0010 | Mineral Ridge Dam Resiliency Upgrades and Source Water Protection - BRIC | $38,316,971.90 | Identified for Further Review |
Ohio | EMC-2022-BR-020-0001 | Mahoning County - Boardman Township - Cranberry Run Flood Mitigation | Not Selected | Not Selected for Further Review |
Ohio | EMC-2022-BR-020-0003 | City of Loveland - Water Treatment Plant Emergency Generator | Not Selected | Not Selected for Further Review |
Ohio | EMC-2022-BR-020-0006 | City of Lancaster - Stream Restoration Project | Not Selected | Does Not Meet HMA Requirements |
Ohio | EMC-2022-BR-020-0011 | Ohio Safe Room Rebate Program | Not Selected | Not Selected for Further Review |
Ohio | EMC-2022-BR-020-0013 | Ottawa County Elevation Project | Not Selected | Not Selected for Further Review |
Oklahoma | EMT-2022-BR-004-0003 | Scoping for Nature Based Solutions | $1,125 | Identified for Further Review |
Oklahoma | EMT-2022-BR-004-0002 | Head Start Generator Project | $46,102.50 | Identified for Further Review |
Oklahoma | EMT-2022-BR-006-0002 | Citizen Place II Storm Shelter: Applicant Management Costs | $51,679.73 | Identified for Further Review |
Oklahoma | EMT-2022-BR-004-0001 | Housing Safe Room Project west side | $114,686.25 | Identified for Further Review |
Oklahoma | EMT-2022-BR-002-0004 | State Management Costs | $268,307.60 | Identified for Further Review |
Oklahoma | EMT-2022-BR-006-0001 | Citizen Place II Storm Shelter | $458,229.93 | Identified for Further Review |
Oklahoma | EMT-2022-BR-029-0001 | Emergency Management Assessment Project | $662,400 | Identified for Further Review |
Oklahoma | EMT-2022-BR-018-0001 | Planning for Resilient Communities within the Chickasaw Nation | $768,717 | Identified for Further Review |
Oklahoma | EMT-2022-BR-029-0002 | Choctaw Nation ERM Assessment | $836,244 | Identified for Further Review |
Oklahoma | EMT-2022-BR-002-0001 | SoonerSafe Phase 28 | $886,400 | Identified for Further Review |
Oklahoma | EMT-2022-BR-002-0002 | OK State Flood Plan Project Scoping | $1,000,000 | Identified for Further Review |
Oklahoma | EMT-2022-BR-002-0003 | Oklahoma County: Increasing Resilience by Restoring One Community's Lifelines | Not Selected | Not Selected for Further Review |
Oregon | EMS-2022-BR-006-0004 | Jackson County Development Services Infrastructure Code Revision | $126,187.50 | Identified for Further Review |
Oregon | EMS-2022-BR-006-0011 | Fanno Creek Slope Stabilization Scoping Project, Portland OR | $225,371.25 | Identified for Further Review |
Oregon | EMS-2022-BR-006-0003 | Grant-Harney-Lake-Malheur-Counties NHMP Updates DLCD | $453,333 | Identified for Further Review |
Oregon | EMS-2022-BR-006-0001 | Lane County Oakridge, Westfir, & Blue River Communities Transmission Interconnection Project Scoping | $750,000 | Identified for Further Review |
Oregon | EMS-2022-BR-006-0020 | City of Portland Tree Planting for Heat Mitigation | $2,000,000 | Identified for Further Review |
Oregon | EMS-2022-BR-006-0007 | Lane County Mapleton Water Storage | $2,700,000 | Identified for Further Review |
Oregon | EMS-2022-BR-006-0009 | Clatsop County Tsunami Earthquake Astoria Hospital | $13,897,122.40 | Identified for Further Review |
Oregon | EMS-2022-BR-006-0022 | Oregon State Management Costs | $19,695,730.77 | Identified for Further Review |
Oregon | EMS-2022-BR-006-0002 | BRIC22 Medford Water Distribution System Resilience Backbone | $34,806,505 | Identified for Further Review |
Oregon | EMS-2022-BR-006-0006 | Grants Pass Water Treatment Plant Relocation BRIC | $50,000,000 | Identified for Further Review |
Oregon | EMS-2022-BR-006-0005 | Safeguarding Energy - Mt. Hood Corridor Resiliency Project, Clackamas County, OR | Not Selected | Does Not Meet HMA Requirements |
Oregon | EMS-2022-BR-006-0008 | Lane County - Mapleton Water Intake | Not Selected | Does Not Meet HMA Requirements |
Oregon | EMS-2022-BR-006-0010 | City of Beaverton Aquifer Storage and Recovery Well 7a | Not Selected | Not Selected for Further Review |
Oregon | EMS-2022-BR-006-0012 | Wildfire and Drought Resilience on Private Lands in Harney County, Oregon | Not Selected | Does Not Meet HMA Requirements |
Oregon | EMS-2022-BR-006-0013 | City of Port Orford Water Infrastructure Upgrade | Not Selected | Does Not Meet HMA Requirements |
Oregon | EMS-2022-BR-006-0014 | Lane County - Mapleton Sewer Infrastructure | Not Selected | Does Not Meet HMA Requirements |
Oregon | EMS-2022-BR-006-0015 | Lane County Public Service Building Seismic Retrofit | Not Selected | Not Selected for Further Review |
Oregon | EMS-2022-BR-006-0016 | City of Port Orford Raw Water Source and Storage Upgrade | Not Selected | Does Not Meet HMA Requirements |
