{"metadata": {"skip":0,"select":null,"rundate":"2026-04-06T00:59:48.670Z","top":1000,"filter":"","format":"json","metadata":true,"orderby":"","entityname":"MissionAssignments","version":"v2","url":"/api/open/v2/MissionAssignments","count":0}, "MissionAssignments": [{"incidentId":"2024081901","incidentName":"R1_Severe Storm-Flooding_08182024","incidentType":"Severe Storm","disasterNumber":3612,"declarationType":"EM","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"3612EMCTDOI-USGS01","maAmendNumber":0,"actionId":476360,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"CT","agencyId":"DOI-USGS","agency":"DOI-USGS (GEOLOGICAL SURVEY)","authority":"Stafford Act","dateReceived":"2024-08-22T00:00:00.000Z","dateRequired":"2024-08-23T00:00:00.000Z","popStartDate":"2024-08-22T00:00:00.000Z","popEndDate":"2024-09-04T00:00:00.000Z","dateObligated":"2024-08-23T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2024-08-22T00:00:00.000Z","maPopEndDate":"2024-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"USGS Field measurements of flood-water heights in impacted communities in CT for 3612-EM-CT not to exceed 50 highwater marks.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Geological Survey (USGS) will provide advance support, real-time field measurements, and daily reporting of water heights in direct support and for situational awareness of FEMA disaster operations for a high-water or flood event.\r\n\r\nUSGS services may include, but are not limited to, the following in direct support of response and recovery operations:\r\n - Field measurements of flood water heights in impacted communities;\r\n - Deploy supplemental water-level measuring instruments.\r\n - Measure streamflow and discharge of flooded channels, directly or indirectly.\r\n - Flagging of High-Water Marks and collect evidence of flooding for impacted areas and communities. \r\n - Locate and record the horizontal position and vertical elevation of the High Water Marks (HWM). \r\n - Documentation of HWMs with field notes, digital photographs, and depth measurements to the ground at the HWM location at the time of inspection. \r\n - Data measurements provided in GIS-ready format via the USGS National Water Information System or Short-Term Network system for display and download. \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ecbcf24e-7d9e-4ced-ae57-4871181703e1","hash":"497d57a5e4d071da1721548476b50b64a7321bdd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024080901","incidentName":"Tropical Disturbance_TS_Ernesto ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24080901USDA-APH01","maAmendNumber":0,"actionId":475083,"maType":"FOS","supportFunction":11,"priority":"High","region":2,"stt":"PR","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-09T00:00:00.000Z","popEndDate":"2024-08-23T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":29184,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":29184,"maPopStartDate":"2024-08-09T00:00:00.000Z","maPopEndDate":"2024-08-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":29184,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-18 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 11 US Department of Agriculture (USDA) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"72dc30d3-d804-4005-897f-91395be284b2","hash":"e0e65997764dc0d660e5b941a18d2f18adabaa55","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024080901","incidentName":"Tropical Disturbance_TS_Ernesto ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24080901DOT01","maAmendNumber":0,"actionId":475067,"maType":"FOS","supportFunction":1,"priority":"High","region":2,"stt":"PR","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-09T00:00:00.000Z","popEndDate":"2024-08-23T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":25000,"maPopStartDate":"2024-08-09T00:00:00.000Z","maPopEndDate":"2024-08-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":25000,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-18 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 01 Dept of Transportation (DOT) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"61a653ea-688c-4218-bef2-662e1c8b7fde","hash":"dbb5a30a3fbd2c96318ba12decb71e63ac072b76","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024080901","incidentName":"Tropical Disturbance_TS_Ernesto ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24080901DOJ-ATF01","maAmendNumber":0,"actionId":475098,"maType":"FOS","supportFunction":13,"priority":"High","region":2,"stt":"PR","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-09T00:00:00.000Z","popEndDate":"2024-08-23T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":73500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":73500,"maPopStartDate":"2024-08-09T00:00:00.000Z","maPopEndDate":"2024-08-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":73500,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-18 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 13 Dept of Justice (DOJ)  will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"eeafed44-bdfa-45be-a2ec-6aeb4199043d","hash":"4f49b6e6d98634659a77d554c06b8fdeac4503cd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024080901","incidentName":"Tropical Disturbance_TS_Ernesto ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24080901DOE-OE01","maAmendNumber":0,"actionId":475064,"maType":"FOS","supportFunction":12,"priority":"High","region":2,"stt":"PR","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-09T00:00:00.000Z","popEndDate":"2024-08-23T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":124822,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":124822,"maPopStartDate":"2024-08-09T00:00:00.000Z","maPopEndDate":"2024-08-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":124822,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-18 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 12 Dept of Energy (DOE) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations  \r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"bdb7935b-5df5-4124-87d8-ddd8feb4a8e3","hash":"35d63a525dff8c4a93b83d676d303b6089c0373a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024080901","incidentName":"Tropical Disturbance_TS_Ernesto ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24080901DOD-OPS01","maAmendNumber":0,"actionId":475095,"maType":"FOS","supportFunction":0,"priority":"High","region":2,"stt":"PR","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-09T00:00:00.000Z","popEndDate":"2024-08-23T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":12364,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":12364,"maPopStartDate":"2024-08-09T00:00:00.000Z","maPopEndDate":"2024-08-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":12364,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-18 and Activation/Deployment Memo for Record Email; FEMA Region 2 Dept Of Defense (DOD) Defense Coordinating Element will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"41df5629-cf88-4c46-b028-def78f8fd1cb","hash":"8c1586309c17510539016209331d393edbf2bcde","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801DOT01","maAmendNumber":2,"actionId":475304,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-11T00:00:00.000Z","dateObligated":"2024-08-13T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment # 2 - De-obligate $10,000.00. MA re-issued as 4806DR-FL-DOT-01\r\nAmendment #1 - Add additional funding of $5000.00.\r\nActivate DOT to RRCC. IOF, JFO, or others teams and facilities as requested; virtual support requested 8/4 and in person support at RRCC requested starting 8/5","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or other teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"4ef89b9d-58bb-4d1a-8947-ad637e7bfaa2","hash":"78e363a899ceb8523464da704afee9467fe5a77c","lastRefresh":"2024-08-27T20:04:38.903Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801DOD-OPS01","maAmendNumber":1,"actionId":475337,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-08-04T00:00:00.000Z","popEndDate":"2024-08-17T00:00:00.000Z","dateObligated":"2024-08-13T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-08-04T00:00:00.000Z","maPopEndDate":"2024-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment #1 - De-obligate $10,000.00. MA is re-issued as 4806DR-FL-DOD-OPS-01\r\nDOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison.\r\n","statementOfWork":"As directed by and in coordination with FEMA, DOD will provide Defense Coordination Officer(s) with supporting staff element(s) (DCO/DCE) to the RRCC, Region 4 Joint Field Office, IOF, or other locations, to provide DOD regional knowledge, requirements validation, and liaison, including as necessary State/Emergency Preparedness Liaison SEPLO/EPLO teams. Supporting staff element, augmentees, Joint Regional Medical Planning Officer (JRMPO), as mission required/requested.\r\nRequirements from FEMA\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b96b5830-31f9-41f5-903e-33026e99479d","hash":"93375d45b11931d86b1e288f00376d1218f01280","lastRefresh":"2024-08-27T20:04:38.903Z"},{"incidentId":"2024080901","incidentName":"Tropical Disturbance_TS_Ernesto ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24080901DHS-CISA01","maAmendNumber":0,"actionId":475096,"maType":"FOS","supportFunction":14,"priority":"High","region":2,"stt":"PR","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-09T00:00:00.000Z","popEndDate":"2024-08-23T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-08-09T00:00:00.000Z","maPopEndDate":"2024-08-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-18 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 14 DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e43c0f6b-bf58-4623-8bbe-9ded331a0a5e","hash":"0665a08da9b51068bfc8b8b870da1b9d3a96bd1b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2018072401","incidentName":"CARR FIRE","incidentType":"Fire","disasterNumber":4382,"declarationType":"DR","declarationTitle":"WILDFIRES AND HIGH WINDS","maId":"4382DRCAFPS01","maAmendNumber":2,"actionId":268988,"maType":"FOS","supportFunction":13,"priority":"High","region":9,"stt":"CA","agencyId":"FPS","agency":"FEDERAL PROTECTIVE SERVICE","authority":"Stafford Act","dateReceived":"2018-09-12T00:00:00.000Z","dateRequired":"2018-09-11T00:00:00.000Z","popStartDate":"2018-08-05T00:00:00.000Z","popEndDate":"2018-09-30T00:00:00.000Z","dateObligated":"2018-09-13T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2018-08-05T00:00:00.000Z","maPopEndDate":"2018-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #2 Extend Project end date to 30 September 2018 \r\n\r\nAmendment #1 Extend Project end date to 20 September 2018\r\n\r\nActivate FPS to DR-4382 to Contract security officers to support the FEMA Security Manager (SM) ","statementOfWork":"As directed by an in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards, policies, and practices.\r\n\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n\r\nAll equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement.\r\n\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n \r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies.\r\n\r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b7699669-a7d8-408b-b625-dc94ef08a4d0","hash":"5e6e970969eb16903fe7a367af3409641d8020f5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VT24072801USDA-APH01","maAmendNumber":1,"actionId":475112,"maType":"FOS","supportFunction":11,"priority":"Normal","region":1,"stt":"VT","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-08T00:00:00.000Z","popEndDate":"2024-08-15T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":-2200,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2200,"maPopStartDate":"2024-08-08T00:00:00.000Z","maPopEndDate":"2024-08-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2200,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate funds and reissue as 3609EM-VT-USDA-APH-01.\r\n\r\nUSDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"854ec201-703c-4430-a7db-7cbb5d262f00","hash":"5b5ff43fa8e249c484a0b5190ebadb572e6affa2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VT24072801USDA-APH01","maAmendNumber":0,"actionId":475069,"maType":"FOS","supportFunction":11,"priority":"Normal","region":1,"stt":"VT","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-08-08T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-08T00:00:00.000Z","popEndDate":"2024-08-15T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":2200,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2200,"maPopStartDate":"2024-08-08T00:00:00.000Z","maPopEndDate":"2024-08-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2200,"maPriority":"Normal","assistanceRequested":"USDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"fde2c8c0-5aec-4709-8544-2caf09406495","hash":"97756e27dcb6d63736b28009a758151ff39635b2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VT24072801EPA01","maAmendNumber":1,"actionId":475101,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"VT","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-14T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate funds and reissue as 3609EM-VT-EPA-01\r\nActivate EPA (ESF-3) to RRCC, IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, the Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.  \r\n\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"7d49afd9-fe84-45a5-b6aa-ace19c262134","hash":"fe86bc1ba6e3070b2ce50cd75353c4313567e2d5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VT24072801EPA01","maAmendNumber":0,"actionId":474919,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"VT","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-14T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Activate EPA (ESF-3) to RRCC, IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, the Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.  \r\n\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"fb7f921e-6a2b-48cf-91b2-9781182374a4","hash":"a516f54b13b0a9fb2817bc44a451fde8a4e23481","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VT24072801DOJ-ATF02","maAmendNumber":1,"actionId":475102,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":1,"stt":"VT","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-08T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":-17910,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-17910,"maPopStartDate":"2024-08-08T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-17910,"maPriority":"Lifesaving","assistanceRequested":"Amendment #1: De-obligate funds and reissue as 3609EM-VT-DOJ-ATF-02.\r\n\r\nRequesting Joint Reception, Staging and Onward Integrations actions to deploy Federal Force protection and accompanying Division Supervisor and 2 logistics support personnel and 15 agents in accordance with FEMA US&amp;R Deployment Security Protocol contained in US&amp;R Branch Document-34;US&amp;R GENERAL MEMORANDUM  2019-079 August 22, 2019-34; for ONE DAY pending EM DEC and MA.","statementOfWork":"As directed by and in coordination with FEMA the Department of Justice (DOJ) will conduct Joint Reception, Staging and Onward Integration (JROSI) activity in preparation for assignment to US&amp;R Force Protection for Type 3 US&amp;R deploying to State of Vermont in support of response to remnants of TS Debby.\r\n\r\nRequirements from FEMA: \r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. \r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. \r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. \r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"cf1009e3-19c8-4c9f-a104-b8e731aa8fc6","hash":"3db99680d78e89d446e7549447c47f18c8863444","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VT24072801DOJ-ATF02","maAmendNumber":0,"actionId":475055,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":1,"stt":"VT","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-08T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-08T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":17910,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":17910,"maPopStartDate":"2024-08-08T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":17910,"maPriority":"Lifesaving","assistanceRequested":"Requesting Joint Reception, Staging and Onward Integrations actions to deploy Federal Force protection and accompanying Division Supervisor and 2 logistics support personnel and 15 agents in accordance with FEMA US&amp;R Deployment Security Protocol contained in US&amp;R Branch Document &#34;US&amp;R GENERAL MEMORANDUM  2019-079 August 22, 2019&#34; for ONE DAY pending EM DEC and MA.","statementOfWork":"As directed by and in coordination with FEMA the Department of Justice (DOJ) will conduct Joint Reception, Staging and Onward Integration (JROSI) activity in preparation for assignment to US&amp;R Force Protection for Type 3 US&amp;R deploying to State of Vermont in support of response to remnants of TS Debby.\r\n\r\nRequirements from FEMA: \r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. \r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. \r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. \r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"1cc326af-f869-42f4-b1ba-98159759b644","hash":"b9e06ff58a28ba0f86d8efd35f52aa0fdc080a24","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VT24072801DOJ-ATF01","maAmendNumber":1,"actionId":475088,"maType":"FOS","supportFunction":13,"priority":"Normal","region":1,"stt":"VT","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-14T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":-4685,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4685,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4685,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate funds and reissue as 3609EM-VT-DOJ-ATF-01\r\n\r\nActivate DOJ (ESF-13) to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\n\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"3221847a-9321-4b3c-861f-629653f67e03","hash":"8b134a4c853f610ee5bf0b46535fc0338c74f008","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VT24072801DOJ-ATF01","maAmendNumber":0,"actionId":474930,"maType":"FOS","supportFunction":13,"priority":"Normal","region":1,"stt":"VT","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-14T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":4685,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":4685,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":4685,"maPriority":"Normal","assistanceRequested":"Activate DOJ (ESF-13) to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\n\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b497b8a6-9e7d-43ef-b466-d1e84c57428b","hash":"efb2f70d23fd82625164e44e5930d8220cfd315c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VT24072801COE-NAD01","maAmendNumber":1,"actionId":475103,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"VT","agencyId":"COE-NAD","agency":"COE NORTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-14T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":-10500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10500,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10500,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate funds and reissue as 3609EM-VT-COE-NAD-01\r\nActivate USACE (ESF-3) to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a1f2e968-5d16-4dd3-afb9-62f5c394f779","hash":"5c95d390b70fd1bb34c0df025bd892cc0e588ccc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VT24072801COE-NAD01","maAmendNumber":0,"actionId":474902,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"VT","agencyId":"COE-NAD","agency":"COE NORTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-14T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":10500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10500,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10500,"maPriority":"Normal","assistanceRequested":"Activate USACE (ESF-3) to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"644f6d94-dd6f-41d7-818b-aa0a6e1c4c44","hash":"c2129b5049a545ab2c96e3c22cff7a3e42835ce0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI24072801USDA-APH01","maAmendNumber":0,"actionId":473881,"maType":"FOS","supportFunction":11,"priority":"High","region":2,"stt":"VI","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-07-28T00:00:00.000Z","dateRequired":"2024-07-28T00:00:00.000Z","popStartDate":"2024-07-28T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-07-28T00:00:00.000Z","obligationAmount":29184,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":29184,"maPopStartDate":"2024-07-28T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":29184,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-15 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 11 US Department of Agriculture (USDA) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"056aaccf-c572-429a-95cb-28e9464f75e9","hash":"136c455b945c74cca8cc787e12609abb32171b17","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI24072801HHS-ASPR01","maAmendNumber":0,"actionId":473882,"maType":"FOS","supportFunction":8,"priority":"High","region":2,"stt":"VI","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-07-28T00:00:00.000Z","dateRequired":"2024-07-28T00:00:00.000Z","popStartDate":"2024-07-28T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-07-28T00:00:00.000Z","obligationAmount":93600,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":93600,"maPopStartDate":"2024-07-28T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":93600,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-15 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 08 Dept of Health &amp; Human Services (HHS) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"48885ba3-b885-4970-a03a-ee226f35904d","hash":"95cb92537cde2ee6a93d9178facbbf08aecd7634","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI24072801DOT01","maAmendNumber":0,"actionId":473883,"maType":"FOS","supportFunction":1,"priority":"High","region":2,"stt":"VI","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-07-28T00:00:00.000Z","dateRequired":"2024-07-28T00:00:00.000Z","popStartDate":"2024-07-28T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-07-28T00:00:00.000Z","obligationAmount":25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":25000,"maPopStartDate":"2024-07-28T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":25000,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-15 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 01 Dept of Transportation (DOT) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"aabad6a8-d2e6-418e-ac27-e4437a8e6ac4","hash":"4e83572b4d43fcd71962fd01e2135904edcf9589","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI24072801DOD-OPS01","maAmendNumber":0,"actionId":473887,"maType":"FOS","supportFunction":0,"priority":"High","region":2,"stt":"VI","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-07-28T00:00:00.000Z","dateRequired":"2024-07-28T00:00:00.000Z","popStartDate":"2024-07-28T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-07-28T00:00:00.000Z","obligationAmount":12364,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":12364,"maPopStartDate":"2024-07-28T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":12364,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-15 and Activation/Deployment Memo for Record Email; FEMA Region 2 Dept Of Defense (DOD) Defense Coordinating Element will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b1ab2a24-c658-4a7e-b050-02b3a51c5e78","hash":"9b8e8f359a9f839dcf65fbf6e17e8349f88827c3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI24072801DHS-CISA02","maAmendNumber":0,"actionId":473910,"maType":"FOS","supportFunction":14,"priority":"High","region":2,"stt":"VI","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-28T00:00:00.000Z","dateRequired":"2024-07-28T00:00:00.000Z","popStartDate":"2024-07-28T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-07-28T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-07-28T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-15 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 14 DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"5a62d2b7-1360-4a31-83b7-51e4f3a8f41c","hash":"e97fe11664e0f2f8b450afea5cf5f3f10b31e6e5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI24072801DHS-CISA01","maAmendNumber":0,"actionId":473909,"maType":"FOS","supportFunction":2,"priority":"High","region":2,"stt":"VI","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-28T00:00:00.000Z","dateRequired":"2024-07-28T00:00:00.000Z","popStartDate":"2024-07-28T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-07-28T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-07-28T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-15 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 02 DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"16f9c2b1-5648-4bb9-99ae-469e55a5043a","hash":"18031c6cd5854abeba7600c1c4859678f4364d85","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI24072801COE-SAD01","maAmendNumber":0,"actionId":473911,"maType":"FOS","supportFunction":3,"priority":"High","region":2,"stt":"VI","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-07-28T00:00:00.000Z","dateRequired":"2024-07-28T00:00:00.000Z","popStartDate":"2024-07-28T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-07-28T00:00:00.000Z","obligationAmount":431200,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":431200,"maPopStartDate":"2024-07-28T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":431200,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-15 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 03 US Army Corps of Engineers (USACE) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"461914c9-baa1-4a26-97a5-7eddc7889a88","hash":"a296122e74963b25e50a4c4f333f67416ac5acf8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NC24072801COE-SAD01","maAmendNumber":0,"actionId":474823,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"NC","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-07T00:00:00.000Z","popStartDate":"2024-08-06T00:00:00.000Z","popEndDate":"2024-08-13T00:00:00.000Z","dateObligated":"2024-08-07T00:00:00.000Z","obligationAmount":73500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":73500,"maPopStartDate":"2024-08-06T00:00:00.000Z","maPopEndDate":"2024-08-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":73500,"maPriority":"High","assistanceRequested":"Activate USACE to the RRCC, IOF, JFO, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"7b920fb7-6780-43d9-99f2-75aaa4b47cb9","hash":"8931961e7878a7e14b4fa83b2e7c3a44368a8f0f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA24072801USDA-FS01","maAmendNumber":0,"actionId":474584,"maType":"FOS","supportFunction":4,"priority":"Normal","region":4,"stt":"GA","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":13420,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":13420,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":13420,"maPriority":"Normal","assistanceRequested":"Activate USFS to the RRCC, IOF JFO or other facilities","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster\r\noperations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The missionassigned\r\nagency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ba378268-6bad-47ef-a870-989608447337","hash":"c161ff935b288831d9fa12cf4e458aa0896839df","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA24072801USDA-APH01","maAmendNumber":0,"actionId":474651,"maType":"FOS","supportFunction":11,"priority":"High","region":4,"stt":"GA","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate ESF11/ USDA staff to RRCC, IOF, JFO, or other teams and facilities as requested by FEMA.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. Requirements from FEMA: 1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). 2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. 3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. 4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. 5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. 6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. 7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. 8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies","id":"26994311-6714-46b2-8118-c4a2ea7a0585","hash":"14bd9b3e32aa754a5be103f9b9c3beaaf78a747a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA24072801SBA01","maAmendNumber":0,"actionId":474636,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"GA","agencyId":"SBA","agency":"SMALL BUSINESS ADMINISTRATION","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Activate SBA staff to RRCC, IOF, JFO, or other teams and facilities as requested by FEMA","statementOfWork":"As directed by and in coordination with FEMA, Small Business Administration (SBA) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of\r\ndisaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The missionassigned\r\nagency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"70493a18-41d7-475b-959e-29c56ee48d0a","hash":"1cb92c85db7494e2108205688bfba12f4a404e8a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA24072801EPA01","maAmendNumber":0,"actionId":474653,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"GA","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-08-06T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"EPA Water SME to identify needs &amp; facilitate information flow for TC Debby","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such\r\nas state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster\r\noperations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The missionassigned\r\nagency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"68627500-91c7-4159-8396-622d995c24fe","hash":"b31aee98fb615e7beb9f15784ca5059c26dd1d40","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA24072801DOE-OE01","maAmendNumber":0,"actionId":474640,"maType":"FOS","supportFunction":12,"priority":"High","region":4,"stt":"GA","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-06T00:00:00.000Z","popStartDate":"2024-08-06T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":110656,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":110656,"maPopStartDate":"2024-08-06T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":110656,"maPriority":"High","assistanceRequested":"Activate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested\r\nto perform the functions of ESF12\r\nin support of disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The missionassigned\r\nagency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"419c8aba-ccf1-461d-b46a-c73fd18ebc5e","hash":"6e503679ffaabf8974407fdbcbc836027e0459e2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA24072801DOD-OPS01","maAmendNumber":0,"actionId":474507,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"GA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-07T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-05T00:00:00.000Z","obligationAmount":437000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":437000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":437000,"maPriority":"High","assistanceRequested":"Provide/stage high wheeled vehicles able to move cargo and/or passengers using DoD ground transportation assets in support of disaster operations. All local, State, and non-DoD national assets are exhausted or do not have the capacity to meet this requirement.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide/stage initial 30 high wheeled vehicles, adjusted as needed, able to move cargo and/or passengers, in support of disaster operations. DoD will provide requested support within capabilities and will determine most effective means of transportation based on available assets, delivery location, and required delivery timeline. Support will include required maintenance.\r\n\r\nDOD is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f87c8feb-1cd4-4c39-9473-e360f7334624","hash":"cc6afd02a9762ab8913d277aa2d13450f835c532","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA24072801DHS-USCG01","maAmendNumber":0,"actionId":474465,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"GA","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-08-04T00:00:00.000Z","dateRequired":"2024-08-04T00:00:00.000Z","popStartDate":"2024-08-04T00:00:00.000Z","popEndDate":"2024-08-11T00:00:00.000Z","dateObligated":"2024-08-05T00:00:00.000Z","obligationAmount":65000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":65000,"maPopStartDate":"2024-08-04T00:00:00.000Z","maPopEndDate":"2024-08-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":65000,"maPriority":"High","assistanceRequested":"Deploy USCG liaison officer(s) to RRCC, IOF, JFO, STT EOC or other facility(s). R4 RRCC (2), Initial request for Florida State EOC (5), Georgia State EOC (2), South Carolina EOC (2), IST (2).  TOTAL: 13 members, adjusted as needed","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies","id":"34ace59b-c0a9-4909-b38b-8ec31bdc22ba","hash":"20f0bbf7bc5d039790c04c4a0d24605f05763813","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA24072801DHS-CISA01","maAmendNumber":0,"actionId":474652,"maType":"FOS","supportFunction":14,"priority":"Normal","region":4,"stt":"GA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Activate CISA 14 LNOs to RRCC, IOF, JFO, or other teams and facilities as requested by FEMA\r\n","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other\r\nteams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\nESF14\r\ncoordination and delivery of products and services\r\nESF5\r\nregarding critical physical and cyber infrastructure\r\nAnalysis\r\nof impacts to Lifelines and National Critical Infrastructure\r\nCISA liaisons may include representatives from\r\nIntegrated\r\nOperations Division (ESF14)\r\nInfrastructure\r\nSecurity Division (Infrastructure SME)\r\nNational\r\nRisk Management Center (Geospatial SME)\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The missionassigned\r\nagency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"be44c1bc-133f-4564-80fd-9c9385430a6e","hash":"509b4a52e848363413164b1174ccd8ca1b6dc4dc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA24072801COE-SAD01","maAmendNumber":0,"actionId":474638,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"GA","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-06T00:00:00.000Z","popStartDate":"2024-08-06T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":21000,"maPopStartDate":"2024-08-06T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":21000,"maPriority":"High","assistanceRequested":"Activate USACE to the RRCC, IOF, JFO, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of\r\ndisaster operations.\r\nSupport may include, but is not limited to, the following:\r\nUSACE support to RRCC\r\nUSACE support to National and/or Regional IMAT\r\nUSACE modeling and/or National Hurricane Program support\r\nUSACE Local Government Liaison(s)\r\nUSACE support to ESF #15 External Affairs\r\nUSACE SME(s)\r\nInfrastructure Systems Recovery Support Function (ISRSF) Field Coordinator (under NDRF)\r\nContract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site specific\r\npersonnel and Non mission specific administrative and management support at a Recovery Field Office (RFO) or\r\nother USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The missionassigned\r\nagency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"131a5ece-0459-4456-990a-4db7f4fc9415","hash":"b070530eb9663993767f0cfe7acb36f7f9f990ab","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801HHS-ASPR01","maAmendNumber":1,"actionId":475265,"maType":"FOS","supportFunction":8,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-17T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":-159168,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-159168,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-159168,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #1 - De-obligate $159,168.00, MA re-issued as 4806DR-FL-HHS-ASPR-01\r\nActivate Health and Human Services (HHS) for staging of and support from appropriate HHS personnel to perform the functions of ESF-8 in/with the RRCC, IOF, JFO, Incident Management Assistance Teams (IMAT), Preliminary Damage Assessment (PDA) Teams, or other public health/medical teams and subject matter experts at various locations to support disaster operations.  ","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f8209d68-8054-4361-84ea-201c5a043bb9","hash":"b1df877ffc9770d0ef25302da84dc80e57a28215","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801HHS-ASPR01","maAmendNumber":0,"actionId":474510,"maType":"FOS","supportFunction":8,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-03T00:00:00.000Z","dateRequired":"2024-08-04T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-17T00:00:00.000Z","dateObligated":"2024-08-03T00:00:00.000Z","obligationAmount":159168,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":159168,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":159168,"maPriority":"Life Sustaining","assistanceRequested":"Activate Health and Human Services (HHS) for staging of and support from appropriate HHS personnel to perform the functions of ESF-8 in/with the RRCC, IOF, JFO, Incident Management Assistance Teams (IMAT), Preliminary Damage Assessment (PDA) Teams, or other public health/medical teams and subject matter experts at various locations to support disaster operations.  ","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"11de9a96-9b36-4961-b9d9-996773939400","hash":"cbac3d4661bf0acfb78509904aeb370cfe3f0058","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801GSA01","maAmendNumber":1,"actionId":475222,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-11T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-17T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":-15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15000,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15000,"maPriority":"High","assistanceRequested":"Amendment #1 - De-obligate $15,000.00, MA re-issued as 4806DR-FL-GSA-01\r\nActivate GSA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\n\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"307beea9-994e-400c-8b9c-4df638664f4d","hash":"359788da03552dc960a5f683f4bdbb633fa47b0b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801GSA01","maAmendNumber":0,"actionId":474511,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-03T00:00:00.000Z","dateRequired":"2024-08-04T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-17T00:00:00.000Z","dateObligated":"2024-08-04T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\n\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"7cf14f9d-d735-40ad-a135-c71821deec8b","hash":"43ee2691b82f0e8b983b827d351c198076ba0942","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801EPA01","maAmendNumber":1,"actionId":475261,"maType":"FOS","supportFunction":10,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-17T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":-167676,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-167676,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-167676,"maPriority":"High","assistanceRequested":"Amendment #1 - De-obligate $167,676.00, MA re-issued as 4806DR-FL-EPA-01\r\nActivate EPA staff to RRCC, IOF, JFO, or other teams and facilities as requested by FEMA.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, IMAT, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.  \r\n\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2dcd0f7f-5043-4df3-9877-9507e2839d55","hash":"1cedd4db3445b57b4ee33f844b5c1d7e80b5090a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801EPA01","maAmendNumber":0,"actionId":474493,"maType":"FOS","supportFunction":10,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-03T00:00:00.000Z","dateRequired":"2024-08-04T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-17T00:00:00.000Z","dateObligated":"2024-08-03T00:00:00.000Z","obligationAmount":167676,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":167676,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":167676,"maPriority":"High","assistanceRequested":"Activate EPA staff to RRCC, IOF, JFO, or other teams and facilities as requested by FEMA.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, IMAT, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.  \r\n\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"cbc58ae3-7501-4158-a1da-050187b4df18","hash":"b0b2720dca4a01a38d89674bcd977c3a05724365","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801DOT01","maAmendNumber":1,"actionId":474804,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-08-06T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-11T00:00:00.000Z","dateObligated":"2024-08-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Amendment #1 - Add additional funding of $5000.00.\r\nActivate DOT to RRCC. IOF, JFO, or others teams and facilities as requested; virtual support requested 8/4 and in person support at RRCC requested starting 8/5","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or other teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"63b16c51-aa40-4f0e-9ab0-baca93b24fe1","hash":"11a111668d791e5fa497f19ccc5992c8dc800d73","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801DOT01","maAmendNumber":0,"actionId":474509,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-03T00:00:00.000Z","dateRequired":"2024-08-04T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-11T00:00:00.000Z","dateObligated":"2024-08-03T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate DOT to RRCC. IOF, JFO, or others teams and facilities as requested; virtual support requested 8/4 and in person support at RRCC requested starting 8/5","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or other teams and facilities as requested.\r\n\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"153e588d-5da4-486d-a41b-24655e2074a4","hash":"bf52e5e1b45938e7564e34bd258ada17ccb038ac","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801DOJ-ATF01","maAmendNumber":1,"actionId":475278,"maType":"FOS","supportFunction":13,"priority":"High","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-17T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":-684950,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-684950,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-684950,"maPriority":"High","assistanceRequested":"Amendment #1 De-obligate $684,950.00. MA re-issued as 4806DR-FL-DOJ-ATF-01\r\nActivate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations. Activate ESF# 13 Law Enforcement Strike Teams (LESTs) and security personnel to support field operations. ","statementOfWork":"As directed by and in coordination with FEMA, Department of Justice/ATF will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested and will provide Federal Law Enforcement Officer (FLEO) Law Enforcement Strike Teams (LESTs) or other security teams as required in support of FEMA disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) will be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"efe4acaa-4aeb-4564-b967-78e78c5ac80b","hash":"d2ec501ab4f656abd58b4253c4528fdecdeffecc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801DOJ-ATF01","maAmendNumber":0,"actionId":474492,"maType":"FOS","supportFunction":13,"priority":"High","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-03T00:00:00.000Z","dateRequired":"2024-08-04T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-17T00:00:00.000Z","dateObligated":"2024-08-03T00:00:00.000Z","obligationAmount":684950,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":684950,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":684950,"maPriority":"High","assistanceRequested":"Activate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations. Activate ESF# 13 Law Enforcement Strike Teams (LESTs) and security personnel to support field operations. ","statementOfWork":"As directed by and in coordination with FEMA, Department of Justice/ATF will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested and will provide Federal Law Enforcement Officer (FLEO) Law Enforcement Strike Teams (LESTs) or other security teams as required in support of FEMA disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) will be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"4373677d-8ad0-4ece-8cb3-b5371f1a3f6c","hash":"80d4dc9107b32d91683ec8376900f3b6bbae8f16","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL24072801DOD-OPS01","maAmendNumber":0,"actionId":474460,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-08-04T00:00:00.000Z","dateRequired":"2024-08-04T00:00:00.000Z","popStartDate":"2024-08-04T00:00:00.000Z","popEndDate":"2024-08-17T00:00:00.000Z","dateObligated":"2024-08-04T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-08-04T00:00:00.000Z","maPopEndDate":"2024-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"DOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison.\r\n","statementOfWork":"As directed by and in coordination with FEMA, DOD will provide Defense Coordination Officer(s) with supporting staff element(s) (DCO/DCE) to the RRCC, Region 4 Joint Field Office, IOF, or other locations, to provide DOD regional knowledge, requirements validation, and liaison, including as necessary State/Emergency Preparedness Liaison SEPLO/EPLO teams. Supporting staff element, augmentees, Joint Regional Medical Planning Officer (JRMPO), as mission required/requested.\r\nRequirements from FEMA\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"145c39da-980e-429d-8a73-8ce1445378bd","hash":"45a4923ba4da24fe238b77d69c1edc0d607b1dbb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLVA02","maAmendNumber":0,"actionId":475497,"maType":"FOS","supportFunction":8,"priority":"Normal","region":4,"stt":"FL","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-06T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":7500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":7500,"maPopStartDate":"2024-08-06T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":7500,"maPriority":"Normal","assistanceRequested":"Activate VHA OEM to NRCC ESF-8 PHMS. This is a re-issuance of MA #  3605EM-FL-VA-02 for $7,500.","statementOfWork":"As directed by and in coordination with FEMA and HHS, Veterans Affairs (VA) - Veterans Health Administration (VHA) Office of Emergency Management (OEM) will provide appropriate personnel to the NRCC, other teams, and facilities to support disaster operations primarily as the FEMA-NRCC-PHMS (Public Health and Medical Specialist) and, at the request of the FEMA-NRCC-PHMUL (Public Health and Medical Unit Leader) the VHA may also serve as the acting PHMUL. If 24-hour coverage is necessary, VHA will support night shift requirements as staffing permits.\r\nADDITIONAL NOTES FROM FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), and durations of assignment(s)\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"22650dc6-6edd-4320-a94b-0806a23a6a8f","hash":"1122d0c70dbda983148af72f79f88cf22d58ccc2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLVA01","maAmendNumber":0,"actionId":475447,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate VA to NRCC. This is a re-issuance of MA # 3605EM-FL-VA-01 for $3,000.","statementOfWork":"As directed by and in coordination with FEMA, Veterans Affairs (VA) will provide appropriate personnel to the NRCC other teams and facilities to support disaster operations. \r\nADDITIONAL NOTES FROM FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), and durations of assignment(s)\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"fa616458-5823-4f1a-a267-36c0dec9f0c0","hash":"3169ee76944697a6c8622ba9680c0da3dfd5d8a0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLUSDA-FS01","maAmendNumber":0,"actionId":475492,"maType":"FOS","supportFunction":4,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":7000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":7000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":7000,"maPriority":"Normal","assistanceRequested":"Activate USFS to the NRCC. This is a re-issuance of MA # 3605EM-FL-USDA-FS-01 for $7,000.","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"efa7a3d9-8b32-4cd6-8f68-fca08608c4cd","hash":"975a2eb34e0a5303e696921181676dda4a5a8480","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLUSDA-APH01","maAmendNumber":0,"actionId":475468,"maType":"FOS","supportFunction":11,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"USDA liaison(s) to the NRCC, FEMA teams, or other facilities. This is a re-issuance of MA # 3605EM-FL-USDA-APH-01 for $3,000.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"92fa3d06-c07c-43f9-8d87-8f59cb12bf78","hash":"d848273ccdcbd63796ae9d0d1616c0ee94b73938","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLHUD01","maAmendNumber":0,"actionId":475467,"maType":"FOS","supportFunction":6,"priority":"Normal","region":4,"stt":"FL","agencyId":"HUD","agency":"HUD (ADMIN SUPPORT OFFICES)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate HUD to NRCC or other teams and facilitate. This is a re-issuance of MA # 3605EM-FL-HUD-01 for $3,000.","statementOfWork":"As directed by and in coordination with FEMA Housing $ Urban Development (HUD) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for HUD command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"4deef6f1-df5f-44f4-89b7-8710b69dba44","hash":"27942c1e8c6f0f7f8bd38610f2cfb2624b090e14","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLHHS-ASPR02","maAmendNumber":0,"actionId":475465,"maType":"FOS","supportFunction":8,"priority":"Normal","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate HHS to NRCC. This is a re-issuance of MA # 3605EM-FL-HHS-ASPR-01 for $3,000.","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f93f2146-a814-4a6d-92b2-c47f36ef3c2c","hash":"07ecb8b8038804d960a1ffad7b1c28a5acbe5419","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLHHS-ASPR01","maAmendNumber":0,"actionId":475280,"maType":"FOS","supportFunction":8,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":159168,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":159168,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":159168,"maPriority":"Life Sustaining","assistanceRequested":"Activate Health and Human Services (HHS) for staging of and support from appropriate HHS personnel to perform the functions of ESF-8 in/with the RRCC, IOF, JFO, Incident Management Assistance Teams (IMAT), Preliminary Damage Assessment (PDA) Teams, or other public health/medical teams and subject matter experts at various locations to support disaster operations.  This is a re-issuance of MA # FL-2472801-HHS-SPR-01 for $159,168.00 and change POP end date to 8/12/24 to align with the operational completion date.","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"6f6298bd-1ba2-4be2-9b4c-6ecf712b1d3a","hash":"9c13b412b46aa5f8b5e541069334ed904ca7f1fd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLGSA02","maAmendNumber":0,"actionId":475464,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate GSA to NRCC, or other teams and facilities as requested. This is a re-issuance of MA # 3605EM-FL-GSA-01 for $3,000.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations. \r\nActivates may include, but are not limited to the following:\r\n- ESF7 support\r\n-Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"6260595a-c8aa-4b14-933a-3842d3c18851","hash":"1064cb8391fac03fbf1ea46416ddc9bdd5b95201","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLGSA01","maAmendNumber":0,"actionId":475244,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-11T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2025-08-02T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2025-08-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested. This is a re-issuance of MA # FL-2472801-GSA-01 for $15,000.00 and extend end date to 08/02/2025","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a12fea39-cdf0-429f-91a2-b2d247eafbd6","hash":"662fbae0f4a613257220a51c8c75d48e1aac4702","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLEPA03","maAmendNumber":0,"actionId":475471,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate EPA to the NRCC or other facilities to support disaster operations. This is a re-issuance of MA # 3605EM-FL-EPA-02 for $3,000.","statementOfWork":"As directed by and in coordination with FEMA, the Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- EPA support to NRCC\r\n- EPA support to National IMAT\r\n- EPA support to ESF #15 External Affairs\r\n- EPA SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- EPA modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under EPA MA meet all Stafford Act and regulatory requirements.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a61c7935-030e-4dbb-bc3d-6e028cb7841a","hash":"24e4927f582249b985bcb1244883b2837db4159a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLEPA02","maAmendNumber":0,"actionId":475462,"maType":"FOS","supportFunction":10,"priority":"Normal","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"EPA ESF 10 to NRCC or other teams and facilities as requested. This is a re-issuance of MA # 3605EM-FL-EPA-01 for $3,000.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"85916105-f8b0-418c-b33b-0a4c7c758053","hash":"f0515cf73abe0e2eb47a7d6e50476ddb71d44021","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLEPA01","maAmendNumber":0,"actionId":475259,"maType":"FOS","supportFunction":10,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":167676,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":167676,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":167676,"maPriority":"High","assistanceRequested":"Activate EPA staff to RRCC, IOF, JFO, or other teams and facilities as requested by FEMA. This is a re-issuance of MA # FL-2472801-EPA-01 for $167,676.00 and change POP end date to 8/12/24 to align with the operational completion date.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, IMAT, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.  \r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2781601d-db77-4f46-a309-0b6b9c67ee2e","hash":"a5b53373c0ed44e7ac7459b187b17c02ac237e70","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOT02","maAmendNumber":0,"actionId":475423,"maType":"FOS","supportFunction":1,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2025-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Life Sustaining","assistanceRequested":"Activate DOT/ ESF 1 to NRCC or other facilities to support disaster operation in support Tropical Storm Debby. This is a re-issuance of MA #3605EM-FL-DOT-01 for $10,000.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"2c8572e3-7868-499a-abfa-38622cd6068b","hash":"99b71ad2ee030c94b54416ed17bd9a587ddfd04c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOT01","maAmendNumber":0,"actionId":475260,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-03T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-11T00:00:00.000Z","dateObligated":"2024-08-17T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Activate DOT to RRCC, IOF, JFO, or other teams and facilities as requested; virtual support requested 8/4/24 and in person support at RRCC requested starting 8/05/2024, Also Change POP end date to 08/11/2024 to align with the operational completion date. This is the re-issuance of MA# FL-24072801-DOT-01-01 for $10,000.00","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or other teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"5e03a1c4-5b0e-44dc-81c6-f0e2d969ad00","hash":"5cde9a4a2b4dda4397cae9951571666e035dbd4d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2018072401","incidentName":"CARR FIRE","incidentType":"Fire","disasterNumber":4382,"declarationType":"DR","declarationTitle":"WILDFIRES AND HIGH WINDS","maId":"4382DRCAFPS01","maAmendNumber":1,"actionId":267702,"maType":"FOS","supportFunction":13,"priority":"High","region":9,"stt":"CA","agencyId":"FPS","agency":"FEDERAL PROTECTIVE SERVICE","authority":"Stafford Act","dateReceived":"2018-08-28T00:00:00.000Z","dateRequired":"2018-08-28T00:00:00.000Z","popStartDate":"2018-08-05T00:00:00.000Z","popEndDate":"2018-09-20T00:00:00.000Z","dateObligated":"2018-08-28T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2018-08-05T00:00:00.000Z","maPopEndDate":"2018-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #1 Extend Project end date to 20 September 2018\r\n\r\nActivate FPS to DR-4382 to Contract security officers to support the FEMA Security Manager (SM) ","statementOfWork":"As directed by an in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards, policies, and practices.\r\n\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n\r\nAll equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement.\r\n\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n \r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies.\r\n\r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"632d524e-f5c9-42cf-97ef-1f41ddd41a25","hash":"316c668214cb0c2374edba542c0ce09e036e4336","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOJ-ATF02","maAmendNumber":0,"actionId":475422,"maType":"FOS","supportFunction":13,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate DOJ to NRCC or other facilities to support FEMA disaster operations. This is a re-issuance of MA # 3605EM-FL-DOJ-ATF-01 for $3,000.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to NRCC or other facilities as requested to perform functions of ESF-13 in support FEMA disaster operations. \r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"4dac7a1e-dec2-498f-b9f4-16f407ae805d","hash":"32bbe74b6f48c63f815b72ac5eba817e4e1b5b10","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOJ-ATF01","maAmendNumber":1,"actionId":475857,"maType":"FOS","supportFunction":13,"priority":"High","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-16T00:00:00.000Z","dateRequired":"2024-08-16T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-21T00:00:00.000Z","obligationAmount":2050956,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2050956,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2050956,"maPriority":"High","assistanceRequested":"Amendment #1 Add additional funding of $2,050,956.00\r\nActivate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations. Activate ESF# 13 Law Enforcement Strike Teams (LESTs) and security personnel to support field operations. This is a re-issuance of MA # FL-2472801-DOJ-ATF-01 for $684,950.00 and change POP end date to 8/12/24 to align with the operational completion date.","statementOfWork":"As directed by and in coordination with FEMA, Department of Justice/ATF will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested and will provide Federal Law Enforcement Officer (FLEO) Law Enforcement Strike Teams (LESTs) or other security teams as required in support of FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) will be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ae84e5b3-9118-4722-968e-2054f59a7202","hash":"22059c51f47fbc347b0b7ee6404139487d86a9b0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOJ-ATF01","maAmendNumber":0,"actionId":475277,"maType":"FOS","supportFunction":13,"priority":"High","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-08-03T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":684950,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":684950,"maPopStartDate":"2024-08-03T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":684950,"maPriority":"High","assistanceRequested":"Activate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations. Activate ESF# 13 Law Enforcement Strike Teams (LESTs) and security personnel to support field operations. This is a re-issuance of MA # FL-2472801-DOJ-ATF-01 for $684,950.00 and change POP end date to 8/12/24 to align with the operational completion date.","statementOfWork":"As directed by and in coordination with FEMA, Department of Justice/ATF will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested and will provide Federal Law Enforcement Officer (FLEO) Law Enforcement Strike Teams (LESTs) or other security teams as required in support of FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) will be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"165b39fd-fce3-47b9-b3de-89ef564213ff","hash":"ec8e61d7a332e4f757d6d9688a93a789ec40e4f4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOI-WCF01","maAmendNumber":0,"actionId":475500,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Activate DOI to NRCC. This is a re-issuance of MA # 3605EM-FL-DOI-WCF-01 for $0.00","statementOfWork":"As directed by and in coordination with FEMA, DOI will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA response operations.\r\nFunding for DOI command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f3dd575c-1eba-45c5-922f-14417409de4b","hash":"a29b488973b98dcf3125a9ee4f2b0e853348c643","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOE-OE01","maAmendNumber":0,"actionId":475438,"maType":"FOS","supportFunction":12,"priority":"High","region":4,"stt":"FL","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Active DOE to the NRCC. This is a re-issuance of MA # 3605EM-FL-DOE-OE-01 for $3,000.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to NRCC, to perform the functions of ESF-12 in support disaster operations.\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"126c27a9-2716-477b-9c16-51d062f07d2a","hash":"76a2456f7f9bb92d56473668dcefbfaa30b405c3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOD-USAF01","maAmendNumber":0,"actionId":475404,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial support. This is a re-issuance of MA # 3605EM-FL-DOD-USAF-01 for $3,000.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"0e2205f9-4c94-44e1-ae56-40d8649b63e0","hash":"7fb6cb732ac3297e0755072eba5d5ce6ee3d7abf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOD-OPS02","maAmendNumber":0,"actionId":475435,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":4000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":4000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":4000,"maPriority":"Normal","assistanceRequested":"Activate DOD to NRCC to support FEMA response operations. This is a re-issuance of MA # 3605EM-FL-DOD-OPS-01 for $4,000.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"356125ab-5d91-4f3d-a278-a878a93c196d","hash":"3b072ef03490e077b90fe16bd16aface6cb60e90","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOD-OPS01","maAmendNumber":0,"actionId":475336,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-08-04T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-17T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-08-04T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"DOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison. Change POP end date to 8/12/24 to align with the operational completion date. This is a re-issuance of FL-24072801-DOD-OPS-01 for $10,000.00\r\n","statementOfWork":"As directed by and in coordination with FEMA, DOD will provide Defense Coordination Officer(s) with supporting staff element(s) (DCO/DCE) to the RRCC, Region 4 Joint Field Office, IOF, or other locations, to provide DOD regional knowledge, requirements validation, and liaison, including as necessary State/Emergency Preparedness Liaison SEPLO/EPLO teams. Supporting staff element, augmentees, Joint Regional Medical Planning Officer (JRMPO), as mission required/requested.\r\nRequirements from FEMA\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"62dd89bf-83bd-43e5-b99c-1bbae485fa18","hash":"346246f70fe9230071eef526bcb3b2a201eb572b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOC-NOAA02","maAmendNumber":0,"actionId":475495,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate NOAA to NRCC to support FEMA disaster operations. This is a re-issuance of MA # 3605EM-FL-DOC-NOAA-02 for $3,000.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the NRCC to support disaster operations\r\nThis may include but is not limited to, the following:\r\n    - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n    - National Weather Service (NWS) Hurricane Liaison Team (HLT)\r\n    - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n    - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8afe933f-2ca2-4bc0-abde-9bfad9c1bd76","hash":"086862ee16233fdc01157cffc08fbb076415e43a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDOC-NOAA01","maAmendNumber":0,"actionId":475431,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":57313,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":57313,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":57313,"maPriority":"High","assistanceRequested":"NOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of Tropical Cyclone Debby and cascading effects. This is a re-issuance of MA # 3605EM-FL-DOC-NOAA-01 for $57,313.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"83900dce-296f-4038-92f3-86c488456fe3","hash":"c866a56ff51cf3742f834ec0b3c998cd500690ac","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDLA01","maAmendNumber":0,"actionId":475399,"maType":"FOS","supportFunction":7,"priority":"Normal","region":4,"stt":"FL","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate DLA liaisons to NRCC. This is a re-issuance of MA # 3605EM-FL-DLA-01 for $3,000","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ef330e78-22ee-48cb-a96c-17e02dd0502f","hash":"82c1635dbc4e27416c61a7e437c71eb4346fe306","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDHS-USCG02","maAmendNumber":0,"actionId":475417,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate USCG liaison(s) to NRCC. This is a re-issuance of MA # 3605EM-FL-DHS-USCG-02 for $3000.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2e844653-9d5b-4cb9-ad9d-723a776c0a29","hash":"71f4beab42740f85edf654b5037e3ea8c39021aa","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDHS-CISA03","maAmendNumber":0,"actionId":475429,"maType":"FOS","supportFunction":14,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate CISA-14 LNO to NRCC. This is a re-issuance of MA # 3605EM-FL-DHS-CISA-02 for $3,000.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial and Infrastructure analyst SME)  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ae4e2fd7-cec2-48fd-b6d1-9485a1ba8b75","hash":"94c3b9b3c041aede6e0839123912db520f9ea8e2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLDHS-CISA02","maAmendNumber":0,"actionId":475366,"maType":"FOS","supportFunction":2,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate CISA ESF-2 to NRCC. This is a re-issuance of MA # 3605EM-FL-DHS-CISA-01 for $3,000.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2f1ec929-7b84-4389-a2d7-492b1b3ab061","hash":"34cb5a07c8b250017a1fba7119da17d3ed9318fb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":4806,"declarationType":"DR","declarationTitle":"HURRICANE DEBBY","maId":"4806DRFLCOE-HQ01","maAmendNumber":0,"actionId":475413,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"FL","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":21000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":21000,"maPriority":"Normal","assistanceRequested":"Activate USACE to the NRCC or other facilities to support disaster operations. This is a re-issuance of MA # 3605EM-FL-COE-HQ-01 for $21,000. ","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"70a38f75-38ee-4cce-955a-8e9b428d0f9a","hash":"023cb6431cda0f4fbd5ffc6b5bd748a5b28e4354","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3609,"declarationType":"EM","declarationTitle":"TROPICAL DEPRESSION DEBBY","maId":"3609EMVTUSDA-APH01","maAmendNumber":1,"actionId":475186,"maType":"FOS","supportFunction":11,"priority":"High","region":1,"stt":"VT","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-08-10T00:00:00.000Z","dateRequired":"2024-08-10T00:00:00.000Z","popStartDate":"2024-08-08T00:00:00.000Z","popEndDate":"2024-08-10T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-08T00:00:00.000Z","maPopEndDate":"2024-08-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1:  Operationally close out as of 8/10/2024.\r\nActivate USDA (ESF-11) to RRCC. This is a reissuance of VT-24072801-USDA-APH-01.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f9b8138b-6668-466f-a68f-2464e807ab7f","hash":"fc5ed96ba05089cc92e6f8d917e2b18d19d4643c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3609,"declarationType":"EM","declarationTitle":"TROPICAL DEPRESSION DEBBY","maId":"3609EMVTUSDA-APH01","maAmendNumber":0,"actionId":475106,"maType":"FOS","supportFunction":11,"priority":"High","region":1,"stt":"VT","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-08T00:00:00.000Z","popEndDate":"2024-08-15T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":2200,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2200,"maPopStartDate":"2024-08-08T00:00:00.000Z","maPopEndDate":"2024-08-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2200,"maPriority":"High","assistanceRequested":"Activate USDA (ESF-11) to RRCC. This is a reissuance of VT-24072801-USDA-APH-01.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8cab5980-658b-4ad4-9050-ae3ce7b02ad1","hash":"c74bf0fa0aa5dd16469b70141e11c8c7c7885bfd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3609,"declarationType":"EM","declarationTitle":"TROPICAL DEPRESSION DEBBY","maId":"3609EMVTEPA01","maAmendNumber":1,"actionId":475148,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"VT","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-10T00:00:00.000Z","dateRequired":"2024-08-10T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-10T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1:  Operationally close out as of 8/10/2024.\r\n\r\nActivate ESF-3 EPA to RRCC.   This is a re-issuance of VT-24072801-EPA- 01.\r\n ","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.  \r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"abfe95a4-ebab-4a43-bbfa-d2e7a299988e","hash":"69bd5e318705a0021ada54cfa77a6df0519a5d5f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3609,"declarationType":"EM","declarationTitle":"TROPICAL DEPRESSION DEBBY","maId":"3609EMVTEPA01","maAmendNumber":0,"actionId":475086,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"VT","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-14T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Activate ESF-3 EPA to RRCC.   This is a re-issuance of VT-24072801-EPA- 01.\r\n ","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.  \r\n\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"09a220e1-c19c-4d98-a18c-d56aa1ea3ee5","hash":"471c555e88d86a3b29e5c252a938a57abf6efa23","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3609,"declarationType":"EM","declarationTitle":"TROPICAL DEPRESSION DEBBY","maId":"3609EMVTDOJ-ATF02","maAmendNumber":0,"actionId":475110,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":1,"stt":"VT","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-08T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":17910,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":17910,"maPopStartDate":"2024-08-08T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":17910,"maPriority":"Lifesaving","assistanceRequested":"Requesting Joint Reception, Staging and Onward Integrations actions to deploy Federal Force protection and accompanying Division Supervisor and 2 logistics support personnel and 15 agents in accordance with FEMA US&amp;R Deployment Security Protocol. This is a reissuance of VT-24072801-DOJ-ATF-02.","statementOfWork":"As directed by and in coordination with FEMA the Department of Justice (DOJ) will conduct Joint Reception, Staging and Onward Integration (JROSI) activity in preparation for assignment to US&amp;R Force Protection for Type 3 US&amp;R deploying to State of Vermont in support of response to remnants of TS Debby.\r\n\r\nRequirements from FEMA: \r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. \r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. \r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. \r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"7de9d674-c7c9-44a4-8852-1adde1407aa6","hash":"5808cc0cdfe529c71134e470717f42b8df64181e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3609,"declarationType":"EM","declarationTitle":"TROPICAL DEPRESSION DEBBY","maId":"3609EMVTDOJ-ATF01","maAmendNumber":1,"actionId":475189,"maType":"FOS","supportFunction":13,"priority":"Normal","region":1,"stt":"VT","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-10T00:00:00.000Z","dateRequired":"2024-08-10T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-10T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1:  Operationally close out as of 8/10/2024.\r\nActivate ESF-13 DOJ to RRCC.  This is a re-issuance of VT-24072801-DOJ-ATF-01. ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"79be6ef0-cf3c-429b-b6ef-6c004ca2fc11","hash":"05957f8006d6b34296440d6ef837c8b8415a076b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3609,"declarationType":"EM","declarationTitle":"TROPICAL DEPRESSION DEBBY","maId":"3609EMVTDOJ-ATF01","maAmendNumber":0,"actionId":475109,"maType":"FOS","supportFunction":13,"priority":"Normal","region":1,"stt":"VT","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-14T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":4685,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":4685,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":4685,"maPriority":"Normal","assistanceRequested":"Activate ESF-3 EPA to RRCC.   This is a re-issuance of VT-24072801-EPA- 01.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\n\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ece989c2-5076-4b35-a862-6b9c0bfe7b1a","hash":"27447fb28253e6e5bb710b731497f2b120aa3d91","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3609,"declarationType":"EM","declarationTitle":"TROPICAL DEPRESSION DEBBY","maId":"3609EMVTCOE-NAD01","maAmendNumber":1,"actionId":475319,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"VT","agencyId":"COE-NAD","agency":"COE NORTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-11T00:00:00.000Z","dateObligated":"2024-08-13T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1:  Operationally close out as of 8/11/2024.\r\nActivate ESF-3 USACE to RRCC.  This is a re-issuance of VT-24072801-COE-NAD- 01.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"4c06c35b-4e08-46ba-805f-0d28a7d5a0b1","hash":"069ac87985e7b93df2a2ab50f26482b802e80845","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3609,"declarationType":"EM","declarationTitle":"TROPICAL DEPRESSION DEBBY","maId":"3609EMVTCOE-NAD01","maAmendNumber":0,"actionId":475104,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"VT","agencyId":"COE-NAD","agency":"COE NORTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-14T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":10500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10500,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10500,"maPriority":"Normal","assistanceRequested":"Activate ESF-3 USACE to RRCC.  This is a re-issuance of VT-24072801-COE-NAD- 01.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f1388286-f491-4012-b554-45358715f27d","hash":"6f68c8769e91ddd3d836c272b4626cb8f673b08d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3608,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3608EMNCHHS-ASPR01","maAmendNumber":0,"actionId":474920,"maType":"DFA","supportFunction":8,"priority":"Lifesaving","region":4,"stt":"NC","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2022-08-07T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-08-21T00:00:00.000Z","dateObligated":"2024-08-07T00:00:00.000Z","obligationAmount":450297,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":112574.25,"fedCostShareAmt":337722.75,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-08-21T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":112574.25,"maFedCostShareAmount":337722.75,"maPriority":"Lifesaving","assistanceRequested":"Health and Medical Task Force (HMTF) Activate appropriate HHS personnel to perform the functions of ESF8 in the State EOC, IOF, JFO, IMAT, PDAs, or other teams and locations to support disaster operations. Initial request for  One (1) Healthcare Assessment Team: 2pax, IMT, REC, Force Health Protection, equipment to support.  One (1)\r\n17-person health/medical task force and equipment for staging to perform the functions of ESF8 capabilities in support of disaster operations, adjusted as needed.","statementOfWork":"As requested by the state of North Carolina and directed by and in coordination with FEMA, Health and Human Services (HHS) will provide ESF 8 personnel, equipment transportation to stage to perform the functions of ESF 8 capabilities in support of disaster operations from the 2024 Debby incident. These functions include rapid health care\r\nfacility and healthcare system assessments in an impacted state(s), territorial or tribal jurisdiction(s). Requirements from FEMA 1. MA task orders (MATOs) may be issued by\r\nFEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n9. A final inspection report will be completed upon termination of all direct Federal assistance work. Final inspection reports shall be signed by a representative of the performing Federal agency and the STT pursuant to 44 CFR.","id":"640f0b81-5904-4255-a3bc-85e6e40b0e6b","hash":"12869a9524f51f68dec5d079132c91ef01cc22db","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3608,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3608EMNCGSA01","maAmendNumber":0,"actionId":474834,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"NC","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-07T00:00:00.000Z","popStartDate":"2024-08-07T00:00:00.000Z","popEndDate":"2024-09-06T00:00:00.000Z","dateObligated":"2024-08-07T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-08-07T00:00:00.000Z","maPopEndDate":"2024-09-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"Activate GSA to RRCC, IOF, JFO or other teams and facilities as requested - North Carolina","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations. Activities may include, but are not limited to, the following: - ESF-7 support - Emergency leasing services for needed space/facilities as requested by FEMA - GSA Lease Contracting Officers (LCOs) and others as needed Requirements from FEMA: 1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). 2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. 3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. 4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. 5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. 6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. 7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. 8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2deebbd2-878c-47dc-88d5-6698d77fd8c1","hash":"d8962394bfcaa3fa6fdb7a22abef62c252f4141b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3607,"declarationType":"EM","declarationTitle":"HURRICANE DEBBY","maId":"3607EMGAGSA01","maAmendNumber":0,"actionId":474677,"maType":"FOS","supportFunction":7,"priority":"Normal","region":4,"stt":"GA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-08-06T00:00:00.000Z","popStartDate":"2024-08-06T00:00:00.000Z","popEndDate":"2024-08-30T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-08-06T00:00:00.000Z","maPopEndDate":"2024-08-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Normal","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations. Activities may include, but are not limited to, the following: ESF-7 support - Emergency leasing services for needed space/facilities as requested by FEMA - GSA Lease Contracting Officers (LCOs) and others as needed Requirements from FEMA: 1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). 2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. 3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. 4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. 5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. 6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. 7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. 8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"7e31ffc7-63ad-4a7d-aa64-c843d8fb68fd","hash":"b7344d29736c122e1d647678b8e69ce2373abf9d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3607,"declarationType":"EM","declarationTitle":"HURRICANE DEBBY","maId":"3607EMGADHS-FPS01","maAmendNumber":0,"actionId":474979,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"GA","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-08-08T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-08T00:00:00.000Z","popEndDate":"2024-08-16T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":11079,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":11079,"maPopStartDate":"2024-08-08T00:00:00.000Z","maPopEndDate":"2024-08-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":11079,"maPriority":"High","assistanceRequested":"Provide security officers as required by the field security manager and regional security officer (RSO) at various venues in support of disaster operations","statementOfWork":"At the direction of, and in coordination with FEMA security personnel, FPS will provide appropriate physical security to support response and recovery operations in the various\r\nvenues in Region 4. Security of FEMA facilities will be based on FEMA security standards, policies and practices. For FPS accounting purposes this MA and associated funds are\r\nintended to fund FEMA task orders for the period specified or until funds are exhausted. Any time extensions or additional funding requirements will be processed utilizing an\r\nRRF including new POP (period of performance) dates, cost estimate and justification. This information will be provided by FEMA Security in coordination with FPS personnel\r\nand approved by the FCO or his/her designee. Equipment purchases are not authorized under this mission assignment. \r\nRequirements from FEMA 1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement. \r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. \r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies","id":"c2d7355b-1988-4a31-8179-9504332f47e1","hash":"45a7f5bd7bb8878c4c14ab27982e2fe6b51fbf13","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3606,"declarationType":"EM","declarationTitle":"HURRICANE DEBBY","maId":"3606EMSCHHS-ASPR01","maAmendNumber":0,"actionId":474648,"maType":"FOS","supportFunction":8,"priority":"Lifesaving","region":4,"stt":"SC","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-08-06T00:00:00.000Z","popStartDate":"2024-08-06T00:00:00.000Z","popEndDate":"2024-08-13T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":1165640,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1165640,"maPopStartDate":"2024-08-06T00:00:00.000Z","maPopEndDate":"2024-08-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1165640,"maPriority":"Lifesaving","assistanceRequested":"Health and Medical Task Force (HMTF) Activate appropriate HHS personnel to perform the functions of ESF8 in the RRCC, IOF, JFO, IMAT, PDAs, or other teams and locations to support disaster operations. Initial request, adjusted as needed, for two (2) teams: 2pax per team, IMT, Force Health Protection, equipment to support. \r\n Two 17person health/medical task force and equipment for FOS prelandfall staging to perform the functions of ESF8 capabilities in support of disaster operations.\r\n","statementOfWork":"Activate Health and Human Services (HHS) ESF&#xfffd;8 personnel and equipment to pre&#xfffd;stage and support 2024 Debby, to perform the functions of ESF&#xfffd;8 and to conduct rapid health\r\ncare facility and health care system assessments in an impacted state(s), territorial or tribal jurisdiction(s). \r\nRequirements from FEMA \r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104&#xfffd;010&#xfffd;3. For MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8161e55f-3d29-40ec-99c7-f43ea3918b54","hash":"273ebe4fb20e65988ea1a42f63af248ebb17da04","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3606,"declarationType":"EM","declarationTitle":"HURRICANE DEBBY","maId":"3606EMSCGSA01","maAmendNumber":0,"actionId":474694,"maType":"FOS","supportFunction":7,"priority":"Normal","region":4,"stt":"SC","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-06T00:00:00.000Z","popEndDate":"2024-08-30T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-08-06T00:00:00.000Z","maPopEndDate":"2024-08-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Normal","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested South\r\nCarolina","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to \r\nthe RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations. Activities may include, but are not limited to, the following: ESF-7 support - Emergency leasing services for needed space/facilities as \r\nrequested by FEMA - GSA Lease Contracting Officers (LCOs) and others as needed Requirements from FEMA: 1. MA task orders \r\n(MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment\r\n(s). 2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. 3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. 4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. 5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation \r\nmaintained by the respective agency. 6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. 7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing \r\nactions, property disposition (if applicable), and Financial/Program points of contact. 8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"123dba6d-effa-4980-9e82-6cdc46e5cbd2","hash":"deb333431fe129eb7ee013f5d201f4c206d281ef","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3606,"declarationType":"EM","declarationTitle":"HURRICANE DEBBY","maId":"3606EMSCCOE-LRD01","maAmendNumber":0,"actionId":474735,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"SC","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-06T00:00:00.000Z","popEndDate":"2024-08-13T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":5400000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5400000,"maPopStartDate":"2024-08-06T00:00:00.000Z","maPopEndDate":"2024-08-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5400000,"maPriority":"High","assistanceRequested":"USACE preposition two (2), adjusted as needed, Type Three (3) temporary emergency power resources to the affected area; staging in the vicinity of Greenville, SC","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the\r\naffected area in support of disaster operations. \r\nInitial requirement is for two (2) Type Three (3) temporary power support assets, adjusted as needed\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the\r\nacquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks). \r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE\r\nis responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and\r\nResponse Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies","id":"da511f12-7bd4-4b04-afc9-1ceb16208cb7","hash":"0868e01faed32365c5531e3cd4e22d60a77d1945","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLVA02","maAmendNumber":1,"actionId":475526,"maType":"FOS","supportFunction":8,"priority":"Normal","region":4,"stt":"FL","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-08T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-7500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-7500,"maPopStartDate":"2024-08-08T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-7500,"maPriority":"Normal","assistanceRequested":"Amendment 1: This MA is replaced by MA # 4806DR-FL-VA- 02. The full $7,500.00 is included in the re-issued mission.\r\nActivate VHA OEM to NRCC ESF-8 PHMS","statementOfWork":"As directed by and in coordination with FEMA and HHS, Veterans Affairs (VA) - Veterans Health Administration (VHA) Office of Emergency Management (OEM) will provide appropriate personnel to the NRCC, other teams, and facilities to support disaster operations primarily as the FEMA-NRCC-PHMS (Public Health and Medical Specialist) and, at the request of the FEMA-NRCC-PHMUL (Public Health and Medical Unit Leader) the VHA may also serve as the acting PHMUL. If 24-hour coverage is necessary, VHA will support night shift requirements as staffing permits.\r\nADDITIONAL NOTES FROM FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), and durations of assignment(s)\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"cabca649-081a-4e70-b900-e2a688a26743","hash":"628d9b04997931230bc98ec03e9405d79e0c3218","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLVA02","maAmendNumber":0,"actionId":475022,"maType":"FOS","supportFunction":8,"priority":"Normal","region":4,"stt":"FL","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2024-08-08T00:00:00.000Z","dateRequired":"2024-08-06T00:00:00.000Z","popStartDate":"2024-08-08T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-10T00:00:00.000Z","obligationAmount":7500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":7500,"maPopStartDate":"2024-08-08T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":7500,"maPriority":"Normal","assistanceRequested":"Activate VHA OEM to NRCC ESF-8 PHMS","statementOfWork":"As directed by and in coordination with FEMA and HHS, Veterans Affairs (VA) - Veterans Health Administration (VHA) Office of Emergency Management (OEM) will provide appropriate personnel to the NRCC, other teams, and facilities to support disaster operations primarily as the FEMA-NRCC-PHMS (Public Health and Medical Specialist) and, at the request of the FEMA-NRCC-PHMUL (Public Health and Medical Unit Leader) the VHA may also serve as the acting PHMUL. If 24-hour coverage is necessary, VHA will support night shift requirements as staffing permits.\r\nADDITIONAL NOTES FROM FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), and durations of assignment(s)\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d2b1c8c0-3930-4660-9fdd-c9ebf374382a","hash":"fb771091db98d58a283c4a9183a965f7a849c773","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLVA01","maAmendNumber":2,"actionId":475553,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-VA- 01. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate VA to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Veterans Affairs (VA) will provide appropriate personnel to the NRCC other teams and facilities to support disaster operations. \r\nADDITIONAL NOTES FROM FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), and durations of assignment(s)\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"655c257f-fb94-4f9b-bbf2-155ca1a5e7ec","hash":"35fe02969cd9f310f85c8839eed619c0caef4dfa","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLVA01","maAmendNumber":1,"actionId":475153,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate VA to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Veterans Affairs (VA) will provide appropriate personnel to the NRCC other teams and facilities to support disaster operations. \r\nADDITIONAL NOTES FROM FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), and durations of assignment(s)\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c8cc1323-d75a-4599-bb6d-7a16580a0b43","hash":"7fdc49e422a34b6fc1b08cc405dd749c75cff85c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLCOE-LRD01","maAmendNumber":4,"actionId":476621,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"FL","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-08-28T00:00:00.000Z","dateRequired":"2024-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2024-08-28T00:00:00.000Z","obligationAmount":-200000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-200000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-200000,"maPriority":"Normal","assistanceRequested":"Amendment #4 - De-obligate funds in the amount of $200,000.00\r\nAmendment #3 - De-obligate funds in the amount of $200,000.00\r\nAmendment #2 - De-obligate funds in the amount of $400,000.00.\r\nAmendment #1 - Amend to De-obligate $500,000.00 per USACE POC recommendations and close the mission. \r\nUSACE pre-position Type IV temporary emergency power resources to Maxwell AFB - ISB.  This replaces FL-23082403-COE-LRD-01-01. \r\n","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for Type IV temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ea662894-670b-4ab8-8a6d-5fd27c225f0b","hash":"bef82efe1a267a596e4f13b57d3eaae9050de143","lastRefresh":"2024-08-28T21:24:45.609Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLVA01","maAmendNumber":0,"actionId":474663,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-07T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate VA to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Veterans Affairs (VA) will provide appropriate personnel to the NRCC other teams and facilities to support disaster operations. \r\nADDITIONAL NOTES FROM FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), and durations of assignment(s)\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"6795b368-e92b-4bed-b502-dabe91516393","hash":"a5fce7ef9b17d2ec6c22600df7c9754bc5221dba","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLUSDA-FS01","maAmendNumber":2,"actionId":475525,"maType":"FOS","supportFunction":4,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-7000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-7000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-7000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-USDA-FS- 01. The full $7,000.00 is included in the re-issued mission.\r\nAmendment 1: Increase of ESF# 4 (USFS) deployment funds by $4000.00 and change POP end date to 8/9/2024 in support of Hurricane/TS Debby.\r\nActivate USFS to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"5b3b9e62-ce04-497e-b146-21816ab12bfd","hash":"56882b83d3ab3a4e25d9afdbf66b6fe5ae45d3c7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLUSDA-FS01","maAmendNumber":1,"actionId":475050,"maType":"FOS","supportFunction":4,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-08-08T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-10T00:00:00.000Z","obligationAmount":4000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":4000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":4000,"maPriority":"Normal","assistanceRequested":"Amendment 1: Increase of ESF# 4 (USFS) deployment funds by $4000.00 and change POP end date to 8/9/2024 in support of Hurricane/TS Debby.\r\nActivate USFS to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"d11412e8-0990-42cd-8e1a-b11f9f5f49b0","hash":"d74077b61ae69c696b28de0024cb2679db9774e4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLUSDA-FS01","maAmendNumber":0,"actionId":474592,"maType":"FOS","supportFunction":4,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate USFS to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f41075f7-c8cc-494b-88de-61f399d8962d","hash":"c39c8264d2a77d5d27ea6dccee73ffc24cb6a951","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLUSDA-APH01","maAmendNumber":2,"actionId":475523,"maType":"FOS","supportFunction":11,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-USDA-APH- 01. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nUSDA liaison(s) to the NRCC, FEMA teams, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2dd6341a-b8df-4d44-99bd-4b610dd9c4e1","hash":"ac60b07f87a71a33e1b594eff6144337bf1a5622","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMECOE-LRD01","maAmendNumber":4,"actionId":476623,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"ME","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-08-28T00:00:00.000Z","dateRequired":"2024-08-28T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-08-28T00:00:00.000Z","obligationAmount":-500000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-500000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-500000,"maPriority":"High","assistanceRequested":"Amendment #4  De-obligate $500,000 IAW USACE ULO validation for 2024-08-20\r\nAmendment #3: De-obligate $600,000 IAW USACE ULO validation for 01JUL2024 and change FEMA PM to Craig Beaulac.\r\nAmendment #2: De-obligate $200,000 IAW agency request dated 20 March 2024.\r\nAmendment #1:  Partial closeout request from USACE and de-obligation of $1,000,000. \r\n-------------------------------------------------\r\nThis is a reissuance of MA-23090401-COE-LRD-01:  Pre-position temporary emergency power resources to Region 1.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\nInitial requirement is for two type IV temporary power support assets.