This page provides the status of the Pre-Disaster Mitigation (PDM) planning and project subapplications that were submitted to FEMA for the Fiscal Year (FY) 2017 application cycle. FEMA's Hazard Mitigation Assistance (HMA) grant programs provide funding to protect life and property from future natural disasters. The PDM grant program is designed to implement a sustained predisaster natural hazard mitigation program to reduce overall risk to the population and structures from future hazard events, while also reducing reliance on Federal funding in future disasters.
For FY 2017, $100 million was appropriated for PDM. FEMA made available $90 million for grants. In March 2017, FEMA announced the application period from August 14-November 14, 2017 in the Notice of Funding Opportunity (NOFO) posted on www.grants.gov.
The agency’s priorities for the FY 2017 PDM program are:
FY2017 Pre-Disaster Mitigation Program Priorities
FEMA will select eligible subapplications up to the available PDM funding amount of $90 million in the following order:
1. Statutory Allocation of $575,000 Federal Share for States, Territories and the District of Columbia (DC)
To meet the statutory requirement, FEMA will select eligible planning and project subapplications from each state, territory and DC in order of the applicant’s rank (#1–x) to the lowest ranked subapplication that brings the total federal share to no more than $575,000 (see Other Eligibility Criteria subsection under section C of this NOFO).
For example, an Applicant’s #1 ranked subapplication for $200,000 Federal share and #2 ranked subapplication for $340,000 would be selected for the allocation; however, the #3 ranked subapplication for $575,000 and any other eligible subapplications would be considered on a competitive basis in priority category 3 below.
2. Tribal Set Aside of $10 Million for Federally-Recognized Tribes, Not to Exceed $575,000 Federal Share Per Tribal Applicant
FEMA will set aside $10 million for federally-recognized tribes applying directly to FEMA as applicants. FEMA will select eligible planning and project subapplications for each tribal applicant in order of the tribe’s rank (#1–x) to the lowest ranked subapplication that brings the total federal share to no more than $575,000, not to exceed a total of $10 million.
3. Competitive Funding
After meeting the statutory requirement for state/territory allocations and the tribal set aside, FEMA will select from the remaining eligible planning and project subapplications from all applicants on a competitive basis up to the available amount of funding.
If an applicant submits projects in excess of the limit for competitive consideration (see Other Eligibility Criteria subsection under section C of this NOFO), then FEMA will only review the highest ranked competitive project subapplications up to the limit.
FEMA will select subapplications for competitive funding in the following order:
- Multi-state/tribal mitigation initiatives. FEMA will select one eligible multi-state/tribal mitigation planning or project subapplication per applicant.
- Planning subapplications from applicants that have less than $400,000 Hazard Mitigation Grant Program (HMGP) planning funds available. FEMA will select eligible planning subapplications from applicants that have less than $400,000 HMGP planning funds available (see Hazard Mitigation Grant Program subsection in Section H of this NOFO).
- Project subapplications from applicants that have less than $4 million HMGP regular project funds available. FEMA will select eligible project subapplications from applicants that have less than $4 million HMGP regular project funds in the following order:
- Non-flood hazard (e.g., seismic, wildfire, landslide, wind and drought) mitigation projects
- Flood mitigation activities except acquisition, elevation, or mitigation reconstruction (e.g., stormwater management and flood control measures)
- Acquisition, elevation and mitigation reconstruction projects
- Generators for critical facilities identified in a FEMA-approved Mitigation Plan
- Planning subapplications from applicants that have $400,000 or more HMGP planning funds available. FEMA will select eligible planning subapplications from applicants that have $400,000 or more HMGP planning funds available.
- Project subapplications from applicants that have $4 million or more HMGP regular project funds available. FEMA will select eligible project subapplications from applicants that have $4 million or more HMGP regular project funds available in the following order:
- Non-flood hazard mitigation projects
- Flood mitigation activities except acquisition, elevation, or mitigation reconstruction
- Acquisition, elevation and mitigation reconstruction projects
- Generators for critical facilities identified in a FEMA-approved Mitigation Plan
FEMA will further prioritize planning and project subapplications in priority categories 2 and 3 above, as needed, in the following order:
- Subapplicant’s small impoverished community status (see Cost Share or Match subsection under section C of this NOFO);
- Indication of public-private partnership (i.e., whether private sector funding is included in the required non-federal cost share);
- Subapplicant’s FEMA-validated residential or commercial Building Code Effectiveness Grading Schedule (BCEGS) rating, as appropriate to the activity type, from a grade of 1 to 10;
- FEMA-validated Benefit Cost Ratio (BCR) for projects (see Benefit Cost Analysis for Mitigation Projects subsection under section D of this NOFO); and
- The applicant’s rank of subapplications (see Content and Form of Application Submission subsection under Section D of this NOFO).
For more information on BCEGS, please visit the Insurance Services Office - Mitigation website.
FEMA may select a subapplication out of priority order based upon one or more of the following factors:
- Availability of funding;
- Duplication of subapplications;
- Program priorities and policy factors; and,
- Other pertinent information.
To be eligible for the state/territory allocation or the tribal set aside, the applicant’s highest ranked planning or project subapplication must not have exceeded $575,000 Federal share. There was no limit to the number of planning and project subapplications that applicants could have submitted for the state/territory allocation or tribal set aside up to $575,000 federal share, but the applicant must have ranked them higher than subapplications for competitive consideration. Applicants could not have included more than nine (9) project subapplications for competitive consideration over and above any project(s) submitted for the state/territory allocation or tribal set aside.
Any applicant agency that was willing to serve as the applicant for multi-state or multi-tribal mitigation activities must have included one multi-state/tribal project subapplication(s) in their grant application for a maximum of ten (10) competitive projects, notwithstanding any project(s) that were submitted towards their state/territory allocation or tribal set aside. Applicants who included multi-state/tribal subapplication(s) in their grant application must have clearly identified how the effort was coordinated.
FEMA received 532 subapplications from 88 applicants (35 of which were federally-recognized Indian Tribal Governments) totaling $261.6 million: 218 planning, 254 projects, and 60 applicant management costs. FEMA has completed its eligibility review to ensure compliance with HMA Guidance and has made selections based on the agency’s priorities and available funding. FEMA has identified for further review 346 PDM subapplications from 76 applicants (27 of which are Indian Tribal Governments): 204 planning, 87 projects, and 55 associated applicant management costs totaling $88.8 million. FEMA selected (identified for further review) all eligible subapplications in priorities 1 through 3cii. Eligible subapplications in priority 3 were ranked in order by project type; small, impoverished community status; BCEGS rating; and BCR for selection. FEMA is unable to fund (not selected) the remaining eligible subapplications in priority 3. The table below lists the submitted planning and project subapplications and the status of each alphabetically by applicant. Further explanation of the status is provided below the table.
FY2017 Pre-Disaster Mitigation Subapplicant Status
The below table lists the submitted planning and project subapplications and the status of each alphabetically by applicant.