Oregon | EMS-2022-BR-006-0017 | High Desert Museum Water Delivery System | Not Selected | Does Not Meet HMA Requirements |
Oregon | EMS-2022-BR-006-0018 | East Portland Community Center Resilience Hub | Not Selected | Does Not Meet HMA Requirements |
Oregon | EMS-2022-BR-006-0019 | Roosevelt Yard Project Scope BRIC Capability - and Capacity-Building | Not Selected | Does Not Meet HMA Requirements |
Oregon | EMS-2022-BR-006-0021 | Garfield Site Preparation BRIC Mitigation Project | Not Selected | Does Not Meet HMA Requirements |
Pennsylvania | EMP-2022-BR-005-0035 | Springfield Mercer EMS Generator | $8,981.25 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0011 | Perry County COOP | $25,153.50 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0029 | BRIC Scoping Hopewell Huntingdon Landslide | $31,500 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0019 | Halfmoon Centre Storm Water Mitigation | $37,515 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0028 | Pennsburg Montgomery Critical Facility Generator | $48,399.75 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0030 | Londonderry Dauphin Generator | $48,750 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0025 | County Hazard Mitigation Plan | $59,968.51 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0002 | Adams County Hazard Mitigation Plan Update 2025 | $75,000 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0023 | Glenburn Lackawanna Generator | $75,000 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0027 | 2025 Hazard Mitigation Plan | $75,000 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0034 | Luzerne County Hazard Mitigation Plan | $75,000 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0013 | 2026 Hazard Mitigation Plan Update | $112,500 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0001 | Schuylkill County Hazard Mitigation Plan Implementation | $187,500 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0024 | Dickson Lackawanna Storm Water Mitigation | $208,500 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0020 | Phila Eastwick BRIC Scoping Flood Resilience | $290,000 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0015 | Upper Salford Montgomery Acquisition | $431,250 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0012 | Bethlehem Infrastructure Project - Easton Avenue Flood Mitigation (Overmatch) | $3,052,700 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0006 | Bridgeville Borough Flood Control Infrastructure Project - Phase 1A | $5,334,092.25 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0017 | Dover York County Floodplain Mitigation (Over Match) | $5,830,897.21 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0026 | Philadelphia Water Department (PWD) Queen Lane Water Pump Generator (Over Match) | $6,080,477 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0033 | Pennsylvania Management Costs | $14,012,826.44 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0008 | Phila. PWD Northeast Effluent Pump Station Mitigation (Over Match) | $50,000,000 | Identified for Further Review |
Pennsylvania | EMP-2022-BR-005-0003 | Carroll Township (Washington County) Landslide Mitigation Project | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2022-BR-005-0004 | Fawn Allegheny Road Slide Mitigation | Not Selected | Does Not Meet HMA Requirements |
Pennsylvania | EMP-2022-BR-005-0005 | Lackawanna Dam #5 Mitigation | Not Selected | Not Selected for Further Review |
Pennsylvania | EMP-2022-BR-005-0007 | Upper Dublin Montgomery Drainage Mitigation (Montgomery Co - Overmatch) | Not Selected | Does Not Meet HMA Requirements |
Pennsylvania | EMP-2022-BR-005-0009 | Jessup Lackawanna Mitigation | Not Selected | Does Not Meet HMA Requirements |
Pennsylvania | EMP-2022-BR-005-0010 | Sunbury Northumberland Levee Mitigation | Not Selected | Does Not Meet HMA Requirements |
Pennsylvania | EMP-2022-BR-005-0014 | Improving Resiliency through Combined Sewer Separate | Not Selected | Does Not Meet HMA Requirements |
Pennsylvania | EMP-2022-BR-005-0016 | Boswell Somerset Storm Water Mitigation | Not Selected | Does Not Meet HMA Requirements |
Pennsylvania | EMP-2022-BR-005-0018 | Williamsport Lycoming Basin Street Pump Station Generator | Not Selected | Does Not Meet HMA Requirements |
Pennsylvania | EMP-2022-BR-005-0021 | BRIC Scoping Kulpmont Northumberland Stormwater Mitigation | Not Selected | Does Not Meet HMA Requirements |
Pennsylvania | EMP-2022-BR-005-0022 | Wilkins Allegheny landslide Mitigation | Not Selected | Does Not Meet HMA Requirements |
Pennsylvania | EMP-2022-BR-005-0031 | Windsor Landslide Mitigation | Not Selected | Does Not Meet HMA Requirements |