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a1a3bbcb-dd65-4d5e-85ba-79670aca3983","hash":"a94f2a477f542257d194c7d6d80566a393a68db0","lastRefresh":"2024-08-28T23:24:50.016Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLUSDA-APH01","maAmendNumber":1,"actionId":475132,"maType":"FOS","supportFunction":11,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nUSDA liaison(s) to the NRCC, FEMA teams, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"0da938c9-973b-4d75-8ea0-edd78b152e6b","hash":"4be75d0674cb62499074007250bb79028cde844a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLUSDA-APH01","maAmendNumber":0,"actionId":474548,"maType":"FOS","supportFunction":11,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"USDA liaison(s) to the NRCC, FEMA teams, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a21f0f93-bbe6-4995-8a56-3fe9c712da45","hash":"a0e972c85056d54adf5617322253e1e172fea280","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLHUD01","maAmendNumber":2,"actionId":475521,"maType":"FOS","supportFunction":6,"priority":"Normal","region":4,"stt":"FL","agencyId":"HUD","agency":"HUD (ADMIN SUPPORT OFFICES)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-HUD- 01. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate HUD to NRCC or other teams and facilitate","statementOfWork":"As directed by and in coordination with FEMA Housing $ Urban Development (HUD) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for HUD command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"ce803b47-a428-4e15-beb4-2179bb2f022d","hash":"412e6f8ec02f430554b227f11f09a70fe88bf4e1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLHUD01","maAmendNumber":1,"actionId":475157,"maType":"FOS","supportFunction":6,"priority":"Normal","region":4,"stt":"FL","agencyId":"HUD","agency":"HUD (ADMIN SUPPORT OFFICES)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate HUD to NRCC or other teams and facilitate","statementOfWork":"As directed by and in coordination with FEMA Housing $ Urban Development (HUD) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for HUD command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"22f6a8f5-031a-42ae-8120-70d4b1708009","hash":"70bf6a875086c65265a821d5fd7ac530ba41053a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2018072401","incidentName":"CARR FIRE","incidentType":"Fire","disasterNumber":4382,"declarationType":"DR","declarationTitle":"WILDFIRES AND HIGH WINDS","maId":"4382DRCAFPS01","maAmendNumber":0,"actionId":265907,"maType":"FOS","supportFunction":13,"priority":"High","region":9,"stt":"CA","agencyId":"FPS","agency":"FEDERAL PROTECTIVE SERVICE","authority":"Stafford Act","dateReceived":"2018-08-06T00:00:00.000Z","dateRequired":"2018-08-05T00:00:00.000Z","popStartDate":"2018-08-05T00:00:00.000Z","popEndDate":"2018-09-05T00:00:00.000Z","dateObligated":"2018-08-07T00:00:00.000Z","obligationAmount":300000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":300000,"maPopStartDate":"2018-08-05T00:00:00.000Z","maPopEndDate":"2018-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":300000,"maPriority":"High","assistanceRequested":"Activate FPS to DR-4382 to Contract security officers to support the FEMA Security Manager (SM) ","statementOfWork":"As directed by an in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards, policies, and practices.\r\n\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n\r\nAll equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement.\r\n\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n \r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies.\r\n\r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"cbb449c5-8c1f-4130-97d5-e192c533c885","hash":"1c52fc117cb7fad511d5818d6f64fd7dbb698c90","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLHUD01","maAmendNumber":0,"actionId":474567,"maType":"FOS","supportFunction":6,"priority":"Normal","region":4,"stt":"FL","agencyId":"HUD","agency":"HUD (ADMIN SUPPORT OFFICES)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate HUD to NRCC or other teams and facilitate","statementOfWork":"As directed by and in coordination with FEMA Housing $ Urban Development (HUD) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for HUD command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"af5a2697-5bf3-4917-9273-1d50ddfa40aa","hash":"e9693f9984e5338868f29a099b3d178ec39e11f7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLHHS-ASPR01","maAmendNumber":2,"actionId":475551,"maType":"FOS","supportFunction":8,"priority":"Normal","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-HHS-ASPR- 02. The full $3,000.00  is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date.\r\nActivate HHS to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2cf36e07-3539-4c7b-bf73-f3a0277a077a","hash":"779674d7b1e9156f1bbd8da5f72e8999c196fdd9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLHHS-ASPR01","maAmendNumber":1,"actionId":475192,"maType":"FOS","supportFunction":8,"priority":"Normal","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-11T00:00:00.000Z","dateRequired":"2024-08-11T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date.\r\nActivate HHS to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"15d266e1-b478-4e28-ad1c-d7c8a1d00600","hash":"eab3bb74a4d110cf15c8ceef42bc508636961175","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLHHS-ASPR01","maAmendNumber":0,"actionId":474526,"maType":"FOS","supportFunction":8,"priority":"Normal","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate HHS to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2ebe145e-c098-4ecb-9fcc-46ac88567063","hash":"44cfc526a36c6193b6d90bd8a5f70c65962aafe2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLGSA01","maAmendNumber":2,"actionId":475484,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-GSA- 02. The full  $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate GSA to NRCC, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations. \r\nActivates may include, but are not limited to the following:\r\n- ESF7 support\r\n-Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"1223bbed-713d-4b32-aa3a-7d484bc568ac","hash":"a8480113fd3e91f60061d081e951d85989784cae","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLGSA01","maAmendNumber":1,"actionId":475142,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\n\r\nActivate GSA to NRCC, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations. \r\nActivates may include, but are not limited to the following:\r\n- ESF7 support\r\n-Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"714d920f-4a48-4055-9a0c-e5842cdd4464","hash":"b1d224d64216fd9e3040575723fdf3cc99568613","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLGSA01","maAmendNumber":0,"actionId":474543,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate GSA to NRCC, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations. \r\n\r\nActivates may include, but are not limited to the following:\r\n- ESF7 support\r\n-Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"7df10f7a-f341-4089-8604-5c7345cb0a86","hash":"6937cb3c7c5336d87d178cd27b706b03703a0b23","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLEPA02","maAmendNumber":2,"actionId":475519,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-EPA- 03. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate EPA to the NRCC or other facilities to support disaster operations","statementOfWork":"As directed by and in coordination with FEMA, the Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- EPA support to NRCC\r\n- EPA support to National IMAT\r\n- EPA support to ESF #15 External Affairs\r\n- EPA SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- EPA modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under EPA MA meet all Stafford Act and regulatory requirements.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a5ce843c-b7b0-4b69-85df-a629388aaeaa","hash":"00faa618870b02bd1aedc17d122ee9e71e09495a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLEPA02","maAmendNumber":1,"actionId":475138,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\n\r\nActivate EPA to the NRCC or other facilities to support disaster operations","statementOfWork":"As directed by and in coordination with FEMA, the Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- EPA support to NRCC\r\n- EPA support to National IMAT\r\n- EPA support to ESF #15 External Affairs\r\n- EPA SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- EPA modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under EPA MA meet all Stafford Act and regulatory requirements.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"64293567-83dd-41db-8351-58c9d260754e","hash":"274256e0d3a658cf9a999d2843eed028f1d488d5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLEPA02","maAmendNumber":0,"actionId":474647,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-07T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate EPA to the NRCC or other facilities to support disaster operations","statementOfWork":"As directed by and in coordination with FEMA, the Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- EPA support to NRCC\r\n- EPA support to National IMAT\r\n- EPA support to ESF #15 External Affairs\r\n- EPA SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- EPA modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under EPA MA meet all Stafford Act and regulatory requirements.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e0872518-e125-470f-a474-0062f8798f49","hash":"65e9869c0e32597aa1cae741e0e91e1e309d10d6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLEPA01","maAmendNumber":2,"actionId":475483,"maType":"FOS","supportFunction":10,"priority":"Normal","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-EPA- 02. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nEPA ESF 10 to NRCC or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"79025517-2b93-4375-b76b-dc8fcd3459dd","hash":"fe6a159bff7db90ab74d8e7131bea66b07a8720a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLEPA01","maAmendNumber":1,"actionId":475133,"maType":"FOS","supportFunction":10,"priority":"Normal","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nEPA ESF 10 to NRCC or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"c5912050-cc39-4dd1-a6da-5481b8a182ab","hash":"ad7857c6ac76f5df0afe2281dbe26e5656a9e15b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLEPA01","maAmendNumber":0,"actionId":474556,"maType":"FOS","supportFunction":10,"priority":"Normal","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"EPA ESF 10 to NRCC or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"78383cee-a19b-4ebb-86e0-6dc64f3f6f93","hash":"ce39d480598defc685a5b520325a7e10298a20c9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOT01","maAmendNumber":3,"actionId":475482,"maType":"FOS","supportFunction":1,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2025-08-06T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 3: This MA is replaced by MA # 4806DR-FL-DOT- 02. The full $10,000.00 is included in the re-issued mission.\r\nAmendment 2: Change POP to 8/9/24 to align with the operational completion date. \r\nAmendment 1: Increase funding by $7000\r\nActivate DOT/ ESF 1 to NRCC or other facilities to support disaster operation in support Tropical Storm Debby","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"36bb44a4-5212-48e0-b37b-5758c49d6854","hash":"bdb95c852171d78caa28316971eabf0e26baba95","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOT01","maAmendNumber":2,"actionId":475154,"maType":"FOS","supportFunction":1,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2025-08-06T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 2: Change POP to 8/9/24 to align with the operational completion date. \r\nAmendment 1: Increase funding by $7000\r\nActivate DOT/ ESF 1 to NRCC or other facilities to support disaster operation in support Tropical Storm Debby","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"ad1ef303-2dff-4544-9349-3d9cb986430d","hash":"7a488c1e50f25b4bf3dd53e9d0c19e6c33635038","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOT01","maAmendNumber":1,"actionId":474739,"maType":"FOS","supportFunction":1,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2025-08-06T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-07T00:00:00.000Z","obligationAmount":7000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":7000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":7000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 1: Increase funding by $7000\r\nActivate DOT/ ESF 1 to NRCC or other facilities to support disaster operation in support Tropical Storm Debby","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"3d0a7499-04d3-41d8-b4fd-b3a97036c8ae","hash":"805fc412f41a7ec7229a277ca7d81ac6d3c931f7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOT01","maAmendNumber":0,"actionId":474533,"maType":"FOS","supportFunction":1,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2025-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Life Sustaining","assistanceRequested":"Activate DOT/ ESF 1 to NRCC or other facilities to support disaster operation in support Tropical Storm Debby","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"39d1958a-dc86-488a-aa42-1936501a61ca","hash":"c5192f9740cc1ff2088b99ef4ef160d8f3a85e21","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOJ-ATF01","maAmendNumber":2,"actionId":475547,"maType":"FOS","supportFunction":13,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-DOJ-ATF- 02. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date.\r\nActivate DOJ to NRCC or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to NRCC or other facilities as requested to perform functions of ESF-13 in support FEMA disaster operations. \r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e053d35c-82f7-48fe-b3b4-fe8d6abdb18d","hash":"0b29adf950fcd143472d66b0101060532e3d9069","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOJ-ATF01","maAmendNumber":1,"actionId":475191,"maType":"FOS","supportFunction":13,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-11T00:00:00.000Z","dateRequired":"2024-08-11T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date.\r\nActivate DOJ to NRCC or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to NRCC or other facilities as requested to perform functions of ESF-13 in support FEMA disaster operations. \r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"58d7c670-d0ef-45cf-89b8-d81d3538b317","hash":"0508fe4a47ac6f6555b67b803380638ca1aa4299","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOJ-ATF01","maAmendNumber":0,"actionId":474574,"maType":"FOS","supportFunction":13,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate DOJ to NRCC or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to NRCC or other facilities as requested to perform functions of ESF-13 in support FEMA disaster operations. \r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2dfbe1e8-78ad-411e-815e-f8121ac63146","hash":"ca81abf75320d418cb0958be79938fd404914048","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOI-WCF01","maAmendNumber":2,"actionId":475556,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-15T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-DOI-WCF- 01. This is a zero-dollar MA.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate DOI to NRCC.","statementOfWork":"As directed by and in coordination with FEMA, DOI will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA response operations.\r\nFunding for DOI command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"450b863e-f730-4c20-9166-ebc7db28cb75","hash":"ff74e6ff11127b4778eafeec915b5ce3e917dd23","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOI-WCF01","maAmendNumber":1,"actionId":475155,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate DOI to NRCC.","statementOfWork":"As directed by and in coordination with FEMA, DOI will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA response operations.\r\nFunding for DOI command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"cf6549e9-74be-474b-a8c6-6b921f746732","hash":"29f6f97bbd14aa16e3128724a710b0977c81b07c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOI-WCF01","maAmendNumber":0,"actionId":474986,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2024-08-08T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Activate DOI to NRCC.","statementOfWork":"As directed by and in coordination with FEMA, DOI will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA response operations.\r\nFunding for DOI command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"00f7f92c-cdf4-49eb-ad24-f180fff05033","hash":"1c17faebddce6f10a712f911c7537ba1499f9a63","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOE-OE01","maAmendNumber":2,"actionId":475545,"maType":"FOS","supportFunction":12,"priority":"High","region":4,"stt":"FL","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-DOE-OE- 01. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActive DOE to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to NRCC, to perform the functions of ESF-12 in support disaster operations.\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"7ff93ee0-7baa-4ea6-8e42-d32c8f8291fd","hash":"69b0337819d33d1f28bdd24951a040323ebccf7b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOE-OE01","maAmendNumber":1,"actionId":475156,"maType":"FOS","supportFunction":12,"priority":"High","region":4,"stt":"FL","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\n\r\nActive DOE to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to NRCC, to perform the functions of ESF-12 in support disaster operations.\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"f6b40c43-c947-446a-b1f5-45395b585351","hash":"69887061925712d9cbf30adc4edff8d409114cf5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2018072401","incidentName":"CARR FIRE","incidentType":"Fire","disasterNumber":4382,"declarationType":"DR","declarationTitle":"WILDFIRES AND HIGH WINDS","maId":"4382DRCAEPA01","maAmendNumber":1,"actionId":337100,"maType":"FOS","supportFunction":10,"priority":"High","region":9,"stt":"CA","agencyId":"EPA","agency":"ENVIRONMENTAL PROTECTION AGY","authority":"Stafford Act","dateReceived":"2020-11-30T00:00:00.000Z","dateRequired":"2020-11-30T00:00:00.000Z","popStartDate":"2018-08-06T00:00:00.000Z","popEndDate":"2018-08-20T00:00:00.000Z","dateObligated":"2020-12-02T00:00:00.000Z","obligationAmount":-38583.3,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-38583.3,"maPopStartDate":"2018-08-06T00:00:00.000Z","maPopEndDate":"2018-08-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-38583.3,"maPriority":"High","assistanceRequested":"Amendment #1 De-obligate $38,583.30 and closeout mission assignment. \r\n\r\nActivate ESF # 10 EPA to DR-4382 JFO, or other teams and facilities as requested ","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other teams and facilities as requested to support disaster operations. \r\n\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n\r\n MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement. \r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. \r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. ","id":"0803a22a-718c-4691-a2e8-8d8f37515a4b","hash":"07af50c20d397b0750e9b25b1e7ccad19b4d9a0e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOE-OE01","maAmendNumber":0,"actionId":474551,"maType":"FOS","supportFunction":12,"priority":"High","region":4,"stt":"FL","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Active DOE to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to NRCC, to perform the functions of ESF-12 in support disaster operations.\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"7d6f59c1-a731-483d-9e1f-5ee01bf888d5","hash":"dd79eaf284c2807de5ae1f68cba7984dfafa194d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOD-USAF01","maAmendNumber":2,"actionId":475517,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-DOD-USAF- 01. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"af2bada2-d527-4e72-afc4-8885c4190a3d","hash":"e85061727836c704f6611cbbbfda411d609e9d2e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOD-USAF01","maAmendNumber":1,"actionId":475137,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"1ad28008-b668-4315-a923-45201bb380e1","hash":"faa8b43e5d0ff127348330ee8b8b12c43f8cb736","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOD-USAF01","maAmendNumber":0,"actionId":474621,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial support","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"17c742b4-ca7b-4a16-a113-ca5b52c1fa12","hash":"b1e3b2869bd94930b54cdd06fff873e45cbc663a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOD-OPS01","maAmendNumber":2,"actionId":475543,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-4000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-DOD-OPS- 02. The full $4,000.00  is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate DOD to NRCC to support FEMA response operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"4df8b3fe-2471-45ac-bd79-351eb817b3cd","hash":"b31490116a14c9886d6f8cdc40bbc1e77c16a0fe","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOD-OPS01","maAmendNumber":1,"actionId":475136,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\n\r\nActivate DOD to NRCC to support FEMA response operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"36890c80-b96e-4745-9b16-168f3d225eaa","hash":"18a90103189512a2061951e931d518c622b28af2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOD-OPS01","maAmendNumber":0,"actionId":474607,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":4000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":4000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":4000,"maPriority":"Normal","assistanceRequested":"Activate DOD to NRCC to support FEMA response operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"dd655b4c-082c-4828-bffc-b24aa1661307","hash":"b8ced9bbb5a79add38645b9ae9fca267302a75ac","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOC-NOAA02","maAmendNumber":2,"actionId":475554,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-DOC-NOAA- 02. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate NOAA to NRCC to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the NRCC to support disaster operations\r\nThis may include but is not limited to, the following:\r\n    - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n    - National Weather Service (NWS) Hurricane Liaison Team (HLT)\r\n    - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n    - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"d55125e6-98f5-4c3a-a105-645d87533a19","hash":"3248869fad5613880f1cbc9c4e11a6e70800d6ec","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOC-NOAA02","maAmendNumber":1,"actionId":475139,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate NOAA to NRCC to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the NRCC to support disaster operations\r\nThis may include but is not limited to, the following:\r\n    - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n    - National Weather Service (NWS) Hurricane Liaison Team (HLT)\r\n    - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n    - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ef9e6949-7fb0-4e8e-bfeb-99f8dd9a4236","hash":"4584c24595c67cd1f1a410fe63288382d5aeacce","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOC-NOAA02","maAmendNumber":0,"actionId":474781,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-07T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate NOAA to NRCC to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the NRCC to support disaster operations\r\nThis may include but is not limited to, the following:\r\n    - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n    - National Weather Service (NWS) Hurricane Liaison Team (HLT)\r\n    - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n    - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"7d55cf4f-5ac9-4f8e-92d4-db3face04a57","hash":"9a4a8b8065c4f245cf55abac152be26c63b70949","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOC-NOAA01","maAmendNumber":2,"actionId":475542,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-57313,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-57313,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-57313,"maPriority":"High","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-DOC-NOAA- 01. The full $57,313.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date and change the PM to Brandon White. \r\nNOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of Tropical Cyclone Debby and cascading effects","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"cb3b5798-5ab9-4459-ada4-2036ded4b005","hash":"85760b10aba2727d2343aa6619d522a5d0f113af","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOC-NOAA01","maAmendNumber":1,"actionId":475140,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date and change the PM to Brandon White. \r\nNOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of Tropical Cyclone Debby and cascading effects","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"fb975340-6c26-4eb5-9164-fd74d0779e9b","hash":"a3daf0cfda2afd6ae4a96a13c4cd4d58d1e411de","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDOC-NOAA01","maAmendNumber":0,"actionId":474572,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":57313,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":57313,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":57313,"maPriority":"High","assistanceRequested":"NOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of Tropical Cyclone Debby and cascading effects","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\n\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\n\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"bd99d789-e0c7-4d0a-8ed5-72360639c46e","hash":"1a610f7002f5f096795c7829aff922bc78e21483","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDLA01","maAmendNumber":2,"actionId":475541,"maType":"FOS","supportFunction":7,"priority":"Normal","region":4,"stt":"FL","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-DLA- 01. The full $3,000.00 is included in the re-issued mission. \r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date.\r\nActivate DLA liaisons to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a9340804-5f42-4bf2-8458-5a4ac172e4ad","hash":"f8e7cc39dbfc61ff452f8062270919a5415dccf5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDLA01","maAmendNumber":1,"actionId":475150,"maType":"FOS","supportFunction":7,"priority":"Normal","region":4,"stt":"FL","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date.\r\nActivate DLA liaisons to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a8ebe6fc-8539-4585-95d6-3223d1e6f7a2","hash":"67f89cc763aeb8592140856689e23d71156a70ce","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDLA01","maAmendNumber":0,"actionId":474522,"maType":"FOS","supportFunction":7,"priority":"Normal","region":4,"stt":"FL","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate DLA liaisons to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"07fc76d0-b0c1-4282-9e34-4058056bcf2a","hash":"6b3136104e6d12dfb57b226d33d9820ff8c03c5d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDHS-USCG02","maAmendNumber":2,"actionId":475538,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DRFLDHS-USCG02. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate USCG liaison(s) to NRCC","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f522fcb8-654e-487d-8aa8-1f3000ee316d","hash":"a3092de8a7c0aa07aa2193e06d37e4a020ac90df","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDHS-USCG02","maAmendNumber":1,"actionId":475134,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate USCG liaison(s) to NRCC","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"3c144334-7ff4-41c8-9c16-11b6fbc21cb2","hash":"d31d8634728d96aa4589e8f4648d8d55843edaf3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDHS-USCG02","maAmendNumber":0,"actionId":474577,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate USCG liaison(s) to NRCC","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"112a9724-1443-408a-8f30-2843462d6899","hash":"ddf8fc09d675a55af2e0cbd2ebac4c22354a8c12","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDHS-USCG01","maAmendNumber":0,"actionId":474498,"maType":"DFA","supportFunction":9,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-08-04T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-04T00:00:00.000Z","popEndDate":"2024-08-11T00:00:00.000Z","dateObligated":"2024-08-04T00:00:00.000Z","obligationAmount":224640,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":56160,"fedCostShareAmt":168480,"maPopStartDate":"2024-08-04T00:00:00.000Z","maPopEndDate":"2024-08-11T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":56160,"maFedCostShareAmount":168480,"maPriority":"High","assistanceRequested":"FL Air Operations requests 2, adjusted as needed, rotary aircraft with hoist and rescue swimmer capability positioned on west side of storm, to immediately conduct SAR operations post storm","statementOfWork":"In support of the State of Florida&#39;s request, as directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide assistance to Search and Rescue efforts when outside their statutory authority in accordance with the USCG FEMA Memo Policy Guidance on ESF # 9 Mission Assignments dated 16 August 2023 with the utilization of USCG assets to assist US&amp;R Teams conducting Search and Rescue missions in support of Emergency Support Function (ESF) 9 for disaster operations.\r\n\r\nFor air missions, an approved task order via Air Operations Flight Request with AOBD/OSC signature is required for reimbursement.\r\n\r\nWhile conducting a tasking, if USCG determines the work to be within USCG&#39;s statutory authority (e.g. phase changes), USCG will notify FEMA to ensure documentation that the tasking is no longer eligible for reimbursement under the MA.\r\n\r\nUSCG is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n9. A final inspection report will be completed upon termination of all direct Federal assistance work. Final inspection reports shall be signed by a representative of the performing Federal agency and the STT pursuant to 44 CFR.","id":"6d108ad5-70a7-41ca-8065-2098e8b96e23","hash":"5ed53f30af554975b02c30946e63fc69b1282477","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDHS-CISA02","maAmendNumber":2,"actionId":475514,"maType":"FOS","supportFunction":14,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-DHS-CISA- 03. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate CISA-14 LNO to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial and Infrastructure analyst SME)  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b23bec69-a4ba-4f4a-86a1-2de4b8b8b1bf","hash":"38c5dd50042af0d28888f0d2b93f2f07693a2dce","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDHS-CISA02","maAmendNumber":1,"actionId":475169,"maType":"FOS","supportFunction":14,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-09T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate CISA-14 LNO to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial and Infrastructure analyst SME)  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"d4eeb118-8798-4e6f-82b2-b974e16fe22a","hash":"672929c2393d134e6a233a302b3b0821ed3b69c5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDHS-CISA02","maAmendNumber":0,"actionId":474614,"maType":"FOS","supportFunction":14,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate CISA-14 LNO to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial and Infrastructure analyst SME)  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"c7de5c1d-3840-4b61-b6a2-941b1cab6fbd","hash":"5ea79e9593cedb4efa5e0feea817411ab35a9554","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDHS-CISA01","maAmendNumber":2,"actionId":475536,"maType":"FOS","supportFunction":2,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-DHS-CISA- 02. The full $3,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate CISA ESF-2 to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"cac0d240-5c21-4626-89e4-4337570bf82b","hash":"3c1d897c2c5b80249a34de0d936c67378b113f04","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDHS-CISA01","maAmendNumber":1,"actionId":475127,"maType":"FOS","supportFunction":2,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate CISA ESF-2 to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"21960da3-c3c5-4f6c-9060-da193e58a65b","hash":"1668c57b36885c89c8e04cc9b5479dbb1a84110b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLDHS-CISA01","maAmendNumber":0,"actionId":474612,"maType":"FOS","supportFunction":2,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate CISA ESF-2 to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"26463c35-2842-44f4-96b5-956c7e864693","hash":"91af5a45c3f47425af393f957c9298a4c0925644","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLCOE-HQ01","maAmendNumber":2,"actionId":475534,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"FL","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-14T00:00:00.000Z","obligationAmount":-21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-21000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-21000,"maPriority":"Normal","assistanceRequested":"Amendment 2: This MA is replaced by MA # 4806DR-FL-COE-HQ- 01. The full $21,000.00 is included in the re-issued mission.\r\nAmendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate USACE to the NRCC or other facilities to support disaster operations","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"04056e67-0c7e-4b2e-b4f6-fc6496b745e8","hash":"30a34686f0516c1ef2aa1ddcbd94966bb794c145","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLCOE-HQ01","maAmendNumber":1,"actionId":475152,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"FL","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2024-08-09T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP to 8/9/24 to align with the operational completion date. \r\nActivate USACE to the NRCC or other facilities to support disaster operations","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"c147a28f-949b-4e06-b8b3-345cf2d3dc9f","hash":"9bd3ea80618a0cd6cd5b8d2e890779b41a30cff5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024072801","incidentName":"Tropical Storm Debby","incidentType":"Tropical Storm","disasterNumber":3605,"declarationType":"EM","declarationTitle":"TROPICAL STORM DEBBY","maId":"3605EMFLCOE-HQ01","maAmendNumber":0,"actionId":474573,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"FL","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":21000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":21000,"maPriority":"Normal","assistanceRequested":"Activate USACE to the NRCC or other facilities to support disaster operations","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"281c99cb-28cf-4986-9541-47c9b09b1e0d","hash":"f1b3a0e09d1ecfdafec6161eed6ff633960dc468","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024071002","incidentName":"R1 Severe Storms and Flooding 07092024","incidentType":"Severe Storm","disasterNumber":4812,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4812DRNHGSA01","maAmendNumber":0,"actionId":476198,"maType":"FOS","supportFunction":7,"priority":"Normal","region":1,"stt":"NH","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-22T00:00:00.000Z","dateRequired":"2024-08-22T00:00:00.000Z","popStartDate":"2024-08-21T00:00:00.000Z","popEndDate":"2024-10-20T00:00:00.000Z","dateObligated":"2024-08-22T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-08-21T00:00:00.000Z","maPopEndDate":"2024-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Requesting GSA assistance with sourcing and leasing a commercial office space in New Hampshire.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide personnel to assist in leasing realty and/or contracting support and/or purchases as required to support FEMA disaster operation for DR-4812-NH. Details will be provided in a Mission Assignment Task Order as necessary. --Funding of leases, contracts, or purchases in not authorized under this Mission Assignment. Leases, contracts, or purchases will be funded separately.\r\nRequirements from FEMA: 1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. \r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. \r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. \r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"d968579b-ad57-41c9-843c-188e2165d9d5","hash":"619da643a25158be5516add4a655c686fdb5d6c1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302USDA-FS02","maAmendNumber":1,"actionId":472635,"maType":"FOS","supportFunction":4,"priority":"High","region":6,"stt":"TX","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 1:  This MA is replaced by MA # 4798DR-TX-USDA-FS- 01.  The full $5,000 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\n\r\nActivate USFS to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"104a2722-ee76-4718-867d-77cf3272b66d","hash":"652b72012366477e2318d0433a552ff165e2df97","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302USDA-FS02","maAmendNumber":0,"actionId":472223,"maType":"FOS","supportFunction":4,"priority":"High","region":6,"stt":"TX","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate USFS to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"13834bdd-faef-40b5-8bf2-308f4189404d","hash":"217e90666028655efc22589f960027c03657ed8c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302USDA-FS01","maAmendNumber":1,"actionId":472219,"maType":"FOS","supportFunction":11,"priority":"High","region":6,"stt":"TX","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment#1.  This MA is operationally and financially closed due to incorrect vendor ID.  All work and cost have been transferred to TX-24070302-USDA-APHS-01.\r\n\r\nUSDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8990b27e-ec1b-4eb4-8b5c-6ee517d339c0","hash":"b5e317ba0961068c5aa5d04ce650279e08757ed6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302USDA-FS01","maAmendNumber":0,"actionId":472189,"maType":"FOS","supportFunction":11,"priority":"High","region":6,"stt":"TX","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"USDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"cc3cbabe-289a-47b3-9802-feeb5b54fca7","hash":"a70a794c711b84d10d2c69a6f81425e910b35614","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302USDA-APH02","maAmendNumber":1,"actionId":472682,"maType":"FOS","supportFunction":11,"priority":"High","region":6,"stt":"TX","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 1:  This MA is replaced by MA # 4798DR-TX-USDA-APH- 01. The full $5,000.00 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission.\r\n \r\nUSDA liaison(s) to the NRCC, FEMA teams, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"16422028-4972-4168-b298-37fd59c4cf46","hash":"237324ead2e0baedfac4398f5c404ae9c762ad82","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023071001","incidentName":"Region I_07-09-2023_severe storms and flooding","incidentType":"Flood","disasterNumber":4720,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4720DRVTDOI-WCF02","maAmendNumber":6,"actionId":476682,"maType":"FOS","supportFunction":19,"priority":"Normal","region":1,"stt":"VT","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2024-08-28T00:00:00.000Z","dateRequired":"2024-08-28T00:00:00.000Z","popStartDate":"2023-09-22T00:00:00.000Z","popEndDate":"2024-09-29T00:00:00.000Z","dateObligated":"2024-08-29T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-22T00:00:00.000Z","maPopEndDate":"2024-09-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #6: Request an extension for DOI through 29-Sept, 2024, for no addl. funding. \r\n\r\nAmendment #5: Request an extension for DOI through 30-August, 2024, no additional funding.\r\n------------------------------------\r\nAmendment #4: Request an extension of DOI-01 through 19 July, no addl. funding. ----- Activate DOI Natural and Cultural Resources RSF personnel\r\n-------------------------------------\r\nAmendment #3: Extend end date to 20 June 2024 with no additional funding.\r\nAmendment #2:  Extend activation to 22 March 2024 and increase funding by $66,351.  \r\nAmendment #1:  Extend activation to 22 December 2023 with no additional funding.\r\n--------------------------------------------------------\r\nActivate DOI Natural and Cultural Resources RSF personnel","statementOfWork":"As directed by and in coordination with FEMA, Dept of Interior (DOI) will provide appropriate personnel to the JFO, JRO, IOF or other teams and facilities in support disaster operations. \r\nSupport may include, but is not limited to the following: \r\n- Natural and Cultural Resources Recovery Support Function support to the JFO and/or JRO. \r\n- Natural and Cultural Resources Recovery Support Function (NCR-RSF) Field Coordinator (under the National Disaster Recovery Framework). \r\n- NCR-RSF Recovery Support subject matter expertise. \r\nThe Natural and Cultural Resources RSF Field Coordinator support may include, but is not limited to, the following:\r\n- Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n- Convene Federal partnering agencies supporting the NCR-RSF, formalize communications/meetings with the NCR-RSF, and serve as the federal point-person for all NCR-RSF-related matters at the field level.\r\n- Maintain regular internal coordination/communication related to RSF initiatives at the field, regional, and national levels.\r\n- Develop an approach to support natural and cultural resources recovery in alignment with goals and priorities set by state, tribe or territory with consideration of the local communities needs and/or regional situation.\r\n- Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n- Assist RSF agencies in continuing to incorporate a comprehensive, multi-sector approach on coordination activities.\r\n- Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n- Request additional support via Subject Matter Experts from pertinent Primary and Supporting agencies on an operation-by-operation basis.\r\n- Monitor and support implementation of appropriate recovery programs.\r\n- Provide support either deployed onsite, episodically, or virtually as determined by NCR RSF National Coordinator in collaboration with the FEMA FDRO.\r\nADDITIONAL INSTRUCTIONS: \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n-For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d02128c5-cda7-4232-b72b-45d6c1120df6","hash":"f2704e87b560700aec0ee5224a2b0ef5cd3f5c56","lastRefresh":"2024-08-29T13:24:42.553Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302USDA-APH02","maAmendNumber":0,"actionId":472236,"maType":"FOS","supportFunction":11,"priority":"High","region":6,"stt":"TX","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"USDA liaison(s) to the NRCC, FEMA teams, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"412e4ca9-6ace-4fc1-82b8-94b39030942b","hash":"09c01011dc9d24adefe2d1b92daa43e2ab76b252","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302USDA-APH01","maAmendNumber":1,"actionId":472924,"maType":"FOS","supportFunction":11,"priority":"High","region":6,"stt":"TX","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-07-16T00:00:00.000Z","dateRequired":"2024-07-16T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-07-16T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment#1: This MA is replaced by 4798DR-TX-USDA-APH-02. The full $5,000.00 is included in the re-issued.  Change PM to Chris Fox\r\nThis MA is a re-issue and replaces 1509-472189 for incorrect vendor ID.  \r\nUSDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"62bdeed1-99a7-4b30-a876-504353342c42","hash":"fa2457f2c854c5a1bfac9689fb0e11887c432a07","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302USDA-APH01","maAmendNumber":0,"actionId":472183,"maType":"FOS","supportFunction":11,"priority":"High","region":6,"stt":"TX","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This MA is a re-issue and replaces 1509-472189 for incorrect vendor ID.  \r\n\r\nUSDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"5a7f16f4-0552-4877-8725-8c0e14d36f4c","hash":"888342d9e416a35216a7e3a522941e882974021f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302HHS-ASPR02","maAmendNumber":1,"actionId":472675,"maType":"FOS","supportFunction":8,"priority":"High","region":6,"stt":"TX","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 1: This MA is replaced by MA # 4798DR-TX-HHS-ASPR- 01. The full $5,000.00 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\nActivate HHS to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"34337f16-e42d-4855-8e99-8836b403a027","hash":"f974e00669d198bd935d8133cc2b24c29da965de","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2018072401","incidentName":"CARR FIRE","incidentType":"Fire","disasterNumber":4382,"declarationType":"DR","declarationTitle":"WILDFIRES AND HIGH WINDS","maId":"4382DRCAEPA01","maAmendNumber":0,"actionId":265908,"maType":"FOS","supportFunction":10,"priority":"High","region":9,"stt":"CA","agencyId":"EPA","agency":"ENVIRONMENTAL PROTECTION AGY","authority":"Stafford Act","dateReceived":"2018-08-06T00:00:00.000Z","dateRequired":"2018-08-06T00:00:00.000Z","popStartDate":"2018-08-06T00:00:00.000Z","popEndDate":"2018-08-20T00:00:00.000Z","dateObligated":"2018-08-06T00:00:00.000Z","obligationAmount":48000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":48000,"maPopStartDate":"2018-08-06T00:00:00.000Z","maPopEndDate":"2018-08-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":48000,"maPriority":"High","assistanceRequested":"Activate ESF # 10 EPA to DR-4382 JFO, or other teams and facilities as requested ","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other teams and facilities as requested to support disaster operations. \r\n\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n\r\n MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement. \r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. \r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. ","id":"612c76c3-8e8f-4000-b1b3-f796c888ba3a","hash":"de4b4f678aff7c6eeea52336f20a634327c1e807","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302HHS-ASPR02","maAmendNumber":0,"actionId":472237,"maType":"FOS","supportFunction":8,"priority":"High","region":6,"stt":"TX","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate HHS to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a12130ba-0623-41ec-82ab-c91dee833b7a","hash":"28a089eb621ce1090fc3e8a36eb73267bfd2306c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302HHS-ASPR01","maAmendNumber":1,"actionId":472684,"maType":"FOS","supportFunction":8,"priority":"High","region":6,"stt":"TX","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-12T00:00:00.000Z","obligationAmount":-5387.84,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5387.84,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5387.84,"maPriority":"High","assistanceRequested":"Amend #1: This MA is replaced by MA# 4798DR-TX-HHS-ASPR-02-00. The full $5,387.84 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\nActivate HHS to RRCC, IOF, JFO, RFO, or other regional facilities as needed to include virtual support.","statementOfWork":"s directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"d2e508b2-60c9-4ff2-b893-4e40dba4cf60","hash":"181f018cdf37063d266bac23fcf36bc00a2f2c65","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302HHS-ASPR01","maAmendNumber":0,"actionId":472158,"maType":"FOS","supportFunction":8,"priority":"High","region":6,"stt":"TX","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":5387.84,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5387.84,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5387.84,"maPriority":"High","assistanceRequested":"Activate HHS to RRCC, IOF, JFO, RFO, or other regional facilities as needed to include virtual support.","statementOfWork":"s directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"4f2bedb7-9c93-4389-b602-538811feb914","hash":"804f7a52adb18828e07ee73971799f213da3d16c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302FCC01","maAmendNumber":1,"actionId":472814,"maType":"FOS","supportFunction":2,"priority":"Life Sustaining","region":6,"stt":"TX","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2024-07-14T00:00:00.000Z","dateRequired":"2024-07-14T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-15T00:00:00.000Z","obligationAmount":-61100,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-61100,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-61100,"maPriority":"Life Sustaining","assistanceRequested":"Amend #1: This MA is replaced by MA #4798DR-TX-FCC- 01. The full $61,100 is included in the re-issued mission. Change PM to Archie.\r\nFCC Cellular Survey Management Coordination","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will deploy Cellular Survey Team(s) and equipment to determine the impact to public safety and EAS communication systems in the affected area and identify surviving and non-working systems in support of disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"3cd50701-7bb5-4801-9e80-1c41ba917da3","hash":"a35d9566665d79abfdb6c5609fafc00f13affada","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302FCC01","maAmendNumber":0,"actionId":472240,"maType":"FOS","supportFunction":2,"priority":"Life Sustaining","region":6,"stt":"TX","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-08T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":61100,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":61100,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":61100,"maPriority":"Life Sustaining","assistanceRequested":"FCC Cellular Survey Management Coordination","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will deploy Cellular Survey Team(s) and equipment to determine the impact to public safety and EAS communication systems in the affected area and identify surviving and non-working systems in support of disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"415b999a-d7b9-4e83-bc84-59871c963b1d","hash":"31cc94270fafbba73623dbcbf52839f86c136009","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302EPA02","maAmendNumber":1,"actionId":472655,"maType":"FOS","supportFunction":10,"priority":"High","region":6,"stt":"TX","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 1: This MA is replaced by MA # 4798DR-TX-EPA-01. The full $5,000.00 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\n\r\nEPA to NRCC or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e448420f-c18b-4dbc-8bcc-d7af26074fc7","hash":"1908fe172e1b5ef88382e9320b7679724e9d9a05","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302EPA02","maAmendNumber":0,"actionId":472222,"maType":"FOS","supportFunction":10,"priority":"High","region":6,"stt":"TX","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"EPA to NRCC or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ceb01513-bf66-4c67-bc65-610833ebe528","hash":"2954ef31bf48d16c235fb81faf98c5d7db131710","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302EPA01","maAmendNumber":1,"actionId":472683,"maType":"FOS","supportFunction":3,"priority":"Normal","region":6,"stt":"TX","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-12T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Normal","assistanceRequested":"Amend #1: This MA is replaced by MA# 4798DR-TX-EPA-02-00. The full $10,000 is included in the re-issued mission. Change POP to end 7/10/2024 to align with the operational completion of the mission. Change PM to James Brandon. \r\nEPA Water SME to identify needs &amp; facilitate information flow","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"56f5dc9b-5ad0-489c-93a8-1ce7005bab1b","hash":"05fad3a12e8d1b6916e923ebd7f4f9e83b58072c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302EPA01","maAmendNumber":0,"actionId":472156,"maType":"FOS","supportFunction":3,"priority":"Normal","region":6,"stt":"TX","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"EPA Water SME to identify needs &amp; facilitate information flow","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"221a8cc3-63e6-4884-bb90-9bde7f71afcb","hash":"6525d239afefc33f366f0af1611163ae82b99446","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOT02","maAmendNumber":1,"actionId":472606,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"TX","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 1:  This MA is replaced by MA # 4798DR-TX-DOT- 01. The full $5,000 that was obligated is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission.\r\nActivate DOT to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"6eb2ced6-0564-4c39-acd1-b24e2e29160f","hash":"74d2e7f55ab61bbefe4deb945566a8ada9021fee","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOT02","maAmendNumber":0,"actionId":472233,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"TX","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate DOT to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"af52be92-a5e5-46c4-9827-53b8a5ff9142","hash":"c66354bca3a3444eddc491512e1d8610f53acf3c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOT01","maAmendNumber":1,"actionId":472695,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"TX","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-12T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amend #1: This MA is replaced by MA #4798DR-TX-DOT-02-00. The full $5,000 is included in the re-issued mission. Change \r\nthe POP to end 7/10/2024 to align with the operational completion of the mission. Change PM to James Brandon. \r\nActivate DOT to RRCC. IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"6b9b00f6-5809-4211-b3a6-5dcd85841896","hash":"899233e4d473d7edbf6b747fe60334725af01254","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOT01","maAmendNumber":0,"actionId":472190,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"TX","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate DOT to RRCC. IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"4f0ae679-5098-4b7f-b3de-94fdfe98487f","hash":"3580fc6ff64ac1c8048d5cafcb43d3cd9a2cf91a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOJ-ATF03","maAmendNumber":1,"actionId":472654,"maType":"FOS","supportFunction":13,"priority":"High","region":6,"stt":"TX","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amendment 1: This MA is replaced by MA #4798DR-TX-DOJ-ATF- 01. The full $3,000 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\n\r\nActivate DOJ to NRCC or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to NRCC or other facilities as requested to perform functions of ESF-13 in support FEMA disaster operations. \r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"d6b3a294-03e0-4037-90f0-73dcc3b773d8","hash":"ee908720997ba75db2afea3e4689938d4c9f8073","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOJ-ATF03","maAmendNumber":0,"actionId":472221,"maType":"FOS","supportFunction":13,"priority":"High","region":6,"stt":"TX","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate DOJ to NRCC or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to NRCC or other facilities as requested to perform functions of ESF-13 in support FEMA disaster operations. \r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"d3d735fb-e7dc-435f-9a7c-44608dbeb0d6","hash":"85eb439a568443f6787fb0e4e58bfa7301c43dde","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOJ-ATF02","maAmendNumber":1,"actionId":472645,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":6,"stt":"TX","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-12T00:00:00.000Z","obligationAmount":-340340,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-340340,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-340340,"maPriority":"Lifesaving","assistanceRequested":"Amend #1: This MA is replaced by MA# 4798DR-TX-DOJ-ATF-02-00. The full $340,340 is included in the re-issued mission. Change POP to end 7/10/2024 to align with the operation of the mission. \r\nActivate DOJ/ATF Law Enforcement Task Force for on-scene security, protection and law enforcement. ","statementOfWork":"As directed by and in coordination with FEMA, the Department of Justice / Bureau of Alcohol, Tobacco, Firearms and Explosives will provide a federal Law Enforcement Task Force or other security teams to manage, coordinate, equip, and sustain on-scene security, protection and law enforcement for federal operational support to response operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"5b02b532-32a0-4abc-bd21-ff7bd12808ca","hash":"9be4d2c196f8a36b20cceb7dd04ae47e47b7543f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOJ-ATF02","maAmendNumber":0,"actionId":472148,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":6,"stt":"TX","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":340340,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":340340,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":340340,"maPriority":"Lifesaving","assistanceRequested":"Activate DOJ/ATF Law Enforcement Task Force for on-scene security, protection and law enforcement. ","statementOfWork":"As directed by and in coordination with FEMA, the Department of Justice / Bureau of Alcohol, Tobacco, Firearms and Explosives will provide a federal Law Enforcement Task Force or other security teams to manage, coordinate, equip, and sustain on-scene security, protection and law enforcement for federal operational support to response operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"38b8be91-fd79-4051-8084-59bebe77062d","hash":"ef539173c00155809e42fbeba9e14cb10b641c15","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023071001","incidentName":"Region I_07-09-2023_severe storms and flooding","incidentType":"Flood","disasterNumber":4720,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4720DRVTDOI-WCF02","maAmendNumber":5,"actionId":473168,"maType":"FOS","supportFunction":19,"priority":"Normal","region":1,"stt":"VT","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2024-07-18T00:00:00.000Z","dateRequired":"2024-07-18T00:00:00.000Z","popStartDate":"2023-09-22T00:00:00.000Z","popEndDate":"2024-08-30T00:00:00.000Z","dateObligated":"2024-07-19T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-22T00:00:00.000Z","maPopEndDate":"2024-09-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #5: Request an extension for DOI through 30-August, 2024, no additional funding.\r\n------------------------------------\r\nAmendment #4: Request an extension of DOI-01 through 19 July, no addl. funding. ----- Activate DOI Natural and Cultural Resources RSF personnel\r\n-------------------------------------\r\nAmendment #3: Extend end date to 20 June 2024 with no additional funding.\r\nAmendment #2:  Extend activation to 22 March 2024 and increase funding by $66,351.  \r\nAmendment #1:  Extend activation to 22 December 2023 with no additional funding.\r\n--------------------------------------------------------\r\nActivate DOI Natural and Cultural Resources RSF personnel","statementOfWork":"As directed by and in coordination with FEMA, Dept of Interior (DOI) will provide appropriate personnel to the JFO, JRO, IOF or other teams and facilities in support disaster operations. \r\nSupport may include, but is not limited to the following: \r\n- Natural and Cultural Resources Recovery Support Function support to the JFO and/or JRO. \r\n- Natural and Cultural Resources Recovery Support Function (NCR-RSF) Field Coordinator (under the National Disaster Recovery Framework). \r\n- NCR-RSF Recovery Support subject matter expertise. \r\nThe Natural and Cultural Resources RSF Field Coordinator support may include, but is not limited to, the following:\r\n- Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n- Convene Federal partnering agencies supporting the NCR-RSF, formalize communications/meetings with the NCR-RSF, and serve as the federal point-person for all NCR-RSF-related matters at the field level.\r\n- Maintain regular internal coordination/communication related to RSF initiatives at the field, regional, and national levels.\r\n- Develop an approach to support natural and cultural resources recovery in alignment with goals and priorities set by state, tribe or territory with consideration of the local communities needs and/or regional situation.\r\n- Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n- Assist RSF agencies in continuing to incorporate a comprehensive, multi-sector approach on coordination activities.\r\n- Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n- Request additional support via Subject Matter Experts from pertinent Primary and Supporting agencies on an operation-by-operation basis.\r\n- Monitor and support implementation of appropriate recovery programs.\r\n- Provide support either deployed onsite, episodically, or virtually as determined by NCR RSF National Coordinator in collaboration with the FEMA FDRO.\r\nADDITIONAL INSTRUCTIONS: \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n-For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"08cefe6c-7f5d-48d4-b988-e50befd2422a","hash":"2e5aa6f0d53053174d7381968b289be9901fe26a","lastRefresh":"2024-08-29T13:24:42.553Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOJ-ATF01","maAmendNumber":0,"actionId":472191,"maType":"FOS","supportFunction":13,"priority":"High","region":6,"stt":"TX","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\n\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f6037b3e-c369-4b47-891a-88a8ef8b5ce9","hash":"e4f52cb77c113bed551343e8d197a72691224ea4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOE-OE02","maAmendNumber":1,"actionId":472636,"maType":"FOS","supportFunction":12,"priority":"High","region":6,"stt":"TX","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 1:  This MA is replaced by MA #4798DR-TX-DOE-OE- 01. The full $5,000 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\nActivate DOE to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the NRCC to perform the functions of ESF-12 in support disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"54bacf72-9155-4c60-acb2-8515fe046231","hash":"b32c06b016995a1736fce428f4d05adf5f7debb7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOE-OE02","maAmendNumber":0,"actionId":472229,"maType":"FOS","supportFunction":12,"priority":"High","region":6,"stt":"TX","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate DOE to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the NRCC to perform the functions of ESF-12 in support disaster operations\r\n\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b89e0fb7-767d-46f5-a8fc-2f45d49c9103","hash":"5f4a25aecbe548a49c03dbe548d0bb823b2ba784","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOE-OE01","maAmendNumber":1,"actionId":472661,"maType":"FOS","supportFunction":12,"priority":"High","region":6,"stt":"TX","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-12T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amend #1: This MA is replaced by MA# 4798DR-TX-DOE-OE-02-00. The full $5,000 is included in the re-issued mission. Change the POP to end 7/10/24 to align with the operational completion of the mission. Change PM to James Brandon.\r\n Activate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"134af8a5-84a8-4de0-bfef-f855b350e615","hash":"ab272d9f1879490672723bf37f920379175f369a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOE-OE01","maAmendNumber":0,"actionId":472159,"maType":"FOS","supportFunction":12,"priority":"High","region":6,"stt":"TX","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"651e397a-4de0-42f9-981b-4d29bf2cadd0","hash":"84db699c94630054c96d79528d65b5af142d6329","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOD-USAF02","maAmendNumber":1,"actionId":472681,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 1: This MA is replaced by MA #4798DR-TX-DOD-USAF- 01. The full $5,000 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\n\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- CAP liaison officer to NRCC and/or imagery collection management support\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"dea1c15f-9b42-4a70-8458-6175367705fa","hash":"a13d8893301e2e45515d5139fc986f18ed3d2264","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOD-USAF02","maAmendNumber":0,"actionId":472186,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial support","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- CAP liaison officer to NRCC and/or imagery collection management support\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ac76c020-ada6-4f11-8dfe-21666f8800db","hash":"7b36228844246b96bca2f3f6884d832455e25698","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOD-USAF01","maAmendNumber":1,"actionId":472697,"maType":"FOS","supportFunction":0,"priority":"High","region":6,"stt":"TX","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-12T00:00:00.000Z","obligationAmount":-38967,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-38967,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-38967,"maPriority":"High","assistanceRequested":"Amend #1: This MA is replaced by MA# 4798DR-TX-DOD-USAF-02-00. The full $38,967 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support\r\nThe following imagery is requested the need: \r\n\tWaldo Imagery\r\n\tHand-Held Imagery (oblique photos)\r\n\tIf Available -- Near Real-Time Video ","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, equipment and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"1c5788af-50fb-444d-b8c1-dd8262afb477","hash":"38f4d75c3b05bec06cf5cd04551f4ec0fd338f84","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOD-USAF01","maAmendNumber":0,"actionId":472214,"maType":"FOS","supportFunction":0,"priority":"High","region":6,"stt":"TX","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-08T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-16T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":38967,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":38967,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":38967,"maPriority":"High","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial support\r\nThe following imagery is requested the need: \r\n\tWaldo Imagery\r\n\tHand-Held Imagery (oblique photos)\r\n\tIf Available -- Near Real-Time Video ","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, equipment and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"3a739524-9b21-48d2-8c37-33ba9794cd99","hash":"43cc8ca09557157409b85a35a674da7bbf7b32ec","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOD-OPS03","maAmendNumber":1,"actionId":472670,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amendment 1:  This MA is replaced by MA # 4798DRTXDOD-OPS01. The full $ 3,000.00 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\nActivate DOD to NRCC to support FEMA response operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"bb48055e-ccf3-49f0-9afb-6850f6fda988","hash":"e1acbb91b7eac387bf619554258121f011b43223","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOD-OPS03","maAmendNumber":0,"actionId":472226,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-07-08T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-08T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate DOD to NRCC to support FEMA response operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"0666350f-1489-4e4a-b3a7-99f3541a9d27","hash":"339c91d43ce7a06a6e7c414a0fdef80897790021","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOD-OPS02","maAmendNumber":1,"actionId":472970,"maType":"FOS","supportFunction":0,"priority":"High","region":6,"stt":"TX","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-07-16T00:00:00.000Z","dateRequired":"2024-07-16T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-08-31T00:00:00.000Z","dateObligated":"2024-07-16T00:00:00.000Z","obligationAmount":-30000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-30000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-08-31T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-30000,"maPriority":"High","assistanceRequested":"Amendment#1:  This MA is replaced by 4798DR-TX-DOD-OPS-02.  The full $30,000.00 is included in the re-issued mission assignment.  Change PM to Chris Fox\r\n\r\n\r\nActivate DoD to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested.  ","statementOfWork":"As requested by and in coordination with FEMA, DOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) and Joint Regional Medical Planning Officer (JRMPO) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison. \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"874f308e-d0fe-41a5-b5b3-912ceac379d4","hash":"e171f05ada99b576002533b3251504c446c35726","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2018072401","incidentName":"CARR FIRE","incidentType":"Fire","disasterNumber":4382,"declarationType":"DR","declarationTitle":"WILDFIRES AND HIGH WINDS","maId":"4382DRCADOT01","maAmendNumber":1,"actionId":296949,"maType":"FOS","supportFunction":1,"priority":"Lifesaving","region":9,"stt":"CA","agencyId":"DOT","agency":"DEPT. OF TRANSPORTATION","authority":"Stafford Act","dateReceived":"2019-08-19T00:00:00.000Z","dateRequired":"2019-08-19T00:00:00.000Z","popStartDate":"2018-08-05T00:00:00.000Z","popEndDate":"2018-08-20T00:00:00.000Z","dateObligated":"2019-08-22T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2018-08-05T00:00:00.000Z","maPopEndDate":"2018-08-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"Lifesaving","assistanceRequested":"Amendment #1 De-obligate $20,000 and closeout mission assignment due to no financial activity over 365 days. \r\n\r\nActivate ESF #1, DOT to the California Governors Office of Emergency Management, State Operations Center (SOC, JFO, DRC and other locations as needed  in support of response operations to Carr Fire DR4382","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to CAL OES SOC, and others teams and facilities as requested. \r\n\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n\r\n MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement. \r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. may be withheld if no invoicing, ULO Validation, or additional justification has been provided. \r\n The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. \r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations ","id":"5406d227-1f9a-4935-a1e0-8a4899cc4369","hash":"1405b18b145231ceb36bf8a95121f2f60a64319f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOD-OPS02","maAmendNumber":0,"actionId":472211,"maType":"FOS","supportFunction":0,"priority":"High","region":6,"stt":"TX","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-08-31T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":30000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":30000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-08-31T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":30000,"maPriority":"High","assistanceRequested":"Activate DoD to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested","statementOfWork":"As requested by and in coordination with FEMA, DOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) and Joint Regional Medical Planning Officer (JRMPO) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison. \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a374fb20-ca22-4cf4-aab9-6dec5e9dd40f","hash":"4609f56da5b01e15f979c19f2dd6df0e508ca56d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOC-NOAA01","maAmendNumber":1,"actionId":472643,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 1: This MA is replaced by MA #4798DR-TX-DOC-NOAA- 01. The full $5,000 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\n\r\nActivate NOAA to NRCC to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the NRCC to support disaster operations\r\nThis may include but is not limited to, the following:\r\n    - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n    - National Weather Service (NWS) Hurricane Liaison Team (HLT)\r\n    - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n    - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"5c14b9df-eea8-4305-9e59-50134d32192a","hash":"4230cc11b474446fa01e0659ce5127426eadd4f6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DOC-NOAA01","maAmendNumber":0,"actionId":472205,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-07-08T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-08T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate NOAA to NRCC to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the NRCC to support disaster operations\r\nThis may include but is not limited to, the following:\r\n    - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n    - National Weather Service (NWS) Hurricane Liaison Team (HLT)\r\n    - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n    - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"44b491da-51e1-43cb-b9a4-953b1764e211","hash":"fc43518cef3d92ea77a1b6e19f8882ca47e7c2c3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DHS-USCG01","maAmendNumber":1,"actionId":472642,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 1:  This MA is replaced by MA #4798DR-TX-DHS-USCG- 01. The full $5,000 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\n\r\nActivate USCG liaison(s) to NRCC for information and planning support","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"0e55d119-9422-40b8-8135-7d46ab5fffa9","hash":"4b6b1911aee052953b1fc9004d94648ed36b46cf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DHS-USCG01","maAmendNumber":0,"actionId":472241,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate USCG liaison(s) to NRCC for information and planning support","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8838bdf8-3121-4760-89fa-53bd280a9bf2","hash":"866a0ddf731fa49e09da40e593347c24c39d55e0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DHS-CISA04","maAmendNumber":1,"actionId":472565,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amendment 1:  This MA is replaced by MA # 4798DRTXDHS-CISA01. The full $3,000 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. \r\n\r\nActivate CISA ESF-2 to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"fb4e42a6-edf4-4759-8298-2b0b9e58c91f","hash":"d3529a4b49228744f6031a132470db3f27e1c824","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DHS-CISA04","maAmendNumber":0,"actionId":472234,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate CISA ESF-2 to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"1b7bfd6d-7585-4c11-92be-f91f42585a90","hash":"e07026d1c4bcf74c5a802980d670ce3ecbc1ee12","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DHS-CISA03","maAmendNumber":1,"actionId":472370,"maType":"FOS","supportFunction":14,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-09T00:00:00.000Z","dateRequired":"2024-07-09T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-09T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 1: De-obligate $5,000 and close mission assignment. MA was erroneously issued to non-activated OFA. \r\nActivate CISA-14 LNO to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial and Infrastructure analyst SME)  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"cfe8e02c-0161-4f25-ba21-5c82f227b58a","hash":"cd00bdb93f11037a31cfbe10c6f28dfc7127da7e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DHS-CISA03","maAmendNumber":0,"actionId":472230,"maType":"FOS","supportFunction":14,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate CISA-14 LNO to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial and Infrastructure analyst SME)  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"03041b85-c048-42f5-a6fc-85daffdb1761","hash":"fee95b40078b6409319c7b8126dbeccb7094ea8e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DHS-CISA02","maAmendNumber":1,"actionId":472759,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-14T00:00:00.000Z","dateRequired":"2024-07-14T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-07-15T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amend #1: This MA is replaced by MA #4798DR-TX-DHS-CISA-02. The full $3,000 is included in the re-issued mission. Change PM to Archie.\r\nActivate CISA ESF-2 to RRCC, IOF, JFO","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"5273191e-3fbe-4c50-bfcb-156d282fb1b5","hash":"1e3d87d011f1098297d6a776b0246c08285e9f07","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DHS-CISA02","maAmendNumber":0,"actionId":472177,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate CISA ESF-2 to RRCC, IOF, JFO","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8c84ee52-65b7-4e51-b01f-07faefa54104","hash":"a62883f9eee5d08b3ea67c226aa621436b2de515","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302DHS-CISA01","maAmendNumber":0,"actionId":472176,"maType":"FOS","supportFunction":14,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate CISA-14 LNOs to RRCC, JFO, IOF and other facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"d28afada-6e3c-42ce-8bad-105efd1747c5","hash":"134958caeeef28fde8ac019b842c352e4dfbc4b7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302COE-SWD02","maAmendNumber":1,"actionId":472202,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":-1500000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1500000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1500000,"maPriority":"High","assistanceRequested":"Amendment#1:MA to be operationally and financially closed.  All cost and work transferred to TX-202470302-COE-LRD-01 (1509-472203)\r\n\r\nUSACE pre-position temporary emergency power resources to the affected area.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for Type IV temporary power support assets with ability to expand or collapse as needed.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"9b4f2651-2c93-432b-bea8-e966937c6403","hash":"730d2182f89151de534460a37e9c7ceb65afab5e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302COE-SWD02","maAmendNumber":0,"actionId":472161,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":1500000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1500000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1500000,"maPriority":"High","assistanceRequested":"USACE pre-position temporary emergency power resources to the affected area.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for Type IV temporary power support assets with ability to expand or collapse as needed.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"56b9cfd4-fa4f-48ce-9e04-8c183eba2352","hash":"a54e7b4b6d7cd92d5b9dd3476f1b37f22befe0f3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302COE-SWD01","maAmendNumber":1,"actionId":472658,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-12T00:00:00.000Z","obligationAmount":-50400,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-50400,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-50400,"maPriority":"High","assistanceRequested":"Amend# 1: This MA is replaced by MA# 4798DR-TX-COE-SWD-01-00. The full $50,400 is included in the re-issued mission. Change POP to end 7/10/24 to align with the operational completion of the mission. Change PM to James Brandon.\r\nActivate USACE to the RRCC, IOF, JFO, or other facilities as needed.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"9604e36e-32fc-46ff-8a50-d8f3b0f7d9de","hash":"db8079e0816f3ab18c9f6a2f916696814befd391","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302COE-SWD01","maAmendNumber":0,"actionId":472175,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-06T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":50400,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":50400,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":50400,"maPriority":"High","assistanceRequested":"Activate USACE to the RRCC, IOF, JFO, or other facilities as needed.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"38527f9f-089f-4a43-ae6c-10a95883c9a9","hash":"981dcc4968fc8375fc2de9a930d9d6a3fb718961","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302COE-LRD01","maAmendNumber":1,"actionId":472751,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-12T00:00:00.000Z","popStartDate":"2024-07-05T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-12T00:00:00.000Z","obligationAmount":-1500000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1500000,"maPopStartDate":"2024-07-05T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1500000,"maPriority":"High","assistanceRequested":"Amend #1: This MA is replaced by MA #4798DR-TX-COE-LRD-01-00. The full $1,500,000 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission. Change PM to James Brandon.\r\n***This MA is a re-issue and replaces TX-2024070302 (1509-472161) for incorrect vendor ID/POP start date***.  \r\nUSACE pre-position temporary emergency power resources to the affected area.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for Type IV temporary power support assets with ability to expand or collapse as needed.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"37f4f9e7-badf-4c14-a3d5-7c493cba1676","hash":"bbf17e2c92e1e4cd26238e101d583881293f682e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302COE-LRD01","maAmendNumber":0,"actionId":472203,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-05T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":1500000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1500000,"maPopStartDate":"2024-07-05T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1500000,"maPriority":"High","assistanceRequested":"***This MA is a re-issue and replaces TX-2024070302 (1509-472161) for incorrect vendor ID/POP start date***.  \r\n\r\nUSACE pre-position temporary emergency power resources to the affected area.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for Type IV temporary power support assets with ability to expand or collapse as needed.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"6cd3c1ab-69f7-4abd-bd79-5d2caf2e54e9","hash":"489b28f84fddb6a5c4e99a8c33d5ed34c357bc60","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302COE-HQ01","maAmendNumber":1,"actionId":472527,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-10T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-21000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-21000,"maPriority":"High","assistanceRequested":"Amendment 1: This MA is replaced by MA # 4798DR-TX-COE-HQ- 01. The full $21,000 is included in the re-issued mission. Change the POP to end 7/10/2024 to align with the operational completion of the mission.\r\n\r\nActivate USACE to the NRCC or other facilities to support disaster operations","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e0cff955-612a-4441-b272-f6435a417a39","hash":"05649c9b42e9ba3e99cda7dc1e65a0f2e1ed2fc7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"TX24070302COE-HQ01","maAmendNumber":0,"actionId":472232,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2024-07-07T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-07T00:00:00.000Z","obligationAmount":21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":21000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":21000,"maPriority":"High","assistanceRequested":"Activate USACE to the NRCC or other facilities to support disaster operations","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"03a29ffe-5b70-421d-9f7c-f4d1677ed653","hash":"90980a9844d84a9e31d4a56d17f003fcb7ea7462","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"LA24070302DOD-USAF01","maAmendNumber":0,"actionId":472594,"maType":"FOS","supportFunction":0,"priority":"High","region":6,"stt":"LA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-10T00:00:00.000Z","popStartDate":"2024-07-10T00:00:00.000Z","popEndDate":"2024-07-20T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":21448,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":21448,"maPopStartDate":"2024-07-10T00:00:00.000Z","maPopEndDate":"2024-07-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":21448,"maPriority":"High","assistanceRequested":"CAP assistance in flying aerial imagery to support FEMA damage assessments. WALDO and Still Camera imagery","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, equipment and/or personnel in support of FEMA disaster operations in Louisiana. \r\nSupport may include, but is not limited to, the following: - Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata) - Transportation of personnel and/or light cargo - Damage assessment imagery/observations, which may include previously collected imagery - Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or delivered on digital media - CAP liaison and/or imagery collection management support - Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety Requirements from FEMA: 1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). 2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. 3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. 4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. 5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. 6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. 7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. 8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"37a19e4c-10cb-4202-aa84-4f5a95a17b99","hash":"0654aa28cbda513e119038b325af5ad7f7b95d81","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXUSDA-FS01","maAmendNumber":0,"actionId":472579,"maType":"FOS","supportFunction":4,"priority":"High","region":6,"stt":"TX","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA # TX24070302USDA-FS02 for $5000\r\nActivate USFS to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"441d3706-8347-4d51-9206-019d5d0f13bb","hash":"fab1046a4464725c2493816fb8568f16ea15097b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXUSDA-APH02","maAmendNumber":0,"actionId":472959,"maType":"FOS","supportFunction":11,"priority":"High","region":6,"stt":"TX","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-07-16T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-16T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This MA is a re-issue and replaces TX-2040703-USDA-APH-01-01 for $5,000.00.  No additional funding required.  Mission complete.  POP end date adjusted for demobilization time to 7.14.24\r\nUSDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"c92ee2d8-f357-4f05-b443-522726f2528b","hash":"7ffe359640f897b942552aaf6429393040d4dd35","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXUSDA-APH01","maAmendNumber":0,"actionId":472540,"maType":"FOS","supportFunction":11,"priority":"High","region":6,"stt":"TX","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA # TX24070302USDA-APH02 for $5000.\r\nUSDA liaison(s) to the NRCC, FEMA teams, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"70fe6f1a-17ec-4c4c-8eb8-bce0fff6f137","hash":"ec54481eaf5ffd905fa361f53c627ed92712aa75","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXHHS-ASPR01","maAmendNumber":0,"actionId":472554,"maType":"FOS","supportFunction":8,"priority":"High","region":6,"stt":"TX","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA # TX24070302HHS-ASPR02 for $5000.\r\nActivate HHS to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"44896d51-9dc0-4ca5-a4cc-0f9044b49ff9","hash":"160ec3630bfb8378e7fc606d559e961cab414a4c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXFCC01","maAmendNumber":0,"actionId":472760,"maType":"FOS","supportFunction":2,"priority":"Life Sustaining","region":6,"stt":"TX","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2024-07-14T00:00:00.000Z","dateRequired":"2024-07-14T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-16T00:00:00.000Z","dateObligated":"2024-07-14T00:00:00.000Z","obligationAmount":61000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":61000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":61000,"maPriority":"Life Sustaining","assistanceRequested":"This is a reissue of TX-24070302-FCC-01 for $61,100.000, with no additional funds. Extend POP end date to 7/16/2024.Change PM to Archie.  \r\nFCC Cellular Survey Management Coordination","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will deploy Cellular Survey Team(s) and equipment to determine the impact to public safety and EAS communication systems in the affected area and identify surviving and non-working systems in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"3c1460d2-b882-4428-a54e-e819204867b5","hash":"3c5e62c0f5cb20af421d564757d97124c4725770","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXEPA02","maAmendNumber":1,"actionId":472749,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-12T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-13T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment#1: POP start date changed to align with surge MA start date 7.6.24. No funding required.  Change PM to James Brandon.\r\n \r\nThis is a re-issue of TX-24070302-EPA-01 from SU to DR with a of total $10,000. EPA Water SME to identify needs &amp; facilitate information flow.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"737a52c8-2457-4211-88ce-343d7a072c44","hash":"0e5f8038b9d63de5188b2456e8165ed2f44df4c9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXEPA02","maAmendNumber":0,"actionId":472677,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-11T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"This is a re-issue of TX-24070302-EPA-01 from SU to DR with a of total $10,000. EPA Water SME to identify needs &amp; facilitate information flow.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"338c10db-4c20-43c5-914c-c0daa08375e7","hash":"678fe34c1b775d6fa06ab958a05be332e02f833e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXEPA01","maAmendNumber":0,"actionId":472585,"maType":"FOS","supportFunction":10,"priority":"High","region":6,"stt":"TX","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA # TX24070302EPA02 for $5000.\r\nEPA to NRCC or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b0b70874-254c-402e-b29a-2776b5191e8e","hash":"5f1233b973546e6fe0dca39a2918bb5ff389eba3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOT02","maAmendNumber":1,"actionId":472740,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"TX","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-12T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-13T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment#1: POP start date changed to 7.6.24 to align with the start date of surge MA. POP. No funding required.  Change PM to James Brandon\r\n\r\n\r\nThis is a re-issue of TX-24070302-DOT-01 from SU to DR with a of total of $5,000. Activate DOT to RRCC. IOF, JFO, or other teams and facilities as requested to include virtual\r\n  \t\t","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"54b0b9b4-cd57-48c1-8b8c-f6b72a44d7b7","hash":"c34ee5dc138c021ac9f1bb4a63633e49f4b12e4a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOT02","maAmendNumber":0,"actionId":472672,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"TX","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-11T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This is a re-issue of TX-24070302-DOT-01 from SU to DR with a of total of $5,000. Activate DOT to RRCC. IOF, JFO, or other teams and facilities as requested to include virtual\r\n  \t\t","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\n\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"6eccd15d-af3b-433a-92cd-cc482267dc85","hash":"319b09b6d90d9c3d0f94fe0f291c42c649ead407","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOT01","maAmendNumber":1,"actionId":474552,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"TX","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":500,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":500,"maPriority":"High","assistanceRequested":"Amendment #1 to add $500 per attached OFA email.  Change PM to Lisa Dodson.\r\nThis is a re-issuance of MA # TX24070302DOT02 for $5000\r\nActivate DOT to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"1b36f41d-459d-4175-97f4-9dab2220aef0","hash":"7bef93104a6c8efcc1cf0b5c030c4fdba69ffc5d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOT01","maAmendNumber":0,"actionId":472574,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"TX","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA # TX24070302DOT02 for $5000\r\nActivate DOT to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"629283e2-7b6c-4620-99aa-e732e35f5105","hash":"e98cb0e67fa7cb43aaafd4db5048bf04ef04268e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOJ-ATF02","maAmendNumber":0,"actionId":472685,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":6,"stt":"TX","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-15T00:00:00.000Z","dateObligated":"2024-07-13T00:00:00.000Z","obligationAmount":340340,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":340340,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":340340,"maPriority":"Lifesaving","assistanceRequested":"This is a re-issue of TX-24070302-DOJ-ATF-02 for a 2-day extension (Period of Performance ending on 07/15/2024) with no increase in funding for a total of $340,340.00. POP start date aligns with SU MA start date.  \r\n\r\nThis extension includes provisions for activating DOJ/ATF Law Enforcement Task Force for on-scene security, protection, and law enforcement.","statementOfWork":"As directed by and in coordination with FEMA, the Department of Justice / Bureau of Alcohol, Tobacco, Firearms and Explosives will provide a federal Law Enforcement Task Force or other security teams to manage, coordinate, equip, and sustain on-scene security, protection and law enforcement for federal operational support to response operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"dcdf1653-7661-44a1-95b3-faa7ba370c19","hash":"e1ec8bf7a198ed6a888d01d1604fa8420f9ac816","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOJ-ATF01","maAmendNumber":0,"actionId":472542,"maType":"FOS","supportFunction":13,"priority":"High","region":6,"stt":"TX","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA #  TX24070302DOJ-ATF03 for $3000.\r\nActivate DOJ to NRCC or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to NRCC or other facilities as requested to perform functions of ESF-13 in support FEMA disaster operations. \r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"407a387d-c443-49e0-823f-cae9c19a8ad8","hash":"52ec274b6bf47a37853e78e1bef1dd7fc5545cd3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOE-OE02","maAmendNumber":2,"actionId":473952,"maType":"FOS","supportFunction":12,"priority":"High","region":6,"stt":"TX","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-07-29T00:00:00.000Z","dateRequired":"2024-07-29T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-07-29T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment#2: Change POP date from 7/19/2024 to 7/13/2024\r\nAmendment#1: Change POP start date to 7.6.24, to align with start date of SU MA.  Change PM to James Brandon.\r\nThis is a re-issue of TX-24070302-DOE-OE-01 from SU to DR, extend POP (POP 07/19/2024) for $5,000 with an additional $22,447 for total of $27,447. Activate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"77ee067e-a2a3-4601-9504-bffc733f8197","hash":"d90577c51cf455366d580e8296340a84b891c5b7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOE-OE02","maAmendNumber":1,"actionId":472741,"maType":"FOS","supportFunction":12,"priority":"High","region":6,"stt":"TX","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-12T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-19T00:00:00.000Z","dateObligated":"2024-07-13T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment#1: Change POP start date to 7.6.24, to align with start date of SU MA.  Change PM to James Brandon.\r\n\r\n\r\nThis is a re-issue of TX-24070302-DOE-OE-01 from SU to DR, extend POP (POP 07/19/2024) for $5,000 with an additional $22,447 for total of $27,447. Activate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8504057a-2483-4b94-bda2-caa29fb639b7","hash":"a36a6c42ceda36f05bb638c8e96a41c08987d9fe","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOE-OE02","maAmendNumber":0,"actionId":472669,"maType":"FOS","supportFunction":12,"priority":"High","region":6,"stt":"TX","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-11T00:00:00.000Z","popEndDate":"2024-07-19T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":27447,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":27447,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":27447,"maPriority":"High","assistanceRequested":"This is a re-issue of TX-24070302-DOE-OE-01 from SU to DR, extend POP (POP 07/19/2024) for $5,000 with an additional $22,447 for total of $27,447. Activate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations\r\n\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"d579cb6d-548a-40d8-b5a8-42cf08c64070","hash":"f2e1883f35e75de76ab28ebc0d45fc5e3de59a0b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023071001","incidentName":"Region I_07-09-2023_severe storms and flooding","incidentType":"Flood","disasterNumber":4720,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4720DRVTDOI-WCF02","maAmendNumber":4,"actionId":466839,"maType":"FOS","supportFunction":19,"priority":"Normal","region":1,"stt":"VT","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2024-05-15T00:00:00.000Z","dateRequired":"2024-05-14T00:00:00.000Z","popStartDate":"2023-09-22T00:00:00.000Z","popEndDate":"2024-07-19T00:00:00.000Z","dateObligated":"2024-05-16T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-22T00:00:00.000Z","maPopEndDate":"2024-09-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #4: Request an extension of DOI-01 through 19 July, no addl. funding. ----- Activate DOI Natural and Cultural Resources RSF personnel\r\n\r\n-------------------------------------\r\nAmendment #3: Extend end date to 20 June 2024 with no additional funding.