Learn about the definition of each status description:
Applicant | Subapplication Title | Submitted Federal Share | Status |
---|---|---|---|
Alabama | Walter Volunteer Fire Department Community Safe Room Site 1 | $ 75,487.50 | Did Not Meet HMA Requirements |
Alabama | Sardis Volunteer Fire Department Community Shelter | $ 75,600.00 | Did Not Meet HMA Requirements |
Alabama | New Canaan Community Center Storm Shelter | $ 76,237.50 | Identified for Further Review |
Alabama | Walter Volunteer Fire Department Community Safe Room Site 2 | $ 75,918.75 | Did Not Meet HMA Requirements |
Alabama | Madison County 2017 Community Safe Room OXR | $ 116,250.00 | Identified for Further Review |
Alabama | 501 Pierce St. Acquisition/Demolition | $ 54,600.00 | Identified for Further Review |
Alabama | 410 Scott Drive Acquisition/Demolition | $ 84,600.00 | Identified for Further Review |
Alaska | City of Fairbanks Public Works Facility Emergency Generator | $ 457,575.00 | Did Not Meet HMA Requirements |
Alaska | 2017 LHMP Updates Block 1 | $ 149,999.99 | Identified for Further Review |
Alaska | 2017 LHMP Updates Block 2 | $ 150,000.00 | Identified for Further Review |
American Samoa | Fagaima Flood Mitigation Project | $ 4,000,000.00 | Did Not Meet HMA Requirements |
Arizona | 2017-PDM-Clifton-Flood Wall Gate | $ 83,250.00 | Did Not Meet HMA Requirements |
Arizona | 2018 PDM St Johns LCR Channel Improvements | $ 520,898.00 | Did Not Meet HMA Requirements |
Arizona | 2017-PDM-Pinal County Sunland Gin Road Drainage Improvements | $ 1,208,625.00 | Did Not Meet HMA Requirements |
Arizona | Catalina Ridge Channel Reconstruction | $ 1,296,571.23 | Did Not Meet HMA Requirements |
Arizona | 2018 PDM Taylor Pinedale Wash | $ 479,806.00 | Identified for Further Review |
Arizona | 2017 PDM Snowflake Fire Station High School | $ 403,539.00 | Identified for Further Review |
Arizona | 2017-PDM-Phoenix_Mandan Street Flood Control Project | $ 692,377.50 | Identified for Further Review |
Arizona | 2017-PDM-Phoenix_Palm Lane Storm Drain Mitigation Project | $ 1,597,234.00 | Not Selected |
Arkansas | Cedar Ridge School District Safe Room | $ 575,000.00 | Identified for Further Review |
Arkansas | Carroll County Educational Cooperative Hazard Mitigation Plan | $ 26,250.00 | Identified for Further Review |
Arkansas | Yell County Hazard Mitigation Plan Update | $ 26,250.00 | Identified for Further Review |
Arkansas | Omaha K-12 Safe Room | $ 859,911.96 | Identified for Further Review |
Arkansas | Cutter Morning Star Public School Safe-room | $ 847,200.00 | Identified for Further Review |
Arkansas | Safe Room Construction at UCA Bear Village, Conway, AR | $ 975,000.00 | Identified for Further Review |
Bear River Band of the Rohnerville Rancheria | Bear River Band of the Rohnerville Rancheria Multi-Hazard Mitigation Plan | $ 135,036.65 | Identified for Further Review |
Blue Lake Rancheria | Blue Lake Rancheria Mitigation Plan Update | $ 110,136.75 | Identified for Further Review |
Bristol Bay Native Association | Phase II Tribal Multi-Hazard Mitigation Plans | $ 352,209.75 | Identified for Further Review |
Bristol Bay Native Association | BBNA Phase II Tribal Multi-Hazard Mitigation Plans | $ 240,747.19 | Identified for Further Review |
California | City of Buellton Emergency Generator | $ 46,950.00 | Did Not Meet HMA Requirements |
California | RD 108 Main Office Emergency Back Up Generator | $ 48,749.99 | Did Not Meet HMA Requirements |
California | Yolo County Housing Emergency Operations Center Generator Project | $ 94,200.00 | Did Not Meet HMA Requirements |
California | Installation of emergency generator at City Hall in the City of Galt. | $ 112,500.00 | Did Not Meet HMA Requirements |
California | Installation of Emergency Generator at the Police Department in the City of Galt | $ 112,500.00 | Did Not Meet HMA Requirements |
California | City of Watsonville Levee Embankment Stabilization Project | $ 1,646,890.22 | Did Not Meet HMA Requirements |
California | Construction of Fullerton Creek Channel (A03) from Beach Blvd to d/s I-5 Freeway | $ 4,000,000.00 | Did Not Meet HMA Requirements |
California | Construction of C05 from d/s Edwards Street to d/s Goldenwest Street | $ 4,000,000.00 | Did Not Meet HMA Requirements |
California | Construction of C05 from Warner Avenue to 1000' d/s Edwards Street | $ 4,000,000.00 | Did Not Meet HMA Requirements |
California | City of San Bernardino City Hall Annex & Parking Structure Seismic Retrofitting | $ 3,748,680.00 | Did Not Meet HMA Requirements |
California | City of Redlands Hazard Mitigation Plan | $ 112,500.00 | Identified for Further Review |
California | City of Fountain Valley Mutihazard Mitigation Plan | $ 22,848.00 | Identified for Further Review |
California | San Luis Obispo County Multi-Jurisdictional Local Hazard Mitigation Plan | $ 200,750.00 | Identified for Further Review |
California | Yolo County Hazard Mitigation Plan Update 2018 | $ 250,000.00 | Identified for Further Review |
California | City of Garden Grove Local Hazard Mitigation Plan | $ 75,000.00 | Identified for Further Review |
California | Vallejo Local Hazard Mitigation Plan | $ 87,160.80 | Identified for Further Review |
California | City of Villa Park Local Hazard Mitigation Plan | $ 90,000.00 | Identified for Further Review |
California | City of Watsonville Local Hazard Mitigation Plan | $ 112,500.00 | Identified for Further Review |
California | STPUD WWTP Emergency Generator Replacement Project | $ 1,142,986.00 | Not Selected |
California | City of Santa Barbara Scour Protection for Desalination Intake Pump Platforms | $ 975,000.00 | Not Selected |
California | Seismic Rehabilitation and Retrofit of Secondary Treatment Clarifiers | $ 2,266,485.00 | Not Selected |
California | City of Chula Vista Emergency Management Program WUI Vegetation Management Proj. | $ 3,459,375.00 | Not Selected |
Chemehuevi Indian Tribe | Chemehuevi Mitigation Plan Update | $ 148,500.00 | Identified for Further Review |
Cherokee Nation Emergency Management | CN Will Rogers Clinic Generator Project | $ 144,751.87 | Did Not Meet HMA Requirements |
Cherokee Nation Emergency Management | CNEP Kenwood School Mitigation | $ 126,111.75 | Did Not Meet HMA Requirements |
Cherokee Nation Emergency Management | Storm Safe Shelter | $ 222,484.32 | Identified for Further Review |
Chippewa Cree Tribe of Rocky Boy's Reservation | Chippewa Cree Tribe Pre-Disaster Mitigation Program CCTPDMP | $ 28,873.00 | Identified for Further Review |
Colorado | City of Colorado Springs, Park Vista/Siferd Channel Improvements Project | $ 2,964,750.00 | Did Not Meet HMA Requirements |
Colorado | RBC Hazard Mitigation Plan Update | $ 36,000.00 | Identified for Further Review |
Colorado | Routt County Hazard Mitigation Plan Update | $ 45,022.35 | Identified for Further Review |
Colorado | The City of Leadville and Lake County Hazard Mitigation Plan Update | $ 37,500.00 | Identified for Further Review |
Colorado | SE Colorado Regional Hazard Mitigation Plan Update | $ 73,182.55 | Identified for Further Review |
Colorado | Adams County Colorado Mitigation Plan Update | $ 45,000.00 | Identified for Further Review |
Colorado | Ouray County Multi-Hazard Mitigation Plan Update | $ 45,470.32 | Identified for Further Review |
Colorado | Hinsdale County / Town of Lake City Hazard Mitigation Planning Grant | $ 37,500.00 | Identified for Further Review |
Colorado | Boulder County Fire Adapted Communities | $ 1,215,630.82 | Identified for Further Review |