Pennsylvania | EMP-2022-BR-005-0032 | Moosic Borough Levee Conduit Repairs | Not Selected | Does Not Meet HMA Requirements |
Puerto Rico | EMN-2022-BR-008-0001 | Puerto Rico Readiness Program | $1,500,000 | Identified for Further Review |
Rhode Island | EMB-2022-BR-007-0002 | Foster Hazard Mitigation Plan Update | $17,250 | Identified for Further Review |
Rhode Island | EMB-2022-BR-007-0004 | Regional Hazard Mitigation Plan for Aquidneck Island | $56,250 | Identified for Further Review |
Rhode Island | EMB-2022-BR-007-0005 | State Management Costs | $85,778.64 | Identified for Further Review |
Rhode Island | EMB-2022-BR-007-0003 | Foddering Farm Road Causeway Project Scoping Study | $157,500 | Identified for Further Review |
Rhode Island | EMB-2022-BR-007-0001 | Seamless Flood Risk Mapping Tool for Coastal and Inland Waters of RI in a Changing Climate | $381,704.39 | Identified for Further Review |
South Carolina | EMA-2022-BR-012-0006 | South Carolina Division of Motor Vehicles (SCDMV) - Retrofitting Hurricane Shutters | $57,563.28 | Identified for Further Review |
South Carolina | EMA-2022-BR-012-0003 | Santee Lynches Regional Hazard Mitigation Plan | $61,191.63 | Identified for Further Review |
South Carolina | EMA-2022-BR-012-0009 | Generator for Fire House #2 and Municipal Fuel Pumps: Florence, SC | $108,675 | Identified for Further Review |
South Carolina | EMA-2022-BR-012-0010 | USC Disaster Resistant University Hazard Mitigation Plan | $109,952.75 | Identified for Further Review |
South Carolina | EMA-2022-BR-012-0002 | City of Beaufort, Pidgeon Point Project Scoping | $172,800 | Identified for Further Review |
South Carolina | EMA-2022-BR-012-0015 | South Carolina Recipient Management Costs | $232,341.40 | Identified for Further Review |
South Carolina | EMA-2022-BR-012-0004 | York County Generator Project | $300,000 | Identified for Further Review |
South Carolina | EMA-2022-BR-012-0007 | Jasper County Stormwater Drainage Study | $937,500 | Identified for Further Review |
South Carolina | EMA-2022-BR-012-0001 | Community Flood Mitigation and Resilience Initiative (Saluda River Basin) | Not Selected | Does Not Meet HMA Requirements |
South Carolina | EMA-2022-BR-012-0005 | Quail Lane Pump Station Submersible Pumps | Not Selected | Not Selected for Further Review |
South Carolina | EMA-2022-BR-012-0008 | Charleston Medical District Elevated Walkway | Not Selected | Does Not Meet HMA Requirements |
South Carolina | EMA-2022-BR-012-0011 | Overhead Electric Utility Conversion Project, Rock Hill SC | Not Selected | Not Selected for Further Review |
South Carolina | EMA-2022-BR-012-0012 | Conway Medical Center Localized Flood Reduction | Not Selected | Does Not Meet HMA Requirements |
South Carolina | EMA-2022-BR-012-0013 | Mount Pleasant Saltgrass Point Drainage Improvement | Not Selected | Not Selected for Further Review |
South Carolina | EMA-2022-BR-012-0014 | Intake Retrofit for Shaws Creek Water Treatment Plant | Not Selected | Does Not Meet HMA Requirements |
South Dakota | EMD-2022-BR-004-0012 | Union County Pre-Disaster Mitigation (PDM) Plan Update | $9,375 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0008 | McPherson County Pre-Disaster Mitigation (PDM) Plan Update | $12,150 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0009 | Marshall County Pre-Disaster Mitigation (PDM) Plan Update | $12,150 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0014 | Spink County Pre-Disaster Mitigation (PDM) Plan Update | $12,150 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0010 | Hamlin County Pre-Disaster Mitigation (PDM) Plan Update | $12,675 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0006 | Brookings County Pre-Disaster Mitigation (PDM) Plan Update | $14,175 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0005 | Kingsbury County Pre-Disaster Mitigation (PDM) Plan Update | $14,400 | Identified for Further Review |
South Dakota | EMD-2022-BR-015-0001 | Sisseton Wahpeton Oyate Plan update | $14,912.25 | Identified for Further Review |
South Dakota | EMD-2022-BR-013-0002 | Recipient Management Costs | $17,220 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0002 | WarHawk District Pre-Disaster Mitigation (PDM) Plan Update | $40,500 | Identified for Further Review |
South Dakota | EMD-2022-BR-013-0001 | Project Scoping for Flood Mitigation | $154,980 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0004 | City of Sioux Falls Tomar Park Neighborhood Buy-Out Program-2022#2 | $197,400 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0003 | Sully County/Oahe Electric Line 320 PLB | $303,751.20 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0015 | State Management Costs | $613,715.82 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0007 | Pennington Co/ West River Electric Line 359 - Radar Hill Road North | $1,022,698.83 | Identified for Further Review |
