The Building Resilient Infrastructure and Communities (BRIC) grant program seeks to categorically shift the federal focus from reactive disaster spending toward research-supported, proactive investment in community resilience so when the hurricane, flood or wildfire comes, communities are better prepared. BRIC provides funds on an annual basis for hazard mitigation planning and the implementation of mitigation projects prior to a disaster.
Fiscal Year 2020 Selections
On July 1, 2021, FEMA announced the selections of subapplications for the $700 million available in Fiscal Year 2020 (FY 2020) for BRIC and FMA grant funding. This includes 38 tribes that have been selected for planning, project and management costs totaling $26.1 million total project costs.
The BRIC FY 2020 application period opened on Sept. 30, 2020, and closed on Jan. 29, 2021. Eligible applicants applied using the new FEMA Grants Outcome (FEMA GO), which is now the grant management system for FMA and BRIC.
This announcement is not an award; it’s a decision on the status of all subapplications.
FEMA reviewed each subapplication to ensure eligibility and minimum program requirements were met. BRIC competitive subapplications then went through a two-part scoring process. In addition, a National Technical Review (NTR) team reviewed all eligible project subapplications for cost-effectiveness and engineering feasibility for FMA and the top ranked $1 billion federal share requested for BRIC.
All eligible projects must also go through an Environmental and Historic Preservation review.
Based upon its review, FEMA has placed each subapplicant in one of three categories: Identified for Further Review, Not Selected or Did Not Meet Hazard Mitigation Assistance (HMA) Requirements.
FEMA will work with applicants selected for “Further Review” to conduct programmatic reviews of the selected subapplications before making a final decision for funding. While FEMA has announced the selections of subapplications for FY 2020, the actual awards are anticipated to be made in the FEMA Grants Outcomes (FEMA GO) system beginning late December 2021.
For additional information or to ask questions, grant applicants should contact their FEMA regional office.
The data shown below represents a summary of the subapplications received by FEMA to apply for the funding available through BRIC ($500 million). Scroll down the page to see specific information about BRIC selections by state.
Summary of Total Subapplications
FEMA received 1,227 subapplications that requested an estimated $4 billion in funding across the BRIC and FMA grant programs.
91 applicants, including 38 Tribes have subapplications that are selected for further review.
Reminder
The number of subapplications requesting FY2020 BRIC and FMA funding continues the trend of oversubscription to HMA grant programs and helps demonstrate the true need for hazard mitigation in the United States.
BRIC Selected Subapplications
- FEMA received 991 subapplications for BRIC funding of which 406 have been selected for further review.
- For FY 2020, the total number of projects selected total the $500 million that was made available for funding with total project costs exceeding $1.18 billion.
Geography Summary
- 53 states and territories applied for BRIC. Of these, 25 states submitted projects that totaled $50 million or more federal share.
- Five states submitted projects with over $200 million federal share: California, New Jersey, New York, Texas and Virginia.
- Tribes submitted 73 subapplications requesting an estimated $22.1 million in federal funding.
Subapplications Summary
- States, territories and tribes submitted requests for the use of BRIC assistance that includes Mitigation Projects, Capability and Capacity Building Activities and Management Costs.
- FEMA also selected projects submitted by 46 small and impoverished communities totaling $39.2 million in total project costs.
- FEMA also selected 8 communities to receive non-financial Direct Technical Assistance through BRIC for FY2020, of which 6 are small and impoverished communities and 3 tribes.
Types of Subapplications
Uses of BRIC Assistance | Number of Subapplications Selected | Total Amount of Project Costs | % of Total Dollars Requested | % of the Subapplications Selected |
---|---|---|---|---|
Mitigation Projects | 65 | $766.1 Million | 15.2% | 19.3% |
Capability and Capacity Building Activities | 272 | $36.72 Million | 80.7% | |
Management Costs | 69 | $78.3 Million | ||
Direct Technical Assistance | 8 |
NOTE: FEMA received seven large project applications with project amounts that reached the maximum in federal share of $50 million.
Project Types Summary
There are various types of projects eligible for BRIC funding. The lists below reflects the top five project types selected by Total Project Cost and Number of Subapplications that do not include Management Costs.
Top Five Project Types by Total Project Cost
- Flood Control = $550 million
- Utility/Infrastructure Protection = $91.3 million
- Wildfire Management = $49.3 million
- Relocation = $21.9 million
- Safe Room/shelters = $15.2 million
Top Five Project Types by Number of Subapplications
- Plan Updates = 123 subapplications
- Engineering, Environmental, Feasibility, and/or Benefit-Cost Analysis = 72 subapplications
- Planning Related Activities = 20 subapplications
- Flood Control = 16 subapplications
- New Plan = 16 subapplications
Highlights of BRIC’s FY 2020 Selections
- During FY 2020, FEMA allocated a maximum amount of $600,000 available for each state.
- Another $20 million was set aside for federally recognized tribes.
- For the tribal set-aside, FEMA received submittals by 40 federally recognized tribes, in which 38 tribes have been selected for further review for more than $26.1 million in total project costs.
- FEMA selected the remaining non-tribal set-aside BRIC funds on a nationally competitive basis:
- 22 projects were selected in the national competition based upon cumulative scores and rankings
- $17.17 million is the average federal share
- 2 Small and Impoverished Communities have project selected
- 12 Phased Projects were selected (7 Flood Control, 1 Wildfire, 1 Utility and Infrastructure Protection, one Relocation, one Stabilization and restoration, and one Floodproofing)
- 12 Flood Control Projects were selected
- 4 Utility and Infrastructure Protection Projects were selected
- 2 Relocation Projects were selected
- And 1 of each of the following were selected:
- Elevation (Roadway)
- Floodproofing
- Safe Room/Shelter
- Wildfire
- For FY 2020 FEMA selected 272 Capability and Capacity Building Activities for $36.72 million and 65 are projects with total project costs of $766.1 million.
- Also under Capability and Capacity Building Activities, FEMA selected 12 building code activities to support efforts in increasing community resiliency.
- All of the projects selected under the national competition came from applicants that had mandatory statewide adopted building codes of either the 2015 or 2018 International Building Code (IBC®) and International Residential Code.
- Also, under the national competition 18 out of the 22 projects selected include nature-based solutions into the mitigation projects.
BRIC Small and Impoverished Community Information
- FEMA is committed to delivering our programs with equity, and this increase in applications from small, impoverished communities is an encouraging sign.
- A small impoverished community is a community of 3,000 or fewer individuals identified by the Applicant that is economically disadvantaged, with residents having an average per capita annual income not exceeding 80% of the national per capita income, based on best available data.
- Of the 991 BRIC submissions, FEMA received subapplications from 98 small and impoverished communities. After further review, 75 were found eligible not including management costs.
- FEMA selected 46 project subapplications, 36 under the Tribal Set Aside, 8 under the Allocation, and 2 under the national competition.
- From 2005 to 2019, small impoverished communities represented an average of about 6% of all subapplications submitted each year. For FY20, the number of small impoverished submissions represents about 9.3% of all non-management cost subapplications submitted.
BRIC Non-Financial Direct Technical Assistance
- FEMA in consultation with applicants will deliver Direct Technical Assistance to eight communities across the nation selected from letters of interest submitted from communities. All the FEMA regions who submitted at least one letter of interest will receive Direct Technical Assistance. Letters of interest were received from all but two regions (2 and 6).
- FEMA may prioritize Direct Technical Assistance for communities that:
- Have not received a project award under Pre-Disaster Mitigation, FMA or Hazard Mitigation Grant Program within the past 5 years
- Have not received an Advance Assistance or Capability- and Capacity-Building subaward under BRIC, PDM, FMA or HMGP within the past 5 years
- Are Tribal governments
- Are designated as small impoverished
- Have demonstrated a compelling need (e.g., communities with significant social vulnerability, communities with multiple major disaster declarations within the past 5 years, etc.)
- FEMA’s provision of Direct Technical Assistance will depend on its ability to perform the requested services. Should the demand for the services exceed FEMA’s organizational capacity, FEMA may refer the community to other technical assistance offerings.
Wildfire Mitigation
- To ensure states, local communities, tribes and territories have what they need to respond wildfires and have capacity to address mitigation, there is a renewed focus on building the capability to take advantage of mitigation funding offered by FEMA.
- One project that FEMA selected represents an innovative systems methodology to reduce the risk of catastrophic wildfires. The methodology works simultaneously at large wildland and neighborhood scales to build more resilient communities.
- The total project cost is $49.3 million. FEMA estimates that 4,103 structures will opt into the defensible program that provides cost-share to property owners to implement defensible space and ignition resistant construction activities.
- The project would also fund hazardous fuels reduction activities across 5,410 acres within three proposed project areas. The number of structures protected by hazardous fuels reduction activities is estimated to be 6,498.
FY 2020 Building Resilient Infrastructure and Communities Subapplicant Status
The below table lists the submitted planning and project subapplications and the status of each alphabetically by applicant.
Applicant State | Subapplication Title | Subapplication ID | Funding Category | Small Impoverished Community | Status | Federal Share Requested | Total Project Cost |
---|---|---|---|---|---|---|---|
AK | Knik Tribe Hazard Mitigation | EMS-2020-BR-132-0003 | Tribal Set-aside | No | Selected for Further Review | $225,000.00 | $300,000.00 |
AK | Knik Tribe Resilient Building Code Implementation | EMS-2020-BR-132-0002 | Tribal Set-aside | No | Ineligible | $225,000.00 | $300,000.00 |
AK | Village of Alatna Resilient Building Code Implementation | EMS-2020-BR-136-0003 | Tribal Set-aside | Yes | Selected for Further Review | $270,000.00 | $300,000.00 |
AK | Kotzebue Electric Association Vulnerability Assessment FEMA BRIC Application | EMS-2020-BR-002-0002 | Allocation | No | Ineligible | $222,915.11 | $297,220.15 |
AK | Koyukuk Village Resilient Building Code Implementation | EMS-2020-BR-121-0002 | Tribal Set-aside | Yes | Ineligible | $270,000.00 | $300,000.00 |
AK | Knik Tribe Management Costs | EMS-2020-BR-132-0001 | Management Cost | No | Selected for Further Review | $30,000.00 | $60,000.00 |
AK | Allakaket Village, Alaska Project Scoping Risk Assessment | EMS-2020-BR-122-0001 | Tribal Set-aside | Yes | Selected for Further Review | $276,600.00 | $310,640.00 |
AK | Nikolai Edzeno Village Hazard Mitigation | EMS-2020-BR-133-0001 | Tribal Set-aside | Yes | Selected for Further Review | $270,000.00 | $300,000.00 |
AK | Seldovia Village Tribe SBF Dock Refurbishment -FY2020 BRIC | EMS-2020-BR-040-0001 | Tribal Set-aside | Yes | Selected for Further Review | $609,550.00 | $677,277.78 |
AK | Village of Alatna Hazard Mitigation | EMS-2020-BR-136-0001 | Tribal Set-aside | Yes | Selected for Further Review | $270,000.00 | $300,000.00 |
AK | Akiak Native Community - FY2020 BRIC - Management Costs | EMS-2020-BR-140-0002 | Management Cost | Yes | Selected for Further Review | $29,688.50 | $13,350.00 |
AK | Nikolai Edzeno Village Resilient Building Code Implementation | EMS-2020-BR-133-0003 | Tribal Set-aside | Yes | Ineligible | $270,000.00 | $300,000.00 |
AK | Nikolai Edzeno Village Management Cost | EMS-2020-BR-133-0002 | Management Cost | Yes | Selected for Further Review | $30,000.00 | $60,000.00 |
AK | Levelock Village Resilient Building Code Implementation | EMS-2020-BR-126-0003 | Tribal Set-aside | Yes | Selected for Further Review | $270,000.00 | $300,000.00 |
AK | Alatna Village Management costs | EMS-2020-BR-136-0002 | Management Cost | Yes | Selected for Further Review | $60,000.00 | $60,000.00 |
AK | Koyukuk Village Hazard Mitigation | EMS-2020-BR-121-0003 | Tribal Set-aside | Yes | Selected for Further Review | $270,000.00 | $300,000.00 |
AK | Native Village of Shungnak Hazard Mitigation | EMS-2020-BR-152-0003 | Tribal Set-aside | Yes | Selected for Further Review | $270,000.00 | $300,000.00 |
AK | Levelock Village Hazard Mitigation | EMS-2020-BR-126-0001 | Tribal Set-aside | Yes | Selected for Further Review | $270,000.00 | $300,000.00 |
AK | Levelock Village Management Cost | EMS-2020-BR-126-0002 | Management Cost | Yes | Selected for Further Review | $60,000.00 | $60,000.00 |
AK | Akiak Acquisition of One Home - FY2020 BRIC | EMS-2020-BR-140-0001 | Tribal Set-aside | Yes | Selected for Further Review | $161,896.50 | $179,885.00 |
AK | 2022 Ugashik Village Hazard Mitigation Plan | EMS-2020-BR-128-0002 | Management Cost | Yes | Selected for Further Review | $4,950.00 | $4,950.00 |
AK | 2022 Planning Ugashik Village | EMS-2020-BR-128-0001 | Tribal Set-aside | Yes | Selected for Further Review | $44,550.00 | $49,500.00 |
AK | Koyukuk Village Management Costs | EMS-2020-BR-121-0001 | Management Cost | Yes | Selected for Further Review | $30,000.00 | $60,000.00 |
AK | Akiak Capability and Capacity Building - FY2020 BRIC | EMS-2020-BR-140-0003 | Tribal Set-aside | Yes | Selected for Further Review | $105,300.00 | $117,000.00 |
AK | Alaska State HMP Update | EMS-2020-BR-002-0003 | Allocation | No | Selected for Further Review | $103,931.25 | $138,575.00 |
AK | State of Alaska SMC | EMS-2020-BR-002-0001 | Management Cost | No | Selected for Further Review | $13,857.50 | $43,579.51 |
AK | Native Village of Shungnak Resilient Building Code Implementation | EMS-2020-BR-152-0002 | Tribal Set-aside | Yes | Selected for Further Review | $270,000.00 | $300,000.00 |
AK | Village of Shungnak Management Costs | EMS-2020-BR-152-0001 | Management Cost | Yes | Selected for Further Review | $60,000.00 | $60,000.00 |
AK | BRIC Project Scoping Activities | EMS-2020-BR-143-0001 | Tribal Set-aside | Yes | Selected for Further Review | $300,000.00 | $333,324.48 |
AK | Buckland, Alaska Project Scoping Risk Assessment | EMS-2020-BR-153-0001 | Tribal Set-aside | Yes | Selected for Further Review | $272,501.00 | $305,619.00 |
AK | BRIC Mitigation Planning | EMS-2020-BR-143-0002 | Tribal Set-aside | Yes | Selected for Further Review | $300,000.00 | $333,408.00 |
AL | SMC BRIC | EMA-2020-BR-010-0017 | Management Cost | No | Selected for Further Review | $72,074.40 | $1,348,741.89 |
AL | HU OMS System | EMA-2020-BR-010-0015 | Competitive | No | Not Selected | $975,000.00 | $1,300,000.00 |
AL | Morgan County Community Shelter - FY2021 BRIC | EMA-2020-BR-010-0001 | Competitive | No | Not Selected | $1,113,449.01 | $1,484,598.68 |
AL | Town of Brilliant Community Safe Room | EMA-2020-BR-010-0007 | Competitive | Yes | Ineligible | $268,850.00 | $297,150.00 |
AL | HU Operations Center | EMA-2020-BR-010-0002 | Competitive | No | Not Selected | $3,357,900.00 | $10,500,000.00 |
AL | Jacksonville 2020 BRIC Application | EMA-2020-BR-010-0010 | Competitive | No | Not Selected | $156,654.00 | $208,872.00 |
AL | Town of County Line Community Safe Room - 2020 BRIC | EMA-2020-BR-010-0006 | Allocation | Yes | Selected for Further Review | $600,000.00 | $720,744.00 |
AL | Portable Generator 2 | EMA-2020-BR-010-0005 | Competitive | No | Not Selected | $84,910.72 | $113,214.29 |
AL | All Hazards Comprehensive Hazard Mitigation Plan | EMA-2020-BR-010-0003 | Competitive | No | Ineligible | $134,670.00 | $179,560.00 |
AL | Fixed Generator C (McIntosh LS) | EMA-2020-BR-010-0011 | Competitive | No | Not Selected | $46,451.47 | $61,935.29 |
AL | Portable Generator 3 | EMA-2020-BR-010-0014 | Competitive | No | Not Selected | $84,910.72 | $113,214.29 |
AL | Fixed Generator B (Yorktown LS) | EMA-2020-BR-010-0004 | Competitive | No | Not Selected | $45,026.47 | $60,035.29 |
AL | Perry County Safe Room (Francis Marion) | EMA-2020-BR-010-0009 | Competitive | No | Ineligible | $2,115,257.25 | $2,820,343.00 |
AL | Portable Generator 1 | EMA-2020-BR-010-0016 | Competitive | No | Not Selected | $132,160.72 | $176,214.29 |
AL | Baldwin County, Alabama – Emergency Generators | EMA-2020-BR-010-0013 | Competitive | No | Not Selected | $725,242.50 | $966,990.00 |
AL | Phenix City Emergency Generator Grant | EMA-2020-BR-010-0008 | Competitive | No | Not Selected | $132,661.39 | $176,881.85 |
AL | (BRIC) - Baldwin Beach Express Signals Backup Power | EMA-2020-BR-010-0012 | Competitive | No | Not Selected | $93,750.00 | $125,000.00 |
AR | Conway Downtown Drainage Study | EMT-2020-BR-009-0013 | Allocation | No | Ineligible | $145,500.00 | $194,000.00 |
AR | Opal Road Flood Mitigation | EMT-2020-BR-009-0022 | Competitive | No | Not Selected | $3,000,000.00 | $4,000,000.00 |
AR | Southside Safe Room | EMT-2020-BR-009-0007 | Competitive | No | Not Selected | $1,436,631.50 | $1,887,842.00 |
AR | Little River County Hazard Mitigation Plan Update | EMT-2020-BR-009-0009 | Allocation | No | Selected for Further Review | $26,250.00 | $35,000.00 |
AR | Fort Smith Acquisition Project | EMT-2020-BR-009-0004 | Competitive | No | Not Selected | $1,215,237.50 | $1,603,650.00 |
AR | Magnolia Stormwater Detention Basin | EMT-2020-BR-009-0012 | Competitive | No | Not Selected | $340,800.00 | $447,300.00 |
AR | Danville School District Safe Room | EMT-2020-BR-009-0025 | Competitive | Yes | Not Selected | $2,096,128.82 | $2,316,780.47 |
AR | Highland School District Safe Room | EMT-2020-BR-009-0005 | Competitive | No | Not Selected | $1,224,741.63 | $1,612,180.50 |
AR | Ozark Junior High/High School Safe Room Project | EMT-2020-BR-009-0016 | Competitive | No | Not Selected | $1,541,989.45 | $2,040,985.93 |
AR | Mountain View School District Safe Room | EMT-2020-BR-009-0003 | Competitive | No | Not Selected | $489,435.00 | $643,762.00 |
AR | Greenhouse Regional Detention | EMT-2020-BR-009-0008 | Competitive | No | Not Selected | $1,350,000.00 | $1,800,000.00 |
AR | Nevada County Hazard Mitigation Plan Update | EMT-2020-BR-009-0010 | Allocation | No | Selected for Further Review | $26,250.00 | $35,000.00 |
AR | Saline County Hazard Mitigation Plan Update | EMT-2020-BR-009-0027 | Allocation | No | Selected for Further Review | $26,250.00 | $35,000.00 |
AR | City of Van Buren Downtown Drainage | EMT-2020-BR-009-0020 | Competitive | No | Not Selected | $841,182.50 | $1,104,910.00 |
AR | Heber Springs Drainage Improvement Project | EMT-2020-BR-009-0015 | Competitive | No | Not Selected | $4,834,950.00 | $6,357,450.00 |
AR | Batesville Drainage Improvement Project | EMT-2020-BR-009-0023 | Competitive | No | Not Selected | $810,970.00 | $1,067,860.00 |
AR | Jackson County Multi-Jurisdictional Hazard Mitigation Plan Update | EMT-2020-BR-009-0024 | Allocation | No | Selected for Further Review | $30,400.00 | $40,000.00 |