Colorado | Boulder County Heil- Lichen Fuels Reduction Project | $ 960,000.00 | Identified for Further Review |
Colorado | Risk Reduction Spillway and Dam Safety Modifications at Lower Beaver Brook | $ 3,987,750.00 | Identified for Further Review |
Colorado | City of Colorado Springs, Pine Creek Stabilization and Restoration Project | $ 2,005,125.00 | Identified for Further Review |
Colorado | City of Colorado Springs, N Douglas Creek Stabilization Project | $ 2,612,325.00 | Identified for Further Review |
Colorado | COS Landslide Property Acquisition | $ 4,000,000.00 | Not Selected |
Connecticut | Purchase and Installation of Generator at Sheehan EM, Wallingford-PDM2017 | $ 335,899.00 | Did Not Meet HMA Requirements |
Connecticut | Town of Madison Emergency Generator Replacement | $ 105,029.10 | Did Not Meet HMA Requirements |
Connecticut | Beach Street Raising | $ 3,973,502.14 | Did Not Meet HMA Requirements |
Connecticut | Riverside Cleaners Dry Floodproofing, Watertown, CT | $ 97,200.00 | Did Not Meet HMA Requirements |
Connecticut | Fairfield Beach Road Sanitary Pump Station | $ 256,666.61 | Did Not Meet HMA Requirements |
Connecticut | Greater Bridgeport Natural Hazard Mitigation Plan Update | $ 112,500.00 | Identified for Further Review |
Connecticut | in Stratford-PDM2017 | $ 2,729,770.90 | Identified for Further Review |
Delaware | City of Newark, DE Northwest Booster Station Mitigation Project | $ 78,126.00 | Identified for Further Review |
District of Columbia | Solid Waste Transfer Station Back-up generators | $ 467,972.25 | Did Not Meet HMA Requirements |
District of Columbia | District Hazard Mitigation Plan Microgrid Addendum | $ 150,000.00 | Did Not Meet HMA Requirements |
District of Columbia | 12th St and ME Ave Pump Station Hardening | $ 818,078.94 | Did Not Meet HMA Requirements |
District of Columbia | FY17 DC State Hazard Mitigation Plan Update | $ 150,000.00 | Did Not Meet HMA Requirements |
Florida | FY 2017 PDM-Palm Beach County-EOC Retrofit | $ 16,203.93 | Did Not Meet HMA Requirements |
Florida | Broward County Mast Arm Conversion at Dixie Highway and Johnson Street | $ 497,377.14 | Identified for Further Review |
Florida | Miami-Dade County, FL Public Housing Palm Court Hardening Project | $ 1,052,372.10 | Not Selected |
Florida | Miami-Dade County, FL: Coral Reef Branch Library Hardening Project | $ 64,317.60 | Not Selected |
Florida | Miami-Dade County, FL: West Dade Regional Library Hardening Project | $ 737,656.31 | Not Selected |
Florida | Miami-Dade County, FL: Kendall Branch Library Hardening Project | $ 90,251.29 | Not Selected |
Florida | Miami-Dade County, FL: Miami Lakes Branch Library Hardening Project | $ 303,818.63 | Not Selected |
Florida | Miami-Dade County, FL Public Housing Edison Plaza Hardening Project | $ 897,345.16 | Not Selected |
Florida | Miami-Dade County, FL Public Housing Biscayne Plaza Hardening Project | $ 778,024.50 | Not Selected |
Florida | Calhoun County Local Mitigation Strategy and 510 Floodplain Management Planning | $ 41,737.50 | Identified for Further Review |
Florida | FY2017 PDM - Pasco County LMS Update | $ 120,085.53 | Identified for Further Review |
Georgia | Cobb County 2017 PDM Acquisition Project | $ 441,365.00 | Identified for Further Review |
Grand Traverse Band of Ottawa and Chippewa Indians | GTB PDM Project: Generators | $ 569,500.00 | Did Not Meet HMA Requirements |
Guam | GCC Building 600 | $ 1,487,960.67 | Did Not Meet HMA Requirements |
Guam | Port Authority of Guam Mitigation Project | $ 1,123,186.11 | Did Not Meet HMA Requirements |
Guam | Update of 2014 Guam Hazard Mitigation Plan | $ 187,344.83 | Identified for Further Review |
Hawaii | City and County of Honolulu Mitigation Project | $ 52,500.00 | Did Not Meet HMA Requirements |
Hawaii | County of Maui Multi-Hazard Mitigation Plan Update 2020 | $ 121,000.00 | Identified for Further Review |
Hawaii | County of Kauai Hazard Mitigation Plan Update | $ 75,000.00 | Identified for Further Review |
Hawaii | County of Hawaii Mitigation Plan Update | $ 114,750.00 | Identified for Further Review |
Hawaii | Wilcox Medical Center Generators | $ 4,000,000.00 | Identified for Further Review |
Idaho | Bonner County Generator & Transfer Switch Project | $ 79,872.37 | Did Not Meet HMA Requirements |
Idaho | City of Coeur d'Alene, Veteran's Centennial Park Fuel Reduction Park Project | $ 14,057.70 | Did Not Meet HMA Requirements |
Idaho | City of Cottonwood Culvert Improvement Project | $ 2,413,053.00 | Did Not Meet HMA Requirements |
Idaho | Stormwater Management Project, Hailey, Idaho | $ 698,695.50 | Did Not Meet HMA Requirements |
Idaho | 2017 Teton Critical Power PDM | $ 374,775.00 | Did Not Meet HMA Requirements |
Idaho | Installation of Backup Generators for Lake Water Treatment Facilities | $ 241,077.00 | Did Not Meet HMA Requirements |
Idaho | All Hazards Mitigation Plan Update | $ 72,060.00 | Identified for Further Review |
Idaho | Canyon County AHMP Update | $ 52,008.00 | Identified for Further Review |
Idaho | FY 2017 Pre-Disaster Mitigation Program | $ 55,125.00 | Identified for Further Review |
Idaho | Madison County Multi-Jurisdiction All Hazard Mitigation Plan | $ 26,250.00 | Identified for Further Review |
Idaho | Washington County, Idaho Multi Hazard Mitigation Plan | $ 43,476.93 | Identified for Further Review |
Illinois | 2017 Multijurisdictional Henderson County Mitigation Update | $ 17,993.33 | Identified for Further Review |
Illinois | Village of Carbon Cliff Pre-Disaster Mitigation Program | $ 574,999.80 | Did Not Meet HMA Requirements |
Illinois | City of Streator Riverside Area Flood Disaster Rehabilitation Project | $ 315,237.00 | Did Not Meet HMA Requirements |
Illinois | Ottawa YMCA Floodwall | $ 1,159,114.00 | Did Not Meet HMA Requirements |
Illinois | Cook County Hazard Mitigation Plan Update 2019 | $ 187,500.74 | Identified for Further Review |
Illinois | Christian County Natural Hazard Mitigation Plan | $ 45,887.72 | Identified for Further Review |
Illinois | Carroll County Natural Hazard Mitigation Plan Update | $ 56,170.37 | Identified for Further Review |
Illinois | Livingston County Multi-Hazard Mitigation Plan | $ 46,213.92 | Identified for Further Review |
Illinois | Calhoun County Natural Hazard Mitigation Plan | $ 35,008.32 | Identified for Further Review |
Illinois | City of Des Plaines FY2017 FMA Fire Station | $ 1,508,655.00 | Identified for Further Review |
Illinois | 2017 Lake County Multi-Hazard Acquisition Project | $ 1,196,983.50 | Identified for Further Review |
Illinois | City of Des Plaines FY2017 FMA Buyout | $ 3,722,297.98 | Identified for Further Review |
Illinois | Mason Co. Flood Mitigation Buy-Out | $ 430,675.02 | Identified for Further Review |
Illinois | Crestwood: Gardens Subdivision Drainage/Stormwater Management Project | $ 2,500,000.00 | Identified for Further Review |
Illinois | Village of Robbins Flood Mitigation and Renewal Project | $ 4,000,000.00 | Identified for Further Review |
Indian Tribal Government | Sisseton Wahpeton Sioux Tribe PDM Plan | $ 13,408.80 | Identified for Further Review |
Indiana | City of Decatur 2017 Evergreen Court Flood Mitigation Project | $ 448,500.00 | Identified for Further Review - Reconsideration |
Indiana | Morgan Co Acq PDMC 2017 | $ 1,820,550.00 | Did Not Meet HMA Requirements |
Indiana | Indiana State Multi-Hazard Mitigation Plan Update | $ 297,000.00 | Identified for Further Review |