South Dakota | EMD-2022-BR-015-0002 | Sisseton Wahpeton Oyate Department of Transportation (SWO DOT) Perpetual Flooding Damage Mitigation Construction Project | $1,941,460.79 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0011 | Walworth County Resilient Systems Project | $2,827,500 | Identified for Further Review |
South Dakota | EMD-2022-BR-004-0001 | City of Sioux Falls Skunk Creek H&H Study | Not Selected | Withdrawn |
South Dakota | EMD-2022-BR-004-0013 | City of Sioux Falls Tomar Park Neighborhood Buy-Out Program-2022#1 | Not Selected | Withdrawn |
Tennessee | EMA-2022-BR-004-0004 | State Management Costs | $267,057 | Identified for Further Review |
Tennessee | EMA-2022-BR-004-0003 | Designing an East Bank Flood Resilience Framework: Elevating Future Development | $400,000 | Identified for Further Review |
Tennessee | EMA-2022-BR-004-0001 | Project 52 - Fire, Port, Hazardous & Disaster Mitigation, Safe Room, Maritime Operations | $1,500,000 | Identified for Further Review |
Tennessee | EMA-2022-BR-004-0002 | EPB Chattanooga Community Network Conversion for Critical Infrastructure | Not Selected | Does Not Meet HMA Requirements |
Texas | EMT-2022-BR-016-0031 | Kenedy County Multi-Hazard Mitigation Plan | $76,000 | Identified for Further Review |
Texas | EMT-2022-BR-016-0009 | San Patricio Flood Mitigation and Resiliency Project Scoping | $112,500 | Identified for Further Review |
Texas | EMT-2022-BR-016-0015 | City of Conroe 2 Home Acquisition BRIC 2022 | $225,633.87 | Identified for Further Review |
Texas | EMT-2022-BR-016-0001 | City of Mission Sunset & Astroland Drainage Engineering Design | $290,143.89 | Identified for Further Review |
Texas | EMT-2022-BR-016-0017 | City of Haslet – Installation of City Hall Facility and Water Department Power Generator Units | $414,800.25 | Identified for Further Review |
Texas | EMT-2022-BR-016-0013 | Town of Combes-Nixon Rd Drainage-National BRIC 2022 | $848,180.02 | Identified for Further Review |
Texas | EMT-2022-BR-016-0004 | Alton Recreation Center Solar Microgrid | $859,815.88 | Identified for Further Review |
Texas | EMT-2022-BR-016-0008 | Harlingen Drainage Improvements | $913,845 | Identified for Further Review |
Texas | EMT-2022-BR-016-0019 | Mission Lateral Regional Detention Facility | $1,372,196.10 | Identified for Further Review |
Texas | EMT-2022-BR-016-0024 | South Lateral Regional Detention Facility | $2,298,105 | Identified for Further Review |
Texas | EMT-2022-BR-016-0026 | San Antonio Water System (SAWS) Emergency Generators | $11,696,722.80 | Identified for Further Review |
Texas | EMT-2022-BR-016-0002 | Texas Division of Emergency Management (TDEM) State Management Costs Subapplication | $14,416,243.27 | Identified for Further Review |
Texas | EMT-2022-BR-016-0011 | Climate Resilience Flood Mitigation Project for Critical Power and Treatment Infrastructure | $50,000,000 | Identified for Further Review |
Texas | EMT-2022-BR-016-0003 | Harris County TX Greens Bayou Mid-Reach Channel Conveyance Improvements - Segment 1 | Not Selected | Does Not Meet HMA Requirements |
Texas | EMT-2022-BR-016-0005 | Community tornado shelter/safe room and generator | Not Selected | Not Selected for Further Review |
Texas | EMT-2022-BR-016-0006 | Cameron County drainage District #3 (CCDD3) San Benito Drainage Master Plan & Project Scoping | Not Selected | Not Selected for Further Review |
Texas | EMT-2022-BR-016-0007 | Low water crossing barriers | Not Selected | Does Not Meet HMA Requirements |
Texas | EMT-2022-BR-016-0010 | Basic Science Building & Medical Research Building Flood Mitigation | Not Selected | Not Selected for Further Review |
Texas | EMT-2022-BR-016-0012 | North Main Drain Expansion Project | Not Selected | Does Not Meet HMA Requirements |
Texas | EMT-2022-BR-016-0014 | El Campo Drainage Master Plan & Project Scoping | Not Selected | Not Selected for Further Review |
Texas | EMT-2022-BR-016-0016 | Jersey Village E127 Construction Project | Not Selected | Does Not Meet HMA Requirements |
Texas | EMT-2022-BR-016-0018 | The City of Houston Turkey Creek Wastewater Treatment Plant Project | Not Selected | Not Selected for Further Review |
Texas | EMT-2022-BR-016-0020 | Southmost Regional Water Authority (SRWA) Well Field and Plant Expansion - Cameron County, TX | Not Selected | Not Selected for Further Review |