\r\nAmendment #2:  Extend activation to 22 March 2024 and increase funding by $66,351.  \r\nAmendment #1:  Extend activation to 22 December 2023 with no additional funding.\r\n--------------------------------------------------------\r\nActivate DOI Natural and Cultural Resources RSF personnel","statementOfWork":"As directed by and in coordination with FEMA, Dept of Interior (DOI) will provide appropriate personnel to the JFO, JRO, IOF or other teams and facilities in support disaster operations. \r\nSupport may include, but is not limited to the following: \r\n- Natural and Cultural Resources Recovery Support Function support to the JFO and/or JRO. \r\n- Natural and Cultural Resources Recovery Support Function (NCR-RSF) Field Coordinator (under the National Disaster Recovery Framework). \r\n- NCR-RSF Recovery Support subject matter expertise. \r\nThe Natural and Cultural Resources RSF Field Coordinator support may include, but is not limited to, the following:\r\n- Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n- Convene Federal partnering agencies supporting the NCR-RSF, formalize communications/meetings with the NCR-RSF, and serve as the federal point-person for all NCR-RSF-related matters at the field level.\r\n- Maintain regular internal coordination/communication related to RSF initiatives at the field, regional, and national levels.\r\n- Develop an approach to support natural and cultural resources recovery in alignment with goals and priorities set by state, tribe or territory with consideration of the local communities needs and/or regional situation.\r\n- Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n- Assist RSF agencies in continuing to incorporate a comprehensive, multi-sector approach on coordination activities.\r\n- Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n- Request additional support via Subject Matter Experts from pertinent Primary and Supporting agencies on an operation-by-operation basis.\r\n- Monitor and support implementation of appropriate recovery programs.\r\n- Provide support either deployed onsite, episodically, or virtually as determined by NCR RSF National Coordinator in collaboration with the FEMA FDRO.\r\nADDITIONAL INSTRUCTIONS: \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n-For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e1e7c5c5-8ed4-4cac-b86e-02bbed32a8e8","hash":"65f720c8ac3bbfcd1e2812ef5a00e8053d21da4a","lastRefresh":"2024-08-29T13:24:42.553Z"},{"incidentId":"2023071001","incidentName":"Region I_07-09-2023_severe storms and flooding","incidentType":"Flood","disasterNumber":4720,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4720DRVTDOI-WCF02","maAmendNumber":3,"actionId":461924,"maType":"FOS","supportFunction":19,"priority":"Normal","region":1,"stt":"VT","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2024-03-19T00:00:00.000Z","dateRequired":"2024-03-19T00:00:00.000Z","popStartDate":"2023-09-22T00:00:00.000Z","popEndDate":"2024-06-20T00:00:00.000Z","dateObligated":"2024-03-19T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-22T00:00:00.000Z","maPopEndDate":"2024-09-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #3: Extend end date to 20 June 2024 with no additional funding.\r\nAmendment #2:  Extend activation to 22 March 2024 and increase funding by $66,351.  \r\nAmendment #1:  Extend activation to 22 December 2023 with no additional funding.\r\n--------------------------------------------------------\r\nActivate DOI Natural and Cultural Resources RSF personnel","statementOfWork":"As directed by and in coordination with FEMA, Dept of Interior (DOI) will provide appropriate personnel to the JFO, JRO, IOF or other teams and facilities in support disaster operations. \r\nSupport may include, but is not limited to the following: \r\n- Natural and Cultural Resources Recovery Support Function support to the JFO and/or JRO. \r\n- Natural and Cultural Resources Recovery Support Function (NCR-RSF) Field Coordinator (under the National Disaster Recovery Framework). \r\n- NCR-RSF Recovery Support subject matter expertise. \r\nThe Natural and Cultural Resources RSF Field Coordinator support may include, but is not limited to, the following:\r\n- Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n- Convene Federal partnering agencies supporting the NCR-RSF, formalize communications/meetings with the NCR-RSF, and serve as the federal point-person for all NCR-RSF-related matters at the field level.\r\n- Maintain regular internal coordination/communication related to RSF initiatives at the field, regional, and national levels.\r\n- Develop an approach to support natural and cultural resources recovery in alignment with goals and priorities set by state, tribe or territory with consideration of the local communities needs and/or regional situation.\r\n- Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n- Assist RSF agencies in continuing to incorporate a comprehensive, multi-sector approach on coordination activities.\r\n- Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n- Request additional support via Subject Matter Experts from pertinent Primary and Supporting agencies on an operation-by-operation basis.\r\n- Monitor and support implementation of appropriate recovery programs.\r\n- Provide support either deployed onsite, episodically, or virtually as determined by NCR RSF National Coordinator in collaboration with the FEMA FDRO.\r\nADDITIONAL INSTRUCTIONS: \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n-For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7ca3e7e1-06e3-4e83-a772-11928f958a52","hash":"12bee76698f64940371e10d941c7df6400658929","lastRefresh":"2024-08-29T13:24:42.553Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOE-OE01","maAmendNumber":0,"actionId":472555,"maType":"FOS","supportFunction":12,"priority":"High","region":6,"stt":"TX","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA # TX24070302DOE-OE02 for $5000.\r\nActivate DOE to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the NRCC to perform the functions of ESF-12 in support disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e95b1da6-e1d4-49b7-af71-ab551192fba7","hash":"bc215dab9304fcb24d0e28eb1e48edb07de91fd3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOD-USAF01","maAmendNumber":0,"actionId":472543,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA #  TX24070302DOD-USAF-02 for $5000.\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- CAP liaison officer to NRCC and/or imagery collection management support\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"41930981-57d1-43a3-ac4b-f8b9ecc5c093","hash":"60cc5cc2dc266358bbbf443aace01891d0bc5271","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOD-OPS02","maAmendNumber":0,"actionId":472944,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":6,"stt":"TX","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-07-16T00:00:00.000Z","dateRequired":"2024-07-06T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-08-30T00:00:00.000Z","dateObligated":"2024-07-16T00:00:00.000Z","obligationAmount":33000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":33000,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-08-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":33000,"maPriority":"Life Sustaining","assistanceRequested":"This MA is a re-issue and replaces TX-24070302-DOD-OPS-02-01 for $30,000.00 with additional $3,000.00.  Activate DOD to RRCC, IOF, JFO to include virtual, or other team(s) and facilities.  Change PM to Chris Fox","statementOfWork":"As requested by and in coordination with FEMA, DOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) and Joint Regional Medical Planning Officer (JRMPO) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"dd7c209d-68d8-4fa7-90ed-a2ece6ae72db","hash":"39e341dd4eb53e58d64ccbbf429641d137d46152","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOD-OPS01","maAmendNumber":0,"actionId":472552,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA # TX24070302DOD-OPS03 for $3000.\r\nActivate DOD to NRCC to support FEMA response operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"477a62a5-8c66-4711-a261-41e4b31e0823","hash":"c9d6ca0953338b8ac41295ab5ad29d6754ead859","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDOC-NOAA01","maAmendNumber":0,"actionId":472556,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA # TX24070302DOC-NOAA01 for $5000.\r\nActivate NOAA to NRCC to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the NRCC to support disaster operations\r\nThis may include but is not limited to, the following:\r\n    - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n    - National Weather Service (NWS) Hurricane Liaison Team (HLT)\r\n    - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n    - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a8e390ac-7c49-44d2-9039-250063e072e7","hash":"7c47b558a6c894d67688a6be76fd8726bf254245","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDHS-USCG01","maAmendNumber":0,"actionId":472583,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA # TX24070302DHS-USCG01 for $5000.\r\nActivate USCG liaison(s) to NRCC for information and planning support","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8dce27ec-985f-46ad-a880-7f92fe657cfd","hash":"42576dd89215cc5ad5a75965e55405833a383c83","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023071001","incidentName":"Region I_07-09-2023_severe storms and flooding","incidentType":"Flood","disasterNumber":4720,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4720DRVTDOI-WCF02","maAmendNumber":2,"actionId":454825,"maType":"FOS","supportFunction":19,"priority":"Normal","region":1,"stt":"VT","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2023-12-21T00:00:00.000Z","dateRequired":"2023-12-20T00:00:00.000Z","popStartDate":"2023-09-22T00:00:00.000Z","popEndDate":"2024-03-21T00:00:00.000Z","dateObligated":"2023-12-21T00:00:00.000Z","obligationAmount":66351,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":66351,"maPopStartDate":"2023-09-22T00:00:00.000Z","maPopEndDate":"2024-09-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":66351,"maPriority":"Normal","assistanceRequested":"Amendment #2:  Extend activation to 22 April 2024 and increase funding by $66,351.  \r\nAmendment #1:  Extend activation to 22 December 2023 with no additional funding.\r\n--------------------------------------------------------\r\nActivate DOI Natural and Cultural Resources RSF personnel","statementOfWork":"As directed by and in coordination with FEMA, Dept of Interior (DOI) will provide appropriate personnel to the JFO, JRO, IOF or other teams and facilities in support disaster operations. \r\nSupport may include, but is not limited to the following: \r\n- Natural and Cultural Resources Recovery Support Function support to the JFO and/or JRO. \r\n- Natural and Cultural Resources Recovery Support Function (NCR-RSF) Field Coordinator (under the National Disaster Recovery Framework). \r\n- NCR-RSF Recovery Support subject matter expertise. \r\nThe Natural and Cultural Resources RSF Field Coordinator support may include, but is not limited to, the following:\r\n- Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n- Convene Federal partnering agencies supporting the NCR-RSF, formalize communications/meetings with the NCR-RSF, and serve as the federal point-person for all NCR-RSF-related matters at the field level.\r\n- Maintain regular internal coordination/communication related to RSF initiatives at the field, regional, and national levels.\r\n- Develop an approach to support natural and cultural resources recovery in alignment with goals and priorities set by state, tribe or territory with consideration of the local communities needs and/or regional situation.\r\n- Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n- Assist RSF agencies in continuing to incorporate a comprehensive, multi-sector approach on coordination activities.\r\n- Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n- Request additional support via Subject Matter Experts from pertinent Primary and Supporting agencies on an operation-by-operation basis.\r\n- Monitor and support implementation of appropriate recovery programs.\r\n- Provide support either deployed onsite, episodically, or virtually as determined by NCR RSF National Coordinator in collaboration with the FEMA FDRO.\r\nADDITIONAL INSTRUCTIONS: \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n-For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2988b8b6-a3e1-431a-8fac-0825ddfd7c98","hash":"4ecd9ec0e91b5e1fb149bd58c4b403b248980547","lastRefresh":"2024-08-29T13:24:42.553Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDHS-FPS01","maAmendNumber":0,"actionId":472689,"maType":"FOS","supportFunction":13,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-11T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-07-11T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"Request Federal Protective Services (FPS) support to provide security at required sites in support of DR-4798-TX.","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities in support of DR-4798-TX based on FEMA security standards, policies, and practices.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.Increase FPS hours to support mission requirement","id":"368d19dc-7326-45a3-b957-866a7b655cf9","hash":"c66d52af6e885b895efb50d5bef543e12c967b19","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDHS-CISA02","maAmendNumber":0,"actionId":472758,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-14T00:00:00.000Z","dateRequired":"2024-07-14T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-16T00:00:00.000Z","dateObligated":"2024-07-14T00:00:00.000Z","obligationAmount":4714.29,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":4714.29,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":4714.29,"maPriority":"High","assistanceRequested":"This is a reissue of TX-24070302-DHS-CISA-02 for $3,000.00, with an additional $1,714.29 for a total of $4,714.29. Extend POP end date to 7/16/2024. Change PM to Archie.\r\nActivate CISA ESF-2 to RRCC, IOF, JFO","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"bc3ddc36-492e-4e3e-b15c-ca9617d0dbec","hash":"e57c97f6d60f8e038562028f3c334524f437508d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023071001","incidentName":"Region I_07-09-2023_severe storms and flooding","incidentType":"Flood","disasterNumber":4720,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4720DRVTDOI-WCF02","maAmendNumber":1,"actionId":450083,"maType":"FOS","supportFunction":19,"priority":"Normal","region":1,"stt":"VT","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2023-10-17T00:00:00.000Z","dateRequired":"2023-10-17T00:00:00.000Z","popStartDate":"2023-09-22T00:00:00.000Z","popEndDate":"2023-12-22T00:00:00.000Z","dateObligated":"2023-10-18T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-22T00:00:00.000Z","maPopEndDate":"2024-09-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #1:  Extend activation to 22 December 2023 with no additional funding.\r\n--------------------------------------------------------\r\nActivate DOI Natural and Cultural Resources RSF personnel","statementOfWork":"As directed by and in coordination with FEMA, Dept of Interior (DOI) will provide appropriate personnel to the JFO, JRO, IOF or other teams and facilities in support disaster operations. \r\nSupport may include, but is not limited to the following: \r\n- Natural and Cultural Resources Recovery Support Function support to the JFO and/or JRO. \r\n- Natural and Cultural Resources Recovery Support Function (NCR-RSF) Field Coordinator (under the National Disaster Recovery Framework). \r\n- NCR-RSF Recovery Support subject matter expertise. \r\nThe Natural and Cultural Resources RSF Field Coordinator support may include, but is not limited to, the following:\r\n- Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n- Convene Federal partnering agencies supporting the NCR-RSF, formalize communications/meetings with the NCR-RSF, and serve as the federal point-person for all NCR-RSF-related matters at the field level.\r\n- Maintain regular internal coordination/communication related to RSF initiatives at the field, regional, and national levels.\r\n- Develop an approach to support natural and cultural resources recovery in alignment with goals and priorities set by state, tribe or territory with consideration of the local communities needs and/or regional situation.\r\n- Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n- Assist RSF agencies in continuing to incorporate a comprehensive, multi-sector approach on coordination activities.\r\n- Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n- Request additional support via Subject Matter Experts from pertinent Primary and Supporting agencies on an operation-by-operation basis.\r\n- Monitor and support implementation of appropriate recovery programs.\r\n- Provide support either deployed onsite, episodically, or virtually as determined by NCR RSF National Coordinator in collaboration with the FEMA FDRO.\r\nADDITIONAL INSTRUCTIONS: \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n-For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"070b25a4-0258-4b6a-aef5-73b98d5dd5ec","hash":"35aac1ead0390d20595bad107826841acfc4cf40","lastRefresh":"2024-08-29T13:24:42.553Z"},{"incidentId":"2023071001","incidentName":"Region I_07-09-2023_severe storms and flooding","incidentType":"Flood","disasterNumber":4720,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4720DRVTDOI-WCF02","maAmendNumber":0,"actionId":448203,"maType":"FOS","supportFunction":19,"priority":"Normal","region":1,"stt":"VT","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2023-09-25T00:00:00.000Z","dateRequired":"2023-09-25T00:00:00.000Z","popStartDate":"2023-09-22T00:00:00.000Z","popEndDate":"2023-10-25T00:00:00.000Z","dateObligated":"2023-09-27T00:00:00.000Z","obligationAmount":67858,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":67858,"maPopStartDate":"2023-09-22T00:00:00.000Z","maPopEndDate":"2024-09-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":67858,"maPriority":"Normal","assistanceRequested":"Activate DOI Natural and Cultural Resources RSF personnel","statementOfWork":"As directed by and in coordination with FEMA, Dept of Interior (DOI) will provide appropriate personnel to the JFO, JRO, IOF or other teams and facilities in support disaster operations. \r\nSupport may include, but is not limited to the following: \r\n- Natural and Cultural Resources Recovery Support Function support to the JFO and/or JRO. \r\n- Natural and Cultural Resources Recovery Support Function (NCR-RSF) Field Coordinator (under the National Disaster Recovery Framework). \r\n- NCR-RSF Recovery Support subject matter expertise. \r\n\r\nThe Natural and Cultural Resources RSF Field Coordinator support may include, but is not limited to, the following:\r\n- Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n- Convene Federal partnering agencies supporting the NCR-RSF, formalize communications/meetings with the NCR-RSF, and serve as the federal point-person for all NCR-RSF-related matters at the field level.\r\n- Maintain regular internal coordination/communication related to RSF initiatives at the field, regional, and national levels.\r\n- Develop an approach to support natural and cultural resources recovery in alignment with goals and priorities set by state, tribe or territory with consideration of the local communities needs and/or regional situation.\r\n- Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n- Assist RSF agencies in continuing to incorporate a comprehensive, multi-sector approach on coordination activities.\r\n- Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n- Request additional support via Subject Matter Experts from pertinent Primary and Supporting agencies on an operation-by-operation basis.\r\n- Monitor and support implementation of appropriate recovery programs.\r\n- Provide support either deployed onsite, episodically, or virtually as determined by NCR RSF National Coordinator in collaboration with the FEMA FDRO.\r\n\r\nADDITIONAL INSTRUCTIONS: \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n-For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c82d5f77-bfb9-4478-863b-173c7c680aad","hash":"6125fdbfab5ed84dec447d3175cbba2b53030010","lastRefresh":"2024-08-29T13:24:42.553Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXDHS-CISA01","maAmendNumber":0,"actionId":472537,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-07T00:00:00.000Z","popStartDate":"2024-07-07T00:00:00.000Z","popEndDate":"2024-07-10T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-07-07T00:00:00.000Z","maPopEndDate":"2024-07-10T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"This is a re-issuance of MA # TX24070302DHS-CISA04 for $3000\r\nActivate CISA ESF-2 to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"75cbe190-55c9-4705-b6e1-2111b93e7aa7","hash":"a4e239f8ff48ced47e77c0ec6a423c595727b1c7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXCOE-SWD01","maAmendNumber":3,"actionId":473726,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-26T00:00:00.000Z","dateRequired":"2024-07-25T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-19T00:00:00.000Z","dateObligated":"2024-07-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment#3: Change POP Date from 7/20 to 7/19\r\nAmendment#2: At request of USACE and OSC approval increase funding by $31,800.00.  Change PM to David Walker.\r\nAmendment #1: POP start date changed to 7.6.24 to align with the start date of surge MA. \r\nNo funding required.  Change PM to James Brandon.\r\nThis is a re-issue of TX-24070302-COE-SWD-01) for $50,400 with an additional funding of $50,400, bringing the total to $100,800. Extend POP end date to 7.20.24.  This extension replaces the verbal MFR and includes provisions for activating USACE to the RRCC, IOF, JFO, RFO, or other regional facilities as needed, including virtual support.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"1c2aea64-eb49-4776-b491-8d4abd3f691c","hash":"ab949e80b6f96081a7a2c90b8bfc625bd219fd41","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXCOE-SWD01","maAmendNumber":2,"actionId":472987,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-16T00:00:00.000Z","dateRequired":"2024-07-16T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-20T00:00:00.000Z","dateObligated":"2024-07-17T00:00:00.000Z","obligationAmount":31800,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":31800,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":31800,"maPriority":"High","assistanceRequested":"Amendment#2: At request of USACE and OSC approval increase funding by $31,800.00.  Change PM to David Walker.\r\nAmendment #1: POP start date changed to 7.6.24 to align with the start date of surge MA. \r\nNo funding required.  Change PM to James Brandon.\r\nThis is a re-issue of TX-24070302-COE-SWD-01) for $50,400 with an additional funding of $50,400, bringing the total to $100,800. Extend POP end date to 7.20.24.  This extension replaces the verbal MFR and includes provisions for activating USACE to the RRCC, IOF, JFO, RFO, or other regional facilities as needed, including virtual support.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"17db0ac6-b1dc-40b3-9b8f-a1959de5c416","hash":"a4068be5e0242b736e74b4c851ea7ba812d43b10","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXCOE-SWD01","maAmendNumber":1,"actionId":472739,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-12T00:00:00.000Z","popStartDate":"2024-07-06T00:00:00.000Z","popEndDate":"2024-07-20T00:00:00.000Z","dateObligated":"2024-07-13T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #1: POP start date changed to 7.6.24 to align with the start date of surge MA. \r\n\r\nNo funding required.  Change PM to James Brandon.\r\n\r\nThis is a re-issue of TX-24070302-COE-SWD-01) for $50,400 with an additional funding of $50,400, bringing the total to $100,800. Extend POP end date to 7.20.24.  This extension replaces the verbal MFR and includes provisions for activating USACE to the RRCC, IOF, JFO, RFO, or other regional facilities as needed, including virtual support.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"17cabe74-8878-4c64-8528-176be6ca8f85","hash":"3510f5a5a603e5b31933e684bae6757a64353050","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXCOE-SWD01","maAmendNumber":0,"actionId":472627,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-11T00:00:00.000Z","popEndDate":"2024-07-20T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":100800,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":100800,"maPopStartDate":"2024-07-06T00:00:00.000Z","maPopEndDate":"2024-07-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":100800,"maPriority":"High","assistanceRequested":"This is a re-issue of TX-24070302-COE-SWD-01) for $50,400 with an additional funding of $50,400, bringing the total to $100,800. Extend POP end date to 7.20.24.  This extension replaces the verbal MFR and includes provisions for activating USACE to the RRCC, IOF, JFO, RFO, or other regional facilities as needed, including virtual support.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e5492e14-2919-42d5-a34d-bb95a5f1d1f9","hash":"503a126c33cce3e09f014fc01e1c9e2412d1ba3b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXCOE-LRD02","maAmendNumber":0,"actionId":472799,"maType":"DFA","supportFunction":3,"priority":"Lifesaving","region":6,"stt":"TX","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-07-13T00:00:00.000Z","dateRequired":"2024-07-11T00:00:00.000Z","popStartDate":"2024-07-11T00:00:00.000Z","popEndDate":"2024-07-25T00:00:00.000Z","dateObligated":"2024-07-14T00:00:00.000Z","obligationAmount":8641400,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":2160350,"fedCostShareAmt":6481050,"maPopStartDate":"2024-07-11T00:00:00.000Z","maPopEndDate":"2024-07-25T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":2160350,"maFedCostShareAmount":6481050,"maPriority":"Lifesaving","assistanceRequested":"At the request of the State of Texas, execute Power Restoration Mission to support TDEM impacted counties from Hurrican Beryl.","statementOfWork":"n support of State of Texas request, as directed by and in coordination with FEMA, USACE will provide temporary power support assets to provide emergency power generation to the affected area in support of disaster operations.\r\n\r\nInitial request is for USACE to activate and deploy one or more\r\nType II Temporary Emergency Power resources to EXECUTE a temporary emergency power mission with the ability to expand or contract to meet the need.\r\n\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stocked Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks). Work includes providing personnel and equipment at the Federal/State staging area and when directed by FEMA, USACE will conduct generator installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n9. A final inspection report will be completed upon termination of all direct Federal assistance work. Final inspection reports shall be signed by a representative of the performing Federal agency and the STT pursuant to 44 CFR.","id":"36aa0717-66e5-4473-801c-5c9be556f42a","hash":"3c529fd77772f0e107d70710c39ed578da98ef80","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXCOE-LRD01","maAmendNumber":3,"actionId":474913,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-07T00:00:00.000Z","popStartDate":"2024-07-05T00:00:00.000Z","popEndDate":"2024-07-11T00:00:00.000Z","dateObligated":"2024-08-09T00:00:00.000Z","obligationAmount":-4320700,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4320700,"maPopStartDate":"2024-07-05T00:00:00.000Z","maPopEndDate":"2024-07-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4320700,"maPriority":"High","assistanceRequested":"Amendment#3:  De-obligate $4,320,700.00 per HQ/USACE Correspondence\r\nAmendment#2: Change POP from 7/17/2024 to 7/11/2024 \r\nAmendment#1: POP start date corrected to 7.5.24 to align with verbal for TYPE II start date of 7.5.24.  Verbal attached.  No funding required.  Change PM to Dave Walker\r\n.  No additional funding required. \r\n Change PM to David Walker.\r\nThis is a re-issue of TX-24070302-COE-LRD-01 for $1,500,000 with an additional $4,320,700.00 for total of $5,820,700.  This MA also replaces the verbal, for USACE pre-position temporary emergency power resources to the affected areas.  ","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for Type IV temporary power support assets with ability to expand or collapse as needed.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"c796645a-9087-49c2-bce2-cd4625f7ed16","hash":"166bfd768c9396eae5804c98aaab98635999b91c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXCOE-LRD01","maAmendNumber":2,"actionId":473703,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-07-26T00:00:00.000Z","dateRequired":"2024-07-25T00:00:00.000Z","popStartDate":"2024-07-05T00:00:00.000Z","popEndDate":"2024-07-11T00:00:00.000Z","dateObligated":"2024-07-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-07-05T00:00:00.000Z","maPopEndDate":"2024-07-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment#2: Change POP from 7/17/2024 to 7/11/2024 \r\nAmendment#1: POP start date corrected to 7.5.24 to align with verbal for TYPE II start date of 7.5.24.  Verbal attached.  No funding required.  Change PM to Dave Walker\r\n.  No additional funding required. \r\n Change PM to David Walker.\r\nThis is a re-issue of TX-24070302-COE-LRD-01 for $1,500,000 with an additional $4,320,700.00 for total of $5,820,700.  This MA also replaces the verbal, for USACE pre-position temporary emergency power resources to the affected areas.  ","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for Type IV temporary power support assets with ability to expand or collapse as needed.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a2881187-5f0f-43b1-9263-19a9febafcdb","hash":"2b5df2346b814f2f15bf47be27ca26f69aa9b7d6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXCOE-LRD01","maAmendNumber":1,"actionId":472862,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-07-15T00:00:00.000Z","dateRequired":"2024-07-15T00:00:00.000Z","popStartDate":"2024-07-05T00:00:00.000Z","popEndDate":"2024-07-17T00:00:00.000Z","dateObligated":"2024-07-15T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-07-05T00:00:00.000Z","maPopEndDate":"2024-07-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment#1: POP start date corrected to 7.5.24 to align with verbal for TYPE II start date of 7.5.24.  Verbal attached.  No funding required.  Change PM to Dave Walker\r\n\r\n\r\n.  No additional funding required. \r\n Change PM to David Walker.\r\n\r\nThis is a re-issue of TX-24070302-COE-LRD-01 for $1,500,000 with an additional $4,320,700.00 for total of $5,820,700.  This MA also replaces the verbal, for USACE pre-position temporary emergency power resources to the affected areas.  ","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for Type IV temporary power support assets with ability to expand or collapse as needed.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"17a91035-999e-446c-8947-b4a252ad49b6","hash":"60820dbc8401cbce4ee114f3311431a978c476d8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024070302","incidentName":"Hurricane Beryl ","incidentType":"Hurricane","disasterNumber":4798,"declarationType":"DR","declarationTitle":"HURRICANE BERYL ","maId":"4798DRTXCOE-LRD01","maAmendNumber":0,"actionId":472605,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-07-11T00:00:00.000Z","dateRequired":"2024-07-10T00:00:00.000Z","popStartDate":"2024-07-10T00:00:00.000Z","popEndDate":"2024-07-17T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":5820700,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5820700,"maPopStartDate":"2024-07-05T00:00:00.000Z","maPopEndDate":"2024-07-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5820700,"maPriority":"High","assistanceRequested":"This is a re-issue of TX-24070302-COE-LRD-01 for $1,500,000 with an additional $4,320,700.00 for total of $5,820,700.  This MA also replaces the verbal, for USACE pre-position temporary emergency power resources to the affected areas.  ","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for Type IV temporary power support assets with ability to expand or collapse as needed.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ad64cb39-6686-44d6-924c-9446d1a201e4","hash":"ef0036f513eff161f6ecbbe22ef736b15c87db5f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802USDA-APH01","maAmendNumber":0,"actionId":471710,"maType":"FOS","supportFunction":11,"priority":"High","region":2,"stt":"PR","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-06-29T00:00:00.000Z","dateRequired":"2024-07-01T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":29184,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":29184,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":29184,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 11 US Department of Agriculture (USDA) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"bcae2ff4-98db-4bab-b7cf-eaf32973f270","hash":"b2ecdd20f5c7d322089e11fb2fe2bbc48d5becf6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802DOJ-ATF01","maAmendNumber":0,"actionId":471659,"maType":"FOS","supportFunction":13,"priority":"High","region":2,"stt":"PR","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-07-01T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":73500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":73500,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":73500,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 13 Dept of Justice (DOJ)  will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\n\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"77dd6439-ec20-4065-9611-33415293f398","hash":"63c1409df6f3c617b96c5536bb602574ef1cc797","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802DOE-OE01","maAmendNumber":1,"actionId":472293,"maType":"FOS","supportFunction":12,"priority":"Normal","region":2,"stt":"PR","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-07-08T00:00:00.000Z","dateRequired":"2024-07-08T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-08T00:00:00.000Z","obligationAmount":59822,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":59822,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":59822,"maPriority":"Normal","assistanceRequested":"Amend 1 - Requesting $59,882.00 to cover response support on PR/USVI/RRCC. As per attached OFA email request\r\nAs directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 12 Dept of Energy (DOE) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations  \r\n\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"0dd58119-7930-405a-ae61-e86087d2653b","hash":"69b634fca5e0534ce8c648ce77ea1cebad11734f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802DOE-OE01","maAmendNumber":0,"actionId":471648,"maType":"FOS","supportFunction":12,"priority":"High","region":2,"stt":"PR","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-07-01T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":65000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":65000,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":65000,"maPriority":"Normal","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 12 Dept of Energy (DOE) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations  \r\n\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f44db277-2c00-42a4-b183-ceee2cf7e2e2","hash":"1c972e341697fabe7449f4ed3f7d50598ef017cf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802DOD-OPS01","maAmendNumber":0,"actionId":471661,"maType":"FOS","supportFunction":0,"priority":"High","region":2,"stt":"PR","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-06-29T00:00:00.000Z","dateRequired":"2024-07-01T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":12364,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":12364,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":12364,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Dept Of Defense (DOD) Defense Coordinating Element will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"fa9052d2-27ec-4003-b140-4697a13a0595","hash":"d7242bb5291a5f68cd3f732ce40b063b24a182dd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802DHS-USCG01","maAmendNumber":1,"actionId":471931,"maType":"FOS","supportFunction":9,"priority":"High","region":2,"stt":"PR","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-07-02T00:00:00.000Z","dateRequired":"2024-07-02T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-02T00:00:00.000Z","obligationAmount":8100,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":8100,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":8100,"maPriority":"High","assistanceRequested":"Amend 1 - Obligate $8100.00 per USCG request \r\nAs directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 09 US Coast Guard (USCG) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. \r\nThis may include but is not limited to the following:\r\nUSCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\nUSCG ESF Watch Officers (typically ESFs 1 (Maritime Transportation System (MTS)), 9 (SAR), and 10 (Oil/Hazmat))\r\nOther USCG SMEs, as applicable\r\nADDITIONAL NOTES: \r\n--MA task orders (MATOs) may be issued by FEMA for specific requirements, additional personnel, location(s), date(s), and duration of assignment(s). \r\n--Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n--All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n--The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n--MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"a2ad81df-6849-40d5-8952-49e37fe374f3","hash":"c2aa76837216500925d1709155ce6141d8893248","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802DHS-USCG01","maAmendNumber":0,"actionId":471674,"maType":"FOS","supportFunction":9,"priority":"High","region":2,"stt":"PR","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-06-29T00:00:00.000Z","dateRequired":"2024-07-01T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":8900,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":8900,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":8900,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 09 US Coast Guard (USCG) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. \r\n\r\nThis may include but is not limited to the following:\r\n\r\nUSCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\nUSCG ESF Watch Officers (typically ESFs 1 (Maritime Transportation System (MTS)), 9 (SAR), and 10 (Oil/Hazmat))\r\nOther USCG SMEs, as applicable\r\n\r\nADDITIONAL NOTES: \r\n--MA task orders (MATOs) may be issued by FEMA for specific requirements, additional personnel, location(s), date(s), and duration of assignment(s). \r\n--Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n--All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n--The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n--MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"1f539f60-6f0a-44f6-a181-b700bff9dd8f","hash":"1c6677be52557d1b3cd22bcba48ba32d2d1ff7e1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802DHS-CISA02","maAmendNumber":0,"actionId":471660,"maType":"FOS","supportFunction":2,"priority":"High","region":2,"stt":"PR","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-06-29T00:00:00.000Z","dateRequired":"2024-07-01T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 02 DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams, or other facilities in support of disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ae05a991-4d89-41dc-9f4a-cb8820f43078","hash":"9645b394ec3fc77c2c7172fc416061446b6b0cb6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802DHS-CISA01","maAmendNumber":1,"actionId":471777,"maType":"FOS","supportFunction":14,"priority":"High","region":2,"stt":"PR","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-01T00:00:00.000Z","dateRequired":"2024-07-01T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-01T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amend 1 - Correction to Section III Action To  ESF 14\r\nAs directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 14 DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\n\r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8611719a-03d7-40b8-a446-72f2b233be7d","hash":"31c6da146e2ba8a70588318f10052742079c3bf7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802DHS-CISA01","maAmendNumber":0,"actionId":471645,"maType":"FOS","supportFunction":2,"priority":"High","region":2,"stt":"PR","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-07-01T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 14 DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\n\r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"9ea7ae00-f01b-4426-9d5a-c6e941be5d87","hash":"2198fc86b695dc450f3ffce0719da59fbe02af83","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802COE-SAD01","maAmendNumber":1,"actionId":473880,"maType":"FOS","supportFunction":3,"priority":"High","region":2,"stt":"PR","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-07-28T00:00:00.000Z","dateRequired":"2024-07-28T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-30T00:00:00.000Z","obligationAmount":-201200,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-201200,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-201200,"maPriority":"High","assistanceRequested":"Amendment #1-De obligate (201,200.00) per USACE request. See attached memo.\r\nAs directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 03 US Army Corps of Engineers (USACE) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"278767ae-1669-4b93-ae3f-a29c0a0a83b4","hash":"2a3bc9fd5231ea459bdd017c4be290c09305246a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802COE-SAD01","maAmendNumber":0,"actionId":471646,"maType":"FOS","supportFunction":3,"priority":"High","region":2,"stt":"PR","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-07-01T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":431200,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":431200,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":431200,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 03 US Army Corps of Engineers (USACE) will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"18ea175a-b83e-4db4-9857-96d4035da9b6","hash":"8e123a59e70ddd15bd6669f599f5611305357e15","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802COE-LRD01","maAmendNumber":1,"actionId":474064,"maType":"FOS","supportFunction":3,"priority":"High","region":2,"stt":"PR","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-07-30T00:00:00.000Z","dateRequired":"2024-07-30T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-07-30T00:00:00.000Z","obligationAmount":-1700000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1700000,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1700000,"maPriority":"High","assistanceRequested":"Amendment 1: de-ob ($1.7M FY24) per attached email.\r\nAs directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 03 US Army Corps of Engineers (USACE) Temporary Power Teams will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\n\r\nInitial requirement is for up to but not limited to:\r\nTemporary Power Subject Matter Expert\r\nTemporary Power PRT ADVON\r\nACI Temporary Power ADVON\r\n249th Engineering Battalion ADVON\r\nTemporary Power PRT Type IV\r\n249th Engineering Battalion Type IV\r\nType IV Power ACI\r\n\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\n\r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"42d54309-867f-492f-a40b-4a7c33228fe0","hash":"f7964c044f20bf726c4afe7cc28608f04eb635e0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062802","incidentName":"Tropical Disturbance AL95","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR24062802COE-LRD01","maAmendNumber":0,"actionId":471662,"maType":"FOS","supportFunction":3,"priority":"High","region":2,"stt":"PR","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-06-29T00:00:00.000Z","dateRequired":"2024-07-01T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-07-14T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":6771614,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":6771614,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-07-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":6771614,"maPriority":"High","assistanceRequested":"As directed by and in accordance with FEMA Region 2 Tropical Disturbance Operations Order 2024-12 and Activation/Deployment Memo for Record Email; FEMA Region 2 Emergency Support Function ESF 03 US Army Corps of Engineers (USACE) Temporary Power Teams will deploy identified resources of the Time Phased Package of the Personnel Resource Deployment Plan to Region 2 RRCC, IOF/JFO in Commonwealth of Puerto Rico and/or Virgin Islands of the United States, and/or other identified facilities in support of FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\n\r\nInitial requirement is for up to but not limited to:\r\nTemporary Power Subject Matter Expert\r\nTemporary Power PRT ADVON\r\nACI Temporary Power ADVON\r\n249th Engineering Battalion ADVON\r\nTemporary Power PRT Type IV\r\n249th Engineering Battalion Type IV\r\nType IV Power ACI\r\n\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\n\r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e96aa88f-95ed-401c-8338-e85e4024061b","hash":"f083c258f2d42da1fba05c2eb8c7d5330b927ca6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062801","incidentName":"R5 Minnesota June 2024 Flooding and Severe Weather","incidentType":"Flood","disasterNumber":4797,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND FLOODING","maId":"4797DRMNDOD-ARMY01","maAmendNumber":0,"actionId":471899,"maType":"FOS","supportFunction":0,"priority":"High","region":5,"stt":"MN","agencyId":"DOD-ARMY","agency":"DOD-ARMY (OPERATION / MAINT)","authority":"Stafford Act","dateReceived":"2024-07-03T00:00:00.000Z","dateRequired":"2024-07-08T00:00:00.000Z","popStartDate":"2024-07-02T00:00:00.000Z","popEndDate":"2024-10-08T00:00:00.000Z","dateObligated":"2024-07-05T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-07-02T00:00:00.000Z","maPopEndDate":"2024-10-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"In coordination with FEMA, the Dept of Defense (DOD) will provide and support an Initial Operating Facility (IOF).\r\n","statementOfWork":"As directed by and in coordination with FEMA, Department of Defense (DoD) Office will provide and support a facility space to function as a FEMA Initial Operating Facility in\r\nsupport of FEMA disaster operations. Initial installation requirements may include but are not limited to the following: office space or workstations for 30-50 Federal and/or state personnel. This includes standard utilities (electricity, heat, air conditioning, light, ventilation, sanitation, trash removal, and cleaning services).\r\n\r\nFEMA will provide its own local area wireless network; phone and internet services is not required. FEMA requires 7 days a week access to the space. The workspace should be securable (locking doors) and have access to parking for at least 30 passenger vehicles. FEMA personnel may have to relocate to another area if the current space needs to be reallocated. No billeting, medical support, or staff augmentation is required.\r\n\r\nMATOs may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment (s).\r\n\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n\r\nAdditional Notes from FEMA:\r\n-- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration\r\nof assignment(s).\r\n-- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required\r\nfor reimbursement.\r\n-- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation\r\nis necessary to ensure reimbursement.\r\n-- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received,\r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency\r\n-- Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement,\r\nper 44 CFR 206.208(c)(2).\r\n-- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received,\r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency.\r\n-- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin\r\n#157. For MAs","id":"d0897da7-0f79-411b-9d20-afa09a718b2f","hash":"b433c5b04cceea8d9327e3e6d91b3351bfd17bcb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062801","incidentName":"R5 Minnesota June 2024 Flooding and Severe Weather","incidentType":"Flood","disasterNumber":4797,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND FLOODING","maId":"4797DRMNDHS-FPS01","maAmendNumber":1,"actionId":475299,"maType":"FOS","supportFunction":13,"priority":"High","region":5,"stt":"MN","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-08-12T00:00:00.000Z","dateRequired":"2024-08-12T00:00:00.000Z","popStartDate":"2024-07-19T00:00:00.000Z","popEndDate":"2024-08-12T00:00:00.000Z","dateObligated":"2024-08-12T00:00:00.000Z","obligationAmount":-1561680,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1561680,"maPopStartDate":"2024-07-19T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1561680,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate all funds as mission is being supported through contracted security services. \r\n  \r\nLevel II Armed Security Protective Security Officer (PSO) to support the protection of DR-4797-MN Facilities, personnel, and property. ","statementOfWork":"Security of FEMA facilities will be based on FEMA Office of Chief Security Officer (OCSO) security standards, policies and practices. At the direction of, and in coordination with FEMA OCSO security personnel, FPS will provide contract protective services officers to support response and recovery operations in the State of Minnesota. FEMA OCSO Security will issue MA Task Orders for specific resource requirements, location(s), dates and duration of assignment(s). Equipment purchases are not authorized under this Mission Assignment.\r\n  \r\nAdditional Notes from FEMA:\r\n-- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration\r\nof assignment(s).\r\n-- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required\r\nfor reimbursement.\r\n-- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation\r\nis necessary to ensure reimbursement.\r\n-- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received,\r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency\r\n-- Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement,\r\nper 44 CFR 206.208(c)(2).\r\n-- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received,\r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency.\r\n-- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin\r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO\r\nValidation, or additional justification has been provided.","id":"e93a97f4-cf2f-4bf6-8cfd-ae97d26a05d9","hash":"bf36acfe37d527d170577feff1613cf5aa49b1be","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062801","incidentName":"R5 Minnesota June 2024 Flooding and Severe Weather","incidentType":"Flood","disasterNumber":4797,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND FLOODING","maId":"4797DRMNDHS-FPS01","maAmendNumber":0,"actionId":473281,"maType":"FOS","supportFunction":13,"priority":"High","region":5,"stt":"MN","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-07-19T00:00:00.000Z","dateRequired":"2024-07-22T00:00:00.000Z","popStartDate":"2024-07-19T00:00:00.000Z","popEndDate":"2024-10-12T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":1561680,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1561680,"maPopStartDate":"2024-07-19T00:00:00.000Z","maPopEndDate":"2024-08-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1561680,"maPriority":"High","assistanceRequested":"Level II Armed Security Protective Security Officer (PSO) to support the protection of DR-4797-MN Facilities, personnel, and property. ","statementOfWork":"Security of FEMA facilities will be based on FEMA Office of Chief Security Officer (OCSO) security standards, policies and practices. At the direction of, and in coordination with FEMA OCSO security personnel, FPS will provide contract protective services officers to support response and recovery operations in the State of Minnesota. FEMA OCSO Security will issue MA Task Orders for specific resource requirements, location(s), dates and duration of assignment(s). Equipment purchases are not authorized under this Mission Assignment.\r\n  \r\nAdditional Notes from FEMA:\r\n-- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration\r\nof assignment(s).\r\n-- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required\r\nfor reimbursement.\r\n-- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation\r\nis necessary to ensure reimbursement.\r\n-- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received,\r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency\r\n-- Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement,\r\nper 44 CFR 206.208(c)(2).\r\n-- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received,\r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency.\r\n-- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin\r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO\r\nValidation, or additional justification has been provided.","id":"24eb538f-46e6-4587-828d-fc1fb7459f7c","hash":"2c7f4d95e5c5262c207748132341b885b551cd0c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062501","incidentName":"R8 SD Flood, Severe Storm, and Winds June 2024","incidentType":"Flood","disasterNumber":4807,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, AND FLOODING","maId":"4807DRSDEPA01","maAmendNumber":0,"actionId":476012,"maType":"FOS","supportFunction":10,"priority":"High","region":8,"stt":"SD","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-08-20T00:00:00.000Z","dateRequired":"2024-08-19T00:00:00.000Z","popStartDate":"2024-08-19T00:00:00.000Z","popEndDate":"2024-09-19T00:00:00.000Z","dateObligated":"2024-08-21T00:00:00.000Z","obligationAmount":99380,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":99380,"maPopStartDate":"2024-08-19T00:00:00.000Z","maPopEndDate":"2024-09-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":99380,"maPriority":"High","assistanceRequested":"Activate EPA to RRCC, IOF, JFO, or other teams and facilities as requested to support disaster operations in support of the state of South Dakota.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA. \r\nRequirements from FEMA: \r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. \r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. \r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"43807cb8-9ee5-4288-972f-b9a1d08180b0","hash":"a821e32cd570f03fe56de9c7cfacf29ec848751d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062501","incidentName":"R8 SD Flood, Severe Storm, and Winds June 2024","incidentType":"Flood","disasterNumber":4807,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, AND FLOODING","maId":"4807DRSDDHS-FPS01","maAmendNumber":0,"actionId":476337,"maType":"FOS","supportFunction":0,"priority":"Normal","region":8,"stt":"SD","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-08-23T00:00:00.000Z","dateRequired":"2024-08-23T00:00:00.000Z","popStartDate":"2024-08-22T00:00:00.000Z","popEndDate":"2024-09-22T00:00:00.000Z","dateObligated":"2024-08-24T00:00:00.000Z","obligationAmount":15956.64,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15956.64,"maPopStartDate":"2024-08-22T00:00:00.000Z","maPopEndDate":"2024-09-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15956.64,"maPriority":"Normal","assistanceRequested":"Contract security officers to support the FEMA Security Manager (SM) to support disaster response operations in the state of South Dakota.","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards, policies, and practices in support of disaster response operations in support of the state of South Dakota. \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. \r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"96bac7f0-34ce-4ee5-80fe-8ede409fb33b","hash":"58d16e7ce211ef929d8d52e3eb72c9b381f210bc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"IA24062201DOD-USAF01","maAmendNumber":2,"actionId":471533,"maType":"FOS","supportFunction":5,"priority":"Normal","region":7,"stt":"IA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-06-27T00:00:00.000Z","popStartDate":"2024-06-22T00:00:00.000Z","popEndDate":"2024-07-01T00:00:00.000Z","dateObligated":"2024-06-28T00:00:00.000Z","obligationAmount":-15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15000,"maPopStartDate":"2024-06-22T00:00:00.000Z","maPopEndDate":"2024-07-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15000,"maPriority":"Normal","assistanceRequested":"AMENDMENT #2 - De-obligate ($15,000) this surge MA will be transferred to a MA under 4796DR-IA.\r\nAMENDMENT #1 - Extend POP to 7/1/2024 - No additional funds required\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial imaging in support of Region 7 Flooding in Iowa 22 JUN 2024","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"90972b5f-4462-4ced-9afd-d2c89bbb774f","hash":"6a65fe2327b2d0ef1bc1cb3d095bd22a5200f3d9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"IA24062201DOD-USAF01","maAmendNumber":1,"actionId":470813,"maType":"FOS","supportFunction":5,"priority":"High","region":7,"stt":"IA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-06-23T00:00:00.000Z","dateRequired":"2024-06-23T00:00:00.000Z","popStartDate":"2024-06-22T00:00:00.000Z","popEndDate":"2024-07-01T00:00:00.000Z","dateObligated":"2024-06-23T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-22T00:00:00.000Z","maPopEndDate":"2024-07-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"AMENDMENT #1 - Extend POP to 7/1/2024 - No additional funds required\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial imaging in support of Region 7 Flooding in Iowa 22 JUN 2024","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"3eef99c4-5d94-4cd1-830e-2a839bb10cf3","hash":"fe68a807a763b61f4812a80c366d9325d092309e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"IA24062201DOD-USAF01","maAmendNumber":0,"actionId":470748,"maType":"FOS","supportFunction":5,"priority":"High","region":7,"stt":"IA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-06-22T00:00:00.000Z","dateRequired":"2024-06-22T00:00:00.000Z","popStartDate":"2024-06-22T00:00:00.000Z","popEndDate":"2024-06-24T00:00:00.000Z","dateObligated":"2024-06-23T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-06-22T00:00:00.000Z","maPopEndDate":"2024-07-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Normal","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial imaging in support of Region 7 Flooding in Iowa 22 JUN 2024","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"1cd54ad8-b2a7-4dc1-a7a6-722bf5c91222","hash":"96b570fd6e0b03dae462990e1e55d7392e8c8b9f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIAHHS-ASPR01","maAmendNumber":1,"actionId":476459,"maType":"FOS","supportFunction":16,"priority":"High","region":7,"stt":"IA","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-23T00:00:00.000Z","dateRequired":"2024-08-23T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-11-01T00:00:00.000Z","dateObligated":"2024-08-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-11-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment#1 Extend Period of Performance (PoP) to 11/01/2024; no additional funds needed.\r\nActivate Health and Human Services (HHS) Administration for Strategic Preparedness and Response (ASPR) to provide appropriate Health &amp; Social Services Recovery Support Function (HSS-RSF) personnel in support of the National Disaster Recovery Framework (NDRF) and FEMA post-disaster recovery operations for DR-4796/4784-IA (Iowa Severe Storms).","statementOfWork":"As directed by and in coordination with FEMA, HHS/ASPR will provide an HSS RSF Field Coordinator (FC) to the IOF, JFO, or other, including virtual, to coordinate the HSS RSF in support of FEMA and NDRF integrated operations to achieve recovery outcomes.\r\nThe HSS RSF Field Coordinator will provide federal coordination with the appropriate RSF primary and support agencies, other Federal Agencies, and STTL partners as directed by FEMA.\r\nThe HHS RSF Field Coordinator will provide specific expertise to the RSFs, the Deputy Federal Coordinating Officer for Recovery, and Federal Disaster Recovery Officer (FDRO) as needed to conduct a Recovery Needs Assessment (RNA) process.\r\nThrough collaboration, the HSS RSF FC will contribute to development of the HSS RSF RNA, and will:\r\n- Identify significant cross-sector HSS RSF recovery issues in impacted areas, and additional resources to support long-term recovery, with special focus on supporting unmet recovery needs in the Health &amp; Social Services core mission areas of education and behavioral health.\r\n- In conjunction with other federal agencies and STTL partners, identify recovery outcomes and strategies for identified HSS RSF recovery issues where Iowa officials request recovery support.\r\n- Serve as the Federal point-person for ASPR Recovery personnel and SMEs from other federal agencies to ensure SMEs in healthcare, behavioral health, public/environmental health, social services, and education are all represented.\r\n- Participate in Recovery Coordination Group meetings and strategic work sessions and collaborate with STTL partners to identify recovery considerations and develop recovery outcomes and strategies that can be supported with Federal resources and services.\r\nThe HSS RSF Field Coordinator in consultation with the HSS RSF National Coordinator, may request additional Subject Matter Expert support from pertinent primary and supporting agencies, on an operation-by-operation basis.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2f85d006-71ab-4ddf-96a2-2a07ca060402","hash":"da1b7f4585060b318d3f2dbe3d0e5cec8300ed69","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIAHHS-ASPR01","maAmendNumber":0,"actionId":474444,"maType":"FOS","supportFunction":16,"priority":"High","region":7,"stt":"IA","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-02T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-08-05T00:00:00.000Z","popEndDate":"2024-09-02T00:00:00.000Z","dateObligated":"2024-08-04T00:00:00.000Z","obligationAmount":28000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":28000,"maPopStartDate":"2024-08-05T00:00:00.000Z","maPopEndDate":"2024-11-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":28000,"maPriority":"High","assistanceRequested":"Activate Health and Human Services (HHS) Administration for Strategic Preparedness and Response (ASPR) to provide appropriate Health &amp; Social Services Recovery Support Function (HSS-RSF) personnel in support of the National Disaster Recovery Framework (NDRF) and FEMA post-disaster recovery operations for DR-4796/4784-IA (Iowa Severe Storms).","statementOfWork":"As directed by and in coordination with FEMA, HHS/ASPR will provide an HSS RSF Field Coordinator (FC) to the IOF, JFO, or other, including virtual, to coordinate the HSS RSF in support of FEMA and NDRF integrated operations to achieve recovery outcomes.\r\nThe HSS RSF Field Coordinator will provide federal coordination with the appropriate RSF primary and support agencies, other Federal Agencies, and STTL partners as directed by FEMA.\r\nThe HHS RSF Field Coordinator will provide specific expertise to the RSFs, the Deputy Federal Coordinating Officer for Recovery, and Federal Disaster Recovery Officer (FDRO) as needed to conduct a Recovery Needs Assessment (RNA) process.\r\nThrough collaboration, the HSS RSF FC will contribute to development of the HSS RSF RNA, and will:\r\n- Identify significant cross-sector HSS RSF recovery issues in impacted areas, and additional resources to support long-term recovery, with special focus on supporting unmet recovery needs in the Health &amp; Social Services core mission areas of education and behavioral health.\r\n- In conjunction with other federal agencies and STTL partners, identify recovery outcomes and strategies for identified HSS RSF recovery issues where Iowa officials request recovery support.\r\n- Serve as the Federal point-person for ASPR Recovery personnel and SMEs from other federal agencies to ensure SMEs in healthcare, behavioral health, public/environmental health, social services, and education are all represented.\r\n- Participate in Recovery Coordination Group meetings and strategic work sessions and collaborate with STTL partners to identify recovery considerations and develop recovery outcomes and strategies that can be supported with Federal resources and services.\r\nThe HSS RSF Field Coordinator in consultation with the HSS RSF National Coordinator, may request additional Subject Matter Expert support from pertinent primary and supporting agencies, on an operation-by-operation basis.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e13a830c-37f6-418c-9c91-155f0510836a","hash":"2c5e164f211c7da34718c5c7a271cbc4c1fbd0d8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIAEPA02","maAmendNumber":1,"actionId":473740,"maType":"DFA","supportFunction":10,"priority":"High","region":7,"stt":"IA","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-07-26T00:00:00.000Z","dateRequired":"2024-07-26T00:00:00.000Z","popStartDate":"2024-07-16T00:00:00.000Z","popEndDate":"2024-08-16T00:00:00.000Z","dateObligated":"2024-07-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-07-16T00:00:00.000Z","maPopEndDate":"2024-08-16T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #1 Change Project Manager to Rachel Fails; no additional funds needed.\r\nEPA oil and hazardous materials field operations for disaster operations in the State of Iowa","statementOfWork":"In support of Iowa request, as directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will conduct oil and hazardous materials field operations, including assessment, mitigation, cleanup and disposal of hazardous materials and oil and response to orphaned containers and/or fixed facilities in support of FEMA disaster operations. These necessary emergency protective measures will mitigate actual and potential threats to public health and safety.\r\nIn close coordination with FEMA, EPA response operations may also include the following:\r\n- household hazardous waste identification, collection, and disposal\r\n- evaluating and monitoring immediate public health and safety threats or hazards resulting from debris removal operations The assistance may include response to eliminate or lessen immediate threats to lives, public health, or safety emanating from actual or potential releases and/or discharges;\r\n- Support of field personnel by EPA personnel deployed virtually;\r\n- providing specialized expertise related to oil/hazmat impacts or release;\r\n- conducting damage assessment of oil/hazmat impact via air, soil, and/or water;\r\n- contractor oversight; and/or\r\n- response, removal, mitigation, staging or disposal oversight of actual and potential oil discharges and releases of hazardous materials.\r\nEPA will coordinate activities involving contaminated debris with USACE as appropriate. Actions may include support by any special teams requested by the Federal On-Scene Coordinator (FOSC) and in coordination with FEMA, as well as special technical assets of all ESF #10 support agencies.\r\nEPA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n9. A final inspection report will be completed upon termination of all direct Federal assistance work. Final inspection reports shall be signed by a representative of the performing Federal agency and the STT pursuant to 44 CFR.","id":"440dea2d-329f-4d9b-8da3-c889bf4e5c36","hash":"7314f4184caaa83cad66d9675c49ea3d9df39fe2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIAEPA02","maAmendNumber":0,"actionId":472988,"maType":"DFA","supportFunction":10,"priority":"High","region":7,"stt":"IA","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-07-16T00:00:00.000Z","dateRequired":"2024-07-16T00:00:00.000Z","popStartDate":"2024-07-16T00:00:00.000Z","popEndDate":"2024-08-16T00:00:00.000Z","dateObligated":"2024-07-18T00:00:00.000Z","obligationAmount":350000,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":87500,"fedCostShareAmt":262500,"maPopStartDate":"2024-07-16T00:00:00.000Z","maPopEndDate":"2024-08-16T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":87500,"maFedCostShareAmount":262500,"maPriority":"High","assistanceRequested":"EPA oil and hazardous materials field operations for disaster operations in the State of Iowa","statementOfWork":"In support of Iowa request, as directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will conduct oil and hazardous materials field operations, including assessment, mitigation, cleanup and disposal of hazardous materials and oil and response to orphaned containers and/or fixed facilities in support of FEMA disaster operations. These necessary emergency protective measures will mitigate actual and potential threats to public health and safety.\r\nIn close coordination with FEMA, EPA response operations may also include the following:\r\n- household hazardous waste identification, collection, and disposal\r\n- evaluating and monitoring immediate public health and safety threats or hazards resulting from debris removal operations The assistance may include response to eliminate or lessen immediate threats to lives, public health, or safety emanating from actual or potential releases and/or discharges;\r\n- Support of field personnel by EPA personnel deployed virtually;\r\n- providing specialized expertise related to oil/hazmat impacts or release;\r\n- conducting damage assessment of oil/hazmat impact via air, soil, and/or water;\r\n- contractor oversight; and/or\r\n- response, removal, mitigation, staging or disposal oversight of actual and potential oil discharges and releases of hazardous materials.\r\nEPA will coordinate activities involving contaminated debris with USACE as appropriate. Actions may include support by any special teams requested by the Federal On-Scene Coordinator (FOSC) and in coordination with FEMA, as well as special technical assets of all ESF #10 support agencies.\r\nEPA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n9. A final inspection report will be completed upon termination of all direct Federal assistance work. Final inspection reports shall be signed by a representative of the performing Federal agency and the STT pursuant to 44 CFR.","id":"1c33076c-b67b-421f-89f2-be50a6fc7517","hash":"2bbc350d7b966933270848116550b27fc7d16207","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIAEPA01","maAmendNumber":1,"actionId":473715,"maType":"FOS","supportFunction":10,"priority":"Normal","region":7,"stt":"IA","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-07-26T00:00:00.000Z","dateRequired":"2024-07-26T00:00:00.000Z","popStartDate":"2024-06-27T00:00:00.000Z","popEndDate":"2024-08-30T00:00:00.000Z","dateObligated":"2024-07-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-27T00:00:00.000Z","maPopEndDate":"2024-08-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #1 Change Project Manager to Rachel Fails; no additional funds needed.\r\nActivate EPA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.\r\n\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b298fe9e-adcf-4e26-8640-d80d35fbd89e","hash":"b82992cfbd1ce9e3a09b4957c617e5f97055e945","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIADOD-USAF01","maAmendNumber":0,"actionId":473533,"maType":"FOS","supportFunction":5,"priority":"Normal","region":7,"stt":"IA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-23T00:00:00.000Z","dateRequired":"2024-06-22T00:00:00.000Z","popStartDate":"2024-06-22T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-24T00:00:00.000Z","obligationAmount":25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":25000,"maPopStartDate":"2024-06-22T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":25000,"maPriority":"Normal","assistanceRequested":"This is a re-issuance of MA#1509-470748 for $15K.  Add additional funds of $10K and change PoP to 7-12-2024. (The previous re-issuance was put in the wrong vendor ID of DoD-OPS and should have been DoD-USAF the amount was de-obligated ($25K) and is now under the correct vendor ID.) ","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"c2f542f8-23d6-4d78-ae48-37223d62c999","hash":"8d9dd5ff7a2881b216b7c0289c3112d436b2615f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIADOD-OPS01","maAmendNumber":2,"actionId":473383,"maType":"FOS","supportFunction":5,"priority":"High","region":7,"stt":"IA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-07-22T00:00:00.000Z","dateRequired":"2024-07-22T00:00:00.000Z","popStartDate":"2024-06-22T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-23T00:00:00.000Z","obligationAmount":-25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-25000,"maPopStartDate":"2024-06-22T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-25000,"maPriority":"High","assistanceRequested":"Amendment #2- De-obligate ($25K) from MA.  The vendor ID should be DoD-USAF instead of DoD-OPS, and a new MA will be created with the correct vendor ID.\r\nAmendment #1- Change POP start date to June 22, 2024, no additional funds needed.\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support - Mission Assignment #471533 is being transferred from the R7 Surge Account (IA-24062201) to 4796DR-IA.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"bfd47204-dca7-4c9a-a543-bdd7bde792bb","hash":"0f769edb6bf2ebbb2b83ae4047780637dbdfbacb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIADOD-OPS01","maAmendNumber":1,"actionId":472467,"maType":"FOS","supportFunction":5,"priority":"High","region":7,"stt":"IA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-10T00:00:00.000Z","popStartDate":"2024-06-22T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-22T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":" Amendment #1- Change POP start date to June 22, 2024, no additional funds needed.\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support - Mission Assignment #471533 is being transferred from the R7 Surge Account (IA-24062201) to 4796DR-IA.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"18a51477-2a73-4b3b-a1f3-44bbc80c9fc6","hash":"948edce83be877bff15b847f54578aab92768711","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIADOD-OPS01","maAmendNumber":0,"actionId":471657,"maType":"FOS","supportFunction":5,"priority":"High","region":7,"stt":"IA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-06-24T00:00:00.000Z","popStartDate":"2024-06-24T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-06-30T00:00:00.000Z","obligationAmount":25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":25000,"maPopStartDate":"2024-06-22T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":25000,"maPriority":"High","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial support - Mission Assignment #471533 is being transferred from the R7 Surge Account (IA-24062201) to 4796DR-IA.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"6783aaaa-390b-496a-9105-c245a8e9e0f1","hash":"890920064ce6f32dd369e12bf1b8bdce4eee83a2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIACOE-MVD03","maAmendNumber":0,"actionId":473548,"maType":"FOS","supportFunction":6,"priority":"High","region":7,"stt":"IA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2024-07-25T00:00:00.000Z","dateRequired":"2024-07-25T00:00:00.000Z","popStartDate":"2024-07-25T00:00:00.000Z","popEndDate":"2024-10-20T00:00:00.000Z","dateObligated":"2024-07-26T00:00:00.000Z","obligationAmount":240590,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":240590,"maPopStartDate":"2024-07-25T00:00:00.000Z","maPopEndDate":"2024-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":240590,"maPriority":"High","assistanceRequested":"USACE provide emergency planning of potential sites for housing in support of FEMA direct housing operations. ","statementOfWork":"As directed by and in coordination with FEMA, U.S. Army Corps of Engineers (USACE) will conduct emergency planning and/or assessment of potential sites for housing in support of FEMA response operations. USACE will prepare to implement contracting processes that will permit the award and execution of contracts for temporary housing support.\r\n\r\nUSACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b486a4cf-d3dd-4cfc-b67c-44542db95c13","hash":"cc6b56a42685fb893f0c086dca2419a3aa643ff7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIACOE-MVD01","maAmendNumber":2,"actionId":474220,"maType":"FOS","supportFunction":3,"priority":"Normal","region":7,"stt":"IA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2024-07-31T00:00:00.000Z","dateRequired":"2024-08-01T00:00:00.000Z","popStartDate":"2024-06-29T00:00:00.000Z","popEndDate":"2024-10-30T00:00:00.000Z","dateObligated":"2024-08-01T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-29T00:00:00.000Z","maPopEndDate":"2024-10-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #2 Change Period of Performance to 10/30/2024; no additional funds needed.\r\nAmendment #1 Change Project Manager to Rachel Fails; no additional funds needed.\r\nActivate USACE to the RRCC, IOF, JFO, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"6841d197-86cc-4f91-8f35-0110d36f088f","hash":"32d703dd7c06ac7449108d9e1015d054333a706a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIACOE-MVD01","maAmendNumber":1,"actionId":473772,"maType":"FOS","supportFunction":3,"priority":"High","region":7,"stt":"IA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2024-07-26T00:00:00.000Z","dateRequired":"2024-07-26T00:00:00.000Z","popStartDate":"2024-06-29T00:00:00.000Z","popEndDate":"2024-08-01T00:00:00.000Z","dateObligated":"2024-07-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-29T00:00:00.000Z","maPopEndDate":"2024-10-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #1 Change Project Manager to Rachel Fails; no additional funds needed.\r\nActivate USACE to the RRCC, IOF, JFO, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"46c07b57-bbd1-4aa5-97bd-86a921a4aee5","hash":"8d37379b65b3a45d3eb9ba0ec2e336412c6143e3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIACOE-MVD01","maAmendNumber":0,"actionId":471456,"maType":"FOS","supportFunction":3,"priority":"High","region":7,"stt":"IA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2024-06-27T00:00:00.000Z","dateRequired":"2024-06-29T00:00:00.000Z","popStartDate":"2024-06-29T00:00:00.000Z","popEndDate":"2024-08-01T00:00:00.000Z","dateObligated":"2024-06-28T00:00:00.000Z","obligationAmount":306000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":306000,"maPopStartDate":"2024-06-29T00:00:00.000Z","maPopEndDate":"2024-10-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":306000,"maPriority":"Normal","assistanceRequested":"Activate USACE to the RRCC, IOF, JFO, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2daadc97-096d-4380-b0ad-0bc2527aedc3","hash":"4c3779915db1b70a38ef1580bdb326e2f77c0479","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIACNCS01","maAmendNumber":1,"actionId":475367,"maType":"DFA","supportFunction":6,"priority":"High","region":7,"stt":"IA","agencyId":"CNCS","agency":"CNCS (CORP FOR NAT'L COMM SCV)","authority":"Stafford Act","dateReceived":"2024-08-14T00:00:00.000Z","dateRequired":"2024-08-30T00:00:00.000Z","popStartDate":"2024-06-29T00:00:00.000Z","popEndDate":"2024-09-30T00:00:00.000Z","dateObligated":"2024-08-19T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-29T00:00:00.000Z","maPopEndDate":"2024-09-30T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment#1  Amend to extend period of performance to 9-30-24 no additional funds needed; change PM to Naomi Bullock.\r\nDeploy CNCS field personnel to support disaster operations","statementOfWork":"In support of the State of Iowa request, as directed by and in accordance with duties outlined in the FEMA/AmeriCorps MOU AmeriCorps personnel as directed by FEMA, Corporation for National Community Service (CNCS) will deploy personnel to support activities including, but not limited to, the following areas in support of FEMA disaster operations: mucking/gutting shelter, feeding, donations and volunteer management, warehousing, non-hazardous disaster debris removal, tarping under the approved USACE program, chain-saw work (for qualified crews only), call centers, volunteer base camp, needs assessment, and long-term recovery committees.\r\nCNCS will provide support in accordance with duties outlined in the FEMA/CNCS MOU and as directed by the FEMA ESF #6 assigned Regional Lead or designee.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n9. A final inspection report will be completed upon termination of all direct Federal assistance work. Final inspection reports shall be signed by a representative of the performing Federal agency and the STT pursuant to 44 CFR.","id":"44385d86-7fa9-4c4d-9151-d7f60bc5e121","hash":"bf16d35030683f2f2efe707c5b644a23888986b3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024062201","incidentName":"Iowa Flooding ","incidentType":"Severe Storm","disasterNumber":4796,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4796DRIACNCS01","maAmendNumber":0,"actionId":471547,"maType":"DFA","supportFunction":6,"priority":"High","region":7,"stt":"IA","agencyId":"CNCS","agency":"CNCS (CORP FOR NAT'L COMM SCV)","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-06-29T00:00:00.000Z","popStartDate":"2024-06-29T00:00:00.000Z","popEndDate":"2024-08-30T00:00:00.000Z","dateObligated":"2024-07-01T00:00:00.000Z","obligationAmount":1400000,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":350000,"fedCostShareAmt":1050000,"maPopStartDate":"2024-06-29T00:00:00.000Z","maPopEndDate":"2024-09-30T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":350000,"maFedCostShareAmount":1050000,"maPriority":"High","assistanceRequested":"Deploy CNCS field personnel to support disaster operations","statementOfWork":"In support of the State of Iowa request, as directed by and in accordance with duties outlined in the FEMA/AmeriCorps MOU AmeriCorps personnel as directed by FEMA, Corporation for National Community Service (CNCS) will deploy personnel to support activities including, but not limited to, the following areas in support of FEMA disaster operations: mucking/gutting shelter, feeding, donations and volunteer management, warehousing, non-hazardous disaster debris removal, tarping under the approved USACE program, chain-saw work (for qualified crews only), call centers, volunteer base camp, needs assessment, and long-term recovery committees.\r\nCNCS will provide support in accordance with duties outlined in the FEMA/CNCS MOU and as directed by the FEMA ESF #6 assigned Regional Lead or designee.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n9. A final inspection report will be completed upon termination of all direct Federal assistance work. Final inspection reports shall be signed by a representative of the performing Federal agency and the STT pursuant to 44 CFR.","id":"0ac97c84-38a8-4a7b-afa9-de887331fa05","hash":"c172d6b96bf39d71b6b8170945c31cb026b04db0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901GSA01","maAmendNumber":1,"actionId":470567,"maType":"FOS","supportFunction":7,"priority":"High","region":6,"stt":"NM","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-06-20T00:00:00.000Z","dateRequired":"2024-06-20T00:00:00.000Z","popStartDate":"2024-06-19T00:00:00.000Z","popEndDate":"2024-07-19T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":-15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15000,"maPopStartDate":"2024-06-19T00:00:00.000Z","maPopEndDate":"2024-07-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15000,"maPriority":"High","assistanceRequested":"Amendment#1: This MA is replaced by 4795DR-NM-GSA-01 (1509-470610).  The full $15,000.00 is included in the re-issued mission\r\n\r\nActivate GSA to RRCC and Virtually, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC and virtually, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\n\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b86ca84e-276a-4a85-a80a-484b36111f5f","hash":"f194de13c9d2449c00dad0d00978a2ff56b750da","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901GSA01","maAmendNumber":0,"actionId":470395,"maType":"FOS","supportFunction":7,"priority":"High","region":6,"stt":"NM","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-06-19T00:00:00.000Z","dateRequired":"2024-06-19T00:00:00.000Z","popStartDate":"2024-06-19T00:00:00.000Z","popEndDate":"2024-07-19T00:00:00.000Z","dateObligated":"2024-06-19T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-06-19T00:00:00.000Z","maPopEndDate":"2024-07-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"Activate GSA to RRCC and Virtually, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC and virtually, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\n\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"98f5fd61-62d5-4e05-bb35-84037548fcb5","hash":"24a60fa17fe5e422435e45f9fd3b61575502358c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901FCC01","maAmendNumber":1,"actionId":470565,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"NM","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2024-06-20T00:00:00.000Z","dateRequired":"2024-06-20T00:00:00.000Z","popStartDate":"2024-06-19T00:00:00.000Z","popEndDate":"2024-07-03T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-06-19T00:00:00.000Z","maPopEndDate":"2024-07-03T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amend #1: This MA is replaced by 4795DR-NM-FCC-01 (1509-470581). The full $5,000.00 is included in the re-issue. \r\nActivate FCC to the RRCC, IOF, JFO, to include virtual or other teams and facilities as requested.  In person travel not required at this time.","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams, or other facilities in support of disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"1a5d36da-210a-41bb-b9f9-e2f0a6bfc872","hash":"c80f0f5a2611f890e02fa5c24c11a9e3ed9a3b84","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901FCC01","maAmendNumber":0,"actionId":470411,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"NM","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2024-06-19T00:00:00.000Z","dateRequired":"2024-06-19T00:00:00.000Z","popStartDate":"2024-06-19T00:00:00.000Z","popEndDate":"2024-07-03T00:00:00.000Z","dateObligated":"2024-06-19T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-06-19T00:00:00.000Z","maPopEndDate":"2024-07-03T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate FCC to the RRCC, IOF, JFO, to include virtual or other teams and facilities as requested.  In person travel not required at this time.","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams, or other facilities in support of disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"d9fe4d31-2685-4c11-b2e7-3ab61c7a3029","hash":"8ef9fb397ec8b3c3456334c765926bf9225b048a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901EPA01","maAmendNumber":1,"actionId":470548,"maType":"FOS","supportFunction":10,"priority":"High","region":6,"stt":"NM","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-06-20T00:00:00.000Z","dateRequired":"2024-06-20T00:00:00.000Z","popStartDate":"2024-06-18T00:00:00.000Z","popEndDate":"2024-06-28T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-06-18T00:00:00.000Z","maPopEndDate":"2024-06-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amend #1: This MA is replaced by 4795DR-NM-EPA-01 (1509-470615). The full $10,000 is included in the re-issued mission.\r\nActivate and deploy EPA Water SME to RRCC, IOF and other areas as needed to include virtual","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"350d7229-b5ff-4b08-90ab-b02f1521b825","hash":"015e1dadbde478cc91dcedc2350f245b934b2598","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901EPA01","maAmendNumber":0,"actionId":470430,"maType":"FOS","supportFunction":10,"priority":"High","region":6,"stt":"NM","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-06-19T00:00:00.000Z","dateRequired":"2024-06-19T00:00:00.000Z","popStartDate":"2024-06-18T00:00:00.000Z","popEndDate":"2024-06-28T00:00:00.000Z","dateObligated":"2024-06-19T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-06-18T00:00:00.000Z","maPopEndDate":"2024-06-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Activate and deploy EPA Water SME to RRCC, IOF and other areas as needed to include virtual","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"1139826a-7ea1-4c31-9abf-5502a59ea790","hash":"bd891f068adf29d4d779e37ff0c375896a43af13","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901DHS-CISA02","maAmendNumber":1,"actionId":470544,"maType":"FOS","supportFunction":14,"priority":"High","region":6,"stt":"NM","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-06-20T00:00:00.000Z","dateRequired":"2024-06-20T00:00:00.000Z","popStartDate":"2024-06-19T00:00:00.000Z","popEndDate":"2024-07-02T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-06-19T00:00:00.000Z","maPopEndDate":"2024-07-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment#1: This MA is replaced by 4795DR-NM-CISA-01 (1509-470577).  The full $5,000.00 is included in the re-issue.  \r\n\r\nActivate CISA-14 LNOs to RRCC and virtually, IOF, JFO, and other facilities as needed.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b7aa3b4b-551c-4173-9d8a-3fd057952e67","hash":"3e2ce6de8401d29ae159406f4db30f40a01ff892","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901DHS-CISA02","maAmendNumber":0,"actionId":470412,"maType":"FOS","supportFunction":14,"priority":"High","region":6,"stt":"NM","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-06-19T00:00:00.000Z","dateRequired":"2024-06-19T00:00:00.000Z","popStartDate":"2024-06-19T00:00:00.000Z","popEndDate":"2024-07-02T00:00:00.000Z","dateObligated":"2024-06-19T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-06-19T00:00:00.000Z","maPopEndDate":"2024-07-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate CISA-14 LNOs to RRCC and virtually, IOF, JFO, and other facilities as needed.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f9b90fe1-ced0-4424-9fd0-c8087594180a","hash":"a1e6a3ff36e6b070dd4a2a93d79544c7f179d739","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901DHS-CISA01","maAmendNumber":1,"actionId":470620,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"NM","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-06-20T00:00:00.000Z","dateRequired":"2024-06-20T00:00:00.000Z","popStartDate":"2024-06-19T00:00:00.000Z","popEndDate":"2024-07-03T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-06-19T00:00:00.000Z","maPopEndDate":"2024-07-03T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment#1: This MA is replaced by 4795DR-NM-CISA-02 (1509-470585).  The full $5,000.00 is included in the re-issued mission.\r\n\r\nActivate and deploy CISA (ESF#2) to RRCC, IOF, JFO to include virtual, and or other facilities as requested.  ","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e0ac9581-2719-4ad7-b341-ec9c979d888e","hash":"826bee791a1a5d894c6d84b24f2c892e433d61af","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901DHS-CISA01","maAmendNumber":0,"actionId":470434,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"NM","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-06-19T00:00:00.000Z","dateRequired":"2024-06-19T00:00:00.000Z","popStartDate":"2024-06-19T00:00:00.000Z","popEndDate":"2024-07-03T00:00:00.000Z","dateObligated":"2024-06-19T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-06-19T00:00:00.000Z","maPopEndDate":"2024-07-03T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate and deploy CISA (ESF#2) to RRCC, IOF, JFO to include virtual, and or other facilities as requested.  ","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"85441d9d-2446-4335-89f8-e8de7a40ee12","hash":"85571c69df0c7f003f96e7310984ff9145d7a4b4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901COE-SWD01","maAmendNumber":1,"actionId":470414,"maType":"FOS","supportFunction":3,"priority":"Normal","region":6,"stt":"NM","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-06-19T00:00:00.000Z","dateRequired":"2024-06-19T00:00:00.000Z","popStartDate":"2024-06-19T00:00:00.000Z","popEndDate":"2024-07-02T00:00:00.000Z","dateObligated":"2024-06-19T00:00:00.000Z","obligationAmount":-50400,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-50400,"maPopStartDate":"2024-06-19T00:00:00.000Z","maPopEndDate":"2024-07-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-50400,"maPriority":"Normal","assistanceRequested":"Amend#1: **INCORRECT VENDOR ID*** ALL WORK AND COST TRANSFERRED TO 1509-470436 - COE-SPD-01\r\nActivate USACE to the RRCC, IOF, JFO to include virtual, or other facilities requested by FEMA.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities as needed in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"51d843e3-f6b3-4073-8ebc-145f42fc3a04","hash":"ceb61df15fd116a58473e35bac7dd7b94e94c3d6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NM24061901COE-SWD01","maAmendNumber":0,"actionId":470391,"maType":"FOS","supportFunction":3,"priority":"Normal","region":6,"stt":"NM","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-06-19T00:00:00.000Z","dateRequired":"2024-06-19T00:00:00.000Z","popStartDate":"2024-06-19T00:00:00.000Z","popEndDate":"2024-07-02T00:00:00.000Z","dateObligated":"2024-06-19T00:00:00.000Z","obligationAmount":50400,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":50400,"maPopStartDate":"2024-06-19T00:00:00.000Z","maPopEndDate":"2024-07-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":50400,"maPriority":"Normal","assistanceRequested":"Activate USACE to the RRCC, IOF, JFO to include virtual, or other facilities requested by FEMA.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities as needed in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2cab9ec3-5d40-4a6f-9650-d236b30540ff","hash":"39b7be4399aa39eccc069f7c10f0f7f61346f57d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMUSDA-FS02","maAmendNumber":0,"actionId":471882,"maType":"DFA","supportFunction":4,"priority":"High","region":6,"stt":"NM","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-07-02T00:00:00.000Z","dateRequired":"2024-07-04T00:00:00.000Z","popStartDate":"2024-07-04T00:00:00.000Z","popEndDate":"2024-07-19T00:00:00.000Z","dateObligated":"2024-07-03T00:00:00.000Z","obligationAmount":281292.48,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":70323.12,"fedCostShareAmt":210969.36,"maPopStartDate":"2024-07-04T00:00:00.000Z","maPopEndDate":"2024-07-19T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":70323.12,"maFedCostShareAmount":210969.36,"maPriority":"High","assistanceRequested":"USFS command and control support for all hazard operations including flood response for the State of New Mexico","statementOfWork":"In support of the request of the State of New Mexico, as directed by and in coordination with FEMA, US Forest Service (USFS) will provide command, control, and coordination resources, including but not limited to command and general staff members or personnel with other specialized qualifications, to assist with all hazard emergency operations to support FEMA disaster operations for DR4795.\r\n- USFS will utilize other Federal agency and State/local resources under existing agreement, as appropriate.  \r\n- USFS will pre-position resources and/or provide assistance.  \r\n- USFS is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nIf authorized by FEMA, USFS will establish a Base Camp to provide lodging, meals, and support for firefighting and command/control personnel and equipment.  This will be provided in lieu of per diem and under a separate mission assignment.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"4a612315-1567-4186-9eb2-a0837edb6a04","hash":"823daacea988e952d13cd455faf7bea7295a2963","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMUSDA-FS01","maAmendNumber":2,"actionId":471614,"maType":"FOS","supportFunction":4,"priority":"High","region":6,"stt":"NM","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-06-28T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-07-22T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":7392,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":7392,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-07-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":7392,"maPriority":"High","assistanceRequested":"Amendment 2: Increase funding by $7,392. Change PM to Tom Erickson.\r\nAmendment#1: Increase funding by $13,176.  Extend POP end date to 7.31. 24.  