Indiana | Indiana County MHMP Updates - PDMC 17 | $ 254,344.78 | Identified for Further Review |
Indiana | Maumee Scout Reservation Community Safe Room | $ 1,159,150.50 | Identified for Further Review |
Indiana | Decatur 2017-1 PDM Acquisition Project | $ 707,493.75 | Identified for Further Review |
Indiana | City of Fort Wayne 2017 Junk Ditch Flood Acquisition Project | $ 745,560.00 | Identified for Further Review |
Indiana | Decatur 2017-2 PDM Acquisition Project | $ 610,818.75 | Identified for Further Review |
Indiana | City of Fort Wayne 2017 St. Marys River Flood Acquisition Project | $ 481,462.50 | Identified for Further Review |
Iowa | TIP Mitigation for Electrical Distribution Lines | $ 353,137.00 | Did Not Meet HMA Requirements |
Iowa | Adair, Audubon and Guthrie County Multi Jurisdiction Hazard Mitigation Plan | $ 30,000.00 | Identified for Further Review |
Iowa | Plymouth, Cherokee, Woodbury, Ida, and Monona Counties Regional Mitigation Plan | $ 90,015.00 | Identified for Further Review |
Iowa | Crawford, Carroll, Greene, and Sac County Multi-J Hazard Mitigation Plan | $ 66,750.00 | Identified for Further Review |
Jamestown S'Klallam Tribe | Jamestown S'Klallam Tribe Multi-Hazard Mitigation Plan Update | $ 29,100.24 | Identified for Further Review |
Jicarilla Apache Nation | Jicarilla Apache Nation Multi Hazard Mitigation Plan | $ 206,000.00 | Identified for Further Review |
Kansas | Crawford County State Park Safe Room | $ 262,500.00 | Identified for Further Review |
Kansas | Anderson County/Harris Safe Room Project | $ 30,000.00 | Identified for Further Review |
Kansas | Lucas-Sylvan safe room | $ 178,425.00 | Identified for Further Review |
Kansas | State of Kansas Regional Multihazard Mitigation Plan Updates | $ 253,249.50 | Identified for Further Review |
Kaw Nation | Kaw Nation Pre-Disaster Storm Shelter and Preparedness Project | $ 213,750.75 | Identified for Further Review |
Kenaitze Indian Tribe (IRA) | Kenaitze PDM Planning | $ 111,371.40 | Identified for Further Review |
Kentucky | Buffalo Trace Regional Hazard Mitigation Plan Update | $ 56,250.00 | Identified for Further Review |
Kentucky | GRADD Hazard Mitigation Plan Update | $ 75,000.00 | Identified for Further Review |
Kentucky | University of Louisville Hazard Mitigation Plan Update 2018 | $ 89,744.00 | Identified for Further Review |
Kentucky | City of Shepherdsville | $ 46,785.00 | Identified for Further Review |
Kentucky | Kentucky Community & Technical College System Hazard Mitigation Plan Update | $ 300,000.00 | Identified for Further Review |
Kentucky | Multi-Jurisdictional Hazard Mitigation Plan for Landslides for the Big Sandy ADD | $ 300,212.00 | Identified for Further Review |
Kentucky | City of Paintsville Hazard Mitigation Plan for Mitigation Strategy Alternatives | $ 150,000.00 | Identified for Further Review |
Kentucky | Louisville Metro Hazard Mitigation Plan Risk Assessment Plan Update | $ 86,167.50 | Identified for Further Review |
Louisiana | Second Harvest Food Bank Wind Retrofit | $ 600,000.00 | Did Not Meet HMA Requirements |
Louisiana | Marvin Braud Pump Station Storm Surge Protection | $ 2,925,000.00 | Did Not Meet HMA Requirements |
Louisiana | Abbeville General Hospital - Rural/Women's Clinic Generator | $ 263,594.00 | Did Not Meet HMA Requirements |
Louisiana | St. Charles Parish Multi-Hazard Mitigation Plan Update | $ 63,450.00 | Identified for Further Review |
Louisiana | Tangipahoa Parish Stormwater Project Development Plan | $ 56,250.00 | Identified for Further Review |
Louisiana | Orleans Parish Multi-Jurisdictional Hazard Mitigation Plan Project | $ 327,450.00 | Identified for Further Review |
Louisiana | Abbeville General Hospital - Main Hospital Generator | $ 814,673.00 | Not Selected |
Lower Brule Sioux Tribe | Lower Brule Sioux Tribe Multi-Hazard Mitigation Plan | $ 36,878.25 | Identified for Further Review |
Maine | Good Shepherd Food Bank Generator | $ 123,750.00 | Did Not Meet HMA Requirements |
Maine | University of Maine System HM Plan - 2018 Update | $ 15,000.00 | Identified for Further Review |
Maryland | Crisfield Tide Gates, Stormwater Infrastructure Repairs, and Pumping Stations | $ 987,610.50 | Did Not Meet HMA Requirements |
Maryland | Town of Betterton Shoreline Erosion Mitigation Project | $ 481,908.96 | Identified for Further Review |
Maryland | Town of Union Bridge Emergency Generator | $ 73,387.50 | Identified for Further Review |
Massachusetts | City of Brockton Generator for Critical Facility | $ 61,779.37 | Did Not Meet HMA Requirements |
Massachusetts | Peabody Russell Street Pump Station Improvements | $ 586,425.00 | Did Not Meet HMA Requirements |
Massachusetts | Hull, MA 2017 PDM WWTP Resiliency Project | $ 4,000,000.00 | Did Not Meet HMA Requirements |
Massachusetts | Adams Shore and Houghs Neck Seawall Improvements | $ 3,992,340.00 | Did Not Meet HMA Requirements |
Massachusetts | Level of Protection Improvements for the Moon Island Sea Wall | $ 3,699,059.25 | Did Not Meet HMA Requirements |
Massachusetts | Tisbury MA, Beach Road Seawall Improvements | $ 3,988,616.00 | Did Not Meet HMA Requirements |
Massachusetts | Western Region Multi Hazard Mitigation Planning | $ 215,875.00 | Identified for Further Review |
Massachusetts | Commonwealth of Massachusetts PDM17 Local Hazard Mitigaiton Planning | $ 210,933.28 | Identified for Further Review |
Massachusetts | Town of Conway-Delabarre Avenue Slope Stabilization | $ 252,207.51 | Not Selected |
Massachusetts | Tiffany Street Stream Channel Improvements | $ 230,265.00 | Not Selected |
Massachusetts | South Branch Parkway Drainage Improvements | $ 577,552.50 | Not Selected |
Massachusetts | Town of Hopkinton MA - Lake Maspenock Dam Upgrades | $ 1,780,653.75 | Not Selected |
Michigan | County of Bay Hazard Mitigation Plan Update | $ 43,213.50 | Identified for Further Review |
Michigan | Update Hazard Mitigation Plans for Chippewa, Luce & Mackinac Counties | $ 30,000.00 | Identified for Further Review |
Michigan | Huron County MI Hazard Mitigation | $ 27,656.25 | Identified for Further Review |
Michigan | Kalamazoo County Hazard Mitigation Plan Update | $ 22,837.50 | Identified for Further Review |
Michigan | 2018 City of Luna Pier Elevation Project | $ 252,135.00 | Identified for Further Review |
Michigan | NE Michigan Hazard Mitigation Plans - 5 Year Update | $ 99,840.00 | Identified for Further Review |
Michigan | Update to the Wayne County Hazard Mitigation Plan | $ 83,759.00 | Identified for Further Review |
Michigan | Dual-Use Safe Rooms and Toilet/Shower Buildings in Various State Parks | $ 1,124,348.00 | Identified for Further Review |
Michigan | Central Michigan University South Campus Mitigation Project | $ 680,913.00 | Identified for Further Review |
Michigan | Phase 4 Storm Shelter2017 | $ 2,876,617.56 | Identified for Further Review |
Michigan | City of Monroe River Raisin Heritage Corridor Pre-Disaster Mitigation Project | $ 493,325.43 | Identified for Further Review |
Michigan | Little Tobacco Intercounty Drain | $ 1,653,220.00 | Identified for Further Review |
Michigan | Estral Beach 2017 PDM | $ 923,473.50 | Identified for Further Review |
Minnesota | 2017 HSEM Plan Updates for 10 Counties | $ 283,500.00 | Identified for Further Review |
Mississippi | Forrest Heights Levee Project-#2 | $ 3,999,999.98 | Did Not Meet HMA Requirements |
Missouri | Neosho School District Safe Room-Goodman Elementary | $ 1,125,000.00 | Identified for Further Review |