Texas | EMT-2022-BR-016-0021 | City of Hallettsville Local Digital Infrastructure Systems | Not Selected | Does Not Meet HMA Requirements |
Texas | EMT-2022-BR-016-0022 | Goliad County Courthouse | Not Selected | Does Not Meet HMA Requirements |
Texas | EMT-2022-BR-016-0023 | City of Victoria Off-Channel Reservoir Interconnect Project | Not Selected | Not Selected for Further Review |
Texas | EMT-2022-BR-016-0025 | Flood Mitigation Affordability, Climate Resiliency and Agricultural Vitality for a Rural Community | Not Selected | Not Selected for Further Review |
Texas | EMT-2022-BR-016-0027 | Goliad County Flood Mitigation - Fannin/Cologne | Not Selected | Does Not Meet HMA Requirements |
Texas | EMT-2022-BR-016-0028 | Localized Flood Risk Reduction Project Catclaw Creek BRIC | Not Selected | Not Selected for Further Review |
Texas | EMT-2022-BR-016-0029 | Galveston National Laboratory, Robert E. Shope Laboratory, & Keiller Building Flood Mitigation | Not Selected | Does Not Meet HMA Requirements |
Texas | EMT-2022-BR-016-0030 | City of San Antonio - Seeling Channel Project | Not Selected | Not Selected for Further Review |
Utah | EMD-2022-BR-009-0013 | City of Saratoga Springs Hazard Mitigation Plan | $36,810 | Identified for Further Review |
Utah | EMD-2022-BR-009-0025 | Woodland Hills Flood Project Scoping | $37,500 | Identified for Further Review |
Utah | EMD-2022-BR-009-0015 | Toquerville City Erosion Hazard Study Project Scoping | $38,775 | Identified for Further Review |
Utah | EMD-2022-BR-009-0023 | Six County Association of Governments (SCAOG) Mitigation Plan Update | $75,000 | Identified for Further Review |
Utah | EMD-2022-BR-009-0005 | Bear River Region Mitigation Plan Update | $90,000 | Identified for Further Review |
Utah | EMD-2022-BR-009-0012 | 2022 Salt Lake County Multijurisdiction Multihazard Mitigation Plan Update | $112,500 | Identified for Further Review |
Utah | EMD-2022-BR-009-0021 | Granger Hunter Improvement District Mitigation Plan | $119,993.99 | Identified for Further Review |
Utah | EMD-2022-BR-009-0006 | Jordan Valley Water Conservancy District (JVWCD) Aqueduct Scoping | $241,877.35 | Identified for Further Review |
Utah | EMD-2022-BR-009-0017 | Utah Geological Survey Subsidence Scoping | $294,973 | Identified for Further Review |
Utah | EMD-2022-BR-009-0001 | Sandy City Debris Flow Hazard Analysis Project Scoping | $300,000 | Identified for Further Review |
Utah | EMD-2022-BR-009-0024 | Jordan School District Seismic Project Scoping | $312,570 | Identified for Further Review |
Utah | EMD-2022-BR-009-0004 | UGS Geologic Hazards Mapping of Salt Lake County | $340,000.26 | Identified for Further Review |
Utah | EMD-2022-BR-009-0026 | DEM State Management Costs | $6,948,495.85 | Identified for Further Review |
Utah | EMD-2022-BR-009-0020 | Central Utah Water Conservancy District (CUWCD) Alpine Aqueduct Reach 1 Risk & Resiliency Project | $46,648,062 | Identified for Further Review |
Utah | EMD-2022-BR-009-0002 | North Salt Lake Honey Well Pump Station Reconstruction | Not Selected | Not Selected for Further Review |
Utah | EMD-2022-BR-009-0003 | Jordan Valley Water Conservancy District (JVWCD) Regional Water Treatment Plant Drought, Wildfire, and Earthquake Resiliency Project. | Not Selected | Not Selected for Further Review |
Utah | EMD-2022-BR-009-0007 | Neffs Canyon Debris Basin Project | Not Selected | Does Not Meet HMA Requirements |
Utah | EMD-2022-BR-009-0008 | Culinary Water Infrastructure Resilience Improvements, Little Mountain Water Tanks | Not Selected | Not Selected for Further Review |
Utah | EMD-2022-BR-009-0009 | Stockton New Culinary Water Source | Not Selected | Does Not Meet HMA Requirements |
Utah | EMD-2022-BR-009-0010 | Granite Schools Retrofit Project | Not Selected | Not Selected for Further Review |
Utah | EMD-2022-BR-009-0011 | Salt Lake City Fix the Bricks | Not Selected | Not Selected for Further Review |
Utah | EMD-2022-BR-009-0014 | Emergency Power for Essential Culinary Water Wells | Not Selected | Not Selected for Further Review |
Utah | EMD-2022-BR-009-0016 | Community Resilience Through Provo River Levee Reconstruction | Not Selected | Not Selected for Further Review |
Utah | EMD-2022-BR-009-0018 | City of Saratoga Springs Water System Emergency Generators | Not Selected | Not Selected for Further Review |
Utah | EMD-2022-BR-009-0019 | Springville Flood Control Project | Not Selected | Not Selected for Further Review |
Utah | EMD-2022-BR-009-0022 | Salt Lake City All-Electric Microgrid, Disaster Response & Decarbonization Project | Not Selected | Does Not Meet HMA Requirements |