Change PM to Mitchell Harrington\r\nActivate USFS to the RRCC and Virtually, IOF JFO or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e6004c4f-a00b-4ee0-85e7-afd6a75292a1","hash":"50259bf42f1e9d10ed13683a9adb58434c47b322","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMUSDA-FS01","maAmendNumber":1,"actionId":470792,"maType":"FOS","supportFunction":4,"priority":"High","region":6,"stt":"NM","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-06-23T00:00:00.000Z","dateRequired":"2024-06-23T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-07-22T00:00:00.000Z","dateObligated":"2024-06-23T00:00:00.000Z","obligationAmount":13176,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":13176,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-07-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":13176,"maPriority":"High","assistanceRequested":"Amendment#1: Increase funding by $13,176.  Extend POP end date to 7.31. 24.  Change PM to Mitchell Harrington\r\nActivate USFS to the RRCC and Virtually, IOF JFO or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3f8cde9d-ef67-4b24-ac02-4d68af418491","hash":"98d426a57b8ca103533e58447d05324deebdea1a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMUSDA-FS01","maAmendNumber":0,"actionId":470755,"maType":"FOS","supportFunction":4,"priority":"High","region":6,"stt":"NM","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-06-21T00:00:00.000Z","dateRequired":"2024-06-21T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-07-22T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":3824.52,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3824.52,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-07-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3824.52,"maPriority":"High","assistanceRequested":"Activate USFS to the RRCC and Virtually, IOF JFO or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"365d2e0e-3247-4db4-9e4e-f9a7998887c1","hash":"0372fa1aede098e089318d80b84e9d65b66bfad3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMNGA01","maAmendNumber":2,"actionId":476121,"maType":"FOS","supportFunction":9,"priority":"Normal","region":6,"stt":"NM","agencyId":"NGA","agency":"NATL GEOSPATIAL-INTELLIGENCY","authority":"Stafford Act","dateReceived":"2024-08-21T00:00:00.000Z","dateRequired":"2024-08-31T00:00:00.000Z","popStartDate":"2024-06-23T00:00:00.000Z","popEndDate":"2024-07-02T00:00:00.000Z","dateObligated":"2024-08-21T00:00:00.000Z","obligationAmount":-57321.74,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-57321.74,"maPopStartDate":"2024-06-23T00:00:00.000Z","maPopEndDate":"2024-07-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-57321.74,"maPriority":"Normal","assistanceRequested":"Amendment #2: Deobligate $57,321.74 per closeout team request to close out MA. Change PM to Paul Mungenast.\r\nAmendment #1 to align POP to operational period. MA was operationally closed 07/02. And change PM to Chris Walsh.\r\nNGA Geospatial Intelligence (GEOINT) support for FEMA Urban Search and Rescue (US&amp;R) deployed supporting the New Mexico Wildfires response.","statementOfWork":"As directed by and in coordination with FEMA, National Geospatial-Intelligence Agency (NGA) will deploy Geospatial Analyst Team(s) to assist the Urban Search &amp; Rescue (US&amp;R) Incident Support Team and deployed task forces in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Mobile GEOINT Support Team (MGST): Heavy, Medium, or Light \r\n- NGA analysts to provide analytical expertise\r\n- NGA operational support staff including contractors to support operations, satellite communications, and sheltering and feeding of NGA staff (a total of 12 personnel to provide mobile GEOINT)\r\nNGA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8fb1b885-2588-4be4-ad42-462603ed4e62","hash":"7be5fca9b1ea8e0106f99716f65c0885525d228f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMNGA01","maAmendNumber":1,"actionId":471880,"maType":"FOS","supportFunction":9,"priority":"High","region":6,"stt":"NM","agencyId":"NGA","agency":"NATL GEOSPATIAL-INTELLIGENCY","authority":"Stafford Act","dateReceived":"2024-07-02T00:00:00.000Z","dateRequired":"2024-07-02T00:00:00.000Z","popStartDate":"2024-06-23T00:00:00.000Z","popEndDate":"2024-07-02T00:00:00.000Z","dateObligated":"2024-07-02T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-23T00:00:00.000Z","maPopEndDate":"2024-07-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #1 to align POP to operational period. MA was operationally closed 07/02. And change PM to Chris Walsh.\r\nNGA Geospatial Intelligence (GEOINT) support for FEMA Urban Search and Rescue (US&amp;R) deployed supporting the New Mexico Wildfires response.","statementOfWork":"As directed by and in coordination with FEMA, National Geospatial-Intelligence Agency (NGA) will deploy Geospatial Analyst Team(s) to assist the Urban Search &amp; Rescue (US&amp;R) Incident Support Team and deployed task forces in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Mobile GEOINT Support Team (MGST): Heavy, Medium, or Light \r\n- NGA analysts to provide analytical expertise\r\n- NGA operational support staff including contractors to support operations, satellite communications, and sheltering and feeding of NGA staff (a total of 12 personnel to provide mobile GEOINT)\r\nNGA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"c0607044-7d19-4395-82c5-d635d7b0accd","hash":"228ffeabd77c3cc55bd9d9429e738571ae1ee2a9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMNGA01","maAmendNumber":0,"actionId":470829,"maType":"FOS","supportFunction":9,"priority":"High","region":6,"stt":"NM","agencyId":"NGA","agency":"NATL GEOSPATIAL-INTELLIGENCY","authority":"Stafford Act","dateReceived":"2024-06-23T00:00:00.000Z","dateRequired":"2024-06-23T00:00:00.000Z","popStartDate":"2024-06-23T00:00:00.000Z","popEndDate":"2024-07-07T00:00:00.000Z","dateObligated":"2024-06-23T00:00:00.000Z","obligationAmount":63980,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":63980,"maPopStartDate":"2024-06-23T00:00:00.000Z","maPopEndDate":"2024-07-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":63980,"maPriority":"Normal","assistanceRequested":"NGA Geospatial Intelligence (GEOINT) support for FEMA Urban Search and Rescue (US&amp;R) deployed supporting the New Mexico Wildfires response.","statementOfWork":"As directed by and in coordination with FEMA, National Geospatial-Intelligence Agency (NGA) will deploy Geospatial Analyst Team(s) to assist the Urban Search &amp; Rescue (US&amp;R) Incident Support Team and deployed task forces in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Mobile GEOINT Support Team (MGST): Heavy, Medium, or Light \r\n- NGA analysts to provide analytical expertise\r\n- NGA operational support staff including contractors to support operations, satellite communications, and sheltering and feeding of NGA staff (a total of 12 personnel to provide mobile GEOINT)\r\n\r\nNGA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e9071e0b-c5b2-49b7-8618-13880700fb49","hash":"dd6661c9cddfd2ef49295f2bcce36627028f1818","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMHHS-ASPR02","maAmendNumber":1,"actionId":472776,"maType":"DFA","supportFunction":8,"priority":"High","region":6,"stt":"NM","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-12T00:00:00.000Z","popStartDate":"2024-07-03T00:00:00.000Z","popEndDate":"2024-08-02T00:00:00.000Z","dateObligated":"2024-07-12T00:00:00.000Z","obligationAmount":77721,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":19430.25,"fedCostShareAmt":58290.75,"maPopStartDate":"2024-07-03T00:00:00.000Z","maPopEndDate":"2024-08-02T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":19430.25,"maFedCostShareAmount":58290.75,"maPriority":"High","assistanceRequested":"Amendment #1 to increase funding by $77,721 and change PM to Chris Walsh.\r\nHHS behavioral health care services in support of disaster operations.","statementOfWork":"In support of the State of New Mexico&#39;s request, as directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will assist State and local staff in providing mental health and substance abuse support services to disaster victims, their families, and rescue response workers.\r\nSupport by HHS mental health teams services may include but is not limited to the following:\r\n- Conduct screening and assessment of community needs relevant to mental and behavioral conditions (e.g., acute/chronic stress reactions and substance abuse)\r\n- Provide grief counseling and psychological first aid to incident victims and responders.\r\n- Development and operation of targeted workshops and trainings (see examples **)\r\n- Support for mental health and/or shelter needs assessments\r\n- HHS ASPR TRACIE and emPOWER resources\r\n- Consultation and expertise regarding provision of psychological first aid and crisis counseling support to incident survivors and/or responders\r\n- Health and Social Services Recovery Support Function (HSS\r\nRSF) Field Coordinator (under NDRF)\r\n- HSS Recovery Support Subject Matter Experts (SME)(s)\r\n- Contract or OFA audit support to ensure costs incurred under HHS Mission Assignments (MAs) meet all Stafford Act and regulatory requirements\r\nFEMA logistical support: Teams may require some level of base operating support (food, shelter, laundry, etc.).\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n9. A final inspection report will be completed upon termination of all direct Federal assistance work. Final inspection reports shall be signed by a representative of the performing Federal agency and the STT pursuant to 44 CFR.","id":"b84e0605-7ec8-434b-8460-dcef2b56e03b","hash":"ab8d987fa3ca95e67e6ee79d850db494f737ba9e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMHHS-ASPR02","maAmendNumber":0,"actionId":471256,"maType":"DFA","supportFunction":8,"priority":"High","region":6,"stt":"NM","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-06-26T00:00:00.000Z","dateRequired":"2024-06-26T00:00:00.000Z","popStartDate":"2024-07-03T00:00:00.000Z","popEndDate":"2024-08-02T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":211811,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":52952.75,"fedCostShareAmt":158858.25,"maPopStartDate":"2024-07-03T00:00:00.000Z","maPopEndDate":"2024-08-02T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":52952.75,"maFedCostShareAmount":158858.25,"maPriority":"High","assistanceRequested":"HHS behavioral health care services in support of disaster operations.","statementOfWork":"In support of the State of New Mexico&#39;s request, as directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will assist State and local staff in providing mental health and substance abuse support services to disaster victims, their families, and rescue response workers.\r\nSupport by HHS mental health teams services may include but is not limited to the following:\r\n- Conduct screening and assessment of community needs relevant to mental and behavioral conditions (e.g., acute/chronic stress reactions and substance abuse)\r\n- Provide grief counseling and psychological first aid to incident victims and responders.\r\n- Development and operation of targeted workshops and trainings (see examples **)\r\n- Support for mental health and/or shelter needs assessments\r\n- HHS ASPR TRACIE and emPOWER resources\r\n- Consultation and expertise regarding provision of psychological first aid and crisis counseling support to incident survivors and/or responders\r\n- Health and Social Services Recovery Support Function (HSS\r\nRSF) Field Coordinator (under NDRF)\r\n- HSS Recovery Support Subject Matter Experts (SME)(s)\r\n- Contract or OFA audit support to ensure costs incurred under HHS Mission Assignments (MAs) meet all Stafford Act and regulatory requirements\r\nFEMA logistical support: Teams may require some level of base operating support (food, shelter, laundry, etc.).\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n9. A final inspection report will be completed upon termination of all direct Federal assistance work. Final inspection reports shall be signed by a representative of the performing Federal agency and the STT pursuant to 44 CFR.","id":"4852d69a-5a2a-44fe-a644-d85edb0fc682","hash":"721d4f055c79c7cd35050c99aed8109ab83ddfc8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMHHS-ASPR01","maAmendNumber":2,"actionId":474958,"maType":"FOS","supportFunction":8,"priority":"Life Sustaining","region":6,"stt":"NM","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-08-08T00:00:00.000Z","dateRequired":"2024-08-08T00:00:00.000Z","popStartDate":"2024-06-21T00:00:00.000Z","popEndDate":"2024-09-02T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-21T00:00:00.000Z","maPopEndDate":"2024-09-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #2: Amend to extend POP end date to 9/2/24, no additional funds required. Change PM to Amanda Cesani.\r\nAmendment #1 no cost POP extension to align with HHS Behavioral Health mission. And change PM to Chris Walsh.\r\nActivate HHS SMEs to RRCC, IOF, JFO, RFO, or other regional facilities. ","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Service (HHS/ASPR) will provide appropriate personnel and SME support to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"7ae8a11e-04f9-4317-a2a7-58dff53bda85","hash":"bb78cc96c47740b3b363e2935623cf99ca9a8403","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMHHS-ASPR01","maAmendNumber":1,"actionId":473228,"maType":"FOS","supportFunction":8,"priority":"Life Sustaining","region":6,"stt":"NM","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-07-18T00:00:00.000Z","dateRequired":"2024-07-18T00:00:00.000Z","popStartDate":"2024-06-21T00:00:00.000Z","popEndDate":"2024-08-02T00:00:00.000Z","dateObligated":"2024-07-19T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-21T00:00:00.000Z","maPopEndDate":"2024-09-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #1 no cost POP extension to align with HHS Behavioral Health mission. And change PM to Chris Walsh.\r\nActivate HHS SMEs to RRCC, IOF, JFO, RFO, or other regional facilities. ","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Service (HHS/ASPR) will provide appropriate personnel and SME support to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"9bf8544b-b939-4935-bf86-38ae64881fd0","hash":"1a1c485277d410d4a92ef5bcbc8609f085fbf110","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMHHS-ASPR01","maAmendNumber":0,"actionId":470770,"maType":"FOS","supportFunction":8,"priority":"Life Sustaining","region":6,"stt":"NM","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-06-22T00:00:00.000Z","dateRequired":"2024-06-21T00:00:00.000Z","popStartDate":"2024-06-21T00:00:00.000Z","popEndDate":"2024-07-21T00:00:00.000Z","dateObligated":"2024-06-22T00:00:00.000Z","obligationAmount":55549.6,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":55549.6,"maPopStartDate":"2024-06-21T00:00:00.000Z","maPopEndDate":"2024-09-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":55549.6,"maPriority":"Life Sustaining","assistanceRequested":"Activate HHS SMEs to RRCC, IOF, JFO, RFO, or other regional facilities. ","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Service (HHS/ASPR) will provide appropriate personnel and SME support to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"6b5cafb4-e4ad-48d5-9694-96522c5a01ec","hash":"92a191d981f2798e727f96d7b47de30bec5f57a7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMFCC02","maAmendNumber":0,"actionId":470654,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"NM","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2024-06-21T00:00:00.000Z","dateRequired":"2024-06-21T00:00:00.000Z","popStartDate":"2024-06-21T00:00:00.000Z","popEndDate":"2024-07-12T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":61100,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":61100,"maPopStartDate":"2024-06-21T00:00:00.000Z","maPopEndDate":"2024-07-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":61100,"maPriority":"High","assistanceRequested":"Request FCC conduct cellular drive test, for Ruidoso, Mescalero and Roswell.  Perform drive test, analyze and report findings.","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will deploy teams and equipment to determine the impact to public safety and EAS communications systems in the affected area and identify surviving and non-working systems in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"31f5d50d-27fa-4066-b671-c7d51a0249de","hash":"9b78d4cd413947855dd5a663cf9dce80c015cad7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMFCC01","maAmendNumber":0,"actionId":470581,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"NM","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2024-06-21T00:00:00.000Z","dateRequired":"2024-06-20T00:00:00.000Z","popStartDate":"2024-06-19T00:00:00.000Z","popEndDate":"2024-07-03T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-06-19T00:00:00.000Z","maPopEndDate":"2024-07-03T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This is a re-issuance of (MA#1509-470565) NM-24061901-FCC- 01 for $5,000.\r\nActivate FCC to the RRCC, IOF, JFO, to include virtual or other teams and facilities as requested.  In person travel not required at this time.","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams, or other facilities in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"c6cad710-b3bd-4f9a-9973-5f367fb60f85","hash":"fe19c8687e92b3cf6622d9b91417868f86a37936","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMEPA02","maAmendNumber":1,"actionId":470938,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"NM","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-06-24T00:00:00.000Z","dateRequired":"2024-06-24T00:00:00.000Z","popStartDate":"2024-06-21T00:00:00.000Z","popEndDate":"2024-07-30T00:00:00.000Z","dateObligated":"2024-06-25T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-21T00:00:00.000Z","maPopEndDate":"2024-07-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1: Extend POP date to 30 July 2024\r\nRequesting Water/Wastewater SME to support USACE IA Mission.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will deploy personnel to provide event-specific planning, preparation, and execution, only at the request of FEMA, for the drinking water and wastewater infrastructure/safety mission in coordination with Emergency Support Function (ESF) 3 for disaster operations.\r\nActivities may include, but are not limited to: sampling and analysis, facility assessments, liaison among Federal, State, local, Tribal, and municipal representatives concerning planning and execution efforts, generating lists of public water systems (PWSs) and publicly owned treatment works (POTWs) within areas affected by the incident, preliminary facility surveys (e.g. operational status, emergency power status/need, physical damage), laboratory support for water sample collection, coordination of essential resources (fuel, treatment chemicals, and personnel), reach back support, and appropriate personnel to manage the EPA field operations.\r\nRequirements from FEMA: 1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). 2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. 3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. 4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. 5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. 6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. 7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. 8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"40e20f05-3fa6-41f9-b6a7-e256da6f7b03","hash":"abc52cf16272211ae0e0f43f99b6367413bfe536","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMEPA02","maAmendNumber":0,"actionId":470732,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"NM","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-06-21T00:00:00.000Z","dateRequired":"2024-06-21T00:00:00.000Z","popStartDate":"2024-06-21T00:00:00.000Z","popEndDate":"2024-07-02T00:00:00.000Z","dateObligated":"2024-06-22T00:00:00.000Z","obligationAmount":112000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":112000,"maPopStartDate":"2024-06-21T00:00:00.000Z","maPopEndDate":"2024-07-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":112000,"maPriority":"High","assistanceRequested":"Requesting Water/Wastewater SME to support USACE IA Mission.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will deploy personnel to provide event-specific planning, preparation, and execution, only at the request of FEMA, for the drinking water and wastewater infrastructure/safety mission in coordination with Emergency Support Function (ESF) 3 for disaster operations.\r\nActivities may include, but are not limited to: sampling and analysis, facility assessments, liaison among Federal, State, local, Tribal, and municipal representatives concerning planning and execution efforts, generating lists of public water systems (PWSs) and publicly owned treatment works (POTWs) within areas affected by the incident, preliminary facility surveys (e.g. operational status, emergency power status/need, physical damage), laboratory support for water sample collection, coordination of essential resources (fuel, treatment chemicals, and personnel), reach back support, and appropriate personnel to manage the EPA field operations.\r\nRequirements from FEMA: 1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). 2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. 3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. 4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. 5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. 6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. 7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. 8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"d06935dd-6349-4766-a798-b8896c2fdec2","hash":"29788d0c6c13036890b5ced9dc136b0fff748541","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMEPA01","maAmendNumber":2,"actionId":470943,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"NM","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-06-25T00:00:00.000Z","dateRequired":"2024-06-24T00:00:00.000Z","popStartDate":"2024-06-18T00:00:00.000Z","popEndDate":"2024-07-30T00:00:00.000Z","dateObligated":"2024-06-25T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-18T00:00:00.000Z","maPopEndDate":"2024-07-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amend #2: Extend the pop to 30 July 2024.\r\nAmend #1: Amend due to administrative error and change federal coordination from ESF 10 to ESF 3.\r\nThis is a re-issuance of (MA#1509-470548) NM-24061901-EPA- 01 for $10,000.\r\nActivate and deploy EPA Water SME to RRCC, IOF and other areas as needed to include virtual","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"1c84c394-cd4b-4413-b9cf-0a32659fa607","hash":"58773fb45332c94d53b77dc0d157a9a5b5d85317","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMEPA01","maAmendNumber":1,"actionId":470730,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"NM","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-06-21T00:00:00.000Z","dateRequired":"2024-06-21T00:00:00.000Z","popStartDate":"2024-06-18T00:00:00.000Z","popEndDate":"2024-06-28T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-18T00:00:00.000Z","maPopEndDate":"2024-07-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amend #1: Amend due to administrative error and change federal coordination from ESF 10 to ESF 3.\r\nThis is a re-issuance of (MA#1509-470548) NM-24061901-EPA- 01 for $10,000.\r\nActivate and deploy EPA Water SME to RRCC, IOF and other areas as needed to include virtual","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"066b1644-c225-4864-9598-c8d0cda7c567","hash":"02d2faa66160ed7e08fd0df2e4ecd538fa527ff8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMEPA01","maAmendNumber":0,"actionId":470615,"maType":"FOS","supportFunction":10,"priority":"High","region":6,"stt":"NM","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-06-21T00:00:00.000Z","dateRequired":"2024-06-20T00:00:00.000Z","popStartDate":"2024-06-18T00:00:00.000Z","popEndDate":"2024-06-28T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-06-18T00:00:00.000Z","maPopEndDate":"2024-07-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"This is a re-issuance of (MA#1509-470548) NM-24061901-EPA- 01 for $10,000.\r\nActivate and deploy EPA Water SME to RRCC, IOF and other areas as needed to include virtual","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"5c47d351-2a80-42b7-aeab-5470bae5d4dc","hash":"9f8ce1db1ec2db9711ecade3799e232f9c19e81a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDOT01","maAmendNumber":1,"actionId":471692,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"NM","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-06-28T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-06-28T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-06-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #1: To align POP with Operational Period. MA was Operationally closed 06/28. And change PM to Tom Erickson.\r\n\r\nActivate DOT to RRCC and virtually IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"9d19ef2a-21fb-44d3-97ba-884f6fac8e6b","hash":"6dcd673367bdc81c95a87d564c3bf85c7320accb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDOT01","maAmendNumber":0,"actionId":470556,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"NM","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-06-20T00:00:00.000Z","dateRequired":"2024-06-20T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-07-02T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-06-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate DOT to RRCC and virtually IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"bf51a6dd-f9be-498d-98d3-e706a3477878","hash":"15b795f0ab047d7a500ac9e392dfd4f6c3482d3c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDOJ-ATF02","maAmendNumber":2,"actionId":471901,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":6,"stt":"NM","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-07-05T00:00:00.000Z","dateRequired":"2024-07-02T00:00:00.000Z","popStartDate":"2024-06-21T00:00:00.000Z","popEndDate":"2024-07-05T00:00:00.000Z","dateObligated":"2024-07-06T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-21T00:00:00.000Z","maPopEndDate":"2024-07-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Lifesaving","assistanceRequested":"Amendment #2 to align POP with operational period. MA was operationally closed 07/05. And change PM to Tom Erickson.\r\nAmendment 1 to extend POP to 07/19/24. add $660,100, and change PM to Mitchell Harrington.\r\nLE Strike Team, formerly the QRT and Security personnel needed to support field operations\r\n","statementOfWork":"As directed by and in coordination with FEMA, Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Quick Response Teams (QRT) or other security teams as required to provide force protection in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ba961e42-469d-4e06-9f93-f26c5676d084","hash":"43fd98aa1c0111504e9300d29d6d012027a7234d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDOJ-ATF02","maAmendNumber":1,"actionId":470974,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":6,"stt":"NM","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-06-25T00:00:00.000Z","dateRequired":"2024-06-25T00:00:00.000Z","popStartDate":"2024-06-21T00:00:00.000Z","popEndDate":"2024-07-19T00:00:00.000Z","dateObligated":"2024-06-26T00:00:00.000Z","obligationAmount":660100,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":660100,"maPopStartDate":"2024-06-21T00:00:00.000Z","maPopEndDate":"2024-07-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":660100,"maPriority":"Lifesaving","assistanceRequested":"Amendment 1 to extend POP to 07/19/24. add $660,100, and change PM to Mitchell Harrington.\r\nLE Strike Team, formerly the QRT and Security personnel needed to support field operations\r\n","statementOfWork":"As directed by and in coordination with FEMA, Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Quick Response Teams (QRT) or other security teams as required to provide force protection in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"5201404a-c26a-4a42-b58f-2db8a498ad78","hash":"0b6627e4a9ed2a1cee6fe99179a48225dbbbf4ea","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDOJ-ATF02","maAmendNumber":0,"actionId":470643,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":6,"stt":"NM","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-06-21T00:00:00.000Z","dateRequired":"2024-06-21T00:00:00.000Z","popStartDate":"2024-06-21T00:00:00.000Z","popEndDate":"2024-07-05T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":316120,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":316120,"maPopStartDate":"2024-06-21T00:00:00.000Z","maPopEndDate":"2024-07-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":316120,"maPriority":"Lifesaving","assistanceRequested":"LE Strike Team, formerly the QRT and Security personnel needed to support field operations\r\n","statementOfWork":"As directed by and in coordination with FEMA, Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Quick Response Teams (QRT) or other security teams as required to provide force protection in support of disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"37cd349d-b2a9-451a-bb90-0510f088acc7","hash":"bcec41ce879b152a384862bd9bb8353c7954ea6e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDOJ-ATF01","maAmendNumber":0,"actionId":470559,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":6,"stt":"NM","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-06-20T00:00:00.000Z","dateRequired":"2024-06-21T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-07-04T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-07-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Lifesaving","assistanceRequested":"Activate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\n\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"56228674-26d7-4204-b4fb-8eb855af3650","hash":"d1ad1f779ac52f76afbfb851f7a96d6b69d490c2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDOI-USGS03","maAmendNumber":2,"actionId":476275,"maType":"DFA","supportFunction":5,"priority":"Normal","region":6,"stt":"NM","agencyId":"DOI-USGS","agency":"DOI-USGS (GEOLOGICAL SURVEY)","authority":"Stafford Act","dateReceived":"2024-08-22T00:00:00.000Z","dateRequired":"2024-08-24T00:00:00.000Z","popStartDate":"2024-06-25T00:00:00.000Z","popEndDate":"2024-10-24T00:00:00.000Z","dateObligated":"2024-08-23T00:00:00.000Z","obligationAmount":50000,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":12500,"fedCostShareAmt":37500,"maPopStartDate":"2024-06-25T00:00:00.000Z","maPopEndDate":"2024-10-24T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":12500,"maFedCostShareAmount":37500,"maPriority":"Normal","assistanceRequested":"Amendment 2: Extend POP end date 60 days to 10/24/2024 and increase funding by $50,000. Change PM to Charles Embry.\r\nAmendment #1 to increase funding by $83k and increase POP to 08/25. And change PM to Chris Walsh. USGS to conduct hydrologic monitoring, support early warning, and documentation of floodwater heights in impacted communities in New Mexico.","statementOfWork":"In support of the State of New Mexico Department of Homeland Security and Emergency Management request, as directed by and in coordination with FEMA, USGS will provide hydrological monitoring to include but not limited to installation of gages, monitoring, data analysis, and other activities necessary to facilitate protection of life and property through warning of further risks and hazards in designated counties.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and\r\nthat costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been\r\nprovided.","id":"2828d57f-65ff-46be-be6c-a5bc12eb6e56","hash":"10ad25f679dd96189c518694f4b0ba7df6877389","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDOI-USGS01","maAmendNumber":0,"actionId":471079,"maType":"FOS","supportFunction":5,"priority":"Life Sustaining","region":6,"stt":"NM","agencyId":"DOI-USGS","agency":"DOI-USGS (GEOLOGICAL SURVEY)","authority":"Stafford Act","dateReceived":"2024-06-25T00:00:00.000Z","dateRequired":"2024-06-25T00:00:00.000Z","popStartDate":"2024-06-25T00:00:00.000Z","popEndDate":"2024-07-25T00:00:00.000Z","dateObligated":"2024-06-26T00:00:00.000Z","obligationAmount":69623,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":69623,"maPopStartDate":"2024-06-25T00:00:00.000Z","maPopEndDate":"2024-07-25T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":69623,"maPriority":"Life Sustaining","assistanceRequested":"USGS Water Science Center in support of the NWS will provide support to the Emergency Alert, warning, and notification systems.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Geological Survey (USGS) Water Science Center will provide support for, \r\nbut not limited to Emergency Alert, notification, and warning systems in direct support of the National Weather Service \r\nand other federal disaster operations for DR4795-NM, as defined in USGS&#39;s mission essential functions.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and\r\nduration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required\r\nfor reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary\r\nto ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are\r\nreceived, services are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f762d9a5-a268-48cb-85ad-258aad3aa0fc","hash":"77bdd2dbf72675a8b8ec02fcd0cfea87b9b2d833","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDHS-TSA01","maAmendNumber":0,"actionId":471114,"maType":"FOS","supportFunction":0,"priority":"High","region":6,"stt":"NM","agencyId":"DHS-TSA","agency":"DHS-TSA (AVIATION SECURITY)","authority":"Stafford Act","dateReceived":"2024-06-26T00:00:00.000Z","dateRequired":"2024-06-26T00:00:00.000Z","popStartDate":"2024-06-26T00:00:00.000Z","popEndDate":"2024-07-13T00:00:00.000Z","dateObligated":"2024-06-26T00:00:00.000Z","obligationAmount":1000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1000,"maPopStartDate":"2024-06-26T00:00:00.000Z","maPopEndDate":"2024-07-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1000,"maPriority":"High","assistanceRequested":"Provide Counter UAS detection equipment","statementOfWork":"As directed by and in coordination with FEMA, the Transportation Security Administration Federal Air Marshals will provide Counter Unmanned Aerial Systems (cUAS) detection equipment to support disaster operations.","id":"11933fda-d3d0-423a-aba2-41df1dcbe062","hash":"132cbf80dc0788b6388d96d4b067adb01822880d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDHS-CISA02","maAmendNumber":1,"actionId":471507,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"NM","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-06-27T00:00:00.000Z","popStartDate":"2024-06-22T00:00:00.000Z","popEndDate":"2024-06-26T00:00:00.000Z","dateObligated":"2024-06-28T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-22T00:00:00.000Z","maPopEndDate":"2024-06-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1 to adjust POP to align with operational period. MA was operationally closed 06/26/24. And change PM to Tom Erickson.\r\nThis request replaces SU RRF#3832-903325 /NM-24061901-DHS-CISA-01\r\nActivate CISA ESF-2 to RRCC, IOF, JFO, and other facilities as requested.  Mission assignment, in person to report to R6 New Mexico IOF/SEOC to stand up the ESF #2 CCG interagency and privet sector for communication restoration.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"688fd596-e8fe-4320-a970-02c9471a674b","hash":"060a21cb332947d13e2f4fa233d63f4d9dc8b22f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDHS-CISA02","maAmendNumber":0,"actionId":470773,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"NM","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-06-22T00:00:00.000Z","dateRequired":"2024-06-21T00:00:00.000Z","popStartDate":"2024-06-22T00:00:00.000Z","popEndDate":"2024-07-30T00:00:00.000Z","dateObligated":"2024-06-22T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2024-06-22T00:00:00.000Z","maPopEndDate":"2024-06-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"This request replaces SU RRF#3832-903325 /NM-24061901-DHS-CISA-01\r\nActivate CISA ESF-2 to RRCC, IOF, JFO, and other facilities as requested.  Mission assignment, in person to report to R6 New Mexico IOF/SEOC to stand up the ESF #2 CCG interagency and privet sector for communication restoration.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"24716d9a-ee9d-4b05-9320-0acc87a86ca5","hash":"1a79157a598a46e867c67453a04ae2dc913bf8fb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDHS-CISA01","maAmendNumber":1,"actionId":471548,"maType":"FOS","supportFunction":14,"priority":"High","region":6,"stt":"NM","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-06-28T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-06-25T00:00:00.000Z","dateObligated":"2024-06-28T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-06-25T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1:  Adjust POP to 25 Jun 2024 to align with end of operational period.\r\nThis MA replaces SU MA 24061901-DHS-02-01\r\nActivate CISA-14 LNOs to RRCC and virtually, IOF, JFO, and other facilities as needed.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"56b41911-a171-4a5f-b9cc-f6b6935d9b66","hash":"a5bbfd57e3bfc411a1bd89e6adacaa85f88af6d7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMDHS-CISA01","maAmendNumber":0,"actionId":470577,"maType":"FOS","supportFunction":14,"priority":"High","region":6,"stt":"NM","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-06-21T00:00:00.000Z","dateRequired":"2024-06-20T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-07-02T00:00:00.000Z","dateObligated":"2024-06-22T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-06-25T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"This MA replaces SU MA 24061901-DHS-02-01\r\nActivate CISA-14 LNOs to RRCC and virtually, IOF, JFO, and other facilities as needed.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"e770d107-e5e6-4351-9160-feef94b89e2b","hash":"53eb0ff96ac55cd50c67ebedd943ee4aa66d3e89","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMCOE-SPD03","maAmendNumber":2,"actionId":471713,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"NM","agencyId":"COE-SPD","agency":"COE SOUTH PACIFIC DIVISION","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-06-28T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-06-29T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-06-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #2: Align POP with Operational Period. MA was operationally closed 06/29/24. And change PM to Tom Erickson.\r\nAmend #1: Extend POP to 4 July 2024 and increase funds by $90,300.\r\nRequesting USACE provide Infrastructure Assessment PRT to IOF for planning, preparedness, and federally requested assessments.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Army Corps of Engineers (USACE) will preposition elements of the Infrastructure Assessment (IA) Planning &amp; Response Team (PRT) management cell to conduct initial planning, preparedness, and field assessments in support of federal disaster operations.\r\nSupport may include the following:\r\nDetermining the need for supporting local public works with rapid evaluation safety assessments, heavy structural inspections (e.g., to help ensure viability of structures that may be used for mass care, emergency housing, etc.), and Nonstructural assessments (e.g. electrical, mechanical, geotechnical, water/wastewater infrastructure, etc.), and evaluating/assessing damaged public facilities, hospitals, and other structures. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"bacba223-e0ad-426b-9051-7c7488824c6f","hash":"bf6c421d24d284062d9313ecfe88b6c3ec96e8d5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMCOE-SPD03","maAmendNumber":1,"actionId":470954,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"NM","agencyId":"COE-SPD","agency":"COE SOUTH PACIFIC DIVISION","authority":"Stafford Act","dateReceived":"2024-06-25T00:00:00.000Z","dateRequired":"2024-06-25T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-07-04T00:00:00.000Z","dateObligated":"2024-06-26T00:00:00.000Z","obligationAmount":90300,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":90300,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-06-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":90300,"maPriority":"High","assistanceRequested":"Amend #1: Extend POP to 4 July 2024 and increase funds by $90,300.\r\n\r\nRequesting USACE provide Infrastructure Assessment PRT to IOF for planning, preparedness, and federally requested assessments.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Army Corps of Engineers (USACE) will preposition elements of the Infrastructure Assessment (IA) Planning &amp; Response Team (PRT) management cell to conduct initial planning, preparedness, and field assessments in support of federal disaster operations.\r\nSupport may include the following:\r\nDetermining the need for supporting local public works with rapid evaluation safety assessments, heavy structural inspections (e.g., to help ensure viability of structures that may be used for mass care, emergency housing, etc.), and Nonstructural assessments (e.g. electrical, mechanical, geotechnical, water/wastewater infrastructure, etc.), and evaluating/assessing damaged public facilities, hospitals, and other structures. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"a6bb3c0a-3385-4897-93f9-94fe58adfde8","hash":"cee531bec554c50ae69d15cd9f1eb9e4eee74813","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMCOE-SPD03","maAmendNumber":0,"actionId":470714,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"NM","agencyId":"COE-SPD","agency":"COE SOUTH PACIFIC DIVISION","authority":"Stafford Act","dateReceived":"2024-06-21T00:00:00.000Z","dateRequired":"2024-06-21T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-06-27T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":31500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":31500,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-06-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":31500,"maPriority":"High","assistanceRequested":"Requesting USACE provide Infrastructure Assessment PRT to IOF for planning, preparedness, and federally requested assessments.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Army Corps of Engineers (USACE) will preposition elements of the Infrastructure Assessment (IA) Planning &amp; Response Team (PRT) management cell to conduct initial planning, preparedness, and field assessments in support of federal disaster operations.\r\n\r\nSupport may include the following:\r\nDetermining the need for supporting local public works with rapid evaluation safety assessments, heavy structural inspections (e.g., to help ensure viability of structures that may be used for mass care, emergency housing, etc.), and Nonstructural assessments (e.g. electrical, mechanical, geotechnical, water/wastewater infrastructure, etc.), and evaluating/assessing damaged public facilities, hospitals, and other structures. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"0864de41-1bad-4816-b912-1b801e4513b7","hash":"8a58dc57477b2a7f218d8c0fcb1b7f682a4796a9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMCOE-SPD02","maAmendNumber":2,"actionId":471711,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"NM","agencyId":"COE-SPD","agency":"COE SOUTH PACIFIC DIVISION","authority":"Stafford Act","dateReceived":"2024-06-28T00:00:00.000Z","dateRequired":"2024-06-28T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-06-29T00:00:00.000Z","dateObligated":"2024-06-29T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-06-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #2: Amend to align POP with operational period. MA was operationally closed 06/29/24. And change PM to Tom Erickson.\r\nAmend #1: Amend to increase funding by $1,567,650.00 and extend POP end date to 4 July 2024.\r\nUSACE pre-position temporary emergency power resources to the affected area.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary emergency power assets associated with a Type III package to aid in accomplishing priority missions in support of disaster operations\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"84dd73f3-53c7-4926-b252-02f2eac34793","hash":"2621d39bee1cb31a9fda3c4ef65326b8d9497a1f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMCOE-SPD02","maAmendNumber":1,"actionId":471003,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"NM","agencyId":"COE-SPD","agency":"COE SOUTH PACIFIC DIVISION","authority":"Stafford Act","dateReceived":"2024-06-25T00:00:00.000Z","dateRequired":"2024-06-25T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-07-04T00:00:00.000Z","dateObligated":"2024-06-26T00:00:00.000Z","obligationAmount":1567650,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1567650,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-06-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1567650,"maPriority":"High","assistanceRequested":"Amend #1: Amend to increase funding by $1,567,650.00 and extend POP end date to 4 July 2024.\r\nUSACE pre-position temporary emergency power resources to the affected area.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary emergency power assets associated with a Type III package to aid in accomplishing priority missions in support of disaster operations\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2eaef99e-93f0-43a1-9d43-2cf18b67af74","hash":"1e0736e5a7cf46f3dd1531d656b722fdd7de6046","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024061901","incidentName":"R6 NM June Wildfires","incidentType":"Fire","disasterNumber":4795,"declarationType":"DR","declarationTitle":"SOUTH FORK FIRE, SALT FIRE, AND FLOODING","maId":"4795DRNMCOE-SPD02","maAmendNumber":0,"actionId":470706,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"NM","agencyId":"COE-SPD","agency":"COE SOUTH PACIFIC DIVISION","authority":"Stafford Act","dateReceived":"2024-06-21T00:00:00.000Z","dateRequired":"2024-06-22T00:00:00.000Z","popStartDate":"2024-06-20T00:00:00.000Z","popEndDate":"2024-06-27T00:00:00.000Z","dateObligated":"2024-06-21T00:00:00.000Z","obligationAmount":2663900,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2663900,"maPopStartDate":"2024-06-20T00:00:00.000Z","maPopEndDate":"2024-06-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2663900,"maPriority":"High","assistanceRequested":"USACE pre-position temporary emergency power resources to the affected area.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary emergency power assets associated with a Type III package to aid in accomplishing priority missions in support of disaster operations\r\n\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\n\r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b7ba3b18-b4e2-4ccc-a6ea-86dfce48b626","hash":"20d45d9e6c0a54096bc3bc6ee06c0b9dcd851b70","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024053001","incidentName":"R7 Missouri Severe Storms (5/19-5/27)","incidentType":"Severe Storm","disasterNumber":4803,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4803DRMOGSA01","maAmendNumber":0,"actionId":473551,"maType":"FOS","supportFunction":7,"priority":"High","region":7,"stt":"MO","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-07-24T00:00:00.000Z","dateRequired":"2024-07-24T00:00:00.000Z","popStartDate":"2024-07-24T00:00:00.000Z","popEndDate":"2024-09-30T00:00:00.000Z","dateObligated":"2024-07-24T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-07-24T00:00:00.000Z","maPopEndDate":"2024-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations in the State of Missouri.  Focus points will be proved in the follow-on MATOs.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\n\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ba60f11b-bd2c-427d-bb1c-9798db408c57","hash":"3415315fa992594f190b592d5f1c28ce165cb9f5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052701","incidentName":"R4 Severe Storms 05/26-27/2024","incidentType":"Severe Storm","disasterNumber":4804,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, LANDSLIDES, AND MUDSLIDES","maId":"4804DRKYGSA01","maAmendNumber":1,"actionId":473956,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"KY","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-07-29T00:00:00.000Z","dateRequired":"2024-07-29T00:00:00.000Z","popStartDate":"2024-07-26T00:00:00.000Z","popEndDate":"2025-07-26T00:00:00.000Z","dateObligated":"2024-07-29T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-07-26T00:00:00.000Z","maPopEndDate":"2025-07-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Amendment #: Add additional funding of $10,000.00 and extend the POP date to 7/26/2025.\r\nActivate GSA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"ee660ee1-36ee-4c79-8437-a6f85a49a4ec","hash":"b6952ad3f27d1a0e3b278f4005e5989ff8080e17","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052701","incidentName":"R4 Severe Storms 05/26-27/2024","incidentType":"Severe Storm","disasterNumber":4804,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, LANDSLIDES, AND MUDSLIDES","maId":"4804DRKYGSA01","maAmendNumber":0,"actionId":473779,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"KY","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-07-26T00:00:00.000Z","dateRequired":"2024-07-29T00:00:00.000Z","popStartDate":"2024-07-26T00:00:00.000Z","popEndDate":"2025-01-26T00:00:00.000Z","dateObligated":"2024-07-27T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-26T00:00:00.000Z","maPopEndDate":"2025-07-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"c9e10972-f253-4876-aa9d-ab005798fbb4","hash":"de563a44fef3aee5ec4c59b0768fe04fdad0b42a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052402","incidentName":"R6 Severe Storms and Tornadoes May 2024","incidentType":"Severe Storm","disasterNumber":4791,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4791DROKGSA01","maAmendNumber":0,"actionId":470109,"maType":"FOS","supportFunction":7,"priority":"Normal","region":6,"stt":"OK","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-06-17T00:00:00.000Z","dateRequired":"2024-06-15T00:00:00.000Z","popStartDate":"2024-06-15T00:00:00.000Z","popEndDate":"2024-08-15T00:00:00.000Z","dateObligated":"2024-06-18T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-06-15T00:00:00.000Z","maPopEndDate":"2024-08-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Normal","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"f006de72-e820-4758-b8d1-09da09f46432","hash":"fa3b6efffca934660367d1a1957e8bb526199c90","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052402","incidentName":"R6 Severe Storms and Tornadoes May 2024","incidentType":"Severe Storm","disasterNumber":4788,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4788DRARDHS-FPS01","maAmendNumber":1,"actionId":475948,"maType":"FOS","supportFunction":13,"priority":"Normal","region":6,"stt":"AR","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-08-19T00:00:00.000Z","dateRequired":"2024-08-31T00:00:00.000Z","popStartDate":"2024-06-11T00:00:00.000Z","popEndDate":"2024-07-01T00:00:00.000Z","dateObligated":"2024-08-19T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-11T00:00:00.000Z","maPopEndDate":"2024-07-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1: Change POP end date to 7/1/24 to align with the operational completion of the mission. Change PM to James Rhodes\r\nContract security officers to support the FEMA Security Manager (SM)","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards, policies, and practices.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8fa7d4d6-6ca0-4da3-8a4b-06e1f4774b72","hash":"8a0b036cc39a0633fd2737ff6436eaf8f5bb86fd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052402","incidentName":"R6 Severe Storms and Tornadoes May 2024","incidentType":"Severe Storm","disasterNumber":4788,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4788DRARDHS-FPS01","maAmendNumber":0,"actionId":469633,"maType":"FOS","supportFunction":13,"priority":"Normal","region":6,"stt":"AR","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-06-11T00:00:00.000Z","dateRequired":"2024-06-13T00:00:00.000Z","popStartDate":"2024-06-11T00:00:00.000Z","popEndDate":"2024-08-16T00:00:00.000Z","dateObligated":"2024-06-12T00:00:00.000Z","obligationAmount":180000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":180000,"maPopStartDate":"2024-06-11T00:00:00.000Z","maPopEndDate":"2024-07-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":180000,"maPriority":"Normal","assistanceRequested":"Contract security officers to support the FEMA Security Manager (SM)","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards, policies, and practices.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"75a463c0-029c-4465-8ed5-b1db37688399","hash":"251b17fca4175cfcd32614e2e50c437529ba4842","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052402","incidentName":"R6 Severe Storms and Tornadoes May 2024","incidentType":"Severe Storm","disasterNumber":4788,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4788DRARCOE-SWD01","maAmendNumber":2,"actionId":474894,"maType":"FOS","supportFunction":3,"priority":"Normal","region":6,"stt":"AR","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-07T00:00:00.000Z","popStartDate":"2024-06-01T00:00:00.000Z","popEndDate":"2024-06-30T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-06-01T00:00:00.000Z","maPopEndDate":"2024-06-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amend #2: Amend to change the POP to end 6/30/2024 to align with the operational completion of the mission. \r\nAmend #1: Amend to extend end date to 7/30/2024 and add funds in the amount of $108,000. Change PM to Anthony In. \r\nActivate USACE to the RRCC, IOF, JFO, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2bf466aa-70c3-4c3f-8c04-ed04aad9c674","hash":"8d5b9b5ad740bc07c677e585b76c2303a27a66d8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052402","incidentName":"R6 Severe Storms and Tornadoes May 2024","incidentType":"Severe Storm","disasterNumber":4788,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4788DRARCOE-SWD01","maAmendNumber":1,"actionId":469270,"maType":"FOS","supportFunction":3,"priority":"Normal","region":6,"stt":"AR","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-06-08T00:00:00.000Z","dateRequired":"2024-06-07T00:00:00.000Z","popStartDate":"2024-06-01T00:00:00.000Z","popEndDate":"2024-07-30T00:00:00.000Z","dateObligated":"2024-06-08T00:00:00.000Z","obligationAmount":108000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":108000,"maPopStartDate":"2024-06-01T00:00:00.000Z","maPopEndDate":"2024-06-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":108000,"maPriority":"Normal","assistanceRequested":"Amend #1: Amend to extend end date to 7/30/2024 and add funds in the amount of $108,000. Change PM to Anthony In. \r\nActivate USACE to the RRCC, IOF, JFO, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"92455f9d-01a1-4d7a-9d77-d128015abb1b","hash":"c00968194795c178b64438a606309a2990641389","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052402","incidentName":"R6 Severe Storms and Tornadoes May 2024","incidentType":"Severe Storm","disasterNumber":4788,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4788DRARCOE-SWD01","maAmendNumber":0,"actionId":468528,"maType":"FOS","supportFunction":3,"priority":"Normal","region":6,"stt":"AR","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-05-31T00:00:00.000Z","dateRequired":"2024-06-01T00:00:00.000Z","popStartDate":"2024-06-01T00:00:00.000Z","popEndDate":"2024-06-30T00:00:00.000Z","dateObligated":"2024-06-01T00:00:00.000Z","obligationAmount":108000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":108000,"maPopStartDate":"2024-06-01T00:00:00.000Z","maPopEndDate":"2024-06-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":108000,"maPriority":"Normal","assistanceRequested":"Activate USACE to the RRCC, IOF, JFO, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"56f508ce-0c25-4cb8-9e06-43d6e64dd07d","hash":"8b54c40d8797adaaf670bb957363c1a4603b1687","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052102","incidentName":"Iowa Severe Storms May 21, 2024","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"IA24052102DOD-USAF02","maAmendNumber":1,"actionId":472545,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":7,"stt":"IA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":null,"popStartDate":"2024-05-22T00:00:00.000Z","popEndDate":"2024-05-27T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15000,"maPopStartDate":"2024-05-22T00:00:00.000Z","maPopEndDate":"2024-05-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment  #1 - De-obligate ($15,000) and close MA.  This surge MA will be transferred to 4784DR-IA. \r\nSAF Auxiliary, Civil Air Patrol (CAP) aerial imaging in support of Region 7 Severe Storms in IOWA, \r\n22 MAY 2024","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"6ae557c9-0771-4ef7-8126-babba3ff15e3","hash":"032694be037c327ad7bfe29072b25d8e74fcd693","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052102","incidentName":"Iowa Severe Storms May 21, 2024","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"IA24052102DOD-USAF02","maAmendNumber":0,"actionId":467569,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":7,"stt":"IA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-05-22T00:00:00.000Z","dateRequired":null,"popStartDate":"2024-05-22T00:00:00.000Z","popEndDate":"2024-05-27T00:00:00.000Z","dateObligated":"2024-05-22T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-05-22T00:00:00.000Z","maPopEndDate":"2024-05-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Life Sustaining","assistanceRequested":"SAF Auxiliary, Civil Air Patrol (CAP) aerial imaging in support of Region 7 Severe Storms in IOWA, \r\n22 MAY 2024","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"97ea9545-9d4e-420a-b5c0-bb2b4140e465","hash":"c520e52cb32a80cddf3efc19db35aaa4ef024cfa","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052102","incidentName":"Iowa Severe Storms May 21, 2024","incidentType":"Severe Storm","disasterNumber":4784,"declarationType":"DR","declarationTitle":"SEVERE STORMS, TORNADOES, AND FLOODING","maId":"4784DRIAUSDA-FS02","maAmendNumber":1,"actionId":473580,"maType":"DFA","supportFunction":4,"priority":"Normal","region":7,"stt":"IA","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-07-24T00:00:00.000Z","dateRequired":"2024-07-24T00:00:00.000Z","popStartDate":"2024-05-27T00:00:00.000Z","popEndDate":"2024-06-28T00:00:00.000Z","dateObligated":"2024-07-26T00:00:00.000Z","obligationAmount":-750000,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":-187500,"fedCostShareAmt":-562500,"maPopStartDate":"2024-05-27T00:00:00.000Z","maPopEndDate":"2024-06-28T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":-187500,"maFedCostShareAmount":-562500,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate ($750,000) mission was not used and closed; change Project Manager (PM) to Wendy Newsom\r\nUSFS command and control support for all-hazards response and recovery operations","statementOfWork":"In support of State of Iowa request, as directed by and in coordination with FEMA, US Forest Service (USFS) will provide command, control, and coordination resources, to include All-Hazards Incident Management command and general staff members or personnel with other specialized qualifications, to assist with emergency operations in support of response and recovery operations.\r\nUSFS will utilize other Federal agency and State/local resources under existing agreement, as appropriate.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n9. A final inspection report will be completed upon termination of all direct Federal assistance work. Final inspection reports shall be signed by a representative of the performing Federal agency and the STT pursuant to 44 CFR.","id":"1bda740d-f29d-47a5-a2fe-a7812296fccf","hash":"4d31cee2d5a88acf80d20bb1edbd1dfdabab88e0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052102","incidentName":"Iowa Severe Storms May 21, 2024","incidentType":"Severe Storm","disasterNumber":4784,"declarationType":"DR","declarationTitle":"SEVERE STORMS, TORNADOES, AND FLOODING","maId":"4784DRIAUSDA-FS02","maAmendNumber":0,"actionId":467942,"maType":"DFA","supportFunction":4,"priority":"High","region":7,"stt":"IA","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-05-25T00:00:00.000Z","dateRequired":"2024-05-27T00:00:00.000Z","popStartDate":"2024-05-27T00:00:00.000Z","popEndDate":"2024-06-28T00:00:00.000Z","dateObligated":"2024-05-26T00:00:00.000Z","obligationAmount":750000,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":187500,"fedCostShareAmt":562500,"maPopStartDate":"2024-05-27T00:00:00.000Z","maPopEndDate":"2024-06-28T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":187500,"maFedCostShareAmount":562500,"maPriority":"Normal","assistanceRequested":"USFS command and control support for all-hazards response and recovery operations","statementOfWork":"In support of State of Iowa request, as directed by and in coordination with FEMA, US Forest Service (USFS) will provide command, control, and coordination resources, to include All-Hazards Incident Management command and general staff members or personnel with other specialized qualifications, to assist with emergency operations in support of response and recovery operations.\r\nUSFS will utilize other Federal agency and State/local resources under existing agreement, as appropriate.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n9. A final inspection report will be completed upon termination of all direct Federal assistance work. Final inspection reports shall be signed by a representative of the performing Federal agency and the STT pursuant to 44 CFR.","id":"40d64e78-136f-427e-a485-ed52303017be","hash":"949b3626a2cca521f037480b71338d513e600ab9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052102","incidentName":"Iowa Severe Storms May 21, 2024","incidentType":"Severe Storm","disasterNumber":4784,"declarationType":"DR","declarationTitle":"SEVERE STORMS, TORNADOES, AND FLOODING","maId":"4784DRIAUSDA-FS01","maAmendNumber":0,"actionId":467941,"maType":"FOS","supportFunction":4,"priority":"High","region":7,"stt":"IA","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-05-25T00:00:00.000Z","dateRequired":"2024-05-27T00:00:00.000Z","popStartDate":"2024-05-27T00:00:00.000Z","popEndDate":"2024-06-28T00:00:00.000Z","dateObligated":"2024-05-26T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2024-05-27T00:00:00.000Z","maPopEndDate":"2024-06-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Activate USFS to the RRCC, IOF JFO or other facilities","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"09b05fea-36b3-48d1-8207-8da46121d043","hash":"d9bfeedbcfc44d8b6ab71e5930ea78779f92fc57","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052102","incidentName":"Iowa Severe Storms May 21, 2024","incidentType":"Severe Storm","disasterNumber":4784,"declarationType":"DR","declarationTitle":"SEVERE STORMS, TORNADOES, AND FLOODING","maId":"4784DRIATVA01","maAmendNumber":0,"actionId":473377,"maType":"FOS","supportFunction":3,"priority":"Normal","region":7,"stt":"IA","agencyId":"TVA","agency":"TENESSE VALLEY AUTHORITY","authority":"Stafford Act","dateReceived":"2024-07-24T00:00:00.000Z","dateRequired":"2024-07-29T00:00:00.000Z","popStartDate":"2024-07-29T00:00:00.000Z","popEndDate":"2024-10-26T00:00:00.000Z","dateObligated":"2024-07-24T00:00:00.000Z","obligationAmount":66000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":66000,"maPopStartDate":"2024-07-29T00:00:00.000Z","maPopEndDate":"2024-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":66000,"maPriority":"Normal","assistanceRequested":"Activate TVA to requested locations in the state of Iowa.","statementOfWork":"As directed by and in coordination with FEMA, Tennessee Valley Authority (TVA) will provide appropriate personnel to support FEMA disaster operations in the State of Iowa.\r\nExpertise required may include, but is not limited to, the following:\r\n- Responsibilities associated with the Program Delivery Manager (PDMG) and Site Inspector, Program Delivery Task Force Leader (PDTFL), Site Inspector Task Force Leader (SITFL), or Site inspector Crew Leader (SICL) positions\r\n- Debris operations\r\n- Waste water facilities operations\r\n- Road, Bridge, or Structural Analysis\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"c4c40781-0b0b-4c19-8ad5-0c9b2c23c232","hash":"7acc921e36f214ad990b99ee7e0044d92b1a87ad","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052102","incidentName":"Iowa Severe Storms May 21, 2024","incidentType":"Severe Storm","disasterNumber":4784,"declarationType":"DR","declarationTitle":"SEVERE STORMS, TORNADOES, AND FLOODING","maId":"4784DRIADOD-USAF02","maAmendNumber":0,"actionId":472898,"maType":"FOS","supportFunction":5,"priority":"Normal","region":7,"stt":"IA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-15T00:00:00.000Z","dateRequired":"2024-05-24T00:00:00.000Z","popStartDate":"2024-05-24T00:00:00.000Z","popEndDate":"2024-05-31T00:00:00.000Z","dateObligated":"2024-07-16T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-05-24T00:00:00.000Z","maPopEndDate":"2024-05-31T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Normal","assistanceRequested":"This is a re-issuance of MA#1509-467569-7220SU-IA-24052102-DoD-USAF-01-$15,000.00","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"2adc2ac2-d4cb-4dc8-99e3-b72f9b084687","hash":"a30f6f743367fed83d809869c42fbcac7d855fb1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024052102","incidentName":"Iowa Severe Storms May 21, 2024","incidentType":"Severe Storm","disasterNumber":4784,"declarationType":"DR","declarationTitle":"SEVERE STORMS, TORNADOES, AND FLOODING","maId":"4784DRIADOD-USAF01","maAmendNumber":0,"actionId":472894,"maType":"FOS","supportFunction":5,"priority":"Normal","region":7,"stt":"IA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-15T00:00:00.000Z","dateRequired":"2024-05-24T00:00:00.000Z","popStartDate":"2024-05-24T00:00:00.000Z","popEndDate":"2024-05-31T00:00:00.000Z","dateObligated":"2024-07-16T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-05-24T00:00:00.000Z","maPopEndDate":"2024-05-31T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"This is a re-issuance of MA#1509-467559-7220SU-IA-24052102-DoD-USAF-01-$5,000.00.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide Small Unmanned Aircraft Systems (sUAS) assets and ground personnel in support of FEMA disaster operations.\r\nUSAF real-time, dynamic, and sustained aerial imaging will be VIEWABLE ONLY AT THE MISSION SITE. Such imaging may include, but is not limited to, the following:\r\n- Full-motion video\r\n- Still photography\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"1c652884-6c23-4214-9484-997dc8dc3072","hash":"524237f9c23c251c6ee49b976bdc4e0329e59b38","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024051201","incidentName":"Severe Weather and Tornadoes","incidentType":"Severe Storm","disasterNumber":4794,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4794DRFLCOE-SAD01","maAmendNumber":0,"actionId":471399,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-06-27T00:00:00.000Z","dateRequired":"2024-07-01T00:00:00.000Z","popStartDate":"2024-06-28T00:00:00.000Z","popEndDate":"2024-09-29T00:00:00.000Z","dateObligated":"2024-06-28T00:00:00.000Z","obligationAmount":382500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":382500,"maPopStartDate":"2024-06-28T00:00:00.000Z","maPopEndDate":"2024-09-29T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":382500,"maPriority":"High","assistanceRequested":"USACE specialized expertise for oversight of debris operations in support of disaster operations. Initial request is for 2 personnel","statementOfWork":"As directed by and in coordination with FEMA, USACE will provide specialized expertise for oversight of debris operations\r\nin support of disaster operations. Support may include the following: providing information on technical requirements\r\nfor debris operations, increasing the efficiency of such operations, efficient monitoring techniques, documentation\r\nrequirements, etc. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory\r\nauthority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The missionassigned\r\nagency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 1040103.\r\nFor MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement\r\n(ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"8949f9d5-4dfe-488a-8240-0baf7419dd69","hash":"d892dc612a65e06983c5c5e1c590574447ff7cd6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024050602","incidentName":"R6 Oklahoma Severe Storms May 2024","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"OK24050602DOD-USAF01","maAmendNumber":0,"actionId":465965,"maType":"FOS","supportFunction":5,"priority":"Normal","region":6,"stt":"OK","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-05-06T00:00:00.000Z","dateRequired":"2024-05-07T00:00:00.000Z","popStartDate":"2024-05-06T00:00:00.000Z","popEndDate":"2024-05-20T00:00:00.000Z","dateObligated":"2024-05-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-05-06T00:00:00.000Z","maPopEndDate":"2024-05-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"WALDO Aerial Imagery coordination for Oklahoma potential damage assessments. \r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"610e15bf-2b4c-439d-bcc4-0f86ebb2a652","hash":"91e88ecd5c77f47ab61d7417a6a495874337fcd1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042902","incidentName":"R7 Iowa Severe Storm","incidentType":"Tornado","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"IA24042902DOD-USAF01","maAmendNumber":1,"actionId":472488,"maType":"FOS","supportFunction":5,"priority":"Normal","region":7,"stt":"IA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-10T00:00:00.000Z","popStartDate":"2024-04-28T00:00:00.000Z","popEndDate":"2024-05-05T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15000,"maPopStartDate":"2024-04-28T00:00:00.000Z","maPopEndDate":"2024-05-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15000,"maPriority":"Normal","assistanceRequested":"Amendment#1 - De-obligate ($15,000) and close MA.  This surge MA will be transferred to 4779DR-IA; change Project Manager to Cody Mckown.  \r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial imaging in support of Region 7 Severe Storms in IOWA, 26 APR 2024","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected imagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or delivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"15bbdb1f-9a77-434a-bb2d-3eae36206b11","hash":"d35662de7928d6b3e486a5c2c1977d4c99210461","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042902","incidentName":"R7 Iowa Severe Storm","incidentType":"Tornado","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"IA24042902DOD-USAF01","maAmendNumber":0,"actionId":465227,"maType":"FOS","supportFunction":5,"priority":"High","region":7,"stt":"IA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-28T00:00:00.000Z","popStartDate":"2024-04-28T00:00:00.000Z","popEndDate":"2024-05-05T00:00:00.000Z","dateObligated":"2024-04-29T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-04-28T00:00:00.000Z","maPopEndDate":"2024-05-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Normal","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial imaging in support of Region 7 Severe Storms in IOWA, 26 APR 2024","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected imagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or delivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7477e7c5-5af1-4178-a20b-4408fdd3bac1","hash":"55e61300f6c612dd53a1a9e3f60f6ea81e3e6f2c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042902","incidentName":"R7 Iowa Severe Storm","incidentType":"Tornado","disasterNumber":4779,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4779DRIAGSA01","maAmendNumber":1,"actionId":470174,"maType":"FOS","supportFunction":7,"priority":"Normal","region":7,"stt":"IA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-06-17T00:00:00.000Z","dateRequired":"2024-06-17T00:00:00.000Z","popStartDate":"2024-05-14T00:00:00.000Z","popEndDate":"2024-08-30T00:00:00.000Z","dateObligated":"2024-06-18T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-05-14T00:00:00.000Z","maPopEndDate":"2024-08-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #1 Extend Period of Performance (POP) to 08/30/2024 -no additional funding needed. \r\nActivate ESF7 (GSA) for reality search for a JFO and subordinate offices Des Moines , IA and surrounding locations throughout the state of Iowa. Specific locations will be provided under the MATO (s). DR4779-IA\r\nIn addition, use of GSA in all matters of realty support, to include negotiations.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations in the state of Iowa. Activities may include, but are not limited to, the following: ESF7 support Emergency leasing services for needed space/facilities as requested by FEMA GSA Lease Contracting Officers (LCOs) and others as needed. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. ","id":"9a3fd4ff-8b1b-40ae-a254-2ae2ee7f68ca","hash":"dff3231a461a98271963992496032a0aa42b0f64","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042902","incidentName":"R7 Iowa Severe Storm","incidentType":"Tornado","disasterNumber":4779,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4779DRIAGSA01","maAmendNumber":0,"actionId":466880,"maType":"FOS","supportFunction":7,"priority":"Normal","region":7,"stt":"IA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-05-15T00:00:00.000Z","dateRequired":"2024-05-14T00:00:00.000Z","popStartDate":"2024-05-14T00:00:00.000Z","popEndDate":"2024-06-19T00:00:00.000Z","dateObligated":"2024-05-18T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-05-14T00:00:00.000Z","maPopEndDate":"2024-08-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Activate ESF7 (GSA) for reality search for a JFO and subordinate offices Des Moines , IA and surrounding locations throughout the state of Iowa. Specific locations will be provided under the MATO (s). DR4779-IA\r\nIn addition, use of GSA in all matters of realty support, to include negotiations.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations in the state of Iowa. Activities may include, but are not limited to, the following: ESF7 support Emergency leasing services for needed space/facilities as requested by FEMA GSA Lease Contracting Officers (LCOs) and others as needed. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. ","id":"0f7221d9-a2fb-4a1e-8227-b27ac7c397d7","hash":"064e6af98aee37179adb1afc31a782b5d3cfd6ad","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042902","incidentName":"R7 Iowa Severe Storm","incidentType":"Tornado","disasterNumber":4779,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4779DRIADOD-USAF01","maAmendNumber":0,"actionId":472891,"maType":"FOS","supportFunction":5,"priority":"Normal","region":7,"stt":"IA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-15T00:00:00.000Z","dateRequired":"2024-05-14T00:00:00.000Z","popStartDate":"2024-05-14T00:00:00.000Z","popEndDate":"2024-05-31T00:00:00.000Z","dateObligated":"2024-07-16T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-05-14T00:00:00.000Z","maPopEndDate":"2024-05-31T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Normal","assistanceRequested":"This is a re-issuance of MA-1509-465227-7220SU-IA-24042902-DOD-USAF-01 for $15,000. ","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies date(s), and duration of assignment(s).\r\n","id":"ddd29316-07c5-4a41-bafa-447fc88ef4cc","hash":"f650910d0a2c3b6a6aaae784e35caf3a8a91466a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042902","incidentName":"R7 Iowa Severe Storm","incidentType":"Tornado","disasterNumber":4779,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4779DRIADHS-FPS01","maAmendNumber":2,"actionId":473964,"maType":"FOS","supportFunction":13,"priority":"Normal","region":7,"stt":"IA","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-07-29T00:00:00.000Z","dateRequired":"2024-07-29T00:00:00.000Z","popStartDate":"2024-05-21T00:00:00.000Z","popEndDate":"2024-09-30T00:00:00.000Z","dateObligated":"2024-07-30T00:00:00.000Z","obligationAmount":917928,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":917928,"maPopStartDate":"2024-05-21T00:00:00.000Z","maPopEndDate":"2024-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":917928,"maPriority":"Normal","assistanceRequested":"Amendment#2: Amend MA to add additional funding of $917,928.00 for additional PSOs for FEMA facilities to ensure security (guard services).  Change POP end date to September 30, 2024; change PM to Stanton Hamlin.\r\nAmendment#1: Amend MA to add additional funding of $500,544.00 for additional PSOs for FEMA facilities to ensure security (guard services).  Change PoP end date to October 25, 2024; change PM to Joseph Crowley.\r\nMission Assignment to FPS for Armed Security services to be provided via Task Order in the State of Iowa for disaster DR-4779-IA.","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards, policies, and practices in the state of Iowa. \r\nADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"bdf577b7-57d2-4c15-9662-35540ab41cd5","hash":"82be16f501af4aaf801e67bec33b948c7731d37d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042902","incidentName":"R7 Iowa Severe Storm","incidentType":"Tornado","disasterNumber":4779,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4779DRIADHS-FPS01","maAmendNumber":1,"actionId":472876,"maType":"FOS","supportFunction":13,"priority":"High","region":7,"stt":"IA","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-07-17T00:00:00.000Z","dateRequired":"2024-07-15T00:00:00.000Z","popStartDate":"2024-05-21T00:00:00.000Z","popEndDate":"2024-10-25T00:00:00.000Z","dateObligated":"2024-07-18T00:00:00.000Z","obligationAmount":500544,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":500544,"maPopStartDate":"2024-05-21T00:00:00.000Z","maPopEndDate":"2024-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":500544,"maPriority":"Normal","assistanceRequested":"Amendment#1: Amend MA to add additional funding of $500,544.00 for additional PSOs for FEMA facilities to ensure security (guard services).  Change PoP end date to October 25, 2024; change PM to Joseph Crowley.\r\nMission Assignment to FPS for Armed Security services to be provided via Task Order in the State of Iowa for disaster DR-4779-IA.","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards, policies, and practices in the state of Iowa. \r\nADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"37a97135-43d7-40be-bb18-153856e3cb7c","hash":"89417e5c34d10a686bd0736d5b89beb9ee123fb0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042902","incidentName":"R7 Iowa Severe Storm","incidentType":"Tornado","disasterNumber":4779,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4779DRIADHS-FPS01","maAmendNumber":0,"actionId":467251,"maType":"FOS","supportFunction":13,"priority":"High","region":7,"stt":"IA","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-05-20T00:00:00.000Z","dateRequired":"2024-05-21T00:00:00.000Z","popStartDate":"2024-05-21T00:00:00.000Z","popEndDate":"2024-09-20T00:00:00.000Z","dateObligated":"2024-05-20T00:00:00.000Z","obligationAmount":757152,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":757152,"maPopStartDate":"2024-05-21T00:00:00.000Z","maPopEndDate":"2024-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":757152,"maPriority":"Normal","assistanceRequested":"Mission Assignment to FPS for Armed Security services to be provided via Task Order in the State of Iowa for disaster DR-4779-IA.","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards, policies, and practices in the state of Iowa. \r\nADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"251e8256-9e60-46fc-8ab1-61c12a633e7a","hash":"c94f5ded60fcd5785ce28f5477937816418ebafd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042901","incidentName":"R7 Nebraska Severe Storms","incidentType":"Tornado","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NE24042901DOD-USAF01","maAmendNumber":1,"actionId":472590,"maType":"FOS","supportFunction":5,"priority":"Normal","region":7,"stt":"NE","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-10T00:00:00.000Z","dateRequired":"2024-07-10T00:00:00.000Z","popStartDate":"2024-04-28T00:00:00.000Z","popEndDate":"2024-05-05T00:00:00.000Z","dateObligated":"2024-07-11T00:00:00.000Z","obligationAmount":-15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15000,"maPopStartDate":"2024-04-28T00:00:00.000Z","maPopEndDate":"2024-05-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15000,"maPriority":"Normal","assistanceRequested":"Amendment  #1 - De-obligate ($15,000) and close MA.  This surge MA will be transferred to 4778DR-NE; change Project Manager to Cody McKown.\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial imaging in support of Region 7 Severe Storms in NEBRASKA, 26 APR 2024","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected imagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or delivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a8f06887-399e-4fbc-bcc7-b8c9a13eae0f","hash":"d085b9bb0e5b803bb5a7ca46c150588e62aa5d01","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042901","incidentName":"R7 Nebraska Severe Storms","incidentType":"Tornado","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NE24042901DOD-USAF01","maAmendNumber":0,"actionId":465226,"maType":"FOS","supportFunction":5,"priority":"High","region":7,"stt":"NE","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-28T00:00:00.000Z","popStartDate":"2024-04-28T00:00:00.000Z","popEndDate":"2024-05-05T00:00:00.000Z","dateObligated":"2024-04-29T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-04-28T00:00:00.000Z","maPopEndDate":"2024-05-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Normal","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial imaging in support of Region 7 Severe Storms in NEBRASKA, 26 APR 2024","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected imagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or delivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4a29cbfd-fc85-4751-8be3-84cf8a4d30b5","hash":"9c2989f70e0dcc19e966780bf90d040bef99da87","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042901","incidentName":"R7 Nebraska Severe Storms","incidentType":"Tornado","disasterNumber":4778,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4778DRNEGSA01","maAmendNumber":0,"actionId":465876,"maType":"FOS","supportFunction":7,"priority":"Normal","region":7,"stt":"NE","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-05-05T00:00:00.000Z","dateRequired":"2024-05-06T00:00:00.000Z","popStartDate":"2024-05-06T00:00:00.000Z","popEndDate":"2024-06-06T00:00:00.000Z","dateObligated":"2024-05-06T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-05-06T00:00:00.000Z","maPopEndDate":"2024-06-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Activate ESF-7 (GSA) for reality search for a JFO and subordinate offices Lincoln Nebraska and surrounding locations throughout the state of Nebraska.  Specific locations will be provided under the MATO (s). \r\n In addition, use of GSA in all matters of realty support, to include negotiations. ","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations in the state of Nebraska.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c34b3d17-2ffc-422d-ac4f-15b36de1e2db","hash":"6573a670d8e9fe07b9d9b756a79ad308bc56628a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042901","incidentName":"R7 Nebraska Severe Storms","incidentType":"Tornado","disasterNumber":4778,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4778DRNEDOD-USAF01","maAmendNumber":0,"actionId":472882,"maType":"FOS","supportFunction":5,"priority":"Normal","region":7,"stt":"NE","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-15T00:00:00.000Z","dateRequired":"2024-07-16T00:00:00.000Z","popStartDate":"2024-05-03T00:00:00.000Z","popEndDate":"2024-05-17T00:00:00.000Z","dateObligated":"2024-07-18T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-05-03T00:00:00.000Z","maPopEndDate":"2024-05-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Normal","assistanceRequested":"This is a re-issuance of MA#1509-465226-7220SU-NE-24042901-DoD-USAF-01-$15,000.00.               ","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected imagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or delivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety:\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.\r\n","id":"d0150f4f-25c8-41b0-9624-cc6cf06a1c73","hash":"cb544490a204dc2317922d27d0e010a18c0062bb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2018072401","incidentName":"CARR FIRE","incidentType":"Fire","disasterNumber":4382,"declarationType":"DR","declarationTitle":"WILDFIRES AND HIGH WINDS","maId":"4382DRCADOT01","maAmendNumber":0,"actionId":265958,"maType":"FOS","supportFunction":1,"priority":"Lifesaving","region":9,"stt":"CA","agencyId":"DOT","agency":"DEPT. OF TRANSPORTATION","authority":"Stafford Act","dateReceived":"2018-08-05T00:00:00.000Z","dateRequired":"2018-08-05T00:00:00.000Z","popStartDate":"2018-08-05T00:00:00.000Z","popEndDate":"2018-08-20T00:00:00.000Z","dateObligated":"2018-08-07T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2018-08-05T00:00:00.000Z","maPopEndDate":"2018-08-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"Lifesaving","assistanceRequested":"Activate ESF #1, DOT to the California Governors Office of Emergency Management, State Operations Center (SOC, JFO, DRC and other locations as needed  in support of response operations to Carr Fire DR4382","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to CAL OES SOC, and others teams and facilities as requested. \r\n\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n\r\n MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement. \r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. may be withheld if no invoicing, ULO Validation, or additional justification has been provided. \r\n The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. \r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations ","id":"164c42c0-060e-47a4-942a-7cb0bc329e26","hash":"e14708e2c47dc9b77c0ff22447b076b254bb5f5a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042901","incidentName":"R7 Nebraska Severe Storms","incidentType":"Tornado","disasterNumber":4778,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, AND TORNADOES","maId":"4778DRNEDHS-FPS01","maAmendNumber":1,"actionId":473270,"maType":"FOS","supportFunction":13,"priority":"Normal","region":7,"stt":"NE","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-07-18T00:00:00.000Z","dateRequired":"2024-07-22T00:00:00.000Z","popStartDate":"2024-05-10T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-07-19T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-05-10T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment#1 - Extend Period of Performance (PoP) to 8/9/2024; no additional funds needed\r\nProvide security officers to the FEMA security manager in support of disaster operations in the state of Nebraska. Assignment will be issued via MATO to FPS for armed security\r\nservices provided to the facilities throughout of the State of Nebraska\r\nCOST ESTIMATE:\r\nJFO 3 guards , 36 hours/day, $66/hr &#61; $2376/day &#61; $71,280/month\r\nDRC&#39;s (2) 2 Guards, 12 hours/day, $66/hr &#61; $1584/day &#61; $47,520/Month\r\n&#43; $10,985 Admin Fee. Total cost through 7/31/24 is $335,705\r\nRequested Resources: Activation FPS","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards, policies, and practices.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"9467e8b1-c591-41b4-9caf-f46a81c9506d","hash":"0a68edd14f5c33383733624e7f99b9a3833563b2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"OK24042701GSA01","maAmendNumber":1,"actionId":465511,"maType":"FOS","supportFunction":7,"priority":"Normal","region":6,"stt":"OK","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-05-01T00:00:00.000Z","dateRequired":"2024-05-01T00:00:00.000Z","popStartDate":"2024-04-30T00:00:00.000Z","popEndDate":"2024-05-06T00:00:00.000Z","dateObligated":"2024-05-01T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2024-04-30T00:00:00.000Z","maPopEndDate":"2024-05-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"Normal","assistanceRequested":"Amend #1: Amend to fully de-obligate and transfer to 4776DR-OK-GSA-01 MA.\r\nActivate GSA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\n\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"374f7479-2f3b-4273-8045-c8d21bdc5055","hash":"e2e3a20424c191ea5d21b8f871ccd7b831c54809","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"OK24042701GSA01","maAmendNumber":0,"actionId":465438,"maType":"FOS","supportFunction":7,"priority":"Normal","region":6,"stt":"OK","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-04-30T00:00:00.000Z","dateRequired":"2024-04-30T00:00:00.000Z","popStartDate":"2024-04-30T00:00:00.000Z","popEndDate":"2024-05-06T00:00:00.000Z","dateObligated":"2024-04-30T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2024-04-30T00:00:00.000Z","maPopEndDate":"2024-05-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"Normal","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\n\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9ab9ed4f-d972-4996-9608-a3dceff7fb08","hash":"9dd716dc527c1f29ac0821455df4c7c67f1b1028","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"OK24042701DOD-USAF01","maAmendNumber":1,"actionId":465819,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"OK","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-05-03T00:00:00.000Z","dateRequired":"2024-05-03T00:00:00.000Z","popStartDate":"2024-04-28T00:00:00.000Z","popEndDate":"2024-05-06T00:00:00.000Z","dateObligated":"2024-05-03T00:00:00.000Z","obligationAmount":-38967,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-38967,"maPopStartDate":"2024-04-28T00:00:00.000Z","maPopEndDate":"2024-05-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-38967,"maPriority":"High","assistanceRequested":"Amend #1: Amend to fully de-obligate and transfer to 4776DR-OK-DOD-USAF- 01 MA.\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"680f3be0-37d5-4db1-bd7b-38e097c65edb","hash":"0e306c8833f2fdb22f093b5727f4d4efae0fcd8c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"OK24042701DOD-USAF01","maAmendNumber":0,"actionId":465166,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"OK","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-04-28T00:00:00.000Z","dateRequired":"2024-04-28T00:00:00.000Z","popStartDate":"2024-04-28T00:00:00.000Z","popEndDate":"2024-05-06T00:00:00.000Z","dateObligated":"2024-04-28T00:00:00.000Z","obligationAmount":38967,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":38967,"maPopStartDate":"2024-04-28T00:00:00.000Z","maPopEndDate":"2024-05-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":38967,"maPriority":"High","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial support","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"5adbd279-fa00-4db6-9de7-ca802ab64f39","hash":"68e184cb529eeb4500471abc52d7ab9e261ef499","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4781,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4781DRTXHUD01","maAmendNumber":0,"actionId":467821,"maType":"FOS","supportFunction":6,"priority":"High","region":6,"stt":"TX","agencyId":"HUD","agency":"HUD (ADMIN SUPPORT OFFICES)","authority":"Stafford Act","dateReceived":"2024-05-23T00:00:00.000Z","dateRequired":"2024-05-30T00:00:00.000Z","popStartDate":"2024-05-30T00:00:00.000Z","popEndDate":"2024-08-28T00:00:00.000Z","dateObligated":"2024-05-24T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-05-30T00:00:00.000Z","maPopEndDate":"2024-08-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Request HUD specialized expertise to FEMA to support the State-Led Housing Task Force (HTF)","statementOfWork":"As directed by and in coordination with FEMA, Housing &amp; Urban Development (HUD) will deploy personnel to provide specialized expertise to FEMA to support the State-Led Housing Task Force (HTF) in support of FEMA disaster operations. Activities may include, but are not limited to, identification of available housing stock, review of existing Federal and State programs and authorities, assistance with the development of disaster specific housing plans, and providing housing community and economic redevelopment expertise to promote recovery efforts. HUD personnel may be tasked to support the housing resource databases. HUD is responsible for providing personnel and/or equipment necessary to accomplish the mission. \r\nRequirements from FEMA: 1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). 2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement. 3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. 4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. 5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. 6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. 7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact. 8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"fd295e73-b23d-4b3f-a420-ba69a2042977","hash":"4dbe91f33268e730c56c6e32b8aa25b27360834e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4781,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4781DRTXDOE-OE01","maAmendNumber":1,"actionId":470101,"maType":"FOS","supportFunction":12,"priority":"High","region":6,"stt":"TX","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-06-17T00:00:00.000Z","dateRequired":"2024-06-17T00:00:00.000Z","popStartDate":"2024-05-18T00:00:00.000Z","popEndDate":"2024-06-07T00:00:00.000Z","dateObligated":"2024-06-17T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-05-18T00:00:00.000Z","maPopEndDate":"2024-06-07T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment#1: Change POP end date to mission completion date of 6.7.24; and verbal request from OFA to reduce funding by $5,000.00\r\nActivate DOE to RRCC. IOF, JFO, to include virtual support or other team(s) facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, to include virtual support, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3074b524-2d42-4d0c-a660-92b9a581c5df","hash":"42f29b5e061e595cf9ab38ad2907abef6e8c5cfb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4781,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4781DRTXDOE-OE01","maAmendNumber":0,"actionId":467269,"maType":"FOS","supportFunction":12,"priority":"High","region":6,"stt":"TX","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-05-18T00:00:00.000Z","dateRequired":"2024-05-01T00:00:00.000Z","popStartDate":"2024-05-18T00:00:00.000Z","popEndDate":"2024-06-16T00:00:00.000Z","dateObligated":"2024-05-18T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-05-18T00:00:00.000Z","maPopEndDate":"2024-06-07T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"Activate DOE to RRCC. IOF, JFO, to include virtual support or other team(s) facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, to include virtual support, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"27124080-3cdd-4d1f-9c4e-b17507c17c59","hash":"5cea6f54fbdd7f5f390031bf410bd3c27b9ab025","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4781,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4781DRTXDHS-FPS01","maAmendNumber":0,"actionId":467558,"maType":"FOS","supportFunction":13,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-05-22T00:00:00.000Z","dateRequired":"2024-05-22T00:00:00.000Z","popStartDate":"2024-05-21T00:00:00.000Z","popEndDate":"2024-07-19T00:00:00.000Z","dateObligated":"2024-05-22T00:00:00.000Z","obligationAmount":1296000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1296000,"maPopStartDate":"2024-05-21T00:00:00.000Z","maPopEndDate":"2024-07-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1296000,"maPriority":"High","assistanceRequested":"Request for Contract Security Officers to support the FEMA Security Manager for various locations as requested.  ","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards, policies, and practices.