AR | Centerpoint Elementary Multi-purpose/Safe Room | EMT-2020-BR-009-0002 | Competitive | No | Not Selected | $1,363,060.56 | $1,797,414.08 |
AR | Sharp County Multi-Jurisdictional Hazard Mitigation Plan Update | EMT-2020-BR-009-0021 | Allocation | No | Selected for Further Review | $30,400.00 | $40,000.00 |
AR | Woodruff County Multi-Jurisdictional Hazard Mitigation Plan Update | EMT-2020-BR-009-0011 | Allocation | No | Selected for Further Review | $30,400.00 | $40,000.00 |
AR | Emmet Drainage Improvements | EMT-2020-BR-009-0019 | Allocation | Yes | Selected for Further Review | $211,858.92 | $234,150.00 |
AR | Concord Safe Room | EMT-2020-BR-009-0014 | Competitive | No | Not Selected | $967,946.00 | $1,272,228.00 |
AR | Cleburne County Multi-Jurisdictional Hazard Mitigation Plan Update | EMT-2020-BR-009-0017 | Allocation | No | Selected for Further Review | $30,400.00 | $40,000.00 |
AR | Prescott School District Safe Room | EMT-2020-BR-009-0006 | Competitive | No | Not Selected | $1,246,508.80 | $1,636,042.80 |
AR | Independence County Multi-Jurisdictional Hazard Mitigation Plan Update | EMT-2020-BR-009-0001 | Allocation | No | Selected for Further Review | $30,400.00 | $40,000.00 |
AR | AWIN Coverage Expansion | EMT-2020-BR-009-0018 | Competitive | No | Ineligible | $4,050,000.00 | $5,400,000.00 |
AR | Arkansas FY2020 State Management Costs | EMT-2020-BR-009-0026 | Management Cost | No | Selected for Further Review | $53,915.00 | $1,225,000.00 |
AS | BUILDING CODE UPGRADE | EMF-2020-BR-189-0003 | Allocation | No | Selected for Further Review | $238,876.50 | $318,502.00 |
AS | State Management Cost | EMF-2020-BR-189-0001 | Management Cost | No | Selected for Further Review | $46,130.20 | $46,018.16 |
AS | Mitigation Outreach Initiatives | EMF-2020-BR-189-0002 | Allocation | No | Selected for Further Review | $107,100.00 | $142,800.00 |
AZ | 2020-BRIC Springerville Coconino Street Flood Control | EMF-2020-BR-193-0011 | Competitive | No | Not Selected | $848,311.50 | $1,114,582.00 |
AZ | BRIC La Paz County Planning and Zoning Code Update | EMF-2020-BR-193-0015 | Allocation | No | Selected for Further Review | $38,166.19 | $50,093.12 |
AZ | Coconino County Resilient Communities Program | EMF-2020-BR-193-0003 | Competitive | No | Not Selected | $187,978.50 | $246,722.00 |
AZ | Mesa Smart/Micro Grid Energy Resilience | EMF-2020-BR-193-0005 | Competitive | No | Ineligible | $4,675,972.25 | $6,137,492.00 |
AZ | 2020 Lower Highland Wash Flood Control Project | EMF-2020-BR-193-0009 | Competitive | No | Not Selected | $2,521,347.00 | $3,361,796.00 |
AZ | Florence Gila River Flood Hazard Mitigation Project | EMF-2020-BR-193-0001 | Allocation | No | Selected for Further Review | $112,500.00 | $150,000.00 |
AZ | Alpine Community Center Emergency Infrastructure Backup | EMF-2020-BR-193-0012 | Allocation | No | Selected for Further Review | $45,600.00 | $59,850.00 |
AZ | City of Cottonwood-Wellsite Generators-FY2020 BRIC | EMF-2020-BR-193-0017 | Competitive | No | Not Selected | $441,637.50 | $588,850.00 |
AZ | FY2020 BRIC State of Arizona Management Costs | EMF-2020-BR-193-0014 | Management Cost | No | Selected for Further Review | $75,942.58 | $1,684,050.00 |
AZ | Landslide mapping along Arizona SR87 corridor, NE Mesa to Strawberry, AZ and SR260 to Mogollon Rim | EMF-2020-BR-193-0007 | Allocation | No | Selected for Further Review | $50,388.96 | $66,135.51 |
AZ | Landscape alternatives to reduce wind velocity | EMF-2020-BR-193-0016 | Allocation | No | Selected for Further Review | $63,750.00 | $85,000.00 |
AZ | Emergency Shelters/Redundant Power  | EMF-2020-BR-193-0002 | Competitive | No | Not Selected | $268,125.00 | $357,500.00 |
AZ | RWRD Tres Rios Wastewater Reclamation Facility Microgrid Generator & Solar Power Resiliency Project | EMF-2020-BR-193-0008 | Competitive | No | Not Selected | $2,112,027.90 | $3,000,000.00 |
AZ | D2 Generators-Outage Support | EMF-2020-BR-193-0004 | Allocation | No | Selected for Further Review | $55,301.14 | $72,841.52 |
AZ | Establishing a Virtual Arizona Earthquake Clearinghouse platform for a safer, more resilient Arizona | EMF-2020-BR-193-0010 | Allocation | No | Selected for Further Review | $56,629.13 | $75,505.60 |
AZ | City of Flagstaff Rio De Flag Lateral Project | EMF-2020-BR-193-0006 | Competitive | No | Not Selected | $820,812.50 | $1,077,750.00 |
AZ | City of Tucson Neosha Dip Crossing Safety Improvements | EMF-2020-BR-193-0018 | Competitive | No | Not Selected | $151,172.25 | $201,563.00 |
AZ | Rimrock Flood Mitigation Project Scoping | EMF-2020-BR-193-0013 | Allocation | No | Selected for Further Review | $150,000.00 | $200,000.00 |
CA | Trinidad Rancheria Drought Mitigation | EMF-2020-BR-185-0001 | Tribal Set-aside | Yes | Selected for Further Review | $270,000.00 | $300,000.00 |
CA | BRIC 2020 Burlingame Shoreline Protection Project Scoping with Millbrae and SFO Airport | EMF-2020-BR-001-0004 | Allocation | No | Selected for Further Review | $300,000.00 | $500,000.00 |
CA | Paskenta 2020 BRIC | EMF-2020-BR-133-0001 | Tribal Set-aside | No | Selected for Further Review | $9,298,050.00 | $12,397,400.00 |
CA | Cost Estimate and Design of Micro Grid Weitchpec FY 2020 BRIC | EMF-2020-BR-129-0001 | Tribal Set-aside | Yes | Selected for Further Review | $233,959.50 | $263,959.50 |
CA | BRIC 2020 - LAUSD - Lockwood Avenue Elementary School - Main Building Seismic Retrofit Project | EMF-2020-BR-001-0009 | Competitive | No | Not Selected | $1,101,944.00 | $1,489,114.00 |
CA | BRIC2020 County of Los Angeles Hall of Administration Building Seismic Retrofit Project | EMF-2020-BR-001-0024 | Competitive | No | Not Selected | $50,000,000.00 | $299,862,390.96 |
CA | Wildfire Resilient Sonoma County - Nature-based Mitigation to Adapt in an Era of Megafires | EMF-2020-BR-001-0015 | Competitive | No | Selected for Further Review | $36,983,751.70 | $49,318,244.70 |
CA | Update Hazard Mitigation Plan for Twenty-Nine Palms Band of Mission Indians | EMF-2020-BR-179-0001 | Tribal Set-aside | Yes | Selected for Further Review | $538,203.60 | $598,004.00 |
CA | BRIC 2020 - LAUSD - Micheltorena Elementary School – Main Building Seismic Retrofit | EMF-2020-BR-001-0028 | Competitive | No | Not Selected | $909,975.00 | $1,229,696.00 |
CA | Microgrid and Emergency Services District Outreach BRIC FY 2020 | EMF-2020-BR-129-0002 | Tribal Set-aside | Yes | Selected for Further Review | $27,000.00 | $30,000.00 |
CA | BRIC 2020 - LAUSD - Irving MS - Auditorium Building Retrofit | EMF-2020-BR-001-0001 | Competitive | No | Not Selected | $743,269.00 | $1,004,418.00 |
CA | Pave Zipline Road to Mitigate Flood and Storm Damage | EMF-2020-BR-079-0001 | Tribal Set-aside | Yes | Selected for Further Review | $580,941.00 | $645,490.00 |
CA | BRIC 2020-LAUSD-Albion Street Elementary - Auditorium Seismic Retrofit | EMF-2020-BR-001-0026 | Competitive | No | Not Selected | $289,291.00 | $390,934.00 |
CA | Pala Trujillo Creek Flood Mitigation Project | EMF-2020-BR-177-0001 | Tribal Set-aside | No | Selected for Further Review | $599,400.00 | $799,200.00 |
CA | Trinidad Rancheria Drought Mitigation Management Costs | EMF-2020-BR-185-0002 | Management Cost | Yes | Selected for Further Review | $30,000.00 | $30,000.00 |
CA | City Redwood City Price Storm Drainage Pump Station Improvements Project. | EMF-2020-BR-001-0010 | Competitive | No | Not Selected | $6,031,713.20 | $8,016,834.00 |
CA | BRIC 2020 Central San Walnut Creek / Grayson Creek Levee Project | EMF-2020-BR-001-0014 | Competitive | No | Selected for Further Review | $2,465,230.68 | $3,276,578.68 |
CA | BRIC 2020 East Valley Water District - Water Main Seismic Retrofit | EMF-2020-BR-001-0012 | Competitive | No | Not Selected | $10,258,633.78 | $13,652,905.92 |
CA | BRIC 2020, City of Menlo Park, Menlo Park SAFER Bay Project | EMF-2020-BR-001-0002 | Competitive | No | Selected for Further Review | $50,000,000.00 | $67,675,087.00 |
CA | BRIC 2020 Belvedere Lagoon Coastal Levee System Improvement Project | EMF-2020-BR-001-0003 | Competitive | No | Not Selected | $15,535,706.80 | $20,994,198.80 |
CA | California BRIC 2020 State Management Cost | EMF-2020-BR-001-0006 | Management Cost | No | Selected for Further Review | $13,373,199.52 | $73,169,349.17 |
CA | BRIC 2020 Earthquake Brace + Bolt Multi-County Soft-story Seismic Retrofit Program | EMF-2020-BR-001-0017 | Competitive | No | Not Selected | $24,998,400.00 | $55,056,000.00 |
CA | BRIC2020 Alameda Flood Control District Estudillo Canal Flood Storage and Tidegate Project | EMF-2020-BR-001-0029 | Competitive | No | Not Selected | $7,607,277.99 | $10,236,897.99 |
CA | BRIC 2020 Earthquake Brace + Bolt Multi-Family Statewide Seismic Retrofit Program | EMF-2020-BR-001-0008 | Competitive | No | Not Selected | $30,000,000.00 | $44,637,500.00 |
CA | BRIC 2020 El Dorado Irrigation District Flume 30 Replacement Project - Wildfire Protection | EMF-2020-BR-001-0020 | Competitive | No | Not Selected | $5,472,462.35 | $7,273,525.35 |
CA | BRIC 2020 - LAUSD - Aldama Elementary - Main Building & Auditorium Seismic Retrofit | EMF-2020-BR-001-0019 | Competitive | No | Not Selected | $2,542,951.00 | $3,436,420.00 |
CA | BRIC 2020 City of Rohnert Park Water Tank System Seismic Retrofit | EMF-2020-BR-001-0011 | Competitive | No | Not Selected | $1,927,953.08 | $2,605,342.00 |
CA | BRIC 2020 City of Escondido, CA Lake Wohlford Dam Replacement Project | EMF-2020-BR-001-0016 | Competitive | No | Not Selected | $45,593,836.80 | $66,805,357.00 |
CA | BRIC 2020 Paradise Recreation & Park District Innovative Wildfire Risk Reduction Buffers (Camp Fire) | EMF-2020-BR-001-0021 | Allocation | No | Selected for Further Review | $218,000.00 | $315,000.00 |
CA | BRIC 2020 City of Rohnert Park Copeland Creek Detention Basin | EMF-2020-BR-001-0025 | Competitive | No | Selected for Further Review | $6,000,000.00 | $12,435,699.80 |
CA | BRIC 2020 South Tahoe PUD Secondary Clarifiers Seismic Retrofit | EMF-2020-BR-001-0018 | Competitive | No | Not Selected | $1,665,026.82 | $2,250,036.25 |
CA | BRIC 2020 City of Hawthorne, Seismic Retrofit of Four Buildings | EMF-2020-BR-001-0030 | Competitive | No | Not Selected | $4,668,661.46 | $6,507,573.46 |
CA | 2020 BRIC SMUD Microgrid Project Scoping | EMF-2020-BR-001-0023 | Allocation | No | Selected for Further Review | $81,997.00 | $211,385.00 |
CA | Pala Trujillo Creek Flood Mitigation Project Management Costs | EMF-2020-BR-177-0002 | Management Cost | No | Selected for Further Review | $79,920.00 | $64,500.00 |
CA | BRIC 2020 Camarillo City Hall and Corp Yard Standby Power Resiliency Project | EMF-2020-BR-001-0005 | Competitive | No | Not Selected | $2,760,000.00 | $3,635,000.00 |
CA | BRIC 2020 - Sacramento River West Side Levee District - Grimes Seepage Mitigation Project | EMF-2020-BR-001-0022 | Competitive | No | Not Selected | $19,036,130.00 | $25,724,500.00 |
CA | Tribal Housing Berm Elevation | EMF-2020-BR-157-0001 | Tribal Set-aside | No | Ineligible | $129,750.00 | $173,000.00 |
CA | BRIC 2020 Alameda County Water District Alvarado Niles Pipeline Seismic Improvement | EMF-2020-BR-001-0007 | Competitive | No | Not Selected | $11,959,783.15 | $16,484,883.74 |
CA | Hazard Mitigation Identification and Planning Project | EMF-2020-BR-191-0001 | Tribal Set-aside | No | Selected for Further Review | $168,750.00 | $225,000.00 |
CA | BRIC 2020 City of Arcata Wastewater Treatment Facility Levee Expansion Project | EMF-2020-BR-001-0027 | Competitive | No | Not Selected | $4,202,100.84 | $5,638,113.60 |
CA | BRIC 2020 - LAUSD 1st Street Elementary School - East Building Seismic Retrofit | EMF-2020-BR-001-0013 | Competitive | No | Not Selected | $762,099.00 | $1,029,864.00 |
CA | Management Weitchpec BRIC FY 2020 | EMF-2020-BR-129-0003 | Management Cost | Yes | Selected for Further Review | $29,395.95 | $29,395.95 |
CO | Colorado Earthquake Resilience Investigation - Code Review & Rapid Visual Screening Pilot Study | EMD-2020-BR-094-0019 | Allocation | No | Selected for Further Review | $40,305.00 | $53,740.00 |
CO | Building Wildfire Mitigation Capacity in Jefferson County | EMD-2020-BR-094-0024 | Allocation | No | Ineligible | $225,014.40 | $300,019.20 |
CO | Cuchara Valley Hazardous Fuels Reduction Project | EMD-2020-BR-094-0028 | Competitive | No | Not Selected | $413,812.50 | $551,750.00 |
CO | BRIC 2020 State Management Costs | EMD-2020-BR-094-0008 | Management Cost | No | Selected for Further Review | $87,006.90 | $2,718,267.00 |
CO | Glenwood Springs' South Bridge Resilient Infrastructure Project | EMD-2020-BR-094-0027 | Competitive | No | Ineligible | $27,170,296.20 | $51,581,134.20 |
CO | Partnership for Wildfire Risk Reduction | EMD-2020-BR-094-0016 | Allocation | No | Selected for Further Review | $75,000.00 | $100,000.00 |
CO | Monument Branch | EMD-2020-BR-094-0009 | Competitive | No | Not Selected | $2,333,097.75 | $3,110,797.00 |
CO | Resilient St. Vrain Project City Reach 3 - Hover Road Reach flood protection project, Longmont, CO | EMD-2020-BR-094-0013 | Competitive | No | Not Selected | $15,385,628.25 | $20,514,171.00 |
CO | Cottonwood Creek at Powers Boulevard | EMD-2020-BR-094-0018 | Competitive | No | Not Selected | $6,192,375.00 | $8,256,500.00 |
CO | Monument Creek | EMD-2020-BR-094-0014 | Competitive | No | Not Selected | $2,175,000.00 | $2,900,000.00 |
CO | Multihazard Mitigation Planning | EMD-2020-BR-094-0022 | Allocation | No | Selected for Further Review | $37,500.00 | $50,005.00 |
CO | El Paso County Fairground Storm Shelters | EMD-2020-BR-094-0021 | Competitive | No | Not Selected | $250,000.00 | $912,529.00 |
CO | Sand Creek, Galley to Palmer Park | EMD-2020-BR-094-0002 | Competitive | No | Not Selected | $2,479,218.75 | $3,305,625.00 |
CO | Colorado Front Range Wildfire Mitigation | EMD-2020-BR-094-0031 | Competitive | No | Not Selected | $4,046,350.50 | $5,395,134.00 |
CO | N. 95th St. Flood Protection | EMD-2020-BR-094-0005 | Competitive | No | Not Selected | $4,761,917.00 | $6,349,223.00 |
CO | Colorado Springs Wildfire Mitigation Palmer Park | EMD-2020-BR-094-0007 | Competitive | No | Not Selected | $249,750.00 | $333,000.00 |
CO | South Englewood Storm Drainage Improvements | EMD-2020-BR-094-0011 | Competitive | No | Not Selected | $13,789,500.00 | $18,386,000.00 |
CO | City of Loveland Pulliam Community Building Renovations 2020 | EMD-2020-BR-094-0026 | Competitive | No | Ineligible | $3,272,498.00 | $5,055,298.00 |
CO | 2021 Eisenhower Johnson Tunnels Generator Replacement | EMD-2020-BR-094-0004 | Competitive | No | Not Selected | $2,500,061.87 | $4,000,099.00 |
CO | Southern Ute Hazard Mitigation Plan | EMD-2020-BR-125-0001 | Tribal Set-aside | No | Selected for Further Review | $30,000.00 | $40,000.00 |
CO | Post-Wildfire Sediment Basins | EMD-2020-BR-094-0020 | Competitive | No | Not Selected | $450,000.00 | $600,000.00 |
CO | Colorado Enhanced State Hazard Mitigation Plan (E-SHMP) Update | EMD-2020-BR-094-0025 | Allocation | No | Selected for Further Review | $110,000.00 | $200,000.00 |
CO | Pueblo County Natural Hazards Mitigation Plan Update FY2022 | EMD-2020-BR-094-0023 | Allocation | No | Selected for Further Review | $42,000.00 | $56,024.00 |
CO | Capacity Improvements: Big Thompson and Fall Rivers, Estes Park, Colorado, flood mitigation | EMD-2020-BR-094-0029 | Allocation | No | Ineligible | $410,625.00 | $547,500.00 |
CO | Town of Morrison, Project Scoping Grant | EMD-2020-BR-094-0001 | Allocation | No | Selected for Further Review | $33,749.99 | $44,999.99 |
CO | City of Greeley Capability- and Capacity- Building Project | EMD-2020-BR-094-0012 | Allocation | No | Selected for Further Review | $175,000.00 | $250,000.00 |
CO | Routt County Community Wildfire Protection Plan | EMD-2020-BR-094-0003 | Allocation | No | Selected for Further Review | $45,000.00 | $60,000.00 |
CO | Hazard Mitigation of South Side Diversion Low Head Dam | EMD-2020-BR-094-0010 | Competitive | No | Not Selected | $7,949,953.50 | $10,599,938.00 |
CO | Overland Road Flood Protection | EMD-2020-BR-094-0030 | Competitive | No | Not Selected | $2,556,189.00 | $3,408,252.00 |
CO | Town of Red Cliff Rockfall Mitigation | EMD-2020-BR-094-0006 | Competitive | No | Not Selected | $2,624,850.00 | $3,499,800.00 |
CO | 2020 Life Safety Retrofit for Emergency Temporary Sheltering Facilities - City & County of Denver | EMD-2020-BR-094-0015 | Competitive | No | Not Selected | $2,612,697.24 | $3,483,596.32 |
CO | City of Westminster HMP 2023 Update | EMD-2020-BR-094-0017 | Allocation | No | Selected for Further Review | $41,430.00 | $55,300.00 |
CT | East Branch Trout Brook Culvert Replacements | EMB-2020-BR-001-0014 | Competitive | No | Not Selected | $5,085,450.37 | $6,780,600.50 |
CT | Implementing Stormwise Management at High-Potential Benefit Locations in Connecticut | EMB-2020-BR-001-0015 | Competitive | No | Not Selected | $7,270,268.00 | $9,697,390.00 |
CT | East Lyme Sewer Pump Station Flood Mitigation | EMB-2020-BR-001-0017 | Competitive | No | Not Selected | $249,000.00 | $332,000.00 |
CT | Linden Avenue Shoreline Stabilization | EMB-2020-BR-001-0002 | Competitive | No | Withdrawn | $2,071,250.81 | $2,761,667.75 |
CT | FY 2020 BRIC DESPP/DEMHS Management Costs | EMB-2020-BR-001-0021 | Management Cost | No | Selected for Further Review | $73,980.10 | $13,813,673.17 |
CT | CITY OF HARTFORD - FEMA BRIC SUBAPPLICATION | EMB-2020-BR-001-0004 | Allocation | No | Selected for Further Review | $8,100.00 | $10,800.00 |
CT | City of Meriden Harbor Brook Improvements - FY 2020 BRIC | EMB-2020-BR-001-0024 | Competitive | No | Ineligible | $6,701,250.00 | $8,935,000.00 |
CT | Old Waterbury Road BRIC Infrastructure Project | EMB-2020-BR-001-0001 | Competitive | No | Ineligible | $722,399.63 | $948,149.50 |
CT | Infrastructure Project | EMB-2020-BR-001-0008 | Competitive | No | Ineligible | $6,300,000.00 | $8,268,750.00 |
CT | Tree Hazard Mitigation Program | EMB-2020-BR-001-0010 | Allocation | No | Selected for Further Review | $111,999.30 | $147,000.00 |
CT | East Lyme Public Safety Building Generator Grant Request 2020 | EMB-2020-BR-001-0018 | Competitive | No | Not Selected | $168,574.08 | $221,966.58 |
CT | City of Norwich, Upper Falls Dam Removal Scoping and Concept Design - FY2020 BRIC | EMB-2020-BR-001-0023 | Allocation | No | Selected for Further Review | $44,100.00 | $58,800.00 |
CT | WPCF Flood Control Berm Mitigation | EMB-2020-BR-001-0019 | Competitive | No | Not Selected | $2,276,212.50 | $2,999,950.00 |
CT | City of New Haven Inland Flooding and Coastal Erosion Protection Project | EMB-2020-BR-001-0022 | Competitive | No | Not Selected | $24,384,394.41 | $32,512,525.88 |
CT | Mystic River Coastal Resilience Planning | EMB-2020-BR-001-0007 | Allocation | No | Ineligible | $217,500.00 | $290,000.00 |
CT | 835 North Greenbrier Drive Orange CT BRIC Application | EMB-2020-BR-001-0011 | Competitive | No | Not Selected | $211,000.00 | $278,000.00 |
CT | Southeastern Connecticut Council of Governments Multi-Jurisdiction Hazard Mitigation Plan Update | EMB-2020-BR-001-0012 | Allocation | No | Selected for Further Review | $149,963.25 | $199,951.00 |
CT | BRIC Stratford, CT Flood Protection Project - North and South of the Wastewater Treatment Plant | EMB-2020-BR-001-0005 | Competitive | No | Not Selected | $12,108,121.75 | $15,891,910.00 |
CT | City of West Haven WPCF Outfall Pipe Resilience Project | EMB-2020-BR-001-0026 | Competitive | No | Not Selected | $25,460,864.00 | $33,417,384.00 |
CT | Resilient Wastewater System Project Scoping | EMB-2020-BR-001-0025 | Allocation | No | Ineligible | $269,611.20 | $358,344.00 |
CT | Capitol Region Natural Hazards Mitigation Plan Update 2024-2029 | EMB-2020-BR-001-0013 | Allocation | No | Ineligible | $188,999.98 | $251,999.97 |
CT | Project Scoping for Hazard Mitigation | EMB-2020-BR-001-0009 | Allocation | No | Selected for Further Review | $112,500.00 | $150,000.00 |
CT | City of Stamford Coastal Flood Resiliency Plan - FY2020 BRIC | EMB-2020-BR-001-0006 | Allocation | No | Ineligible | $150,000.00 | $200,000.00 |
CT | Project Scoping - Langer Pond Dam | EMB-2020-BR-001-0016 | Allocation | No | Ineligible | $75,000.00 | $100,000.00 |