Vermont | EMB-2022-BR-002-0008 | Tunbridge Emergency Corridor Vulnerability Project Scoping | $39,200 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0006 | Bristol Mountain Street Project Scoping | $46,400 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0007 | Weathersfield Bowen Hill Road Project Scoping | $57,950 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0013 | Belvidere Back Road Culvert Project Scoping | $67,450 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0011 | Chittenden Wildcat Road Project Scoping and Design | $76,000 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0009 | Brandon Wheeler Road Bridge and Culvert Project Scoping | $80,000 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0003 | Highgate Machia Rd Bank Instability Alternatives Study | $100,400 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0010 | Local Hazard Mitigation Plan Development 2022 - USACE Engineer Research and Development Center (ERDC) | $152,820 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0012 | Mitigation, Adaptation, Justice: Grassroots Infrastructure for Integrating Climate Justice | $180,386.95 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0015 | Health - Cooling Capabilities Assessment | $192,013.46 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0016 | Vermont Management Costs | $232,148.51 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0014 | VEM Statewide Flood Study Scoping | $390,000 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0005 | Local Hazard Mitigation Plan Development 2022 - Non-EDRC | $398,775 | Identified for Further Review |
Vermont | EMB-2022-BR-002-0001 | Coventry Ice Jam Study | Not Selected | Does Not Meet HMA Requirements |
Vermont | EMB-2022-BR-002-0002 | Addison Couty Regional Planning Commission (ACRPC) Ripton Old Town Road Project Scoping | Not Selected | Does Not Meet HMA Requirements |
Vermont | EMB-2022-BR-002-0004 | Rutland County Community Development & Local Planning (RRPC) Mt Tabor Scoping Study | Not Selected | Does Not Meet HMA Requirements |
Virgin Islands | EMN-2022-BR-006-0001 | United States Virgin Islands (USVI) - (Scoping) Resilience Hubs | $277,546.50 | Identified for Further Review |
Virginia | EMP-2022-BR-006-0020 | Greene County Code Enforcement | $105,904 | Identified for Further Review |
Virginia | EMP-2022-BR-006-0007 | VA Department of Conservation and Recreation (DCR) Disaster Assistance Response Team | $107,718 | Identified for Further Review |
Virginia | EMP-2022-BR-006-0008 | City of Charlottesville - Rock Creek Watershed Management Plan | $231,360 | Identified for Further Review |
Virginia | EMP-2022-BR-006-0003 | Downtown Roanoke Flood Reduction - Green Infrastructure | $248,000 | Identified for Further Review |
Virginia | EMP-2022-BR-006-0005 | Enhancement of Landslide in Virginia Commonwealth HMP | $520,055.75 | Identified for Further Review |
Virginia | EMP-2022-BR-006-0022 | Virginia Department of Emergency Management (VDEM) Management Costs | $7,761,736.50 | Identified for Further Review |
Virginia | EMP-2022-BR-006-0016 | Feeder Channel Retaining Wall Restoration and Pre-Sedimentation Basin | $11,993,942 | Identified for Further Review |
Virginia | EMP-2022-BR-006-0006 | Virginia Department of Emergency Management (VDEM) - Green Power Mobile Energy Storage System | $21,720,039.50 | Identified for Further Review |
Virginia | EMP-2022-BR-006-0012 | City of Portsmouth-Lake Meade Dam Adaptations | $24,210,000 | Identified for Further Review |
Virginia | EMP-2022-BR-006-0001 | City of Portsmouth - Lake Cohoon Dam Adaptations | Not Selected | Not Selected for Further Review |
Virginia | EMP-2022-BR-006-0002 | Brooke Road Flood Mitigation and Resiliency Project | Not Selected | Does Not Meet HMA Requirements |
Virginia | EMP-2022-BR-006-0004 | City of Alexandria Waterfront Implementation Project | Not Selected | Does Not Meet HMA Requirements |
Virginia | EMP-2022-BR-006-0009 | Rivanna Water and Sewer Authority (RWSA) Central Water Line Resilience | Not Selected | Does Not Meet HMA Requirements |
Virginia | EMP-2022-BR-006-0010 | Middle Peninsula Planning District Commission (PDC) - Focused Mitigation Action and Analysis | Not Selected | Does Not Meet HMA Requirements |
Virginia | EMP-2022-BR-006-0011 | City of Charlottesville - Generators for Critical Facilities | Not Selected | Does Not Meet HMA Requirements |
Virginia | EMP-2022-BR-006-0013 | City of Chesapeake - N Battlefield Blvd | Not Selected | Not Selected for Further Review |
Virginia | EMP-2022-BR-006-0014 | Franklin County- Flood Mitigation at Ferrum College | Not Selected | Not Selected for Further Review |