Missouri | Sparta R-III School District Community Safe Room | $ 1,458,000.00 | Identified for Further Review |
Missouri | Miller R-II School District - Miller High School Community Safe Room | $ 924,750.00 | Identified for Further Review |
Moapa Band of Paiutes | Moapa Band of Paiutes Generator Installation Construction Project | $ 77,940.00 | Did Not Meet HMA Requirements |
Montana | Ninemile Creek Drought Mitigation Project | $ 1,200,000.00 | Did Not Meet HMA Requirements |
Montana | Sanders/Lake County Mitigation Plan update | $ 37,500.00 | Identified for Further Review |
Montana | Fallon County and Carter County Mitigation Plan Update | $ 49,999.99 | Identified for Further Review |
Montana | Carbon County Montana PDM Plan Update | $ 25,000.00 | Identified for Further Review |
Montana | Fort Belknap Indian Community | $ 25,000.00 | Identified for Further Review |
Montana | Lincoln County PDM Grant | $ 24,999.67 | Identified for Further Review |
Montana | Granite County PDM Plan | $ 24,999.99 | Identified for Further Review |
Montana | City of Deer Lodge Cottonwood Creek Property Acquisition | $ 232,500.00 | Identified for Further Review |
Muscogee (Creek) Nation | Muscogee Creek Nation Mitigation Project | $ 283,298.25 | Did Not Meet HMA Requirements |
Native Village of Kwigillingok | Native Village of Kwigillingok Pre Disaster Mitigation Project | $ 253,190.00 | Identified for Further Review |
Nebraska | Hamilton-Seward-York Multihazard Mitigation Project | $ 60,000.00 | Identified for Further Review |
Nebraska | Lower Elkhorn Natural Resources District Hazard Mitigation Plan Update | $ 150,000.43 | Identified for Further Review |
Nebraska | LPNNRD Hazard Mitigation Project | $ 200,038.50 | Identified for Further Review |
Nebraska | Upper Loup NRD Multihazard Mitigation Project | $ 64,935.00 | Identified for Further Review |
Nebraska | Lower Platte South NRD Hazard Mitigation Plan Update | $ 60,000.00 | Identified for Further Review |
Nevada | PDM - CNLV Oak Island Storm Drain Mitigation Project | $ 1,493,250.00 | Did Not Meet HMA Requirements |
Nevada | Douglas County - Smelter Creek Regional Flood Control Project PDM Nov 9 2017 | $ 2,473,650.00 | Did Not Meet HMA Requirements |
Nevada | Nye County Multihazard Mitigation Plan Update | $ 77,462.29 | Identified for Further Review |
Nevada | Douglas County Hazard Mitigaton Plan Update | $ 45,173.31 | Identified for Further Review |
Nevada | Washoe County Multi-Jurisdictional Hazard Mitigation Planning | $ 225,000.00 | Identified for Further Review |
Nevada | Multi-Jurisdictional Hazard Mitigation Plan; Humboldt, Pershing, Lander Counties | $ 60,000.01 | Identified for Further Review |
New Hampshire | Knights Brook Culvert Replacement | $ 221,250.00 | Did Not Meet HMA Requirements |
New Hampshire | Tuttle Road Culvert Replacement and Bank Stabilization | $ 381,656.25 | Did Not Meet HMA Requirements |
New Hampshire | Pecor Road and Old Cheshire Turnpike Culvert Replacement | $ 203,962.50 | Did Not Meet HMA Requirements |
New Hampshire | FFY 2017 Local Hazard Mitigation Plan Updates | $ 250,497.75 | Identified for Further Review |
New Hampshire | City of Somersworth, Emergency Backup Generator-DPW Facility | $ 43,500.00 | Identified for Further Review |
New Jersey | Oceanport Flood Reduction Initiative | $ 855,876.37 | Did Not Meet HMA Requirements |
New Jersey | City of Somers Point Pump Station Replacement | $ 169,275.00 | Did Not Meet HMA Requirements |
New Jersey | City of Somers Point Exton Road Pump Station | $ 260,172.00 | Did Not Meet HMA Requirements |
New Jersey | Ventnor Pump Station | $ 15,187.50 | Did Not Meet HMA Requirements |
New Jersey | Brigantine PDM Project | $ 140,211.75 | Did Not Meet HMA Requirements |
New Jersey | 2017 PDM Carteret Middle School Generator | $ 223,969.00 | Did Not Meet HMA Requirements |
New Jersey | Morris County Hazard Mitigation Plan Update | $ 126,000.00 | Identified for Further Review |
New Jersey | Passaic County And All Municipalities Hazard Mitigation Plan Update 2020 | $ 126,000.00 | Identified for Further Review |
New Jersey | Atlantic County Multi-Jurisdictional Hazard Mitigation Plan Update | $ 126,000.00 | Identified for Further Review |
New Jersey | Union County Multi-Jursticitional Hazard Mitigation Plan | $ 126,000.00 | Identified for Further Review |
New Jersey | Stream Bank Stabilization to protect Pleasant Valley Road in Marlboro Township | $ 420,236.00 | Identified for Further Review |
New Jersey | Rehabilitation of the Laurel Brook Wastewater Pump Station | $ 393,000.00 | Identified for Further Review |
New Jersey | Pleasantville PDM Pump generator | $ 187,500.00 | Identified for Further Review |
New Mexico | Upper Bosque de Bernalillo Flood Control | $ 395,604.91 | Identified for Further Review - Reconsideration |
New Mexico | Chaves County Hazard Mitigation Plan | $ 37,500.00 | Identified for Further Review |
New Mexico | Dona Ana County Hazard Mitigation Plan | $ 60,000.00 | Identified for Further Review |
New Mexico | McKinley County Hazard Mitigation Plan | $ 37,500.00 | Identified for Further Review |
New Mexico | San Juan County Hazard Mitigation Plan | $ 48,727.43 | Identified for Further Review |
New Mexico | San Miguel County HMP | $ 41,250.00 | Identified for Further Review |
New Mexico | City of Santa Fe Hazard Mitigation Plan Update | $ 37,500.00 | Identified for Further Review |
New Mexico | Union County HMP | $ 37,499.98 | Identified for Further Review |
New York | Village of Freeport PDM Infrastructure Flood Protection Project | $ 282,837.30 | Identified for Further Review |
New York | Orleans County Multijurisdictional Multihazard Mitigation Plan | $ 112,500.00 | Identified for Further Review |
New York | Fallsburg Water Well Auxiliary Power Initiative | $ 52,500.00 | Identified for Further Review |
New York | Jefferson County Multi-Jurisdictional Hazard Mitigation Plan | $ 225,000.00 | Identified for Further Review |
New York | Cortland County Multi- Jurisdictional All- Hazard Mitigation Plan | $ 112,500.00 | Identified for Further Review |
New York | Cattaraugus County Multi-Jurisdictional Hazard Mitigation Plan | $ 112,500.00 | Identified for Further Review |
New York | Tompkins County (NY) Hazard Mitigation Plan Update | $ 93,750.00 | Identified for Further Review |
New York | Pre-Disaster Mitigation-PDM Cayuga County | $ 84,375.00 | Identified for Further Review |
New York | Wyoming County Multi-Jurisdictinal All-Hazard Plan | $ 75,000.00 | Identified for Further Review |
New York | Suffolk County Multi-Jurisdiction Hazard Mitigation Plan Update | $ 300,000.00 | Identified for Further Review |
New York | Nassau County Natural Hazard Mitigation Plan Update | $ 206,250.00 | Identified for Further Review |
New York | Wayne County Multi-Hazard Plan Update | $ 112,500.00 | Identified for Further Review |
New York | Oneida County Hazard Mitigation Plan Update | $ 97,500.00 | Identified for Further Review |
New York | Clinton County Pre-Disaster Multi-Jurisdictional Hazard Mitigation Plan | $ 75,000.00 | Identified for Further Review |
New York | Putnam County Ny Pre-Disaster Mitigation-PDM plan | $ 112,500.00 | Identified for Further Review |
New York | Schenectady County Pre-Disaster Mitigation-PDM | $ 112,725.00 | Identified for Further Review |
New York | PDM - NYC Hazard Mitigation Plan Enhancements 2019 | $ 300,000.00 | Identified for Further Review |
New York | 2017 PDM Town of East Fishkill Acquisition of 3 Properties | $ 628,256.25 | Identified for Further Review |