CT | South Central Region: Multi-Jurisdiction Hazard Mitigation Plan Update | EMB-2020-BR-001-0020 | Allocation | No | Selected for Further Review | $132,000.00 | $173,250.00 |
CT | BRIC | EMB-2020-BR-001-0003 | Competitive | No | Not Selected | $9,863,472.74 | $13,151,296.99 |
DC | Blue/Green Storm Water Flood Mitigation in Southwest Washington, DC | EMP-2020-BR-069-0003 | Competitive | No | Selected for Further Review | $18,612,178.00 | $24,781,584.00 |
DC | Saint Elizabeths Hospital Campus & DC Emergency Communications Microgrid Project | EMP-2020-BR-069-0002 | Competitive | No | Selected for Further Review | $19,948,639.00 | $26,514,837.00 |
DC | Project Scoping For Small Parks And Open Space For Mitigation Projects in Washington, DC | EMP-2020-BR-069-0004 | Allocation | No | Selected for Further Review | $187,500.00 | $247,500.00 |
DC | DC 2020 BRIC Management Costs | EMP-2020-BR-069-0006 | Management Cost | No | Selected for Further Review | $5,208,774.60 | $5,422,272.00 |
DC | DC Water Permanent Generators and Connections Project | EMP-2020-BR-069-0001 | Competitive | No | Ineligible | $1,579,882.24 | $2,134,976.00 |
DC | Project Scoping for Power Resilient Onsite Generation | EMP-2020-BR-069-0007 | Allocation | No | Selected for Further Review | $300,000.00 | $395,500.00 |
DC | Project Scoping for Stormwater Flood Mitigation in Resilience Focus Areas (RFA) in Washington, DC | EMP-2020-BR-069-0005 | Allocation | No | Selected for Further Review | $112,500.00 | $148,325.00 |
DE | Delaware State All-Hazard Mitigation Plan Update | EMP-2020-BR-074-0001 | Allocation | No | Selected for Further Review | $225,000.00 | $300,000.00 |
DE | Hyde Run Flood Hazard Mitigation at Oak Ridge Road | EMP-2020-BR-074-0004 | Competitive | No | Not Selected | $661,299.37 | $881,732.50 |
DE | Bayview Beach Elevation for 21.5 S. New Road and 36, 37, & 38 N New Road | EMP-2020-BR-074-0002 | Competitive | No | Not Selected | $565,500.00 | $754,000.00 |
DE | FY20 State Management Costs | EMP-2020-BR-074-0003 | Management Cost | No | Selected for Further Review | $30,000.00 | $100,000.00 |
FL | Data Center Generators | EMA-2020-BR-036-0002 | Tribal Set-aside | No | Ineligible | $275,625.00 | $367,500.00 |
FL | Public Works Generator Mitigation Project-Animal Care Protective Services (ACPS) | EMA-2020-BR-182-0013 | Allocation | No | Selected for Further Review | $270,938.01 | $361,250.68 |
FL | FY2020 - BRIC - Pasco County - Senior Center Generator | EMA-2020-BR-182-0009 | Allocation | No | Selected for Further Review | $196,875.00 | $262,500.00 |
FL | City of Tamarac Water Treatment Plant Hardening | EMA-2020-BR-182-0021 | Competitive | No | Not Selected | $725,905.50 | $967,874.00 |
FL | Miami-Dade County, FL: PHCD Ingram Terrace Comprehensive Residential Mitigation Project | EMA-2020-BR-182-0019 | Competitive | No | Not Selected | $587,948.24 | $794,632.03 |
FL | FY2020 - BRIC - Pasco County - Fasano Regional Shelter Hardening | EMA-2020-BR-182-0004 | Allocation | No | Selected for Further Review | $42,590.40 | $55,899.90 |
FL | BRIC - Pasco County - Green Key Drainage | EMA-2020-BR-182-0017 | Competitive | No | Not Selected | $1,113,093.21 | $1,460,934.85 |
FL | FY2020 - BRIC - Pasco County - Indigo Ln - Acquisition Demolition | EMA-2020-BR-182-0003 | Allocation | No | Selected for Further Review | $72,056.20 | $94,573.76 |
FL | FY2020-BRIC-Pasco County-Thomas Blvd Acquisition | EMA-2020-BR-182-0001 | Competitive | No | Not Selected | $162,019.75 | $212,651.00 |
FL | Charlotte County Leachate Plant Generator Project - LPGP | EMA-2020-BR-182-0020 | Competitive | No | Not Selected | $767,114.25 | $1,022,819.00 |
FL | Building Codes Capacity Building | EMA-2020-BR-036-0001 | Tribal Set-aside | No | Selected for Further Review | $42,285.49 | $56,380.66 |
FL | City of Homestead Power Grid Resiliency | EMA-2020-BR-182-0015 | Competitive | No | Not Selected | $3,905,550.75 | $5,207,401.00 |
FL | Miami-Dade County, FL: Countywide Continuity of Operations Energy Resilience Project | EMA-2020-BR-182-0016 | Competitive | No | Ineligible | $21,445,201.00 | $28,980,001.00 |
FL | City of Miami Beach Maurice Gibb Memorial Park Seawall Mitigation Project | EMA-2020-BR-182-0010 | Competitive | No | Ineligible | $1,534,074.19 | $2,045,432.26 |
FL | City of Panama City Emergency Response Center Codes Plus - FY2020 BRIC | EMA-2020-BR-182-0012 | Competitive | No | Not Selected | $784,898.67 | $1,030,188.23 |
FL | K-8 School Central Basin | EMA-2020-BR-182-0007 | Competitive | No | Not Selected | $3,951,000.00 | $5,268,000.00 |
FL | SFWMD Building Flood Resiliency at Critical Basins in South Florida: C-7 Basin | EMA-2020-BR-182-0014 | Competitive | No | Ineligible | $45,391,000.20 | $62,295,863.20 |
FL | Human Services Generator Project - BRIC | EMA-2020-BR-182-0005 | Competitive | No | Not Selected | $448,875.00 | $598,500.00 |
FL | Monroe County Twin Lakes Subdivision Road Mitigation Project | EMA-2020-BR-182-0008 | Competitive | No | Ineligible | $5,613,728.85 | $7,312,399.18 |
FL | SFWMD Building Flood Resiliency at Critical Basins in South Florida: C-9 Basin | EMA-2020-BR-182-0006 | Competitive | No | Ineligible | $48,305,049.46 | $64,824,136.20 |
FL | State of Florida BRIC Management Costs | EMA-2020-BR-182-0002 | Management Cost | No | Selected for Further Review | $77,422.43 | $19,537,036.13 |
FL | Monroe County Sands Subdivision Road Mitigation Project | EMA-2020-BR-182-0011 | Competitive | No | Withdrawn | $6,590,953.52 | $8,659,364.03 |
FL | City of Port St. Lucie Flood Control Structures - FY2020 BRIC | EMA-2020-BR-182-0018 | Competitive | No | Not Selected | $2,936,955.75 | $3,915,941.00 |
GA | An Innovative Hybrid Approach to Enhancing Future Flood Resiliency | EMA-2020-BR-001-0007 | Allocation | No | Ineligible | $235,803.00 | $314,404.00 |
GA | Wilkes County Hazard Mitigation Plan Update | EMA-2020-BR-001-0022 | Allocation | No | Selected for Further Review | $15,000.00 | $20,000.00 |
GA | Multi-county Hazus Analyses | EMA-2020-BR-001-0001 | Allocation | No | Selected for Further Review | $44,957.25 | $59,943.00 |
GA | Dougherty County Acquisition | EMA-2020-BR-001-0015 | Competitive | No | Not Selected | $338,987.25 | $451,983.00 |
GA | Cedartown Backup Generators | EMA-2020-BR-001-0018 | Competitive | No | Ineligible | $560,100.00 | $746,800.00 |
GA | Washington County Hazard Mitigation Plan Update | EMA-2020-BR-001-0012 | Allocation | No | Selected for Further Review | $15,000.00 | $20,000.00 |
GA | Mobile Home Parks Acquisition | EMA-2020-BR-001-0014 | Competitive | Yes | Not Selected | $609,106.50 | $676,785.00 |
GA | Greene County Hazard Mitigation Plan Update | EMA-2020-BR-001-0023 | Allocation | No | Selected for Further Review | $27,200.00 | $35,700.00 |
GA | City of Calhoun Generators | EMA-2020-BR-001-0011 | Competitive | No | Not Selected | $631,875.39 | $842,500.52 |
GA | City of Washington Generator Project | EMA-2020-BR-001-0004 | Allocation | No | Selected for Further Review | $148,324.50 | $197,766.00 |
GA | Dougherty County, GA - Safe Room Application | EMA-2020-BR-001-0016 | Competitive | No | Not Selected | $419,334.72 | $559,112.96 |
GA | Ivey GA, Water/Sewer System Resiliency | EMA-2020-BR-001-0009 | Competitive | Yes | Not Selected | $673,776.00 | $748,640.00 |
GA | Springfield Canal Improvements | EMA-2020-BR-001-0017 | Competitive | No | Not Selected | $10,500,000.00 | $14,000,000.00 |
GA | Lowndes County Emergency Backup Generator Project | EMA-2020-BR-001-0002 | Competitive | No | Not Selected | $198,262.50 | $264,350.00 |
GA | Coweta County Hazard Mitigation Plan Update | EMA-2020-BR-001-0010 | Allocation | No | Selected for Further Review | $32,000.00 | $42,000.00 |
GA | Gilmer County Hazard Mitigation Plan Update | EMA-2020-BR-001-0021 | Allocation | No | Selected for Further Review | $22,400.00 | $29,400.00 |
GA | Taylor County Hazard Mitigation Plan Update | EMA-2020-BR-001-0006 | Allocation | No | Selected for Further Review | $17,600.00 | $23,100.00 |
GA | 2020 BRIC Management Grant | EMA-2020-BR-001-0005 | Management Cost | No | Selected for Further Review | $60,481.60 | $1,194,885.00 |
GA | Eatonton Flooding Mitigation Feasibility Study for Affected Properties | EMA-2020-BR-001-0003 | Allocation | No | Selected for Further Review | $22,500.00 | $30,000.00 |
GA | 2020 DeKalb County Property Acquisitions | EMA-2020-BR-001-0013 | Competitive | No | Not Selected | $4,570,391.25 | $6,093,855.00 |
GA | Chattooga County Property Acquisition Grant | EMA-2020-BR-001-0020 | Allocation | No | Selected for Further Review | $39,305.25 | $52,407.00 |
GA | McIntosh County Hazard Mitigation Plan Update | EMA-2020-BR-001-0019 | Allocation | No | Selected for Further Review | $27,200.00 | $35,700.00 |
GA | Dawson County Hazard Mitigation Plan Update | EMA-2020-BR-001-0024 | Allocation | No | Selected for Further Review | $24,000.00 | $31,500.00 |
GA | Echols County Hazard Mitigation Plan Update | EMA-2020-BR-001-0008 | Allocation | No | Selected for Further Review | $20,800.00 | $27,300.00 |
GU | Namo - flood control & bank stabilization | EMF-2020-BR-149-0015 | Competitive | No | Not Selected | $348,224.18 | $436,590.00 |
GU | Agat - Finile Feasibility Study | EMF-2020-BR-149-0001 | Allocation | No | Selected for Further Review | $144,000.00 | $189,000.00 |
GU | Tumon Bay Lateral Underground Conversion | EMF-2020-BR-149-0005 | Competitive | No | Not Selected | $2,960,000.00 | $3,885,000.00 |
GU | Sergeant Frankie E. Smith Facility, FMA Project | EMF-2020-BR-149-0011 | Competitive | No | Not Selected | $160,000.00 | $210,000.00 |
GU | Port Authority of Guam Wharves Service Life Extension - Hardening of Wharves F1 - F6 | EMF-2020-BR-149-0010 | Competitive | No | Not Selected | $17,174,136.00 | $22,660,014.67 |
GU | Local Precincts, BRIC Project | EMF-2020-BR-149-0004 | Competitive | No | Not Selected | $160,000.00 | $210,000.00 |
GU | Manell - Restoring the Manell River's Natural Flowpath and Reforestation of the Manell Watershed | EMF-2020-BR-149-0007 | Competitive | No | Ineligible | $992,000.00 | $1,302,000.00 |
GU | GCC Building 600 Retrofit Project | EMF-2020-BR-149-0013 | Competitive | No | Not Selected | $1,054,895.93 | $1,384,550.90 |
GU | Underground Utility Infrastructure Relocation and Power Distribution | EMF-2020-BR-149-0006 | Competitive | No | Ineligible | $616,000.00 | $808,500.00 |
GU | Umatac - pre storm river maintenance & bank stabilization | EMF-2020-BR-149-0002 | Competitive | No | Not Selected | $617,601.60 | $810,602.10 |
GU | Guam 2020 Technical Assistance | EMF-2020-BR-149-0003 | Management Cost | No | Selected for Further Review | $67,473.57 | $3,320,254.83 |
GU | GHS/OCD Facility Hardening | EMF-2020-BR-149-0009 | Allocation | No | Selected for Further Review | $119,890.50 | $157,358.00 |
GU | Dededo Kaiser Secondary Hybrid Conversion | EMF-2020-BR-149-0012 | Competitive | No | Not Selected | $1,600,000.00 | $2,100,000.00 |
GU | DYA E-UNIT "Hardening putting Typhoon Shutters to windows, 169 San Isidro St. Mangilao, Guam 96923 | EMF-2020-BR-149-0008 | Allocation | No | Selected for Further Review | $10,670.33 | $13,377.73 |
GU | Update of the 2019 Guam Hazard Mitigation Plan | EMF-2020-BR-149-0014 | Allocation | No | Selected for Further Review | $240,000.00 | $315,000.00 |
HI | Pali Momi Medical Center Emergency Generator System Improvements | EMF-2020-BR-143-0016 | Competitive | No | Not Selected | $4,590,000.00 | $6,240,000.00 |
HI | Hawaii State Energy Office - 3 Microgrids - Oahu - FY2020 BRIC | EMF-2020-BR-143-0010 | Competitive | No | Not Selected | $6,080,763.00 | $7,981,001.44 |
HI | State of Hawaii Emergency Operations Center Hardening and Modernization | EMF-2020-BR-143-0012 | Competitive | No | Ineligible | $50,000,000.00 | $106,050,000.00 |
HI | Honolulu Harbor Microgrid at FTZ9 - FY2020 BRIC | EMF-2020-BR-143-0006 | Competitive | No | Not Selected | $937,500.00 | $1,250,000.00 |
HI | Honolulu Board of Water Supply Emergency Power Master Plan | EMF-2020-BR-143-0017 | Allocation | No | Selected for Further Review | $75,000.00 | $100,000.00 |
HI | Kahana Bay Erosion Mitigation, Maui, Hawaii | EMF-2020-BR-143-0004 | Competitive | No | Not Selected | $18,034,801.50 | $24,046,402.00 |
HI | Hawaii Safe Home Hurricane Wind Retrofit Program | EMF-2020-BR-143-0013 | Competitive | No | Not Selected | $326,817.00 | $460,317.00 |
HI | Beach Restoration at Napili Bay, Maui (Hawaii), a Nature-Based Approach to Community Resilience | EMF-2020-BR-143-0002 | Competitive | No | Ineligible | $2,628,318.75 | $3,304,425.00 |
HI | Microgrid at Kaimuki Middle School and Capacity Building | EMF-2020-BR-143-0009 | Allocation | No | Selected for Further Review | $375,000.00 | $500,000.00 |
HI | Project Scoping - Options for Sea-Level Rise | EMF-2020-BR-143-0008 | Allocation | No | Selected for Further Review | $150,000.00 | $200,000.00 |
HI | Removal and Replacement of Underground Storage Tanks (UST) at HFD Fire Stations | EMF-2020-BR-143-0014 | Competitive | No | Not Selected | $1,425,000.00 | $1,900,000.00 |
HI | Koʻolauloa Resilience Hub and Community Safe Room | EMF-2020-BR-143-0011 | Competitive | No | Not Selected | $20,435,198.37 | $27,246,931.16 |
HI | Wailuku Wastewater Pump Station Modifications | EMF-2020-BR-143-0003 | Competitive | No | Not Selected | $4,612,500.00 | $6,150,000.00 |
HI | West Hawaii Fire Infrastructure | EMF-2020-BR-143-0015 | Competitive | No | Not Selected | $249,999.75 | $333,333.00 |
HI | City Building Code Update and BCEGS | EMF-2020-BR-143-0005 | Competitive | No | Not Selected | $262,495.91 | $349,994.54 |
HI | Resiliency - King Kalakaua Building (DCCA) | EMF-2020-BR-143-0001 | Competitive | No | Not Selected | $7,162,500.00 | $9,550,000.00 |
HI | State of Hawaii Management Costs | EMF-2020-BR-143-0007 | Management Cost | No | Selected for Further Review | $80,000.00 | $6,962,000.00 |
IA | Scott County Multi-jurisdictional Hazard Mitigation Plan Update | EMK-2020-BR-010-0003 | Allocation | No | Selected for Further Review | $22,500.00 | $40,000.00 |
IA | Cedar Rapids: Basin & Sewer Flood Mitigation | EMK-2020-BR-010-0002 | Competitive | No | Not Selected | $2,578,237.50 | $3,437,650.00 |
IA | Administration Building Generator | EMK-2020-BR-010-0015 | Competitive | No | Not Selected | $407,602.50 | $543,470.00 |
IA | Back up Generator | EMK-2020-BR-010-0007 | Allocation | Yes | Selected for Further Review | $57,048.00 | $63,327.00 |
IA | Iowa Storm Water Management Manual Capability- and Capacity-Building Standards | EMK-2020-BR-010-0009 | Allocation | No | Selected for Further Review | $37,500.00 | $50,000.00 |
IA | FY 2020 BRIC Recipient Management Cost | EMK-2020-BR-010-0011 | Management Cost | No | Selected for Further Review | $38,585.27 | $1,089,329.00 |
IA | Generator FY 2020 BRIC | EMK-2020-BR-010-0013 | Allocation | No | Selected for Further Review | $52,500.00 | $70,000.00 |
IA | City of Marathon generator city emergency command | EMK-2020-BR-010-0005 | Allocation | No | Selected for Further Review | $41,838.75 | $55,588.75 |
IA | City of Royal Generator Application | EMK-2020-BR-010-0014 | Allocation | Yes | Selected for Further Review | $35,070.00 | $38,820.00 |
IA | City of Millersburg Community Shelter/City Building Generator | EMK-2020-BR-010-0010 | Allocation | No | Selected for Further Review | $10,288.88 | $13,504.90 |
IA | Buena Vista County Multi-jurisdictional Hazard Mitigation Plan Update | EMK-2020-BR-010-0012 | Allocation | No | Selected for Further Review | $22,500.00 | $30,000.00 |
IA | Iowa County English River F67 Bridge Flood Mitigation 2020 BRIC | EMK-2020-BR-010-0016 | Competitive | No | Not Selected | $956,870.90 | $1,350,654.90 |
IA | 2021 City of Dyersville Project Scoping BRIC | EMK-2020-BR-010-0001 | Allocation | No | Ineligible | $187,500.00 | $250,000.00 |
IA | Prairie Energy Cooperative - 2020 BRIC Overhead Strengthening | EMK-2020-BR-010-0017 | Competitive | No | Not Selected | $1,342,875.00 | $1,790,500.00 |
IA | Cherokee Lift Station Relocation | EMK-2020-BR-010-0006 | Competitive | No | Not Selected | $2,133,737.50 | $2,841,650.00 |
IA | City of Martelle Pump House Generator | EMK-2020-BR-010-0004 | Allocation | No | Selected for Further Review | $18,627.00 | $24,612.00 |
IA | Washington County - Dogwood Ave Flood Mitigation Project | EMK-2020-BR-010-0008 | Competitive | No | Withdrawn | $222,732.75 | $293,517.00 |
ID | Idaho Falls Wastewater Lift-Station Emergency Back-up Generators | EMS-2020-BR-001-0005 | Competitive | No | Not Selected | $1,236,386.25 | $1,648,515.00 |
ID | LREC Powerpole Wildfire Mitigation Project | EMS-2020-BR-001-0014 | Allocation | Yes | Selected for Further Review | $64,980.16 | $72,200.18 |
ID | 2020 BRIC IOEM Management Costs | EMS-2020-BR-001-0013 | Management Cost | No | Selected for Further Review | $78,310.02 | $112,924.54 |
ID | S Flat Iron Road Culvert | EMS-2020-BR-001-0012 | Allocation | No | Selected for Further Review | $150,000.00 | $200,000.00 |
ID | Teton Creek Flood Mitigation | EMS-2020-BR-001-0003 | Competitive | No | Not Selected | $2,100,000.00 | $2,800,000.00 |
ID | All Hazards Mitigation Plan Update | EMS-2020-BR-001-0006 | Allocation | No | Selected for Further Review | $23,175.00 | $30,900.00 |
ID | South Tom Beall Road Protection | EMS-2020-BR-001-0002 | Competitive | No | Not Selected | $192,750.00 | $257,000.00 |
ID | Powerline Conversion to Underground - Farragut State Park / US Naval Warfare Center | EMS-2020-BR-001-0008 | Competitive | No | Not Selected | $6,610,528.82 | $8,814,038.43 |
ID | Power line Conversion to Underground - Spirit Lake East Subdivision | EMS-2020-BR-001-0001 | Competitive | No | Not Selected | $5,943,120.79 | $8,833,413.78 |
ID | Big Canyon Reforestation | EMS-2020-BR-001-0007 | Allocation | No | Selected for Further Review | $187,500.00 | $250,000.00 |
ID | City of Meridian, ID- 9-Mile Creek Flood Hazard Mitigation Project | EMS-2020-BR-001-0009 | Competitive | No | Not Selected | $2,903,326.00 | $4,032,313.00 |
ID | Project scoping, Cassia County RRHD - Culvert Upsizing | EMS-2020-BR-001-0011 | Allocation | No | Selected for Further Review | $75,000.00 | $100,000.00 |
ID | Powerline Conversion to Underground - Hayden Lake î€ | EMS-2020-BR-001-0010 | Competitive | No | Not Selected | $8,412,365.86 | $11,216,487.81 |
ID | State of Idaho Hazard Mitigation Plan Update | EMS-2020-BR-001-0004 | Allocation | No | Selected for Further Review | $97,500.00 | $130,000.00 |
IL | 7321-7337 South Shore Drive, Chicago, IL - Detached Breakwater Construction | EMC-2020-BR-160-0018 | Competitive | Yes | Not Selected | $851,250.00 | $1,135,000.00 |
IL | Natural Stormwater Detention System at 111th St. & Lavergne Ave. | EMC-2020-BR-160-0001 | Competitive | No | Not Selected | $2,903,076.00 | $3,870,768.00 |
IL | City of Chicago C&CB: Building Code Adoption and Enforcement - FY2020 BRIC | EMC-2020-BR-160-0006 | Competitive | No | Ineligible | $214,000.00 | $289,000.00 |
IL | City of Des Plaines Fire Station #61 Relocation | EMC-2020-BR-160-0010 | Competitive | No | Ineligible | $3,574,500.00 | $4,766,000.00 |
IL | Village of Lakewood FY20 BRIC Subapplication | EMC-2020-BR-160-0028 | Competitive | No | Ineligible | $450,000.00 | $600,000.00 |
IL | Downers Grove - Curtiss and Glenview Drainage Improvement Project - FY2020 BRIC | EMC-2020-BR-160-0002 | Competitive | No | Not Selected | $328,395.75 | $437,861.00 |
IL | City of Peru Water Street Electric Substation Relocation FY2020 BRIC | EMC-2020-BR-160-0012 | Competitive | No | Not Selected | $4,968,616.44 | $7,098,023.48 |
IL | 2023 State Multihazard Mitigation Plan | EMC-2020-BR-160-0015 | Allocation | No | Selected for Further Review | $225,000.00 | $300,000.00 |
IL | BRIC Subapplication Mitigation Hazard | EMC-2020-BR-160-0025 | Competitive | Yes | Not Selected | $20,620,673.28 | $22,911,859.20 |
IL | BRIC | EMC-2020-BR-160-0020 | Competitive | No | Not Selected | $6,949,500.00 | $9,266,000.00 |
IL | Brentwood Stormsewer Improvements | EMC-2020-BR-160-0013 | Competitive | No | Not Selected | $1,904,347.69 | $2,539,130.25 |