Virginia | EMP-2022-BR-006-0015 | Lancaster County - Westland Beach-Windmill Point Shoreline Stabilization Project | Not Selected | Not Selected for Further Review |
Virginia | EMP-2022-BR-006-0017 | Rivanna Water & Sewer Authority Flood Protection Resiliency Design and Scoping | Not Selected | Does Not Meet HMA Requirements |
Virginia | EMP-2022-BR-006-0018 | Chubb Lake / Lake Bradford - Pump Station and Outfall | Not Selected | Does Not Meet HMA Requirements |
Virginia | EMP-2022-BR-006-0019 | City of Chesapeake Deepwater Dr Road Elevation | Not Selected | Not Selected for Further Review |
Virginia | EMP-2022-BR-006-0021 | Greene/Stanardsville - Water Supply Protection | Not Selected | Not Selected for Further Review |
Washington | EMS-2022-BR-028-0001 | Upper Skagit Indian Tribe Management Costs | $87,803.73 | Identified for Further Review |
Washington | EMS-2022-BR-024-0001 | Managment Costs for Fidalgo Bay Road Design | $92,068.29 | Identified for Further Review |
Washington | EMS-2022-BR-028-0003 | Wellhead Protection Area Seismic Retrofit Project Scoping | $114,300 | Identified for Further Review |
Washington | EMS-2022-BR-035-0002 | Ocean Beach School District (OBSD) Tsunami Towers Feasibility | $160,000 | Identified for Further Review |
Washington | EMS-2022-BR-035-0008 | City of Bainbridge Island Shoreline Road Climate Adaptation Project Scoping | $187,347.75 | Identified for Further Review |
Washington | EMS-2022-BR-035-0020 | King County Regional Hazard Mitigation Plan Update | $234,374.40 | Identified for Further Review |
Washington | EMS-2022-BR-035-0012 | Region 5 Hazard Mitigation Plan Update | $267,660 | Identified for Further Review |
Washington | EMS-2022-BR-035-0011 | WA Department of Corrections Risk & Vulnerability Assessment and Mitigation Strategy Development | $323,755.25 | Identified for Further Review |
Washington | EMS-2022-BR-028-0002 | Elder's Boulevard Water Line Seismic Retrofit | $638,303 | Identified for Further Review |
Washington | EMS-2022-BR-035-0007 | Washington State Vertical Evacuation Structure Scoping for Disadvantaged Communities | $715,760 | Identified for Further Review |
Washington | EMS-2022-BR-024-0002 | Preliminary Engineering / Design for Fidalgo Bay Road Reconstruction | $828,614.61 | Identified for Further Review |
Washington | EMS-2022-BR-035-0004 | Shaw and Wide Hollow Creeks Flood Control Project | $5,999,990 | Identified for Further Review |
Washington | EMS-2022-BR-035-0014 | BRIC22 State Management Costs (SMC) | $7,585,576.00 | Identified for Further Review |
Washington | EMS-2022-BR-035-0018 | Goldendale Climate Resilience Microgrid | $9,817,554.40 | Identified for Further Review |
Washington | EMS-2022-BR-035-0013 | Acquisition of Valley Brook Mobile Home Park & Floodplain Reconnection | $10,000,000 | Identified for Further Review |
Washington | EMS-2022-BR-035-0022 | Graveyard Spit Dynamic Revetment and Dune Restoration | $12,866,014.50 | Identified for Further Review |
Washington | EMS-2022-BR-035-0016 | Construction of Jones Setback Levee | $15,541,600 | Identified for Further Review |
Washington | EMS-2022-BR-031-0001 | Port Gamble S'Klallam Resilient Data Infrastructure Project | Not Selected | Does Not Meet HMA Requirements |
Washington | EMS-2022-BR-035-0001 | City of Seattle Northlake Retaining Wall Seismic Retrofit Phased Project | Not Selected | Does Not Meet HMA Requirements |
Washington | EMS-2022-BR-035-0003 | City of Renton, Lift Station Improvement Project | Not Selected | Not Selected for Further Review |
Washington | EMS-2022-BR-035-0005 | Covington Water District Tank 4 Replacement Project, 22427 SE 331st Street, Auburn, WA 98092 | Not Selected | Not Selected for Further Review |
Washington | EMS-2022-BR-035-0006 | Covington Water District Tank 1 Replacement Project, 18631 SE 300th Pl , Kent, WA 98042 | Not Selected | Not Selected for Further Review |
Washington | EMS-2022-BR-035-0009 | Seattle Parks and Recreation - Indoor Cooler, Clean Air Respite Center | Not Selected | Not Selected for Further Review |
Washington | EMS-2022-BR-035-0010 | Day Island Bridge Replacement Study and Construction Project | Not Selected | Not Selected for Further Review |
Washington | EMS-2022-BR-035-0015 | Storm Creek Erosion | Not Selected | Not Selected for Further Review |
Washington | EMS-2022-BR-035-0017 | Emergency Generator for Public Works and Police Facilities | Not Selected | Does Not Meet HMA Requirements |
Washington | EMS-2022-BR-035-0019 | Ocean Shores Seismic Retrofit Water Storage 2022 | Not Selected | Not Selected for Further Review |
Washington | EMS-2022-BR-035-0021 | City of Seattle University Branch Library Seismic Retrofit | Not Selected | Not Selected for Further Review |