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"214b3913-6e31-4c94-9d11-47a15a5c9b34","hash":"ced1777063817511a7a8558a62672049c03e3766","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4781,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4781DRTXDHS-CISA01","maAmendNumber":1,"actionId":468362,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-06-03T00:00:00.000Z","dateRequired":"2024-05-30T00:00:00.000Z","popStartDate":"2024-05-18T00:00:00.000Z","popEndDate":"2024-05-22T00:00:00.000Z","dateObligated":"2024-06-03T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-05-18T00:00:00.000Z","maPopEndDate":"2024-05-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment#1: Amend to align POP end day with mission completion date of 5.22.24. \r\n\r\n\r\n**This MA includes and replaces 4781DR-TX-CISA-01 due to incorrect vendor ID***\r\nActivate and deploy CISA ESF-2 to RRCC, IOF, JFO to include virtual or other facilities as requested. ","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, to include virtual or other teams and facilities to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e67d8e3e-edb4-4c79-94c2-872a00ae7769","hash":"51d394c66779165c2b591c880f34a4979c259a79","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4781,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4781DRTXDHS-CISA01","maAmendNumber":0,"actionId":467306,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"TX","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-05-20T00:00:00.000Z","dateRequired":"2024-05-18T00:00:00.000Z","popStartDate":"2024-05-18T00:00:00.000Z","popEndDate":"2024-06-07T00:00:00.000Z","dateObligated":"2024-05-20T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-05-18T00:00:00.000Z","maPopEndDate":"2024-05-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"**This MA includes and replaces 4781DR-TX-CISA-01 due to incorrect vendor ID***\r\nActivate and deploy CISA ESF-2 to RRCC, IOF, JFO to include virtual or other facilities as requested. ","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, to include virtual or other teams and facilities to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7974f153-5bb1-4c3d-a07c-eadee05c672f","hash":"7ea20855560111405c60fb8fad005f62193ec2ca","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4781,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4781DRTXCOE-SWD02","maAmendNumber":1,"actionId":473832,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-26T00:00:00.000Z","dateRequired":"2024-07-26T00:00:00.000Z","popStartDate":"2024-07-05T00:00:00.000Z","popEndDate":"2024-07-30T00:00:00.000Z","dateObligated":"2024-07-27T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2024-07-05T00:00:00.000Z","maPopEndDate":"2024-07-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Amendment#1: At request of USACE with concurrence of OSC Increase funding by $20,000.00.  \r\n\r\nThis MA replaces the verbal activation work and cost.  \r\nActivate USACE to the RRCC, IOF, JFO, or other facilities to include virtual.  ","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"b0189eed-21bd-4ab4-ade5-136dedde0813","hash":"6cb5a629e0de7b5d679bd1873c14c13937fd9722","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4781,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4781DRTXCOE-SWD02","maAmendNumber":0,"actionId":472105,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"TX","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-05T00:00:00.000Z","dateRequired":"2024-07-03T00:00:00.000Z","popStartDate":"2024-07-05T00:00:00.000Z","popEndDate":"2024-07-30T00:00:00.000Z","dateObligated":"2024-07-05T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2024-07-05T00:00:00.000Z","maPopEndDate":"2024-07-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"This MA replaces the verbal activation work and cost.  \r\nActivate USACE to the RRCC, IOF, JFO, or other facilities to include virtual.  ","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\n\r\nRequirements from FEMA:\r\n1. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n2. Agencies may be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement.\r\n3. All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n4. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n5. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n6. MAs shall be considered for fiscal closure or reduction of obligations 180 days after the projected end date in accordance with the FEMA Policy 104-010-3. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n7. Prior to departing disaster operations, provide FEMA with details on status of any ongoing actions, property disposition (if applicable), and Financial/Program points of contact.\r\n8. Sharing of Personally Identifiable Information (PII) between the agencies is not authorized by this MA. The agencies must complete an Information Sharing Access Agreement (ISAA), an Interconnection Security Agreement (ISA) and/or a Privacy Threshold Analysis (PTA), if required by either Agency, before data is transferred between the agencies.","id":"dcbc18cc-47e9-4028-ba50-3375d3e1ffea","hash":"828213f42d3b0c84080a983ccbb1124a5c450cca","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4781,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4781DRTXCISA01","maAmendNumber":1,"actionId":467450,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"TX","agencyId":"CISA","agency":"~~AMENDMENT - CISA","authority":"Stafford Act","dateReceived":"2024-05-21T00:00:00.000Z","dateRequired":"2024-05-21T00:00:00.000Z","popStartDate":"2024-05-18T00:00:00.000Z","popEndDate":"2024-06-07T00:00:00.000Z","dateObligated":"2024-05-21T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2024-05-18T00:00:00.000Z","maPopEndDate":"2024-06-07T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amendment#1:  **INCORRECT VENDOR ID** ALL WORK AND COST TRANSFERRED TO 4785DR-TX-DHS-CISA-01 (1509-467306) MA is operationally and financially closed.  Change PM to Archie Salters.\r\n\r\nActivate CISA (ESF#2) to RRCC, IOF, JFO to include virtual support and other facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, to include virtual support or other teams and facilities to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"726a1e3b-4bd5-4e6e-8ffb-7be2838a1d71","hash":"5864865b988020d98152f9b16de341a344a8fa72","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4781,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4781DRTXCISA01","maAmendNumber":0,"actionId":467254,"maType":"FOS","supportFunction":2,"priority":"High","region":6,"stt":"TX","agencyId":"CISA","agency":"~~AMENDMENT - CISA","authority":"Stafford Act","dateReceived":"2024-05-18T00:00:00.000Z","dateRequired":"2024-05-18T00:00:00.000Z","popStartDate":"2024-05-18T00:00:00.000Z","popEndDate":"2024-06-07T00:00:00.000Z","dateObligated":"2024-05-18T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2024-05-18T00:00:00.000Z","maPopEndDate":"2024-06-07T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate CISA (ESF#2) to RRCC, IOF, JFO to include virtual support and other facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, to include virtual support or other teams and facilities to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a54cfb13-1f77-480d-9672-e747a6531979","hash":"455cacfdaeff105508dd0373b05cf73fc8d692a8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4776,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4776DROKDOD-USAF01","maAmendNumber":0,"actionId":465820,"maType":"FOS","supportFunction":5,"priority":"High","region":6,"stt":"OK","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-05-03T00:00:00.000Z","dateRequired":"2024-05-03T00:00:00.000Z","popStartDate":"2024-04-28T00:00:00.000Z","popEndDate":"2024-05-03T00:00:00.000Z","dateObligated":"2024-05-03T00:00:00.000Z","obligationAmount":38967,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":38967,"maPopStartDate":"2024-04-28T00:00:00.000Z","maPopEndDate":"2024-05-03T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":38967,"maPriority":"High","assistanceRequested":"This MA is being reissued under 4776DR-OK and will include and replace MA#1509-465166 under the SU. \r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d806d614-be2b-42fb-a9db-ee4f17353ad9","hash":"d067739ee48c54e04224811a5e3017c65fae5525","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2018072401","incidentName":"CARR FIRE","incidentType":"Fire","disasterNumber":4382,"declarationType":"DR","declarationTitle":"WILDFIRES AND HIGH WINDS","maId":"4382DRCADOE01","maAmendNumber":1,"actionId":276728,"maType":"FOS","supportFunction":12,"priority":"High","region":9,"stt":"CA","agencyId":"DOE","agency":"DEPARTMENT OF ENERGY","authority":"Stafford Act","dateReceived":"2018-11-26T00:00:00.000Z","dateRequired":"2018-11-26T00:00:00.000Z","popStartDate":"2018-08-05T00:00:00.000Z","popEndDate":"2018-08-17T00:00:00.000Z","dateObligated":"2018-12-03T00:00:00.000Z","obligationAmount":-30000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-30000,"maPopStartDate":"2018-08-05T00:00:00.000Z","maPopEndDate":"2018-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-30000,"maPriority":"High","assistanceRequested":"Amendment #1; De-obligate funds in the amount of $30,000.00 to close this Mission Assignment.\r\n\r\nActivate  ESF #12 DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, or other team(s) or facilities as requested to support disaster operations \r\n\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n\r\n MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement. \r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. \r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. ","id":"1e8445d6-e4e3-478a-9220-9d300b488607","hash":"58bc308ddc051d0ad83e5dace5cc73bad46110d4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4776,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4776DROKCOE-SWD01","maAmendNumber":6,"actionId":473775,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"OK","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-26T00:00:00.000Z","dateRequired":"2024-07-26T00:00:00.000Z","popStartDate":"2024-05-06T00:00:00.000Z","popEndDate":"2024-07-24T00:00:00.000Z","dateObligated":"2024-07-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-05-06T00:00:00.000Z","maPopEndDate":"2024-07-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amend #6: Amend to extend and align POP end date to mission complete as of 7/24/24. \r\nAmend #5: Amend to add funds in amount of $12,600 and to align POP end date to mission complete date of 7/19/2024.\r\nAmend #4: Amend to add funds in amount of $54,000. Change PM to James Rhodes.\r\nAmend #3: Extend end date additional 60 days through 11 Aug 24 with no additional funding required.  Change PM to Lauren Pickens.\r\nAmend #2: Amend to add funds in amount of $40,000 and extend POP to 06/12/2024. Change PM to Marquise Robinson. \r\nAmend #1: Amend to add funds in the amount of $10,000.00.\r\nUSACE specialized expertise for oversight of debris operations in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, USACE will provide specialized expertise for oversight of debris operations in support of disaster operations in various locations as determined by FEMA.\r\nSupport may include the following: providing information on technical requirements for debris operations, increasing the efficiency of such operations, efficient monitoring techniques, documentation requirements, etc.\r\nUSACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"019da381-4e1d-467c-a5d8-e8bd858238b1","hash":"1ba1732c0bff920fefbbf61eeb5d0cce593b1263","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4776,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4776DROKCOE-SWD01","maAmendNumber":5,"actionId":473146,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"OK","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-07-18T00:00:00.000Z","dateRequired":"2024-07-18T00:00:00.000Z","popStartDate":"2024-05-06T00:00:00.000Z","popEndDate":"2024-07-19T00:00:00.000Z","dateObligated":"2024-07-21T00:00:00.000Z","obligationAmount":12600,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":12600,"maPopStartDate":"2024-05-06T00:00:00.000Z","maPopEndDate":"2024-07-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":12600,"maPriority":"High","assistanceRequested":"Amend #5: Amend to add funds in amount of $12,600 and to align POP end date to mission complete date of 7/19/2024.\r\nAmend #4: Amend to add funds in amount of $54,000. Change PM to James Rhodes.\r\nAmend #3: Extend end date additional 60 days through 11 Aug 24 with no additional funding required.  Change PM to Lauren Pickens.\r\nAmend #2: Amend to add funds in amount of $40,000 and extend POP to 06/12/2024. Change PM to Marquise Robinson. \r\nAmend #1: Amend to add funds in the amount of $10,000.00.\r\nUSACE specialized expertise for oversight of debris operations in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, USACE will provide specialized expertise for oversight of debris operations in support of disaster operations in various locations as determined by FEMA.\r\nSupport may include the following: providing information on technical requirements for debris operations, increasing the efficiency of such operations, efficient monitoring techniques, documentation requirements, etc.\r\nUSACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"3ba58de9-8fd7-4775-a826-bc6b9f5beee9","hash":"b32f7560ce3e3f22b2737d1390300fab3e34a362","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4776,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4776DROKCOE-SWD01","maAmendNumber":4,"actionId":469885,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"OK","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-06-13T00:00:00.000Z","dateRequired":"2024-06-13T00:00:00.000Z","popStartDate":"2024-05-06T00:00:00.000Z","popEndDate":"2024-08-11T00:00:00.000Z","dateObligated":"2024-06-14T00:00:00.000Z","obligationAmount":54000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":54000,"maPopStartDate":"2024-05-06T00:00:00.000Z","maPopEndDate":"2024-07-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":54000,"maPriority":"High","assistanceRequested":"Amend #4: Amend to add funds in amount of $54,000. Change PM to James Rhodes.\r\nAmend #3: Extend end date additional 60 days through 11 Aug 24 with no additional funding required.  Change PM to Lauren Pickens.\r\nAmend #2: Amend to add funds in amount of $40,000 and extend POP to 06/12/2024. Change PM to Marquise Robinson. \r\nAmend #1: Amend to add funds in the amount of $10,000.00.\r\nUSACE specialized expertise for oversight of debris operations in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, USACE will provide specialized expertise for oversight of debris operations in support of disaster operations in various locations as determined by FEMA.\r\nSupport may include the following: providing information on technical requirements for debris operations, increasing the efficiency of such operations, efficient monitoring techniques, documentation requirements, etc.\r\nUSACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"b5ff49ff-36fb-41c3-8a1e-727f07770f0e","hash":"1507c2bae53207bf451cde85420bbb36da5396dc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4776,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4776DROKCOE-SWD01","maAmendNumber":3,"actionId":469535,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"OK","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-06-11T00:00:00.000Z","dateRequired":"2024-06-11T00:00:00.000Z","popStartDate":"2024-05-06T00:00:00.000Z","popEndDate":"2024-08-11T00:00:00.000Z","dateObligated":"2024-06-12T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-05-06T00:00:00.000Z","maPopEndDate":"2024-07-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amend #3: Extend end date additional 60 days through 11 Aug 24 with no additional funding required.  Change PM to Lauren Pickens.\r\nAmend #2: Amend to add funds in amount of $40,000 and extend POP to 06/12/2024. Change PM to Marquise Robinson. \r\nAmend #1: Amend to add funds in the amount of $10,000.00.\r\nUSACE specialized expertise for oversight of debris operations in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, USACE will provide specialized expertise for oversight of debris operations in support of disaster operations in various locations as determined by FEMA.\r\nSupport may include the following: providing information on technical requirements for debris operations, increasing the efficiency of such operations, efficient monitoring techniques, documentation requirements, etc.\r\nUSACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"673f8028-bfe6-4d16-8d30-7d6da5f9b50b","hash":"d0dc89045295174d484aff9ab0aaaadffa061740","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4776,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4776DROKCOE-SWD01","maAmendNumber":2,"actionId":466911,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"OK","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-05-15T00:00:00.000Z","dateRequired":"2024-05-15T00:00:00.000Z","popStartDate":"2024-05-06T00:00:00.000Z","popEndDate":"2024-06-12T00:00:00.000Z","dateObligated":"2024-05-15T00:00:00.000Z","obligationAmount":40000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":40000,"maPopStartDate":"2024-05-06T00:00:00.000Z","maPopEndDate":"2024-07-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":40000,"maPriority":"High","assistanceRequested":"Amend #2: Amend to add funds in amount of $40,000 and extend POP to 06/12/2024. Change PM to Marquise Robinson. \r\nAmend #1: Amend to add funds in the amount of $10,000.00.\r\nUSACE specialized expertise for oversight of debris operations in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, USACE will provide specialized expertise for oversight of debris operations in support of disaster operations in various locations as determined by FEMA.\r\nSupport may include the following: providing information on technical requirements for debris operations, increasing the efficiency of such operations, efficient monitoring techniques, documentation requirements, etc.\r\nUSACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"4dd6d8f4-4997-488e-a184-0cfa8ee2608e","hash":"7f15d407c7617266dea21ed2d6006a0244052462","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4776,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4776DROKCOE-SWD01","maAmendNumber":1,"actionId":466177,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"OK","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-05-08T00:00:00.000Z","dateRequired":"2024-05-08T00:00:00.000Z","popStartDate":"2024-05-06T00:00:00.000Z","popEndDate":"2024-05-22T00:00:00.000Z","dateObligated":"2024-05-08T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-05-06T00:00:00.000Z","maPopEndDate":"2024-07-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Amend #1: Amend to add funds in the amount of $10,000.00.\r\nUSACE specialized expertise for oversight of debris operations in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, USACE will provide specialized expertise for oversight of debris operations in support of disaster operations in various locations as determined by FEMA.\r\nSupport may include the following: providing information on technical requirements for debris operations, increasing the efficiency of such operations, efficient monitoring techniques, documentation requirements, etc.\r\nUSACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"9c72e176-a39c-4a09-9112-a48cb02183fe","hash":"a11cbfdbdc43827795bf168ede84f8dabca3ae3e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024042701","incidentName":"R6 Severe Storms OK, TX, AR, LA","incidentType":"Severe Storm","disasterNumber":4776,"declarationType":"DR","declarationTitle":"SEVERE STORMS, STRAIGHT-LINE WINDS, TORNADOES, AND FLOODING","maId":"4776DROKCOE-SWD01","maAmendNumber":0,"actionId":465916,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"OK","agencyId":"COE-SWD","agency":"COE SOUTHWESTERN DIVISION","authority":"Stafford Act","dateReceived":"2024-05-06T00:00:00.000Z","dateRequired":"2024-05-08T00:00:00.000Z","popStartDate":"2024-05-06T00:00:00.000Z","popEndDate":"2024-05-22T00:00:00.000Z","dateObligated":"2024-05-07T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-05-06T00:00:00.000Z","maPopEndDate":"2024-07-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"USACE specialized expertise for oversight of debris operations in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, USACE will provide specialized expertise for oversight of debris operations in support of disaster operations in various locations as determined by FEMA.\r\nSupport may include the following: providing information on technical requirements for debris operations, increasing the efficiency of such operations, efficient monitoring techniques, documentation requirements, etc.\r\nUSACE is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"5a4f2943-ee82-4f15-b626-d436749446b7","hash":"9a7924b443453c2746134a3a6518f2152fca0d57","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024032101","incidentName":"R5-Ohio-Severe Storms and Tornadoes (3/14/24)","incidentType":"Tornado","disasterNumber":4777,"declarationType":"DR","declarationTitle":"TORNADOES","maId":"4777DROHGSA02","maAmendNumber":0,"actionId":466033,"maType":"FOS","supportFunction":7,"priority":"High","region":5,"stt":"OH","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-05-07T00:00:00.000Z","dateRequired":"2024-05-06T00:00:00.000Z","popStartDate":"2024-05-06T00:00:00.000Z","popEndDate":"2024-06-17T00:00:00.000Z","dateObligated":"2024-05-07T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-05-06T00:00:00.000Z","maPopEndDate":"2024-06-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Assistance with leasing services in the State of Ohio\r\nGSA to RRCC, IOF, JFO, or other teams and facilities as requested\r\nRequested Resources: Activation GSA","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\n  \r\nActivities may include, but are not limited to, the following:\r\n--ESF-7 support\r\n--Emergency leasing services for needed space/facilities as requested by FEMA.\r\n--GSA Lease Contracting Officers (LCOs) and others as needed\r\n  \r\nAdditional Notes from FEMA:\r\n-- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration \r\nof assignment(s). \r\n-- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n-- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n-- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n-- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-- Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).\r\n-- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n","id":"fad05012-e2e0-42a0-b961-c43c231ab908","hash":"bd887e7eba845813ba717b2e0208535d46506332","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024032101","incidentName":"R5-Ohio-Severe Storms and Tornadoes (3/14/24)","incidentType":"Tornado","disasterNumber":4777,"declarationType":"DR","declarationTitle":"TORNADOES","maId":"4777DROHDHS-FPS01","maAmendNumber":0,"actionId":466152,"maType":"FOS","supportFunction":13,"priority":"Normal","region":5,"stt":"OH","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-05-08T00:00:00.000Z","dateRequired":"2024-05-07T00:00:00.000Z","popStartDate":"2024-05-08T00:00:00.000Z","popEndDate":"2024-08-05T00:00:00.000Z","dateObligated":"2024-05-08T00:00:00.000Z","obligationAmount":1230120,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1230120,"maPopStartDate":"2024-05-08T00:00:00.000Z","maPopEndDate":"2024-08-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1230120,"maPriority":"Normal","assistanceRequested":"Level II Armed Security Protective Services Officer (PSO) to support the protection of DR-4777-OH facilities, personnel, and property.\r\n","statementOfWork":"Security of FEMA facilities will be based on FEMA Office of Chief Security Officer (OCSO) security standards, policies and practices. At the direction of, and in coordination with FEMA OCSO security personnel, FPS will provide contract protective services officers to support response and recovery operations in the State of Ohio. FEMA OCSO Security will issue MA Task Orders for specific resource requirements, location(s), dates and duration of assignment(s). Equipment purchases are not authorized under this Mission Assignment.\r\n  \r\nAdditional Notes from FEMA:\r\n-- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration \r\nof assignment(s). \r\n-- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required \r\nfor reimbursement. \r\n-- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation \r\nis necessary to ensure reimbursement. \r\n-- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n-- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency \r\n-- Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, \r\nper 44 CFR 206.208(c)(2).\r\n-- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency. \r\n","id":"9cc73db4-487f-4551-8fe8-da41869c5d78","hash":"3d8e7428317b09c7b325fb09bfad934b85729d3c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024020801","incidentName":"San Diego Co January 2024 Winter Storms","incidentType":"Severe Storm","disasterNumber":4758,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4758DRCAGSA01","maAmendNumber":0,"actionId":459342,"maType":"FOS","supportFunction":3,"priority":"High","region":9,"stt":"CA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-21T00:00:00.000Z","popStartDate":"2024-02-20T00:00:00.000Z","popEndDate":"2024-03-20T00:00:00.000Z","dateObligated":"2024-02-22T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-02-20T00:00:00.000Z","maPopEndDate":"2024-03-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested..","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as\r\nrequested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n\r\nESF 7 support\r\n\r\n Emergency leasing services for needed space/facilities as requested by FEMA GSA Lease Contracting Officers (LCOs) and others as needed.\r\n\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n\r\n;All equipment and supply purchases must be coordinated with FEMA Project Manager.\r\n\r\nIf approved documentation is necessary to ensure reimbursement.\r\n\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate \r\nMA.\r\n\r\nThe mission: assigned agency is responsible for ensuring that all activity is properly authorized, \r\n\r\ngoods are received, services are provided, and that costs are reasonable and supported by \r\ndocumentation maintained by the respective agency.\r\n\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been. \r\nprovided.\r\n","id":"da212d5b-7e8d-442c-bb45-16f5cb1d8d55","hash":"d5e48b0eda9405bf08bada94bdc1c3276120ba1b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024020801","incidentName":"San Diego Co January 2024 Winter Storms","incidentType":"Severe Storm","disasterNumber":4758,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4758DRCADOD-OPS02","maAmendNumber":1,"actionId":468099,"maType":"FOS","supportFunction":5,"priority":"High","region":9,"stt":"CA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-05-28T00:00:00.000Z","dateRequired":"2024-05-28T00:00:00.000Z","popStartDate":"2024-02-21T00:00:00.000Z","popEndDate":"2024-03-20T00:00:00.000Z","dateObligated":"2024-06-05T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-02-21T00:00:00.000Z","maPopEndDate":"2024-03-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment # 1 to de-obligate $10,000.00 and close MA. Per ULO report the MA was not utilized.\r\nDOD provide and support facility(s) as a FEMA Incident Support Base (ISB), Federal Staging Area (FSA), and/or FEMA Federal Team Staging Facility (FTSF)","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support a facility to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to the affected area(s) or other locations as required in support of FEMA disaster operations.\r\nDOD will provide, MCAS Miramar and support as an ISB, FSA, and/or FTSF.\r\nInitial installation requirements may include, but are not limited to, the following:\r\nSecure Marshaling Area for Approximately 5 trucks and Estimated 2 trailers.\r\nDOD is responsible for providing equipment personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency\r\nMA will be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"48f90d06-df57-41cb-b720-20726654393f","hash":"865a35fe5067f8bd8043f8a7490679761babb9bc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024020801","incidentName":"San Diego Co January 2024 Winter Storms","incidentType":"Severe Storm","disasterNumber":4758,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4758DRCADOD-OPS02","maAmendNumber":0,"actionId":459343,"maType":"FOS","supportFunction":5,"priority":"High","region":9,"stt":"CA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-21T00:00:00.000Z","popStartDate":"2024-02-21T00:00:00.000Z","popEndDate":"2024-03-20T00:00:00.000Z","dateObligated":"2024-02-22T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-21T00:00:00.000Z","maPopEndDate":"2024-03-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"DOD provide and support facility(s) as a FEMA Incident Support Base (ISB), Federal Staging Area (FSA), and/or FEMA Federal Team Staging Facility (FTSF)","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support a facility to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to the affected area(s) or other locations as required in support of FEMA disaster operations.\r\n\r\nDOD will provide, MCAS Miramar and support as an ISB, FSA, and/or FTSF.\r\n\r\nInitial installation requirements may include, but are not limited to, the following:\r\n\r\nSecure Marshaling Area for Approximately 5 trucks and Estimated 2 trailers.\r\n\r\nDOD is responsible for providing equipment personnel and/or equipment necessary to accomplish the mission.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency\r\n\r\nMA will be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d11563d1-25b9-4c58-bb19-a8e12f49fe03","hash":"b2c3e10227172054b3e8c16ff7bd25c7cb871738","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024020801","incidentName":"San Diego Co January 2024 Winter Storms","incidentType":"Severe Storm","disasterNumber":4758,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4758DRCADOD-OPS01","maAmendNumber":1,"actionId":468098,"maType":"FOS","supportFunction":5,"priority":"High","region":9,"stt":"CA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-05-28T00:00:00.000Z","dateRequired":"2024-05-28T00:00:00.000Z","popStartDate":"2024-02-21T00:00:00.000Z","popEndDate":"2024-03-20T00:00:00.000Z","dateObligated":"2024-06-05T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-02-21T00:00:00.000Z","maPopEndDate":"2024-03-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment # 1 to de-obligate $10,000.00 and close MA. Per ULO no DRADs were issued.\r\nActivate DOD to RRCC, IOF, or JFO to support FEMA disaster operations.  Virtual support, as needed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel in support of the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n \r\nMA,  shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. ","id":"80482fa2-6ed8-440d-aab8-e275781f9fb1","hash":"9666864f60d7868328e20843882cc3ec97fe40be","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024020801","incidentName":"San Diego Co January 2024 Winter Storms","incidentType":"Severe Storm","disasterNumber":4758,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4758DRCADOD-OPS01","maAmendNumber":0,"actionId":459323,"maType":"FOS","supportFunction":5,"priority":"High","region":9,"stt":"CA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-21T00:00:00.000Z","popStartDate":"2024-02-21T00:00:00.000Z","popEndDate":"2024-03-20T00:00:00.000Z","dateObligated":"2024-02-22T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-21T00:00:00.000Z","maPopEndDate":"2024-03-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Activate DOD to RRCC, IOF, or JFO to support FEMA disaster operations.  Virtual support, as needed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel in support of the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n \r\nMA,  shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. ","id":"0465dbd0-8889-48c5-afcc-73a68904e1b2","hash":"86fa761ad4256848918992ba73ca608128a55fad","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024020801","incidentName":"San Diego Co January 2024 Winter Storms","incidentType":"Severe Storm","disasterNumber":4758,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4758DRCADHS-FPS01","maAmendNumber":2,"actionId":474186,"maType":"FOS","supportFunction":13,"priority":"High","region":9,"stt":"CA","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-07-31T00:00:00.000Z","dateRequired":"2024-07-31T00:00:00.000Z","popStartDate":"2024-02-27T00:00:00.000Z","popEndDate":"2024-04-21T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":-68602.92,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-68602.92,"maPopStartDate":"2024-02-27T00:00:00.000Z","maPopEndDate":"2024-04-21T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-68602.92,"maPriority":"High","assistanceRequested":"Amendment #2 to de-obligate $-68,602.92 per 07/01/2024 QULO report.\r\nExtend Mission Assignment to 4/21/2024. At no additional cost\r\nContract security officers to support the FEMA Security Manager (SM)","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards,\r\npolicies, and practices.\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), \r\ndate(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting \r\ndocumentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, \r\ndocumentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate \r\nMA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by \r\ndocumentation maintained by the respective agency.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with \r\nFEMA CFO Bulletin #157. \r\nFor MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"b63619b5-fec3-4ef0-8589-ec00b7b4d996","hash":"74540d13270486e98a4309007bc57bb439d810bf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024020801","incidentName":"San Diego Co January 2024 Winter Storms","incidentType":"Severe Storm","disasterNumber":4758,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4758DRCADHS-FPS01","maAmendNumber":1,"actionId":461218,"maType":"FOS","supportFunction":13,"priority":"High","region":9,"stt":"CA","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-03-13T00:00:00.000Z","dateRequired":"2024-03-12T00:00:00.000Z","popStartDate":"2024-02-27T00:00:00.000Z","popEndDate":"2024-04-21T00:00:00.000Z","dateObligated":"2024-04-01T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-02-27T00:00:00.000Z","maPopEndDate":"2024-04-21T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Extend Mission Assignment to 4/21/2024. At no additional cost\r\nContract security officers to support the FEMA Security Manager (SM)","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards,\r\npolicies, and practices.\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), \r\ndate(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting \r\ndocumentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, \r\ndocumentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate \r\nMA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by \r\ndocumentation maintained by the respective agency.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with \r\nFEMA CFO Bulletin #157. \r\nFor MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"cfe815d3-92c3-4255-bc13-4c02567ed25d","hash":"af5f10bc1f5bfaee4c14fd6d4661b0135e505787","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024020801","incidentName":"San Diego Co January 2024 Winter Storms","incidentType":"Severe Storm","disasterNumber":4758,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4758DRCADHS-FPS01","maAmendNumber":0,"actionId":460055,"maType":"FOS","supportFunction":13,"priority":"High","region":9,"stt":"CA","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-02-27T00:00:00.000Z","dateRequired":"2024-02-29T00:00:00.000Z","popStartDate":"2024-02-27T00:00:00.000Z","popEndDate":"2024-03-27T00:00:00.000Z","dateObligated":"2024-02-28T00:00:00.000Z","obligationAmount":100000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":100000,"maPopStartDate":"2024-02-27T00:00:00.000Z","maPopEndDate":"2024-04-21T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":100000,"maPriority":"High","assistanceRequested":"Contract security officers to support the FEMA Security Manager (SM)","statementOfWork":"As directed by and in coordination with FEMA, Federal Protective Service (FPS) will provide appropriate physical security of FEMA facilities based on FEMA security standards,\r\npolicies, and practices.\r\n\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), \r\ndate(s), and duration of assignment(s).\r\n\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting \r\ndocumentation is required for reimbursement.\r\n\r\nAll equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, \r\ndocumentation is necessary to ensure reimbursement.\r\n\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate \r\nMA.\r\n\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by \r\ndocumentation maintained by the respective agency.\r\n\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with \r\nFEMA CFO Bulletin #157. \r\n\r\nFor MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"9432536a-a05c-4a85-a12e-374ed713c645","hash":"0ecdff5da5ee95443a954c52b4e1a622d0571744","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101USDA-FS01","maAmendNumber":1,"actionId":463492,"maType":"FOS","supportFunction":4,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-04-04T00:00:00.000Z","dateRequired":"2024-04-04T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-05-01T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment: De-ob and closeout mission assignment.   \r\n\r\nActivate USFS to the RRCC, IOF JFO or other facilities","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"7bda1035-e2f2-433f-bcd3-237877ae6b44","hash":"5e61187a70e22b97738740c4ddf17c05c9ff25cb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101USDA-FS01","maAmendNumber":0,"actionId":457790,"maType":"FOS","supportFunction":4,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-04T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Life Sustaining","assistanceRequested":"Activate USFS to the RRCC, IOF JFO or other facilities","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"d9f99d23-c9b4-4c01-b7e3-da703bc9b790","hash":"1d1b6a7cd4a0ad035fe67798c3122bf05d583388","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101USDA-APH01","maAmendNumber":1,"actionId":468387,"maType":"FOS","supportFunction":11,"priority":"High","region":9,"stt":"CA","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-05-31T00:00:00.000Z","dateRequired":"2024-05-31T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-06-05T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment # 1 to de-obligate $10,000.00. Per ULO document, no charges have been made as of 04/01/2024. \r\nUSDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b9f9ebc3-f790-469b-803c-ae38880e83ee","hash":"20467adbc9e40d3447b4859a5d7c5a4cbf31e119","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101USDA-APH01","maAmendNumber":0,"actionId":457789,"maType":"FOS","supportFunction":11,"priority":"High","region":9,"stt":"CA","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-04T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"USDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a98a2c89-d388-4b0a-93dc-7aea9c585905","hash":"583619c99fc4daf95ba6d3211ac4ce06709866a5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101HHS-ASPR01","maAmendNumber":0,"actionId":457761,"maType":"FOS","supportFunction":8,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-04T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Life Sustaining","assistanceRequested":"Activate HHS to RRCC, IOF, JFO, RFO, or other regional facilities ","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9f257542-6d1d-41da-892f-f555d285d871","hash":"65bd3ef767eb5abaf7399b509487a7c95ea4815c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101GSA01","maAmendNumber":1,"actionId":468105,"maType":"FOS","supportFunction":7,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-05-31T00:00:00.000Z","dateRequired":"2024-05-29T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-06-05T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment # 1 to de-obligate $10,000.00 and per ULO close Mission Assignment.\r\nActivate GSA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f69e9bca-af58-493e-96ae-e947159b6be8","hash":"cc1817cc09eb65edbd79185a83534b678e009b6e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101GSA01","maAmendNumber":0,"actionId":457760,"maType":"FOS","supportFunction":7,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-02T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Life Sustaining","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8834f009-061a-4a21-8b43-5369cc7c417a","hash":"8cae816d55bb65895d37dfbf1b913128fc926dd8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101EPA01","maAmendNumber":0,"actionId":457788,"maType":"FOS","supportFunction":10,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-02T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Life Sustaining","assistanceRequested":"Activate EPA ESF 10  to CAL OES, SOC RRCC, IOF, JFO, or other teams and facilities as requested. \r\n","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations. Funding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.  MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement.  Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7a922116-2ab8-496a-a51b-2cfd3f7c3002","hash":"51ab82b6ba93e0ca998a454c0f804ced9a5c3a24","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DOT01","maAmendNumber":1,"actionId":468104,"maType":"FOS","supportFunction":1,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-05-31T00:00:00.000Z","dateRequired":"2024-05-28T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-06-05T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment # 1 to de-obligate $10,000.00.\r\nActivate DOT to RRCC. IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ff19758b-7e1b-41d7-9822-a83d0f9d4884","hash":"4e88f4e13e9eb15f9338383cee26fe89abbad24e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DOT01","maAmendNumber":0,"actionId":457787,"maType":"FOS","supportFunction":1,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-04T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Life Sustaining","assistanceRequested":"Activate DOT to RRCC. IOF, JFO, or others teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"812d9d99-184a-4511-9932-5b764505094e","hash":"8c8a9450b4629cde1bd7b52bbd0b02406368f382","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DOJ-ATF01","maAmendNumber":1,"actionId":473851,"maType":"FOS","supportFunction":13,"priority":"High","region":9,"stt":"CA","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-07-26T00:00:00.000Z","dateRequired":"2024-07-26T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-07-31T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate -$10,000.00 and closeout Mission Assignment. \r\n\r\nActivate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations. Funding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"e70d6d0b-1f0c-4d28-bbcc-d5de27148584","hash":"a4d132e8dba06f9cb9308a2c881a662acb269ff6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DOJ-ATF01","maAmendNumber":0,"actionId":457791,"maType":"FOS","supportFunction":13,"priority":"High","region":9,"stt":"CA","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-04T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Activate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations. Funding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"9dc5d5cc-3486-488c-bbce-7d60b5d08b11","hash":"1ada93d41a39cc28c66dd9d3f3a951223158d2f4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DOE-OE01","maAmendNumber":1,"actionId":474218,"maType":"FOS","supportFunction":12,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-07-31T00:00:00.000Z","dateRequired":"2024-07-31T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #1: De-obligate $-10,000.00 per 07/01/2024 quarterly ULO report.\r\nActivate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations Funding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a72ec8d1-1eb7-4271-a019-2efa5b1dcc54","hash":"c75a18c6076a2b68d0349e417b9e29f9882173f9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DOE-OE01","maAmendNumber":0,"actionId":457757,"maType":"FOS","supportFunction":12,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-04T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Life Sustaining","assistanceRequested":"Activate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations Funding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c5d2d604-a8bd-4caa-958d-adcaf2ecb8a7","hash":"9d38e12bc6de7be1862030376a4eb8564f9fa635","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DOD-OPS02","maAmendNumber":1,"actionId":468103,"maType":"FOS","supportFunction":7,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-05-28T00:00:00.000Z","dateRequired":"2024-05-28T00:00:00.000Z","popStartDate":"2024-02-05T00:00:00.000Z","popEndDate":"2024-02-12T00:00:00.000Z","dateObligated":"2024-06-05T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2024-02-05T00:00:00.000Z","maPopEndDate":"2024-02-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment # 1 to de-obligate $20,000.00 and close Mission Assignment; Per ULO no DRADs were issued.\r\nDOD provide and support March ARB as a FEMA Incident Support Base (ISB), Federal Staging Area (FSA), and/or FEMA Federal Team Staging Facility (FTSF)","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support March ARB to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to the affected area(s) or other locations as required in support of FEMA disaster operations.    \r\nInitial installation requirements may include, but are not limited to, the following:\r\nMarshalling area: 20 trucks/trailers, 3-5 acres hardstand\r\nSufficient MHE vehicles/aircraft trans load\r\nOffice space/desks for 15 personnel. No life support. EPLO on site\r\nDOD is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ad90c140-cbb3-4773-8b2f-6b1fcbc7c596","hash":"8106c5b77c323c6988e7bc7f35ddf0bbb9151acb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DOD-OPS02","maAmendNumber":0,"actionId":458014,"maType":"FOS","supportFunction":7,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-05T00:00:00.000Z","popStartDate":"2024-02-05T00:00:00.000Z","popEndDate":"2024-02-12T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2024-02-05T00:00:00.000Z","maPopEndDate":"2024-02-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"Life Sustaining","assistanceRequested":"DOD provide and support March ARB as a FEMA Incident Support Base (ISB), Federal Staging Area (FSA), and/or FEMA Federal Team Staging Facility (FTSF)","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support March ARB to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to the affected area(s) or other locations as required in support of FEMA disaster operations.    \r\n\r\nInitial installation requirements may include, but are not limited to, the following:\r\nMarshalling area: 20 trucks/trailers, 3-5 acres hardstand\r\nSufficient MHE vehicles/aircraft trans load\r\nOffice space/desks for 15 personnel. No life support. EPLO on site\r\nDOD is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d7f9c5bf-0b41-4910-8368-a5cc138844d5","hash":"daaa81ab12f02fb09c7046826e45a607903d9547","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DOD-OPS01","maAmendNumber":1,"actionId":468102,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"CA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-05-28T00:00:00.000Z","dateRequired":"2024-05-28T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-06-05T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Normal","assistanceRequested":"Amendment # 1 to de-obligate $10,000.00 and close Mission Assignment; per ULO no DRADs were issued.\r\nRequest DCO / DCE Oakland (including as necessary SEPLO/EPLO) assistance at the EOC, Joint Field Office, RRCC, or other locations specified by FEMA in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, DoD will provide a Defense Coordinating Officer with supporting staff element\r\n(DCO / DCE) to the EOC RRCC Region IX, Joint Field Office, or other locations, to provide DoD regional knowledge, requirements\r\nvalidation, and liaison. Including as necessary State/Emergency Preparedness Liaison SEPLO/EPLO Teams. Supporting staff element required may include a Joint Regional Medical Planning Officer (JRMPO).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"bdec85d6-9b77-4547-b796-6ec5751d72ca","hash":"6717fc0428c66f89119c48e0e118ef27a305f8e7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DOD-OPS01","maAmendNumber":0,"actionId":457794,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-04T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Request DCO / DCE Oakland (including as necessary SEPLO/EPLO) assistance at the EOC, Joint Field Office, RRCC, or other locations specified by FEMA in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, DoD will provide a Defense Coordinating Officer with supporting staff element\r\n(DCO / DCE) to the EOC RRCC Region IX, Joint Field Office, or other locations, to provide DoD regional knowledge, requirements\r\nvalidation, and liaison. Including as necessary State/Emergency Preparedness Liaison SEPLO/EPLO Teams. Supporting staff element required may include a Joint Regional Medical Planning Officer (JRMPO).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"90d72355-f629-47d3-a976-135ed1c5736f","hash":"4e74b0fc4d308e22dbcb8f14f34452057a1beb40","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DHS-USCG01","maAmendNumber":1,"actionId":472399,"maType":"FOS","supportFunction":9,"priority":"Lifesaving","region":9,"stt":"CA","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-07-09T00:00:00.000Z","dateRequired":"2024-07-09T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-07-15T00:00:00.000Z","obligationAmount":-30000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-30000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-30000,"maPriority":"Lifesaving","assistanceRequested":"Amendment #1 to de-obligate $30,000.00 and closeout amendment as stated in document -Email request for de-obligation.pdf.-\r\nDeploy USCG liaison officer(s) to RRCC, IOF, JFO, STT EOC or other facility(s)","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n- USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n- USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n- Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"14e348a5-1813-4908-8384-78f5173748f1","hash":"725106be7af6d17bb0530019b04e890a212a4cf3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DHS-USCG01","maAmendNumber":0,"actionId":457793,"maType":"FOS","supportFunction":9,"priority":"Lifesaving","region":9,"stt":"CA","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-04T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":30000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":30000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":30000,"maPriority":"Lifesaving","assistanceRequested":"Deploy USCG liaison officer(s) to RRCC, IOF, JFO, STT EOC or other facility(s)","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n- USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n- USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n- Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"be6c16ee-1749-4c11-89d4-44d7505e3d5c","hash":"c49ba968d6513796ecc0209d86baa86361a0207a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DHS-CISA01","maAmendNumber":1,"actionId":474188,"maType":"FOS","supportFunction":14,"priority":"High","region":9,"stt":"CA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-07-31T00:00:00.000Z","dateRequired":"2024-07-31T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $-5,000.00 per 07/01/2024 quarterly ULO report requirements.\r\nActivate CISA-14 LNOs to RRCC, JFO, IOF","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\n\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8311452e-8d90-4702-9794-9882b6cc008d","hash":"944880173008a1e9d26f936505f4ba0a64322099","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101DHS-CISA01","maAmendNumber":0,"actionId":457792,"maType":"FOS","supportFunction":14,"priority":"High","region":9,"stt":"CA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-04T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate CISA-14 LNOs to RRCC, JFO, IOF","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\n\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3aa9423a-684c-4dc7-aa9f-c970eb1be25c","hash":"12d7264abc655f67f48546d134302e95c8f40723","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101COE-SPD01","maAmendNumber":1,"actionId":466325,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"COE-SPD","agency":"COE SOUTH PACIFIC DIVISION","authority":"Stafford Act","dateReceived":"2024-05-09T00:00:00.000Z","dateRequired":"2024-05-09T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-05-24T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment#1 De-obligate $10,000 and closeout mission assignment. \r\nActivate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities. ","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"97588a1e-6383-4525-ae05-2e87dbaca376","hash":"df337f75f65b733a4650ccc78a1ad22c04250030","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024013101","incidentName":"R9 Atmospheric River CA","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"CA24013101COE-SPD01","maAmendNumber":0,"actionId":457786,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"CA","agencyId":"COE-SPD","agency":"COE SOUTH PACIFIC DIVISION","authority":"Stafford Act","dateReceived":"2024-02-04T00:00:00.000Z","dateRequired":"2024-02-04T00:00:00.000Z","popStartDate":"2024-02-04T00:00:00.000Z","popEndDate":"2024-02-11T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2024-02-04T00:00:00.000Z","maPopEndDate":"2024-02-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Life Sustaining","assistanceRequested":"Activate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities. ","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"326316a5-6dbe-44aa-a521-948dd5fc827b","hash":"faa0ecab70a130cdc8e22fc214c5d6e13984b779","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024010901","incidentName":"New England Severe Storms 01092024","incidentType":"Severe Storm","disasterNumber":4766,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND FLOODING","maId":"4766DRRIGSA01","maAmendNumber":0,"actionId":462800,"maType":"FOS","supportFunction":7,"priority":"Normal","region":1,"stt":"RI","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-03-28T00:00:00.000Z","dateRequired":"2024-03-27T00:00:00.000Z","popStartDate":"2024-03-27T00:00:00.000Z","popEndDate":"2024-04-27T00:00:00.000Z","dateObligated":"2024-03-28T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-03-27T00:00:00.000Z","maPopEndDate":"2024-04-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Requesting GSA assistance with sourcing and leasing a commercial office space in Warwick RI.  Facility requirements 19,000 - 22,000sq. Ft. commercial office space.\r\nAdditional requirements: ADA compliant, 150 - 200 parking spots, loading dock, wrap around services to be included.\r\nActivation - GSA start date 03/27/2024 for 30 days.\r\nRequested Resources: Activation - GSA","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide personnel to assist in leasing realty and/or contracting support and/or purchases as required to support FEMA disaster operation for DR-4766. Initial request is for GSA to find and assist in the leasing of a suitable location in Warwick, RI area. Details will be provided in a Mission Assignment Task Order as necessary.\r\n--Funding of leases, contracts, or purchases in not authorized under this Mission Assignment. Leases, contracts, or purchases will be funded separately.\r\n--MA task orders (MATOS) may be issues by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignments(s).\r\n--Agencies will be reimbursed for all eligible expenses pursuant to 44 CRF. Supporting documentation is required for reimbursement.\r\n--All equipment and supply purchases must be coordinated with FEMA as a separate MA.\r\n--The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n--MAs shall be considered for closure after 45 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MA&#39;s still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"701ff29e-842b-40ab-b846-cddb3a2ad1a2","hash":"f7effc7c938d3543501446f6217beabd675dc4a3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024010901","incidentName":"New England Severe Storms 01092024","incidentType":"Severe Storm","disasterNumber":4764,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND FLOODING","maId":"4764DRMEUSDA-RD01","maAmendNumber":3,"actionId":474783,"maType":"FOS","supportFunction":19,"priority":"Normal","region":1,"stt":"ME","agencyId":"USDA-RD","agency":"USDA-RURAL DEVELOPMENT","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-06T00:00:00.000Z","popStartDate":"2024-05-08T00:00:00.000Z","popEndDate":"2024-09-08T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-05-08T00:00:00.000Z","maPopEndDate":"2024-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #3:  Extend end date to 8 September 2024 with no additional cost. \r\nAmendment #2: De-obligate $60,000.00 IAW USDA validation of 01JUL2024 ULO report.\r\nAmendment #1:  Extend POP end date to 08/09/2024 for no additional cost.\r\nProvide USDA disaster program subject matter expertise to FCO and also at disaster field offices, specifically in mostly rural counties, in support of Individual Assistance Staff.","statementOfWork":"As directed by and in coordination with FEMA, the United States Department of Agriculture (USDA) will provide appropriate personnel to the JFO, JRO, or other teams and/or facilities to support disaster recovery operations. \r\nLiaison support may include, but is not limited to, the following: \r\n- USDA support to the JFO and/or AFO - USDA Local, State, Tribal, Territorial, and Federal Government Advisor(s).\r\n - Nonspecific Recovery Support Function (RSF) Field Coordinator (under NDRF).\r\n- USDA Recovery Support SME(s).\r\n- Contract or OFA audit support to ensure costs incurred under USDA Mission Assignments (MAs) meet all Stafford Act and regulatory requirements.\r\n- Support to USDA Agencies and Programs.\r\n- Providing Subject Matter Expertise to the Federal Coordinating Officer (FCO) and FCO Special Advisor for Recovery. \r\n- Providing technical assistance and collaboration with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n - Developing and completing NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FCO and/or Special Advisor for Recovery.\r\n - Provide support either deployed onsite, episodically, or virtually as needed. \r\n- Develop an approach to support recovery, unique to the local communities and/or regional situation, working with and through existing USDA structures.\r\nAdditional information:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), \r\nand duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required \r\nfor reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary \r\nto ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin \r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO \r\nValidation, or additional justification has been provided.","id":"056a2d73-c128-4a34-94e7-33d8686ecdf5","hash":"3da1318fa0a2a81eaa0e94852eaa3e640a8c01e9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024010901","incidentName":"New England Severe Storms 01092024","incidentType":"Severe Storm","disasterNumber":4764,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND FLOODING","maId":"4764DRMEUSDA-RD01","maAmendNumber":2,"actionId":474597,"maType":"FOS","supportFunction":19,"priority":"High","region":1,"stt":"ME","agencyId":"USDA-RD","agency":"USDA-RURAL DEVELOPMENT","authority":"Stafford Act","dateReceived":"2024-08-05T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2024-05-08T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":-60000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-60000,"maPopStartDate":"2024-05-08T00:00:00.000Z","maPopEndDate":"2024-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-60000,"maPriority":"Normal","assistanceRequested":"Amendment #2: De-obligate $60,000.00 IAW USDA validation of 01JUL2024 ULO report.\r\nAmendment #1:  Extend POP end date to 08/09/2024 for no additional cost.\r\nProvide USDA disaster program subject matter expertise to FCO and also at disaster field offices, specifically in mostly rural counties, in support of Individual Assistance Staff.","statementOfWork":"As directed by and in coordination with FEMA, the United States Department of Agriculture (USDA) will provide appropriate personnel to the JFO, JRO, or other teams and/or facilities to support disaster recovery operations. \r\nLiaison support may include, but is not limited to, the following: \r\n- USDA support to the JFO and/or AFO - USDA Local, State, Tribal, Territorial, and Federal Government Advisor(s).\r\n - Nonspecific Recovery Support Function (RSF) Field Coordinator (under NDRF).\r\n- USDA Recovery Support SME(s).\r\n- Contract or OFA audit support to ensure costs incurred under USDA Mission Assignments (MAs) meet all Stafford Act and regulatory requirements.\r\n- Support to USDA Agencies and Programs.\r\n- Providing Subject Matter Expertise to the Federal Coordinating Officer (FCO) and FCO Special Advisor for Recovery. \r\n- Providing technical assistance and collaboration with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n - Developing and completing NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FCO and/or Special Advisor for Recovery.\r\n - Provide support either deployed onsite, episodically, or virtually as needed. \r\n- Develop an approach to support recovery, unique to the local communities and/or regional situation, working with and through existing USDA structures.\r\nAdditional information:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), \r\nand duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required \r\nfor reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary \r\nto ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin \r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO \r\nValidation, or additional justification has been provided.","id":"92e94219-2453-437b-960f-756dffb59864","hash":"db22914ce2500733a89348631028b32720261225","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024010901","incidentName":"New England Severe Storms 01092024","incidentType":"Severe Storm","disasterNumber":4764,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND FLOODING","maId":"4764DRMEUSDA-RD01","maAmendNumber":1,"actionId":469259,"maType":"FOS","supportFunction":19,"priority":"High","region":1,"stt":"ME","agencyId":"USDA-RD","agency":"USDA-RURAL DEVELOPMENT","authority":"Stafford Act","dateReceived":"2024-06-07T00:00:00.000Z","dateRequired":"2024-06-07T00:00:00.000Z","popStartDate":"2024-05-08T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-06-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-05-08T00:00:00.000Z","maPopEndDate":"2024-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #1:  Extend POP end date to 08/09/2024 for no additional cost.\r\n\r\nProvide USDA disaster program subject matter expertise to FCO and also at disaster field offices, specifically in mostly rural counties, in support of Individual Assistance Staff.","statementOfWork":"As directed by and in coordination with FEMA, the United States Department of Agriculture (USDA) will provide appropriate personnel to the JFO, JRO, or other teams and/or facilities to support disaster recovery operations. \r\nLiaison support may include, but is not limited to, the following: \r\n- USDA support to the JFO and/or AFO - USDA Local, State, Tribal, Territorial, and Federal Government Advisor(s).\r\n - Nonspecific Recovery Support Function (RSF) Field Coordinator (under NDRF).\r\n- USDA Recovery Support SME(s).\r\n- Contract or OFA audit support to ensure costs incurred under USDA Mission Assignments (MAs) meet all Stafford Act and regulatory requirements.\r\n- Support to USDA Agencies and Programs.\r\n- Providing Subject Matter Expertise to the Federal Coordinating Officer (FCO) and FCO Special Advisor for Recovery. \r\n- Providing technical assistance and collaboration with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n - Developing and completing NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FCO and/or Special Advisor for Recovery.\r\n - Provide support either deployed onsite, episodically, or virtually as needed. \r\n- Develop an approach to support recovery, unique to the local communities and/or regional situation, working with and through existing USDA structures.\r\nAdditional information:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), \r\nand duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required \r\nfor reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary \r\nto ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin \r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO \r\nValidation, or additional justification has been provided.","id":"765f472b-2b32-401a-bfd9-b70805f9687b","hash":"440aecb39ebef5728822a7d13bcbadcf3c9271a8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2024010901","incidentName":"New England Severe Storms 01092024","incidentType":"Severe Storm","disasterNumber":4764,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND FLOODING","maId":"4764DRMEUSDA-RD01","maAmendNumber":0,"actionId":466582,"maType":"FOS","supportFunction":19,"priority":"High","region":1,"stt":"ME","agencyId":"USDA-RD","agency":"USDA-RURAL DEVELOPMENT","authority":"Stafford Act","dateReceived":"2024-05-13T00:00:00.000Z","dateRequired":"2024-05-10T00:00:00.000Z","popStartDate":"2024-05-08T00:00:00.000Z","popEndDate":"2024-06-10T00:00:00.000Z","dateObligated":"2024-05-14T00:00:00.000Z","obligationAmount":90000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":90000,"maPopStartDate":"2024-05-08T00:00:00.000Z","maPopEndDate":"2024-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":90000,"maPriority":"Normal","assistanceRequested":"Provide USDA disaster program subject matter expertise to FCO and also at disaster field offices, specifically in mostly rural counties, in support of Individual Assistance Staff.","statementOfWork":"As directed by and in coordination with FEMA, the United States Department of Agriculture (USDA) will provide appropriate personnel to the JFO, JRO, or other teams and/or facilities to support disaster recovery operations. \r\nLiaison support may include, but is not limited to, the following: \r\n- USDA support to the JFO and/or AFO - USDA Local, State, Tribal, Territorial, and Federal Government Advisor(s).\r\n - Nonspecific Recovery Support Function (RSF) Field Coordinator (under NDRF).\r\n- USDA Recovery Support SME(s).\r\n- Contract or OFA audit support to ensure costs incurred under USDA Mission Assignments (MAs) meet all Stafford Act and regulatory requirements.\r\n- Support to USDA Agencies and Programs.\r\n- Providing Subject Matter Expertise to the Federal Coordinating Officer (FCO) and FCO Special Advisor for Recovery. \r\n- Providing technical assistance and collaboration with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n - Developing and completing NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FCO and/or Special Advisor for Recovery.\r\n - Provide support either deployed onsite, episodically, or virtually as needed. \r\n- Develop an approach to support recovery, unique to the local communities and/or regional situation, working with and through existing USDA structures.\r\n\r\nAdditional information:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), \r\nand duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required \r\nfor reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary \r\nto ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin \r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO \r\nValidation, or additional justification has been provided.","id":"2eae5619-c30d-4207-a73a-6c020e119b2a","hash":"35e316266dc467918aec6715f418546658d655a2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121901","incidentName":"R1 Severe Storms and Flooding 12172023","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23121901DOI-USGS01","maAmendNumber":1,"actionId":459177,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOI-USGS","agency":"DOI-USGS (GEOLOGICAL SURVEY)","authority":"Stafford Act","dateReceived":"2024-02-16T00:00:00.000Z","dateRequired":"2024-02-16T00:00:00.000Z","popStartDate":"2023-12-19T00:00:00.000Z","popEndDate":"2024-01-19T00:00:00.000Z","dateObligated":"2024-02-20T00:00:00.000Z","obligationAmount":-192000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-192000,"maPopStartDate":"2023-12-19T00:00:00.000Z","maPopEndDate":"2024-01-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-192000,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $192,000 and reissue as 4754DR-ME-DOI-USGS-01.\r\nUSGS Field measurements of flood-water heights in impacted communities. Initial request for support at up to 600 locations.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Geological Survey (USGS) will provide advance support, real-time field measurements, and daily reporting of water heights in direct support and for situational awareness of FEMA disaster operations for a high-water or flood event.\r\n\r\nUSGS services may include, but are not limited to, the following in direct support of response and recovery operations:\r\n - Field measurements of flood water heights in impacted communities;\r\n - Deploy supplemental water-level measuring instruments.\r\n - Measure streamflow and discharge of flooded channels, directly or indirectly.\r\n - Flagging of High-Water Marks and collect evidence of flooding for impacted areas and communities. \r\n - Locate and record the horizontal position and vertical elevation of the High Water Marks (HWM). \r\n - Documentation of HWMs with field notes, digital photographs, and depth measurements to the ground at the HWM location at the time of inspection. \r\n - Data measurements provided in GIS-ready format via the USGS National Water Information System or Short-Term Network system for display and download. \r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"16849e70-1e95-41d1-859a-49f268c83c6d","hash":"492b3a3d5ca00c4d32f8fd4707900482ddca7a08","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121901","incidentName":"R1 Severe Storms and Flooding 12172023","incidentType":"Severe Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23121901DOI-USGS01","maAmendNumber":0,"actionId":454722,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOI-USGS","agency":"DOI-USGS (GEOLOGICAL SURVEY)","authority":"Stafford Act","dateReceived":"2023-12-19T00:00:00.000Z","dateRequired":"2023-12-19T00:00:00.000Z","popStartDate":"2023-12-19T00:00:00.000Z","popEndDate":"2024-01-19T00:00:00.000Z","dateObligated":"2023-12-19T00:00:00.000Z","obligationAmount":192000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":192000,"maPopStartDate":"2023-12-19T00:00:00.000Z","maPopEndDate":"2024-01-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":192000,"maPriority":"High","assistanceRequested":"USGS Field measurements of flood-water heights in impacted communities. Initial request for support at up to 600 locations.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Geological Survey (USGS) will provide advance support, real-time field measurements, and daily reporting of water heights in direct support and for situational awareness of FEMA disaster operations for a high-water or flood event.\r\n\r\nUSGS services may include, but are not limited to, the following in direct support of response and recovery operations:\r\n - Field measurements of flood water heights in impacted communities;\r\n - Deploy supplemental water-level measuring instruments.\r\n - Measure streamflow and discharge of flooded channels, directly or indirectly.\r\n - Flagging of High-Water Marks and collect evidence of flooding for impacted areas and communities. \r\n - Locate and record the horizontal position and vertical elevation of the High Water Marks (HWM). \r\n - Documentation of HWMs with field notes, digital photographs, and depth measurements to the ground at the HWM location at the time of inspection. \r\n - Data measurements provided in GIS-ready format via the USGS National Water Information System or Short-Term Network system for display and download. \r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4b772564-63a1-4db5-a755-730f0f3f8c67","hash":"3044e9db8c3b1e4a8a632aa257462be550fca0d1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121901","incidentName":"R1 Severe Storms and Flooding 12172023","incidentType":"Severe Storm","disasterNumber":4754,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4754DRMEGSA03","maAmendNumber":0,"actionId":472737,"maType":"FOS","supportFunction":7,"priority":"Normal","region":1,"stt":"ME","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-07-12T00:00:00.000Z","dateRequired":"2024-07-12T00:00:00.000Z","popStartDate":"2024-07-08T00:00:00.000Z","popEndDate":"2024-08-09T00:00:00.000Z","dateObligated":"2024-07-12T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-07-08T00:00:00.000Z","maPopEndDate":"2024-08-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":" GSA to assist with leasing of space needed to run JFO and DRC operations. Could include leasing of separate facilities in Maine.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3cdd0548-2604-4291-8a17-c1c92172b8d6","hash":"2ddc0bd66d06799bb3edaff8d70c2c227e482294","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121901","incidentName":"R1 Severe Storms and Flooding 12172023","incidentType":"Severe Storm","disasterNumber":4754,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4754DRMEGSA02","maAmendNumber":4,"actionId":465669,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-05-03T00:00:00.000Z","dateRequired":"2024-05-02T00:00:00.000Z","popStartDate":"2024-02-01T00:00:00.000Z","popEndDate":"2024-06-05T00:00:00.000Z","dateObligated":"2024-05-03T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-02-01T00:00:00.000Z","maPopEndDate":"2024-06-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #4: Extend period of performance to 06/05/2024. No additional funding.\r\nAmendment #3: Amend to extend GSA mission for 30 days. New POP end date of 05/01/2024. No additional funding required.\r\nAmendment #2: Extend period of performance to 03/30/2024. No additional funding.\r\nAmendment #1: Amend to extend POP to 29 FEB 2024. No additional cost required. \r\nActivate GSA to assist with leasing of space needed to run JFO and DRC operations. Could include leasing of separate facilities in Maine.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"6e0eb4e9-b9b2-48a8-bfba-50e4ca71277f","hash":"dd408ee5f84334083bac2893b39f8d7c981d5344","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121901","incidentName":"R1 Severe Storms and Flooding 12172023","incidentType":"Severe Storm","disasterNumber":4754,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4754DRMEGSA02","maAmendNumber":3,"actionId":462891,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-03-28T00:00:00.000Z","dateRequired":"2024-03-30T00:00:00.000Z","popStartDate":"2024-02-01T00:00:00.000Z","popEndDate":"2024-05-01T00:00:00.000Z","dateObligated":"2024-03-28T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-02-01T00:00:00.000Z","maPopEndDate":"2024-06-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #3: Amend to extend GSA mission for 30 days. New POP end date of 05/01/2024. No additional funding required.\r\nAmendment #2: Extend period of performance to 03/30/2024. No additional funding.\r\nAmendment #1: Amend to extend POP to 29 FEB 2024. No additional cost required. \r\nActivate GSA to assist with leasing of space needed to run JFO and DRC operations. Could include leasing of separate facilities in Maine.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"0b03076e-57d5-4214-8679-9a3932b32b6c","hash":"470dc1ab4ade703e686f9e75749c5009918ade0a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121901","incidentName":"R1 Severe Storms and Flooding 12172023","incidentType":"Severe Storm","disasterNumber":4754,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4754DRMEGSA02","maAmendNumber":2,"actionId":460188,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-02-28T00:00:00.000Z","dateRequired":"2024-02-28T00:00:00.000Z","popStartDate":"2024-02-01T00:00:00.000Z","popEndDate":"2024-03-30T00:00:00.000Z","dateObligated":"2024-02-29T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-02-01T00:00:00.000Z","maPopEndDate":"2024-06-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #2: Extend period of performance to 03/30/2024. No additional funding.\r\nAmendment #1: Amend to extend POP to 29 FEB 2024. No additional cost required. \r\nActivate GSA to assist with leasing of space needed to run JFO and DRC operations. Could include leasing of separate facilities in Maine.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b71b7c84-bf5a-4387-b100-a76127097af4","hash":"4b037d8c2f90947dc0a5a8bd6d3a62453a98163e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121901","incidentName":"R1 Severe Storms and Flooding 12172023","incidentType":"Severe Storm","disasterNumber":4754,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4754DRMEGSA02","maAmendNumber":1,"actionId":458891,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-02-14T00:00:00.000Z","dateRequired":"2024-02-14T00:00:00.000Z","popStartDate":"2024-02-01T00:00:00.000Z","popEndDate":"2024-02-29T00:00:00.000Z","dateObligated":"2024-02-15T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-02-01T00:00:00.000Z","maPopEndDate":"2024-06-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #1: Amend to extend POP to 29 FEB 2024. No additional cost required. \r\n\r\nActivate GSA to assist with leasing of space needed to run JFO and DRC operations. Could include leasing of separate facilities in Maine.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"438bb78c-1167-4f7b-acc7-5c1c381a713e","hash":"87e142f7e60313d3b56121d711356bf466f1b2dc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121901","incidentName":"R1 Severe Storms and Flooding 12172023","incidentType":"Severe Storm","disasterNumber":4754,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4754DRMEGSA02","maAmendNumber":0,"actionId":457850,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-02-01T00:00:00.000Z","dateRequired":"2024-02-01T00:00:00.000Z","popStartDate":"2024-02-01T00:00:00.000Z","popEndDate":"2024-02-14T00:00:00.000Z","dateObligated":"2024-02-01T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2024-02-01T00:00:00.000Z","maPopEndDate":"2024-06-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"Activate GSA to assist with leasing of space needed to run JFO and DRC operations. Could include leasing of separate facilities in Maine.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a3f3c27a-b985-4181-871d-cf693a4cd100","hash":"a16ba3fdfa9c953ece88a25e683c9c92b080e4fb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121901","incidentName":"R1 Severe Storms and Flooding 12172023","incidentType":"Severe Storm","disasterNumber":4754,"declarationType":"DR","declarationTitle":"SEVERE STORM AND FLOODING","maId":"4754DRMEDOI-USGS01","maAmendNumber":0,"actionId":459191,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOI-USGS","agency":"DOI-USGS (GEOLOGICAL SURVEY)","authority":"Stafford Act","dateReceived":"2024-02-16T00:00:00.000Z","dateRequired":"2023-12-19T00:00:00.000Z","popStartDate":"2023-12-19T00:00:00.000Z","popEndDate":"2024-01-19T00:00:00.000Z","dateObligated":"2024-02-21T00:00:00.000Z","obligationAmount":138452.37,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":138452.37,"maPopStartDate":"2023-12-19T00:00:00.000Z","maPopEndDate":"2024-01-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":138452.37,"maPriority":"High","assistanceRequested":"USGS Field measurements of flood-water heights in impacted communities. Initial request for support at up to 600 locations. This MA is a reissuance of ME-23121901-DOI-USGS-01.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Geological Survey (USGS) will provide advance support, real-time field measurements, and daily reporting of water heights in direct support and for situational awareness of FEMA disaster operations for a high-water or flood event.\r\n\r\nUSGS services may include, but are not limited to, the following in direct support of response and recovery operations:\r\n - Field measurements of flood water heights in impacted communities;\r\n - Deploy supplemental water-level measuring instruments.\r\n - Measure streamflow and discharge of flooded channels, directly or indirectly.\r\n - Flagging of High-Water Marks and collect evidence of flooding for impacted areas and communities. \r\n - Locate and record the horizontal position and vertical elevation of the High Water Marks (HWM). \r\n - Documentation of HWMs with field notes, digital photographs, and depth measurements to the ground at the HWM location at the time of inspection. \r\n - Data measurements provided in GIS-ready format via the USGS National Water Information System or Short-Term Network system for display and download. \r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"fff13527-9c62-4388-ade8-b9451413c16d","hash":"1e04ed1ad29a08e230e6c3316160bd84efa47c67","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121001","incidentName":"R4 Severe Storms (Dec 9-10, 2023)","incidentType":"Severe Storm","disasterNumber":4751,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4751DRTNUSDA-RD01","maAmendNumber":1,"actionId":464011,"maType":"FOS","supportFunction":19,"priority":"Normal","region":4,"stt":"TN","agencyId":"USDA-RD","agency":"USDA-RURAL DEVELOPMENT","authority":"Stafford Act","dateReceived":"2024-04-11T00:00:00.000Z","dateRequired":"2024-04-10T00:00:00.000Z","popStartDate":"2024-01-12T00:00:00.000Z","popEndDate":"2024-06-16T00:00:00.000Z","dateObligated":"2024-04-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-01-12T00:00:00.000Z","maPopEndDate":"2024-06-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #1: Extend projected end date to June 16, 2024.\r\nRSF - As directed by and in coordination with FEMA, the United States Department of Agriculture, (USDA) will provide appropriate personnel to JFO, JRO, or other teams and/or facilities to support disaster operations. Liaison support may include but is not limited to the following: two additional team members from USDA within Rural Development joining primary field coordinator at times and provides for local Tennessee Rural Development leadership to participate in public events and prioritize disaster related applications when possible.","statementOfWork":"As directed by and in coordination with FEMA, the United States Department of Agriculture (USDA) will provide appropriate personnel to the JFO, JRO, or other teams and/or facilities to support disaster operations.\r\nLiaison support may include, but is not limited to, the following:\r\n-USDA support to the JFO and/or JRO\r\n-USDA Local, State, Tribal, Territorial, and Federal Government Advisor(s)\r\n-Nonspecific Recovery Support Function (RSF) Field Coordinator (under NDRF)\r\n-USDA Recovery Support SME(s)\r\n-Contract or OFA audit support to ensure costs incurred under USDA Mission Assignments (Mas) meet all Stafford Act and regulatory requirements.\r\n-Support to USDA Agencies and Programs\r\n-Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n-Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n-Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n-Provide support either deployed onsite, episodically, or virtually as needed.\r\n-Develop an approach to support recovery, unique to the local communities and/or regional situation, working with and through existing USDA structures.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations","id":"edfd3e84-1575-41fc-a407-8912765746b2","hash":"70835fa2ff517f248cbd8d05b96c2617855cba1d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121001","incidentName":"R4 Severe Storms (Dec 9-10, 2023)","incidentType":"Severe Storm","disasterNumber":4751,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4751DRTNUSDA-RD01","maAmendNumber":0,"actionId":456107,"maType":"FOS","supportFunction":19,"priority":"Normal","region":4,"stt":"TN","agencyId":"USDA-RD","agency":"USDA-RURAL DEVELOPMENT","authority":"Stafford Act","dateReceived":"2024-01-12T00:00:00.000Z","dateRequired":"2024-01-16T00:00:00.000Z","popStartDate":"2024-01-12T00:00:00.000Z","popEndDate":"2024-04-16T00:00:00.000Z","dateObligated":"2024-01-14T00:00:00.000Z","obligationAmount":92000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":92000,"maPopStartDate":"2024-01-12T00:00:00.000Z","maPopEndDate":"2024-06-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":92000,"maPriority":"Normal","assistanceRequested":"RSF - As directed by and in coordination with FEMA, the United States Department of Agriculture, (USDA) will provide appropriate personnel to JFO, JRO, or other teams and/or facilities to support disaster operations. Liaison support may include but is not limited to the following: two additional team members from USDA within Rural Development joining primary field coordinator at times and provides for local Tennessee Rural Development leadership to participate in public events and prioritize disaster related applications when possible.","statementOfWork":"As directed by and in coordination with FEMA, the United States Department of Agriculture (USDA) will provide appropriate personnel to the JFO, JRO, or other teams and/or facilities to support disaster operations.\r\n\r\n\r\nLiaison support may include, but is not limited to, the following:\r\n-USDA support to the JFO and/or JRO\r\n-USDA Local, State, Tribal, Territorial, and Federal Government Advisor(s)\r\n-Nonspecific Recovery Support Function (RSF) Field Coordinator (under NDRF)\r\n-USDA Recovery Support SME(s)\r\n-Contract or OFA audit support to ensure costs incurred under USDA Mission Assignments (Mas) meet all Stafford Act and regulatory requirements.\r\n-Support to USDA Agencies and Programs\r\n-Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n-Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities.\r\n-Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n-Provide support either deployed onsite, episodically, or virtually as needed.\r\n-Develop an approach to support recovery, unique to the local communities and/or regional situation, working with and through existing USDA structures.\r\n\r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations","id":"97b8335c-26a0-46f9-a870-483c2a7367fc","hash":"17ae43d224cb0102a03e362b15abed33d4bd2912","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121001","incidentName":"R4 Severe Storms (Dec 9-10, 2023)","incidentType":"Severe Storm","disasterNumber":4751,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4751DRTNDOD-OPS01","maAmendNumber":1,"actionId":465026,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"TN","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-04-26T00:00:00.000Z","dateRequired":"2024-04-25T00:00:00.000Z","popStartDate":"2023-12-21T00:00:00.000Z","popEndDate":"2024-02-20T00:00:00.000Z","dateObligated":"2024-05-01T00:00:00.000Z","obligationAmount":-500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-500,"maPopStartDate":"2023-12-21T00:00:00.000Z","maPopEndDate":"2024-02-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-500,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $500.00 per 4/1/2024 ULO Report.\r\nRequesting use of appropriate space in the Fort Campbell AAFES. \r\nFEMA will use the premises primarily as a Disaster Recovery Center office where FEMA will receive survivors for the purpose of providing information such as the status of applications, and general information on FEMA disaster assistance. ","statementOfWork":"Request appropriate space in the Fort Campbell AAFES for use as Disaster Recovery Center office. Provide life safety and lifesaving requirements as required by FEMA.\r\n- Be prepared to provide EPLO LNO to serve as liaison between the base and FEMA.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual)\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9abba831-7b6e-41c0-965d-9d3c7cfae047","hash":"c01e849e73e8ee0c0efd8dafcd884e9b5f1063f5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121001","incidentName":"R4 Severe Storms (Dec 9-10, 2023)","incidentType":"Severe Storm","disasterNumber":4751,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4751DRTNDOD-OPS01","maAmendNumber":0,"actionId":454927,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"TN","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-12-21T00:00:00.000Z","dateRequired":"2023-12-23T00:00:00.000Z","popStartDate":"2023-12-21T00:00:00.000Z","popEndDate":"2024-02-20T00:00:00.000Z","dateObligated":"2023-12-22T00:00:00.000Z","obligationAmount":500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":500,"maPopStartDate":"2023-12-21T00:00:00.000Z","maPopEndDate":"2024-02-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":500,"maPriority":"High","assistanceRequested":"Requesting use of appropriate space in the Fort Campbell AAFES. \r\nFEMA will use the premises primarily as a Disaster Recovery Center office where FEMA will receive survivors for the purpose of providing information such as the status of applications, and general information on FEMA disaster assistance. ","statementOfWork":"Request appropriate space in the Fort Campbell AAFES for use as Disaster Recovery Center office. Provide life safety and lifesaving requirements as required by FEMA.\r\n- Be prepared to provide EPLO LNO to serve as liaison between the base and FEMA.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual)\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"624f3d47-ca7a-45b6-a5f5-a74f5f73ffbf","hash":"c08cbf902b8ff3a29567c76b1eae6fe7c220c791","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121001","incidentName":"R4 Severe Storms (Dec 9-10, 2023)","incidentType":"Severe Storm","disasterNumber":4751,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4751DRTNCOE-LRD02","maAmendNumber":2,"actionId":459003,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"TN","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-02-15T00:00:00.000Z","dateRequired":"2024-02-15T00:00:00.000Z","popStartDate":"2023-12-18T00:00:00.000Z","popEndDate":"2024-03-22T00:00:00.000Z","dateObligated":"2024-02-16T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-12-18T00:00:00.000Z","maPopEndDate":"2024-03-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #2 - Extend projected end date to 03/22/2024; no additional funding required at this time.\r\nAmendment #1 - Add additional funding of $21,000.00 and extend projected end date to 02/21/2024 \r\nActivate USACE in support of DR-4751-TN, severe weather and tornadoes in Tennessee at the IOF, JFO or other locations as needed.  ","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"66417034-4a7d-4750-a257-28c2cbc4c9ee","hash":"dd939aa2a691217a3b7cf028bcbfa084ffdc954a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121001","incidentName":"R4 Severe Storms (Dec 9-10, 2023)","incidentType":"Severe Storm","disasterNumber":4751,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4751DRTNCOE-LRD02","maAmendNumber":1,"actionId":456834,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"TN","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-01-23T00:00:00.000Z","dateRequired":"2024-01-23T00:00:00.000Z","popStartDate":"2023-12-18T00:00:00.000Z","popEndDate":"2024-02-21T00:00:00.000Z","dateObligated":"2024-01-24T00:00:00.000Z","obligationAmount":21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":21000,"maPopStartDate":"2023-12-18T00:00:00.000Z","maPopEndDate":"2024-03-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":21000,"maPriority":"High","assistanceRequested":"Amendment #1 - Add additional funding of $21,000.00 and extend projected end date to 02/21/2024 \r\nActivate USACE in support of DR-4751-TN, severe weather and tornadoes in Tennessee at the IOF, JFO or other locations as needed.  ","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c9814458-aa8d-407a-abaf-531eb1def697","hash":"3bb621a8d488245d57859bfeb15bab21c9e1abbe","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121001","incidentName":"R4 Severe Storms (Dec 9-10, 2023)","incidentType":"Severe Storm","disasterNumber":4751,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4751DRTNCOE-LRD02","maAmendNumber":0,"actionId":454598,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"TN","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2023-12-18T00:00:00.000Z","dateRequired":"2023-12-19T00:00:00.000Z","popStartDate":"2023-12-18T00:00:00.000Z","popEndDate":"2024-01-22T00:00:00.000Z","dateObligated":"2023-12-18T00:00:00.000Z","obligationAmount":21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":21000,"maPopStartDate":"2023-12-18T00:00:00.000Z","maPopEndDate":"2024-03-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":21000,"maPriority":"High","assistanceRequested":"Activate USACE in support of DR-4751-TN, severe weather and tornadoes in Tennessee at the IOF, JFO or other locations as needed.  ","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"269525b2-136d-4a9f-8d6e-1eb0aa258064","hash":"19765c93cf6e67cea86ca70fad472aba0f81c58a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121001","incidentName":"R4 Severe Storms (Dec 9-10, 2023)","incidentType":"Severe Storm","disasterNumber":4751,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4751DRTNCOE-LRD01","maAmendNumber":3,"actionId":465020,"maType":"DFA","supportFunction":3,"priority":"High","region":4,"stt":"TN","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-04-25T00:00:00.000Z","dateRequired":"2024-04-25T00:00:00.000Z","popStartDate":"2023-12-15T00:00:00.000Z","popEndDate":"2024-03-15T00:00:00.000Z","dateObligated":"2024-04-26T00:00:00.000Z","obligationAmount":-123472.46,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":-30868.12,"fedCostShareAmt":-92604.35,"maPopStartDate":"2023-12-15T00:00:00.000Z","maPopEndDate":"2024-03-15T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":-30868.12,"maFedCostShareAmount":-92604.35,"maPriority":"High","assistanceRequested":"Amendment #3 - De-obligate $123,472.46 per 4/1/2024 QULO report.\r\nAmendment #2 - Extend projected end date to 03/15/2024; no additional funding required at this time.\r\nAmendment #1 - Add additional funding of $315,000.00 and extend projected end date to 02/14/2024\r\nRequest Debris SME and Debris Specialists to assist TEMA with Technical Assistance for the counties in Tennessee effected by the severe storms and tornadoes and to validate Debris data, monitor Debris operations activities and provide training or other support as requested. The request to include characterization of debris to determine priorities and safety precautions as related to the debris in those designated counties.","statementOfWork":"In support of State of Tennessee request, as directed by and in coordination with FEMA, USACE will provide \r\nspecialized expertise for oversight of debris operations in support of disaster operations. \r\nSupport may include but not limited to the following: \r\n- provide information on technical requirements \r\n- technical assistance \r\n- validation of Debris data \r\n- monitoring Debris operations \r\n- provide training on debris activities \r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration \r\nof assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required \r\nfor reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary \r\nto ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin \r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"03504e67-1230-4180-adbe-3a35b165ab25","hash":"1df9ded6044261ea5c3bf3a3f43d947d749bcf11","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121001","incidentName":"R4 Severe Storms (Dec 9-10, 2023)","incidentType":"Severe Storm","disasterNumber":4751,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4751DRTNCOE-LRD01","maAmendNumber":2,"actionId":458820,"maType":"DFA","supportFunction":3,"priority":"High","region":4,"stt":"TN","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-02-14T00:00:00.000Z","dateRequired":"2024-02-14T00:00:00.000Z","popStartDate":"2023-12-15T00:00:00.000Z","popEndDate":"2024-03-15T00:00:00.000Z","dateObligated":"2024-02-14T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-12-15T00:00:00.000Z","maPopEndDate":"2024-03-15T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #2 - Extend projected end date to 03/15/2024; no additional funding required at this time.