IL | Amboy FPD Fire Department Relocation | EMC-2020-BR-160-0011 | Competitive | No | Ineligible | $2,250,000.00 | $3,000,000.00 |
IL | City of Chicago-71st Street to 75th Street Shoreline Feasibility Study | EMC-2020-BR-160-0004 | Competitive | No | Ineligible | $1,125,000.00 | $1,500,000.00 |
IL | Winnebago Road Infrastructure Improvements | EMC-2020-BR-160-0026 | Allocation | No | Selected for Further Review | $375,000.00 | $500,000.00 |
IL | Project scoping for new building ,renovations and demolition of GR | EMC-2020-BR-160-0029 | Competitive | No | Ineligible | $2,757,906.00 | $3,677,208.00 |
IL | GPSD Levee Improvement & Certification Project | EMC-2020-BR-160-0023 | Competitive | No | Not Selected | $3,662,391.00 | $4,883,188.00 |
IL | Addison Creek Channel Improvements Project MWRD 2 | EMC-2020-BR-160-0003 | Competitive | No | Not Selected | $33,951,618.82 | $45,268,825.09 |
IL | Drainage Improvements in Elmhurst, Illinois | EMC-2020-BR-160-0009 | Competitive | No | Not Selected | $2,001,431.25 | $2,668,575.00 |
IL | Jersey County Buyout & Acquisition FY20 BRIC | EMC-2020-BR-160-0024 | Competitive | No | Not Selected | $458,484.62 | $611,312.82 |
IL | Roscoe Road Infrastructure Improvements | EMC-2020-BR-160-0021 | Competitive | No | Not Selected | $2,025,000.00 | $2,700,000.00 |
IL | City of Watseka Acquisition and Demolition Project 2021 | EMC-2020-BR-160-0007 | Competitive | No | Not Selected | $3,554,077.50 | $4,931,598.00 |
IL | MWRD Ford Heights Buyout/Riparian Restoration Project | EMC-2020-BR-160-0027 | Competitive | No | Not Selected | $8,466,606.00 | $11,288,808.00 |
IL | 2020_ChicagoDWM_Regional SolutionsProjectScoping | EMC-2020-BR-160-0014 | Competitive | No | Ineligible | $300,000.00 | $400,000.00 |
IL | bric project | EMC-2020-BR-160-0008 | Competitive | Yes | Ineligible | $3,080,465.10 | $3,422,739.00 |
IL | City of Freeport BRIC Acquisition/Demolition Project | EMC-2020-BR-160-0017 | Competitive | No | Not Selected | $2,347,365.00 | $3,129,820.00 |
IL | Sheridan Road Revetment | EMC-2020-BR-160-0022 | Competitive | No | Not Selected | $3,915,000.00 | $5,220,000.00 |
IL | BRIC FY2020 - State Management Costs | EMC-2020-BR-160-0019 | Management Cost | No | Selected for Further Review | $80,000.00 | $14,967,450.98 |
IL | Harwood Heights Flood Mitigation Project | EMC-2020-BR-160-0005 | Competitive | No | Not Selected | $1,134,634.25 | $1,646,179.00 |
IL | Village of Crestwood Storm Sewer Upgrades - FY2020 BRIC | EMC-2020-BR-160-0016 | Competitive | No | Ineligible | $1,209,461.25 | $1,612,615.00 |
IN | Fort Wayne, IN - Thieme Drive Flood System - FY2020 BRIC | EMC-2020-BR-038-0010 | Competitive | No | Not Selected | $1,566,685.75 | $2,238,122.50 |
IN | Fort Wayne, IN - Foster Park Stormwater Pump Station - FY2020 BRIC | EMC-2020-BR-038-0007 | Competitive | No | Not Selected | $6,334,510.00 | $9,049,300.00 |
IN | Indiana Dept. of Homeland Security BRIC SMC application | EMC-2020-BR-038-0002 | Management Cost | No | Selected for Further Review | $79,413.32 | $242,880.65 |
IN | IDHS Building Code Adoption and Enforcement Activities | EMC-2020-BR-038-0003 | Allocation | No | Selected for Further Review | $299,337.00 | $399,116.00 |
IN | Nashville Utilities | EMC-2020-BR-038-0009 | Competitive | No | Ineligible | $4,125,000.00 | $5,500,000.00 |
IN | City of Indianapolis Rocky Ripple Flood Damage Risk Reduction Project - FY2020 BRIC | EMC-2020-BR-038-0001 | Competitive | No | Not Selected | $48,499,248.87 | $69,284,641.25 |
IN | Indiana County MHMP Updates - BRIC 20 | EMC-2020-BR-038-0005 | Allocation | No | Selected for Further Review | $296,262.90 | $395,017.20 |
IN | Flood Mitigation Study of Salamonie River Montpelier | EMC-2020-BR-038-0004 | Competitive | No | Ineligible | $63,750.00 | $85,000.00 |
IN | Crawford County Community School Corporation Safe Room | EMC-2020-BR-038-0008 | Competitive | No | Not Selected | $5,893,661.25 | $7,858,215.00 |
IN | Sugar Creek Acquisition Project | EMC-2020-BR-038-0006 | Competitive | No | Not Selected | $450,840.00 | $601,120.00 |
KS | River Road Bank Stabilization | EMK-2020-BR-038-0005 | Allocation | No | Selected for Further Review | $480,375.00 | $640,500.00 |
KS | Storm Shelter | EMK-2020-BR-038-0002 | Competitive | No | Not Selected | $120,000.00 | $160,000.00 |
KS | Tribal Mitigation Plan Update 2020 | EMK-2020-BR-009-0001 | Tribal Set-aside | No | Selected for Further Review | $26,790.40 | $38,288.64 |
KS | Geary County EOC- Hardened Rooms | EMK-2020-BR-038-0003 | Allocation | No | Selected for Further Review | $111,000.00 | $148,000.00 |
KS | USD 461 Multi-use Community FEMA Shelter in Neodesha, KS 2020 | EMK-2020-BR-038-0001 | Competitive | Yes | Not Selected | $1,800,000.00 | $2,000,000.00 |
KS | State of Kansas Management Costs | EMK-2020-BR-038-0004 | Management Cost | No | Selected for Further Review | $78,850.00 | $60,000.00 |
KY | Smithland Flood Safety Barrier Project | EMA-2020-BR-002-0005 | Competitive | Yes | Not Selected | $1,419,871.44 | $1,569,331.60 |
KY | MSWS Water Main Stabilization Project | EMA-2020-BR-002-0008 | Competitive | No | Not Selected | $90,000.00 | $120,000.00 |
KY | Commonwealth of Kentucky Enhanced Hazard Mitigation Plan Update 2023 | EMA-2020-BR-002-0010 | Allocation | No | Selected for Further Review | $300,000.00 | $400,000.00 |
KY | MSWS Greenbrier Spillway Project | EMA-2020-BR-002-0007 | Competitive | No | Not Selected | $63,750.00 | $85,000.00 |
KY | BRIC 2020 KY Management Costs | EMA-2020-BR-002-0002 | Management Cost | No | Selected for Further Review | $1,477,019.93 | $2,837,552.00 |
KY | Frankfort Mero Flood Pump Station Renewal and Mero Sanitary Pump Station Relocation - BRIC | EMA-2020-BR-002-0009 | Competitive | No | Selected for Further Review | $10,543,961.38 | $13,970,199.31 |
KY | MUPB Intake Relocation Project | EMA-2020-BR-002-0001 | Competitive | No | Not Selected | $4,212,750.00 | $5,617,000.00 |
KY | LFUCG Building Inspection And Code Enforcement Accreditation | EMA-2020-BR-002-0012 | Allocation | No | Selected for Further Review | $11,775.00 | $15,700.00 |
KY | MUPB Stormwater Project | EMA-2020-BR-002-0011 | Competitive | No | Ineligible | $333,750.00 | $445,000.00 |
KY | Henon Lane Detention Basin Expansion | EMA-2020-BR-002-0006 | Allocation | No | Selected for Further Review | $37,500.00 | $50,000.00 |
KY | Paddy's Flood Pump Station Project | EMA-2020-BR-002-0013 | Competitive | No | Not Selected | $50,000,000.00 | $76,933,100.00 |
KY | Regional Energy Resilience Mitigation Project Scoping | EMA-2020-BR-002-0004 | Allocation | No | Selected for Further Review | $213,225.00 | $284,300.00 |
KY | Covington Ridge Detention Basin Expansion Study | EMA-2020-BR-002-0003 | Allocation | No | Selected for Further Review | $37,500.00 | $50,000.00 |
LA | Entergy Louisiana Substation Flood Protection | EMT-2020-BR-101-0004 | Competitive | No | Not Selected | $29,607,558.00 | $39,476,744.00 |
LA | Tangipahoa Parish Government BRIC FY20 Early Warning and Rain Gauges | EMT-2020-BR-101-0013 | Competitive | No | Ineligible | $1,163,693.50 | $1,527,348.00 |
LA | FY2020 BRIC DPS06 Audubon Golf Course Community Flood Mitigation Project | EMT-2020-BR-101-0022 | Competitive | No | Not Selected | $9,802,553.40 | $13,070,071.20 |
LA | Terrebonne Parish 2020 BRIC Ashland CJC Flood Control and Resiliency Project | EMT-2020-BR-101-0003 | Competitive | No | Not Selected | $752,871.97 | $1,003,829.29 |
LA | Louisiana Wireless Information Network Critical Infrastructure Resilience Through Redundant Power | EMT-2020-BR-101-0024 | Competitive | No | Not Selected | $1,774,513.20 | $2,366,017.60 |
LA | Town of Vidalia Wastewater Improvements FY2020 BRIC | EMT-2020-BR-101-0002 | Competitive | No | Not Selected | $3,285,261.00 | $4,380,348.00 |
LA | Jeff Parish Helios Sewer Generator | EMT-2020-BR-101-0028 | Competitive | No | Not Selected | $1,126,799.10 | $1,502,398.80 |
LA | Developing a Framework for Coordinated Resilience Planning in the State of Louisiana | EMT-2020-BR-101-0011 | Allocation | No | Ineligible | $300,000.00 | $400,000.00 |
LA | LUMCON Roof Retrofit | EMT-2020-BR-101-0015 | Competitive | No | Not Selected | $1,415,638.25 | $1,867,001.00 |
LA | SJBP Channelization and Drainage Improvement | EMT-2020-BR-101-0025 | Competitive | No | Not Selected | $2,131,775.45 | $2,798,125.60 |
LA | Terrebonne Parish 2020 BRIC Lirette Street Drainage Improvement Project | EMT-2020-BR-101-0018 | Competitive | No | Not Selected | $825,960.43 | $1,101,280.58 |
LA | TPCG BRIC 2020 Oysterbed Living Shoreline Protection Program | EMT-2020-BR-101-0027 | Competitive | No | Ineligible | $1,466,475.00 | $1,955,300.00 |
LA | Jeff Parish Bucktown Drainage Improvements | EMT-2020-BR-101-0009 | Competitive | No | Not Selected | $5,698,314.00 | $7,597,752.00 |
LA | LCG - Comprehensive Stormwater Plan | EMT-2020-BR-101-0014 | Allocation | No | Ineligible | $300,000.00 | $600,000.00 |
LA | Washington Parish Safe Room | EMT-2020-BR-101-0021 | Competitive | No | Not Selected | $1,118,993.25 | $1,491,991.00 |
LA | 2021 SWBNO Power Reliability Projects | EMT-2020-BR-101-0008 | Competitive | No | Not Selected | $45,990,000.00 | $63,000,000.00 |
LA | Lafourche Parish 2020 BRIC Elevation Project | EMT-2020-BR-101-0007 | Competitive | No | Ineligible | $482,333.25 | $643,111.00 |
LA | Stormwater Master Plan for the City of Slidell, Louisiana | EMT-2020-BR-101-0019 | Allocation | No | Selected for Further Review | $300,000.00 | $400,000.00 |
LA | GOHSEP BRIC SMC FY2020 Application | EMT-2020-BR-101-0012 | Management Cost | No | Selected for Further Review | $74,700.00 | $4,431,906.00 |
LA | Calcasieu Parish Sheriff's Office Safe Rooms | EMT-2020-BR-101-0023 | Competitive | No | Not Selected | $3,046,534.50 | $4,062,046.00 |
LA | 2021 SWBNO Power Resiliency and Sustainability Studies | EMT-2020-BR-101-0010 | Allocation | No | Ineligible | $637,500.00 | $1,050,000.00 |
LA | Jeff Parish Bucktown Marsh Creation & Living Shoreline - Community Flood Mitigation | EMT-2020-BR-101-0029 | Competitive | No | Ineligible | $4,338,400.00 | $10,838,400.00 |
LA | LWIN Critical Communication T-1 Migration for Resiliency and Sustainability | EMT-2020-BR-101-0016 | Competitive | No | Ineligible | $1,724,677.50 | $2,299,570.00 |
LA | Project Scoping for Jeff Parish Bucktown Green Infrastructure | EMT-2020-BR-101-0005 | Allocation | No | Selected for Further Review | $187,500.00 | $250,000.00 |
LA | Terrebonne Parish 2020 BRIC Elevation Project | EMT-2020-BR-101-0020 | Competitive | No | Not Selected | $433,271.25 | $577,695.00 |
LA | '20 BRIC - N. Vermilion Regional Detention Pond | EMT-2020-BR-101-0017 | Allocation | No | Ineligible | $280,500.00 | $374,000.00 |
LA | St. Tammany Parish Generators for Water Systems | EMT-2020-BR-101-0006 | Competitive | No | Not Selected | $603,585.00 | $804,780.00 |
LA | Calcasieu Drainage Pump Stations: Project Scoping for Redundant Communications System | EMT-2020-BR-101-0026 | Allocation | No | Selected for Further Review | $72,750.00 | $97,000.00 |
LA | '20 BRIC - Vermilion Parish EOC/911 Communications District Multi-Purpose Safe Room | EMT-2020-BR-101-0001 | Allocation | No | Ineligible | $397,443.75 | $529,925.00 |
MA | Reed Street Outfall Project | EMB-2020-BR-002-0020 | Competitive | No | Not Selected | $237,187.50 | $316,250.00 |
MA | Boxford Willow Road Culvert Replacement | EMB-2020-BR-002-0007 | Competitive | No | Not Selected | $378,384.37 | $504,512.50 |
MA | Blue Line/Lewis Street East Boston Flood Mitigation Project | EMB-2020-BR-002-0032 | Competitive | No | Not Selected | $3,076,751.00 | $4,045,199.00 |
MA | Town of Provincetown Ryder Street Flood Mitigation Project | EMB-2020-BR-002-0017 | Competitive | No | Not Selected | $2,156,240.00 | $2,830,065.00 |
MA | Haskell Pond Dam Design Storm and Seismic Improvements | EMB-2020-BR-002-0013 | Competitive | No | Not Selected | $4,991,276.46 | $6,551,701.46 |
MA | Station Road Bridge Upgrade | EMB-2020-BR-002-0004 | Competitive | No | Ineligible | $1,367,250.00 | $1,823,000.00 |
MA | Emergency Backup Generators | EMB-2020-BR-002-0031 | Competitive | No | Not Selected | $108,190.57 | $144,254.09 |
MA | Salem MA, Sewer Pipe Relocation Project | EMB-2020-BR-002-0019 | Competitive | No | Ineligible | $6,309,014.66 | $8,412,019.54 |
MA | Building Code Study & Action Guide: Strategies to Increase Local & State Flood Resilience Standards | EMB-2020-BR-002-0015 | Allocation | No | Selected for Further Review | $98,250.00 | $139,917.00 |
MA | Ipswich Town Wharf Sewer Pump Station Relocation Flood Mitigation Project | EMB-2020-BR-002-0003 | Competitive | No | Not Selected | $10,837,575.00 | $14,450,100.00 |
MA | Central Street Bridge Improvements and Sawmill Brook Restoration, Culvert Retrofit & Restoration | EMB-2020-BR-002-0025 | Competitive | No | Selected for Further Review | $4,484,673.00 | $5,979,564.00 |
MA | Princeton Hazard Mitigation and Resiliency Plan Update (use this one) | EMB-2020-BR-002-0016 | Allocation | No | Selected for Further Review | $5,850.00 | $7,800.00 |
MA | Harvard MA Town Hall Emergency Generator | EMB-2020-BR-002-0014 | Competitive | No | Not Selected | $56,700.00 | $75,600.00 |
MA | Pinrock Road Sewer Pump Station Bypass Pump Quick Connect Retrofit | EMB-2020-BR-002-0027 | Competitive | No | Not Selected | $189,000.00 | $252,000.00 |
MA | Cedar Pond Outlet Structure Modification | EMB-2020-BR-002-0005 | Allocation | No | Selected for Further Review | $71,000.00 | $96,000.00 |
MA | Wellfleet DPW Emergency Generator | EMB-2020-BR-002-0001 | Competitive | No | Not Selected | $100,170.00 | $133,560.00 |
MA | Hazard Mitigation Plan Update 2020 | EMB-2020-BR-002-0010 | Allocation | No | Selected for Further Review | $13,350.00 | $19,000.00 |
MA | Hazard Mitigation Plan Update | EMB-2020-BR-002-0029 | Allocation | No | Selected for Further Review | $13,350.00 | $19,500.00 |
MA | Town of Holliston Mitigation Plan 2021 Update | EMB-2020-BR-002-0011 | Allocation | No | Selected for Further Review | $13,350.00 | $19,500.00 |
MA | City of Everett Island End River Flood Resiliency Project | EMB-2020-BR-002-0006 | Allocation | No | Selected for Further Review | $131,250.00 | $224,250.00 |
MA | Union Square Stormwater Mitigation Program | EMB-2020-BR-002-0008 | Competitive | No | Not Selected | $43,422,594.15 | $57,631,467.40 |
MA | Hopkinton MA Evaluation and Conceptual Design of Stream Crossings with Flooding Issues | EMB-2020-BR-002-0009 | Allocation | No | Selected for Further Review | $57,468.75 | $76,625.00 |
MA | Merrimack Valley Region Multijurisdictional Planning Grant | EMB-2020-BR-002-0018 | Allocation | No | Selected for Further Review | $63,750.00 | $85,000.00 |
MA | Old Colony Multi-Jurisdictional Hazard Mitigation Plan - FY20 BRIC | EMB-2020-BR-002-0012 | Allocation | No | Selected for Further Review | $50,000.00 | $70,000.00 |
MA | Town of Norfolk Hazard Mitigation Plan Update | EMB-2020-BR-002-0028 | Allocation | No | Selected for Further Review | $13,350.00 | $17,800.00 |
MA | BRIC 2020 State Management Cost | EMB-2020-BR-002-0023 | Management Cost | No | Selected for Further Review | $685,754.60 | $1,550,000.00 |
MA | Maynard, MA - Local Hazard Mitigation Plan (Update) | EMB-2020-BR-002-0002 | Allocation | No | Selected for Further Review | $13,350.00 | $26,090.00 |
MA | City of Cambridge Hazard Mitigation Plan | EMB-2020-BR-002-0021 | Allocation | No | Selected for Further Review | $13,350.00 | $20,000.00 |
MA | Town of Wareham - Resiliency Improvements at Narrows, Hynes and Cohasset Narrows Sewer Pump Stations | EMB-2020-BR-002-0022 | Competitive | No | Not Selected | $1,760,000.00 | $2,310,000.00 |
MA | Sewer Pump Station Flood Impact Evaluation | EMB-2020-BR-002-0024 | Allocation | No | Selected for Further Review | $42,290.25 | $56,500.00 |
MA | Resilience Improvements in the Meadow Brook Corridor | EMB-2020-BR-002-0026 | Competitive | No | Not Selected | $1,209,072.36 | $1,587,032.48 |
MA | Merrimac MA, Mill Street Culvert | EMB-2020-BR-002-0030 | Competitive | No | Not Selected | $492,215.49 | $656,287.31 |
MA | MWT BRIC MIT Hazards: Management Costs REV | EMB-2020-BR-124-0002 | Management Cost | Yes | Selected for Further Review | $51,000.00 | $54,000.00 |
MA | MWT BRIC MIT Hazards: Project | EMB-2020-BR-124-0001 | Tribal Set-aside | Yes | Selected for Further Review | $459,000.00 | $510,000.00 |
MA | MWT BRIC MIT Hazards: Plan | EMB-2020-BR-124-0003 | Tribal Set-aside | Yes | Ineligible | $27,000.00 | $30,000.00 |
MD | Wheaton Branch Flood Mitigation project | EMP-2020-BR-005-0006 | Competitive | No | Not Selected | $1,749,638.32 | $2,332,851.10 |
MD | 12186 Laramie Lane Acquisition & Demolition | EMP-2020-BR-005-0018 | Competitive | No | Not Selected | $280,284.75 | $373,713.00 |
MD | 3610 Bay View Drive Acquisition & Demolition | EMP-2020-BR-005-0008 | Competitive | No | Not Selected | $474,468.75 | $632,625.00 |
MD | Middle Branch Resiliency Initiative - Stage I FINAL | EMP-2020-BR-005-0005 | Competitive | No | Selected for Further Review | $31,924,193.00 | $47,139,468.00 |
MD | Somerset County Hazard Mitigation Plan Update | EMP-2020-BR-005-0012 | Allocation | No | Selected for Further Review | $30,000.00 | $40,000.00 |
MD | Easton Utilities, Maryland Windmill Sewage Pumping Station Replacement & Windmill Forcemain Upgrade | EMP-2020-BR-005-0020 | Competitive | No | Ineligible | $3,324,303.75 | $4,432,405.00 |
MD | Anne Arundel County Sawmill Creek Tributaries Stream Restoration | EMP-2020-BR-005-0014 | Competitive | No | Ineligible | $3,356,957.37 | $8,439,129.46 |
MD | City of Cambridge MD Sewer System Hardening for Resilience to All Hazards | EMP-2020-BR-005-0022 | Competitive | No | Ineligible | $3,860,850.00 | $5,147,800.00 |
MD | St. George Island Living Shoreline and Wetland Restoration Project along MD 249 | EMP-2020-BR-005-0019 | Allocation | No | Selected for Further Review | $141,894.75 | $235,000.00 |
MD | Baltimore City 2023 Hazard Mitigation Plan Update | EMP-2020-BR-005-0015 | Allocation | No | Selected for Further Review | $83,400.00 | $116,125.00 |
MD | MEMA State Management Cost - BRIC | EMP-2020-BR-005-0013 | Management Cost | No | Selected for Further Review | $4,799,020.00 | $7,037,974.40 |
MD | Calvert County 2023 HMP Update | EMP-2020-BR-005-0004 | Allocation | No | Selected for Further Review | $29,540.25 | $39,387.00 |
MD | FY20 BRIC City of Annapolis Hazard Mitigation Plan Update | EMP-2020-BR-005-0003 | Allocation | No | Selected for Further Review | $37,500.00 | $50,000.00 |
MD | Deep Creek VFD Generator Project-FY2020 BRIC | EMP-2020-BR-005-0007 | Competitive | No | Not Selected | $43,815.00 | $58,420.00 |
MD | Garrett County Hazard Mitigation Plan Update- BRIC FY2021 | EMP-2020-BR-005-0010 | Allocation | No | Selected for Further Review | $16,852.50 | $22,470.00 |
MD | Anne Arundel County Fire Station Generator Replacement Project | EMP-2020-BR-005-0011 | Competitive | No | Not Selected | $352,500.00 | $470,000.00 |
MD | Eastern Garrett VFD Generator- FY2020 BRIC | EMP-2020-BR-005-0001 | Competitive | No | Not Selected | $42,375.00 | $56,500.00 |
MD | Dorchester County, MD - 2007 Farm Creek Rd, Wingate Structure Elevation - Shields Residence | EMP-2020-BR-005-0016 | Competitive | Yes | Not Selected | $112,915.17 | $125,461.30 |
MD | City of Hyattsville MD: Nature-Based Solution Project | EMP-2020-BR-005-0021 | Competitive | No | Not Selected | $174,368.52 | $232,491.36 |
MD | 9333 Bay Ave North Beach Elevation | EMP-2020-BR-005-0017 | Competitive | No | Not Selected | $66,112.50 | $88,150.00 |
MD | 2022 Prince George's Hazard Mitigation Plan Update | EMP-2020-BR-005-0023 | Allocation | No | Selected for Further Review | $50,812.50 | $67,750.00 |
MD | Ocean City Maryland Hazard Mitigation Plan Update | EMP-2020-BR-005-0009 | Allocation | No | Selected for Further Review | $22,500.00 | $30,000.00 |
MD | Anne Arundel County Roadway Vulnerability Assessment - FY2020 BRIC | EMP-2020-BR-005-0002 | Allocation | No | Selected for Further Review | $187,500.00 | $250,000.00 |
ME | Building Code Training Program | EMB-2020-BR-126-0002 | Allocation | No | Selected for Further Review | $81,000.00 | $108,000.00 |