Washington | EMS-2022-BR-035-0023 | Washington State Public Transportation (SPTP) Influent Pump Station Building Seismic Upgrade Project | Not Selected | Not Selected for Further Review |
Wisconsin | EMC-2022-BR-004-0001 | Bad River Band PDMP Management Costs | $2,480.17 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0020 | City of New Holstein Storm Water Mitigation Project at 2600 Calumet Drive | $20,253 | Identified for Further Review |
Wisconsin | EMC-2022-BR-004-0002 | Bad River Band PDMP Update | $21,258.63 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0016 | Jefferson County All-Natural Hazard Mitigation Plan Update | $22,400 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0019 | Kewaunee County Hazard Mitigation Plan Update | $25,690.70 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0004 | Green Lake County Hazard Mitigation Plan Update | $25,812 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0001 | Sauk County - County Plan Update | $27,523.58 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0008 | Marinette County, Wisconsin Hazard Mitigation Plan | $29,313.24 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0021 | Eau Claire County Hazard Mitigation Plan | $39,040 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0002 | Trempealeau County Hazard Mitigation Plan Update | $47,219.52 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0003 | Pierce County Hazard Mitigation Planning Grant | $47,982.30 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0017 | Monroe County Multi-Hazards Mitigation Plan Update | $47,999.91 | Identified for Further Review |
Wisconsin | EMC-2022-BR-015-0001 | Lac Courte Oreilles (LCO) Hazard Mitigation | $76,500 | Identified for Further Review |
Wisconsin | EMC-2022-BR-013-0001 | Menominee Indian Tribe of Wisconsin BRIC 22 Management Costs | $98,552.59 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0005 | Central River Falls Flood Control Study | $146,800 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0022 | Central Fond du Lac Flood Control Study | $206,000 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0013 | South Central Manitowoc Grand Avenue and Rubick Field Storm Sewer and Dry Pond Design | $264,000 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0018 | Wisconsin Division of Natural Resources (DNR) - Capability and Capacity Building Partnerships/Planning-Related Activities Grant | $375,000 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0006 | Village of Birchwood Community Safe Room Project | $674,965.91 | Identified for Further Review |
Wisconsin | EMC-2022-BR-013-0002 | Menominee Tribe Overhead to Underground Power Line Conversion Mitigation Project | $872,894.36 | Identified for Further Review |
Wisconsin | EMC-2022-BR-010-0001 | Application Management Costs | $1,058,991.15 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0023 | Wisconsin Emergency Management (WEM) Recipient Management Cost Grant | $2,103,932.27 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0014 | Potosi School District Community Safe Room Project | $2,892,300 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0009 | School District of Phillips Community Safe Room | $4,199,262.10 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0011 | Cuba City School District Community Safe Room Project | $8,792,147.34 | Identified for Further Review |
Wisconsin | EMC-2022-BR-010-0002 | Oneida Nation Health Campus Resiliency Project | $9,077,067 | Identified for Further Review |
Wisconsin | EMC-2022-BR-008-0007 | Village of Lake Hallie Community Safe Room Project | Not Selected | Does Not Meet HMA Requirements |
Wisconsin | EMC-2022-BR-008-0010 | Southwestern Wisconsin School District Community Safe Room | Not Selected | Not Selected for Further Review |
Wisconsin | EMC-2022-BR-008-0012 | Platteville School District Community Safe Room Project | Not Selected | Does Not Meet HMA Requirements |
Wisconsin | EMC-2022-BR-008-0015 | City of Medford Community Safe Room Project | Not Selected | Does Not Meet HMA Requirements |
Wyoming | EMD-2022-BR-010-0001 | Storm Drainage Master Plan - Capital Improvement Project Planning | $75,000 | Identified for Further Review |
Wyoming | EMD-2022-BR-010-0002 | Wyoming Office of Homeland Security - Management Costs | $134,534.30 | Identified for Further Review |
Wyoming | EMD-2022-BR-010-0003 | North Platte River - Boozer Creek Restoration BRIC | $885,959.25 | Identified for Further Review |
Wyoming | EMD-2022-BR-018-0001 | Wind River Inter-Tribal Council Tribal Multi-Hazard Mitigation Plan Project Scoping | $1,093,837 | Identified for Further Review |