\r\nAmendment #1 - Add additional funding of $315,000.00 and extend projected end date to 02/14/2024\r\nRequest Debris SME and Debris Specialists to assist TEMA with Technical Assistance for the counties in Tennessee effected by the severe storms and tornadoes and to validate Debris data, monitor Debris operations activities and provide training or other support as requested. The request to include characterization of debris to determine priorities and safety precautions as related to the debris in those designated counties.","statementOfWork":"In support of State of Tennessee request, as directed by and in coordination with FEMA, USACE will provide \r\nspecialized expertise for oversight of debris operations in support of disaster operations. \r\nSupport may include but not limited to the following: \r\n- provide information on technical requirements \r\n- technical assistance \r\n- validation of Debris data \r\n- monitoring Debris operations \r\n- provide training on debris activities \r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration \r\nof assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required \r\nfor reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary \r\nto ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin \r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"9cba6262-dc64-4c61-9502-3c1216d4fa79","hash":"a094c19b684dac0c4ec9a4d68cd16becfed83e46","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121001","incidentName":"R4 Severe Storms (Dec 9-10, 2023)","incidentType":"Severe Storm","disasterNumber":4751,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4751DRTNCOE-LRD01","maAmendNumber":1,"actionId":455740,"maType":"DFA","supportFunction":3,"priority":"High","region":4,"stt":"TN","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-01-13T00:00:00.000Z","dateRequired":"2024-01-09T00:00:00.000Z","popStartDate":"2023-12-15T00:00:00.000Z","popEndDate":"2024-02-14T00:00:00.000Z","dateObligated":"2024-01-17T00:00:00.000Z","obligationAmount":315000,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":78750,"fedCostShareAmt":236250,"maPopStartDate":"2023-12-15T00:00:00.000Z","maPopEndDate":"2024-03-15T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":78750,"maFedCostShareAmount":236250,"maPriority":"High","assistanceRequested":"Amendment #1 - Add additional funding of $315,000.00 and extend projected end date to 02/14/2024\r\nRequest Debris SME and Debris Specialists to assist TEMA with Technical Assistance for the counties in Tennessee effected by the severe storms and tornadoes and to validate Debris data, monitor Debris operations activities and provide training or other support as requested. The request to include characterization of debris to determine priorities and safety precautions as related to the debris in those designated counties.","statementOfWork":"In support of State of Tennessee request, as directed by and in coordination with FEMA, USACE will provide \r\nspecialized expertise for oversight of debris operations in support of disaster operations. \r\nSupport may include but not limited to the following: \r\n- provide information on technical requirements \r\n- technical assistance \r\n- validation of Debris data \r\n- monitoring Debris operations \r\n- provide training on debris activities \r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration \r\nof assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required \r\nfor reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary \r\nto ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin \r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"3058d4d0-4a87-4221-be93-2af358ff69b9","hash":"cd9639e4d3c86e4929f9f254ed472a910966e024","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023121001","incidentName":"R4 Severe Storms (Dec 9-10, 2023)","incidentType":"Severe Storm","disasterNumber":4751,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND TORNADOES","maId":"4751DRTNCOE-LRD01","maAmendNumber":0,"actionId":454529,"maType":"DFA","supportFunction":3,"priority":"High","region":4,"stt":"TN","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2023-12-15T00:00:00.000Z","dateRequired":"2023-12-16T00:00:00.000Z","popStartDate":"2023-12-15T00:00:00.000Z","popEndDate":"2024-01-15T00:00:00.000Z","dateObligated":"2023-12-16T00:00:00.000Z","obligationAmount":270000,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":67500,"fedCostShareAmt":202500,"maPopStartDate":"2023-12-15T00:00:00.000Z","maPopEndDate":"2024-03-15T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":67500,"maFedCostShareAmount":202500,"maPriority":"High","assistanceRequested":"Request Debris SME and Debris Specialists to assist TEMA with Technical Assistance for the counties in Tennessee effected by the severe storms and tornadoes and to validate Debris data, monitor Debris operations activities and provide training or other support as requested. The request to include characterization of debris to determine priorities and safety precautions as related to the debris in those designated counties.","statementOfWork":"In support of State of Tennessee request, as directed by and in coordination with FEMA, USACE will provide \r\nspecialized expertise for oversight of debris operations in support of disaster operations. \r\nSupport may include but not limited to the following: \r\n- provide information on technical requirements \r\n- technical assistance \r\n- validation of Debris data \r\n- monitoring Debris operations \r\n- provide training on debris activities \r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration \r\nof assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required \r\nfor reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary \r\nto ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin \r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"82374086-2c31-46de-b98c-caac3c426dcd","hash":"8ea54316686b41b6b126a1eaf3830b7add52a08a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DOT02","maAmendNumber":2,"actionId":474562,"maType":"FOS","supportFunction":1,"priority":"Normal","region":2,"stt":"PR","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":-4349.36,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4349.36,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4349.36,"maPriority":"Normal","assistanceRequested":"Amend 2 - De-obligate ($4,349.36 FY24) As per July 2024 Quarterly ULO report attached.\r\nAmend 1 - De-obligation of ($15,246.28 FY24) per the April 2024 Quarterly ULO Validation process.\r\nActivation of ESF 01 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested. \r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1b01a2b0-05c5-49ff-a2dc-2f82a38b942d","hash":"a0be0b413a5048d434c5ca23e4789505b035e48f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DOT02","maAmendNumber":1,"actionId":465068,"maType":"FOS","supportFunction":1,"priority":"Normal","region":2,"stt":"PR","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-25T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-05-01T00:00:00.000Z","obligationAmount":-15246.28,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15246.28,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15246.28,"maPriority":"Normal","assistanceRequested":"Amend 1 - De-obligation of ($15,246.28 FY24) per the April 2024 Quarterly ULO Validation process.\r\nActivation of ESF 01 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested. \r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8b3509fc-71f6-46c8-9991-4c20383844ed","hash":"e5291d916d6165f49d8db24d04dee656c2036bd5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DOT02","maAmendNumber":0,"actionId":450237,"maType":"FOS","supportFunction":1,"priority":"High","region":2,"stt":"PR","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-10-18T00:00:00.000Z","dateRequired":"2023-10-19T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2023-10-18T00:00:00.000Z","obligationAmount":39797.8,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":39797.8,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":39797.8,"maPriority":"Normal","assistanceRequested":"Activation of ESF 01 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested. \r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"395b3c16-ebdb-43a4-8000-eb737688a766","hash":"63195a9ef8d7064c8a0240f9e061e874133002ff","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DOJ-ATF02","maAmendNumber":1,"actionId":474591,"maType":"FOS","supportFunction":13,"priority":"Normal","region":2,"stt":"PR","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":-15346.76,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15346.76,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15346.76,"maPriority":"Normal","assistanceRequested":"Amend 1 - De-obligate ($15,346.76 FY24) as per the Quarterly July 2024 ULO report attached.\r\nActivation of ESF 13 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"056b8f8e-92cf-4362-9e3d-5bcc8751ab70","hash":"904bd17030494d66f54dceb77e6132a939c74733","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DOJ-ATF02","maAmendNumber":0,"actionId":450257,"maType":"FOS","supportFunction":13,"priority":"High","region":2,"stt":"PR","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-10-18T00:00:00.000Z","dateRequired":"2023-10-19T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2023-10-18T00:00:00.000Z","obligationAmount":36911.13,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":36911.13,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":36911.13,"maPriority":"Normal","assistanceRequested":"Activation of ESF 13 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"a6085588-6d46-49cd-b6ab-118909973474","hash":"a7e6664865b26bc3af8eb2321c53bab2ae01c1a5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DOE-OE02","maAmendNumber":2,"actionId":474555,"maType":"FOS","supportFunction":12,"priority":"Normal","region":2,"stt":"PR","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-05T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":-11216.41,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-11216.41,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-11216.41,"maPriority":"Normal","assistanceRequested":"Amend 2 - De-obligate ($11,216.41 FY24) as per July 2024 Quarterly ULO report attached.\r\nAmend 1 - De-obligate ($12,721.09 FY24) per April 2024 Quarterly ULO Report\r\nActivation of ESF 12 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations  \r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n  - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n ","id":"ce2f4553-1fbb-4b8b-b0e7-64849b408c06","hash":"b204faf6d65b22e721a776e84d8c50472a99d251","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DOE-OE02","maAmendNumber":1,"actionId":465089,"maType":"FOS","supportFunction":12,"priority":"High","region":2,"stt":"PR","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-26T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-05-01T00:00:00.000Z","obligationAmount":-12721.09,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-12721.09,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-12721.09,"maPriority":"Normal","assistanceRequested":"Amend 1 - De-obligate ($12,721.09 FY24) per April 2024 Quarterly ULO Report\r\nActivation of ESF 12 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations  \r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n  - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n ","id":"9bbb19f1-7f4e-441d-8fde-8dad0a792cb4","hash":"884e7b3d90ea93d2318244ea2fb88f5c2299baff","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DOE-OE02","maAmendNumber":0,"actionId":450256,"maType":"FOS","supportFunction":12,"priority":"High","region":2,"stt":"PR","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-10-18T00:00:00.000Z","dateRequired":"2023-10-19T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2023-10-18T00:00:00.000Z","obligationAmount":75315,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":75315,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":75315,"maPriority":"Normal","assistanceRequested":"Activation of ESF 12 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations  \r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n  - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n ","id":"087eeae9-e6ca-4d6f-9b02-40c850537ce1","hash":"c9825c2b38152178f80c0cb7d608ff7eaa7ea5e9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DOD-OPS02","maAmendNumber":2,"actionId":465007,"maType":"FOS","supportFunction":0,"priority":"Normal","region":2,"stt":"PR","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-25T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-05-01T00:00:00.000Z","obligationAmount":-1465.2,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1465.2,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1465.2,"maPriority":"Normal","assistanceRequested":"Amend 2 - De-obligation of ($1,465.20 FY 24) per the April 2024 Quarterly ULO Validation process.\r\nAmend 1 - De-obligation of ($46,586.85 FY24) per request of the January 2024 ULO Report\r\nActivation of DoD/DCE Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"720bbb4b-9cd5-497e-9bf4-0cff55663898","hash":"692d16ceb2f1614502342c327e2c2463dcc462d0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DOD-OPS02","maAmendNumber":1,"actionId":457474,"maType":"FOS","supportFunction":0,"priority":"High","region":2,"stt":"PR","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-01-30T00:00:00.000Z","dateRequired":"2024-02-02T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-02-01T00:00:00.000Z","obligationAmount":-46586.85,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-46586.85,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-46586.85,"maPriority":"Normal","assistanceRequested":"Amend 1 - De-obligation of ($46,586.85 FY24) per request of the January 2024 ULO Report\r\nActivation of DoD/DCE Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2a925252-7897-48d7-b7cf-66a89f570ebb","hash":"9c79780cba6fc0668c0e3900c1af18e2642e515d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DOD-OPS02","maAmendNumber":0,"actionId":450266,"maType":"FOS","supportFunction":0,"priority":"High","region":2,"stt":"PR","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-18T00:00:00.000Z","dateRequired":"2023-10-19T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2023-10-18T00:00:00.000Z","obligationAmount":64669.83,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":64669.83,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":64669.83,"maPriority":"Normal","assistanceRequested":"Activation of DoD/DCE Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ed0167c1-c5d1-44b3-be60-c404008056be","hash":"4df049b7577f2f2855f077d5cc7121854bd7cd46","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DHS-USCG02","maAmendNumber":1,"actionId":457834,"maType":"FOS","supportFunction":9,"priority":"High","region":2,"stt":"PR","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-02-01T00:00:00.000Z","dateRequired":"2024-02-01T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-02-01T00:00:00.000Z","obligationAmount":-8906.22,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-8906.22,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-8906.22,"maPriority":"High","assistanceRequested":"Amend 1 - De-obligate $8,906.22 FY24 per January 2024 ULO.\r\nActivation of ESF 09 (US Coast Guard) Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1051e6a6-6892-47fe-9437-7a893852a851","hash":"e675df700ccfd691c2ae2628db6eb1fcce8c7f45","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DHS-USCG02","maAmendNumber":0,"actionId":450255,"maType":"FOS","supportFunction":9,"priority":"High","region":2,"stt":"PR","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-10-18T00:00:00.000Z","dateRequired":"2023-10-19T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2023-10-18T00:00:00.000Z","obligationAmount":8906.22,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":8906.22,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":8906.22,"maPriority":"High","assistanceRequested":"Activation of ESF 09 (US Coast Guard) Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"012412f6-2c95-432c-a597-c4bde296226d","hash":"b9412ce31e00594dd5dc514f20aa26971453bdf4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DHS-CISA01","maAmendNumber":1,"actionId":465082,"maType":"FOS","supportFunction":14,"priority":"High","region":2,"stt":"PR","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-26T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-05-01T00:00:00.000Z","obligationAmount":-17640.7,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-17640.7,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-17640.7,"maPriority":"High","assistanceRequested":"Amend 1 - De-obligate ($17,640.70 FY24) per April 2024 Quarterly ULO Report\r\n Activation of ESF 14 DHS Cybersecurity &amp; Infrastructure Security Agency (CISA)Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined and in accordance with Region 2 Operations Order 2023-020 or as otherwise directed.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\n\r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ea7010e3-c4b1-4cc8-89e9-778ebfa993db","hash":"5e899fbfd67166d131aaeb3ba4847343f9edca21","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701DHS-CISA01","maAmendNumber":0,"actionId":450213,"maType":"FOS","supportFunction":14,"priority":"High","region":2,"stt":"PR","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-10-18T00:00:00.000Z","dateRequired":"2023-10-19T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2023-10-18T00:00:00.000Z","obligationAmount":22098.69,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":22098.69,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":22098.69,"maPriority":"High","assistanceRequested":"Activation of ESF 14 DHS Cybersecurity &amp; Infrastructure Security Agency (CISA)Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined and in accordance with Region 2 Operations Order 2023-020 or as otherwise directed.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\n\r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"20fc9378-a84a-4422-abef-bf4afb1d56f3","hash":"ad745f57b05fd102b66d667b7dd190c9080f7cf7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701COE-SAD02","maAmendNumber":3,"actionId":457403,"maType":"FOS","supportFunction":3,"priority":"Normal","region":2,"stt":"PR","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-01-30T00:00:00.000Z","dateRequired":"2024-02-02T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-02-01T00:00:00.000Z","obligationAmount":-7618.8,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-7618.8,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-7618.8,"maPriority":"Normal","assistanceRequested":"Amend 3 - De obligate ($7,618.80 FY24) per attached (in ECAPS) January 2024 ULO report\r\nAmend 2 - Add $5,109.60 to cover additional costs. \r\nAmend 1 - Add $10,000.00 to cover additional costs\r\nActivation of ESF 03 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"6646eac8-9c55-416d-953a-0b47a9033e53","hash":"90b220d733bcb43ca9fa8bf67fed231eafeaf42d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701COE-SAD02","maAmendNumber":2,"actionId":452157,"maType":"FOS","supportFunction":3,"priority":"Normal","region":2,"stt":"PR","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-11-09T00:00:00.000Z","dateRequired":"2023-11-09T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2023-11-09T00:00:00.000Z","obligationAmount":5109.6,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5109.6,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5109.6,"maPriority":"Normal","assistanceRequested":"Amend 2 - Add $5,109.60 to cover additional costs. \r\nAmend 1 - Add $10,000.00 to cover additional costs\r\nActivation of ESF 03 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"67e37729-ba54-4eab-bb01-4a342e12f3b5","hash":"64d5780cf0e462abd78e92f2a85320693027facb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701COE-SAD02","maAmendNumber":1,"actionId":451488,"maType":"FOS","supportFunction":3,"priority":"Normal","region":2,"stt":"PR","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-11-01T00:00:00.000Z","dateRequired":"2023-11-01T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2023-11-01T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Amend 1 - Add $10,000.00 to cover additional costs\r\n\r\nActivation of ESF 03 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f83e1399-387f-45f2-a9aa-1b8bc78ebd4d","hash":"fdd72b07be7a041f471052c27c709df53442255f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701COE-SAD02","maAmendNumber":0,"actionId":450239,"maType":"FOS","supportFunction":3,"priority":"High","region":2,"stt":"PR","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-10-18T00:00:00.000Z","dateRequired":"2023-10-19T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2023-10-18T00:00:00.000Z","obligationAmount":115500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":115500,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":115500,"maPriority":"Normal","assistanceRequested":"Activation of ESF 03 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"99a11d4c-6447-4393-ae5f-364e9ae84bdb","hash":"f5b57534a699b851079ad70cedd2c482615e2c0c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701COE-LRD02","maAmendNumber":1,"actionId":469781,"maType":"FOS","supportFunction":3,"priority":"High","region":2,"stt":"PR","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-06-13T00:00:00.000Z","dateRequired":"2024-06-13T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-06-14T00:00:00.000Z","obligationAmount":-100000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-100000,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-100000,"maPriority":"High","assistanceRequested":"Amend 01-De-Obligate (-100,000.00) per OFA partial closeout memo.  (Attached)\r\nActivation of Temp Power Teams and/or Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\nInitial requirement is for, up to but not limited to, Type 4 temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"80ba6635-c5c5-4fcc-bdd2-dbf562a503fb","hash":"5dab1dea84cdae7fb467ae4714ddae6653101121","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101701","incidentName":"R 02 Invest 94L - PR USVI","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"PR23101701COE-LRD02","maAmendNumber":0,"actionId":450240,"maType":"FOS","supportFunction":3,"priority":"High","region":2,"stt":"PR","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2023-10-18T00:00:00.000Z","dateRequired":"2023-10-19T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2023-10-18T00:00:00.000Z","obligationAmount":3775494,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3775494,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3775494,"maPriority":"High","assistanceRequested":"Activation of Temp Power Teams and/or Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-020 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\nInitial requirement is for, up to but not limited to, Type 4 temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ae2a0d00-733a-4e77-bbf6-06b9f9f74fdc","hash":"bfd5c7aab5126084e486d0729741b8d3bf15fa58","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023101201","incidentName":"Severe Storms/Tornados_RI_9/10/23-9/13/23 ","incidentType":"Severe Storm","disasterNumber":4753,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, AND TORNADOES","maId":"4753DRRIGSA01","maAmendNumber":0,"actionId":455682,"maType":"FOS","supportFunction":7,"priority":"Normal","region":1,"stt":"RI","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-01-08T00:00:00.000Z","dateRequired":"2024-01-09T00:00:00.000Z","popStartDate":"2024-01-08T00:00:00.000Z","popEndDate":"2024-02-09T00:00:00.000Z","dateObligated":"2024-01-09T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-01-08T00:00:00.000Z","maPopEndDate":"2024-02-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Activation of GSA support for 4753DR-RI. \r\nInitial request is for GSA assistance with sourcing and leasing a commercial office space in Warwick RI.  Facility requirements 8,000 - 12,000sq. Ft. commercial office space. \r\nAdditional requirements: ADA compliant, 75 - 100 parking spots, loading dock, wrap around services to be included.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide personnel to assist in leasing realty and/or contracting support and/or purchases as required to support FEMA disaster operations. Initial request is for GSA to find and assist in the leasing of a suitable location in Warwick, RI area. Details will be provided in a Mission Assignment Task Order as necessary.\r\n--Funding of leases, contracts, or purchases in not authorized under this Mission Assignment. Leases, contracts, or purchases will be funded separately.\r\n--MA task orders (MATOS) may be issues by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignments(s).\r\n--Agencies will be reimbursed for all eligible expenses pursuant to 44 CRF. Supporting documentation is required for reimbursement.\r\n--All equipment and supply purchases must be coordinated with FEMA as a separate MA.\r\n--The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency. \r\n--MAs shall be considered for closure after 45 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MA&#39;s still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8e87883b-8526-4483-8f20-34840431444f","hash":"9ac8166448466efdc64babaab31d6b801929dd0e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MP23100501DOD-OPS01","maAmendNumber":1,"actionId":449407,"maType":"FOS","supportFunction":7,"priority":"Normal","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-13T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"Normal","assistanceRequested":"Amendment1:  De-obligate $20,000.00 and closeout Surge MA. \r\nThis MA is being replaced with 3602EM-MP-DOD-OPS-03-00.\r\n\r\n(DOD) will provide and support Saipan Army Reserve Center to function as an FSA/ISB in support of FEMA disaster operations. ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support Saipan Army Reserve Center to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to as required in support of FEMA disaster operations. Initial installation requirements may include, but are not limited to: marshaling area for transportation trucks and trailers, storage space for generators and equipment, staging area for federal responders, and/or the personnel, equipment and Material Handling Equipment (MHE) to support operations.\r\nADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. .","id":"4448560a-dae6-4275-a3a5-53e619f52a60","hash":"a1ec7451da35c1c845bc4912a912a997f7023655","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MP23100501DOD-OPS01","maAmendNumber":0,"actionId":449287,"maType":"FOS","supportFunction":7,"priority":"Normal","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-07T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"Normal","assistanceRequested":"(DOD) will provide and support Saipan Army Reserve Center to function as an FSA/ISB in support of FEMA disaster operations. ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support Saipan Army Reserve Center to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to as required in support of FEMA disaster operations. Initial installation requirements may include, but are not limited to: marshaling area for transportation trucks and trailers, storage space for generators and equipment, staging area for federal responders, and/or the personnel, equipment and Material Handling Equipment (MHE) to support operations.\r\nADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. .","id":"878b062f-523a-47ca-bb12-bf3347888646","hash":"8e9aca4e61c7fca463df49112f00d6a07254c0d0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MP23100501COE-POD02","maAmendNumber":1,"actionId":449551,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-07T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-10-13T00:00:00.000Z","obligationAmount":-2000000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2000000,"maPopStartDate":"2023-10-07T00:00:00.000Z","maPopEndDate":"2023-10-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2000000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 1:  De-obligate $2,000,000 and closeout Surge MA.  \r\nThis MA is replaced by  3602EM-MP-COE-POD-02-00.\r\nUSACE pre-position temporary emergency power resources to the affected area.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for type IV temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ecd41452-8da8-4f9d-81fc-b6f010fed20f","hash":"5aabe9502855f422d0bb4624d71d02496236f19e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MP23100501COE-POD02","maAmendNumber":0,"actionId":449317,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-07T00:00:00.000Z","popStartDate":"2023-10-07T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-10-07T00:00:00.000Z","obligationAmount":2000000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2000000,"maPopStartDate":"2023-10-07T00:00:00.000Z","maPopEndDate":"2023-10-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2000000,"maPriority":"Life Sustaining","assistanceRequested":"USACE pre-position temporary emergency power resources to the affected area.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for type IV temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2399a0f9-0b52-472b-b8db-17136efecc1c","hash":"68401225f78282a6a3c325ea019440b3fd09c60b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MP23100501COE-POD01","maAmendNumber":2,"actionId":449350,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-13T00:00:00.000Z","obligationAmount":-100000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-100000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-100000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 2:  De-obligate $100,000 and closeout Surge MA.  \r\nThis MA is replaced with 3602EM-MP-COE-POD-01-00.\r\nAmendment #1 Correct admin Error projected end date should be 10/17/2023. \r\nActivate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a097cec2-0fbe-4a93-b19e-c1a9e763f55d","hash":"205dbf458bc4f2ccd30a25a2b15edbca992d146f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MP23100501COE-POD01","maAmendNumber":1,"actionId":449331,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-07T00:00:00.000Z","dateRequired":"2023-10-07T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-08T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #1 Correct admin Error projected end date should be 10/17/2023. \r\nActivate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c991ac30-6878-4255-9e09-8d16ed6d6a03","hash":"c8156114b59a6567438252ea0744f4551444cf35","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MP23100501COE-POD01","maAmendNumber":0,"actionId":449292,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-07T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-06T00:00:00.000Z","dateObligated":"2023-10-07T00:00:00.000Z","obligationAmount":100000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":100000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":100000,"maPriority":"Life Sustaining","assistanceRequested":"Activate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b08b457c-9b9e-4e34-9b41-4c42deb2713b","hash":"53913601001121017aac9d198ccd092d9d4be599","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501USDA-APH01","maAmendNumber":1,"actionId":449698,"maType":"FOS","supportFunction":11,"priority":"High","region":9,"stt":"GU","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-10-12T00:00:00.000Z","dateRequired":"2023-10-12T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment #1 - De-obligate -$10,000.00 and close out MA . This MA is replaced by 3602EM-MP-USDA-APH-01-00\r\n\r\n\r\nUSDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"caab03a7-3005-41de-86f4-8ae21f766bb1","hash":"da35cc1eae4d2db3c58e75d16fbaea865d45a068","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501USDA-APH01","maAmendNumber":0,"actionId":449217,"maType":"FOS","supportFunction":11,"priority":"High","region":9,"stt":"GU","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"USDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.\r\n\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"63755a69-79fe-4dea-8dfd-e8749c8c6b86","hash":"d7290b8de57450aa70aa3271846329c1153ca506","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501HHS-ASPR02","maAmendNumber":1,"actionId":449697,"maType":"FOS","supportFunction":8,"priority":"High","region":9,"stt":"GU","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-10-12T00:00:00.000Z","dateRequired":"2023-10-12T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-17T00:00:00.000Z","obligationAmount":-1600000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1600000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1600000,"maPriority":"High","assistanceRequested":"Amendment#1 De-obligate -$1,600,000.00 and close out MA. This MA is replaced by 3602EM-MP-HHS-ASPR-02-00\r\nHHS to deploy DMAT teams in support of disaster operations. \r\n","statementOfWork":"As directed by and in coordination with FEMA, Health &amp;  Human Services (HHS) will deploy National Disaster Medical System (NDMS) Disaster Medical Assistance Team (DMAT), National Veterinary Response Team (NVRT), Disaster Mortuary Operational Response Team (DMORT) medical response teams, personnel, and equipment to augment State and local medical response resources. NDMS team capabilities may include the following: - Primary and acute care, mass casualties triage, initial resuscitation and stabilization, advanced life support, and preparing the sick or injured for evacuation - Veterinary medical services in support of ESF #11 for service and companion animals - Mortuary assistance to recover, identify, and process deceased victims - Mass casualty decontamination; medical triage following a nuclear, biological, and/or chemical incidents. - Burn Teams - Pediatric Teams - Crush Medicine Teams - International Medical/Surgical Teams - Mental Health Teams Teams are composed of non-Federal volunteers who are placed on intermittent Federal appointments to facilitate activation, when necessary. When activated, NDMS response team members are Federalized employees of the HHS. Teams are normally deployed for 10 to 14 days. FEMA logistical support needed: Teams may require some level of base operating support (food, shelter, laundry, etc.). ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4c7072ce-71d8-42f9-b33c-1006307a1c2f","hash":"8ae1ff9fcdf6ec5b5692af47addc03db06b32075","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501HHS-ASPR02","maAmendNumber":0,"actionId":449306,"maType":"FOS","supportFunction":8,"priority":"High","region":9,"stt":"GU","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-07T00:00:00.000Z","obligationAmount":1600000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1600000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1600000,"maPriority":"High","assistanceRequested":"HHS to deploy DMAT teams in support of disaster operations. \r\n","statementOfWork":"As directed by and in coordination with FEMA, Health &amp;  Human Services (HHS) will deploy National Disaster Medical System (NDMS) Disaster Medical Assistance Team (DMAT), National Veterinary Response Team (NVRT), Disaster Mortuary Operational Response Team (DMORT) medical response teams, personnel, and equipment to augment State and local medical response resources. NDMS team capabilities may include the following: - Primary and acute care, mass casualties triage, initial resuscitation and stabilization, advanced life support, and preparing the sick or injured for evacuation - Veterinary medical services in support of ESF #11 for service and companion animals - Mortuary assistance to recover, identify, and process deceased victims - Mass casualty decontamination; medical triage following a nuclear, biological, and/or chemical incidents. - Burn Teams - Pediatric Teams - Crush Medicine Teams - International Medical/Surgical Teams - Mental Health Teams Teams are composed of non-Federal volunteers who are placed on intermittent Federal appointments to facilitate activation, when necessary. When activated, NDMS response team members are Federalized employees of the HHS. Teams are normally deployed for 10 to 14 days. FEMA logistical support needed: Teams may require some level of base operating support (food, shelter, laundry, etc.). ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"66d232ce-19d0-42bf-b322-11fa5272ac68","hash":"a5e11cd0c99d53adbb9a955428389599483ed73e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501HHS-ASPR01","maAmendNumber":1,"actionId":449712,"maType":"FOS","supportFunction":8,"priority":"High","region":9,"stt":"GU","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-10-12T00:00:00.000Z","dateRequired":"2023-10-12T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":-160000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-160000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-160000,"maPriority":"High","assistanceRequested":"Amendment ##1 - De-obligate -$160,000.00 and closeout MA. This MA is replaced by 3602EM-MP-HHS-ASPR-01-00\t\r\n\r\nActivate HHS to RRCC, IOF, JFO, RFO, or other regional facilities.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"28105dc0-6c71-4939-b41f-87ce941dc7ef","hash":"5962c2dadb35c369b31a33e4d83debd70009efff","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501HHS-ASPR01","maAmendNumber":0,"actionId":449179,"maType":"FOS","supportFunction":8,"priority":"High","region":9,"stt":"GU","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":160000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":160000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":160000,"maPriority":"High","assistanceRequested":"Activate HHS to RRCC, IOF, JFO, RFO, or other regional facilities.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"47520409-f565-4ea1-9358-4c68b2788146","hash":"012605d0997d1b5846f7303d621234521950fb69","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501EPA01","maAmendNumber":1,"actionId":449850,"maType":"FOS","supportFunction":10,"priority":"High","region":9,"stt":"GU","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-10-13T00:00:00.000Z","dateRequired":"2023-10-13T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-17T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment # 1 to De-obligate $5,000.00 and close out MA. This MA is replaced by (3602EM-MP-EPA-01-00).\r\nActivate EPA to RRCC, IOF, JFO, or other teams and facilities as requested.  \r\n","statementOfWork":"As directed by and in coordination with FEMA, Evironmental Protection Agency will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. ADDITIONAL NOTES from FEMA: \r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\n For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"52a47d81-540a-47ed-a28c-f195aa5e2631","hash":"12f085e22ee58bb3558e157d6cee5be4c828b11b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501EPA01","maAmendNumber":0,"actionId":449180,"maType":"FOS","supportFunction":10,"priority":"High","region":9,"stt":"GU","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate EPA to RRCC, IOF, JFO, or other teams and facilities as requested.  \r\n\r\n","statementOfWork":"As directed by and in coordination with FEMA, Evironmental Protection Agency will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. ADDITIONAL NOTES from FEMA: \r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\n For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"179479f7-01f1-4f19-b1cc-310cb4bee6c7","hash":"e91a1bfa4e428aee9190627a50b76de7b731595b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOT01","maAmendNumber":1,"actionId":449816,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"GU","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-10-13T00:00:00.000Z","dateRequired":"2023-10-13T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-17T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"High","assistanceRequested":"Amendment # 1 to De-obligate $20,000.00 and close out MA. This MA is replaced by 3601EM-GU-DOT- 01-00\r\nActivate DOT to RRCC. IOF, JFO, or others teams and facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ae350a42-9172-46c7-8fc8-24d7320cb737","hash":"e6afdd9cbfdcffd7f765864be5f41163f27cbde4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOT01","maAmendNumber":0,"actionId":449213,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"GU","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Activate DOT to RRCC. IOF, JFO, or others teams and facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"823a0e27-cc92-4d1b-a604-b2687be7e400","hash":"d05fdfff43ddfa48942b125fec7a498f8bf6ccde","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOJ-ATF01","maAmendNumber":1,"actionId":449833,"maType":"FOS","supportFunction":13,"priority":"Life Sustaining","region":9,"stt":"GU","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-10-13T00:00:00.000Z","dateRequired":"2023-10-12T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-17T00:00:00.000Z","obligationAmount":-125000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-125000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-125000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment # 1 to De-obligate $125,000.00 and close out MA. This MA is replaced by (EM 3602 CNMI 3602EM-MP-DOJ-ATF-01-00).\r\nActivate ESF 13 DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations. ESF13 will provide Law Enforcement Strike Team (LEST) personnel, Incident Management personnel, Liaison officers, and Management Support Personnel as appropriate to support the mission assignment.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a0adedf2-d824-45eb-956c-a7d1c1e5d7ab","hash":"2708c2525354514b8ddde0b01bf0b14927f1f03a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOJ-ATF01","maAmendNumber":0,"actionId":449295,"maType":"FOS","supportFunction":13,"priority":"Life Sustaining","region":9,"stt":"GU","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-10-07T00:00:00.000Z","dateRequired":"2023-10-07T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-07T00:00:00.000Z","obligationAmount":125000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":125000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":125000,"maPriority":"Life Sustaining","assistanceRequested":"Activate ESF 13 DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations. ESF13 will provide Law Enforcement Strike Team (LEST) personnel, Incident Management personnel, Liaison officers, and Management Support Personnel as appropriate to support the mission assignment.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"529c3cc4-fc24-4d09-889e-9145caa949c6","hash":"3eaadc72ed8f11c7f954aa010777eaceedc0f747","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOE-OE01","maAmendNumber":1,"actionId":449568,"maType":"FOS","supportFunction":12,"priority":"High","region":9,"stt":"GU","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-12T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":-80436,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-80436,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-80436,"maPriority":"High","assistanceRequested":"Amendment #1 De-obligate -$80,436.00 and closeout MA. \r\n\r\nActivate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations Funding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"86c0c5a4-80d6-4dac-827e-e73690bccdf2","hash":"788266c74c4f8055dd22dc7a7303ef9210d7cd99","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOE-OE01","maAmendNumber":0,"actionId":449214,"maType":"FOS","supportFunction":12,"priority":"High","region":9,"stt":"GU","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-12T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":80436,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":80436,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":80436,"maPriority":"High","assistanceRequested":"Activate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations Funding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b73ee305-c6f0-41b9-a97a-121f6efe3aaf","hash":"d29d0d10194456b4083f48c420dc7ddf5a0c2ce4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOD-OPS05","maAmendNumber":1,"actionId":449523,"maType":"FOS","supportFunction":0,"priority":"Lifesaving","region":9,"stt":"GU","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-11T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":-250000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-250000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-250000,"maPriority":"Lifesaving","assistanceRequested":"Amendment #1 De-obligate-$250,000.00 and closeout MA  \r\nThis MA is replaced by 3602EM-MP-DOD-OPS-04-00 \r\nDOD strategic air transportation of personnel (non-medical patients) and/or cargo.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide transportation of personnel (nonmedical patients) and/or cargo, in support of FEMA disaster operations. DOD is responsible for providing personnel and/or equipment necessary to accomplish the mission, including Material Handling Equipment (MHE).\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective  agency.\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n-For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"caa28e3d-be07-4751-96ea-4b06a8e36c98","hash":"919ef12cc885d4389049350bb41ac0c58270879b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOD-OPS05","maAmendNumber":0,"actionId":449225,"maType":"FOS","supportFunction":0,"priority":"Lifesaving","region":9,"stt":"GU","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-07T00:00:00.000Z","obligationAmount":250000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":250000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":250000,"maPriority":"Lifesaving","assistanceRequested":"DOD strategic air transportation of personnel (non-medical patients) and/or cargo.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide transportation of personnel (nonmedical patients) and/or cargo, in support of FEMA disaster operations. DOD is responsible for providing personnel and/or equipment necessary to accomplish the mission, including Material Handling Equipment (MHE).\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective  agency.\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n-For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"a996f6c2-fe2c-4027-a957-997f4db1896d","hash":"6eb22ab7972289df5abf3f31b7ac2598b74322e6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOD-OPS04","maAmendNumber":1,"actionId":449569,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"GU","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":-150000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-150000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-150000,"maPriority":"Normal","assistanceRequested":"Amendment #1 De-obligate $150,000.00 and closeout MA.\r\nThis MA is replaced by 3602EM-MP-DOD-OPS-02-00 (EM3602 CNMI) Dept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations ","statementOfWork":"As requested by and in coordination with FEMA and other appropriate civilian authorities, Dept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations throughout Guam and CNMI. This support may include providing personnel, equipment, fuel, and all logistical support necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA: - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"c952c070-55c1-4a72-bcce-2f68b14ffc3a","hash":"57e490866dc763db86dc49f80944e81e3e1ca0e2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOD-OPS04","maAmendNumber":0,"actionId":449195,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"GU","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-07T00:00:00.000Z","obligationAmount":150000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":150000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":150000,"maPriority":"Normal","assistanceRequested":" Dept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations ","statementOfWork":"As requested by and in coordination with FEMA and other appropriate civilian authorities, Dept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations throughout Guam and CNMI. This support may include providing personnel, equipment, fuel, and all logistical support necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA: - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"aac4f331-1ff5-4eef-8295-1d0538440aaa","hash":"bf7c5ac365e24da6e864866590edec14df4c5747","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOD-OPS03","maAmendNumber":1,"actionId":449567,"maType":"FOS","supportFunction":7,"priority":"Normal","region":9,"stt":"GU","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"Normal","assistanceRequested":"Amendment #1 De-obligate-$20,000.00 and close out MA.\r\n\r\nProvide Andersen AFB as a FEMA Incident Support Base (ISB), Federal Staging Area (FSA), and/or FEMA Federal Team Staging Facility in support of response and recovery operations. ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support Anderson Air Force Base (AAFB) to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to as required in support of FEMA disaster operations. Initial installation requirements may include, but are not limited to: marshaling area for transportation trucks and trailers, storage space for generators and equipment, staging area for federal responders, and/or the personnel, equipment and Material Handling Equipment (MHE) to support operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"09cdaa42-d98b-499a-81f6-99121b53fb44","hash":"8c41256b332ef3499f3f2ba2629b770036c207d7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOD-OPS03","maAmendNumber":0,"actionId":449219,"maType":"FOS","supportFunction":7,"priority":"Normal","region":9,"stt":"GU","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"Normal","assistanceRequested":"Provide Andersen AFB as a FEMA Incident Support Base (ISB), Federal Staging Area (FSA), and/or FEMA Federal Team Staging Facility in support of response and recovery operations. ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support Anderson Air Force Base (AAFB) to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to as required in support of FEMA disaster operations. Initial installation requirements may include, but are not limited to: marshaling area for transportation trucks and trailers, storage space for generators and equipment, staging area for federal responders, and/or the personnel, equipment and Material Handling Equipment (MHE) to support operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"05e5cc5f-5785-47d3-92b9-5df1af1a3053","hash":"a62b4c040be6f0f6cebfe7f3416af0c83e5d1150","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOD-OPS02","maAmendNumber":1,"actionId":449555,"maType":"FOS","supportFunction":7,"priority":"High","region":9,"stt":"GU","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"High","assistanceRequested":"Amendment #1 De-obligate -$20,000.00 and closeout MA \r\n\r\nDOD to provide Naval Guam Base as FSA/ISB to support disaster operations. ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support Naval Base Guam to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to as required in support of FEMA disaster operations. Initial installation requirements may include, but are not limited to: marshaling area for transportation trucks and trailers, storage space for generators and equipment, staging area for federal responders, and/or the personnel, equipment and Material Handling Equipment (MHE) to support operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"dc256b3a-d8f3-4d55-a835-7a7801894ed5","hash":"a3fbc2999ff26dc206abb33c0b5fb3d3c0305adc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOD-OPS02","maAmendNumber":0,"actionId":449227,"maType":"FOS","supportFunction":7,"priority":"High","region":9,"stt":"GU","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-07T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"DOD to provide Naval Guam Base as FSA/ISB to support disaster operations. ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support Naval Base Guam to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to as required in support of FEMA disaster operations. Initial installation requirements may include, but are not limited to: marshaling area for transportation trucks and trailers, storage space for generators and equipment, staging area for federal responders, and/or the personnel, equipment and Material Handling Equipment (MHE) to support operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"6e36bb6e-4429-4fbb-8e72-98ba635b7eac","hash":"78ae97f55f4f0fe4fc4cc321a861eb9aa11a2fa1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOD-OPS01","maAmendNumber":1,"actionId":449566,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":9,"stt":"GU","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-07T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":-50000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-50000,"maPopStartDate":"2023-10-07T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-50000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #1 De-obligate -$50,000.00 and close out MA.\r\nThis MA is replaced by \t3602EM-MP-DOD-OPS-01-00\r\nRequest DCO / DCE (including as necessary SEPLO/EPLO) assistance at the EOC, Joint Field Office, RRCC, or other locations specified by FEMA in support of disaster operations. ","statementOfWork":"As directed by and in coordination with FEMA, DoD will activate and provide a Defense Coordinating Officer with supporting staff element (DCO/DCE Pacific) to the Guam/CNMI emergency management agencies, FEMA Initial Operating Facility, Joint Field Office, or other locations designated in Guam or CNMI, in order to provide DoD regional knowledge, mission requirement validation, and liaison capabilities. The DoD should also provide State/Emergency Preparedness Liaison SEPLO/EPLO teams, Joint Regional Medical Planning Officers (JRMPO), Command and Control (C2) elements, and logistics self-support as necessary to support the lead federal agency.ADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8c032cc9-82e1-486e-8dd8-22298fd091be","hash":"b607f3338a2c750df75f2fea07c4877b0b315b2c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DOD-OPS01","maAmendNumber":0,"actionId":449194,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":9,"stt":"GU","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-07T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":50000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":50000,"maPopStartDate":"2023-10-07T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":50000,"maPriority":"Life Sustaining","assistanceRequested":"Request DCO / DCE (including as necessary SEPLO/EPLO) assistance at the EOC, Joint Field Office, RRCC, or other locations specified by FEMA in support of disaster operations. ","statementOfWork":"As directed by and in coordination with FEMA, DoD will activate and provide a Defense Coordinating Officer with supporting staff element (DCO/DCE Pacific) to the Guam/CNMI emergency management agencies, FEMA Initial Operating Facility, Joint Field Office, or other locations designated in Guam or CNMI, in order to provide DoD regional knowledge, mission requirement validation, and liaison capabilities. The DoD should also provide State/Emergency Preparedness Liaison SEPLO/EPLO teams, Joint Regional Medical Planning Officers (JRMPO), Command and Control (C2) elements, and logistics self-support as necessary to support the lead federal agency.ADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c9bb0986-640a-4605-b2d5-6799ef6135cd","hash":"d806910b67441caea6ed8d87108a0401f22ed7e3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DHS-USCG01","maAmendNumber":1,"actionId":449849,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"GU","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-10-13T00:00:00.000Z","dateRequired":"2023-10-13T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-17T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Normal","assistanceRequested":"Amendment # 1 to De-obligate $10,000.00 and close out MA. This MA is replaced by (3601EM-GU-DHS-USCG- 01).\r\nDeploy USCG liaison officer(s) to RRCC, IOF, JFO, STT EOC or other facility(s)","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"12250c59-38ee-4bab-a3be-ab2a8cda8218","hash":"de21a630ceea5296bd80457ac874aee9798c8951","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DHS-USCG01","maAmendNumber":0,"actionId":449226,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"GU","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-05T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-07T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Deploy USCG liaison officer(s) to RRCC, IOF, JFO, STT EOC or other facility(s)","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"75273ed8-ba0b-4b4d-b997-2243d9119579","hash":"a8ddffa8c35bcf885976a1eff44545ce84d5a9a3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DHS-CISA01","maAmendNumber":1,"actionId":449817,"maType":"FOS","supportFunction":2,"priority":"High","region":9,"stt":"GU","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-10-13T00:00:00.000Z","dateRequired":"2023-10-13T00:00:00.000Z","popStartDate":"2023-10-08T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-10-17T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-10-08T00:00:00.000Z","maPopEndDate":"2023-10-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"High","assistanceRequested":"Amendment # 1 to De-obligate $20,000.00 and close out MA. This MA is replaced by (3602EM-MP-DHS-CISA-01-00).\r\nActivate CISA ESF-2 to RRCC, IOF, JFO\r\n","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"916dbbcb-0ae6-471f-a1e2-6b04a0df18cd","hash":"d6332b0b94ff987a5e55c4d33e26971fc4728616","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501DHS-CISA01","maAmendNumber":0,"actionId":449330,"maType":"FOS","supportFunction":2,"priority":"High","region":9,"stt":"GU","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-10-07T00:00:00.000Z","dateRequired":"2023-10-07T00:00:00.000Z","popStartDate":"2023-10-08T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-10-08T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-08T00:00:00.000Z","maPopEndDate":"2023-10-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Activate CISA ESF-2 to RRCC, IOF, JFO\r\n","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7c9e5e76-d5e4-44dd-844d-9620647da60e","hash":"9eb2a5accfd7c4c2ce8e42deafbc7f625ba93918","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501COE-POD02","maAmendNumber":1,"actionId":449406,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"GU","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-15T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":-2000000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2000000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2000000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment # 1 De obligate $2,000,000.00 and close out MA.\r\nThis MA is replaced by 3601EM-GU-COE-POD-02-00\r\nUSACE pre-position temporary emergency power resources to the affected area","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for type IV temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"39c40780-f151-4300-b4a8-e22d0df91e6b","hash":"2819a08ef5cdb9d62cd251c6f8bc6738d630f362","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501COE-POD02","maAmendNumber":0,"actionId":449256,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"GU","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-08T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-15T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":2000000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2000000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2000000,"maPriority":"Life Sustaining","assistanceRequested":"USACE pre-position temporary emergency power resources to the affected area","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\n\r\nInitial requirement is for type IV temporary power support assets\r\n\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\n\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"be6e6637-0055-4f47-b8f6-df2a3bd042ed","hash":"c1b55cf9539c99412fae8ba3887921cb4e42f266","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501COE-POD01","maAmendNumber":1,"actionId":449543,"maType":"FOS","supportFunction":3,"priority":"High","region":9,"stt":"GU","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":-100000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-100000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-100000,"maPriority":"High","assistanceRequested":"Amendment #1 De-obligate -$100,000.00 and close out MA. \r\nThis MA is replaced by 3601EM-GU-COE-POD-01-00\r\nActivate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities. \r\n","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f3a9e25a-eecc-49d7-952c-0be096692352","hash":"a7a8fdaa4dc12e3deb4eca8d69a91b9038d8d329","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GU23100501COE-POD01","maAmendNumber":0,"actionId":449216,"maType":"FOS","supportFunction":3,"priority":"High","region":9,"stt":"GU","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-06T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-07T00:00:00.000Z","obligationAmount":100000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":100000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":100000,"maPriority":"High","assistanceRequested":"Activate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities. \r\n","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a3ac1518-a371-4c72-850d-5458fe72abde","hash":"075b13e273252aab729c6c1d4d6368d081468d46","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPUSDA-APH01","maAmendNumber":2,"actionId":465615,"maType":"FOS","supportFunction":11,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-05-07T00:00:00.000Z","dateRequired":"2024-05-01T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2024-05-24T00:00:00.000Z","obligationAmount":-2533.76,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2533.76,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2533.76,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #2: De-obligate -$2,533.76 per April 2024 Quarterly ULO Report. \r\n\r\nAmendment #1: Deobligate $4,366.92 per 01/01/2024 Quarterly ULO Report.\r\nActivate USDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"5642364f-6af1-4fe2-86fd-edc1a879c549","hash":"bac38a35c25579ec79641d66adb648b1f8ac2604","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2018072401","incidentName":"CARR FIRE","incidentType":"Fire","disasterNumber":4382,"declarationType":"DR","declarationTitle":"WILDFIRES AND HIGH WINDS","maId":"4382DRCADOE01","maAmendNumber":0,"actionId":265957,"maType":"FOS","supportFunction":12,"priority":"High","region":9,"stt":"CA","agencyId":"DOE","agency":"DEPARTMENT OF ENERGY","authority":"Stafford Act","dateReceived":"2018-08-05T00:00:00.000Z","dateRequired":"2018-08-05T00:00:00.000Z","popStartDate":"2018-08-05T00:00:00.000Z","popEndDate":"2018-08-17T00:00:00.000Z","dateObligated":"2018-08-06T00:00:00.000Z","obligationAmount":30000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":30000,"maPopStartDate":"2018-08-05T00:00:00.000Z","maPopEndDate":"2018-08-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":30000,"maPriority":"High","assistanceRequested":"Activate  ESF #12 DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, or other team(s) or facilities as requested to support disaster operations \r\n\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n\r\n MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement. \r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. \r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. ","id":"4e1ea745-3683-4096-8dcd-1bf95e8d9eda","hash":"dc6446848f18933f28777aa1273a9cc910b76d7a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPUSDA-APH01","maAmendNumber":1,"actionId":459202,"maType":"FOS","supportFunction":11,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-19T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2024-03-05T00:00:00.000Z","obligationAmount":-4366.92,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4366.92,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4366.92,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #1: Deobligate $4,366.92 per 01/01/2024 Quarterly ULO Report.\r\n\r\nActivate USDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"143106b3-6c9c-498a-a55f-a8f8785a7b97","hash":"4310edc6d937d91a3fff849f32ae09b9ee01438e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPUSDA-APH01","maAmendNumber":0,"actionId":449347,"maType":"FOS","supportFunction":11,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Life Sustaining","assistanceRequested":"USDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"aaa435f5-6e09-4416-85ac-413aaedb1376","hash":"63b84c63e0c20c400147e85742ccb9cbfc0c8276","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPHHS-ASPR03","maAmendNumber":1,"actionId":449665,"maType":"FOS","supportFunction":8,"priority":"High","region":9,"stt":"MP","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-11T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1 to decrease POP to align with NRCC Activation Status and change PM to William Gibbons Jr.\r\nActivate HHS to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"79281309-5d11-4a55-b830-429de57620b2","hash":"c61dc64ce0153ddabbd4ba6dc05201c28d965434","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPHHS-ASPR03","maAmendNumber":0,"actionId":449400,"maType":"FOS","supportFunction":8,"priority":"High","region":9,"stt":"MP","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":6750,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":6750,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":6750,"maPriority":"High","assistanceRequested":"Activate HHS to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e8e33b07-8113-4abf-bb28-5bd4354d28b6","hash":"563e0ed20b3e26609eb7de306ff4bf329636b6da","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPHHS-ASPR02","maAmendNumber":0,"actionId":449393,"maType":"FOS","supportFunction":8,"priority":"High","region":9,"stt":"MP","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":1600000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1600000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1600000,"maPriority":"High","assistanceRequested":"HHS to deploy DMAT teams in support of disaster operations. \r\n","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will deploy National Disaster Medical System (NDMS) Disaster Medical Assistance Team (DMAT), National Veterinary Response Team (NVRT), Disaster Mortuary Operational Response Team (DMORT) medical response teams, personnel, and equipment to augment State and local medical response resources. NDMS team capabilities may include the following: - Primary and acute care, mass casualties triage, initial resuscitation and stabilization, advanced life support, and preparing the sick or injured for evacuation - Veterinary medical services in support of ESF #11 for service and companion animals - Mortuary assistance to recover, identify, and process deceased victims - Mass casualty decontamination; medical triage following a nuclear, biological, and/or chemical incidents. - Burn Teams - Pediatric Teams - Crush Medicine Teams - International Medical/Surgical Teams - Mental Health Teams Teams are composed of non-Federal volunteers who are placed on intermittent Federal appointments to facilitate activation, when necessary. When activated, NDMS response team members are Federalized employees of the HHS. Teams are normally deployed for 10 to 14 days. FEMA logistical support needed: Teams may require some level of base operating support (food, shelter, laundry, etc.). ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8d4d5338-f263-41fd-be1f-705a4d1b6db1","hash":"f13041ca68877b4b3306d85d1065290b1ae7aeb6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPHHS-ASPR01","maAmendNumber":0,"actionId":449388,"maType":"FOS","supportFunction":8,"priority":"Lifesaving","region":9,"stt":"MP","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":160000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":160000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":160000,"maPriority":"Lifesaving","assistanceRequested":"Activate HHS to RRCC, IOF, JFO, RFO, or other regional facilities.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7d207076-68d6-4ba6-a724-73516d40dd8f","hash":"f350d5523a35c23875b8517c37b15015f63389aa","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPGSA02","maAmendNumber":2,"actionId":450379,"maType":"FOS","supportFunction":7,"priority":"High","region":9,"stt":"MP","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-10-19T00:00:00.000Z","dateRequired":"2023-10-19T00:00:00.000Z","popStartDate":"2023-10-09T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2023-10-19T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-10-09T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 2 to de-obligate $5,000 and change PM to Andrew Ingersoll\r\nAmendment 1 to decrease POP to align with NRCC Activation Status\r\nActivate GSA to NRCC, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n - ESF7 support\r\n - Emergency leasing services for needed space/facilities as requested by FEMA\r\n - GSA Lease Contracting Officers (LCOs) and others as needed\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9eb52794-d0b8-4fb6-821c-6ba735323301","hash":"18e65c79d0d5d5c88a19212796a64414c4d62601","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPGSA02","maAmendNumber":1,"actionId":449667,"maType":"FOS","supportFunction":7,"priority":"High","region":9,"stt":"MP","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-11T00:00:00.000Z","popStartDate":"2023-10-09T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-09T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1 to decrease POP to align with NRCC Activation Status\r\nActivate GSA to NRCC, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n - ESF7 support\r\n - Emergency leasing services for needed space/facilities as requested by FEMA\r\n - GSA Lease Contracting Officers (LCOs) and others as needed\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8b1dece2-269e-4aa7-90a7-9c7458e38352","hash":"a0975e77e2bb3b94b5e8d7ca90bada7995b522b5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPGSA02","maAmendNumber":0,"actionId":449415,"maType":"FOS","supportFunction":7,"priority":"High","region":9,"stt":"MP","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-09T00:00:00.000Z","popEndDate":"2023-10-24T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-10-09T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate GSA to NRCC, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations.\r\n\r\nActivities may include, but are not limited to, the following:\r\n - ESF7 support\r\n - Emergency leasing services for needed space/facilities as requested by FEMA\r\n - GSA Lease Contracting Officers (LCOs) and others as needed\r\n\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8332804b-0903-4283-821f-0f82c995bf18","hash":"b349308a2016734dc7df856da73c548100287afe","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPGSA01","maAmendNumber":1,"actionId":459201,"maType":"FOS","supportFunction":7,"priority":"High","region":9,"stt":"MP","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-19T00:00:00.000Z","popStartDate":"2023-10-08T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2024-03-05T00:00:00.000Z","obligationAmount":-4640.01,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4640.01,"maPopStartDate":"2023-10-08T00:00:00.000Z","maPopEndDate":"2023-10-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4640.01,"maPriority":"High","assistanceRequested":"Amendment #1: Deobligate $4,640.01 per 01/01/2024 Quarterly ULO Report.\r\nActivate GSA to RRCC, IOF, JFO, or other teams and facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d8b52977-5f4f-4711-aa6e-172bc7bbeeba","hash":"940eddacf85f7476911962d567fc7c80756eb8c1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPGSA01","maAmendNumber":0,"actionId":449381,"maType":"FOS","supportFunction":7,"priority":"High","region":9,"stt":"MP","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-08T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-10-08T00:00:00.000Z","maPopEndDate":"2023-10-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"fa8548a0-5a1e-4fd6-802a-d51701b4ab2f","hash":"bb53c68adac29a9bae4f0d694c4b072936880567","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPFCC02","maAmendNumber":0,"actionId":449367,"maType":"FOS","supportFunction":2,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-09T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":17155,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":17155,"maPopStartDate":"2023-10-09T00:00:00.000Z","maPopEndDate":"2023-10-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":17155,"maPriority":"Life Sustaining","assistanceRequested":"Radio Frequency (RF) Spectrum Management and Coordination.  FCC spectrum management coordination in support of disaster operations","statementOfWork":"As requested by and in coordination with FEMA, Federal Communications Commission (FCC) will provide spectrum management \r\nassistance in support of FEMA disaster operations. Specific capabilities provided and activities performed may \r\ninclude but are not limited to the following: -Management of radio frequencies. -Assistance with submission of frequency \r\nassignment requests. -  Resolution of frequency interference issues. -Facilitating requests for Radio Frequency \r\nspectrum. - Advising Federal leadership on spectrum issues.  -Coordinating frequencies for incoming Federal first \r\nresponder communications assets and systems, including: assisting with State, local, Tribal, industry, and volunteer \r\norganization interoperability issues; providing technical guidance and coordination of Special Temporary Assignments \r\nand assignment modification routing for Federal responders; facilitating connectivity to FCC, Washington, D.\r\nC - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration \r\nof assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation \r\nis required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project \r\nManager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), \r\nif required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring \r\nthat all activity is properly authorized, goods are received, services are provided, and that costs are reasonable \r\nand supported by documentation maintained by the respective agency - MAs shall be considered for closure after \r\n180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests \r\nfor additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been \r\nprovided.","id":"e8dc4db5-21cb-4dca-b244-7685759a8125","hash":"b3bc8f0a03b3f9988fade2aae316a22d91a1640d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPFCC01","maAmendNumber":0,"actionId":449387,"maType":"FOS","supportFunction":2,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-09T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":34310,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":34310,"maPopStartDate":"2023-10-09T00:00:00.000Z","maPopEndDate":"2023-10-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":34310,"maPriority":"Life Sustaining","assistanceRequested":"Project Roll Call - Automated Spectrum Sensing Platforms.  FCC spectrum management coordination in support of disaster operations","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will deploy teams and equipment\r\nto determine the impact to public safety and EAS communications systems in the affected area and identify surviving and\r\nnonworking systems in support of disaster operations.\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of\r\nassignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for\r\nreimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is\r\nnecessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received,\r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\nMAs\r\nshall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or\r\nadditional justification has been provided.","id":"cea85e0f-42a1-40b2-8b55-40cd9d3a66b9","hash":"8cc0bdc95eff770b00934e24702fcd6dae37ea72","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPEPA02","maAmendNumber":1,"actionId":449664,"maType":"FOS","supportFunction":3,"priority":"High","region":9,"stt":"MP","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-11T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1 to decrease POP to align with NRCC Activation Status and change PM to William Gibbons Jr.\r\nWater/Wastewater SME to NRCC ","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will deploy appropriate personnel to provide water and wastewater expertise to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nEPA will coordinate with USACE/ESF-3 as appropriate.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2169179d-b17d-4aee-99b6-865a7fd2c0d1","hash":"d52385236336b110af3812fa2cbf7ee01c124818","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPEPA02","maAmendNumber":0,"actionId":449348,"maType":"FOS","supportFunction":3,"priority":"High","region":9,"stt":"MP","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Water/Wastewater SME to NRCC ","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will deploy appropriate personnel to provide water and wastewater expertise to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nEPA will coordinate with USACE/ESF-3 as appropriate.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f8eeb2e4-a0a0-40ad-910f-47a05d438252","hash":"1461c7a7db6ee5d67c7c086b58f9d87c82eb4ded","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPEPA01","maAmendNumber":0,"actionId":449389,"maType":"FOS","supportFunction":10,"priority":"Lifesaving","region":9,"stt":"MP","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Lifesaving","assistanceRequested":"Activate EPA to RRCC, IOF, JFO, or other teams and facilities as requested.  \r\n","statementOfWork":"As directed by and in coordination with FEMA, Evironmental Protection Agency will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. ADDITIONAL NOTES from FEMA: \r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\n For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"416105cd-93f8-47df-a5fd-06b66a246921","hash":"698cdf5fd5d1128d2570f489bc82112ebe896011","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOT02","maAmendNumber":3,"actionId":464763,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"MP","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-04-25T00:00:00.000Z","dateRequired":"2024-04-24T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2024-05-14T00:00:00.000Z","obligationAmount":-8010.72,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-8010.72,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-8010.72,"maPriority":"High","assistanceRequested":"Amendment 3 to deobligate $8,010.72 per 4-1-24 QULO and OFA request. Change PM to Danny Carpenter.\r\nAmendment 2 to de-obligate $10,840 per 01.01.24 QULO and OFA request. And change PM to Danny Carpenter\r\nAmendment 1 to decrease POP to align with NRCC Activation Status and change PM to William Gibbons Jr.\r\nActivate DOT to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d3ef1c4e-0213-4071-ad4d-8b13be60c018","hash":"a23555a584a5df13c7190d76f09ac5a88ee453fe","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOT02","maAmendNumber":2,"actionId":457078,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"MP","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-01-24T00:00:00.000Z","dateRequired":"2024-01-24T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2024-01-24T00:00:00.000Z","obligationAmount":-10840,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10840,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10840,"maPriority":"High","assistanceRequested":"Amendment 2 to de-obligate $10,840 per 01.01.24 QULO and OFA request. And change PM to Danny Carpenter\r\nAmendment 1 to decrease POP to align with NRCC Activation Status and change PM to William Gibbons Jr.\r\nActivate DOT to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"5432a5aa-cffd-4792-ab50-9f8444298a50","hash":"74c34540a837023fe1de536a8272eb72b3a71c02","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOT02","maAmendNumber":1,"actionId":449623,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"MP","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-11T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1 to decrease POP to align with NRCC Activation Status and change PM to William Gibbons Jr.\r\nActivate DOT to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7a75c7d5-18e7-40ef-97da-b361108ab7ac","hash":"6bb7066eac8129b36c0658b1aa7b35beca0d08c2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOT02","maAmendNumber":0,"actionId":449399,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"MP","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Activate DOT to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\n\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8a02f459-8ad6-447e-82b2-196dd6e304d0","hash":"55e103531ff0c46c327d09ba6e9240f82675a8b8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOT01","maAmendNumber":2,"actionId":465610,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"MP","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-05-07T00:00:00.000Z","dateRequired":"2024-05-01T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2024-05-24T00:00:00.000Z","obligationAmount":-2364.95,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2364.95,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2364.95,"maPriority":"High","assistanceRequested":"Amendment #2 De-obligate -$2,364.95 per April 2024 Quarterly ULO Report. \r\n\r\nAmendment #1: De-obligate $12,562.38 per 01/01/2024 Quarterly ULO report.\r\nActivate DOT to RRCC. IOF, JFO, or others teams and facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"aed12624-463d-4196-ba49-8ac8034779dd","hash":"ac97a01e8403a9705eaed8f67efba19bbe819994","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOT01","maAmendNumber":1,"actionId":460246,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"MP","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-02-29T00:00:00.000Z","dateRequired":"2024-02-29T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2024-02-29T00:00:00.000Z","obligationAmount":-12562.38,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-12562.38,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-12562.38,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $12,562.38 per 01/01/2024 Quarterly ULO report.\r\nActivate DOT to RRCC. IOF, JFO, or others teams and facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a290b510-db2a-40a7-af4b-8a05733733b0","hash":"270f940fd8ad113b4b96a5af3d4fcdeabf2616bb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOT01","maAmendNumber":0,"actionId":449370,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"MP","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Activate DOT to RRCC. IOF, JFO, or others teams and facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"dcfac0d0-a612-4fb3-b231-f87b651b9b4c","hash":"05698430d2763c29cc7a8e5196f8053f3217fbaf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOJ01","maAmendNumber":1,"actionId":449633,"maType":"FOS","supportFunction":13,"priority":"High","region":9,"stt":"MP","agencyId":"DOJ","agency":"DOJ (GEN ADMIN)","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-11T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1 to decrease POP to align with NRCC Activation Status and change PM to William Gibbons Jr.\r\nActivate DOJ to NRCC or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to NRCC or other facilities as requested to perform functions of ESF-13 in support FEMA disaster operations.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ba9ecf80-a5b5-4c33-8cb6-0137a4f6db59","hash":"27aed66a8600d73669a48d2a13c56dd8351c3209","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOJ01","maAmendNumber":0,"actionId":449405,"maType":"FOS","supportFunction":13,"priority":"High","region":9,"stt":"MP","agencyId":"DOJ","agency":"DOJ (GEN ADMIN)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate DOJ to NRCC or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to NRCC or other facilities as requested to perform functions of ESF-13 in support FEMA disaster operations.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"39bea071-f19c-4de8-9930-ba1bd77a0143","hash":"d2af6a809bd70d0a8bfc4cfca54775c46b6910cb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOJ-ATF01","maAmendNumber":1,"actionId":466269,"maType":"FOS","supportFunction":13,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-05-09T00:00:00.000Z","dateRequired":"2024-05-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2024-05-14T00:00:00.000Z","obligationAmount":12976.1,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":12976.1,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":12976.1,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #1  Increase funding 12,976.10 to cover final invoice . Extend POP to 10-16-2023 to cover last day of travel \r\nActivate ESF 13 DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations. ESF13 will provide Law Enforcement Strike Team (LEST) personnel, Incident Management personnel, Liaison officers, and Management Support Personnel as appropriate to support the mission assignment.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"dcd90dbf-056b-4dbc-818a-fe9af70d14e5","hash":"faef29e87b168897dd0a232faef3d1aabbb61f7c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOJ-ATF01","maAmendNumber":0,"actionId":449372,"maType":"FOS","supportFunction":13,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":125000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":125000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":125000,"maPriority":"Life Sustaining","assistanceRequested":"Activate ESF 13 DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations. ESF13 will provide Law Enforcement Strike Team (LEST) personnel, Incident Management personnel, Liaison officers, and Management Support Personnel as appropriate to support the mission assignment.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4be90fc3-17c6-4006-9578-c3ec99a1d3dd","hash":"15760c3c4d268dbaae2be1dde5aacda781a5b27c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOE-OE02","maAmendNumber":2,"actionId":474012,"maType":"FOS","supportFunction":12,"priority":"High","region":9,"stt":"MP","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-07-31T00:00:00.000Z","dateRequired":"2024-07-29T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":-23379.19,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-23379.19,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-23379.19,"maPriority":"High","assistanceRequested":"Amendment 2: De-obligate -$23,379.19 per July 2024 QULO Report. Change PM to DeLane Garner. \r\nAmendment 1 to decrease POP to align with NRCC Activation Status and change PM to William Gibbons Jr.\r\nActivate DOE to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the NRCC to perform the functions of ESF-12 in support disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"03f01425-2e9d-4e6b-b1e3-cac5596d93b5","hash":"c8ffc7f56a1d689a2c67c43ed57af3fc4071d0ee","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOE-OE02","maAmendNumber":1,"actionId":449622,"maType":"FOS","supportFunction":12,"priority":"High","region":9,"stt":"MP","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-11T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1 to decrease POP to align with NRCC Activation Status and change PM to William Gibbons Jr.\r\nActivate DOE to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the NRCC to perform the functions of ESF-12 in support disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"04a7e287-1ca4-47b5-aa73-ec705420f298","hash":"408236e24d3978841a8fff04ff4743bc3d248a27","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOE-OE02","maAmendNumber":0,"actionId":449349,"maType":"FOS","supportFunction":12,"priority":"High","region":9,"stt":"MP","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":25080,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":25080,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":25080,"maPriority":"High","assistanceRequested":"Activate DOE to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the NRCC to perform the functions of ESF-12 in support disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"95f60182-e474-4a69-a885-c08fc994466b","hash":"779455ccf4bf1ffcde63307e500a05d02c925c88","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOE-OE01","maAmendNumber":3,"actionId":474016,"maType":"FOS","supportFunction":12,"priority":"High","region":9,"stt":"MP","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-08-06T00:00:00.000Z","dateRequired":"2024-07-30T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":-35626.42,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-35626.42,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-35626.42,"maPriority":"High","assistanceRequested":"Amendment #3  deobligate -$35,626.42 per attached 01 JULY 2024 QULO. \r\nAmendment 2: De-obligate -$8,432.00 per April 2024 Quarterly ULO Report. \r\nAmendment 1:  Extend POP end date to 10/26/23.  No additional funding required.\r\nActivate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations Funding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b802e97d-658c-4f4f-b5c9-0b6fde6bc5f3","hash":"36031907bb5bffb83f50de7d43c31b6b38491806","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOE-OE01","maAmendNumber":2,"actionId":465609,"maType":"FOS","supportFunction":12,"priority":"High","region":9,"stt":"MP","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-05-07T00:00:00.000Z","dateRequired":"2024-05-01T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2024-05-24T00:00:00.000Z","obligationAmount":-8432,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-8432,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-8432,"maPriority":"High","assistanceRequested":"Amendment 2: De-obligate -$8,432.00 per April 2024 Quarterly ULO Report. \r\n\r\nAmendment 1:  Extend POP end date to 10/26/23.  No additional funding required.\r\nActivate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations Funding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4403fd99-72e0-4f6e-8497-a170b4e84189","hash":"ee0dc82be6d8ef4af5dbd1bddcf17ca73031cc20","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOE-OE01","maAmendNumber":1,"actionId":449803,"maType":"FOS","supportFunction":12,"priority":"High","region":9,"stt":"MP","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-10-12T00:00:00.000Z","dateRequired":"2023-10-12T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-26T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1:  Extend POP end date to 10/26/23.  No additional funding required.\r\nActivate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations Funding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e8a1a15e-e385-44c7-aa33-1f1342b687e1","hash":"ba1605578fa69ce4834aaa4e54d41c0da210f2a0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOE-OE01","maAmendNumber":0,"actionId":449391,"maType":"FOS","supportFunction":12,"priority":"High","region":9,"stt":"MP","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":80436,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":80436,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-26T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":80436,"maPriority":"High","assistanceRequested":"Activate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations Funding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"773b1f09-7788-4b9c-b039-9470d9efc102","hash":"62737f4c62f0e4f99d171aac14b1de946ebf07f1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS05","maAmendNumber":1,"actionId":458958,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-02-20T00:00:00.000Z","dateRequired":"2024-02-15T00:00:00.000Z","popStartDate":"2023-10-11T00:00:00.000Z","popEndDate":"2023-10-18T00:00:00.000Z","dateObligated":"2024-02-23T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-10-11T00:00:00.000Z","maPopEndDate":"2023-10-18T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 1: De-obligate -$20,000.00 per Jan 2024 ULO Quarterly Report. \r\n\r\nDOD emergency route clearing / opening.","statementOfWork":"\tAs directed by and in coordination with FEMA, DoD will provide personnel with the equipment necessary to clear debris to facilitate emergency access and egress in the CNMI in support of FEMA response operations. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n\r\nDOD is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"8a4f84c4-e455-497c-a73a-2806f5891a53","hash":"94981281dfdea10659fb4faeb2fb5dc7bd7d58f1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS05","maAmendNumber":0,"actionId":449397,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-11T00:00:00.000Z","popEndDate":"2023-10-18T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-11T00:00:00.000Z","maPopEndDate":"2023-10-18T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"Life Sustaining","assistanceRequested":"DOD emergency route clearing / opening.","statementOfWork":"\tAs directed by and in coordination with FEMA, DoD will provide personnel with the equipment necessary to clear debris to facilitate emergency access and egress in the CNMI in support of FEMA response operations. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n\r\nDOD is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"46ca4cb3-bb69-4c0b-9de8-24e80a3eb36f","hash":"c4aca71491826ecf0bd97fa8b81df7471a7dfae1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS04","maAmendNumber":1,"actionId":458933,"maType":"FOS","supportFunction":0,"priority":"Lifesaving","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-02-20T00:00:00.000Z","dateRequired":"2024-02-14T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2024-02-23T00:00:00.000Z","obligationAmount":-250000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-250000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-250000,"maPriority":"Lifesaving","assistanceRequested":"Amendment # 1 to De-obligate $250,000.00 and close out MA.\r\nDOD strategic air transportation of personnel (non-medical patients) and/or cargo.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide transportation of personnel (nonmedical patients) and/or cargo, in support of FEMA disaster operations. DOD is responsible for providing personnel and/or equipment necessary to accomplish the mission, including Material Handling Equipment (MHE).\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective  agency.\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n-For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"748d0cc6-5b0c-4c37-9c37-0fcb44a419d0","hash":"42a55e784eb7b970a9d33fce6b2242036112f97e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS04","maAmendNumber":0,"actionId":449373,"maType":"FOS","supportFunction":0,"priority":"Lifesaving","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":250000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":250000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":250000,"maPriority":"Lifesaving","assistanceRequested":"DOD strategic air transportation of personnel (non-medical patients) and/or cargo.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide transportation of personnel (nonmedical patients) and/or cargo, in support of FEMA disaster operations. DOD is responsible for providing personnel and/or equipment necessary to accomplish the mission, including Material Handling Equipment (MHE).\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective  agency.\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\n-For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"a2998e35-b28e-45c9-99df-b61e8bc75cae","hash":"bac399358445b805c5317cf3e4931ad35478975e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS03","maAmendNumber":1,"actionId":458957,"maType":"FOS","supportFunction":7,"priority":"Normal","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-02-20T00:00:00.000Z","dateRequired":"2024-02-15T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2024-02-29T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"Normal","assistanceRequested":"Amendment 1: De-obligate -$20,000.00 per Jan 2024 ULO Quarterly Report. \r\n(DOD) will provide and support Saipan Army Reserve Center to function as an FSA/ISB in support of FEMA disaster operations. This MA replaces MP23100501DOD-OPS0100","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support Saipan Army Reserve Center to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to as required in support of FEMA disaster operations. Initial installation requirements may include, but are not limited to: marshaling area for transportation trucks and trailers, storage space for generators and equipment, staging area for federal responders, and/or the personnel, equipment and Material Handling Equipment (MHE) to support operations.