ME | Planning + Preliminary Engineering Report for Presumpscot River Landslide | EMB-2020-BR-126-0001 | Allocation | No | Ineligible | $600,000.00 | $800,000.15 |
ME | State of Maine Management Costs | EMB-2020-BR-126-0004 | Management Cost | No | Selected for Further Review | $27,943.52 | $80,000.00 |
ME | Oxford County Hazard Mitigation Plan Update 2023 | EMB-2020-BR-126-0005 | Allocation | No | Selected for Further Review | $9,000.00 | $12,000.00 |
ME | Back River Creek Marsh Infrastructure Resilience Project | EMB-2020-BR-126-0003 | Allocation | No | Selected for Further Review | $119,576.36 | $159,435.15 |
MI | CIty of Lansing Floodplain Acquisition Phase 8 | EMC-2020-BR-154-0008 | Allocation | No | Selected for Further Review | $175,521.06 | $232,194.75 |
MI | City of Ann Arbor - Multihazard Plan Update | EMC-2020-BR-154-0003 | Allocation | No | Selected for Further Review | $110,587.50 | $147,450.00 |
MI | Kent County - Ottawa County - City of Grand Rapids Hazard Mitigation Plan | EMC-2020-BR-154-0001 | Allocation | No | Selected for Further Review | $34,275.00 | $45,700.00 |
MI | City of Allendale - Pressure Sewer Improvements | EMC-2020-BR-154-0004 | Competitive | No | Ineligible | $2,145,693.00 | $2,860,924.00 |
MI | City of Luna Pier - Elevation of 3 homes | EMC-2020-BR-154-0005 | Competitive | No | Not Selected | $250,748.44 | $334,331.25 |
MI | Charlevoix & Emmet Counties Hazard Mitigation Plan Update | EMC-2020-BR-154-0010 | Allocation | No | Selected for Further Review | $66,000.12 | $88,000.16 |
MI | Marquette, City of - Lake Superior Shoreline Stabilization | EMC-2020-BR-154-0007 | Competitive | No | Ineligible | $1,274,489.62 | $1,699,319.50 |
MI | Allen Park, City of - Acquisition/Demolition | EMC-2020-BR-154-0009 | Allocation | No | Selected for Further Review | $75,432.00 | $100,576.00 |
MI | City of Grand Rapids, Building Codes/Standards/Accreditation | EMC-2020-BR-154-0006 | Allocation | No | Selected for Further Review | $88,239.37 | $117,652.50 |
MI | Osceola County - Hazard Mitigation Plan Updates | EMC-2020-BR-154-0002 | Allocation | No | Selected for Further Review | $21,914.88 | $29,219.84 |
MI | BRIC FY20 - State of Michigan State Management Costs (SMC) | EMC-2020-BR-154-0011 | Management Cost | No | Selected for Further Review | $76,079.33 | $390,533.18 |
MN | Management costs | EMC-2020-BR-141-0003 | Management Cost | No | Selected for Further Review | $20,200.00 | $262,225.48 |
MN | City of Duluth | EMC-2020-BR-141-0001 | Competitive | No | Not Selected | $4,920,750.00 | $6,561,000.00 |
MN | Five Hazard Mitigation Plan updates | EMC-2020-BR-141-0002 | Allocation | No | Selected for Further Review | $151,500.00 | $202,000.00 |
MO | Competitive - Wheaton R-III School District Community Safe Room | EMK-2020-BR-001-0005 | Competitive | Yes | Not Selected | $2,250,360.00 | $2,487,240.00 |
MO | State Allocation - High Point R-III School District Safe Room | EMK-2020-BR-001-0007 | Allocation | Yes | Selected for Further Review | $600,000.00 | $679,350.00 |
MO | FY20 BRIC MO State Management Cost | EMK-2020-BR-001-0009 | Management Cost | No | Selected for Further Review | $67,935.00 | $415,855.24 |
MO | Competitive - Meadow Heights R-II School District Safe Room | EMK-2020-BR-001-0010 | Competitive | Yes | Not Selected | $1,725,912.00 | $1,907,587.00 |
MO | Competitive - Weaubleau R-III School District Community Safe Room | EMK-2020-BR-001-0003 | Competitive | Yes | Not Selected | $1,472,737.00 | $1,627,762.00 |
MO | Competitive- City of Amazonia Sewer Improvements | EMK-2020-BR-001-0006 | Competitive | Yes | Not Selected | $414,255.87 | $460,284.30 |
MO | Competitive BRIC HMG Willow Springs Elementary School Safe Room | EMK-2020-BR-001-0001 | Competitive | Yes | Not Selected | $2,686,500.00 | $2,985,000.00 |
MO | FY20 BRIC Competitive-North Wood R-IV Safe Room | EMK-2020-BR-001-0002 | Competitive | Yes | Not Selected | $1,155,483.00 | $1,283,870.00 |
MO | FY20 Competitive-Middletown Critical Facility Generator | EMK-2020-BR-001-0008 | Competitive | Yes | Not Selected | $36,622.10 | $40,477.06 |
MO | Competitive - Knob Noster R-VIII School District - High School Community Safe Room | EMK-2020-BR-001-0004 | Competitive | Yes | Not Selected | $2,088,765.00 | $2,308,635.00 |
MP | Blighted Buildings Hazard Mitigation | EMF-2020-BR-180-0001 | Allocation | No | Selected for Further Review | $150,000.00 | $200,000.00 |
MP | CNMI Micro Beach Mitigation Scoping Assessment | EMF-2020-BR-180-0003 | Allocation | No | Selected for Further Review | $108,750.00 | $145,000.00 |
MP | FY20 CNMI BRIC Project Scoping for Dandan Flood and Stormwater Drainage Improvement | EMF-2020-BR-180-0002 | Allocation | No | Selected for Further Review | $191,229.75 | $254,973.00 |
MP | FY 20 CNMI BRIC Management Cost | EMF-2020-BR-180-0004 | Management Cost | No | Selected for Further Review | $59,997.30 | $59,997.20 |
MS | Did Not Submit | $- | $- | ||||
MT | State of Montana Hazard Mitigation Plan Update | EMD-2020-BR-123-0011 | Allocation | No | Selected for Further Review | $112,500.00 | $150,000.00 |
MT | Flathead County PDM Update 2020 - HMGP | EMD-2020-BR-123-0006 | Allocation | No | Selected for Further Review | $30,000.00 | $40,000.00 |
MT | Basin Creek Dam #1 Rehabilitation Project | EMD-2020-BR-123-0002 | Competitive | No | Not Selected | $1,650,039.00 | $2,200,052.00 |
MT | Ravalli County Como Dam Multihazard Mitigation Project | EMD-2020-BR-123-0001 | Competitive | No | Not Selected | $1,355,853.75 | $1,807,805.00 |
MT | Rock Creek Fire Mitigation Project | EMD-2020-BR-123-0003 | Competitive | No | Not Selected | $919,950.00 | $1,226,600.00 |
MT | City of Billings Water Supply Flood and Drought Mitigation Project | EMD-2020-BR-123-0005 | Competitive | No | Not Selected | $50,000,000.00 | $132,309,857.00 |
MT | St. Regis Sewer River Crossing Reconstruction-2020 BRIC | EMD-2020-BR-123-0004 | Competitive | No | Not Selected | $674,941.42 | $899,921.90 |
MT | City of Three Forks Flood Mitigation - FY2020 BRIC | EMD-2020-BR-123-0009 | Competitive | No | Not Selected | $3,784,537.50 | $5,046,050.00 |
MT | St. Regis Flood Control Feasibility Study and Plan, FEMA Hazard Mitigation Project | EMD-2020-BR-123-0010 | Allocation | No | Selected for Further Review | $71,684.55 | $95,579.40 |
MT | Sewell Subdivision Floodwater Control Project | EMD-2020-BR-123-0007 | Competitive | No | Not Selected | $755,307.00 | $1,007,076.00 |
MT | State of Montana 2020 Management Costs | EMD-2020-BR-123-0008 | Management Cost | No | Selected for Further Review | $28,557.94 | $3,056,800.00 |
NC | Pitt County Regional Special Medical Needs Shelter/Gymnasium | EMA-2020-BR-100-0029 | Competitive | No | Not Selected | $12,716,250.00 | $16,955,000.00 |
NC | Wilson Housing Authority Flood Remediation | EMA-2020-BR-100-0013 | Competitive | No | Not Selected | $8,854,499.40 | $11,805,999.20 |
NC | Jones Ferry Road Water Treatment Plant Electrical Distribution Improvements | EMA-2020-BR-100-0002 | Competitive | No | Not Selected | $4,991,253.38 | $6,744,937.00 |
NC | Town of Duck Living Shoreline and NC 12 Resiliency Project | EMA-2020-BR-100-0028 | Competitive | No | Selected for Further Review | $1,849,197.37 | $2,465,596.50 |
NC | Fayetteville, NC - Wayland Drive Drainage Improvements – BRIC FY2020 | EMA-2020-BR-100-0026 | Competitive | No | Not Selected | $1,955,651.60 | $2,793,788.00 |
NC | Cumberland County Stream Gauge and Early Notification | EMA-2020-BR-100-0008 | Competitive | No | Not Selected | $225,000.00 | $300,000.00 |
NC | Soules Swamp Reclamation | EMA-2020-BR-100-0012 | Competitive | No | Not Selected | $4,500,000.00 | $6,000,000.00 |
NC | Town of Princeville | EMA-2020-BR-100-0032 | Competitive | Yes | Selected for Further Review | $10,968,389.85 | $12,187,099.85 |
NC | Greenbriar Flood Mitigation and Stream Restoration | EMA-2020-BR-100-0010 | Competitive | No | Not Selected | $927,817.50 | $1,237,090.00 |
NC | Brunswick Town Fort Anderson Shoreline Restoration Project | EMA-2020-BR-100-0018 | Competitive | No | Ineligible | $2,292,377.02 | $3,056,502.70 |
NC | Silver Creek Pump Station Improvements | EMA-2020-BR-100-0031 | Allocation | No | Selected for Further Review | $600,000.00 | $4,836,109.00 |
NC | BRIC Hilltop Needmore Park Preserve Dam Mitigation | EMA-2020-BR-100-0023 | Competitive | No | Not Selected | $372,686.25 | $496,915.00 |
NC | BRIC2020 Management Costs | EMA-2020-BR-100-0021 | Management Cost | No | Selected for Further Review | $3,400,570.00 | $11,940,730.00 |
NC | Belhaven Main Street Flood Mitigation | EMA-2020-BR-100-0027 | Competitive | Yes | Ineligible | $1,990,746.45 | $2,211,940.50 |
NC | Cultural Center Lake Sediment Removal | EMA-2020-BR-100-0030 | Competitive | Yes | Ineligible | $978,245.91 | $1,086,939.90 |
NC | Lumberton Loop: A City-Wide Plan for Flood Mitigation, Restoration, and Recreation in Lumberton, NC | EMA-2020-BR-100-0009 | Competitive | No | Selected for Further Review | $1,927,179.32 | $2,623,685.32 |
NC | Craven County Water Telemetry Project, Craven County, Carteret County, and Jones County | EMA-2020-BR-100-0016 | Competitive | No | Not Selected | $1,641,646.50 | $2,188,862.00 |
NC | BRIC 2020 Hickory Northeast Wastewater Treatment Facility Hardening and Stream Restoration Project | EMA-2020-BR-100-0017 | Competitive | No | Selected for Further Review | $5,407,285.22 | $7,186,898.25 |
NC | Chapel Hill Flood Storage and Culvert Improvements Projects, Town of Chapel Hill NC | EMA-2020-BR-100-0019 | Competitive | No | Ineligible | $4,817,294.35 | $6,617,294.35 |
NC | Bolin Creek Watershed Study | EMA-2020-BR-100-0033 | Competitive | No | Ineligible | $5,396,084.00 | $7,396,084.00 |
NC | Cumberland County Wide Vulnerability Assessment Project | EMA-2020-BR-100-0022 | Competitive | No | Ineligible | $37,500.00 | $50,000.00 |
NC | Watershed-based V/R assessment to scale up resilience building actions across jurisdictions | EMA-2020-BR-100-0015 | Competitive | No | Ineligible | $240,000.00 | $347,500.00 |
NC | Thomas Langston Detention Pond Scoping | EMA-2020-BR-100-0003 | Competitive | No | Ineligible | $37,687.50 | $50,250.00 |
NC | Rutherford County Phase 1 Flood Mitigation Study of Cleghorn Creek | EMA-2020-BR-100-0025 | Competitive | No | Ineligible | $179,612.25 | $239,483.00 |
NC | Currituck County Water Level and Flood Prediction Study | EMA-2020-BR-100-0004 | Competitive | No | Ineligible | $384,110.25 | $567,504.00 |
NC | Morgan Creek Interceptor Replacement and Upstream Sewer Rehabilitation Type: Sanitary Sewer Project | EMA-2020-BR-100-0011 | Competitive | No | Ineligible | $9,006,984.00 | $12,171,600.00 |
NC | Building a Resilient Carolinas | EMA-2020-BR-100-0024 | Competitive | No | Ineligible | $456,500.00 | $650,000.00 |
NC | BRIC 2020 Hickory Snow Creek Pump Station Relocation and Flood Hardening | EMA-2020-BR-100-0020 | Competitive | No | Selected for Further Review | $3,540,938.78 | $4,706,311.08 |
NC | Flood Hazard Mitigation Plan | EMA-2020-BR-100-0006 | Competitive | No | Ineligible | $112,500.00 | $150,000.00 |
NC | ï¶ New Hanover County Community Resilience Project with Emphasis on Energy Security | EMA-2020-BR-100-0001 | Competitive | No | Not Selected | $547,010.00 | $743,103.00 |
NC | Red Bud and Piney Mountain Rd Flood Storage Projects: Design and Identification of Project Elements | EMA-2020-BR-100-0007 | Competitive | No | Ineligible | $386,981.25 | $515,975.00 |
NC | Megan Drive Detention Pond Scoping | EMA-2020-BR-100-0014 | Competitive | No | Ineligible | $37,687.50 | $50,250.00 |
NC | Town of Kure Beach Stormwater Infiltration for 7 Sites - FY2020 BRIC | EMA-2020-BR-100-0005 | Competitive | No | Not Selected | $730,938.75 | $974,585.00 |
ND | Steele County Hazard Mitigation Plan Update | EMD-2020-BR-120-0009 | Allocation | No | Selected for Further Review | $27,000.00 | $36,000.00 |
ND | Garrison Raw Water Intake | EMD-2020-BR-120-0013 | Competitive | No | Not Selected | $2,471,250.00 | $3,295,000.00 |
ND | Emmons County - Schwahn Lake High Water Outlet | EMD-2020-BR-120-0005 | Competitive | No | Not Selected | $1,230,000.00 | $1,640,000.00 |
ND | Steele County Road 5 Bridge Improvement | EMD-2020-BR-120-0012 | Competitive | No | Not Selected | $503,250.00 | $671,000.00 |
ND | Puppy Dog Coulee Flood Control | EMD-2020-BR-120-0007 | Competitive | No | Not Selected | $9,409,285.05 | $12,545,713.38 |
ND | McIntosh Multi Hazard Mitigation Plan Update | EMD-2020-BR-120-0015 | Allocation | No | Selected for Further Review | $35,000.00 | $46,666.67 |
ND | Traill County Multi-Hazard Mitigation Plan Update | EMD-2020-BR-120-0001 | Allocation | No | Selected for Further Review | $34,000.00 | $45,333.34 |
ND | Sheridan County Multi-Hazard Mitigation Plan Update | EMD-2020-BR-120-0006 | Allocation | No | Selected for Further Review | $25,000.00 | $33,333.33 |
ND | Northwood Storm and Sanitary Sewer Improvements | EMD-2020-BR-120-0011 | Competitive | Yes | Not Selected | $11,721,979.80 | $13,024,422.00 |
ND | West Side Interceptor Improvements | EMD-2020-BR-120-0014 | Allocation | No | Selected for Further Review | $225,000.00 | $300,000.00 |
ND | Sheridan County Water Management Infrastructure Inventory and Flood Hazard Mitigation Assessment | EMD-2020-BR-120-0010 | Allocation | No | Selected for Further Review | $82,687.50 | $110,250.00 |
ND | Griggs County Multi-Hazard Mitigation Plan Update | EMD-2020-BR-120-0004 | Allocation | No | Selected for Further Review | $26,587.00 | $35,449.34 |
ND | 2020 BRIC State Management Costs | EMD-2020-BR-120-0008 | Management Cost | No | Selected for Further Review | $65,636.60 | $3,957,050.14 |
ND | Mercer County Multi-Hazard Mitigation Plan Update | EMD-2020-BR-120-0002 | Allocation | No | Selected for Further Review | $37,000.00 | $49,333.34 |
ND | Grand Forks Storm Water Improvements For Pump Station 188 Area | EMD-2020-BR-120-0003 | Competitive | No | Not Selected | $5,805,750.00 | $7,741,000.00 |
NE | Polk County RPPD Transmission Line | EMK-2020-BR-013-0001 | Competitive | No | Not Selected | $1,875,262.50 | $2,500,350.00 |
NE | Headworks Mitigation Project | EMK-2020-BR-013-0014 | Competitive | No | Not Selected | $2,805,225.00 | $3,740,300.00 |
NE | Abie to Bruno Transmission Line | EMK-2020-BR-013-0011 | Competitive | No | Not Selected | $967,014.75 | $1,289,353.00 |
NE | Papio WP-4 Project | EMK-2020-BR-013-0010 | Competitive | No | Not Selected | $4,119,385.15 | $5,492,513.53 |
NE | Bank Stabilization C1-465 | EMK-2020-BR-013-0008 | Competitive | No | Not Selected | $575,814.00 | $767,752.00 |
NE | City of Omaha Flood Pumping Stations' Resiliency Projects | EMK-2020-BR-013-0004 | Competitive | No | Ineligible | $7,288,057.25 | $9,676,393.00 |
NE | Niobrara to Santee Line | EMK-2020-BR-013-0007 | Competitive | No | Not Selected | $645,630.00 | $860,840.00 |
NE | Sargent Flood Resiliency Project | EMK-2020-BR-013-0006 | Competitive | Yes | Not Selected | $4,293,082.30 | $4,745,091.45 |
NE | NEMA BRIC 2020 Recipient Management Costs | EMK-2020-BR-013-0003 | Management Cost | No | Selected for Further Review | $73,620.80 | $2,169,964.25 |
NE | West Fremont Project Scoping-Flood Hazard | EMK-2020-BR-013-0015 | Allocation | No | Selected for Further Review | $187,500.00 | $250,000.00 |
NE | Tri-Basin NRD All-hazard mitigation plan update | EMK-2020-BR-013-0005 | Allocation | No | Selected for Further Review | $60,906.00 | $81,208.00 |
NE | Hayes, Hitchcock, and Frontier Counties Hazard Mitigation Plan 2022 Update | EMK-2020-BR-013-0013 | Allocation | No | Selected for Further Review | $52,500.00 | $70,000.00 |
NE | 2021 Columbus Flood Mitigation Plan | EMK-2020-BR-013-0012 | Allocation | No | Selected for Further Review | $187,500.00 | $250,000.00 |
NE | Winnebago Tribe of Nebraska Reservation Plan | EMK-2020-BR-028-0001 | Tribal Set-aside | Yes | Selected for Further Review | $179,024.00 | $199,970.00 |
NE | Tri-County Hazard Mitigation Plan | EMK-2020-BR-013-0009 | Allocation | No | Selected for Further Review | $63,750.00 | $85,000.00 |
NE | Pender Flood Mitigation Project | EMK-2020-BR-013-0002 | Competitive | No | Not Selected | $4,084,777.35 | $5,411,703.13 |
NH | Local Hazard Mitigation Plan Updates | EMB-2020-BR-125-0005 | Allocation | No | Selected for Further Review | $294,996.75 | $393,329.00 |
NH | BRIC - Somersworth - Salmon Falls Road | EMB-2020-BR-125-0003 | Allocation | No | Selected for Further Review | $120,000.00 | $157,500.00 |
NH | BRIC - Barrington - Pond Hill Rd and Daniel Cater Rd | EMB-2020-BR-125-0001 | Allocation | No | Selected for Further Review | $40,324.00 | $52,925.25 |
NH | BRIC - Barrington - Lakeside Oaks | EMB-2020-BR-125-0006 | Competitive | No | Not Selected | $199,916.00 | $262,389.75 |
NH | BRIC'20 Management Costs | EMB-2020-BR-125-0004 | Management Cost | No | Selected for Further Review | $60,375.43 | $165,278.90 |
NH | BRIC - Enfield - Potato Road Culvert | EMB-2020-BR-125-0002 | Competitive | No | Ineligible | $647,328.00 | $849,618.00 |
NJ | BRIC - Wildwood Crest: Flood Mitigation Bayside Improvements | EMN-2020-BR-056-0003 | Competitive | No | Not Selected | $6,884,353.12 | $9,179,137.50 |
NJ | BRIC FY2020 - New Jersey DEP Hudson River Floodwall Infrastructure and Resilience Park | EMN-2020-BR-056-0018 | Competitive | No | Selected for Further Review | $22,517,000.00 | $243,005,239.00 |
NJ | BRIC - Cape May Seawall Project Scoping | EMN-2020-BR-056-0011 | Competitive | No | Ineligible | $195,536.25 | $260,715.00 |
NJ | (BRIC) NJIB Statewide Capacity Building Partnership with NJOEM | EMN-2020-BR-056-0017 | Allocation | No | Selected for Further Review | $320,000.00 | $420,000.00 |
NJ | BRIC - Atlantic City Emergency Generators - Fire Stations | EMN-2020-BR-056-0005 | Competitive | No | Not Selected | $687,483.75 | $906,645.00 |
NJ | FY 2020 BRIC Lacey Township Island View Drive | EMN-2020-BR-056-0022 | Competitive | No | Not Selected | $395,520.00 | $519,120.00 |
NJ | Salem County HMP UPDATE 2020 | EMN-2020-BR-056-0032 | Allocation | No | Selected for Further Review | $125,000.00 | $166,685.79 |
NJ | FY20 BRIC - City of Wildwood, NJ: Pacific Avenue Infrastructure Mitigation | EMN-2020-BR-056-0026 | Competitive | No | Ineligible | $3,612,869.06 | $4,807,158.75 |
NJ | BRIC - Longport Borough: Winchester Avenue Resiliency Project | EMN-2020-BR-056-0025 | Competitive | No | Not Selected | $1,136,250.00 | $1,505,000.00 |
NJ | BRIC - Ventnor Heights Flood Mitigation Project | EMN-2020-BR-056-0020 | Competitive | No | Not Selected | $1,201,765.55 | $1,592,354.06 |
NJ | FY 2020 BRIC Secaucus Huber Street Floodwall Project | EMN-2020-BR-056-0006 | Competitive | No | Not Selected | $9,300,000.00 | $12,400,000.00 |
NJ | FY20 BRIC - City of Somers Point, NJ: Bay Avenue Infrastructure Mitigation | EMN-2020-BR-056-0019 | Competitive | No | Ineligible | $1,818,350.00 | $2,417,800.00 |
NJ | FY20 BRIC - City of Wildwood, NJ: Otten's Harbor Infrastructure Mitigation | EMN-2020-BR-056-0008 | Competitive | No | Not Selected | $1,980,682.50 | $2,630,910.00 |
NJ | BRIC - Pleasantville Emergency Generators Project | EMN-2020-BR-056-0014 | Competitive | No | Not Selected | $190,869.16 | $250,515.77 |
NJ | (BRIC) JCMUA Boonton Potable Water Treatment Plant Electrical Distribution System Retrofit | EMN-2020-BR-056-0034 | Competitive | No | Not Selected | $11,250,000.00 | $15,750,000.00 |
NJ | BRIC - Chelsea Heights Flood Mitigation Project | EMN-2020-BR-056-0033 | Competitive | No | Ineligible | $6,395,275.87 | $8,517,034.50 |
NJ | Main Pump Station | EMN-2020-BR-056-0037 | Competitive | No | Ineligible | $20,000,000.00 | $59,231,509.00 |
NJ | BRIC - Woodbridge Township: Sanitary Pump Station Flood Proofing | EMN-2020-BR-056-0028 | Competitive | No | Ineligible | $4,076,887.50 | $5,435,850.00 |
NJ | BRIC FY20 - Management Costs | EMN-2020-BR-056-0001 | Management Cost | No | Selected for Further Review | $30,508,779.64 | $47,614,822.49 |
NJ | BRIC - Stone Harbor Bayside Resiliency Project | EMN-2020-BR-056-0029 | Competitive | No | Not Selected | $4,093,087.50 | $5,447,450.00 |