Newtok Village Council | Newtok-Mertarvik Relocation Housing Construction | $ 517,499.97 | Identified for Further Review |
North Carolina | University of North Carolina - Western Campuses Multi-jurisdictional HM Plan | $ 250,000.00 | Identified for Further Review - Reconsideration |
North Carolina | University of North Carolina - Eastern Campuses Multi-jurisdictional HM Plan | $ 250,000.00 | Identified for Further Review |
North Dakota | NDDES Alt SEOC, State Radio, and NDDoH Facility Generator | $ 263,290.23 | Did Not Meet HMA Requirements |
North Dakota | NDDES Critical Facility Generators (EOC, FD, PD, EMS) | $ 819,433.59 | Did Not Meet HMA Requirements |
North Dakota | McIntosh County Generators | $ 133,629.75 | Did Not Meet HMA Requirements |
North Dakota | City of Fargo Raw Water Intake Flood Mitigation | $ 4,000,000.00 | Did Not Meet HMA Requirements |
North Dakota | City of Flasher Lift Station Generator | $ 10,818.00 | Identified for Further Review |
North Dakota | City of Grafton 2017 PDM Project | $ 168,765.00 | Identified for Further Review - Second Selection |
North Dakota | Nelson County -- Nodak Electric Line Burial | $ 80,775.00 | Identified for Further Review |
North Dakota | Cass County Multi-Hazard Mitigation Plan Update | $ 40,500.00 | Identified for Further Review |
North Dakota | Oliver County MHMP Update | $ 18,819.61 | Identified for Further Review |
North Dakota | Dickey County MHMP Update | $ 20,500.00 | Identified for Further Review |
North Dakota | Hettinger County MHMP Update | $ 25,300.00 | Identified for Further Review |
North Dakota | Billings-Dunn-Golden Valley-Stark Counties MHMP | $ 75,000.00 | Identified for Further Review |
North Dakota | LaMoure County MHMP Update | $ 26,707.15 | Identified for Further Review |
North Dakota | Adams County MHMP Update | $ 24,000.00 | Identified for Further Review |
North Dakota | Burke-Divide Multijurisdictional Hazard Mitigation Plan | $ 42,900.00 | Identified for Further Review |
North Dakota | Storm Shelters | $ 157,320.00 | Identified for Further Review |
North Dakota | University of Mary Slope Stability Project | $ 2,844,888.75 | Identified for Further Review |
North Dakota | Unity Medical Center - 2017 Generator Project | $ 390,798.00 | Did Not Meet HMA Requirements |
North Dakota | Generator for the Main Lift Station - Jamestown, North Dakota | $ 190,360.43 | Identified for Further Review |
North Dakota | Generator for the Central Valley Health District - Jamestown, North Dakota | $ 74,094.10 | Identified for Further Review |
North Dakota | Washburn Intake Improvements | $ 1,026,025.00 | Identified for Further Review |
Northern Mariana Islands | Rota Health Center Building Structural Exterior Hardening- Windows and Doors | $ 48,516.04 | Identified for Further Review |
Northern Mariana Islands | Tinian Health Center Storm Readiness Project | $ 30,000.00 | Identified for Further Review |
Northern Mariana Islands | CNMI Department of Labor Storm Shutter Protection Project | $ 12,297.60 | Identified for Further Review |
Northern Mariana Islands | Pedro P. Tenorio Multi-Purpose Center Storm Readiness Project | $ 90,951.00 | Identified for Further Review |
Northern Mariana Islands | Department of Public Safety Storm Shutter Project | $ 13,612.50 | Identified for Further Review |
Northern Mariana Islands | Sadog Tasi Wastewater Facility Storm Shutter Project | $ 21,795.95 | Identified for Further Review |
Northern Mariana Islands | Aging Center (Man Amko) Storm Shutter Project | $ 24,952.50 | Identified for Further Review |
Northern Mariana Islands | Tinian Youth Center Storm Shutter Project | $ 28,957.51 | Identified for Further Review |
Ohio | Village of Hebron: PDM Sunny Acres Floodplain Restoration and Wetland Creation | $ 207,000.00 | Identified for Further Review |
Ohio | Village of Ottawa PDM FY17 Flood Mitigation | $ 237,265.46 | Identified for Further Review |
Ohio | City of North Olmsted PDM Acquisition Project | $ 101,340.00 | Identified for Further Review |
Ohio | Ohio Safe Room Rebate Program PDM 17 (Set-A-Side) | $ 29,394.53 | Identified for Further Review |
Ohio | State of Ohio Hazard Mitigation Plan Update | $ 299,950.08 | Identified for Further Review |
Ohio | State of Ohio 18-County Hazard Mitigation Plan Update- Part 1, Contractual | $ 380,224.34 | Identified for Further Review |
Ohio | State of Ohio 18-County Hazard Mitigation Plan Update- Part 2, In-house | $ 34,661.93 | Identified for Further Review |
Ohio | Ohio Safe Room Rebate Program PDM 17 (Competitive) | $ 563,190.00 | Identified for Further Review |
Ohio | Defiance County PDM Community Safe Room Project | $ 607,955.62 | Identified for Further Review |
Ohio | City of Euclid Erosion Mitigation Project | $ 2,670,712.50 | Identified for Further Review |
Ohio | Village of Valley View 2017 PDM Project | $ 2,452,005.00 | Identified for Further Review |
Ohio | Zimber Ditch Flood Mitigation Assistance Project | $ 737,090.62 | Identified for Further Review |
Ohio | Delhi Township Rapid Run #3 PDM FY17 Acquisition Project | $ 2,974,944.00 | Identified for Further Review |
Ohio | 2017 Tinkers Creek PDM Hazard Mitigation Project | $ 267,720.71 | Identified for Further Review |
Ohio | Marion County Multihazard Mitigation Project | $ 41,700.00 | Identified for Further Review |
Ohio | City of Sharonville Flood Mitigation Project | $ 1,927,027.02 | Not Selected |
Oregon | PDM 17 Oregon NHMP Update | $ 300,000.00 | Identified for Further Review |
Oregon | PDM17 Planning Regions 1 and 7 | $ 270,091.00 | Identified for Further Review |
Oregon | Seismic Retrofit of Grand Butte Reservoir and Pipeline | $ 2,216,198.40 | Identified for Further Review |
Paskenta Band of Nomlaki Indians | Paskenta Band of Nomlaki Indians Mitigation Plan | $ 126,928.00 | Identified for Further Review |
Pennsylvania | West Mead Township Emergency Generator Project | $ 30,834.75 | Did Not Meet HMA Requirements |
Pennsylvania | 2017 PDM City of Coatesville Generator | $ 43,500.00 | Did Not Meet HMA Requirements |
Pennsylvania | Proposed Closure Structure Modifications Project | $ 540,543.75 | Did Not Meet HMA Requirements |
Pennsylvania | 2017 - PDM | $ 251,775.00 | Did Not Meet HMA Requirements |
Pennsylvania | New Brighton Borough Streambank Restoration Project | $ 93,393.75 | Did Not Meet HMA Requirements |
Pennsylvania | Sullivan County HMGP - All Hazards Plan Update | $ 33,750.00 | Identified for Further Review |
Pennsylvania | Perry County Multi-Hazard Mitigation Plan | $ 29,250.00 | Identified for Further Review |
Pennsylvania | Forest County Hazard Mitigation Plan Update | $ 11,062.50 | Identified for Further Review |
Pennsylvania | Westmoreland County Hazard Mitigation Plan Update | $ 65,001.00 | Identified for Further Review |
Pennsylvania | Mifflin County Multihazard Plan | $ 30,000.00 | Identified for Further Review |
Pennsylvania | Bradford County Hazard Mitigation Plan Update | $ 45,000.00 | Identified for Further Review |
Pennsylvania | Union County Hazard Mitigation Plan Update | $ 33,750.00 | Identified for Further Review |
Pennsylvania | Juniata County Hazard Mitigation Plan Update | $ 37,500.00 | Identified for Further Review |
Pennsylvania | Adams County Hazard Mitigation Plan Update | $ 45,000.00 | Identified for Further Review |
Pennsylvania | Cumberland County Hazard Mitigation Plan Update | $ 37,500.00 | Identified for Further Review |
Pennsylvania | Fulton County Hazard Mitigation Plan Update | $ 30,000.00 | Identified for Further Review |