\r\nADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. .","id":"0ae1967c-147a-46f1-b9bd-4103f318f2a9","hash":"766be87b0a9aaa6eca5b5645a897c2d7d582bdfe","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS03","maAmendNumber":0,"actionId":449371,"maType":"FOS","supportFunction":7,"priority":"Normal","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"Normal","assistanceRequested":"(DOD) will provide and support Saipan Army Reserve Center to function as an FSA/ISB in support of FEMA disaster operations. This MA replaces MP23100501DOD-OPS0100","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide and support Saipan Army Reserve Center to function as a FEMA Incident Support Base (ISB), a Federal Staging Area (FSA) to support forward distribution of supplies or equipment, and/or a FEMA Federal Team Staging Facility (FTSF) for personnel and teams to as required in support of FEMA disaster operations. Initial installation requirements may include, but are not limited to: marshaling area for transportation trucks and trailers, storage space for generators and equipment, staging area for federal responders, and/or the personnel, equipment and Material Handling Equipment (MHE) to support operations.\r\nADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided. .","id":"6a0be22a-955f-40eb-83ec-dab06252b2ff","hash":"e011a7d419b2414954dcd587e3df95c9a163317e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS02","maAmendNumber":3,"actionId":474010,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-07-31T00:00:00.000Z","dateRequired":"2024-07-29T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":-65016.5,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-65016.5,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-65016.5,"maPriority":"Normal","assistanceRequested":"Amendment 3: De-obligate -$65,016.50 per July 2024 Quarterly ULO Report.\r\n\r\nAmendment 2: De-obligate -$84,983.50 per Jan 2024 Quarterly ULO Report. \r\nAmendment # 1 Extent POP to 10/17/2023. No cost extension\r\nDept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations ","statementOfWork":"As requested by and in coordination with FEMA and other appropriate civilian authorities, Dept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations throughout Guam and CNMI. This support may include providing personnel, equipment, fuel, and all logistical support necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA: - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"424615ee-eb64-4367-be13-d1818885b581","hash":"8d6b42f7994abb70f8e841cd50d5ac572dbf30c1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS02","maAmendNumber":2,"actionId":459092,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-02-20T00:00:00.000Z","dateRequired":"2024-02-16T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2024-02-23T00:00:00.000Z","obligationAmount":-84983.5,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-84983.5,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-84983.5,"maPriority":"Normal","assistanceRequested":"Amendment 2: De-obligate -$84,983.50 per Jan 2024 Quarterly ULO Report. \r\nAmendment # 1 Extent POP to 10/17/2023. No cost extension\r\nDept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations ","statementOfWork":"As requested by and in coordination with FEMA and other appropriate civilian authorities, Dept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations throughout Guam and CNMI. This support may include providing personnel, equipment, fuel, and all logistical support necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA: - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"fc6b6d40-c4ec-4513-ab13-5b9b57c32c69","hash":"ecd030c8ae9f53162aab8a496882c6be7e178b2b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS02","maAmendNumber":1,"actionId":449728,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-13T00:00:00.000Z","dateRequired":"2023-10-12T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-17T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment # 1 Extent POP to 10/17/2023. No cost extension\r\nDept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations ","statementOfWork":"As requested by and in coordination with FEMA and other appropriate civilian authorities, Dept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations throughout Guam and CNMI. This support may include providing personnel, equipment, fuel, and all logistical support necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA: - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"b66ddf67-5607-48ed-9c77-5427a40f6d5a","hash":"1517e6f3eab8727a9ffd64934053e4bff0d62a86","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS02","maAmendNumber":0,"actionId":449390,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":150000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":150000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":150000,"maPriority":"Normal","assistanceRequested":"Dept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations ","statementOfWork":"As requested by and in coordination with FEMA and other appropriate civilian authorities, Dept of Defense (DOD) will provide interisland transportation (to include rotary wing transportation, fixed wing transportation, and sealift capabilities) of personnel, cargo, or commodities in support of FEMA disaster operations throughout Guam and CNMI. This support may include providing personnel, equipment, fuel, and all logistical support necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA: - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"8389c09f-25d2-47c0-8714-95521d57a026","hash":"01275034240692e3368d8f4eb0509d29b7da6995","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS01","maAmendNumber":3,"actionId":474000,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-07-31T00:00:00.000Z","dateRequired":"2024-07-29T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":-3624.48,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3624.48,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3624.48,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #3 De-obligate -$3,624.48 per July 2024 QULO Report. \r\n\r\nAmendment #2: De-obligate -$71,375.52 per Jan 2024 Quarterly ULO Report. \r\nAmendment #1- Increase funds by $25,000.00 and extend POP to 10/17/2023.\r\nRequest DCO / DCE (including as necessary SEPLO/EPLO) assistance at the EOC, Joint Field Office, RRCC, or other locations specified by FEMA in support of disaster operations. ","statementOfWork":"As directed by and in coordination with FEMA, DoD will activate and provide a Defense Coordinating Officer with supporting staff element (DCO/DCE Pacific) to the Guam/CNMI emergency management agencies, FEMA Initial Operating Facility, Joint Field Office, or other locations designated in Guam or CNMI, in order to provide DoD regional knowledge, mission requirement validation, and liaison capabilities. The DoD should also provide State/Emergency Preparedness Liaison SEPLO/EPLO teams, Joint Regional Medical Planning Officers (JRMPO), Command and Control (C2) elements, and logistics self-support as necessary to support the lead federal agency.ADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3322ce8e-32a3-4dcc-a06f-d3e0caa97c15","hash":"6a3783031563f6ebfab6395d8379b6c8de124e45","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS01","maAmendNumber":2,"actionId":459089,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-02-20T00:00:00.000Z","dateRequired":"2024-02-16T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2024-02-23T00:00:00.000Z","obligationAmount":-71375.52,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-71375.52,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-71375.52,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #2: De-obligate -$71,375.52 per Jan 2024 Quarterly ULO Report. \r\nAmendment #1- Increase funds by $25,000.00 and extend POP to 10/17/2023.\r\nRequest DCO / DCE (including as necessary SEPLO/EPLO) assistance at the EOC, Joint Field Office, RRCC, or other locations specified by FEMA in support of disaster operations. ","statementOfWork":"As directed by and in coordination with FEMA, DoD will activate and provide a Defense Coordinating Officer with supporting staff element (DCO/DCE Pacific) to the Guam/CNMI emergency management agencies, FEMA Initial Operating Facility, Joint Field Office, or other locations designated in Guam or CNMI, in order to provide DoD regional knowledge, mission requirement validation, and liaison capabilities. The DoD should also provide State/Emergency Preparedness Liaison SEPLO/EPLO teams, Joint Regional Medical Planning Officers (JRMPO), Command and Control (C2) elements, and logistics self-support as necessary to support the lead federal agency.ADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f69d74d6-3625-4143-92a5-66e31dd81275","hash":"ad199bf7a1232a09323a6acf4dda558301df80d2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS01","maAmendNumber":1,"actionId":449727,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-12T00:00:00.000Z","dateRequired":"2023-10-12T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-18T00:00:00.000Z","obligationAmount":25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":25000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":25000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #1- Increase funds by $25,000.00 and extend POP to 10/17/2023.\r\nRequest DCO / DCE (including as necessary SEPLO/EPLO) assistance at the EOC, Joint Field Office, RRCC, or other locations specified by FEMA in support of disaster operations. ","statementOfWork":"As directed by and in coordination with FEMA, DoD will activate and provide a Defense Coordinating Officer with supporting staff element (DCO/DCE Pacific) to the Guam/CNMI emergency management agencies, FEMA Initial Operating Facility, Joint Field Office, or other locations designated in Guam or CNMI, in order to provide DoD regional knowledge, mission requirement validation, and liaison capabilities. The DoD should also provide State/Emergency Preparedness Liaison SEPLO/EPLO teams, Joint Regional Medical Planning Officers (JRMPO), Command and Control (C2) elements, and logistics self-support as necessary to support the lead federal agency.ADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"83d6f6f1-4925-4ad2-8553-228922956182","hash":"6daf7a9611ea3dde8c95172aa146e4d903e93aa6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDOD-OPS01","maAmendNumber":0,"actionId":449368,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":50000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":50000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-17T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":50000,"maPriority":"Life Sustaining","assistanceRequested":"Request DCO / DCE (including as necessary SEPLO/EPLO) assistance at the EOC, Joint Field Office, RRCC, or other locations specified by FEMA in support of disaster operations. ","statementOfWork":"As directed by and in coordination with FEMA, DoD will activate and provide a Defense Coordinating Officer with supporting staff element (DCO/DCE Pacific) to the Guam/CNMI emergency management agencies, FEMA Initial Operating Facility, Joint Field Office, or other locations designated in Guam or CNMI, in order to provide DoD regional knowledge, mission requirement validation, and liaison capabilities. The DoD should also provide State/Emergency Preparedness Liaison SEPLO/EPLO teams, Joint Regional Medical Planning Officers (JRMPO), Command and Control (C2) elements, and logistics self-support as necessary to support the lead federal agency.ADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9020e0b4-d600-43b4-8f82-5e0432aac084","hash":"01ff078aa3411e3bdfebb0a9a2a023847d140238","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDLA01","maAmendNumber":2,"actionId":459465,"maType":"FOS","supportFunction":7,"priority":"High","region":9,"stt":"MP","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-21T00:00:00.000Z","popStartDate":"2023-10-09T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2024-02-28T00:00:00.000Z","obligationAmount":-4188.2,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4188.2,"maPopStartDate":"2023-10-09T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4188.2,"maPriority":"High","assistanceRequested":"Amendment 2: De-obligate $4,188.20 per 01/01/2024 Quarterly ULO report. Also changing PM to Daniel Carpenter.\r\nAmendment 1 to decrease POP to align with NRCC Activation Period\r\nActivate DLA liaisons to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"45bc78cd-5de6-428e-acaf-5a62c09ac11e","hash":"4780e1f2ddc605b26821b8c0ce481b9a9126d14a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDLA01","maAmendNumber":1,"actionId":449632,"maType":"FOS","supportFunction":7,"priority":"High","region":9,"stt":"MP","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-11T00:00:00.000Z","popStartDate":"2023-10-09T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-09T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1 to decrease POP to align with NRCC Activation Period\r\nActivate DLA liaisons to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"eeb4716c-c228-4ab4-b865-6ab319ad7a91","hash":"71c63c640ba79d7d1a467a252dd77433d038d7f7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDLA01","maAmendNumber":0,"actionId":449446,"maType":"FOS","supportFunction":7,"priority":"High","region":9,"stt":"MP","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-09T00:00:00.000Z","popEndDate":"2023-10-24T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-10-09T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate DLA liaisons to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\n\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"306cf060-8157-4145-8f21-601242b776fa","hash":"430a84e30a5b6ff18df1f0004328ecff7b5b4d59","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDHS-USCG01","maAmendNumber":1,"actionId":459203,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"MP","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-19T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2024-02-29T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate $10,000 per 01/01/2024 Quarterly ULO Report.\r\nDeploy USCG liaison officer(s) to RRCC, IOF, JFO, STT EOC or other facility(s)","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a23ddfee-e648-40b0-8a4a-7be1ef979407","hash":"6df8d0f0bf673ed0712fdc8f1658a6eb19917666","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDHS-USCG01","maAmendNumber":0,"actionId":449398,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"MP","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Deploy USCG liaison officer(s) to RRCC, IOF, JFO, STT EOC or other facility(s)","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f67150d7-d980-4738-945a-55ab92dbc95e","hash":"6ea134c09a803e10642a7673ead004f6477ab081","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDHS-CISA02","maAmendNumber":1,"actionId":449621,"maType":"FOS","supportFunction":2,"priority":"High","region":9,"stt":"MP","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-11T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1 to decrease POP to align with NRCC Activation Period and change PM to William Gibbons JR.\r\nActivate CISA ESF-2 to NRCC","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b3389b2d-25b1-486d-bfa4-b1170273372c","hash":"02ca10b5ed81aaf06e7c196334f9548bfd03b0e7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDHS-CISA02","maAmendNumber":0,"actionId":449383,"maType":"FOS","supportFunction":2,"priority":"High","region":9,"stt":"MP","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate CISA ESF-2 to NRCC","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c78b6365-dca0-46b0-877e-dc52398bab1c","hash":"3fb77ef16135e256ad63cf7071d273f4d234c5b4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPDHS-CISA01","maAmendNumber":0,"actionId":449369,"maType":"FOS","supportFunction":2,"priority":"High","region":9,"stt":"MP","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-08T00:00:00.000Z","popEndDate":"2023-10-15T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-08T00:00:00.000Z","maPopEndDate":"2023-10-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Activate CISA ESF-2 to RRCC, IOF, JFO\r\n","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ca3305d1-1e08-4171-b17b-8d806802a666","hash":"4d5dec017a11c691f16b3ac4481d8668c3be6433","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPCOE-POD02","maAmendNumber":2,"actionId":470534,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2024-06-20T00:00:00.000Z","dateRequired":"2024-06-20T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-20T00:00:00.000Z","dateObligated":"2024-06-28T00:00:00.000Z","obligationAmount":-200000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-200000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-200000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment # 2 De-obligate $200,000.00 and await final invoices \r\nAmendment 1 De-oligate $500,000 per attached MEMO\r\nUSACE pre-position temporary emergency power resources to the affected area.  This MA replaces MP-23100501COE-POD-02-00.\r\nThis amended IFMIS is a transition from Pre-Declaration Surge to an Emergency Declaration to include additional funding in the amount of $1,394,050 making cumulative amount $3,394,050 to include the Start Date of the Verbal MA# COE-POD-02V, 6 Oct 2023 and pushing the Estimated Projected End Date to 20 Oct 2023.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for type IV temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"cf08afb6-a8d8-44c7-b18b-90646088a09b","hash":"5c8932bc408067f32b8aa74a52711a4099a54ed1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPCOE-POD02","maAmendNumber":1,"actionId":462659,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2024-03-26T00:00:00.000Z","dateRequired":"2024-03-26T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-20T00:00:00.000Z","dateObligated":"2024-04-05T00:00:00.000Z","obligationAmount":-300000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-300000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-300000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 1 De-oligate $500,000 per attached MEMO\r\nUSACE pre-position temporary emergency power resources to the affected area.  This MA replaces MP-23100501COE-POD-02-00.\r\nThis amended IFMIS is a transition from Pre-Declaration Surge to an Emergency Declaration to include additional funding in the amount of $1,394,050 making cumulative amount $3,394,050 to include the Start Date of the Verbal MA# COE-POD-02V, 6 Oct 2023 and pushing the Estimated Projected End Date to 20 Oct 2023.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for type IV temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1b599734-3fa0-48e7-b96f-c87c52f9414e","hash":"e471e41e811675b4b8c658737a75860da7f55a49","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPCOE-POD02","maAmendNumber":0,"actionId":449384,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-20T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":3394050,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3394050,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3394050,"maPriority":"Life Sustaining","assistanceRequested":"USACE pre-position temporary emergency power resources to the affected area.  This MA replaces MP-23100501COE-POD-02-00.\r\nThis amended IFMIS is a transition from Pre-Declaration Surge to an Emergency Declaration to include additional funding in the amount of $1,394,050 making cumulative amount $3,394,050 to include the Start Date of the Verbal MA# COE-POD-02V, 6 Oct 2023 and pushing the Estimated Projected End Date to 20 Oct 2023.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for type IV temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b000d64a-7a8f-436d-901d-4b44a511cc11","hash":"4ac22ba0ba12e532f22e01cef6fd63c1a68c2a91","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPCOE-POD01","maAmendNumber":3,"actionId":465592,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2024-05-07T00:00:00.000Z","dateRequired":"2024-05-01T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-20T00:00:00.000Z","dateObligated":"2024-05-24T00:00:00.000Z","obligationAmount":-21660.86,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-21660.86,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-21660.86,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #3: De-obligate -$21,660.86 and closeout MA per April 2024 Quarterly ULO Report. \r\nAmendment #2 to extend POP to 10/20/2023. No cost extension\r\nAdmin Error: This amended IFMIS is a transition from Pre-Declaration Surge to an Emergency Declaration to include the Start Date of the MA MP-23100501-COE-POD- 01-00 6 Oct 2023 through Projected End Date to 17 Oct 2023.\r\nActivate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities. \r\nThis MA replaces MP-23100501-COE-POD- 01.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ddd5df3f-1ed0-4e4c-9b87-b009624e7287","hash":"04adf289a69fd2a161653b2d67bd5f4506ca596b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPCOE-POD01","maAmendNumber":2,"actionId":449937,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-17T00:00:00.000Z","dateRequired":"2023-10-16T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-20T00:00:00.000Z","dateObligated":"2023-10-17T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #2 to extend POP to 10/20/2023. No cost extension\r\nAdmin Error: This amended IFMIS is a transition from Pre-Declaration Surge to an Emergency Declaration to include the Start Date of the MA MP-23100501-COE-POD- 01-00 6 Oct 2023 through Projected End Date to 17 Oct 2023.\r\nActivate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities. \r\nThis MA replaces MP-23100501-COE-POD- 01.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"62902b21-2512-4d95-a90f-485f9d2ad302","hash":"5109305bda0d92e0e930f5079e244b19ef0eb223","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPCOE-POD01","maAmendNumber":1,"actionId":449528,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Life Sustaining","assistanceRequested":"Admin Error: This amended IFMIS is a transition from Pre-Declaration Surge to an Emergency Declaration to include the Start Date of the MA MP-23100501-COE-POD- 01-00 6 Oct 2023 through Projected End Date to 17 Oct 2023.\r\nActivate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities. \r\nThis MA replaces MP-23100501-COE-POD- 01.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f0c3d7e3-6aa7-4a4c-bf92-24596d26bba5","hash":"0bca031284a62c12984162988e9c82605c1140b7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPCOE-POD01","maAmendNumber":0,"actionId":449385,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"MP","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":100000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":100000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":100000,"maPriority":"Life Sustaining","assistanceRequested":"Activate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities. \r\nThis MA replaces MP-23100501-COE-POD- 01.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f71352a7-d949-44e3-b7cf-4040c3439760","hash":"bb1b8d952da5fdf41fe38ac497ddcbec5cb27172","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPCOE-HQ01","maAmendNumber":2,"actionId":457076,"maType":"FOS","supportFunction":3,"priority":"High","region":9,"stt":"MP","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2024-01-24T00:00:00.000Z","dateRequired":"2024-01-24T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2024-01-24T00:00:00.000Z","obligationAmount":-18534.76,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-18534.76,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-18534.76,"maPriority":"High","assistanceRequested":"Amendment 2 to de-obligate $18,534.76 per 01.01.24 QULO/OFA request and change PM to Danny Carpenter.\r\nAmendment 1 to decrease POP to align with NRCC Activation Status and change PM to William Gibbons Jr.\r\nActivate USACE to the NRCC or other facilities to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a5ee28d5-0319-47bf-a1d7-fc0583ee7bd5","hash":"8079850cec774b3c8f659f1c785ed19588f6c3f9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPCOE-HQ01","maAmendNumber":1,"actionId":449619,"maType":"FOS","supportFunction":3,"priority":"High","region":9,"stt":"MP","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-11T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1 to decrease POP to align with NRCC Activation Status and change PM to William Gibbons Jr.\r\nActivate USACE to the NRCC or other facilities to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1af3adca-d610-497b-b1dd-df4f8efb97e7","hash":"69660742a4b399f745f4a3b5f6fce6ca4e5e9329","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3602,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3602EMMPCOE-HQ01","maAmendNumber":0,"actionId":449351,"maType":"FOS","supportFunction":3,"priority":"High","region":9,"stt":"MP","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-10T00:00:00.000Z","popEndDate":"2023-10-17T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":21000,"maPopStartDate":"2023-10-10T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":21000,"maPriority":"High","assistanceRequested":"Activate USACE to the NRCC or other facilities to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"61fc5e09-7ebf-4bfa-b584-8f87d2b7758b","hash":"1d54a898a24f69e44b91b68ddfa1edd557f85a33","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUDOT01","maAmendNumber":2,"actionId":465591,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"GU","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-05-07T00:00:00.000Z","dateRequired":"2024-05-01T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2024-05-24T00:00:00.000Z","obligationAmount":-5119.58,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5119.58,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5119.58,"maPriority":"High","assistanceRequested":"Amendment #2: De-obligate -$5,119.58 per April 2024 Quarterly ULO Report. \r\nAmendment #1: Deobligate $4,080.00 per 01/01/2024 Quarterly ULO Report.\r\nActivate DOT to RRCC. IOF, JFO, or other teams and facilities as requested. This MA replaces GU-23100501-DOT- 01\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"5e86ebd6-cddf-46ec-9bcf-0b63e8bbfb7e","hash":"bf7859544150149d9818533265faa5c81aff0cba","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUDOT01","maAmendNumber":1,"actionId":459204,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"GU","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-19T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2024-02-29T00:00:00.000Z","obligationAmount":-4080,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4080,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4080,"maPriority":"High","assistanceRequested":"Amendment #1: Deobligate $4,080.00 per 01/01/2024 Quarterly ULO Report.\r\nActivate DOT to RRCC. IOF, JFO, or other teams and facilities as requested. This MA replaces GU-23100501-DOT- 01\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3b862097-a71f-478a-8386-6dec27260212","hash":"4b8c0b93dc9eaffae3920b2f32d908d8e401ecb7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUDOT01","maAmendNumber":0,"actionId":449356,"maType":"FOS","supportFunction":1,"priority":"High","region":9,"stt":"GU","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Activate DOT to RRCC. IOF, JFO, or others teams and facilities as requested. This MA replaces GU-23100501-DOT- 01\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"baebacc5-51f1-4054-933b-541a7f45b6eb","hash":"63e206e4ebf99b134f454ac03748181beeddfd75","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUDHS-USCG01","maAmendNumber":2,"actionId":456131,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"GU","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-01-12T00:00:00.000Z","dateRequired":"2024-01-12T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2024-01-12T00:00:00.000Z","obligationAmount":-156.93,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-156.93,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-156.93,"maPriority":"Normal","assistanceRequested":"Amendment #2 De-obligate -$156.93 per attached DHS-USCG correspondence.  \r\n\r\nAmendment #1 Increase funding by $1,931.01 \r\nDeploy USCG liaison officer(s) to RRCC, IOF, JFO, STT EOC or other facility(s). This MA replaces GU23100501DHS-USCG0100","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"49683867-df8a-4cb1-a9b2-821d87b7c13c","hash":"8c8d64fedb3decb5937f78120dd0b468739d96e2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUDHS-USCG01","maAmendNumber":1,"actionId":451112,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"GU","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-11-01T00:00:00.000Z","dateRequired":"2023-10-27T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":1931.01,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1931.01,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1931.01,"maPriority":"Normal","assistanceRequested":"Amendment #1 Increase funding by $1,931.01 \r\n\r\nDeploy USCG liaison officer(s) to RRCC, IOF, JFO, STT EOC or other facility(s). This MA replaces GU23100501DHS-USCG0100","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"035d2e24-c0ec-421a-aaa1-ebaaf7409ec0","hash":"68eb930d7be77a8068f50b060d6ae0cbbbe97c93","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUDHS-USCG01","maAmendNumber":0,"actionId":449425,"maType":"FOS","supportFunction":0,"priority":"Normal","region":9,"stt":"GU","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Deploy USCG liaison officer(s) to RRCC, IOF, JFO, STT EOC or other facility(s). This MA replaces GU23100501DHS-USCG0100","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"dc10ae1a-0fe1-4439-8dca-da5d05667177","hash":"61843880849e2007cee1ee3d973332910d5d67c2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUDHS-CISA01","maAmendNumber":1,"actionId":449668,"maType":"FOS","supportFunction":14,"priority":"High","region":9,"stt":"GU","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-10-11T00:00:00.000Z","dateRequired":"2023-10-11T00:00:00.000Z","popStartDate":"2023-10-09T00:00:00.000Z","popEndDate":"2023-10-11T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-09T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment 1 to decrease POP to align with NRCC Activation Status\r\nActivate CISA-14 LNO to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial and Infrastructure analyst SME)  \r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"6abc5735-7e4a-43dd-ab81-3460eed6948a","hash":"e78846e23819288c5288a052357700fb951efc93","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUDHS-CISA01","maAmendNumber":0,"actionId":449301,"maType":"FOS","supportFunction":14,"priority":"High","region":9,"stt":"GU","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-09T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-10-09T00:00:00.000Z","maPopEndDate":"2023-10-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate CISA-14 LNO to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\n\r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial and Infrastructure analyst SME)  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2c2f70be-0467-4ba9-a080-9fabdf0983a5","hash":"d8c8eaaff1dfc59b2daa52ea1861c14ebf8f5657","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUCOE-POD02","maAmendNumber":2,"actionId":470531,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"GU","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2024-06-20T00:00:00.000Z","dateRequired":"2024-06-20T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-20T00:00:00.000Z","dateObligated":"2024-06-28T00:00:00.000Z","obligationAmount":-200000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-200000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-200000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #2 De-obligate $200,000.00 and await final invoices. \r\n\r\nAmendment 1 De-obligate $500,000 per attached MEMO\r\nUSACE pre-position temporary emergency power resources to the affected area. This amended IFMIS is a transition from Pre-Declaration Surge to an Emergency Declaration to include additional funding in the amount of $1,394,050 making cumulative amount $3,394,050 to include the Start Date of the Verbal MA# COE-POD-02V, 6 Oct 2023 and pushing the Estimated Projected End Date to 20 Oct 2023  \r\n","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for type IV temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"18ada91a-9c20-49e9-b2a6-f20aedf5ecb3","hash":"113713337f8849ce4b650dc21a076a93c63e8da7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUCOE-POD02","maAmendNumber":1,"actionId":462696,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"GU","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2024-03-26T00:00:00.000Z","dateRequired":"2024-03-26T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-20T00:00:00.000Z","dateObligated":"2024-04-05T00:00:00.000Z","obligationAmount":-500000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-500000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-500000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 1 De-obligate $500,000 per attached MEMO\r\nUSACE pre-position temporary emergency power resources to the affected area. This amended IFMIS is a transition from Pre-Declaration Surge to an Emergency Declaration to include additional funding in the amount of $1,394,050 making cumulative amount $3,394,050 to include the Start Date of the Verbal MA# COE-POD-02V, 6 Oct 2023 and pushing the Estimated Projected End Date to 20 Oct 2023  \r\n","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for type IV temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2895f2e0-dcba-4944-b800-ba7bda94d467","hash":"26e2cc371526f3ef6a8974b0f8833bd498c1dba7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUCOE-POD02","maAmendNumber":0,"actionId":449364,"maType":"FOS","supportFunction":3,"priority":"Life Sustaining","region":9,"stt":"GU","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-09T00:00:00.000Z","dateRequired":"2023-10-06T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-20T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":3394050,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3394050,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3394050,"maPriority":"Life Sustaining","assistanceRequested":"USACE pre-position temporary emergency power resources to the affected area. This amended IFMIS is a transition from Pre-Declaration Surge to an Emergency Declaration to include additional funding in the amount of $1,394,050 making cumulative amount $3,394,050 to include the Start Date of the Verbal MA# COE-POD-02V, 6 Oct 2023 and pushing the Estimated Projected End Date to 20 Oct 2023  \r\n","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations.\r\nInitial requirement is for type IV temporary power support assets\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).\r\nWork includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"5b2c9d47-2223-4bbd-89b2-afde2e1564d3","hash":"7ec99533cedb7a313799aa3b434d9bb0d05ac391","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUCOE-POD01","maAmendNumber":1,"actionId":465625,"maType":"FOS","supportFunction":3,"priority":"High","region":9,"stt":"GU","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2024-05-07T00:00:00.000Z","dateRequired":"2024-05-01T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2024-05-24T00:00:00.000Z","obligationAmount":-29328.66,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-29328.66,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-29328.66,"maPriority":"High","assistanceRequested":"Amendment#1: De-obligate -$29,328.66 per April 2024 Quarterly ULO Report. \r\n\r\nActivate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities. \r\nThis amended IFMIS is a transition from Pre-Declaration  Surge to an Emergency Declaration to include  initial funding in the amount of 100,000 and to include the Start Date of the MA# GU23100501COE-POD-01-00, 6 Oct 2023 through  Projected End Date to 14 Oct 2023.\r\n","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b920be48-f9e7-409e-8431-62d727cfbe10","hash":"98477cc68ec978d95129e82ebf9b517546264f21","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023100501","incidentName":"R09 Guam Tropical Cyclone WPAC INVEST 98","incidentType":"Tropical Storm","disasterNumber":3601,"declarationType":"EM","declarationTitle":"TROPICAL STORM BOLAVEN","maId":"3601EMGUCOE-POD01","maAmendNumber":0,"actionId":449386,"maType":"FOS","supportFunction":3,"priority":"High","region":9,"stt":"GU","agencyId":"COE-POD","agency":"COE PACIFIC OCEAN DIVISION","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-09T00:00:00.000Z","popStartDate":"2023-10-06T00:00:00.000Z","popEndDate":"2023-10-14T00:00:00.000Z","dateObligated":"2023-10-11T00:00:00.000Z","obligationAmount":100000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":100000,"maPopStartDate":"2023-10-06T00:00:00.000Z","maPopEndDate":"2023-10-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":100000,"maPriority":"High","assistanceRequested":"Activate ESF 3 USACE to the RRCC, IOF, JFO, or other facilities. \r\nThis amended IFMIS is a transition from Pre-Declaration  Surge to an Emergency Declaration to include  initial funding in the amount of 100,000 and to include the Start Date of the MA# GU23100501COE-POD-01-00, 6 Oct 2023 through  Projected End Date to 14 Oct 2023.\r\n","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4fff3dd8-3398-43aa-959a-05cfc5190dc3","hash":"27154dce9795161115f457f5f3ca950737818c08","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLAUSDA-APH01","maAmendNumber":2,"actionId":452646,"maType":"FOS","supportFunction":11,"priority":"High","region":6,"stt":"LA","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-11-16T00:00:00.000Z","dateRequired":"2023-11-16T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2023-11-16T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"AMEND #2: De-obligate all funds in amount of $5,000.00 (BFY 23) (06) per agency as no billing against MA.  This will financially close MA. \r\nAmend #1: Extend end date additional 30 days per OSC.  No additional funding.  Change PM to Marquise Robinson. \r\nUSDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"0a349332-bc69-431c-9eb0-d85235a6d3b5","hash":"1c1c03cf332dd498ee9554cacd1e355521374222","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLAUSDA-APH01","maAmendNumber":1,"actionId":449066,"maType":"FOS","supportFunction":11,"priority":"High","region":6,"stt":"LA","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-10-05T00:00:00.000Z","dateRequired":"2023-10-05T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amend #1: Extend end date additional 30 days per OSC.  No additional funding.  Change PM to Marquise Robinson. \r\nUSDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"dfca1283-1615-4a0c-8fa1-8b6042c299fa","hash":"23e9b304637c3c2ddc007d4fde6e08669bce3177","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLAUSDA-APH01","maAmendNumber":0,"actionId":448503,"maType":"FOS","supportFunction":11,"priority":"High","region":6,"stt":"LA","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-09-27T00:00:00.000Z","dateRequired":"2023-09-27T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-10-06T00:00:00.000Z","dateObligated":"2023-09-27T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"USDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f743caee-cca9-4fc5-b371-88519987e198","hash":"b5623d04257bc2708822152dcffc975f8569799f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLAHHS-ASPR01","maAmendNumber":2,"actionId":458077,"maType":"FOS","supportFunction":8,"priority":"High","region":6,"stt":"LA","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2024-02-05T00:00:00.000Z","dateRequired":"2024-02-05T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2024-02-06T00:00:00.000Z","obligationAmount":-2500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2500,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2500,"maPriority":"High","assistanceRequested":"Amend #2: De-obligate remaining funds in amount of $2500.00 BFY 23 fund code 06 per approval of HHS and financially close MA. Change PM to Marquise Robinson. \r\nAmend #1: Extend end date additional 30 days per OSC.  No additional funding per HHS.  Change PM to Joel Rosario. \r\nActivate HHS to RRCC, IOF, JFO, RFO, or other regional facilities. ","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"5d9f234f-d4e1-4a08-87f4-0a0f06e516ba","hash":"ffc365a7b0b907d5f2468e6b471be4a12a15656c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLAHHS-ASPR01","maAmendNumber":1,"actionId":449035,"maType":"FOS","supportFunction":8,"priority":"High","region":6,"stt":"LA","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-10-05T00:00:00.000Z","dateRequired":"2023-10-05T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amend #1: Extend end date additional 30 days per OSC.  No additional funding per HHS.  Change PM to Joel Rosario. \r\nActivate HHS to RRCC, IOF, JFO, RFO, or other regional facilities. ","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8c8466ef-9642-41e9-a46a-a6ef4af7d9a0","hash":"920aa323f61b0409ed524348155324590f47f88c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLAHHS-ASPR01","maAmendNumber":0,"actionId":448505,"maType":"FOS","supportFunction":8,"priority":"High","region":6,"stt":"LA","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-09-27T00:00:00.000Z","dateRequired":"2023-09-27T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-10-06T00:00:00.000Z","dateObligated":"2023-09-27T00:00:00.000Z","obligationAmount":2500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2500,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2500,"maPriority":"High","assistanceRequested":"Activate HHS to RRCC, IOF, JFO, RFO, or other regional facilities ","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"123c3642-778d-44f6-ae49-b43972d30b87","hash":"37d0aa093cf5f8ea494c5a53730b4dd8e2fb2213","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLAGSA01","maAmendNumber":2,"actionId":452482,"maType":"FOS","supportFunction":7,"priority":"High","region":6,"stt":"LA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-11-14T00:00:00.000Z","dateRequired":"2023-11-14T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2023-11-14T00:00:00.000Z","obligationAmount":-4772.9,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4772.9,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4772.9,"maPriority":"High","assistanceRequested":"AMEND #2: De-obligate remaining funds in amount of $4,772.90 (BFY 23) (06) per GSA and financially close MA.  \r\nAmend #1: Extend end date 30 days per OSC.  No additional funding. Change PM to Chris Mabry. \r\nActivate GSA to RRCC, IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e4850f0f-12e2-4e24-bbdb-84f258a9ec2a","hash":"3357387ab5cca6b6a3be041a12f8b9685ffdd5f2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLAGSA01","maAmendNumber":1,"actionId":449090,"maType":"FOS","supportFunction":7,"priority":"High","region":6,"stt":"LA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-10-05T00:00:00.000Z","dateRequired":"2023-10-05T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amend #1: Extend end date 30 days per OSC.  No additional funding. Change PM to Chris Mabry. \r\nActivate GSA to RRCC, IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"14476793-72af-45df-b31c-cf0cb80f8faa","hash":"3f7928990d7776bbaf991022de22563f00f079a4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLAGSA01","maAmendNumber":0,"actionId":448457,"maType":"FOS","supportFunction":7,"priority":"High","region":6,"stt":"LA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-09-27T00:00:00.000Z","dateRequired":"2023-09-27T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-10-06T00:00:00.000Z","dateObligated":"2023-09-27T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\n\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"822f2760-2d86-4437-b47a-8cc231ef5286","hash":"184f406ccdc8a901f8e717a1d2da329867922c43","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLADOT01","maAmendNumber":2,"actionId":452617,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"LA","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-11-16T00:00:00.000Z","dateRequired":"2023-11-16T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2023-11-16T00:00:00.000Z","obligationAmount":-1000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1000,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1000,"maPriority":"High","assistanceRequested":"AMEND #2: De-obligate all funds in amount of $1000 (BFY 23) (06) per agency as no billing against MA. This will financially close MA. \r\nAmend #1: Extend end date 30 days per OSC.  No additional funding. \r\n Change PM to Marquise Robinson. \r\nActivate DOT to RRCC. IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or other teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3561633b-4674-4ae3-9cf1-8bb5df4b300d","hash":"4ee2f0022f6128a911a96aab95d8b1dd635b8e10","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLADOT01","maAmendNumber":1,"actionId":448878,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"LA","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-10-05T00:00:00.000Z","dateRequired":"2023-10-04T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amend #1: Extend end date 30 days per OSC.  No additional funding. \r\n Change PM to Marquise Robinson. \r\nActivate DOT to RRCC. IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or other teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3068898b-6105-4433-b345-acab6cc7930f","hash":"ba0da02a6ed4cf13bcaec05f97fba73778bf7e29","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLADOT01","maAmendNumber":0,"actionId":448456,"maType":"FOS","supportFunction":1,"priority":"High","region":6,"stt":"LA","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-09-27T00:00:00.000Z","dateRequired":"2023-09-27T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-10-06T00:00:00.000Z","dateObligated":"2023-09-27T00:00:00.000Z","obligationAmount":1000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1000,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1000,"maPriority":"High","assistanceRequested":"Activate DOT to RRCC. IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or other teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"50c6ad9d-b760-4f12-9cee-b3824ae3ab77","hash":"2e2530a2bb49e28c7d6b491e5bd027f4018d6934","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLADOD-OPS01","maAmendNumber":2,"actionId":455986,"maType":"FOS","supportFunction":0,"priority":"High","region":6,"stt":"LA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-01-10T00:00:00.000Z","dateRequired":"2024-01-10T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2024-01-11T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amend #2: Per DOD, de-obligate all funds in amount of $3000 as no costs incurred and therefore no billing against MA.  BFY 23 - 06 funding. MA will be financially closed. \r\nAmend #1: Extend MA additional 30 days beyond current end date per OSC.  No additional funding at this time. Change PM to Jay Moreau. \r\nActivate DOD to RRCC, IOF, or JFO to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide BUT NOT LIMITED TO a Defense Coordinating Officer (DCO), supporting staff element (DCE), and Services Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOs) and other appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"334022ca-b01b-4962-a89c-2e0845b5109d","hash":"9d67cccd213ff3c2a3c5206e26cf9c2f58ac8611","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLADOD-OPS01","maAmendNumber":1,"actionId":449045,"maType":"FOS","supportFunction":0,"priority":"High","region":6,"stt":"LA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-04T00:00:00.000Z","dateRequired":"2023-10-04T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amend #1: Extend MA additional 30 days beyond current end date per OSC.  No additional funding at this time. Change PM to Jay Moreau. \r\nActivate DOD to RRCC, IOF, or JFO to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide BUT NOT LIMITED TO a Defense Coordinating Officer (DCO), supporting staff element (DCE), and Services Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOs) and other appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"8263808a-4630-402d-a017-90ff4ce1d500","hash":"eb15b7e113d3472c46576a18387756afa6b0556d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLADOD-OPS01","maAmendNumber":0,"actionId":448473,"maType":"FOS","supportFunction":0,"priority":"High","region":6,"stt":"LA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-27T00:00:00.000Z","dateRequired":"2023-09-27T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-10-06T00:00:00.000Z","dateObligated":"2023-09-27T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate DOD to RRCC, IOF, or JFO to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide BUT NOT LIMITED TO a Defense Coordinating Officer (DCO), supporting staff element (DCE), and Services Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOs) and other appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n\r\n\r\n\r\n","id":"f6c1aae6-5cf5-4713-8d2d-d342c3e8b555","hash":"86e57ebbd5f0f887b7da9464ea864ebebf408262","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLADHS-CISA01","maAmendNumber":2,"actionId":452647,"maType":"FOS","supportFunction":14,"priority":"High","region":6,"stt":"LA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-11-16T00:00:00.000Z","dateRequired":"2023-11-16T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2023-11-16T00:00:00.000Z","obligationAmount":-1000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1000,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1000,"maPriority":"High","assistanceRequested":"AMEND #2: De-obligate all funds in amount of $1,000.00 (BFY 23) (06) per agency as no billing against MA.  This will financially close MA. \r\nAmend #1: Extend end date additional 30 days per OSC.  No additional funding.  Change PM to Marquise Robinson. \r\nActivate CISA-14 LNOs to RRCC, JFO, IOF","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9b3b2b38-0736-4c19-b66b-ef1c3db97b58","hash":"235ccd91d798d7174a27a65aabc7dd3d982da27f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLADHS-CISA01","maAmendNumber":1,"actionId":449069,"maType":"FOS","supportFunction":14,"priority":"High","region":6,"stt":"LA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-10-05T00:00:00.000Z","dateRequired":"2023-10-05T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2023-10-06T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amend #1: Extend end date additional 30 days per OSC.  No additional funding.  Change PM to Marquise Robinson. \r\nActivate CISA-14 LNOs to RRCC, JFO, IOF","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"27fb6d3b-e42f-44c8-92bc-40ddd1cc12da","hash":"782af729cf1c44586d35aa32f7677096db93e894","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLADHS-CISA01","maAmendNumber":0,"actionId":448504,"maType":"FOS","supportFunction":14,"priority":"High","region":6,"stt":"LA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-27T00:00:00.000Z","dateRequired":"2023-09-27T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-10-06T00:00:00.000Z","dateObligated":"2023-09-27T00:00:00.000Z","obligationAmount":1000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1000,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1000,"maPriority":"High","assistanceRequested":"Activate CISA-14 LNOs to RRCC, JFO, IOF","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\n\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"520573c5-6ca4-4704-918a-84361cad4dde","hash":"5a4a4ca1e1b2b6940b6876127498577cc5951c63","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLACOE-MVD02","maAmendNumber":2,"actionId":459373,"maType":"FOS","supportFunction":18,"priority":"Normal","region":6,"stt":"LA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2024-02-22T00:00:00.000Z","dateRequired":"2024-02-21T00:00:00.000Z","popStartDate":"2023-10-23T00:00:00.000Z","popEndDate":"2023-12-22T00:00:00.000Z","dateObligated":"2024-02-22T00:00:00.000Z","obligationAmount":-131173.13,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-131173.13,"maPopStartDate":"2023-10-23T00:00:00.000Z","maPopEndDate":"2023-12-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-131173.13,"maPriority":"Normal","assistanceRequested":"AMEND #2: De-obligate remaining funds in amount of $ 131,173.13 BFY 24 FUND CODE 06 and financially close MA per USACE.  \r\nAMEND #1:  Increase funding by additional $38,000.00 for a total obligation of $173,000.00 per USACE and OSC concurrence.  \r\nActivate USACE Infrastructure RSF Field Coordinator","statementOfWork":"As directed by and in coordination with FEMA, the U.S. Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, RRCC, IOF, JFO, JRO or other facilities in support of National Disaster Recovery Framework post-disaster operations.\r\n\r\nSupport personnel may include, but is not limited to the following:\r\n- USACE support to the JFO and/or JRO\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under the NDRF)\r\n- IS-RSF Recovery Support SME(s)\r\n\r\nThe Infrastructure Systems RSF Field Coordinator support may include, but is not limited to, the following:\r\n Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n Convene federal partnering agencies supporting the IS-RSF, formalize communications/meetings with the IS-RSF, and serve as the federal point-person for all IS-RSF-related matters at the field level. Maintain regular internal coordination/communication related to RSF initiatives at the field, regional, and national levels and ensure work in the disaster-affected area is consistent with the Recovery Strategy Development.\r\n Develop an approach to support infrastructure systems recovery, unique to the local communities and/or regional situation.\r\n Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities. Assist RSF agencies in continuing to incorporate a comprehensive, multi-sector approach on coordination activities that align with the Recovery Strategy Development.\r\n Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n In consultation with the National RSF Coordinator, serve as an agency representative or agency liaison.\r\n Monitor supported and implemented recovery programs.\r\n Provide support either deployed onsite, episodically, or virtually as needed.\r\n\r\nThe IS-RSF Field Coordinator may be selected based upon several key criteria beyond that of subject matter experience. The selected individual ideally will:\r\n Be either housed in, or intimately aware of the affected region.\r\n Have experience coordinating infrastructure issues as well as experience or knowledge of mitigation and resilience. Reach back capability for technical support of these areas is suitable.\r\n Have experience managing staff, planning and meeting facilitation.\r\n\r\nIS-RSF activation may also include applicable USACE agency program area Subject Matter Experts (SMEs). Those SME costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the disaster recovery operations as authorized by FEMA.\r\n\r\n\r\n---MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be re imbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"3a5fcbf1-94cf-4d69-9d65-de02a995e9e4","hash":"b58efde0903f63a2efbacb1d4d2c53d05daab6c9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLACOE-MVD02","maAmendNumber":1,"actionId":451091,"maType":"FOS","supportFunction":18,"priority":"Normal","region":6,"stt":"LA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2023-10-26T00:00:00.000Z","dateRequired":"2023-10-26T00:00:00.000Z","popStartDate":"2023-10-23T00:00:00.000Z","popEndDate":"2023-12-22T00:00:00.000Z","dateObligated":"2023-10-27T00:00:00.000Z","obligationAmount":38000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":38000,"maPopStartDate":"2023-10-23T00:00:00.000Z","maPopEndDate":"2023-12-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":38000,"maPriority":"Normal","assistanceRequested":"AMEND #1:  Increase funding by additional $38,000.00 for a total obligation of $173,000.00 per USACE and OSC concurrence.  \r\nActivate USACE Infrastructure RSF Field Coordinator","statementOfWork":"As directed by and in coordination with FEMA, the U.S. Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, RRCC, IOF, JFO, JRO or other facilities in support of National Disaster Recovery Framework post-disaster operations.\r\n\r\nSupport personnel may include, but is not limited to the following:\r\n- USACE support to the JFO and/or JRO\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under the NDRF)\r\n- IS-RSF Recovery Support SME(s)\r\n\r\nThe Infrastructure Systems RSF Field Coordinator support may include, but is not limited to, the following:\r\n Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n Convene federal partnering agencies supporting the IS-RSF, formalize communications/meetings with the IS-RSF, and serve as the federal point-person for all IS-RSF-related matters at the field level. Maintain regular internal coordination/communication related to RSF initiatives at the field, regional, and national levels and ensure work in the disaster-affected area is consistent with the Recovery Strategy Development.\r\n Develop an approach to support infrastructure systems recovery, unique to the local communities and/or regional situation.\r\n Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities. Assist RSF agencies in continuing to incorporate a comprehensive, multi-sector approach on coordination activities that align with the Recovery Strategy Development.\r\n Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n In consultation with the National RSF Coordinator, serve as an agency representative or agency liaison.\r\n Monitor supported and implemented recovery programs.\r\n Provide support either deployed onsite, episodically, or virtually as needed.\r\n\r\nThe IS-RSF Field Coordinator may be selected based upon several key criteria beyond that of subject matter experience. The selected individual ideally will:\r\n Be either housed in, or intimately aware of the affected region.\r\n Have experience coordinating infrastructure issues as well as experience or knowledge of mitigation and resilience. Reach back capability for technical support of these areas is suitable.\r\n Have experience managing staff, planning and meeting facilitation.\r\n\r\nIS-RSF activation may also include applicable USACE agency program area Subject Matter Experts (SMEs). Those SME costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the disaster recovery operations as authorized by FEMA.\r\n\r\n\r\n---MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be re imbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"d660e64b-418b-42eb-b19c-917161e7bebd","hash":"bedc94501396fe401c1a35435eed9150a7d60cf6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLACOE-MVD02","maAmendNumber":0,"actionId":450789,"maType":"FOS","supportFunction":18,"priority":"Normal","region":6,"stt":"LA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2023-10-23T00:00:00.000Z","dateRequired":"2023-10-26T00:00:00.000Z","popStartDate":"2023-10-23T00:00:00.000Z","popEndDate":"2023-12-22T00:00:00.000Z","dateObligated":"2023-10-24T00:00:00.000Z","obligationAmount":135000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":135000,"maPopStartDate":"2023-10-23T00:00:00.000Z","maPopEndDate":"2023-12-22T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":135000,"maPriority":"Normal","assistanceRequested":"Activate USACE Infrastructure RSF Field Coordinator","statementOfWork":"As directed by and in coordination with FEMA, the U.S. Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, RRCC, IOF, JFO, JRO or other facilities in support of National Disaster Recovery Framework post-disaster operations.\r\n\r\nSupport personnel may include, but is not limited to the following:\r\n- USACE support to the JFO and/or JRO\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under the NDRF)\r\n- IS-RSF Recovery Support SME(s)\r\n\r\nThe Infrastructure Systems RSF Field Coordinator support may include, but is not limited to, the following:\r\n Provide Subject Matter Expertise to the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO).\r\n Convene federal partnering agencies supporting the IS-RSF, formalize communications/meetings with the IS-RSF, and serve as the federal point-person for all IS-RSF-related matters at the field level. Maintain regular internal coordination/communication related to RSF initiatives at the field, regional, and national levels and ensure work in the disaster-affected area is consistent with the Recovery Strategy Development.\r\n Develop an approach to support infrastructure systems recovery, unique to the local communities and/or regional situation.\r\n Provide technical assistance and collaborate with other agencies on recovery strategies/solutions, mitigation, resilience, and sustainability opportunities. Assist RSF agencies in continuing to incorporate a comprehensive, multi-sector approach on coordination activities that align with the Recovery Strategy Development.\r\n Develop and complete NDRF products that may include the Recovery Needs Assessment and/or performance tracking tools, as directed by the FDRO or FCO.\r\n In consultation with the National RSF Coordinator, serve as an agency representative or agency liaison.\r\n Monitor supported and implemented recovery programs.\r\n Provide support either deployed onsite, episodically, or virtually as needed.\r\n\r\nThe IS-RSF Field Coordinator may be selected based upon several key criteria beyond that of subject matter experience. The selected individual ideally will:\r\n Be either housed in, or intimately aware of the affected region.\r\n Have experience coordinating infrastructure issues as well as experience or knowledge of mitigation and resilience. Reach back capability for technical support of these areas is suitable.\r\n Have experience managing staff, planning and meeting facilitation.\r\n\r\nIS-RSF activation may also include applicable USACE agency program area Subject Matter Experts (SMEs). Those SME costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the disaster recovery operations as authorized by FEMA.\r\n\r\n\r\n---MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be re imbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"271071c1-7c46-494b-895d-4f4b3c33965f","hash":"bd0f3cd3fd1813b4de4ca74b69d32e5dacfc4ea1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLACOE-MVD01","maAmendNumber":4,"actionId":459614,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"LA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2024-02-22T00:00:00.000Z","dateRequired":"2024-02-22T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2024-02-22T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amend #4: De-obligate remaining funds in amount of $10,000 BFY 24 FUND CODE 06 per USACE and financially close MA. \r\nAmend #3: De-obligate $8,166.18 BFY 24 for total de-obligation of $16,366.18 per USACE. Funds are 06 fund citation. \r\nAmend #2: De-obligate total of $16,366.18 per USACE.  This will be a two-part de-obligation as money is spread over two FYs.  BFY 23 de-obligation amount is $8,200.00 and BFY 24 de-obligation amount is $8,166.18.  All funds are under 06 funding citation. \r\nAmend #1: Extend end date 30 days per OSC and increase funding by $35,000.00 per USACE.  Change PM to Marquise Robinson. \r\nActivate USACE to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7fb13277-8d0d-4846-bff5-0e5c0a1045b4","hash":"8cca8d37c5a23863bbf39dcadd14fd6c50a36ba9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLACOE-MVD01","maAmendNumber":3,"actionId":456464,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"LA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2024-01-18T00:00:00.000Z","dateRequired":"2024-01-18T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2024-01-18T00:00:00.000Z","obligationAmount":-8166.18,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-8166.18,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-8166.18,"maPriority":"High","assistanceRequested":"Amend #3: De-obligate $8,166.18 BFY 24 for total de-obligation of $16,366.18 per USACE. Funds are 06 fund citation. \r\nAmend #2: De-obligate total of $16,366.18 per USACE.  This will be a two-part de-obligation as money is spread over two FYs.  BFY 23 de-obligation amount is $8,200.00 and BFY 24 de-obligation amount is $8,166.18.  All funds are under 06 funding citation. \r\nAmend #1: Extend end date 30 days per OSC and increase funding by $35,000.00 per USACE.  Change PM to Marquise Robinson. \r\nActivate USACE to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"659d2db9-e82c-48e4-844c-9a42184f7982","hash":"f30b03655fe212801551a95b2bdeb4a34fb8685e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLACOE-MVD01","maAmendNumber":2,"actionId":456270,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"LA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2024-01-16T00:00:00.000Z","dateRequired":"2024-01-16T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2024-01-16T00:00:00.000Z","obligationAmount":-8200,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-8200,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-8200,"maPriority":"High","assistanceRequested":"Amend #2: De-obligate total of $16,366.18 per USACE.  This will be a two-part de-obligation as money is spread over two FYs.  BFY 23 de-obligation amount is $8,200.00 and BFY 24 de-obligation amount is $8,166.18.  All funds are under 06 funding citation. \r\nAmend #1: Extend end date 30 days per OSC and increase funding by $35,000.00 per USACE.  Change PM to Marquise Robinson. \r\nActivate USACE to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"fb439be7-37b5-4c36-a924-0ab1121cb597","hash":"6f268c49fd9ad81d20bd0824aab73e172d20dfbb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLACOE-MVD01","maAmendNumber":1,"actionId":449414,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"LA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2023-10-10T00:00:00.000Z","dateRequired":"2023-10-10T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-11-05T00:00:00.000Z","dateObligated":"2023-10-10T00:00:00.000Z","obligationAmount":35000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":35000,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":35000,"maPriority":"High","assistanceRequested":"Amend #1: Extend end date 30 days per OSC and increase funding by $35,000.00 per USACE.  Change PM to Marquise Robinson. \r\nActivate USACE to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7ad49f77-8e6a-4698-9ea5-ebdee718826f","hash":"39bb3c2dfb2d0e32b70977e4004851847bb8e3df","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023092201","incidentName":"Louisiana Saltwater Intrusion ","incidentType":"Other","disasterNumber":3600,"declarationType":"EM","declarationTitle":"SEAWATER INTRUSION ","maId":"3600EMLACOE-MVD01","maAmendNumber":0,"actionId":448483,"maType":"FOS","supportFunction":3,"priority":"High","region":6,"stt":"LA","agencyId":"COE-MVD","agency":"COE MISSISSIPPI VALLEY DIV","authority":"Stafford Act","dateReceived":"2023-09-27T00:00:00.000Z","dateRequired":"2023-09-27T00:00:00.000Z","popStartDate":"2023-09-27T00:00:00.000Z","popEndDate":"2023-10-06T00:00:00.000Z","dateObligated":"2023-09-27T00:00:00.000Z","obligationAmount":8200,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":8200,"maPopStartDate":"2023-09-27T00:00:00.000Z","maPopEndDate":"2023-11-05T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":8200,"maPriority":"High","assistanceRequested":"Activate USACE to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- USACE support to RRCC\r\n- USACE support to National and/or Regional IMAT\r\n- USACE modeling and/or National Hurricane Program support\r\n- USACE Local Government Liaison(s)\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"125cf96e-5c8b-41ac-ae25-016cd1b35cad","hash":"ef347b9211c0044104d884434844163c9a709470","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023091401","incidentName":"Flooding_MA_09112023","incidentType":"Flood","disasterNumber":4780,"declarationType":"DR","declarationTitle":"SEVERE STORMS AND FLOODING","maId":"4780DRMAGSA01","maAmendNumber":0,"actionId":467007,"maType":"FOS","supportFunction":7,"priority":"Normal","region":1,"stt":"MA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-05-16T00:00:00.000Z","dateRequired":"2024-05-16T00:00:00.000Z","popStartDate":"2024-05-16T00:00:00.000Z","popEndDate":"2024-06-19T00:00:00.000Z","dateObligated":"2024-05-16T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-05-16T00:00:00.000Z","maPopEndDate":"2024-06-19T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Requesting GSA assistance with sourcing and leasing a commercial office space in the State of Massachusetts. Facility requirements: 12,000 - 20,000 sq. ft. commercial office spaces preferably with attached 5,000 sq. ft warehousing space with loading dock. Additional requirements: ADA/ABA compliance, 125 parking spaces, loading dock. Requested Resources: Activation - GSA","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide personnel to assist in leasing realty and/or contraction support and/or purchasing as required to support FEMA disaster operations.  \r\n\r\n--Funding of leases, contracts, or purchases in not authorized under this Mission Assignment. Leases, contracts, or purchases will be funded separately.\r\n--MA task orders (MATOS) may be issues by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignments(s).\r\n--Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--All equipment and supply purchases must be coordinated with FEMA as a separate MA.\r\n--The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are receive, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n--MAs shall be considered for closure after 45 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MA&#39;s still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"70b2bc98-7174-401f-b22a-2b3eba0eaa2a","hash":"a237ecacffc726841cc0966c020b83c53952a61c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023091301","incidentName":"R3_West Virginia Severe Storms and Flooding ","incidentType":"Flood","disasterNumber":4756,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4756DRWVGSA02","maAmendNumber":3,"actionId":468009,"maType":"FOS","supportFunction":7,"priority":"Normal","region":3,"stt":"WV","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-05-28T00:00:00.000Z","dateRequired":"2024-05-28T00:00:00.000Z","popStartDate":"2024-02-01T00:00:00.000Z","popEndDate":"2024-07-07T00:00:00.000Z","dateObligated":"2024-05-29T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-02-01T00:00:00.000Z","maPopEndDate":"2024-07-07T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 3: Extend POP until 7/7/2024. Change PM to Sarah Davis \r\nAmendment 2: Extend POP by 30 days for lease renewal through 6/6/2024\r\nAmend 01 Extend the POP by 30 days and increase funds by $2,500.\r\n \r\nActivate GSA to RRCC, IOF, JFO, or other teams and facilities as requested. WV JFO Site Inspection/ Expansion in current WV Fit Office. GSA Leasing in person to support contracting new DR space.\r\nActivate GSA to Virtual RRCC , or other teams and facilities as requested to assist in GSA lease/ contract","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"374fac43-d0a1-4c00-8767-6577573d1e6f","hash":"a252b303fd54c771c8089fb5e7054f0b83094f9f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023091301","incidentName":"R3_West Virginia Severe Storms and Flooding ","incidentType":"Flood","disasterNumber":4756,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4756DRWVGSA02","maAmendNumber":2,"actionId":464420,"maType":"FOS","supportFunction":7,"priority":"Normal","region":3,"stt":"WV","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-04-18T00:00:00.000Z","dateRequired":"2024-04-18T00:00:00.000Z","popStartDate":"2024-02-01T00:00:00.000Z","popEndDate":"2024-06-06T00:00:00.000Z","dateObligated":"2024-04-19T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-02-01T00:00:00.000Z","maPopEndDate":"2024-07-07T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 2: Extend POP by 30 days for lease renewal through 6/6/2024\r\n\r\nAmend 01 Extend the POP by 30 days and increase funds by $2,500.\r\n \r\nActivate GSA to RRCC, IOF, JFO, or other teams and facilities as requested. WV JFO Site Inspection/ Expansion in current WV Fit Office. GSA Leasing in person to support contracting new DR space.\r\nActivate GSA to Virtual RRCC , or other teams and facilities as requested to assist in GSA lease/ contract","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1a5610e3-2055-4e66-88fe-f50086a9d748","hash":"bec92e441358adce6501d2f4e47781f8f423cdd5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023091301","incidentName":"R3_West Virginia Severe Storms and Flooding ","incidentType":"Flood","disasterNumber":4756,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4756DRWVGSA02","maAmendNumber":1,"actionId":461710,"maType":"FOS","supportFunction":7,"priority":"Normal","region":3,"stt":"WV","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-03-15T00:00:00.000Z","dateRequired":"2024-03-15T00:00:00.000Z","popStartDate":"2024-02-01T00:00:00.000Z","popEndDate":"2024-05-06T00:00:00.000Z","dateObligated":"2024-03-19T00:00:00.000Z","obligationAmount":2500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2500,"maPopStartDate":"2024-02-01T00:00:00.000Z","maPopEndDate":"2024-07-07T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2500,"maPriority":"Normal","assistanceRequested":"Amend 01 Extend the POP by 30 days and increase funds by $2,500.\r\n \r\nActivate GSA to RRCC, IOF, JFO, or other teams and facilities as requested. WV JFO Site Inspection/ Expansion in current WV Fit Office. GSA Leasing in person to support contracting new DR space.\r\nActivate GSA to Virtual RRCC , or other teams and facilities as requested to assist in GSA lease/ contract","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"02b4f0a2-2d18-4684-82b0-7854bb81ae8d","hash":"5394d9069d96e6ec67a118bd1e3663998e348f29","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023091301","incidentName":"R3_West Virginia Severe Storms and Flooding ","incidentType":"Flood","disasterNumber":4756,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4756DRWVGSA02","maAmendNumber":0,"actionId":458262,"maType":"FOS","supportFunction":7,"priority":"Normal","region":3,"stt":"WV","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-02-07T00:00:00.000Z","dateRequired":"2024-02-01T00:00:00.000Z","popStartDate":"2024-02-01T00:00:00.000Z","popEndDate":"2024-04-06T00:00:00.000Z","dateObligated":"2024-02-08T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-02-01T00:00:00.000Z","maPopEndDate":"2024-07-07T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, or other teams and facilities as requested. WV JFO Site Inspection/ Expansion in current WV Fit Office. GSA Leasing in person to support contracting new DR space.\r\nActivate GSA to Virtual RRCC , or other teams and facilities as requested to assist in GSA lease/ contract","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations.\r\n\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b1bf01bb-5a24-4617-ac8f-6e10785ea788","hash":"fbe044234dd95f28280a66edd899de2f460f44c0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023091301","incidentName":"R3_West Virginia Severe Storms and Flooding ","incidentType":"Flood","disasterNumber":4756,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4756DRWVGSA01","maAmendNumber":1,"actionId":458837,"maType":"FOS","supportFunction":7,"priority":"Normal","region":3,"stt":"WV","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-02-14T00:00:00.000Z","dateRequired":"2024-02-14T00:00:00.000Z","popStartDate":"2024-02-01T00:00:00.000Z","popEndDate":"2024-02-16T00:00:00.000Z","dateObligated":"2024-02-14T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2024-02-01T00:00:00.000Z","maPopEndDate":"2024-02-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate and close due to incorrect SOW. \r\n\r\nActivate GSA to IOF, JFO, or other teams and facilities as requested. WV JFO Site Inspection/ Expansion in current WV Fit Office \r\nGSA Leasing in person to support contracting new DR space.\r\nActivate GSA to Virtual RRCC , or other teams and facilities as requested to assist in GSA lease/ contract","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n - ESF7 support\r\n - Emergency leasing services for needed space/facilities as requested by FEMA\r\n - GSA Lease Contracting Officers (LCOs) and others as needed\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7ec50abf-63b3-4efe-8982-5fb2d90f2c9d","hash":"361ca5fc16c83a645239b91b7b796cfc50924276","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023091301","incidentName":"R3_West Virginia Severe Storms and Flooding ","incidentType":"Flood","disasterNumber":4756,"declarationType":"DR","declarationTitle":"SEVERE STORMS, FLOODING, LANDSLIDES, AND MUDSLIDES","maId":"4756DRWVGSA01","maAmendNumber":0,"actionId":457870,"maType":"FOS","supportFunction":7,"priority":"Normal","region":3,"stt":"WV","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-02-01T00:00:00.000Z","dateRequired":"2024-02-01T00:00:00.000Z","popStartDate":"2024-02-01T00:00:00.000Z","popEndDate":"2024-02-16T00:00:00.000Z","dateObligated":"2024-02-02T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-02-01T00:00:00.000Z","maPopEndDate":"2024-02-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Activate GSA to IOF, JFO, or other teams and facilities as requested. WV JFO Site Inspection/ Expansion in current WV Fit Office \r\nGSA Leasing in person to support contracting new DR space.\r\n\r\nActivate GSA to Virtual RRCC , or other teams and facilities as requested to assist in GSA lease/ contract","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n - ESF7 support\r\n - Emergency leasing services for needed space/facilities as requested by FEMA\r\n - GSA Lease Contracting Officers (LCOs) and others as needed\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2769b42a-aa75-4bcc-897c-d6cd8b665f13","hash":"749fe6f768c5dbc944b1675c1e95d0b241167d5a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023091201","incidentName":"MI Severe Storms and Flooding","incidentType":"Severe Storm","disasterNumber":4757,"declarationType":"DR","declarationTitle":"SEVERE STORMS, TORNADOES, AND FLOODING","maId":"4757DRMIGSA01","maAmendNumber":0,"actionId":458473,"maType":"FOS","supportFunction":7,"priority":"Normal","region":5,"stt":"MI","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-02-12T00:00:00.000Z","dateRequired":"2024-02-12T00:00:00.000Z","popStartDate":"2024-02-10T00:00:00.000Z","popEndDate":"2024-07-15T00:00:00.000Z","dateObligated":"2024-02-13T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2024-02-10T00:00:00.000Z","maPopEndDate":"2024-07-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Assistance with leasing services in the State of MI.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations. \r\n  \r\nActivities may include, but are not limited to, the following: ESF7 support Emergency leasing services for needed space/facilities as requested by FEMA GSA Lease Contracting Officers (LCOs) and others as needed.\r\n  \r\nAdditional Notes from FEMA:\r\n-- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration \r\nof assignment(s). \r\n-- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required \r\nfor reimbursement. \r\n-- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation \r\nis necessary to ensure reimbursement. \r\n-- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n-- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency \r\n-- Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, \r\nper 44 CFR 206.208(c)(2).\r\n-- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective \r\nagency. \r\n-- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin \r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO \r\nValidation, or additional justification has been provided.\r\n","id":"70e4050a-0ce4-4c82-8ad0-79a59ab30119","hash":"1ac537eec30cf7c32b2f54beb740dd5418e3208e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023091201","incidentName":"MI Severe Storms and Flooding","incidentType":"Severe Storm","disasterNumber":4757,"declarationType":"DR","declarationTitle":"SEVERE STORMS, TORNADOES, AND FLOODING","maId":"4757DRMIDHS-FPS01","maAmendNumber":0,"actionId":458775,"maType":"FOS","supportFunction":13,"priority":"High","region":5,"stt":"MI","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2024-02-13T00:00:00.000Z","dateRequired":"2024-02-16T00:00:00.000Z","popStartDate":"2024-02-16T00:00:00.000Z","popEndDate":"2024-05-15T00:00:00.000Z","dateObligated":"2024-02-14T00:00:00.000Z","obligationAmount":200880,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":200880,"maPopStartDate":"2024-02-16T00:00:00.000Z","maPopEndDate":"2024-05-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":200880,"maPriority":"High","assistanceRequested":"Security Team - \r\n  \r\nMission Assignment to FPS for Level II Armed Security Guard services to be provided via Task Order in the State of Michigan for disaster DR4757MI","statementOfWork":"Security of FEMA facilities will be based on FEMA Office of Chief Security Officer (OCSO) security standards, policies, and practices. At the direction of, and in coordination with FEMA OCSO security personnel, FPS will provide contract protective services officers to support response and recovery operations in the State of Michigan. FEMA OCSO Security\r\nwill issue MA Task Orders for specific resource requirements, location(s), dates, and duration of assignments(s). Equipment purchases are not authorized under this Mission Assignment. \r\n  \r\nAdditional Notes from FEMA:\r\n-- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration \r\nof assignment(s). \r\n-- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n-- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n-- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n-- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, \r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n-- Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).\r\n-- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n-- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"c56b21b3-522d-442c-bc0a-13ecaf716148","hash":"f88d92c196acd6b5273c968c66ae0f370ea2a24e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023091201","incidentName":"MI Severe Storms and Flooding","incidentType":"Severe Storm","disasterNumber":4757,"declarationType":"DR","declarationTitle":"SEVERE STORMS, TORNADOES, AND FLOODING","maId":"4757DRMICOE-LRD01","maAmendNumber":0,"actionId":473783,"maType":"FOS","supportFunction":3,"priority":"High","region":5,"stt":"MI","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-07-26T00:00:00.000Z","dateRequired":"2024-07-29T00:00:00.000Z","popStartDate":"2024-07-29T00:00:00.000Z","popEndDate":"2024-09-13T00:00:00.000Z","dateObligated":"2024-07-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2024-07-29T00:00:00.000Z","maPopEndDate":"2024-09-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"In coordination with FEMA, the US Army Corps of Engineers (USACE) will provide and support an recovery field office in support of DR-4757-MI.\r\n","statementOfWork":"As directed by and in coordination with FEMA, U.S. Army Corps of Engineers (USACE) will provide and support a facility space to function as a FEMA recovery field office in support of FEMA disaster operations.\r\n  \r\nAdditional Notes from FEMA:\r\n-- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration\r\nof assignment(s).\r\n-- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required\r\nfor reimbursement.\r\n-- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation\r\nis necessary to ensure reimbursement.\r\n-- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received,\r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency\r\n-- Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement,\r\nper 44 CFR 206.208(c)(2).\r\n-- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received,\r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency.\r\n-- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin\r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO\r\nValidation, or additional justification has been provided.","id":"f6fdfbd1-ed7e-4f4d-8e5f-95d775f44e25","hash":"d59629912eec47c9cf11a493c16d0c9bd71fd305","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401FCC01","maAmendNumber":0,"actionId":446460,"maType":"FOS","supportFunction":2,"priority":"High","region":2,"stt":"VI","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2023-09-06T00:00:00.000Z","dateRequired":"2023-09-05T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-06T00:00:00.000Z","obligationAmount":7462.89,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":7462.89,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":7462.89,"maPriority":"High","assistanceRequested":"Activation of ESF 2 (FCC) Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams, or other facilities in support of disaster operations.\r\n\r\n- MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement.\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies.\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a98c422e-5a00-42a0-bdff-a63d4e770447","hash":"21c6aa30695deba98c4ce17d4318b6e20e07b1ec","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOT01","maAmendNumber":2,"actionId":465079,"maType":"FOS","supportFunction":1,"priority":"Normal","region":2,"stt":"VI","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-26T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2024-05-01T00:00:00.000Z","obligationAmount":-12072.59,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-12072.59,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-12072.59,"maPriority":"Normal","assistanceRequested":"Amend 2 - De-obligate ($12072.59 FY23) per April 2024 Quarterly ULO Report\r\nAmend 1 - De-obligate ($20,000.00 FY23) as per OFA email\r\nActivation of ESF 01 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested. \r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"17111ed7-5bf7-49eb-a0d4-9fdf5eb38223","hash":"8b99f30e85db36233e5f445af63175156ae95fe5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOT01","maAmendNumber":1,"actionId":446908,"maType":"FOS","supportFunction":1,"priority":"Normal","region":2,"stt":"VI","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-09-11T00:00:00.000Z","dateRequired":"2023-09-11T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-11T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"Normal","assistanceRequested":"Amend 1 - De-obligate ($20,000.00 FY23) as per OFA email\r\nActivation of ESF 01 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested. \r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"30cad4ef-2170-404b-8568-27d4b7ab4e48","hash":"4a366ebbbf1a7c0d45111663959bf0b9dff04df7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOT01","maAmendNumber":0,"actionId":446466,"maType":"FOS","supportFunction":1,"priority":"High","region":2,"stt":"VI","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-09-06T00:00:00.000Z","dateRequired":"2023-09-05T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-06T00:00:00.000Z","obligationAmount":39797.8,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":39797.8,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":39797.8,"maPriority":"Normal","assistanceRequested":"Activation of ESF 01 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested. \r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b073770b-ad24-4b06-a8ea-0bc739d6b817","hash":"8114abdcb90e6058633ff7bed4c1d4b26032b7db","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOJ-ATF01","maAmendNumber":1,"actionId":474668,"maType":"FOS","supportFunction":13,"priority":"Normal","region":2,"stt":"VI","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-06T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":-18995.88,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-18995.88,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-18995.88,"maPriority":"Normal","assistanceRequested":"Amend 1 - De-obligate ($18,995.88 FY23) per July 2024 Quarterly ULO report.\r\nActivation of ESF 13 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"26c50d81-a1b6-4901-9eca-fe33a323c116","hash":"ccb67465cf00b7a7201e513ba675403cbb59b390","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOJ-ATF01","maAmendNumber":0,"actionId":446510,"maType":"FOS","supportFunction":13,"priority":"Normal","region":2,"stt":"VI","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-09-06T00:00:00.000Z","dateRequired":"2023-09-05T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-06T00:00:00.000Z","obligationAmount":36911.13,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":36911.13,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":36911.13,"maPriority":"Normal","assistanceRequested":"Activation of ESF 13 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"1e140382-15ad-4f7f-869b-038b39c1fe88","hash":"43f870719922668974b4fedc95df358e092ed221","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOE-OE01","maAmendNumber":3,"actionId":474676,"maType":"FOS","supportFunction":12,"priority":"Normal","region":2,"stt":"VI","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-08-07T00:00:00.000Z","dateRequired":"2024-08-06T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2024-08-08T00:00:00.000Z","obligationAmount":-12296.25,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-12296.25,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-12296.25,"maPriority":"Normal","assistanceRequested":"Amend 3 - De-obligate ($12,296.25 FY23) as per July 2024 Quarterly ULO report \r\nAmend 2 - De-obligate ($3,303.58 FY23) per the April 2024 Quarterly ULO Validation process.\r\nAmend 1 - Obligate $35,113.89 for supplemental costs as per OFA Email.\r\nActivation of ESF 12 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations  \r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n  - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n ","id":"c1e68589-b71e-4180-aec0-7a4689cf3cf4","hash":"f3c21ebeb06860a5275395b231a952b07f8383e7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOE-OE01","maAmendNumber":2,"actionId":465039,"maType":"FOS","supportFunction":12,"priority":"Normal","region":2,"stt":"VI","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-25T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2024-05-01T00:00:00.000Z","obligationAmount":-3303.58,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3303.58,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3303.58,"maPriority":"Normal","assistanceRequested":"Amend 2 - De-obligate ($3,303.58 FY23) per the April 2024 Quarterly ULO Validation process.\r\nAmend 1 - Obligate $35,113.89 for supplemental costs as per OFA Email.\r\nActivation of ESF 12 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations  \r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n  - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n ","id":"cd1fea0d-465a-4e33-aa20-4f9e9acf7754","hash":"21e14623850cc9f143816fabbf4af5df50c41838","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOE-OE01","maAmendNumber":1,"actionId":446910,"maType":"FOS","supportFunction":12,"priority":"Normal","region":2,"stt":"VI","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-09-11T00:00:00.000Z","dateRequired":"2023-09-11T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-11T00:00:00.000Z","obligationAmount":35113.89,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":35113.89,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":35113.89,"maPriority":"Normal","assistanceRequested":"Amend 1 - Obligate $35,113.89 for supplemental costs as per OFA Email.\r\nActivation of ESF 12 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations  \r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n  - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n ","id":"17e5e9e8-ba5d-49ea-97ee-5538026c6f31","hash":"65d067f06f9d185bc06626127e064e687e973c11","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOE-OE01","maAmendNumber":0,"actionId":446450,"maType":"FOS","supportFunction":12,"priority":"High","region":2,"stt":"VI","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-09-06T00:00:00.000Z","dateRequired":"2023-09-05T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-06T00:00:00.000Z","obligationAmount":40201.11,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":40201.11,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":40201.11,"maPriority":"Normal","assistanceRequested":"Activation of ESF 12 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations  \r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n  - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n ","id":"8d43d2af-a3bf-4cc8-9956-dc30e54c9590","hash":"950f3e1907b9f8b69a6f9a9bd8fb794c14bf332e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOD-USAF01","maAmendNumber":1,"actionId":465038,"maType":"FOS","supportFunction":5,"priority":"Normal","region":2,"stt":"VI","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-25T00:00:00.000Z","popStartDate":"2023-09-06T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2024-05-01T00:00:00.000Z","obligationAmount":-7362.75,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-7362.75,"maPopStartDate":"2023-09-06T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-7362.75,"maPriority":"Normal","assistanceRequested":"Amend 1 - De-Obligate ($7,362.75 FY24) per the April 2024 Quarterly ULO Validation process.\r\nRequest aerial imagery support pre- and post-landfall within FEMA Region 2 Area of Responsibility as pertains to TS Lee as applicable. Initial location is Puerto Rico and US Virgin Islands.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\nAerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\nTransportation of personnel and/or light cargo\r\nDamage assessment imagery/observations, which may include previously collected imagery\r\nGeotagged or georeferenced imagery, uploadable to FEMAprovided FTP website or delivered on digital media\r\nCAP liaison and/or imagery collection management support\r\nAirborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/LifeSafety\r\n\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2ca3a746-c07c-4818-8325-b7d889d46098","hash":"85c9ce994c70aa877ccffcb5d4f9b5822b7b4be6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOD-USAF01","maAmendNumber":0,"actionId":446519,"maType":"FOS","supportFunction":5,"priority":"High","region":2,"stt":"VI","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-09-06T00:00:00.000Z","dateRequired":"2023-09-07T00:00:00.000Z","popStartDate":"2023-09-06T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-07T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2023-09-06T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Normal","assistanceRequested":"Request aerial imagery support pre- and post-landfall within FEMA Region 2 Area of Responsibility as pertains to TS Lee as applicable. Initial location is Puerto Rico and US Virgin Islands.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\nAerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\nTransportation of personnel and/or light cargo\r\nDamage assessment imagery/observations, which may include previously collected imagery\r\nGeotagged or georeferenced imagery, uploadable to FEMAprovided FTP website or delivered on digital media\r\nCAP liaison and/or imagery collection management support\r\nAirborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/LifeSafety\r\n\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7c9935d7-9c0d-45f1-85b4-3bccddd766cf","hash":"8a636be91d6fdc944e6b14f67dbf3611f4b3bf62","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOD-OPS01","maAmendNumber":2,"actionId":457396,"maType":"FOS","supportFunction":0,"priority":"Normal","region":2,"stt":"VI","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-01-30T00:00:00.000Z","dateRequired":"2024-01-29T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2024-02-01T00:00:00.000Z","obligationAmount":-5832.36,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5832.36,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5832.36,"maPriority":"Normal","assistanceRequested":"Amend 2 - De obligate ($5,832.36 FY 23) as per attached (in ECAPS) January 2024 ULO report.\r\nAmend 1 - De obligate ($55,000 FY 23) as per attached October 2023 ULO report.