NJ | FY2020 BRIC Project Scoping Carteret Noes Creek/Arthur Kill Flood Control | EMN-2020-BR-056-0009 | Competitive | No | Ineligible | $37,500.00 | $50,000.00 |
NJ | BRIC - Berkeley Heights Generator Project | EMN-2020-BR-056-0007 | Competitive | No | Not Selected | $86,670.00 | $115,560.00 |
NJ | Freehold Township Water Treatment Plant Generator Project (FY2020 BRIC) | EMN-2020-BR-056-0035 | Competitive | No | Ineligible | $1,120,000.00 | $1,600,000.00 |
NJ | BRIC - Washington Avenue Project Scoping | EMN-2020-BR-056-0031 | Competitive | No | Ineligible | $72,000.00 | $94,500.00 |
NJ | BRIC 2020 Flood Mitigation of Lower Ferry Rd and Fackler Rd Pump Stations | EMN-2020-BR-056-0036 | Competitive | No | Not Selected | $8,496,000.00 | $11,151,000.00 |
NJ | BRIC FY2020 New Jersey Meadowlands East Riser Ditch Pumping Station and Channel Improvements | EMN-2020-BR-056-0002 | Competitive | No | Selected for Further Review | $36,000,000.00 | $61,295,870.00 |
NJ | FY2020 BRIC Rochelle Park Sewer Pump Station Flood Mitigation Project | EMN-2020-BR-056-0015 | Competitive | No | Ineligible | $920,937.50 | $1,315,625.00 |
NJ | BRIC - Margate - Adams Avenue Flood Mitigation Project | EMN-2020-BR-056-0012 | Competitive | No | Not Selected | $1,417,800.00 | $1,880,400.00 |
NJ | BRIC -2020 Ventnor City-Winchester Avenue Resiliency Project | EMN-2020-BR-056-0004 | Competitive | No | Not Selected | $1,645,511.05 | $2,184,014.74 |
NJ | BRIC Neptune Basin Expansion - Township of Stafford | EMN-2020-BR-056-0030 | Competitive | No | Not Selected | $3,478,505.25 | $4,638,007.00 |
NJ | BRIC-Pleasant Valley Road Stream Bank Stabilization Project, Phase III | EMN-2020-BR-056-0016 | Competitive | No | Ineligible | $570,300.00 | $760,400.00 |
NJ | FY 2020 BRIC Neptune Twp South Riverside Flood Pumps | EMN-2020-BR-056-0023 | Competitive | No | Not Selected | $666,000.00 | $900,000.00 |
NJ | FY20 BRIC - NJ Technical Assistance Program for Application Development and Capacity Building | EMN-2020-BR-056-0013 | Allocation | No | Selected for Further Review | $150,001.18 | $200,001.57 |
NJ | BRIC - Sea Isle City: 46th Street Pump Station Mitigation Project | EMN-2020-BR-056-0010 | Competitive | No | Not Selected | $2,111,812.50 | $2,815,750.00 |
NJ | BRIC - Gulph Mill Road Flood Mitigation Project | EMN-2020-BR-056-0021 | Competitive | No | Not Selected | $220,836.00 | $289,847.25 |
NJ | Township of Brick Roadway Elevation Project- BRIC 2020 | EMN-2020-BR-056-0027 | Competitive | No | Not Selected | $5,522,291.25 | $7,327,055.00 |
NM | New Mexico Climate Adaptation and Resilience Planning | EMT-2020-BR-098-0001 | Allocation | No | Selected for Further Review | $106,666.67 | $140,000.00 |
NM | New Mexico Climate Adaptation and Resilience Partnerships | EMT-2020-BR-098-0004 | Allocation | No | Selected for Further Review | $317,333.33 | $420,000.00 |
NM | Cougar Road Flood Mitigation | EMT-2020-BR-122-0001 | Tribal Set-aside | Yes | Ineligible | $456,030.00 | $506,700.00 |
NM | NM State Hazard Mitigation Plan 2023 Up-date | EMT-2020-BR-098-0005 | Allocation | No | Selected for Further Review | $120,000.00 | $157,500.00 |
NM | Lincoln County Multi Jurisdictional HMP | EMT-2020-BR-098-0002 | Allocation | No | Selected for Further Review | $56,000.00 | $73,500.00 |
NM | Pueblo of Santa Ana Hazard Mitigation Plan | EMT-2020-BR-116-0001 | Tribal Set-aside | Yes | Selected for Further Review | $234,160.18 | $260,177.98 |
NM | BRIC 2020 State Management Costs | EMT-2020-BR-098-0003 | Management Cost | No | Selected for Further Review | $79,100.00 | $75,333.33 |
NV | Hobart Creek Reservoir Dam Resilient Infrastructure Project | EMF-2020-BR-090-0004 | Competitive | No | Not Selected | $10,021,355.00 | $13,940,279.00 |
NV | Sutro Terrace Storm Drain and Basin Scoping Project BRIC Application | EMF-2020-BR-090-0005 | Allocation | No | Selected for Further Review | $125,300.50 | $164,616.75 |
NV | Maxwell Basin Flood Mitigation Project BRIC Application | EMF-2020-BR-090-0008 | Competitive | No | Not Selected | $1,562,248.53 | $2,050,764.71 |
NV | UMC Microgrid and Resiliency Project Scoping | EMF-2020-BR-090-0007 | Allocation | No | Selected for Further Review | $202,564.18 | $270,085.57 |
NV | City of Reno Microgrids Project Scoping | EMF-2020-BR-090-0003 | Allocation | No | Selected for Further Review | $93,450.84 | $124,601.12 |
NV | Nevada BRIC 2020 Management Costs | EMF-2020-BR-090-0006 | Management Cost | No | Selected for Further Review | $80,734.94 | $1,679,839.30 |
NV | Lincoln County HM Plan Update | EMF-2020-BR-090-0002 | Allocation | No | Selected for Further Review | $29,480.54 | $39,159.97 |
NV | Mesquite Virgin River Flood Control Project Scoping | EMF-2020-BR-090-0001 | Allocation | No | Selected for Further Review | $149,203.94 | $208,885.94 |
NY | 10 - NYS - OPRHP - BRIC - Golden Hill State Park Lighthouse Shoreline/Embankment Protection Project | EMN-2020-BR-063-0017 | Competitive | No | Not Selected | $915,902.09 | $1,202,121.50 |
NY | FY20 BRIC - Port Authority NY-NJ: Elevation-Floodproofing of Building 111 Infrastructure Mitigation | EMN-2020-BR-056-0038 | Competitive | No | Not Selected | $2,025,431.80 | $2,737,070.00 |
NY | 50 - Greene Co - BRIC - Catskill Point Shore Stabilization Project | EMN-2020-BR-063-0011 | Competitive | No | Not Selected | $1,019,200.00 | $1,394,200.00 |
NY | FY2020 BRIC Management Cost | EMN-2020-BR-063-0014 | Management Cost | No | Selected for Further Review | $2,865,701.70 | $28,100,000.00 |
NY | 109 - Nyack (V) - BRIC - Nyack Creek Drainage Improvements | EMN-2020-BR-063-0025 | Competitive | No | Ineligible | $4,400,753.04 | $6,112,157.00 |
NY | 61-Village of Solvay-BRIC-West Genesee Street Westcott Reservoir Charles Avenue Watershed Analysis | EMN-2020-BR-063-0015 | Allocation | No | Ineligible | $25,950.00 | $34,600.00 |
NY | 117 - Orange Co DPW - BRIC - Cromline Creek Pump Station Flood Resilience Improvement Project | EMN-2020-BR-063-0020 | Competitive | Yes | Not Selected | $1,156,188.00 | $1,277,892.00 |
NY | FY20 BRIC - Port Authority NY-NJ: Elevation-Floodproofing of Building 260 Infrastructure Mitigation | EMN-2020-BR-056-0024 | Competitive | No | Ineligible | $1,739,000.00 | $2,350,000.00 |
NY | 154 - Nassau Co DPW - BRIC - BRIC 2020 Nassau County Long Beach WPCP Consolidation Project | EMN-2020-BR-063-0004 | Competitive | No | Ineligible | $27,839,750.00 | $95,566,000.00 |
NY | 125 - NYCHA - BRIC - Resilient East Harlem: Protecting NYCHA Residents from Extreme Temperatures | EMN-2020-BR-063-0026 | Competitive | No | Ineligible | $9,855,673.38 | $13,099,313.00 |
NY | 40-Mohawk (V)-BRIC -Fulmer Greenplain - Minnowbrook | EMN-2020-BR-063-0027 | Competitive | Yes | Ineligible | $1,546,650.00 | $1,718,500.00 |
NY | 93 - BRIC C&CB - NYDOS - Statewide Online Training for Code Enforcers | EMN-2020-BR-063-0001 | Allocation | No | Ineligible | $195,000.00 | $266,587.00 |
NY | 14 – Herkimer Co ES – BRIC – Herkimer Co Multijurisdictional HMP Update | EMN-2020-BR-063-0033 | Allocation | No | Selected for Further Review | $67,500.00 | $90,000.00 |
NY | 111-Ontario County Planning Department-BRIC-Resiliency Plan | EMN-2020-BR-063-0013 | Allocation | No | Ineligible | $60,000.00 | $80,000.00 |
NY | 1-Monroe County OEM-BRIC-Monroe County Multi-Juri. Hazard Mitigation Plan Update | EMN-2020-BR-063-0007 | Allocation | No | Selected for Further Review | $90,000.00 | $120,000.00 |
NY | 16 - Warren County - BRIC - Multi-Jurisdictional Hazard MItigation Plan Update | EMN-2020-BR-063-0019 | Allocation | No | Selected for Further Review | $90,000.00 | $120,000.00 |
NY | 62 - Mamaroneck V - BRIC - Sheldrake and Mamaroneck River Basin Planning Project | EMN-2020-BR-063-0016 | Allocation | No | Selected for Further Review | $32,000.00 | $50,750.00 |
NY | 94 - Inc Village of Sea Cliff - BRIC - Sea Cliff Bluff Stabilization Scoping | EMN-2020-BR-063-0029 | Allocation | No | Ineligible | $37,500.00 | $50,000.00 |
NY | 130 - NYCDOT - BRIC - Cool Corridors - Model Urban Heat Island Streets Project Scoping | EMN-2020-BR-063-0012 | Allocation | No | Selected for Further Review | $320,500.00 | $430,500.00 |
NY | 190 - NYSDOT - BRIC - 2020 Lower Sauquoit Creek Flood Mitigation | EMN-2020-BR-063-0003 | Competitive | No | Ineligible | $14,143,143.42 | $18,857,524.56 |
NY | 45-Village of Piermont-BRIC-Capability and Capacity Building Planning to Enhance Resiliency | EMN-2020-BR-063-0002 | Allocation | No | Ineligible | $75,000.00 | $143,100.00 |
NY | 96 - Penn Yan (V) - BRIC - Village of Penn Yan 2nd Sewer Force Main to WWTP | EMN-2020-BR-063-0006 | Competitive | No | Not Selected | $900,000.00 | $1,200,000.00 |
NY | 126 - NYC H&H - BRIC - BRIC 2020 NYC Health & Hospitals, Bronx Emergency Activated Community Shelter | EMN-2020-BR-063-0028 | Competitive | No | Ineligible | $49,732,056.00 | $66,099,568.00 |
NY | 9 - NYS Parks - BRIC - Lake Ontario State Parkway | EMN-2020-BR-063-0024 | Allocation | No | Ineligible | $266,302.50 | $349,563.00 |
NY | 179 - Vestal (T) - BRIC - Choconut Creek Stabilization & Municipal Well Protection Project | EMN-2020-BR-063-0022 | Competitive | No | Not Selected | $860,631.00 | $1,147,508.00 |
NY | 95 - Monroe (T) - BRIC - Generator Installation | EMN-2020-BR-063-0023 | Competitive | No | Not Selected | $154,218.75 | $205,625.00 |
NY | 98 - Tannersville - BRIC - Reservoir No. 3 - Earth Dam Rehabilitation | EMN-2020-BR-063-0031 | Competitive | No | Not Selected | $1,125,000.00 | $1,500,000.00 |
NY | 161- Nassau County - BRIC - 2020 - Beech Street-Park Street Flood Mitigation Initiative | EMN-2020-BR-063-0010 | Competitive | No | Ineligible | $14,519,716.94 | $19,359,622.60 |
NY | 145 - NYC Parks - BRIC - BRIC 2020 GOSR/NYCParks Tottenville Shoreline Protection Project | EMN-2020-BR-063-0008 | Competitive | No | Selected for Further Review | $19,822,053.06 | $26,345,767.00 |
NY | 119 - NYC Dept. SBS - BRIC - BRIC 2020 NYCEDC Hunts Point, Meat Market & 600 Food Center Drive | EMN-2020-BR-063-0021 | Competitive | No | Not Selected | $14,682,302.52 | $19,514,452.72 |
NY | 20 - New Castle (T) - BRIC - Upper Minkel Dam Decommissioning & Riparian Corridor Restoration | EMN-2020-BR-063-0018 | Competitive | No | Selected for Further Review | $1,050,000.00 | $1,500,000.00 |
NY | 66 - Steuben County Planning Department - BRIC - Flood Hazard Regulations Project | EMN-2020-BR-063-0030 | Allocation | No | Ineligible | $53,250.00 | $71,000.00 |
NY | 180 - BRIC - Community Risk and Resiliency Act Implementation | EMN-2020-BR-063-0009 | Allocation | No | Ineligible | $299,910.00 | $399,880.00 |
NY | 131 - NYCDEP - BRIC - BRIC 2020 DEP Southeastern Queens Stormwater Mitigation at Sayres Avenue | EMN-2020-BR-063-0032 | Competitive | No | Not Selected | $2,746,526.64 | $3,650,446.80 |
NY | 56 - NYC OEM - BRIC - Regional Food Flow Resilience Study | EMN-2020-BR-063-0005 | Allocation | No | Ineligible | $157,500.00 | $207,500.00 |
NY | Shinnecock Baseline Assessment to Guide Future Plans and Responses to Natural Disasters | EMN-2020-BR-066-0001 | Tribal Set-aside | Yes | Selected for Further Review | $423,853.20 | $470,948.00 |
OH | City of Columbiana - Beverly Ray Drainage Improvements BRIC FY2020 | EMC-2020-BR-051-0004 | Competitive | No | Not Selected | $1,296,149.48 | $1,702,149.48 |
OH | Ohio Safe Room Rebate Program | EMC-2020-BR-051-0014 | Competitive | No | Not Selected | $265,999.00 | $349,125.00 |
OH | Hancock County Fox St. Acquisition BRIC FY2020 | EMC-2020-BR-051-0001 | Competitive | No | Not Selected | $141,175.75 | $186,474.75 |
OH | City of Zanesville Muskingum Ave. ( Dug Rd. ) Improvements BRIC 2020 | EMC-2020-BR-051-0011 | Competitive | No | Not Selected | $4,084,296.00 | $5,624,620.00 |
OH | Washington Township Acquisition Project BRIC FY20 | EMC-2020-BR-051-0006 | Allocation | No | Selected for Further Review | $110,573.25 | $147,431.00 |
OH | Radnor Township Acquisition Project BRIC FY20 | EMC-2020-BR-051-0010 | Allocation | No | Selected for Further Review | $150,887.60 | $228,800.00 |
OH | City of Barberton - Wolf Creek Dam Improvements - BRIC 2020 | EMC-2020-BR-051-0002 | Competitive | No | Not Selected | $6,830,750.00 | $9,109,000.00 |
OH | City of Columbiana - Prospect/Y&S/Pittsburgh Drainage Improvements BRIC FY2020 | EMC-2020-BR-051-0007 | Competitive | No | Not Selected | $1,039,312.25 | $1,364,312.25 |
OH | MSDGC - Muddy Creek Rd Phase II BRIC 2020 | EMC-2020-BR-051-0008 | Competitive | No | Not Selected | $591,590.81 | $776,472.31 |
OH | City of Canfield: Overbrook Storm Sewer Improvement, BRIC 2020 | EMC-2020-BR-051-0005 | Competitive | No | Not Selected | $279,430.00 | $366,890.00 |
OH | 2020 City of Parma Hazard Mitigation BRIC 2020 | EMC-2020-BR-051-0012 | Competitive | No | Not Selected | $2,430,900.73 | $3,262,954.00 |
OH | Miami Conservancy District - Dog Leg Road Floodplain Mitigation BRIC 2020 | EMC-2020-BR-051-0017 | Competitive | No | Not Selected | $43,891.40 | $58,600.00 |
OH | Village of Burbank - 133 Water Street Acquisition - BRIC Project | EMC-2020-BR-051-0015 | Allocation | Yes | Selected for Further Review | $91,671.30 | $101,857.00 |
OH | City of Aurora Geauga Lake Neighborhood BRIC 2020 | EMC-2020-BR-051-0016 | Competitive | No | Not Selected | $1,505,397.16 | $1,990,763.46 |
OH | State of Ohio Five-County Hazard Mitigation Plan Update | EMC-2020-BR-051-0013 | Allocation | No | Selected for Further Review | $245,851.50 | $327,802.00 |
OH | The Ohio State University - Cannon Drive Levee Project BRIC 2020 | EMC-2020-BR-051-0009 | Competitive | No | Not Selected | $25,470,280.80 | $39,185,047.39 |
OH | BRIC FY2020 Management Cost State of Ohio | EMC-2020-BR-051-0003 | Management Cost | No | Selected for Further Review | $80,589.00 | $6,478,229.86 |
OK | City of Tulsa Fulton Creek Flood Resilient Infrastructure and Community Grant | EMT-2020-BR-014-0002 | Competitive | No | Not Selected | $17,850,366.75 | $23,800,489.00 |
OK | Tulsa County Resilient Infrastructure Project | EMT-2020-BR-014-0003 | Competitive | No | Not Selected | $5,434,635.75 | $7,246,181.00 |
OK | OWRB Statewide flood plan - FY2020 BRIC | EMT-2020-BR-014-0001 | Allocation | No | Selected for Further Review | $300,000.00 | $851,000.00 |
OK | Osage Nation Mitigation Plan Update | EMT-2020-BR-108-0001 | Tribal Set-aside | No | Selected for Further Review | $25,875.00 | $34,500.00 |
OK | 2021-001 BRIC Tsa-La-Gi Shelter | EMT-2020-BR-105-0001 | Tribal Set-aside | No | Selected for Further Review | $261,502.50 | $348,670.00 |
OK | Checotah Public School Safe Room Project | EMT-2020-BR-014-0006 | Competitive | No | Not Selected | $1,142,988.37 | $1,523,984.50 |
OK | Lake Ellsworth Spillway Resilience Project | EMT-2020-BR-014-0011 | Competitive | No | Not Selected | $16,295,325.00 | $21,727,100.00 |
OK | Southmoore High School Detention Pond and Storm Sewer Project | EMT-2020-BR-014-0008 | Allocation | No | Selected for Further Review | $112,500.00 | $150,000.00 |
OK | FY 2020 BRIC SMC | EMT-2020-BR-014-0009 | Management Cost | No | Selected for Further Review | $125,100.00 | $6,816,286.89 |
OK | OCWUT - Hefner Water Treatment Plant Generators - FY 2020 BRIC | EMT-2020-BR-014-0007 | Competitive | No | Not Selected | $14,449,500.00 | $19,266,000.00 |
OK | Mitigation Planning | EMT-2020-BR-110-0001 | Tribal Set-aside | No | Selected for Further Review | $158,130.00 | $210,840.00 |
OK | Choctaw Nation Storm Shelter Project | EMT-2020-BR-114-0001 | Tribal Set-aside | No | Selected for Further Review | $571,875.00 | $762,500.00 |
OK | M&A | EMT-2020-BR-110-0002 | Management Cost | No | Selected for Further Review | $21,084.00 | $21,084.00 |
OK | City of Norman - Flood Warning System Development | EMT-2020-BR-014-0005 | Allocation | No | Selected for Further Review | $75,000.00 | $100,000.00 |
OK | Roadway Flood Drainage Improvement | EMT-2020-BR-014-0010 | Competitive | No | Not Selected | $4,142,233.61 | $5,522,978.14 |
OK | Project Scoping for Midway Drive Flood Mitigation | EMT-2020-BR-014-0004 | Allocation | No | Selected for Further Review | $112,500.00 | $150,000.00 |
OR | Developing Resilient Green Infrastructure in Bear Creek Corridor | EMS-2020-BR-131-0003 | Competitive | No | Not Selected | $3,352,973.02 | $4,470,630.69 |
OR | Cascades East Interconnection Point | EMS-2020-BR-131-0005 | Allocation | No | Ineligible | $424,566.30 | $566,088.40 |
OR | East Portland Solar + Storage Resilience Hub | EMS-2020-BR-131-0001 | Competitive | No | Ineligible | $571,875.00 | $762,500.00 |
OR | Douglas County Seismic Retrofit Project | EMS-2020-BR-131-0004 | Competitive | No | Not Selected | $7,239,375.00 | $9,652,500.00 |
OR | DPSST Microgrid Project Scoping for All Hazard Mitigation | EMS-2020-BR-131-0002 | Allocation | No | Selected for Further Review | $40,875.00 | $54,500.00 |
OR | Tigard Resiliency Initiative Feasibility Study | EMS-2020-BR-131-0006 | Allocation | No | Selected for Further Review | $127,500.00 | $170,000.00 |
PA | Mercer County Hazard Mitigation Planning Grant | EMP-2020-BR-084-0016 | Allocation | No | Selected for Further Review | $37,500.00 | $50,000.00 |
PA | PA Building Code Project Application | EMP-2020-BR-084-0004 | Allocation | No | Selected for Further Review | $150,000.00 | $200,000.00 |
PA | PITTSBURGH, CITY OF Riverview Park Landslide Mitigation | EMP-2020-BR-084-0011 | Competitive | No | Ineligible | $600,000.00 | $800,000.00 |
PA | Oversubscribed Scoping Project: Understanding Pennsylvanians' Floodplain Insurance Purchasing Habits | EMP-2020-BR-084-0027 | Competitive | No | Not Selected | $199,939.00 | $266,620.00 |
PA | Indiana County Hazard Mitigation Plan Update | EMP-2020-BR-084-0003 | Allocation | No | Selected for Further Review | $33,750.00 | $45,000.00 |
PA | Jersey Shore Lycoming Lawshee Run Culvert Enhancement and Watershed Protection Project | EMP-2020-BR-084-0005 | Competitive | No | Ineligible | $6,870,000.00 | $9,160,000.00 |
PA | Luzerne County Penn Lake Park Borough/Dennison Township Community Flood Mitigation Project BRIC 2020 | EMP-2020-BR-084-0020 | Competitive | No | Ineligible | $7,407,750.00 | $9,877,000.00 |
PA | Clinton County Hazard Mitigation Plan | EMP-2020-BR-084-0024 | Allocation | No | Selected for Further Review | $33,750.00 | $45,000.00 |
PA | Palmer Township Generator for EOC | EMP-2020-BR-084-0015 | Competitive | No | Not Selected | $275,085.94 | $366,781.25 |
PA | Lehigh Twp Northampton County Standby Generators for Three Sewage Pump Stations | EMP-2020-BR-084-0018 | Competitive | No | Not Selected | $202,500.00 | $270,000.00 |
PA | Philadelphia Water Department Cohocksink Mitigation Project - BRIC | EMP-2020-BR-084-0007 | Competitive | No | Ineligible | $18,750,000.00 | $25,000,000.00 |
PA | Upper Darby Delaware County Naylor's Run Flood Mitigation | EMP-2020-BR-084-0001 | Competitive | No | Not Selected | $4,908,750.00 | $6,545,000.00 |
PA | Philadelphia Cobbs Creek Floodplain Restoration | EMP-2020-BR-084-0002 | Competitive | No | Not Selected | $9,000,000.00 | $12,000,000.00 |
PA | OVERSUBSCRIBED - Lebanon County Hazard Mitigation Plan Update Application | EMP-2020-BR-084-0009 | Competitive | No | Ineligible | $41,250.00 | $55,000.00 |
PA | Yeadon Delaware Sanitary Sewer Generator project | EMP-2020-BR-084-0013 | Competitive | No | Not Selected | $210,375.00 | $280,500.00 |
PA | Erie County Hazard Mitigation Planning Grant | EMP-2020-BR-084-0025 | Allocation | No | Selected for Further Review | $37,500.00 | $50,000.00 |
PA | Hampton Township Allegheny County Water Pollution Control Facility Mitigation | EMP-2020-BR-084-0008 | Competitive | No | Not Selected | $34,819,759.50 | $46,426,346.00 |
PA | Berks County Hazard Mitigation Plan Update | EMP-2020-BR-084-0022 | Allocation | No | Selected for Further Review | $73,125.00 | $97,500.00 |
PA | Project Scoping: Comm of PA Flood Protect Conduit Inspects/SOG Dev/Study for Resilience | EMP-2020-BR-084-0012 | Allocation | No | Selected for Further Review | $150,000.00 | $200,000.00 |
PA | Oversubscription Lehigh Valley HazMit Plan (update 2023) - Northampton & Lehigh Counties | EMP-2020-BR-084-0014 | Competitive | No | Ineligible | $93,750.00 | $125,000.00 |