Pennsylvania | Luzerne County Hazard Mitigation Plan 2019 Update | $ 56,250.00 | Identified for Further Review |
Port Gamble S'Klallam Tribe | PGST Plan Update with Coastal Storm and Landslide Risk including Sea Level Rise | $ 150,000.00 | Identified for Further Review |
Pueblo of Isleta | Hazard Mitigation Planning | $ 85,000.00 | Identified for Further Review |
Puerto Rico | Generators for ASEM services | $ 484,987.82 | Did Not Meet HMA Requirements |
Quapaw Tribe of Oklahoma | Quapaw Tribe Community Safe Rooms | $ 289,306.50 | Did Not Meet HMA Requirements |
Quileute Tribe | Quileute Emergency Generators Mitigation Project | $ 291,349.53 | Identified for Further Review |
Quinault Indian Nation | Quinault Indian Nation Pre-Disaster Mitigation Project | $ 477,764.08 | Did Not Meet HMA Requirements |
Sac and Fox Tribe of the Mississippi in Iowa | Assessment of the groundwater and surface water resources within the Settlement | $ 134,346.83 | Did Not Meet HMA Requirements |
Saginaw Chippewa Indian Tribe of Michigan | Saginaw Chippewa Indian Tribe of Michigan Pre Disaster Mitigation Planning Grant | $ 97,087.39 | Identified for Further Review |
Santa Clara Pueblo | Santa Clara Pueblo PK Crossing Culvert and Stream Restoration | $ 431,249.94 | Did Not Meet HMA Requirements |
Scotts Valley Band of Pomo Indians | Scotts Valley Band of Pomo Indians Multi-Tribal Hazard Mitigation Plan | $ 400,000.00 | Identified for Further Review |
Seldovia Village Tribe | Seldovia Village Tribe: Tribal Mitigation Planning Project | $ 128,578.42 | Identified for Further Review |
Shoalwater Bay Indian Tribe | Vertical Evacuation Tower | $ 2,281,860.00 | Identified for Further Review |
Shoalwater Bay Indian Tribe | Defensible Spaces Project | $ 69,200.52 | Identified for Further Review |
Shoalwater Bay Indian Tribe | Generator Backup Systems | $ 143,430.00 | Identified for Further Review |
Soboba Band of Luiseño Indians | Soboba Band of Luiseno Indians Mitigation Project Line J | $ 552,392.96 | Identified for Further Review |
South Carolina | City of West Columbia Soil Stabiliazation Project | $ 229,500.00 | Did Not Meet HMA Requirements |
South Carolina | Marion County Back Up Power Source | $ 274,323.00 | Did Not Meet HMA Requirements |
South Carolina | Town of Edisto Beach Myrtle Street Pre Disaster Mitigation Project | $ 548,456.55 | Did Not Meet HMA Requirements |
South Carolina | Purchase Mobile Generators & Install Exterior Docking Stations | $ 99,123.28 | Did Not Meet HMA Requirements |
South Carolina | Winthrop University All-Hazard Mitigation Plan | $ 82,500.00 | Identified for Further Review |
South Carolina | Sumter County SC Water Systems Backup Power | $ 75,325.50 | Identified for Further Review |
South Carolina | Daufuskie Island Fire Department Retrofit Mitigation Project | $ 62,090.56 | Identified for Further Review - Reconsideration |
South Carolina | LLCS Lift Station/Grinder Pump | $ 76,500.00 | Identified for Further Review |
South Carolina | SCDMV Pre-Disaster Mitigation Grant- Install Exterior Hurricane Shutters | $ 138,090.75 | Identified for Further Review |
South Dakota | Hungry Hollow Storm Sewer Improvements | $ 974,906.25 | Did Not Meet HMA Requirements |
South Dakota | Crow Creek Sioux Tribe Tornado Safe Rooms | $ 24,600.00 | Identified for Further Review |
South Dakota | City of Faulkton Storm Shelter | $ 138,881.25 | Identified for Further Review |
South Dakota | Flandreau Safe Room Number 2 | $ 167,766.00 | Identified for Further Review |
South Dakota | Gann Valley Tornado Safe Room | $ 3,075.00 | Identified for Further Review |
South Dakota | Parkston Depot Street Structure Relocation | $ 24,037.00 | Identified for Further Review |
South Dakota | Todd County/Rosebud Sioux Tribe PDM Plan Update | $ 11,250.00 | Identified for Further Review |
South Dakota | Bennett County PDM Plan Update | $ 7,500.00 | Identified for Further Review |
South Dakota | Clay County PDM Plan Update | $ 12,900.00 | Identified for Further Review |
South Dakota | Warhawk District PDM Plan Update | $ 35,250.00 | Identified for Further Review |
South Dakota | McCook County PDM Plan Update | $ 12,900.00 | Identified for Further Review |
South Dakota | Mellette County PDM Plan Update | $ 6,000.00 | Identified for Further Review |
South Dakota | Turner County PDM Plan Update | $ 12,900.00 | Identified for Further Review |
South Dakota | Union County PDM Plan Update | $ 12,900.00 | Identified for Further Review |
South Dakota | Clark County PDM Plan Update | $ 13,102.50 | Identified for Further Review |
South Dakota | Spink County PDM Plan Update | $ 11,250.00 | Identified for Further Review |
South Dakota | Miner County PDM Plan Update | $ 11,602.50 | Identified for Further Review |
South Dakota | Brookings County PDM Plan Update | $ 11,283.75 | Identified for Further Review |
South Dakota | Kingsbury County PDM Plan Update | $ 11,782.50 | Identified for Further Review |
South Dakota | Roberts County PDM Plan Update | $ 11,643.75 | Identified for Further Review |
South Dakota | Hamlin County PDM Plan Update | $ 10,777.50 | Identified for Further Review |
South Dakota | Marshall County PDM Plan Update | $ 11,250.00 | Identified for Further Review |
South Dakota | McPherson County PDM Plan Update | $ 11,250.00 | Identified for Further Review |
South Dakota | Rapid City Fire Department Ignition Resistant Roofing Project | $ 140,886.96 | Identified for Further Review |
Stillaguamish Tribe of Indians | Stillaguamish Tribe of Indians of Washington Pre-disaster Planning | $ 74,808.00 | Identified for Further Review |
Tennessee | Madison County Safe Room Project | $ 1,085,702.25 | Did Not Meet HMA Requirements |
Tennessee | Sequatchie County Multi-Jurisdictional Hazard Mitigation Plan Update - 2018 | $ 49,434.00 | Identified for Further Review |
Texas | PDM - Leon County Generator | $ 255,543.75 | Did Not Meet HMA Requirements |
Texas | City of Fort Worth Central Arlington Heights PDM | $ 4,000,000.00 | Did Not Meet HMA Requirements |
Texas | Hill County Hazard Mitigation Plan Project | $ 49,500.00 | Identified for Further Review |
Texas | Limestone County Texas Hazard Mitigation Plan Project | $ 40,500.00 | Identified for Further Review |
Texas | Falls County Hazard Mitigation Plan Project | $ 30,000.00 | Identified for Further Review |
Texas | Freestone County Hazard Mitigation Plan Project | $ 40,125.00 | Identified for Further Review |
Texas | HazMAP Updates for Erath, Hood, and Hunt Counties | $ 184,499.95 | Identified for Further Review |
Texas | HazMAP Update for Palo Pinto and Parker Counties | $ 139,500.00 | Identified for Further Review |
Texas | Travis County Texas 2017 Wildfire | $ 453,307.50 | Not Selected |
Tulalip Tribes of Washington | Tulalip Tribes of Washington Hazard Mitigation Plan Update | $ 110,432.22 | Identified for Further Review |
Turtle Mountain Band of Chippewa | Turtle Mountain Multihazard Mitigation Update | $ 37,500.00 | Identified for Further Review |
Upper Sioux Community (Indian Reservation) | Upper Sioux Community Storm Safe Shelter | $ 564,754.50 | Did Not Meet HMA Requirements |
Upper Skagit Indian Tribe | Upper Skagit Indian Tribe Hazard Mitigation Plan Update | $ 150,000.00 | Identified for Further Review |
Upper Skagit Indian Tribe | Water System Seismic Retrofits | $ 306,315.00 | Identified for Further Review |
Utah | City of Woods Cross Land Subsidence Project | $ 386,920.00 | Did Not Meet HMA Requirements |