PA | Bethlehem Northampton Santee Road Sunset Drive Easton Avenue Drainage Mitigation | EMP-2020-BR-084-0021 | Competitive | No | Not Selected | $5,011,586.30 | $6,682,115.00 |
PA | Susquehanna County Hazard Mitigation Plan Update | EMP-2020-BR-084-0023 | Allocation | No | Selected for Further Review | $33,750.00 | $45,000.00 |
PA | Jefferson County Hazard Mitigation Plan Update | EMP-2020-BR-084-0006 | Allocation | No | Selected for Further Review | $37,500.00 | $50,000.00 |
PA | PA BRIC State Management Cost | EMP-2020-BR-084-0017 | Management Cost | No | Selected for Further Review | $78,250.00 | $12,197,755.57 |
PA | Pine Grove Schuylkill Green Infrastructure Storm water Mitigation | EMP-2020-BR-084-0026 | Competitive | No | Not Selected | $1,613,020.05 | $2,150,693.40 |
PA | Shamokin Coal Wastewater Infrastructure Mitigation | EMP-2020-BR-084-0019 | Competitive | No | Not Selected | $592,500.00 | $790,000.00 |
PA | IFLOWS 2.0: Upgrading Pennsylvania’s Integrated Flood Observation and Warning System | EMP-2020-BR-084-0010 | Competitive | No | Ineligible | $450,000.00 | $600,000.00 |
PR | Did Not Submit | $- | $- | ||||
RI | Town of Barrington Hazard Mitigation & Flood Managment Plan - FY2020 BRIC | EMB-2020-BR-071-0002 | Allocation | No | Selected for Further Review | $22,875.00 | $30,500.00 |
RI | Block Island Hazard Mitigation Plan Update 2022 | EMB-2020-BR-071-0010 | Allocation | No | Selected for Further Review | $10,620.00 | $14,160.00 |
RI | Warwick FY2020 Building Resilient Infrastructure in Communities (BRIC) | EMB-2020-BR-071-0008 | Allocation | No | Selected for Further Review | $32,229.00 | $42,972.00 |
RI | BRIC - Westerly Resilient Infrastructure: WWTP Flood Mitigation Project | EMB-2020-BR-071-0005 | Competitive | No | Not Selected | $3,463,165.15 | $4,617,553.54 |
RI | 2022 East Providence RI Local Hazard Mitigation Plan Update | EMB-2020-BR-071-0001 | Allocation | No | Selected for Further Review | $13,125.00 | $17,500.00 |
RI | State Management Costs | EMB-2020-BR-071-0004 | Management Cost | No | Selected for Further Review | $62,246.52 | $439,279.73 |
RI | Smithfield Hazard Mitigation Plan | EMB-2020-BR-071-0013 | Allocation | No | Selected for Further Review | $7,500.00 | $10,000.00 |
RI | No Providence | EMB-2020-BR-071-0014 | Competitive | No | Not Selected | $338,235.93 | $450,981.25 |
RI | Municipal Resilience Program | EMB-2020-BR-071-0009 | Allocation | No | Selected for Further Review | $157,500.00 | $210,000.00 |
RI | North and South Easton Pond Dam Mitigation Planning | EMB-2020-BR-071-0007 | Allocation | No | Selected for Further Review | $135,750.00 | $181,000.00 |
RI | Hazard Mitigation Plan Update | EMB-2020-BR-071-0003 | Allocation | No | Selected for Further Review | $20,949.90 | $27,933.20 |
RI | North Kingstown – Alternate Emergency Access to Mount View | EMB-2020-BR-071-0012 | Allocation | No | Ineligible | $124,547.33 | $166,063.11 |
RI | A project scoping activity for the Little Beach Area of Bonnet Shores / Landtrust | EMB-2020-BR-071-0011 | Allocation | No | Selected for Further Review | $52,350.00 | $69,800.00 |
RI | Update to the Town's Natural Hazard Mitigation Plan | EMB-2020-BR-071-0006 | Allocation | No | Selected for Further Review | $13,950.00 | $18,600.00 |
SC | Spartanburg County Emergency Services - Generator Project | EMA-2020-BR-194-0029 | Competitive | No | Ineligible | $248,263.50 | $331,018.00 |
SC | Backup Pump at Fort Jackson Pump Station Project | EMA-2020-BR-194-0014 | Competitive | No | Not Selected | $637,500.00 | $850,000.00 |
SC | Garden City Drainage Improvement Project Site 5 | EMA-2020-BR-194-0032 | Competitive | No | Not Selected | $622,467.22 | $829,956.89 |
SC | DHEC Statewide Emergency PPE Warehouse Project | EMA-2020-BR-194-0019 | Competitive | No | Not Selected | $26,287,979.25 | $35,050,639.00 |
SC | Pickens County Multi-Jurisdictional Hazard Mitigation Plan | EMA-2020-BR-194-0009 | Allocation | No | Selected for Further Review | $48,750.00 | $65,000.00 |
SC | Power Resilience for Murrells Inlet WWTP Project | EMA-2020-BR-194-0027 | Competitive | No | Not Selected | $135,853.30 | $181,137.73 |
SC | Horry County - McCormick Road Culvert Project | EMA-2020-BR-194-0030 | Competitive | No | Ineligible | $513,450.00 | $684,600.00 |
SC | SC Upstate Regional Scoping Project | EMA-2020-BR-194-0007 | Competitive | No | Ineligible | $600,000.00 | $800,000.00 |
SC | Myrtle Beach Wither's Swash Mitigation Project | EMA-2020-BR-194-0010 | Competitive | No | Ineligible | $2,104,500.00 | $2,806,000.00 |
SC | SC BRIC 2020 Management Cost | EMA-2020-BR-194-0002 | Management Cost | No | Selected for Further Review | $4,729,743.34 | $11,116,973.57 |
SC | Old Village Drainage Resilience-BRIC Project | EMA-2020-BR-194-0031 | Competitive | No | Not Selected | $5,347,165.50 | $7,551,945.00 |
SC | Horry County - Socastee Creek Flood Bench Project | EMA-2020-BR-194-0012 | Competitive | No | Ineligible | $1,244,486.25 | $1,659,315.00 |
SC | Charleston County Vulnerability Assessment | EMA-2020-BR-194-0028 | Allocation | No | Selected for Further Review | $82,500.00 | $110,000.00 |
SC | Folly Beach - West Indian & Tabby Drive Flood Mitigation Project Scoping | EMA-2020-BR-194-0022 | Allocation | No | Selected for Further Review | $34,960.00 | $45,885.00 |
SC | City of Columbia Resilient Water Supply Project | EMA-2020-BR-194-0033 | Competitive | No | Selected for Further Review | $32,635,783.95 | $46,622,548.35 |
SC | Mauldin Scoping Project | EMA-2020-BR-194-0024 | Competitive | No | Ineligible | $78,750.00 | $105,000.00 |
SC | Isle of Palms SC - Waldrep Home- Elevation Project | EMA-2020-BR-194-0003 | Competitive | No | Not Selected | $266,035.31 | $354,713.75 |
SC | Lexington County Recovery Shelter Retrofit | EMA-2020-BR-194-0016 | Competitive | No | Not Selected | $202,116.00 | $269,488.00 |
SC | Marion County Rural Water Stream Crossings Project | EMA-2020-BR-194-0020 | Competitive | No | Ineligible | $647,946.75 | $863,929.00 |
SC | Abbeville Public Utility System Redundancy Tie-In Project | EMA-2020-BR-194-0011 | Competitive | No | Not Selected | $581,767.50 | $775,690.00 |
SC | Clarendon County - Walker-Gamble Watershed Mitigation Project Scoping | EMA-2020-BR-194-0006 | Allocation | No | Selected for Further Review | $53,625.00 | $71,500.00 |
SC | Greenhill Community Drainage Project | EMA-2020-BR-194-0005 | Competitive | No | Not Selected | $186,676.63 | $261,347.63 |
SC | Sullivan's Island Storm Water Master Project Scoping | EMA-2020-BR-194-0008 | Allocation | No | Selected for Further Review | $116,415.00 | $157,500.00 |
SC | Fort Jackson Pump Station Project | EMA-2020-BR-194-0023 | Competitive | No | Not Selected | $693,750.00 | $925,000.00 |
SC | Greenville County Acquisition Project | EMA-2020-BR-194-0013 | Competitive | No | Not Selected | $1,181,230.91 | $1,562,313.46 |
SC | Charleston Medical District Flood Mitigation Project | EMA-2020-BR-194-0015 | Competitive | No | Not Selected | $2,250,000.00 | $3,000,000.00 |
SC | Cherokee County Flood Mitigation Projects | EMA-2020-BR-194-0001 | Competitive | No | Ineligible | $337,500.00 | $450,000.00 |
SC | Chestnut Bay Resilience Project | EMA-2020-BR-194-0018 | Competitive | No | Ineligible | $2,004,000.00 | $2,672,000.00 |
SC | Pelzer Community Drainage Project Scoping | EMA-2020-BR-194-0021 | Allocation | Yes | Ineligible | $95,000.00 | $105,000.00 |
SC | Backup Pump at Spring Valley Mobile Home Park Pump Station Project | EMA-2020-BR-194-0026 | Competitive | No | Not Selected | $684,750.00 | $913,000.00 |
SC | Backup Pump at Pebble Creek Pump Station Project | EMA-2020-BR-194-0025 | Competitive | No | Not Selected | $487,500.00 | $650,000.00 |
SC | SCDOI Safe Homes Program Project | EMA-2020-BR-194-0004 | Competitive | No | Not Selected | $160,208.92 | $220,208.92 |
SC | City of Bennettsville Stormwater Study | EMA-2020-BR-194-0017 | Allocation | No | Selected for Further Review | $168,750.00 | $225,000.00 |
SD | Lake County PDM Plan Update | EMD-2020-BR-119-0001 | Allocation | No | Selected for Further Review | $13,537.50 | $18,050.00 |
SD | Codington County PDM Plan Update | EMD-2020-BR-119-0007 | Allocation | No | Selected for Further Review | $13,237.50 | $17,650.00 |
SD | City of Sioux Falls Tomar Park Buyout Property #2 | EMD-2020-BR-119-0010 | Competitive | No | Withdrawn | $180,391.68 | $236,764.08 |
SD | City of Sioux Falls Tomar Park Buyout - Property #1 | EMD-2020-BR-119-0009 | Allocation | No | Withdrawn | $191,288.76 | $251,057.12 |
SD | City of Sioux Falls Tomar Park Buyout Property #3 | EMD-2020-BR-119-0008 | Competitive | No | Withdrawn | $176,478.96 | $231,628.64 |
SD | Sanborn County PDM Plan Update | EMD-2020-BR-119-0011 | Allocation | No | Selected for Further Review | $7,500.00 | $10,000.00 |
SD | Management Cost | EMD-2020-BR-122-0002 | Management Cost | No | Selected for Further Review | $16,922.30 | $16,116.50 |
SD | Hanson County H&H Study (Project Scoping) | EMD-2020-BR-119-0004 | Competitive | No | Ineligible | $346,481.25 | $461,975.00 |
SD | Brule County Storm Water Evaluation (Project Scoping) | EMD-2020-BR-119-0003 | Allocation | No | Selected for Further Review | $337,423.95 | $449,898.60 |
SD | Spirit Lake Township H&H Study (Project Scoping) | EMD-2020-BR-119-0002 | Allocation | No | Selected for Further Review | $9,655.50 | $12,673.00 |
SD | Drainage Improvement for Tribal Roads | EMD-2020-BR-122-0001 | Tribal Set-aside | Yes | Selected for Further Review | $152,300.73 | $169,223.03 |
SD | BRIC Management Cost | EMD-2020-BR-119-0006 | Management Cost | No | Selected for Further Review | $53,797.16 | $171,939.64 |
SD | Lincoln County H&H Study (Project Scoping) | EMD-2020-BR-119-0005 | Allocation | No | Selected for Further Review | $22,275.00 | $29,700.00 |
TN | Satellite EAS Relay | EMA-2020-BR-241-0008 | Allocation | No | Ineligible | $195,000.00 | $260,000.00 |
TN | MADISON COUNTY/DISTRICT PPE SUPPLY BUILDING | EMA-2020-BR-241-0010 | Competitive | No | Ineligible | $592,500.00 | $790,000.00 |
TN | Tiptonville Pump Station | EMA-2020-BR-241-0006 | Competitive | No | Ineligible | $336,600.00 | $448,800.00 |
TN | BRIC: Blount County Back up 911 facility | EMA-2020-BR-241-0007 | Competitive | No | Ineligible | $412,500.00 | $550,000.00 |
TN | EPB Chattanooga Community Network Conversion for Critical Infrastructure | EMA-2020-BR-241-0003 | Competitive | No | Not Selected | $37,300,064.84 | $49,999,972.84 |
TN | Sugar Creek - Stream and Floodplain Restoration - Medina, TN | EMA-2020-BR-241-0001 | Competitive | No | Not Selected | $224,175.00 | $298,900.00 |
TN | Rutherford County EMS/Fire Stations | EMA-2020-BR-241-0012 | Competitive | No | Ineligible | $17,158,381.99 | $22,877,842.65 |
TN | Cane Creek - Stream Restoration and Infrastructure Resilience - Camden, TN | EMA-2020-BR-241-0004 | Allocation | No | Selected for Further Review | $90,000.00 | $120,000.00 |
TN | Beaver Creek - Drainage Infrastructure Rehabilitation - Huntingdon, TN | EMA-2020-BR-241-0002 | Competitive | No | Not Selected | $553,875.00 | $738,500.00 |
TN | ETSU Geotechnical Mitigation Strategies | EMA-2020-BR-241-0011 | Allocation | No | Selected for Further Review | $210,000.00 | $280,000.00 |
TN | Big Creek - Stream Infrastructure Improvement - Atoka, TN | EMA-2020-BR-241-0009 | Competitive | No | Ineligible | $342,390.00 | $456,520.00 |
TN | Tennessee State Management Cost | EMA-2020-BR-241-0005 | Management Cost | No | Selected for Further Review | $40,000.00 | $7,682,053.54 |
TX | Town of Combes-Nixon Rd Drainage- National | EMT-2020-BR-104-0014 | Competitive | Yes | Not Selected | $852,667.75 | $942,422.25 |
TX | Brazos Valley Regional Hazard Mitigation Plan | EMT-2020-BR-104-0023 | Allocation | No | Selected for Further Review | $112,593.38 | $183,359.40 |
TX | Bacliff Drainage Enhancement Project | EMT-2020-BR-104-0018 | Competitive | No | Not Selected | $463,425.00 | $617,900.00 |
TX | Sienna LID Pump Station Conversion at Woods Acreage Estate Outfall | EMT-2020-BR-104-0001 | Competitive | No | Not Selected | $1,659,000.00 | $2,184,000.00 |
TX | Channel 100-A | EMT-2020-BR-104-0008 | Competitive | No | Not Selected | $30,053,149.50 | $39,570,866.00 |
TX | City of Goliad - Critical Facilities Generators - 2020 BRIC | EMT-2020-BR-104-0017 | Competitive | Yes | Not Selected | $842,940.00 | $936,600.00 |
TX | Forest Shadows Subdivision Flood Mitigation BRIC | EMT-2020-BR-104-0024 | Competitive | No | Not Selected | $1,063,823.20 | $1,396,267.95 |
TX | BRIC (FMA Duplicate) 2020 Buyout | EMT-2020-BR-104-0005 | Competitive | No | Not Selected | $13,492,730.30 | $17,990,307.06 |
TX | HCDD1 Raymondville Drain, Hidalgo Portion, BRIC | EMT-2020-BR-104-0021 | Competitive | No | Not Selected | $115,242,201.00 | $153,656,268.00 |
TX | Sienna LID Slope Pave of Brazos River Levee | EMT-2020-BR-104-0026 | Competitive | No | Not Selected | $7,900,000.00 | $10,400,000.00 |
TX | Storm Surge Protection and Resiliency | EMT-2020-BR-104-0009 | Competitive | Yes | Not Selected | $3,305,928.80 | $3,673,032.00 |
TX | Bear Creek Village Subdivision Flood Mitigation BRIC | EMT-2020-BR-104-0028 | Competitive | No | Not Selected | $8,629,200.00 | $11,325,825.00 |
TX | Orange County Flood and Drainage Improvements - 2020 BRIC | EMT-2020-BR-104-0003 | Competitive | No | Not Selected | $8,132,560.65 | $10,695,108.68 |
TX | City of Bay City - Bridge Mitigaton - BRIC 2020 | EMT-2020-BR-104-0015 | Competitive | No | Not Selected | $5,056,831.20 | $6,637,090.95 |
TX | Travis County Multi-Jurisdictional Hazard Mitigation Plan | EMT-2020-BR-104-0016 | Allocation | No | Selected for Further Review | $107,850.05 | $141,553.18 |
TX | Hays County Community Flood Mitigation | EMT-2020-BR-104-0011 | Competitive | No | Not Selected | $11,010,584.00 | $14,451,391.50 |
TX | City of Houston Advanced Flood Inundation Modeling for Enhanced Building Codes | EMT-2020-BR-104-0025 | Allocation | No | Selected for Further Review | $226,500.00 | $377,500.00 |
TX | BRIC Jefferson County Home Elevations | EMT-2020-BR-104-0020 | Competitive | No | Not Selected | $1,360,163.25 | $1,785,246.00 |
TX | BRIC 2020 Buyout | EMT-2020-BR-104-0013 | Competitive | No | Not Selected | $2,839,918.16 | $3,786,557.55 |
TX | State Management Costs | EMT-2020-BR-104-0027 | Management Cost | No | Selected for Further Review | $88,432.46 | $41,888,335.45 |
TX | Fallwell Lane, Sand Hill Energy Center & South Austin Regional WWTP Access | EMT-2020-BR-104-0006 | Competitive | No | Not Selected | $16,701,420.42 | $21,920,751.30 |
TX | a. City of Galveston (TX) – 37th Street Drainage Improvement Project Scoping – FY2020 BRIC | EMT-2020-BR-104-0004 | Competitive | No | Ineligible | $4,885,746.90 | $6,407,444.00 |
TX | Newton County Planning | EMT-2020-BR-104-0010 | Allocation | No | Selected for Further Review | $52,339.00 | $88,000.00 |
TX | City of Galveston (TX) – Pier 20 Drainage Improvement Project (Phased) – FY2020 BRIC | EMT-2020-BR-104-0019 | Competitive | No | Not Selected | $44,369,296.35 | $58,556,077.60 |
TX | City of Houston - Market Square Flood Control and Stormwater Mitigation Project BRIC | EMT-2020-BR-104-0012 | Competitive | No | Not Selected | $35,114,668.16 | $47,452,254.27 |
TX | Bexar County Multi-Jurisdictional Hazard Mitigation Plan Update | EMT-2020-BR-104-0002 | Allocation | No | Selected for Further Review | $55,855.23 | $93,912.00 |
TX | City of Alpine- Zoning , Code, Drought & Historic Properties Plan Updates | EMT-2020-BR-104-0007 | Allocation | No | Ineligible | $65,384.13 | $106,492.76 |
TX | City of Pharr, TX - SEPDMPP1 - FY2020 BRIC | EMT-2020-BR-104-0022 | Competitive | No | Not Selected | $8,602,802.21 | $11,397,502.95 |
UT | Thistle Stream Flood Control | EMD-2020-BR-065-0016 | Competitive | No | Ineligible | $4,591,130.21 | $6,121,507.21 |
UT | Lehi City Emergency Generators | EMD-2020-BR-065-0021 | Competitive | No | Not Selected | $1,856,625.00 | $2,475,500.00 |
UT | Santaquin City Emergency Generator | EMD-2020-BR-065-0017 | Competitive | No | Not Selected | $87,088.50 | $116,118.00 |
UT | Weber Basin Water Conservancy District Parallel Aqueduct | EMD-2020-BR-065-0008 | Competitive | No | Not Selected | $18,937,023.20 | $47,342,558.00 |
UT | Hobble and Payson Debris Basin Project | EMD-2020-BR-065-0009 | Competitive | No | Not Selected | $2,537,055.20 | $3,388,155.20 |
UT | Logan City River Bank Stabilization | EMD-2020-BR-065-0030 | Competitive | No | Not Selected | $422,403.00 | $554,404.00 |
UT | Perry City Sewer Lift Station Generator | EMD-2020-BR-065-0025 | Competitive | No | Not Selected | $155,525.00 | $207,150.00 |
UT | Sullivan Park Streambank Stabilization | EMD-2020-BR-065-0002 | Competitive | No | Not Selected | $1,005,675.00 | $1,340,900.00 |
UT | Mount Pleasant Utah Drought Resistant Landscaping | EMD-2020-BR-065-0015 | Competitive | No | Not Selected | $1,500,000.00 | $2,026,000.00 |
UT | Bountiful Critical Facilities Generators Project | EMD-2020-BR-065-0019 | Competitive | No | Not Selected | $327,010.50 | $436,014.00 |
UT | Fix the Bricks 2020 | EMD-2020-BR-065-0023 | Competitive | No | Not Selected | $3,887,888.00 | $5,183,851.00 |
UT | Saratoga Springs Seismic Retrofit | EMD-2020-BR-065-0033 | Competitive | No | Not Selected | $79,216.98 | $105,622.64 |
UT | Saratoga Springs Debris Basin-Clark Canyon | EMD-2020-BR-065-0006 | Competitive | No | Not Selected | $1,493,726.06 | $1,991,634.75 |
UT | Granite School District EOC Generator Project | EMD-2020-BR-065-0014 | Competitive | No | Not Selected | $1,700,506.20 | $2,267,341.60 |
UT | Harrisville Four-Mile Creek Culvert Project | EMD-2020-BR-065-0022 | Competitive | No | Not Selected | $455,415.00 | $606,720.00 |
UT | Emery County Pre-Disaster Hazard Mitigation Plan 2023 | EMD-2020-BR-065-0007 | Allocation | No | Selected for Further Review | $33,750.00 | $45,000.00 |
UT | Tooele City Water Well Emergency Generators | EMD-2020-BR-065-0024 | Competitive | No | Not Selected | $622,500.00 | $830,000.00 |
UT | Sevier County Clear Creek Bank Stabilization | EMD-2020-BR-065-0011 | Competitive | No | Not Selected | $292,500.00 | $390,000.00 |
UT | Draper City Fuel Mitigation Project | EMD-2020-BR-065-0005 | Competitive | No | Not Selected | $398,772.30 | $523,696.40 |
UT | Lehi City Flooding Project Scoping | EMD-2020-BR-065-0010 | Allocation | No | Selected for Further Review | $150,000.00 | $200,000.00 |
UT | Brighton Wildfire Fuels Reduction | EMD-2020-BR-065-0034 | Competitive | No | Not Selected | $116,555.55 | $155,407.40 |
UT | Penstock Waterlines Resilient Infrastructure Project | EMD-2020-BR-065-0020 | Competitive | No | Not Selected | $8,072,625.00 | $10,763,500.00 |
UT | San Juan County Mitigation Plan Update | EMD-2020-BR-065-0027 | Allocation | No | Selected for Further Review | $22,500.00 | $30,000.00 |
UT | MWDSLS Multi-hazard Mitigation Plan | EMD-2020-BR-065-0031 | Allocation | No | Selected for Further Review | $119,837.70 | $157,308.60 |
UT | Carbon County Hazard Mitigation Plan 2023 | EMD-2020-BR-065-0001 | Allocation | No | Selected for Further Review | $33,750.00 | $45,000.00 |
UT | Altamont Town Flood Mitigation Project Scoping | EMD-2020-BR-065-0004 | Allocation | No | Selected for Further Review | $16,224.05 | $25,000.00 |
UT | Ballard City Flood Mitigation Project Scoping | EMD-2020-BR-065-0032 | Allocation | No | Selected for Further Review | $15,000.00 | $20,000.00 |
UT | South Weber City Multi-hazard Mitigation Plan | EMD-2020-BR-065-0035 | Allocation | No | Selected for Further Review | $53,188.25 | $69,813.50 |
UT | Saratoga Springs Emergency Generator | EMD-2020-BR-065-0003 | Competitive | No | Not Selected | $468,606.60 | $624,808.80 |
UT | BRIC 2020 State of Utah Management Costs | EMD-2020-BR-065-0013 | Management Cost | No | Selected for Further Review | $79,693.46 | $640,474.23 |
UT | North Salt Lake Water Facility Generators | EMD-2020-BR-065-0028 | Competitive | No | Not Selected | $1,226,137.50 | $1,634,850.00 |
UT | Eureka Flood Control Basin Project | EMD-2020-BR-065-0012 | Competitive | No | Not Selected | $2,639,417.00 | $3,600,013.00 |
UT | Layton City Water System Generators | EMD-2020-BR-065-0029 | Competitive | No | Not Selected | $323,513.25 | $431,351.00 |
UT | Monroe City Flood Scoping Project | EMD-2020-BR-065-0018 | Allocation | No | Selected for Further Review | $18,750.00 | $25,000.00 |
UT | Utah Statewide Residential Seismic Retrofit Program Project Scoping | EMD-2020-BR-065-0026 | Allocation | No | Selected for Further Review | $137,000.00 | $179,812.50 |
VA | Northern Neck PDC - Regional Hazard Mitigation Plan Update | EMP-2020-BR-036-0036 | Allocation | No | Selected for Further Review | $75,000.00 | $100,000.00 |
VA | York County - Goodwin Neck Culvert Replacement | EMP-2020-BR-036-0015 | Competitive | No | Not Selected | $640,779.00 | $854,372.00 |
VA | Town of Bedford - Bedford Memorial Hospital Generator | EMP-2020-BR-036-0021 | Competitive | No | Ineligible | $3,205,806.00 | $4,274,408.00 |
VA | Altavista, Town of - English Park Shoreline Stabilization | EMP-2020-BR-036-0026 | Competitive | No | Ineligible | $1,078,500.00 | $1,438,000.00 |
VA | City of Hampton - Honor Park Resllience Project | EMP-2020-BR-036-0008 | Competitive | No | Not Selected | $4,528,461.00 | $6,037,948.00 |
VA | Virginia Beach - Eastern Shore Drive Drainage Improvement | EMP-2020-BR-036-0010 | Competitive | No | Not Selected | $21,383,675.00 | $30,548,107.00 |
VA | City of Chesapeake - N. Battlefield Blvd Road Elevation | EMP-2020-BR-036-0024 | Competitive | No | Not Selected | $3,308,049.00 | $4,410,732.00 |
VA | City of Norfolk - Increasing Resilience of Norfolk's Road Network | EMP-2020-BR-036-0011 | Competitive | No | Ineligible | $7,700,000.00 | $11,000,000.00 |
VA | Pamunkey Indian Tribe - Indian Reservation Generators | EMP-2020-BR-036-0029 | Competitive | No | Not Selected | $61,425.00 | $81,900.00 |
VA | Town of Smithfield - Great Springs Road Acquisition & Demolition Project | EMP-2020-BR-036-0018 | Competitive | No | Not Selected | $690,180.00 | $920,240.00 |
VA | City of Chesapeake - Install Fixed Generators at 3 Wastewater Pump Stations | EMP-2020-BR-036-0013 | Competitive | No | Not Selected | $263,812.50 | $351,750.00 |
VA | DCR - Rehabilitation High Hazard Soil and Water Conservation District Impounding Structures (Dams) | EMP-2020-BR-036-0032 | Competitive | No | Not Selected | $45,000,015.00 | $60,000,020.00 |
VA | Greene/Stanardsville - Water Supply Protection | EMP-2020-BR-036-0028 | Competitive | No | Not Selected | $50,000,000.00 | $73,000,000.00 |
VA | Henrico County - Gambles Mill Pump Station Water and Sewer Protective Measures | EMP-2020-BR-036-0001 | Competitive | No | Not Selected | $9,059,055.75 | $12,078,741.00 |
VA | Middle Peninsula PDC - Fight the Flood Program Development | EMP-2020-BR-036-0017 | Allocation | No | Selected for Further Review | $75,000.00 | $100,000.00 |
VA | Albemarle County - Flood Hazard Modeling and Reduction in the Branchlands Neighborhood | EMP-2020-BR-036-0014 | Allocation | No | Selected for Further Review | $96,261.00 | $128,348.00 |
VA | Middle Peninsula PDC - Hog Island Living Shoreline Construction | EMP-2020-BR-036-0019 | Competitive | No | Ineligible | $110,250.00 | $147,000.00 |
VA | New River Valley Regional Commission - Hazard Mitigation Plan Update | EMP-2020-BR-036-0007 | Allocation | No | Selected for Further Review | $75,000.00 | $100,000.00 |
VA | City of Hampton - North Armistead Avenue Resilience Project | EMP-2020-BR-036-0034 | Competitive | No | Not Selected | $9,827,643.00 | $13,103,524.00 |
VA | VA DHCD - When Disaster Strikes Institute and the Establishment of a SDRN | EMP-2020-BR-036-0020 | Allocation | No | Selected for Further Review | $80,640.00 | $107,520.00 |
VA | VDEM - BRIC 2020 Management Costs | EMP-2020-BR-036-0006 | Management Cost | No | Selected for Further Review | $77,466.00 | $8,840,000.00 |
VA | Dinwiddie County Water Authority (DCWA) - Emergency Water Line | EMP-2020-BR-036-0012 | Competitive | No | Not Selected | $2,773,000.00 | $3,747,297.00 |
VA | City of Portsmouth - Emergency Services Communication Improvements | EMP-2020-BR-036-0022 | Competitive | No | Not Selected | $2,766,424.50 | $3,688,566.00 |
VA | City of Hampton - Emergency Power for 6 Sanitary Sewer Pump Stations | EMP-2020-BR-036-0002 | Competitive | No | Not Selected | $388,125.00 | $517,500.00 |
VA | City of Chesapeake - Wastewater Pump Station Acquisition and Reconstruction | EMP-2020-BR-036-0027 | Competitive | No | Not Selected | $2,362,500.00 | $3,150,000.00 |
VA | City of Alexandria - Four Mile Run Sediment Removal Project | EMP-2020-BR-036-0016 | Competitive | No | Ineligible | $1,406,250.00 | $1,875,000.00 |
VA | Town of Tangier - Feasibility Study and Preliminary Design for Microgrid Power on Tangier Island | EMP-2020-BR-036-0003 | Allocation | Yes | Selected for Further Review | $114,030.00 | $126,700.00 |
VA | Prince William County - Fleetwood Drive Floodgate Installations | EMP-2020-BR-036-0031 | Competitive | No | Ineligible | $118,831.50 | $158,442.00 |
VA | Town of Hillsboro - Water Supply Improvement | EMP-2020-BR-036-0005 | Competitive | No | Ineligible | $80,689.00 | $115,270.00 |
VA | City of Chesapeake - Deepwater Dr. Road Elevation | EMP-2020-BR-036-0023 | Competitive | No | Not Selected | $354,611.25 | $472,815.00 |
VA | City of Portsmouth - Public Safety Complex Redevelopment | EMP-2020-BR-036-0025 | Competitive | No | Ineligible | $48,286,749.00 | $64,382,332.00 |
VA | Middle Peninsula PDC - Living Shoreline Constrcution for 6 Properties | EMP-2020-BR-036-0009 | Competitive | No | Ineligible | $97,500.00 | $130,000.00 |
VA | Henrico County - Woodman Rd. Drainage Improvement (Culvert Upgrade) | EMP-2020-BR-036-0033 | Competitive | No | Not Selected | $4,084,368.00 | $5,445,824.00 |
VA | City of Fairfax - Plan Integration | EMP-2020-BR-036-0030 | Allocation | No | Selected for Further Review | $9,069.00 | $12,092.00 |
VA | Town of Crewe - Emergency Generators | EMP-2020-BR-036-0035 | Competitive | No | Not Selected | $74,095.50 | $98,794.00 |
VA | GWRC - Regional Hazard Mitigation Plan | EMP-2020-BR-036-0004 | Allocation | No | Selected for Further Review | $75,000.00 | $100,000.00 |
VI | Did Not Submit | $- | $- | ||||
VT | WNRCD Hands Mill Dam Removal in Washington | EMB-2020-BR-003-0011 | Competitive | No | Not Selected | $429,343.53 | $563,513.38 |
VT | Technical Assistance and BCA Development | EMB-2020-BR-003-0004 | Allocation | No | Selected for Further Review | $96,000.00 | $128,000.00 |
VT | Local Hazard Mitigation Plan Development | EMB-2020-BR-003-0002 | Allocation | No | Selected for Further Review | $216,150.00 | $288,200.00 |
VT | Island Expansion Project Scoping in Panton | EMB-2020-BR-003-0007 | Allocation | No | Selected for Further Review | $24,000.00 | $31,500.00 |
VT | BRIC Vermont State Management Costs | EMB-2020-BR-003-0009 | Management Cost | No | Selected for Further Review | $79,257.67 | $65,500.00 |
VT | Cross Brothers Dam Removal in Northfield | EMB-2020-BR-003-0005 | Competitive | No | Not Selected | $762,118.00 | $1,000,279.88 |
VT | Railroad Trestle #308 Project Scoping in Barre City | EMB-2020-BR-003-0013 | Allocation | No | Selected for Further Review | $53,600.00 | $70,350.00 |
VT | Mountain Top Road Drainage Project Scoping in Chittenden | EMB-2020-BR-003-0006 | Allocation | No | Selected for Further Review | $12,800.00 | $16,800.00 |
VT | Flat Iron Road Hazard Mitigation Project Scoping in Warren | EMB-2020-BR-003-0012 | Allocation | No | Selected for Further Review | $24,800.00 | $32,550.00 |
VT | Division of Fire Safety Building Code Development | EMB-2020-BR-003-0010 | Allocation | No | Selected for Further Review | $42,420.33 | $55,676.68 |
VT | Garfield Road Culvert Project Scoping in Hyde Park | EMB-2020-BR-003-0003 | Allocation | No | Selected for Further Review | $32,000.00 | $42,000.00 |
VT | Whitcomb Island Road Bridge Project Scoping in Hyde Park | EMB-2020-BR-003-0008 | Allocation | No | Selected for Further Review | $40,000.00 | $52,500.00 |
VT | 2023 State Hazard Mitigation Plan Facilitation Support | EMB-2020-BR-003-0001 | Allocation | No | Selected for Further Review | $56,250.00 | $75,000.00 |
WA | Quileute Hazard Mitigation Plan 2021 | EMS-2020-BR-127-0001 | Tribal Set-aside | Yes | Selected for Further Review | $77,769.00 | $86,410.00 |
WA | MIT HMP Development | EMS-2020-BR-139-0001 | Tribal Set-aside | No | Selected for Further Review | $200,000.00 | $270,000.00 |
WA | Quinault Indian Nation FEMA Buyout Analysis for Taholah Relocation | EMS-2020-BR-137-0002 | Tribal Set-aside | Yes | Selected for Further Review | $31,050.00 | $34,500.00 |
WA | BRIC 2020 State Management Costs Sub-Application | EMS-2020-BR-102-0013 | Management Cost | No | Selected for Further Review | $7,952,267.82 | $14,197,608.09 |
WA | Covington Water District Tank 4 Replacement Project, 22427 SE 331st Street, Auburn, WA 98092 | EMS-2020-BR-102-0001 | Competitive | No | Not Selected | $1,772,973.25 | $7,091,893.00 |
WA | Westport Vertical Evacuation Structure | EMS-2020-BR-102-0010 | Competitive | Yes | Selected for Further Review | $13,735,823.40 | $15,262,026.00 |
WA | Mission Creek: Shelton Tree Farm Flood Mitigation and Bank Stabilization | EMS-2020-BR-102-0016 | Competitive | No | Not Selected | $118,500.00 | $158,000.00 |
WA | Seattle Northlake Retaining Wall Seismic Retrofit - FY2020 BRIC | EMS-2020-BR-102-0021 | Competitive | No | Not Selected | $13,228,227.75 | $17,637,637.00 |
WA | King County Mitigation of Properties At-Risk from Flood and Landslide Hazards | EMS-2020-BR-102-0020 | Competitive | No | Not Selected | $1,367,300.06 | $1,823,066.75 |
WA | FY20 BRIC Subapplication--Coyote Drive and Community Plaza Way Water Line Seismic Retrofit | EMS-2020-BR-125-0002 | Tribal Set-aside | Yes | Selected for Further Review | $499,500.00 | $555,000.00 |
WA | Storm Creek Erosion Management Project | EMS-2020-BR-102-0022 | Competitive | No | Not Selected | $548,000.00 | $1,000,000.00 |
WA | FY 20 BRIC -- Elder's Boulevard Water System Seismic Design | EMS-2020-BR-125-0003 | Tribal Set-aside | Yes | Selected for Further Review | $100,500.00 | $111,667.00 |
WA | Kittitas County Washington Waste Transfer Station Flood Mitigation | EMS-2020-BR-102-0005 | Competitive | No | Selected for Further Review | $12,654,940.38 | $17,274,080.38 |
WA | FY20 BRIC LIBC Project Scoping Nooksack Estuary Hydraulic Modeling | EMS-2020-BR-129-0001 | Tribal Set-aside | No | Selected for Further Review | $182,070.21 | $242,760.28 |
WA | Updating and maintaining King County’s landslide database & landslide hazard mapping | EMS-2020-BR-102-0017 | Allocation | No | Selected for Further Review | $187,500.00 | $250,000.00 |
WA | Mitigating Urban Heat Island Risks in King County, WA | EMS-2020-BR-102-0004 | Allocation | No | Selected for Further Review | $90,552.00 | $120,736.00 |
WA | Permanent Generator at Everett Regional Water Supply's Evergreen Pump Station | EMS-2020-BR-102-0018 | Competitive | No | Not Selected | $816,696.75 | $1,088,929.00 |
WA | Quinault Indian Nation Hazard Mitigation Plan Update 2021 | EMS-2020-BR-137-0001 | Tribal Set-aside | Yes | Selected for Further Review | $95,737.50 | $106,375.00 |
WA | Swinomish Planning Subapplication | EMS-2020-BR-141-0002 | Tribal Set-aside | Yes | Selected for Further Review | $270,000.00 | $300,000.00 |
WA | North Shore Levee West | EMS-2020-BR-102-0002 | Competitive | No | Selected for Further Review | $34,650,746.20 | $46,200,995.00 |
WA | City of Auburn Reservoir 2 Seismic Control Valve | EMS-2020-BR-102-0009 | Competitive | No | Not Selected | $900,000.00 | $1,200,000.00 |
WA | 2021 Airport Tower Seismic Retrofit | EMS-2020-BR-102-0008 | Competitive | No | Not Selected | $6,402,501.00 | $8,536,668.00 |
WA | City of Walla Walla Water Transmission Main Seismic Upgrade | EMS-2020-BR-102-0003 | Competitive | No | Not Selected | $5,656,530.00 | $7,542,040.00 |
WA | WSDOT Project Scoping | EMS-2020-BR-102-0012 | Allocation | No | Selected for Further Review | $161,130.60 | $214,840.80 |
WA | Aberdeen-Hoquiam Fry Creek Pump Station | EMS-2020-BR-102-0015 | Competitive | No | Ineligible | $9,017,080.50 | $12,022,774.00 |
WA | Water Station 5 Reservoir and Pump Station Replacement Project | EMS-2020-BR-102-0011 | Competitive | No | Not Selected | $20,754,827.00 | $27,673,104.00 |
WA | Seattle Tolt Water Supply Pipeline Seismic Resiliency Project - FY2020 BRIC | EMS-2020-BR-102-0019 | Competitive | No | Not Selected | $2,157,252.00 | $2,876,336.00 |
WA | FY20 BRIC - Management Costs | EMS-2020-BR-125-0001 | Management Cost | Yes | Selected for Further Review | $66,666.70 | $66,666.00 |
WA | Replacement of Reservoir 2 | EMS-2020-BR-102-0007 | Competitive | No | Not Selected | $15,175,500.00 | $20,234,000.00 |
WA | Project Scoping – Tidal Surge-Inundation Zones | EMS-2020-BR-141-0004 | Tribal Set-aside | Yes | Selected for Further Review | $92,487.89 | $102,764.32 |
WA | Lake Meridian Water District Storage Facilities - Seismic and Geotechnical Studies | EMS-2020-BR-102-0006 | Allocation | No | Selected for Further Review | $150,000.00 | $200,000.00 |
WA | Project Scoping – Pioneer Parkway-Rainbow Bridge – Landslide Risk | EMS-2020-BR-141-0003 | Tribal Set-aside | Yes | Selected for Further Review | $85,003.25 | $94,448.06 |
WA | FY20 BRIC LIBC Project Scoping Nooksack Estuary Hydraulic Modeling | EMS-2020-BR-129-0002 | Management Cost | No | Selected for Further Review | $24,276.03 | $24,243.10 |
WA | City of Kirkland South Reservoir Seismic Retrofits | EMS-2020-BR-102-0014 | Competitive | No | Not Selected | $2,430,000.00 | $3,240,000.00 |
WA | Swinomish Management Subapplication | EMS-2020-BR-141-0005 | Management Cost | Yes | Selected for Further Review | $59,998.46 | $59,998.45 |
WA | Swinomish Infrastructure Subapplication | EMS-2020-BR-141-0001 | Tribal Set-aside | Yes | Selected for Further Review | $92,494.97 | $102,772.19 |
WI | Barron County Multi-Hazard Mitigation Plan Update | EMC-2020-BR-009-0021 | Allocation | No | Selected for Further Review | $36,000.00 | $47,250.00 |
WI | Raw Water Facility Mitigation Project - Shoreline Protection - Sheb. Water Utility | EMC-2020-BR-009-0012 | Competitive | No | Not Selected | $1,386,556.29 | $1,866,377.19 |
WI | Lafayette County Hazard Mitigation Plan Update | EMC-2020-BR-009-0010 | Allocation | No | Selected for Further Review | $26,666.67 | $35,000.01 |
WI | Lake Park Bluff Restoration Project | EMC-2020-BR-009-0002 | Competitive | No | Not Selected | $1,336,601.53 | $1,754,289.52 |
WI | Application for BRIC funding | EMC-2020-BR-009-0007 | Competitive | No | Not Selected | $2,784,372.48 | $3,654,488.88 |
WI | Rock County Hazard Mitigation Plan | EMC-2020-BR-009-0011 | Allocation | No | Selected for Further Review | $24,520.92 | $32,694.56 |
WI | County Road Y Mitigation | EMC-2020-BR-009-0026 | Competitive | No | Not Selected | $829,505.61 | $1,088,726.12 |
WI | Royall School District BRIC Safe Room Project | EMC-2020-BR-009-0003 | Competitive | Yes | Not Selected | $3,654,348.10 | $4,040,348.10 |
WI | Monroe County Real-time Flood Monitoring System - FY2020BRIC Planning | EMC-2020-BR-009-0029 | Allocation | No | Selected for Further Review | $32,000.00 | $42,000.00 |
WI | Pepin County Multi-Hazards Mitigation Plan Update 2021-2022 | EMC-2020-BR-009-0016 | Allocation | No | Selected for Further Review | $24,368.20 | $32,931.20 |
WI | Lincoln-King Safe Room | EMC-2020-BR-009-0023 | Competitive | No | Not Selected | $2,521,908.00 | $3,362,544.00 |
WI | Village of Chaseburg Acquisition/Demolition | EMC-2020-BR-009-0020 | Competitive | Yes | Not Selected | $124,067.15 | $137,126.85 |
WI | Washington Co. Hazard Mitigation Plan UPDATE | EMC-2020-BR-009-0014 | Allocation | No | Selected for Further Review | $48,000.00 | $63,000.00 |
WI | Norwalk-Ontario-Wilton BRIC Safe Room Project | EMC-2020-BR-009-0031 | Competitive | Yes | Not Selected | $2,217,650.00 | $2,452,650.00 |
WI | Darlington Community Schools BRIC Safe Room Project | EMC-2020-BR-009-0019 | Competitive | Yes | Not Selected | $4,885,718.52 | $5,420,718.52 |
WI | Douglas County Wisconsin Highway Dept. Nemadji Bridge | EMC-2020-BR-009-0028 | Competitive | No | Not Selected | $790,328.98 | $1,037,306.79 |
WI | Old Sauk Trails Business Park Pond and Greenway Flood Mitigation: City of Madison FY2020 BRIC | EMC-2020-BR-009-0001 | Competitive | No | Not Selected | $6,430,069.33 | $9,013,579.33 |
WI | Loyal School District BRIC Safe Room Project | EMC-2020-BR-009-0017 | Competitive | Yes | Not Selected | $4,010,446.27 | $4,435,446.27 |
WI | Lake Hallie BRIC Safe Room Project | EMC-2020-BR-009-0022 | Competitive | No | Not Selected | $9,483,118.04 | $12,448,118.04 |
WI | Columbia County - Dekorra Acquisition/Demolition | EMC-2020-BR-009-0013 | Competitive | No | Not Selected | $133,596.00 | $175,344.75 |
WI | Rolling Hills Subdivision | EMC-2020-BR-009-0027 | Allocation | No | Selected for Further Review | $40,000.00 | $52,500.00 |
WI | Lincoln County Hazard Mitigation Plan Update | EMC-2020-BR-009-0025 | Allocation | No | Selected for Further Review | $31,500.00 | $42,000.00 |
WI | Iowa County Multi Hazard Mitigation Plan 2022 Update | EMC-2020-BR-009-0006 | Allocation | No | Selected for Further Review | $22,500.00 | $30,000.00 |
WI | Lily River at County Road DD Crossing Replacement and Flood Risk Mitigation Project | EMC-2020-BR-009-0024 | Competitive | No | Not Selected | $261,432.97 | $343,130.78 |
WI | Northern Wisconsin State Fairgrounds (Chippewa Falls) Community Safe Room | EMC-2020-BR-009-0008 | Competitive | No | Not Selected | $633,292.00 | $872,498.00 |
WI | City of Sheboygan Southside Interceptor Sanitary Sewage System Infrastructure Improvement Project | EMC-2020-BR-009-0015 | Competitive | No | Not Selected | $7,329,130.66 | $10,273,870.66 |
WI | Radisson Community Safe Room | EMC-2020-BR-009-0018 | Competitive | Yes | Ineligible | $485,939.82 | $537,091.38 |
WI | Town of Liberty Acquisition/Demolition | EMC-2020-BR-009-0004 | Competitive | Yes | Not Selected | $167,246.12 | $184,850.98 |
WI | Vernon County Building Resilience & Capacity with Technology & Partnerships | EMC-2020-BR-009-0030 | Allocation | No | Selected for Further Review | $186,010.36 | $244,138.82 |
WI | Bad River WWTP | EMC-2020-BR-144-0001 | Tribal Set-aside | Yes | Selected for Further Review | $66,916.80 | $74,352.00 |
WI | 2022 Outagamie County Multi-Hazard Mitigation Plan Update | EMC-2020-BR-009-0005 | Allocation | No | Selected for Further Review | $26,801.10 | $35,176.45 |
WI | 2020 BRIC Recipient Management Costs | EMC-2020-BR-009-0009 | Management Cost | No | Selected for Further Review | $65,669.10 | $4,620,000.00 |
WV | State Management | EMP-2020-BR-002-0002 | Management Cost | No | Selected for Further Review | $30,000.00 | $30,000.00 |
WV | State Plan Update | EMP-2020-BR-002-0001 | Allocation | No | Selected for Further Review | $225,000.00 | $300,000.00 |
WY | Cheyenne Duff Avenue Flood Control Project | EMD-2020-BR-099-0005 | Competitive | No | Not Selected | $5,023,488.94 | $6,697,985.25 |
WY | Cheyenne Dry Creek UPRR Crossing Project Scoping Design | EMD-2020-BR-099-0004 | Allocation | No | Selected for Further Review | $150,000.00 | $200,000.00 |
WY | Town of Mills Riverfront Stabilization & Restoration Planning Project | EMD-2020-BR-099-0008 | Allocation | No | Selected for Further Review | $56,250.00 | $75,000.00 |
WY | Town of Pine Bluffs Capability- and Capacity-Building Project | EMD-2020-BR-099-0006 | Allocation | No | Selected for Further Review | $112,500.00 | $150,000.00 |
WY | Goshen and Gering-Ft. Laramie Irrigation District Tunnel #1 & #2 Collapse and Disaster Prevention | EMD-2020-BR-099-0007 | Competitive | No | Not Selected | $17,891,775.00 | $23,855,700.00 |
WY | Wyoming Office of Homeland Security - Management Costs | EMD-2020-BR-099-0003 | Management Cost | No | Selected for Further Review | $42,500.00 | $3,627,000.00 |
WY | LaPrele Dam Mitigation Project; Central Wyoming | EMD-2020-BR-099-0001 | Competitive | No | Ineligible | $3,440,000.00 | $4,515,000.00 |
WY | Wolf Creek Road Reconstruction Project | EMD-2020-BR-099-0002 | Competitive | Yes | Not Selected | $706,021.78 | $784,468.65 |