Utah | Perry City Flood Control District Debris Flow Mitigation Project | $ 675,937.50 | Did Not Meet HMA Requirements |
Utah | Carbon Count Generator Project | $ 84,000.00 | Did Not Meet HMA Requirements |
Utah | Eaglepointe Landslide Mitigation in the City of North Salt Lake | $ 2,143,093.14 | Did Not Meet HMA Requirements |
Utah | City of Saratoga Springs Emergency Generators for Water Infrastructure | $ 171,000.00 | Identified for Further Review |
Utah | Salt Lake City Fix the Bricks | $ 1,916,395.50 | Identified for Further Review |
Utah | City of North Ogden Flashflood/Runoff Mitigation Project | $ 874,695.00 | Identified for Further Review |
Utah | Salt Lake County Multi-Jurisdiction Multi-Hazard Mitigation Plan | $ 76,500.00 | Identified for Further Review |
Utah | Six County Association of Governments Hazard Mitigation Plan Update | $ 78,562.50 | Identified for Further Review |
Utah | Pre-Disaster Mitigation Plan Update for the Bear River Region, Utah | $ 90,000.00 | Identified for Further Review |
Utah | West Haven City Flood Mitigation Grant | $ 615,249.00 | Identified for Further Review |
Utah | City of Saratoga Springs Flood Hazard Mitigation | $ 916,719.75 | Identified for Further Review |
Vermont | Newton Road Flood Mitigation | $ 376,661.25 | Identified for Further Review |
Vermont | State of Vermont Local Hazard Mitigation Plan Development | $ 117,187.50 | Identified for Further Review |
Vermont | Town of Wardsboro Buyout Mitigation Project | $ 58,575.00 | Identified for Further Review |
Vermont | Brownington Generator 2017 | $ 22,500.53 | Identified for Further Review |
Vermont | Newton Road Acquisitions (2) | $ 306,933.75 | Not Selected |
Virgin Islands | Tank #2 Hurricane Mitigation Project | $ 219,600.00 | Did Not Meet HMA Requirements |
Virgin Islands | Feeder 11 Upgrade at St. Thomas USVI | $ 995,081.25 | Did Not Meet HMA Requirements |
Virgin Islands | Charlotte Amalie High School Underground Project Phase 1 | $ 558,355.52 | Did Not Meet HMA Requirements |
Virgin Islands | USVI Standard State Hazard Mitigation Plan Update | $ 150,000.00 | Identified for Further Review |
Virgin Islands | Hurricane Shutters, Rollup Doors & Generator Installation | $ 57,661.50 | Identified for Further Review |
Virgin Islands | King Street, Frederiksted Underground Electrical Distribution | $ 3,228,237.45 | Identified for Further Review |
Virgin Islands | Queen Street, Christiansted Underground Electrical Distribution | $ 2,730,723.86 | Identified for Further Review |
Virginia | Town of Pound-Church Street Landslide Remediation Project | $ 419,490.00 | Did Not Meet HMA Requirements |
Virginia | Rockingham County Lake Shenandoah Stormwater Management Project | $ 547,500.00 | Did Not Meet HMA Requirements |
Virginia | City of Virginia Beach Generator for Fire Station 11 | $ 243,750.00 | Did Not Meet HMA Requirements |
Virginia | Virginia Beach Central Plant Generator | $ 1,125,000.00 | Did Not Meet HMA Requirements |
Virginia | Cumberland Plateau PDC All Hazards Mitigation Plan Update | $ 30,000.00 | Identified for Further Review |
Virginia | Enhancement of Landslide Hazard Risk in State and Local Hazard Mitigation Plans | $ 85,648.50 | Identified for Further Review |
Virginia | Essex County Elevation of 1 Property | $ 131,250.00 | Identified for Further Review |
Virginia | Essex County Elevation of 3 Properties | $ 393,750.00 | Identified for Further Review |
Washington | MVSD Old Main High School Seismic Upgrade Project | $ 2,567,732.79 | Did Not Meet HMA Requirements |
Washington | Asotin County Hazard Mitigation Plan | $ 37,500.00 | Identified for Further Review |
Washington | Garfield County Hazard Mitigation Plan | $ 40,424.00 | Identified for Further Review |
Washington | Update existing FEMA-approved Multi-Hazard Mitigation Plan City/Town Adoption | $ 37,500.00 | Identified for Further Review |
Washington | Whitman County Hazard Mitigation Plan | $ 48,750.00 | Identified for Further Review |
Washington | 5-Year Update of current, unexpired Hazard Mitigation Plan | $ 48,750.00 | Identified for Further Review |
Washington | Kitsap County WA MultiJurisdictional Multihazard Mitigation Plan | $ 37,485.00 | Identified for Further Review |
Washington | Island County WA Multi-Jurisdiction Hazard Mitigation Plan | $ 94,777.50 | Identified for Further Review |
Washington | Region 5 All Hazard Mitigation Plan Update | $ 116,827.50 | Identified for Further Review |
Washington | Snohomish County 2020 Hazard Mitigation Plan Update | $ 112,497.13 | Identified for Further Review |
Washington | Skagit County Natural Hazard Mitigation Plan Update Project | $ 85,500.00 | Identified for Further Review |
Washington | Spokane County Multi-Jurisdictional Mitigation Plan Update | $ 150,000.00 | Identified for Further Review |
Washington | Upgrade/Relocate existing watermain | $ 780,743.95 | Identified for Further Review |
Washington | Slide Ridge Retrofit Construction | $ 1,281,856.33 | Identified for Further Review |
Washington | Mann Road Flood Mitigation | $ 1,642,350.00 | Identified for Further Review |
Wisconsin | Chippewa County Natural Hazards Mitigation Plan Update | $ 24,000.00 | Identified for Further Review |
Wisconsin | Brown County WI Mitigation Plan | $ 57,330.00 | Identified for Further Review |
Wisconsin | Langlade County All Hazard Mitigation Plan Update | $ 30,000.00 | Identified for Further Review |
Wisconsin | Marinette County, Wisconsin Hazard Mitigation Plan | $ 24,980.74 | Identified for Further Review |
Wisconsin | Dodge County, WI - All Hazard Mitigation Plan Update 2018 | $ 25,626.59 | Identified for Further Review |
Wisconsin | Kewaunee County | $ 20,785.00 | Identified for Further Review |
Wisconsin | Sheboygan County, Wisconsin Hazard Mitigation Plan | $ 24,936.68 | Identified for Further Review |
Wisconsin | Wood County PDM Plan | $ 17,250.00 | Identified for Further Review |
Wisconsin | Manitowoc County, Wisconsin Hazard Mitigation Plan | $ 24,980.80 | Identified for Further Review |
Wisconsin | Jackson County Mitigation Plan Update 2017 | $ 30,375.19 | Identified for Further Review |
Wisconsin | La Crosse County Haz Mit Update 2017 | $ 31,331.19 | Identified for Further Review |
Wisconsin | Prairie Lake Estates Community Safe Room, Barron County, WI | $ 204,517.00 | Identified for Further Review |
Wisconsin | Regional Hazard Mitigation Plan Update2 | $ 78,147.50 | Identified for Further Review |
Wisconsin | Adams County All Hazards Mitigation Plan Update | $ 30,000.00 | Identified for Further Review |
Wisconsin | Hazard Mitigation Grant Program Planning Grant | $ 28,500.00 | Identified for Further Review |
Wisconsin | Columbia County WI PDM Plan Update | $ 11,424.00 | Identified for Further Review |
Wisconsin | Fond du Lac County Natural Hazard Mitigation Project | $ 21,953.79 | Identified for Further Review |
Wisconsin | Forest County All Hazards Mitigation Plan Update | $ 30,000.00 | Identified for Further Review |
Wisconsin | Clark County Multi-Hazard Mitigation Plan Update | $ 28,800.00 | Identified for Further Review |
Wisconsin | Waupaca Co WI PDM Plan Update | $ 23,230.00 | Identified for Further Review |
Wisconsin | East End Estates Community Safe Room Project, Barron County, WI | $ 111,616.00 | Identified for Further Review |
Wisconsin | Ozaukee County - Flood Mitigation -1980 Edgewater Drive | $ 82,796.25 | Identified for Further Review |
Wyoming | North Platte River Restoration and Flood Mitigation, Saratoga, WY at Boozer Cr. | $ 825,000.00 | Did Not Meet HMA Requirements |