\r\nActivation of DoD/DCE Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-015 or as directed.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\n\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"03452ec3-e641-4413-8fb0-3cf32a614c1b","hash":"448d12557e7ee52fa3e9ef75163b7d8662ed5b6f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOD-OPS01","maAmendNumber":1,"actionId":450964,"maType":"FOS","supportFunction":0,"priority":"Normal","region":2,"stt":"VI","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-25T00:00:00.000Z","dateRequired":"2023-10-25T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-10-27T00:00:00.000Z","obligationAmount":-55000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-55000,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-55000,"maPriority":"Normal","assistanceRequested":"Amend 1 - De obligate ($55,000 FY 23) as per attached October 2023 ULO report.\r\nActivation of DoD/DCE Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-015 or as directed.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\n\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"fe36d00d-8ae7-46ee-85da-fde76c805249","hash":"14d93f4733a845619cb9f22f2397325786b88b6f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2018072401","incidentName":"CARR FIRE","incidentType":"Fire","disasterNumber":4382,"declarationType":"DR","declarationTitle":"WILDFIRES AND HIGH WINDS","maId":"4382DRCADOD01","maAmendNumber":1,"actionId":295825,"maType":"FOS","supportFunction":5,"priority":"Lifesaving","region":9,"stt":"CA","agencyId":"DOD","agency":"DEPARTMENT OF DEFENSE","authority":"Stafford Act","dateReceived":"2019-07-31T00:00:00.000Z","dateRequired":"2019-07-31T00:00:00.000Z","popStartDate":"2018-08-10T00:00:00.000Z","popEndDate":"2018-09-08T00:00:00.000Z","dateObligated":"2019-08-09T00:00:00.000Z","obligationAmount":-25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-25000,"maPopStartDate":"2018-08-10T00:00:00.000Z","maPopEndDate":"2018-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-25000,"maPriority":"Lifesaving","assistanceRequested":"Amendment #1 de-obligate $25,000 and closeout mission assignment per July ULO Report \r\n\r\nActivate DOD to RRCC, IOF, or JFO to support FEMA disaster operations.  ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations. \r\n\r\n MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement. \r\n\r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n\r\n If required and authorized by FEMA, activation of agency command center(s) will be covered under a separate MA. \r\n The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. \r\n\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. ","id":"5e32ae14-1e24-45a1-b3f1-42b098143f92","hash":"cb8c919c4951c9d76237dbb00779ca7e404ece29","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DOD-OPS01","maAmendNumber":0,"actionId":446467,"maType":"FOS","supportFunction":0,"priority":"High","region":2,"stt":"VI","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-06T00:00:00.000Z","dateRequired":"2023-09-05T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-06T00:00:00.000Z","obligationAmount":64669.83,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":64669.83,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":64669.83,"maPriority":"Normal","assistanceRequested":"Activation of DoD/DCE Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations.\r\n\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e949c97d-af7b-4cd1-8629-3efb20682a9e","hash":"2e37b5be0221888299ac455a3740d0eeb0dda17a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DHS-USCG01","maAmendNumber":1,"actionId":457782,"maType":"FOS","supportFunction":9,"priority":"High","region":2,"stt":"VI","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-02-01T00:00:00.000Z","dateRequired":"2024-02-01T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2024-02-01T00:00:00.000Z","obligationAmount":-6385.49,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-6385.49,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-6385.49,"maPriority":"High","assistanceRequested":"Amend 1 - De-obligate $6,385.49 FY23 per January 2024 ULO.\r\nActivation of ESF 9 (US Coast Guard) Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"cfb8c551-6c94-42a4-9386-5d31b87231e7","hash":"8f9bbce143ee384ecad206d91ee1ecb0b73a13a5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DHS-USCG01","maAmendNumber":0,"actionId":446441,"maType":"FOS","supportFunction":9,"priority":"High","region":2,"stt":"VI","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-09-06T00:00:00.000Z","dateRequired":"2023-09-05T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-06T00:00:00.000Z","obligationAmount":8906.22,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":8906.22,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":8906.22,"maPriority":"High","assistanceRequested":"Activation of ESF 9 (US Coast Guard) Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b0058799-b826-4c2d-a2de-769a4866f611","hash":"0b5006663f8d1c00e6aff4815b9da0136f5a48d3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DHS-CISA02","maAmendNumber":1,"actionId":450912,"maType":"FOS","supportFunction":2,"priority":"Normal","region":2,"stt":"VI","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-10-25T00:00:00.000Z","dateRequired":"2023-10-25T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-10-25T00:00:00.000Z","obligationAmount":-11833.07,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-11833.07,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-11833.07,"maPriority":"Normal","assistanceRequested":"Amendment No1 - De-obligate $11,833.07 as requested in the Oct 2023 ULO report\r\nActivation of ESF 2 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\nADDITIONAL NOTES from FEMA: \r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9d586e0d-356c-4504-9c89-33e4b93ccfd4","hash":"a5a2815a3e2caaa8318b08046bc4a70ccc588fda","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DHS-CISA02","maAmendNumber":0,"actionId":446476,"maType":"FOS","supportFunction":2,"priority":"Normal","region":2,"stt":"VI","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-06T00:00:00.000Z","dateRequired":"2023-09-05T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-06T00:00:00.000Z","obligationAmount":14522.47,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":14522.47,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":14522.47,"maPriority":"Normal","assistanceRequested":"Activation of ESF 2 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\nADDITIONAL NOTES from FEMA: \r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"96eaf2c6-247a-4056-bd24-ef07a44c56b2","hash":"59101367f3e64c351684d212e90db6fb916ad7b1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DHS-CISA01","maAmendNumber":1,"actionId":450910,"maType":"FOS","supportFunction":14,"priority":"High","region":2,"stt":"VI","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-10-25T00:00:00.000Z","dateRequired":"2023-10-25T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-10-25T00:00:00.000Z","obligationAmount":-11564.48,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-11564.48,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-11564.48,"maPriority":"High","assistanceRequested":"Amendment No1 - De-obligate $11,564.48 per Oct 2023 ULO report\r\nActivation of ESF 14 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\n\r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4c325c02-a808-4801-a549-69d734e71a3e","hash":"25f4dce3d8fe3a5ce7b355ee89c2cbee1735cecd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401DHS-CISA01","maAmendNumber":0,"actionId":446464,"maType":"FOS","supportFunction":14,"priority":"High","region":2,"stt":"VI","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-06T00:00:00.000Z","dateRequired":"2023-09-05T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-06T00:00:00.000Z","obligationAmount":22098.69,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":22098.69,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":22098.69,"maPriority":"High","assistanceRequested":"Activation of ESF 14 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\n\r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ce972785-cd2d-4194-a2e7-edf9864d6c80","hash":"37fa27eddbeaf1fc43fba22189fdde2325d5afeb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401COE-SAD01","maAmendNumber":1,"actionId":457472,"maType":"FOS","supportFunction":3,"priority":"High","region":2,"stt":"VI","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-01-30T00:00:00.000Z","dateRequired":"2024-01-29T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2024-02-01T00:00:00.000Z","obligationAmount":-28673.39,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-28673.39,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-28673.39,"maPriority":"High","assistanceRequested":"Amend 1 - De-obligation of ($28673.39 FY23) per request of the January 2024 ULO Report\r\nActivation of ESF 03 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"69050719-0af0-4912-b461-8a975d7a8a91","hash":"4028fb326b7421006ce88c7a2896f021111bf92c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401COE-SAD01","maAmendNumber":0,"actionId":446468,"maType":"FOS","supportFunction":3,"priority":"High","region":2,"stt":"VI","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-09-06T00:00:00.000Z","dateRequired":"2023-09-05T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-06T00:00:00.000Z","obligationAmount":115500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":115500,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":115500,"maPriority":"High","assistanceRequested":"Activation of ESF 03 Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order  2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"6e6a0cc7-e354-4411-b81d-ccaa3489ffd5","hash":"80ab1948fd955d78f57d652fa6ca5b26dda82f3f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401COE-LRD01","maAmendNumber":3,"actionId":474254,"maType":"FOS","supportFunction":3,"priority":"Normal","region":2,"stt":"VI","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-08-01T00:00:00.000Z","dateRequired":"2024-08-01T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2024-08-03T00:00:00.000Z","obligationAmount":-500000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-500000,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-500000,"maPriority":"Normal","assistanceRequested":"Amend 3 - De-obligate ($500,000 FY 23) per USACE partial closeout memo\r\nAmend 2 - De-obligate ($100,000 FY 23) per USACE partial closeout memo\r\nAmend 1 - De-obligate ($150,000 FY 23) as per attached request from USACE POC\r\nActivation of Temp Power Teams and/or Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\n\r\nInitial requirement is for, up to but not limited to, Type 4 temporary power support assets\r\n\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\n\r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"351bbd3f-5922-4366-bbc9-f3b78354b07a","hash":"2cb13a28e1a628fb74fbbffd432fbfaac0c3d3bf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401COE-LRD01","maAmendNumber":2,"actionId":469892,"maType":"FOS","supportFunction":3,"priority":"Normal","region":2,"stt":"VI","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-06-13T00:00:00.000Z","dateRequired":"2024-06-13T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2024-06-14T00:00:00.000Z","obligationAmount":-100000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-100000,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-100000,"maPriority":"Normal","assistanceRequested":"Amend 2 - De-obligate ($100,000 FY 23) per USACE partial closeout memo\r\nAmend 1 - De-obligate ($150,000 FY 23) as per attached request from USACE POC\r\nActivation of Temp Power Teams and/or Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\n\r\nInitial requirement is for, up to but not limited to, Type 4 temporary power support assets\r\n\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\n\r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"bdaf796a-f69b-4edd-ac9b-d9d67e8135ae","hash":"6e9379396cbaae7559b55203c7b0c7e4a4b1a711","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401COE-LRD01","maAmendNumber":1,"actionId":462205,"maType":"FOS","supportFunction":3,"priority":"Normal","region":2,"stt":"VI","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-03-21T00:00:00.000Z","dateRequired":"2024-03-21T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2024-03-21T00:00:00.000Z","obligationAmount":-150000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-150000,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-150000,"maPriority":"Normal","assistanceRequested":"Amend 1 - De-obligate ($150,000 FY 23) as per attached request from USACE POC\r\nActivation of Temp Power Teams and/or Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\n\r\nInitial requirement is for, up to but not limited to, Type 4 temporary power support assets\r\n\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\n\r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7a23656b-1fdb-4fa8-b968-c28d89e93ce6","hash":"d964248cd0bf46312bf1f99a63d8786cfb8d9039","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"VI23090401COE-LRD01","maAmendNumber":0,"actionId":446421,"maType":"FOS","supportFunction":3,"priority":"High","region":2,"stt":"VI","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2023-09-05T00:00:00.000Z","dateRequired":"2023-08-05T00:00:00.000Z","popStartDate":"2023-09-05T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-06T00:00:00.000Z","obligationAmount":3775494,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3775494,"maPopStartDate":"2023-09-05T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3775494,"maPriority":"Normal","assistanceRequested":"Activation of Temp Power Teams and/or Representatives to the Region 2 RRCC, IOF/JFO in New Jersey, New York, Puerto Rico and US Virgin Islands, and/or other facilities in support of FEMA disaster operations as defined in accordance with Region 2 Operations Order 2023-015 or as directed.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\n\r\nInitial requirement is for, up to but not limited to, Type 4 temporary power support assets\r\n\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\n\r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9a9841ae-9401-4d49-aaa4-2856c71bf586","hash":"aa73300a7a65fe1d17fa0601114d884b5b1c1d56","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401VA01","maAmendNumber":1,"actionId":447568,"maType":"FOS","supportFunction":8,"priority":"High","region":1,"stt":"ME","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA and change the PM to Brandon White. This MA has been replaced by 3598EM-ME-VA-01. Activate VA to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Veterans Affairs (VA) will provide appropriate personnel to the NRCC other teams and facilities to support disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\nMA\r\ntask orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies\r\nwill be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll\r\nequipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation\r\nof agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe\r\nmission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency\r\nMAs\r\nshall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for\r\nadditional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"4234842a-c7f6-41cd-9649-56609e735606","hash":"e5807f585ab089359d70b7f87f03ab67fa8b8667","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401VA01","maAmendNumber":0,"actionId":447428,"maType":"FOS","supportFunction":8,"priority":"High","region":1,"stt":"ME","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate VA to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Veterans Affairs (VA) will provide appropriate personnel to the NRCC other teams and facilities to support disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\nMA\r\ntask orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies\r\nwill be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll\r\nequipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation\r\nof agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe\r\nmission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency\r\nMAs\r\nshall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for\r\nadditional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"367b5da7-af15-4520-a45b-335ae2f1e581","hash":"16a8cd224f9b83c447457e378880dfb70c65fe9d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401HHS-ASPR01","maAmendNumber":1,"actionId":447565,"maType":"FOS","supportFunction":8,"priority":"High","region":1,"stt":"ME","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA and change the PM to Brandon White. This MA has been replaced by 3598EM-ME-HHS-ASPR-01. Activate HHS to NRCC.","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"54a0a9f1-70d9-4568-b210-08f8bec91473","hash":"d07b33d30d1a3100afbee5a40e70fe917e9c0ecf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401HHS-ASPR01","maAmendNumber":0,"actionId":447342,"maType":"FOS","supportFunction":8,"priority":"High","region":1,"stt":"ME","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate HHS to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d0b0b063-b302-42ca-967b-feecb9c25bc5","hash":"ee755611a48f01b3e5f662f3c83a71e48f47a0a7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401GSA01","maAmendNumber":1,"actionId":447522,"maType":"FOS","supportFunction":7,"priority":"Life Sustaining","region":1,"stt":"ME","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2024-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-2500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2500,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2500,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA and change the PM to Brandon White.  This MA has been replaced by 3598EM-ME-GSA-01\r\nActivate GSA to NRCC, or other teams and facilities as request.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n-ES&amp; support\r\n-Emergency leasing services for needed space/facilities as required by FEMA\r\n-GSA Lease Contracting Officers (LCOs) and other as needed\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"a159eee2-af34-4bff-a16e-83c457eccc6f","hash":"98a1adb646bf5d32480c9cd0b0d2e1eb3be3d4b4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401GSA01","maAmendNumber":0,"actionId":447393,"maType":"FOS","supportFunction":7,"priority":"Life Sustaining","region":1,"stt":"ME","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2024-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":2500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2500,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2500,"maPriority":"Life Sustaining","assistanceRequested":"Activate GSA to NRCC, or other teams and facilities as request.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations.\r\n\r\nActivities may include, but are not limited to, the following:\r\n-ES&amp; support\r\n-Emergency leasing services for needed space/facilities as required by FEMA\r\n-GSA Lease Contracting Officers (LCOs) and other as needed\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n\r\n\r\n","id":"c4cb9e1a-4169-44e2-b082-9ad9248f5bfb","hash":"8e1e8e9919fc0a6f5993fa0d4f06182472f2db13","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401EPA01","maAmendNumber":1,"actionId":447523,"maType":"FOS","supportFunction":10,"priority":"High","region":1,"stt":"ME","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA and change the PM to Brandon White. This MA has been replaced by 3598EM-ME-EPA-01.EPA to NRCC or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7c3f100e-456b-481c-b0c6-2facd9870e6f","hash":"176123551e1736a7e2da16a7ebb23515df29b986","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401EPA01","maAmendNumber":0,"actionId":447419,"maType":"FOS","supportFunction":10,"priority":"High","region":1,"stt":"ME","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"EPA to NRCC or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested to support disaster operations.\r\n\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c553d4a9-5d6e-44af-adf0-67a19140ee97","hash":"bf96849a6427c676ce15f88eb719db05c0b3437e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DOI-WCF01","maAmendNumber":1,"actionId":447573,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-2500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2500,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2500,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA and change the PM to Brandon White. This MA has been replaced by 3598EM-ME-DOI-WCF-01. Activate DOI to NRCC.","statementOfWork":"As directed by and in coordination with FEMA, DOI will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA response operations.\r\nFunding for DOI command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2a87043a-867b-4ed3-abb1-351b02984411","hash":"d98d03ab13a1e8fa44294a4dfe7b340da706d919","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DOI-WCF01","maAmendNumber":0,"actionId":447427,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":2500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2500,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2500,"maPriority":"High","assistanceRequested":"Activate DOI to NRCC.","statementOfWork":"As directed by and in coordination with FEMA, DOI will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA response operations.\r\n\r\nFunding for DOI command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4f6c842b-34b7-442f-b788-55ce902b27f7","hash":"6f3f07049d5fba8dac120cf0be80ae0b691064af","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DOE-OE01","maAmendNumber":1,"actionId":447548,"maType":"FOS","supportFunction":12,"priority":"High","region":1,"stt":"ME","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA. This MA has been replaced by 3598EM-ME-DOE-OE- 02. Activate DOE to the NRCC.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the NRCC to perform the functions of ESF-12 in support disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"986af255-6ec4-4cfb-b69c-8489862a765d","hash":"084d2dd8e576aac105e7b2f8d5cd370f7b6f5a07","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DOE-OE01","maAmendNumber":0,"actionId":447441,"maType":"FOS","supportFunction":12,"priority":"High","region":1,"stt":"ME","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate DOE to the NRCC","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the NRCC to perform the functions of ESF-12 in support disaster operations\r\n\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1c3579a8-9298-4a47-9f37-d91987cd5d8b","hash":"40da823176e4fe998c7a5fa7100894bc028bc987","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DOD-USAF01","maAmendNumber":1,"actionId":447585,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA and change the PM to Brandon White. This MA has been replaced by 3598EM-ME-DOD-USAF-01\r\nRequest United States Air Auxiliary/Civil Air Patrol provide CAP LNO support at the FEMA NRCC in response to HC Lee.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"012e5095-8cf2-4887-ba6c-a75bd1d64732","hash":"eb13424abc08e7a67df902947077858b971eece1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DOD-USAF01","maAmendNumber":0,"actionId":447401,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Request United States Air Auxiliary/Civil Air Patrol provide CAP LNO support at the FEMA NRCC in response to HC Lee.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"74286fcd-2e8d-4115-a569-9b085014c7f7","hash":"fc8aa1fe0660d1c2811435d366bc5b6188107b3b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DOD-OPS01","maAmendNumber":1,"actionId":447570,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":1,"stt":"ME","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA and change the PM to Brandon White. This MA has been replaced by 3598EM-ME-DOD-OPS-01\r\nActivate DOD to NRCC to support FEMA response operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"ca7a503d-2ca2-4d1a-ba27-ff7f29805cf9","hash":"16c21832f411cffcc378ff7dfba2a32b1874dcfb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DOD-OPS01","maAmendNumber":0,"actionId":447360,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":1,"stt":"ME","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Life Sustaining","assistanceRequested":"Activate DOD to NRCC to support FEMA response operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n\r\n","id":"9ae91eb1-6671-4945-92c3-1b4dc4fb5115","hash":"32264285294465d8dfc78c413e9d1ef24003c143","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DOC-NOAA01","maAmendNumber":1,"actionId":447541,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA and change the PM to Brandon White. This MA has been replaced by 3598EM-ME-DOC-NOAA-01. Activate NOAA to NRCC to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the NRCC to support disaster operations\r\nThis may include but is not limited to, the following:\r\n    - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n    - National Weather Service (NWS) Hurricane Liaison Team (HLT)\r\n    - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n    - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\nADDITIONAL NOTES from FEMA:\r\n  - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2c70f60f-00c0-4871-970f-bafb94085c01","hash":"afa18e06a10dbb03f49a58cd6b69eb80cdd392f3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DOC-NOAA01","maAmendNumber":0,"actionId":447425,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate NOAA to NRCC to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the NRCC to support disaster operations\r\n\r\nThis may include but is not limited to, the following:\r\n    - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n    - National Weather Service (NWS) Hurricane Liaison Team (HLT)\r\n    - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n    - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\n\r\nADDITIONAL NOTES from FEMA:\r\n  - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"cb85bb55-7db4-45d8-a532-8b4a50686994","hash":"28c1284af88a9e2828c0397c2afc49b684ddaced","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DLA01","maAmendNumber":1,"actionId":447549,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-2500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2500,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2500,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA.  This MA has been replaced by 3598EM-ME-DLA-01\r\nActivate DLA liaisons to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ec63bc13-305f-4edd-beb0-816ed45206fc","hash":"7daff8c6696376e523dff63880bfab4072761933","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DLA01","maAmendNumber":0,"actionId":447396,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":2500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2500,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2500,"maPriority":"High","assistanceRequested":"Activate DLA liaisons to NRCC","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\n\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4e5449f7-770c-46f0-b67d-d1aa367f9e0a","hash":"d2a7b40d344e2b5ca852c2839789b4a88b601972","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DHS-USCG01","maAmendNumber":1,"actionId":447525,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA.  This MA has been replaced by 3598EM-ME-DHS-USCG-01\r\n\r\n\r\nActivate USCG liaison(s) to NRCC. ","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b516ce24-20ed-4550-8df1-7b030e26dcf8","hash":"0876595ceebceadd30edc38161019c0d0ae81a8e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DHS-USCG01","maAmendNumber":0,"actionId":447362,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate USCG liaison(s) to NRCC","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\n\r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d9fb3d28-dcb1-41d6-8a06-9b524d39744f","hash":"20791af337f2affa4d9f7ef06f21b4bad51fcbb2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DHS-CISA01","maAmendNumber":1,"actionId":447555,"maType":"FOS","supportFunction":2,"priority":"High","region":1,"stt":"ME","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-2500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2500,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2500,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA and change the PM to Brandon White. This MA has been replaced by 3598EM-ME-DHS-CISA-01\r\nActivate CISA ESF-2 to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2f91d066-c5e0-4579-a632-d8f0332d5cec","hash":"4806cd7f9c7d14ad05f90c40bae3642c12e3a770","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401DHS-CISA01","maAmendNumber":0,"actionId":447405,"maType":"FOS","supportFunction":2,"priority":"High","region":1,"stt":"ME","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":2500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2500,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2500,"maPriority":"High","assistanceRequested":"Activate CISA ESF-2 to NRCC","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2c959c37-8d34-4210-883f-ed8ac0953d94","hash":"2f1f863dfa2ec315a01bf754f4b3f3824a49d949","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401COE-HQ01","maAmendNumber":1,"actionId":447554,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"ME","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-21000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-21000,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA and change the PM to Brandon White. This MA has been replaced by 3598EM-ME-COE-HQ-01\r\nActivate USACE to the NRCC or other facilities to support disaster operations","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d3e7b17c-6676-4563-9df3-967e794073d6","hash":"da011978ed06838d56f8d3e3f6003f880c5b9379","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"ME23090401COE-HQ01","maAmendNumber":0,"actionId":447399,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"ME","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":21000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":21000,"maPriority":"High","assistanceRequested":"Activate USACE to the NRCC or other facilities to support disaster operations","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\n\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b07c5e5b-e1b3-48d7-b6b1-f101119bf576","hash":"329a3d4435cb8e1765ecd320dd6ed32b433d76a1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401HHS-ASPR01","maAmendNumber":1,"actionId":447578,"maType":"FOS","supportFunction":8,"priority":"Normal","region":1,"stt":"MA","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-6750,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-6750,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-6750,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate and reissue as 3598EM-ME-HHS-ASPR-01.\r\n\r\n________________________________________________________\r\n\r\n\r\nActivate HHS to RRCC, IOF, JFO, RFO, or other regional facilities","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health and Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"23b27d27-a222-4951-9da0-dca30761ad9a","hash":"18207088a4c42ceebf4d513d0883b65fc41ddc10","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401HHS-ASPR01","maAmendNumber":0,"actionId":447285,"maType":"FOS","supportFunction":8,"priority":"Normal","region":1,"stt":"MA","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-09-13T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-13T00:00:00.000Z","obligationAmount":6750,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":6750,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":6750,"maPriority":"Normal","assistanceRequested":"Activate HHS to RRCC, IOF, JFO, RFO, or other regional facilities","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health and Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"90d554c3-5ebc-4b77-93cb-de353d5a7c1d","hash":"6289a559311285b4e01805091b5cac2b74fc754f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401EPA02","maAmendNumber":1,"actionId":447624,"maType":"FOS","supportFunction":10,"priority":"Normal","region":1,"stt":"MA","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate and reissue as 3598EM-ME-EPA-02.\r\n-----------------------------------------------------------------------------------------\r\nActivate EPA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.  \r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n&#xfffd;\tMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n&#xfffd;\tAll equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement.  \r\n&#xfffd;\tAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR.  Supporting documentation is required for reimbursement.  \r\n&#xfffd;\tThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. \r\n&#xfffd;\tMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.  For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"75af5615-9583-4972-a31c-e7a5611e70f4","hash":"52f68faca8e852d8061639269c78d55ee9fee961","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401EPA02","maAmendNumber":0,"actionId":447303,"maType":"FOS","supportFunction":10,"priority":"Normal","region":1,"stt":"MA","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-13T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-13T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Activate EPA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.  \r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n&#xfffd;\tMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n&#xfffd;\tAll equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement.  \r\n&#xfffd;\tAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR.  Supporting documentation is required for reimbursement.  \r\n&#xfffd;\tThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. \r\n&#xfffd;\tMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.  For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f519ec18-6a5d-42a9-a00c-ff498d24fe15","hash":"5e0a05c1f5164c034c9e36a1a65f48b4dbb63375","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401EPA01","maAmendNumber":1,"actionId":447608,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"MA","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate and reissue as 3598EM-ME-EPA-01.\r\n-----------------------------------------------------------------------------------------\r\nActivate EPA Water SME to RRCC to identify needs and facilitate information flow.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\nNOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"2846731e-36c4-4600-ad08-adb0336ceb6f","hash":"fc80ff63c7a61ebf62aef6b120f03f0a876cee8e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401EPA01","maAmendNumber":0,"actionId":447234,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"MA","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-13T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-13T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Activate EPA Water SME to RRCC to identify needs and facilitate information flow.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\nNOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"4ba263e3-1140-4197-8874-267e1e548438","hash":"4d665dca65b75df40aa5220f386c569f56cd301e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOT01","maAmendNumber":1,"actionId":447604,"maType":"FOS","supportFunction":1,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-12818,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-12818,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-12818,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate and reissue as 3598EM-ME-DOT-01.\r\n-----------------------------------------------------------------------------------------\r\nActivate DOT to RRCC, IOF, JFO, or other regional facilities.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested. \r\n\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"21602605-20c9-4900-91ad-13aebc29cdc5","hash":"378258e0deaaea943679d953138ea76577898b69","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOT01","maAmendNumber":0,"actionId":447266,"maType":"FOS","supportFunction":1,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-09-13T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-13T00:00:00.000Z","obligationAmount":12818,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":12818,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":12818,"maPriority":"Normal","assistanceRequested":"Activate DOT to RRCC, IOF, JFO, or other regional facilities.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested. \r\n\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. \r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1b1588d5-aff1-48b9-bd7d-6dbc4ed8f0a9","hash":"e5326978758cc8c32bb1b1832c25fef14c83ca43","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOJ-ATF02","maAmendNumber":1,"actionId":447588,"maType":"FOS","supportFunction":13,"priority":"High","region":1,"stt":"MA","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-24T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-294865,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-294865,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-294865,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate and reissue as 3598EM-ME-DOJ-ATF-02.\r\n\r\n________________________________________________________\r\n\r\n\r\n\r\nRequest DOJ/ATF force protection personnel:\r\nIMT: 15 person x 7 days\r\nTwo 16 person Federal Agent/Law Enforcement Strike Teams (LEST NIMS Typing Terminology.  Formerly QRT IAW US&amp;R Memo FEMA HQ) x 7 days\r\nMission Support Team x 7 days","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ)/ATF will provide appropriate personnel to staff ESF#13 Incident Management Team(s) (IMT), Management Support Team(s) (MST) to direct ESF#13 Field Force Protection/Security Operations in support FEMA disaster operations.\r\nAdditionally, the Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST) or other security teams as required to provide force protection in support of disaster operations.\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n-The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e7cffd1b-8bb3-4b7c-b316-b15444a025be","hash":"93c9126866d87f7d6f54d578c0e805d6914f117a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOJ-ATF02","maAmendNumber":0,"actionId":447363,"maType":"FOS","supportFunction":13,"priority":"High","region":1,"stt":"MA","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-09-13T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-24T00:00:00.000Z","dateObligated":"2023-09-13T00:00:00.000Z","obligationAmount":294865,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":294865,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":294865,"maPriority":"High","assistanceRequested":"Request DOJ/ATF force protection personnel:\r\nIMT: 15 person x 7 days\r\nTwo 16 person Federal Agent/Law Enforcement Strike Teams (LEST NIMS Typing Terminology.  Formerly QRT IAW US&amp;R Memo FEMA HQ) x 7 days\r\nMission Support Team x 7 days","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ)/ATF will provide appropriate personnel to staff ESF#13 Incident Management Team(s) (IMT), Management Support Team(s) (MST) to direct ESF#13 Field Force Protection/Security Operations in support FEMA disaster operations.\r\nAdditionally, the Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST) or other security teams as required to provide force protection in support of disaster operations.\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n-The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency \r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3751c610-cf45-4d2c-9f4f-7ac8e8ce2705","hash":"fa3f36665545ad201341892c6c2ef089792dc64f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOJ-ATF01","maAmendNumber":1,"actionId":447542,"maType":"FOS","supportFunction":13,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate and reissue as 3598EM-ME-DOJ-ATF-01.\r\n\r\n_________________________________________________________\r\n\r\n\r\n\r\nActivate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"679ed04f-a5da-4893-aed9-febb4b17d656","hash":"8ba05adc71c2c3954199e1f80273f3e45dfdcab1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOJ-ATF01","maAmendNumber":0,"actionId":447316,"maType":"FOS","supportFunction":13,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-09-13T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-13T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Activate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"46d6ee16-dc17-4c1f-b370-9f5ae43c630c","hash":"70b4b6a04a6d1f935c54e4aa6a0daada70a48140","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOI-USGS01","maAmendNumber":1,"actionId":447586,"maType":"FOS","supportFunction":5,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOI-USGS","agency":"DOI-USGS (GEOLOGICAL SURVEY)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-176000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-176000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-176000,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate and reissue as 3598EM-ME-USGS-01.\r\n\r\n________________________________________________________\r\n\r\nUSGS Field measurements of flood-water heights in impacted communities","statementOfWork":"As directed by and in coordination with FEMA, U.S. Geological Survey (USGS) will provide advance support, real-time field measurements, and daily reporting of water heights in direct support and for situational awareness of FEMA disaster operations for a high-water or flood event.\r\n\r\nUSGS services may include, but are not limited to, the following in direct support of response and recovery operations:\r\n - Field measurements of flood water heights in impacted communities;\r\n - Deploy supplemental water-level measuring instruments.\r\n - Measure streamflow and discharge of flooded channels, directly or indirectly.\r\n - Flagging of High-Water Marks and collect evidence of flooding for impacted areas and communities. \r\n - Locate and record the horizontal position and vertical elevation of the High Water Marks (HWM). \r\n - Documentation of HWMs with field notes, digital photographs, and depth measurements to the ground at the HWM location at the time of inspection. \r\n - Data measurements provided in GIS-ready format via the USGS National Water Information System or Short-Term Network system for display and download. \r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4f33d4b3-403b-4dac-9c3e-de22bb61eb99","hash":"8a0c3c776553c638ca0db1a745166c3004dcbbeb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOI-USGS01","maAmendNumber":0,"actionId":447314,"maType":"FOS","supportFunction":5,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOI-USGS","agency":"DOI-USGS (GEOLOGICAL SURVEY)","authority":"Stafford Act","dateReceived":"2023-09-13T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-13T00:00:00.000Z","obligationAmount":176000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":176000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":176000,"maPriority":"Normal","assistanceRequested":"USGS Field measurements of flood-water heights in impacted communities","statementOfWork":"As directed by and in coordination with FEMA, U.S. Geological Survey (USGS) will provide advance support, real-time field measurements, and daily reporting of water heights in direct support and for situational awareness of FEMA disaster operations for a high-water or flood event.\r\n\r\nUSGS services may include, but are not limited to, the following in direct support of response and recovery operations:\r\n - Field measurements of flood water heights in impacted communities;\r\n - Deploy supplemental water-level measuring instruments.\r\n - Measure streamflow and discharge of flooded channels, directly or indirectly.\r\n - Flagging of High-Water Marks and collect evidence of flooding for impacted areas and communities. \r\n - Locate and record the horizontal position and vertical elevation of the High Water Marks (HWM). \r\n - Documentation of HWMs with field notes, digital photographs, and depth measurements to the ground at the HWM location at the time of inspection. \r\n - Data measurements provided in GIS-ready format via the USGS National Water Information System or Short-Term Network system for display and download. \r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7d196eeb-fff0-4a3b-993d-35a53065a5d5","hash":"d27410d6cfaa78fcdb7dded746654eacb7018b6b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2018072401","incidentName":"CARR FIRE","incidentType":"Fire","disasterNumber":4382,"declarationType":"DR","declarationTitle":"WILDFIRES AND HIGH WINDS","maId":"4382DRCADOD01","maAmendNumber":0,"actionId":266329,"maType":"FOS","supportFunction":5,"priority":"Lifesaving","region":9,"stt":"CA","agencyId":"DOD","agency":"DEPARTMENT OF DEFENSE","authority":"Stafford Act","dateReceived":"2018-08-10T00:00:00.000Z","dateRequired":"2018-08-09T00:00:00.000Z","popStartDate":"2018-08-10T00:00:00.000Z","popEndDate":"2018-09-08T00:00:00.000Z","dateObligated":"2018-08-10T00:00:00.000Z","obligationAmount":25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":25000,"maPopStartDate":"2018-08-10T00:00:00.000Z","maPopEndDate":"2018-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":25000,"maPriority":"Lifesaving","assistanceRequested":"Activate DOD to RRCC, IOF, or JFO to support FEMA disaster operations.  ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations. \r\n\r\n MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement. \r\n\r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n\r\n If required and authorized by FEMA, activation of agency command center(s) will be covered under a separate MA. \r\n The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. \r\n\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. ","id":"f0a70fed-674d-4e49-aaa6-a523233c44d1","hash":"de9496d3c9aa201741a6d960b08c88c7eba33d0c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOD-USAF01","maAmendNumber":1,"actionId":447579,"maType":"FOS","supportFunction":5,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-25000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-25000,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate and reissue as 3598EM-ME-DOD-USAF-01.\r\nUSAF Auxiliary, Civil Air Patrol (CAP) Northeast Region (NER) aerial support.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata).\r\n- Transportation of personnel and/or light cargo.\r\n- Damage assessment imagery/observations, which may include previously collected imagery.\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or delivered on digital media.\r\n- CAP liaison and/or imagery collection management support.\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"07859088-913f-47ed-856d-33657f4c9963","hash":"bb4f8d1fd792232bee47f83a4e4f96fcefad2668","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOD-USAF01","maAmendNumber":0,"actionId":447186,"maType":"FOS","supportFunction":5,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-09-12T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-13T00:00:00.000Z","obligationAmount":25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":25000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":25000,"maPriority":"Normal","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) Northeast Region (NER) aerial support.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata).\r\n- Transportation of personnel and/or light cargo.\r\n- Damage assessment imagery/observations, which may include previously collected imagery.\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or delivered on digital media.\r\n- CAP liaison and/or imagery collection management support.\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2cb972be-9fa1-481e-b0ac-12559fa1fc64","hash":"1766c47abefc174a0dd5d2faeaf5fa01cd2cd57e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOD-OPS02","maAmendNumber":1,"actionId":447561,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"MA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"-Amendment #1: De-obligate and reissue as 3598EM-ME-DOD-OPS-02.\r\n------------------------------------------------------------------------------------------\r\nRequesting DOD provide Westover ARB Incident Support Base (ISB) in support of Tropical Cyclone Lee Response.","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Defense (DOD) will provide and support a facility to function as a FEMA Incident Support Base (ISB) as required in support of FEMA disaster response operations.\r\nInitial installation requirements may include, but are not limited to, the following:\r\n- Staging for up to 75 tractor trailer trucks to pre;stage commodities.\r\n- Permit FEMA to provide equipment and supplies for FEMA use. This property and other removable property will remain FEMA property in the exclusive control and authority of\r\nFEMA and will be removed by FEMA upon termination of the FOS mission assignment.\r\n- DOD is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to: 24 hour security and escort services for incoming tractor trailers, wrap around services to include dumpster, port-o-johns, hand washing station, and light towers if necessary.\r\nAdditional notes from FEMA:   \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-  The mission-;assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency\r\n-  MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"64397147-b0c5-4227-9e8d-093e6cc57644","hash":"fca5911533be0b5ad36d57000658e348a98c9361","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOD-OPS02","maAmendNumber":0,"actionId":447025,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"MA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-11T00:00:00.000Z","dateRequired":"2023-09-11T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-11T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Requesting DOD provide Westover ARB Incident Support Base (ISB) in support of Tropical Cyclone Lee Response.","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Defense (DOD) will provide and support a facility to function as a FEMA Incident Support Base (ISB) as required in support of FEMA disaster response operations.\r\nInitial installation requirements may include, but are not limited to, the following:\r\n- Staging for up to 75 tractor trailer trucks to pre;stage commodities.\r\n- Permit FEMA to provide equipment and supplies for FEMA use. This property and other removable property will remain FEMA property in the exclusive control and authority of\r\nFEMA and will be removed by FEMA upon termination of the FOS mission assignment.\r\n- DOD is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to: 24 hour security and escort services for incoming tractor trailers, wrap around services to include dumpster, port-o-johns, hand washing station, and light towers if necessary.\r\nAdditional notes from FEMA:   \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-  The mission-;assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency\r\n-  MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"bc3fd000-4186-4759-9840-dba3115828de","hash":"aa7044b4de53bf9d901a18187098bfbcbb8401aa","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOD-OPS01","maAmendNumber":1,"actionId":447560,"maType":"FOS","supportFunction":0,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"Normal","assistanceRequested":"-Amendment #1: De-obligate and reissue as 3598EM-ME-DOD-OPS-01.\r\n---------------------------------------------------------------------------------------\r\nRequest Defense Coordinating Element (DCO/DCE) (including as necessary additional supporting augmented staff) assistance at the RRCC or other locations specified by FEMA in support of response operations in Region 1.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations. \r\nADDITIONAL NOTES from FEMA: \r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"14bc4f65-e981-4146-aa5b-807ddd0fc46a","hash":"437b7060bc79af2623754b837f5ce0449090ccd8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOD-OPS01","maAmendNumber":0,"actionId":446977,"maType":"FOS","supportFunction":0,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-11T00:00:00.000Z","dateRequired":"2023-09-11T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-11T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Request Defense Coordinating Element (DCO/DCE) (including as necessary additional supporting augmented staff) assistance at the RRCC or other locations specified by FEMA in support of response operations in Region 1.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations. \r\nADDITIONAL NOTES from FEMA: \r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"34fb6767-002b-4d02-b17e-e0cafd2ddaa7","hash":"42dedef080434c88df1137b4303dcefb7cf34b5c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOC-NOAA02","maAmendNumber":1,"actionId":447610,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"MA","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-104616,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-104616,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-104616,"maPriority":"High","assistanceRequested":"-Amendment #1: De-obligate and reissue as 3598EM-ME-NOAA-02.\r\n--------------------------------------------------------------------------------------\r\nNOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of an incident and cascading effects","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"5a994a9b-d91b-46ae-aa18-cbc95779a194","hash":"3d178d520ad5aacace36c0486e6af127ffc381c5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOC-NOAA02","maAmendNumber":0,"actionId":447308,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"MA","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-13T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-13T00:00:00.000Z","obligationAmount":104616,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":104616,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":104616,"maPriority":"High","assistanceRequested":"NOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of an incident and cascading effects","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"34c8bdcd-bfe0-4758-b710-96d3824738f7","hash":"8f7983a477a3f26c404938ece0bd0371124b756e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOC-NOAA01","maAmendNumber":1,"actionId":447605,"maType":"FOS","supportFunction":5,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"Normal","assistanceRequested":"-Amendment #1: De-obligate and reissue as 3598EM-ME-DOC-NOAA-01.\r\n-------------------------------------------------------------------------------------\r\nActivate NOAA to RRCC, IOF, JFO, or other teams or facilities to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested, to support disaster operations.\r\n\r\nThis may include but is not limited to, the following:\r\n - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n - National Weather Service (NWS) Hurricane Liaison Team (HRT)\r\n - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"db812665-068d-417f-8891-154101be8c9f","hash":"fbeaf7e93b983e670da1261daa8178bdc2fad90c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DOC-NOAA01","maAmendNumber":0,"actionId":447094,"maType":"FOS","supportFunction":5,"priority":"Normal","region":1,"stt":"MA","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-12T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-12T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Activate NOAA to RRCC, IOF, JFO, or other teams or facilities to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested, to support disaster operations.\r\n\r\nThis may include but is not limited to, the following:\r\n - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n - National Weather Service (NWS) Hurricane Liaison Team (HRT)\r\n - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ed32a850-34d7-4e2b-b506-31bc22af8401","hash":"8e02c756d1edc475672b67a072076d5b36af51a6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DHS-USCG01","maAmendNumber":1,"actionId":447571,"maType":"FOS","supportFunction":9,"priority":"Normal","region":1,"stt":"MA","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate and reissue as 3598EM-ME-DHS-USCG-01.\r\n________________________________________________________\r\nDeploy USCG liaison officer(s) to RRCC.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a493468d-8aaa-4537-abf4-822cd49a4051","hash":"63f21beb5a5dafd8a54c17fb9967d41c5ffad221","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DHS-USCG01","maAmendNumber":0,"actionId":447284,"maType":"FOS","supportFunction":9,"priority":"Normal","region":1,"stt":"MA","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-09-13T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-13T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Deploy USCG liaison officer(s) to RRCC.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ac4e8a75-70c7-4296-9c02-40ccdce14997","hash":"caa9cef1b0b2ec83e0425de038ac947df91be694","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DHS-CISA02","maAmendNumber":1,"actionId":447539,"maType":"FOS","supportFunction":14,"priority":"Normal","region":1,"stt":"MA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate and reissue as 3598EM-ME-DHS-CISA-02.\r\n_________________________________________________________\r\nActivate CISA-14 LNOs to RRCC (initial request is for virtual support).","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n - Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific \r\n   requirements, personnel, location(s), date(s), and duration of \r\n   assignment(s).\r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 \r\n   CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA \r\n   Project Manager. If approved, documentation is necessary to ensure \r\n   reimbursement.\r\n - Activation of agency command center(s), if required, must be \r\n   coordinated with FEMA as a separate MA.\r\n - The mission-assigned agency is responsible for ensuring that all \r\n   activity is properly authorized, goods are received, services are \r\n   provided, and that costs are reasonable and supported by \r\n   documentation maintained by the respective agency\r\n - MAs shall be considered for closure after 180 days with no financial \r\n   activity in accordance with FEMA CFO Bulletin #157. For MAs still \r\n   operationally open, requests for additional obligations may be \r\n   withheld if no invoicing, ULO Validation, or additional justification has \r\n   been provided.","id":"d47480f6-d6fb-4efa-a42e-4a790a8fd3fd","hash":"7df34ee2d6596916ceafd26ccfd3ba59ef090c57","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DHS-CISA02","maAmendNumber":0,"actionId":447258,"maType":"FOS","supportFunction":14,"priority":"Normal","region":1,"stt":"MA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-13T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-13T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Activate CISA-14 LNOs to RRCC (initial request is for virtual support).","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n - Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific \r\n   requirements, personnel, location(s), date(s), and duration of \r\n   assignment(s).\r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 \r\n   CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA \r\n   Project Manager. If approved, documentation is necessary to ensure \r\n   reimbursement.\r\n - Activation of agency command center(s), if required, must be \r\n   coordinated with FEMA as a separate MA.\r\n - The mission-assigned agency is responsible for ensuring that all \r\n   activity is properly authorized, goods are received, services are \r\n   provided, and that costs are reasonable and supported by \r\n   documentation maintained by the respective agency\r\n - MAs shall be considered for closure after 180 days with no financial \r\n   activity in accordance with FEMA CFO Bulletin #157. For MAs still \r\n   operationally open, requests for additional obligations may be \r\n   withheld if no invoicing, ULO Validation, or additional justification has \r\n   been provided.","id":"5522a55d-aa54-4809-a2d8-aa4deba10007","hash":"b08c0974172616b609df14ffd2bf9caaf6cbe8a3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DHS-CISA01","maAmendNumber":2,"actionId":447557,"maType":"FOS","supportFunction":2,"priority":"High","region":1,"stt":"MA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15000,"maPriority":"High","assistanceRequested":"Amendment #2: De-obligate and reissue as 3598EM-ME-DHS-CISA-01.\r\n--------------------------------------------------------------\r\nAmendment # 01:  Additional funding of $5,000 added for additional staffing.  \r\n--------------------------------------------------------------------------------\r\nActivate CISA ESF-2 to the RRCC, IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f5a75945-6562-494d-b402-2ae4573367e2","hash":"6fd828c5004aae50af520075632e14e11127c913","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DHS-CISA01","maAmendNumber":1,"actionId":447356,"maType":"FOS","supportFunction":2,"priority":"High","region":1,"stt":"MA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Amendment # 01:  Additional funding of $5,000 added for additional staffing.  \r\n--------------------------------------------------------------------------------\r\nActivate CISA ESF-2 to the RRCC, IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1b7c181c-ae8f-46dc-ba96-13b5c7aa2151","hash":"8aa9928e887e0b77d13cb2e2c6a98961e41ed428","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401DHS-CISA01","maAmendNumber":0,"actionId":447115,"maType":"FOS","supportFunction":2,"priority":"High","region":1,"stt":"MA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-12T00:00:00.000Z","dateRequired":"2023-09-12T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-12T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Activate CISA ESF-2 to the RRCC, IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"6a0996ff-af22-4e82-8a34-2b5fb0e1acdc","hash":"2c00bd89bffa5d4b0b29456b9f54f116c0b7abd5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401COE-NAD01","maAmendNumber":2,"actionId":447576,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"MA","agencyId":"COE-NAD","agency":"COE NORTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-27000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-27000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-27000,"maPriority":"Normal","assistanceRequested":"Amendment #2: De-obligate and reissue as 3598EM-ME-COE-NAD-01.\r\n\r\n----------------------------\r\n\r\nAmendment #1: To add $13,500.00 in additional funding for staffing increase. \r\n\r\n-----------------------------------\r\nActivate ESF-3, USACE to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a0b62291-d85e-4907-8075-599f1e7c592f","hash":"b6a10da37c8cee08f5d8978e1f2786ff1e5e9831","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401COE-NAD01","maAmendNumber":1,"actionId":447436,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"MA","agencyId":"COE-NAD","agency":"COE NORTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-09-14T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":13500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":13500,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":13500,"maPriority":"Normal","assistanceRequested":"Amendment #1: To add $13,500.00 in additional funding for staffing increase. \r\n\r\n------\r\n\r\nActivate ESF-3, USACE to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4f432c3c-7f15-444e-841d-be7f210acc6c","hash":"3805a7eded3b8a4be6093ecac8080e7d16bd23ce","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401COE-NAD01","maAmendNumber":0,"actionId":447033,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"MA","agencyId":"COE-NAD","agency":"COE NORTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-09-11T00:00:00.000Z","dateRequired":"2023-09-12T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-12T00:00:00.000Z","obligationAmount":13500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":13500,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":13500,"maPriority":"Normal","assistanceRequested":"Activate ESF-3, USACE to the RRCC, IOF, JFO, or other facilities.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"aabf61b4-2588-4333-a5d0-a5e259feacd4","hash":"3ce6d7140bf0490a752752d4368ebdca7f90fab5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401COE-LRD01","maAmendNumber":1,"actionId":447582,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"MA","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":null,"popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":-4600000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4600000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4600000,"maPriority":"High","assistanceRequested":"-Amendment #1: De-obligate and reissue as 3598EM-ME-COE-LRD-01.\r\n---------------------------------------------------------------------------------------\r\nUSACE pre-position temporary emergency power resources to the affected area(s)","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\n\r\nInitial requirement is for two type IV temporary power support assets.\r\n\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\n\r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2fba2553-b40a-45f3-8a63-37e453c53d39","hash":"4c50095c0d9ad405e7c9134b20ef3b5dade0deab","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"MA23090401COE-LRD01","maAmendNumber":0,"actionId":447153,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"MA","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2023-09-12T00:00:00.000Z","dateRequired":null,"popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-12T00:00:00.000Z","obligationAmount":4600000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":4600000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":4600000,"maPriority":"High","assistanceRequested":"USACE pre-position temporary emergency power resources to the affected area(s)","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\n\r\nInitial requirement is for two type IV temporary power support assets.\r\n\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\n\r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d41e6b72-d666-45f6-9f89-ab39f79501c6","hash":"6e51669c1efc9c1a0a1f564c1db7a5667c49b3b3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEVA01","maAmendNumber":0,"actionId":447535,"maType":"FOS","supportFunction":8,"priority":"High","region":1,"stt":"ME","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-15T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-09-15T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate VA to NRCC. This MA replaces ME-23090401-VA-01 with no change in cost or POP.","statementOfWork":"As directed by and in coordination with FEMA, Veterans Affairs (VA) will provide appropriate personnel to the NRCC other teams and facilities to support disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\nMA\r\ntask orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies\r\nwill be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll\r\nequipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation\r\nof agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe\r\nmission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency\r\nMAs\r\nshall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for\r\nadditional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"864641a0-5df8-47a2-b997-8859da7c867d","hash":"0daa5929b0a7317c95a21b70a630c4173f9afcca","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEHHS-ASPR02","maAmendNumber":0,"actionId":447658,"maType":"FOS","supportFunction":8,"priority":"Normal","region":1,"stt":"ME","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":6750,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":6750,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":6750,"maPriority":"Normal","assistanceRequested":"This is reissuance of MA-23090401-HHS-ASPR-01:  Activate HHS to RRCC (ESF-8).","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Health &amp; Human Services (HHS) will provide appropriate personnel to the RRCC, IOF, JFO, RFO, or other teams and/or facilities to support disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"13f96964-dd14-4478-b8c0-adfbd169bff4","hash":"cd51cecee8acf9cbd6a06dab6e813984057ec502","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEHHS-ASPR01","maAmendNumber":0,"actionId":447564,"maType":"FOS","supportFunction":8,"priority":"High","region":1,"stt":"ME","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-15T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":12600,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":12600,"maPopStartDate":"2023-09-15T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":12600,"maPriority":"High","assistanceRequested":"Activate HHS to NRCC. This MA replaces ME-23090401-HHS-ASPR-01 and increases the cost to $12,600 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"448a1890-e562-4f41-9339-e1136d6df1fb","hash":"af44311b82937a128cd5a492bb463fd498e4e08f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEGSA01","maAmendNumber":1,"actionId":459153,"maType":"FOS","supportFunction":7,"priority":"Life Sustaining","region":1,"stt":"ME","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-02-16T00:00:00.000Z","dateRequired":"2024-02-16T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-02-20T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 1:  De-obligate $5,000.00 as indicated on the 01-01-2024 QULO response. Also changing PM to Christel Lugo. \r\nActivate GSA to NRCC, or other teams and facilities as request. This MA replaces ME-23090401-GSA-01 and increases the cost to $5,000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n-ES&amp; support\r\n-Emergency leasing services for needed space/facilities as required by FEMA\r\n-GSA Lease Contracting Officers (LCOs) and other as needed\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"1b49cf89-c335-46e7-aac5-144fa33dd40f","hash":"a2ba5a3d128c3a8896b125ac8111f67f31dff88d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEGSA01","maAmendNumber":0,"actionId":447551,"maType":"FOS","supportFunction":7,"priority":"Life Sustaining","region":1,"stt":"ME","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2024-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Life Sustaining","assistanceRequested":"Activate GSA to NRCC, or other teams and facilities as request. This MA replaces ME-23090401-GSA-01 and increases the cost to $5,000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n-ES&amp; support\r\n-Emergency leasing services for needed space/facilities as required by FEMA\r\n-GSA Lease Contracting Officers (LCOs) and other as needed\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"6656132f-22a6-41fc-85af-b76bf23fb95d","hash":"dcaa28966af752baa711adf7e9f90194b323b67b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEEPA03","maAmendNumber":0,"actionId":447656,"maType":"FOS","supportFunction":10,"priority":"High","region":1,"stt":"ME","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"This is a reissue of MA-23090401-EPA-02:  Activate EPA  ESF-10 to RRCC.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.  \r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement.  \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR.  Supporting documentation is required for reimbursement.  \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.  For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"46c1b447-114f-40d2-b28c-693eba406d97","hash":"9206d30e1a227c9e729e4640e185ff5323c20f60","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEEPA02","maAmendNumber":0,"actionId":447665,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"ME","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"This is a reissue of MA-23090401-EPA-01:  Activate EPA (ESF 3) to RRCC \r\n","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate SME personnel to deploy to response coordination locations such as state EOC, RRCC, JFO, of other teams and facilities, as requested to support identification of water/wastewater needs and facilitation of information flow during disaster operations.\r\n\r\nNOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"e27c4930-7484-4c50-a415-4e738e0ed928","hash":"caf9168466dc4fd11720da04b486bedc0c9e6355","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEEPA01","maAmendNumber":0,"actionId":447521,"maType":"FOS","supportFunction":10,"priority":"High","region":1,"stt":"ME","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"EPA to NRCC or other teams and facilities as requested. This MA replaces ME-23090401-EPA-01 and increases the cost to $10,000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"dfabd593-7e2a-4afd-9f56-e70adf5fc336","hash":"a51c8785836693ae77f1ec8a9ec85d01c4b245d8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOT01","maAmendNumber":2,"actionId":464850,"maType":"FOS","supportFunction":1,"priority":"High","region":1,"stt":"ME","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-04-24T00:00:00.000Z","dateRequired":"2024-04-24T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-04-25T00:00:00.000Z","obligationAmount":-2773.01,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2773.01,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2773.01,"maPriority":"High","assistanceRequested":"Amendment #2: De-obligate $2,773.01 IAW ULO.\r\n\r\nAmendment #1: De-obligate $5,658.00 IAW ULO.\r\nThis is a reissue of MA-23090401-DOT-01:  Activate DOT to RRCC (ESF-1).\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\n\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7f10fffe-9111-4337-a362-bf9d4dba339a","hash":"4298d3766a4f679f1f596c35341f32bc0649bb30","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOT01","maAmendNumber":1,"actionId":457586,"maType":"FOS","supportFunction":1,"priority":"High","region":1,"stt":"ME","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-01-30T00:00:00.000Z","dateRequired":"2024-01-30T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-01-30T00:00:00.000Z","obligationAmount":-5658,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5658,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5658,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $5,658.00 IAW ULO.\r\n\r\nThis is a reissue of MA-23090401-DOT-01:  Activate DOT to RRCC (ESF-1).\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\n\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4c1ca0e6-0207-4835-b4c4-18440a1b62e8","hash":"fccf87e71c47d45555f53fa7f56f58228528a119","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOT01","maAmendNumber":0,"actionId":447638,"maType":"FOS","supportFunction":1,"priority":"High","region":1,"stt":"ME","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":12818,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":12818,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":12818,"maPriority":"High","assistanceRequested":"This is a reissue of MA-23090401-DOT-01:  Activate DOT to RRCC (ESF-1).\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\n\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9be37607-fbd6-4cd9-9635-dbf5d62a71dc","hash":"157366bb3d69bbac1df77fa0cb8e7bbbdc6328a1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOJ02","maAmendNumber":1,"actionId":474146,"maType":"FOS","supportFunction":13,"priority":"Normal","region":1,"stt":"ME","agencyId":"DOJ","agency":"DOJ (GEN ADMIN)","authority":"Stafford Act","dateReceived":"2024-07-31T00:00:00.000Z","dateRequired":"2024-07-31T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-08-01T00:00:00.000Z","obligationAmount":-8938.86,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-8938.86,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-8938.86,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate $8,938.86 IAW DOJ validation for 01JUL2024 ULO Report.\r\n-----\r\nThis is a reissuance of MA-23090401-DOJ-01:  Activate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\n\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4f1cc9d5-794e-4288-be8c-9eb8e01266cd","hash":"56c0ee7fdaec11646930cffeb930f9340be117c2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOJ02","maAmendNumber":0,"actionId":447653,"maType":"FOS","supportFunction":13,"priority":"Normal","region":1,"stt":"ME","agencyId":"DOJ","agency":"DOJ (GEN ADMIN)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"This is a reissuance of MA-23090401-DOJ-01:  Activate DOJ to RRCC, IOF, JFO, or other facilities to support FEMA disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ) will provide appropriate personnel to RRCC, JFO, IOF, or other facilities as requested in support FEMA disaster operations.\r\n\r\nFunding for DOJ command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2486c26b-5de2-497d-89ff-bbff682347db","hash":"a5ff14093038ad09ea9246c5e03151ad0a868844","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOJ01","maAmendNumber":2,"actionId":474116,"maType":"FOS","supportFunction":13,"priority":"High","region":1,"stt":"ME","agencyId":"DOJ","agency":"DOJ (GEN ADMIN)","authority":"Stafford Act","dateReceived":"2024-07-31T00:00:00.000Z","dateRequired":"2024-07-31T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-24T00:00:00.000Z","dateObligated":"2024-08-01T00:00:00.000Z","obligationAmount":-100000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-100000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-100000,"maPriority":"High","assistanceRequested":"Amendment #2: De-obligate $100,000 IAW DOJ validation for 01JUL2024 ULO Report.\r\nAmendment #1:  De-obligate $4,000 pending final billing. \r\n--------------------\r\nThis is a reissuance of MA-23090401-DOJ-02:  Request DOJ/ATF force protection personnel.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ)/ATF will provide appropriate personnel to staff ESF#13 Incident Management Team(s) (IMT), Management Support Team(s) (MST) to direct ESF#13 Field Force Protection/Security Operations in support FEMA disaster operations.\r\n\r\n Additionally, the Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST) or other security teams as required to provide force protection in support of disaster operations.\r\n\r\n&#xfffd; MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n&#xfffd; Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n&#xfffd; All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n&#xfffd; Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n&#xfffd; The mission&#xfffd; assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency \r\n&#xfffd; MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"bda1081c-1126-4528-abf3-0710c00a9ea2","hash":"2cdd402d2761b84227c745aa25378ca9c796d5c0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOJ01","maAmendNumber":1,"actionId":464868,"maType":"FOS","supportFunction":13,"priority":"High","region":1,"stt":"ME","agencyId":"DOJ","agency":"DOJ (GEN ADMIN)","authority":"Stafford Act","dateReceived":"2024-04-24T00:00:00.000Z","dateRequired":"2024-04-24T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-24T00:00:00.000Z","dateObligated":"2024-04-26T00:00:00.000Z","obligationAmount":-4000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4000,"maPriority":"High","assistanceRequested":"Amendment #1:  De-obligate $4,000 pending final billing. \r\n--------------------\r\nThis is a reissuance of MA-23090401-DOJ-02:  Request DOJ/ATF force protection personnel.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ)/ATF will provide appropriate personnel to staff ESF#13 Incident Management Team(s) (IMT), Management Support Team(s) (MST) to direct ESF#13 Field Force Protection/Security Operations in support FEMA disaster operations.\r\n\r\n Additionally, the Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST) or other security teams as required to provide force protection in support of disaster operations.\r\n\r\n&#xfffd; MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n&#xfffd; Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n&#xfffd; All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n&#xfffd; Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n&#xfffd; The mission&#xfffd; assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency \r\n&#xfffd; MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"34b63a07-5e0a-4dd9-8f35-34d4860420c6","hash":"8e0568f93f34582cf91231f1cd65d6a63780736a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOJ01","maAmendNumber":0,"actionId":447636,"maType":"FOS","supportFunction":13,"priority":"High","region":1,"stt":"ME","agencyId":"DOJ","agency":"DOJ (GEN ADMIN)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-24T00:00:00.000Z","dateObligated":"2023-09-18T00:00:00.000Z","obligationAmount":294865,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":294865,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":294865,"maPriority":"High","assistanceRequested":"This is a reissuance of MA-23090401-DOJ-02:  Request DOJ/ATF force protection personnel.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Justice (DOJ)/ATF will provide appropriate personnel to staff ESF#13 Incident Management Team(s) (IMT), Management Support Team(s) (MST) to direct ESF#13 Field Force Protection/Security Operations in support FEMA disaster operations.\r\n\r\n Additionally, the Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST) or other security teams as required to provide force protection in support of disaster operations.\r\n\r\n&#xfffd; MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n&#xfffd; Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n&#xfffd; All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n&#xfffd; Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n&#xfffd; The mission&#xfffd; assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency \r\n&#xfffd; MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8c88e203-eef0-460b-bff9-a68fbc6af236","hash":"dd280ac95584d599e6e1388c3586e05ab8eb52c2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOI-WCF01","maAmendNumber":1,"actionId":452090,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2023-11-08T00:00:00.000Z","dateRequired":"2023-11-08T00:00:00.000Z","popStartDate":"2023-09-15T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-11-08T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-09-15T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate $5,000 and closeout per attached OFA QULO response.  Change PM to Lisa Dodson.\r\nActivate DOI to NRCC. This MA replaces ME-23090401-DOI-WCF-01 and increases the cost to $5,000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA, DOI will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA response operations.\r\nFunding for DOI command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"41817bde-46ab-42fe-a1d0-e14769e36033","hash":"4384c2453678b1fb114d92f5d78eb37f018ebd01","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOI-WCF01","maAmendNumber":0,"actionId":447569,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-15T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-15T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate DOI to NRCC. This MA replaces ME-23090401-DOI-WCF-01 and increases the cost to $5,000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA, DOI will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA response operations.\r\nFunding for DOI command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"54d0d29e-a2b8-490b-a170-b3909f6df4f1","hash":"1379a0ed261478e5dd18f7eea3d829a9c041af3d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOI-USGS01","maAmendNumber":1,"actionId":447692,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOI-USGS","agency":"DOI-USGS (GEOLOGICAL SURVEY)","authority":"Stafford Act","dateReceived":"2023-09-16T00:00:00.000Z","dateRequired":"2023-09-16T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-16T00:00:00.000Z","dateObligated":"2023-09-17T00:00:00.000Z","obligationAmount":-176000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-176000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-176000,"maPriority":"High","assistanceRequested":"Amendment #1: Deobligate funds and update POP end date to 9/16/23 to reflect operational closure. No costs incurred.\r\n\r\n-----------------\r\n\r\nThis is a reissue of MA-23090401-USGS-01:  USGS Field measurements of flood-water heights in impacted communities\r\n","statementOfWork":"As directed by and in coordination with FEMA, U.S. Geological Survey (USGS) will provide advance support, real-time field measurements, and daily reporting of water heights in direct support and for situational awareness of FEMA disaster operations for a high-water or flood event.\r\nUSGS services may include, but are not limited to, the following in direct support of response and recovery operations:\r\n - Field measurements of flood water heights in impacted communities;\r\n - Deploy supplemental water-level measuring instruments.\r\n - Measure streamflow and discharge of flooded channels, directly or indirectly.\r\n - Flagging of High-Water Marks and collect evidence of flooding for impacted areas and communities. \r\n - Locate and record the horizontal position and vertical elevation of the High Water Marks (HWM). \r\n - Documentation of HWMs with field notes, digital photographs, and depth measurements to the ground at the HWM location at the time of inspection. \r\n - Data measurements provided in GIS-ready format via the USGS National Water Information System or Short-Term Network system for display and download. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"5052cc7d-0096-4d15-89e3-359a30c43fa5","hash":"3acb5ff3f1b7a6f76d65b057a6b48c5f807ac0ee","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOI-USGS01","maAmendNumber":0,"actionId":447623,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOI-USGS","agency":"DOI-USGS (GEOLOGICAL SURVEY)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":176000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":176000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-16T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":176000,"maPriority":"High","assistanceRequested":"This is a reissue of MA-23090401-USGS-01:  USGS Field measurements of flood-water heights in impacted communities\r\n","statementOfWork":"As directed by and in coordination with FEMA, U.S. Geological Survey (USGS) will provide advance support, real-time field measurements, and daily reporting of water heights in direct support and for situational awareness of FEMA disaster operations for a high-water or flood event.\r\n\r\nUSGS services may include, but are not limited to, the following in direct support of response and recovery operations:\r\n - Field measurements of flood water heights in impacted communities;\r\n - Deploy supplemental water-level measuring instruments.\r\n - Measure streamflow and discharge of flooded channels, directly or indirectly.\r\n - Flagging of High-Water Marks and collect evidence of flooding for impacted areas and communities. \r\n - Locate and record the horizontal position and vertical elevation of the High Water Marks (HWM). \r\n - Documentation of HWMs with field notes, digital photographs, and depth measurements to the ground at the HWM location at the time of inspection. \r\n - Data measurements provided in GIS-ready format via the USGS National Water Information System or Short-Term Network system for display and download. \r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"27a0fad0-d296-447a-aa11-8ad97c253228","hash":"80578630009e643ad058baa85869b606b2732369","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2020030901","incidentName":"COVID-19 Pandemic","incidentType":"Biological","disasterNumber":4521,"declarationType":"DR","declarationTitle":"COVID-19 PANDEMIC","maId":"4521DRNEDOD03","maAmendNumber":11,"actionId":476710,"maType":"DFA","supportFunction":0,"priority":"High","region":7,"stt":"NE","agencyId":"DOD","agency":"~~AMENDMENT - DOD","authority":"Stafford Act","dateReceived":"2024-08-28T00:00:00.000Z","dateRequired":"2024-08-28T00:00:00.000Z","popStartDate":"2020-08-22T00:00:00.000Z","popEndDate":"2021-04-30T00:00:00.000Z","dateObligated":"2024-08-29T00:00:00.000Z","obligationAmount":-276.71,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-276.71,"maPopStartDate":"2020-08-22T00:00:00.000Z","maPopEndDate":"2021-04-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-276.71,"maPriority":"High","assistanceRequested":"Title 32-Amendment #11-Request de-obligation of ($-276.712) per 7-1-24 quarterly ULO.\r\nTitle 32-Amendment #10-Request de-obligation of ($-85.12) per 4-1-24 quarterly ULO.\r\nTitle 32-Amendment #09-Request de-obligation of (-$1,266.33) per 10-1-23 quarterly ULO; change PM to Robert Stegner.\r\nTitle 32-Amendment #08-Request de-obligation of (-$1,415,252.50) per NGB.\r\nTitle 32-Amendment #07-Request de-obligation of (-$662,701.79) per NGB.\r\nT32 Amendment#6 This mission is operationally closed as of April 30,2021. Continuation of this work funded under American Rescue Plan Act of 2021 is on MA#1509-349950 \r\nPeriod of Performance: Amend to end April 30, 2021; change PM to Adrian Walker\r\nTitle-32\r\nAmendment#5 Add additional funding of $313,000.00 for April 2021 incremental funding.\r\nTitle-32\r\nAmendment#4 Add additional funding of $1,100,000 for March 2021 incremental funding due to the state of Nebraska identifying need for funding for 200 PAX. \r\nTitle-32\r\nAmendment#3 Applicable to POTUS Memo dated 21 January 2021, extend Mission Assignment Estimated End Date to 30 September 2021 and change Cost Share 100/0% retroactive to 22 August 2020. No additional funding required; change PM to Wendy Newsom \r\nTitle-32\r\nAmendment#2  DOD to provide 200 personnel and increase funding $2,867,000.00, for mission continuation. Funding estimate valid 01 Jan 2021 through 31 Jan 2021. \r\nTitle-32\r\nAmendment#1 In accordance with Presidential Memo dated December 3, 2020, POP is extended to March 31, 2021.  This is a no-cost extension and will be incrementally funded.  Change Project Manager to Holly Chapman.\r\nTitle-32\r\nDOD provide up to 50 personnel to assist state to execute emergency protective measures to mitigate the impacts of COVID-19. This replaces MA#1509-327341-4521DR-NE-DOD-02, subject to a (25% state cost share). Mission will be incrementally funded with initial cost estimated at $960,000.00 for operations beginning 8/22/20 through 9/30/20. Additional funding requirements will be provided by NGB J8 thereafter. Original state signed RRF is being used to support the MA due to clarification in the SOW for billing purposes. ","statementOfWork":"Consistent with President Trumps Memorandum Providing Federal Support for Governors Use of the National Guard to Respond to COVID-19, dated 3 August 2020, to assist the State of Nebraska to respond to the threats and hazards caused by COVID-19, FEMA requests DoD provide essential assistance support to the State of Nebraska.  Pursuant to President Trumps Memoranda, FEMA can fully reimburse DoD for this support if DoD requests that States order National Guard Forces to perform duty to fulfill this mission assignment.  DOD will execute the MA as directed by and in coordination with FEMA, and will: Provide essential assistance to meet the immediate threats to life resulting from the COVID-19 outbreak as authorized by Sections 403 (42 U.S.C. 5170b) of the Robert T. Stafford Disaster Relief and Emergency Assistance Act, Public Law 93-288, as amended, 42 U.S.C. 5121 et seq., to support COVID-19 operations in Nebraska.  National Guard units under state control will execute critical missions to save lives and protect the public health and safety. Eligible activities are limited to Emergency Protective Measures, as outlined in COVID-19 specific Public Assistance policy or otherwise authorized by FEMA.  Safety and security missions, not to include law enforcement activities, are authorized as part of this MA.  Effective 8/22/2020, eligible costs under this MA include pay, allowances, travel to place National Guard personnel on Title 32 orders, and per diem. Eligible expenses will also include: 1. Operating costs for DoD equipment already in DoD stocks necessary to fulfill the MA; and 2. Equipment and supplies that only DoD can purchase and that are necessary to fulfill the requirements of the MA, and pre-approved by the FEMA project Manager, 3. Lastly, additional eligible expenses authorized in writing by ORR leadership Employment costs (supplies, equipment, etc.) will be the responsibility of the state, and ineligible MA expenses may be submitted for reimbursement consideration to FEMA via a Public Assistance Project Worksheet. FEMA can offer 100% reimbursement to DOD for this support, if it is executed with National Guard personnel under Title 32 pursuant to the Presidents August 3 proclamation on Providing Federal Support for Governors Use of the National Guard to Respond to COVID-19.\r\nDOD will deploy with appropriate command and control, support personnel, and equipment as required.  In support of this activity, the State will develop a transition plan for this support that will reflect the current mission sets, the conditions required to either terminate or transition the missions, the means of transition (i.e., contracted, other state agency, or National Guard in state active-duty), and the projected timeline to transition.  States will submit the initial plan to FEMA not later than 45 days after this mission assignment is executed and will provide an update on the status of transition no later than 60 days prior to final date T-32 authorized via Presidential Memoranda. All local, State, and non-DoD national assets are exhausted or do not have the capacity to meet this requirement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"0598662e-a3ee-474e-9267-52ad262146b3","hash":"eeb1774376a5921339e17f071c3ce317bfd23b57","lastRefresh":"2024-08-29T13:24:42.553Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOE-OE02","maAmendNumber":0,"actionId":447511,"maType":"FOS","supportFunction":12,"priority":"High","region":1,"stt":"ME","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-15T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":25080,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":25080,"maPopStartDate":"2023-09-15T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":25080,"maPriority":"High","assistanceRequested":"DOE activation to the NRCC. This MA replaces ME-23090401-DOE-OE01; and increases the cost to $25,080.00 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the NRCC to perform the functions of ESF-12 in support disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"15de0c8a-c179-4ec8-95cd-8d38df69819b","hash":"ce9eeba87927205bdbbf358394381e38220b4942","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-USAF02","maAmendNumber":2,"actionId":475361,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-08-13T00:00:00.000Z","dateRequired":"2024-08-13T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-08-16T00:00:00.000Z","obligationAmount":70.32,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":70.32,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":70.32,"maPriority":"High","assistanceRequested":"Amendment #2:  Add $70.32 to cover final billing\r\nAmendment #1: De-obligate $25,000.00 IAW ULO. \r\nThis is a reissue of MA-23090401-DOD-USAF-01:  USAF Civil Air Patrol (CAP) to provide imagery support to Region 1. \r\n","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1cad4bf7-fb52-4561-81cf-2e9884e1bf80","hash":"6fdcbde9767eb0b2f6ebd1118e5b304c5dabfd74","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-USAF02","maAmendNumber":1,"actionId":457588,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-01-30T00:00:00.000Z","dateRequired":"2024-01-30T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-01-30T00:00:00.000Z","obligationAmount":-25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-25000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-25000,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $25,000.00 IAW ULO. \r\n\r\nThis is a reissue of MA-23090401-DOD-USAF-01:  USAF Civil Air Patrol (CAP) to provide imagery support to Region 1. \r\n","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a052ff5e-c478-40b7-9dd0-0a5dfddccb1b","hash":"a9d948fd457dd674622d044be53a3a90eb27aca9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-USAF02","maAmendNumber":0,"actionId":447651,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-12T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":25000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":25000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":25000,"maPriority":"High","assistanceRequested":"This is a reissue of MA-23090401-DOD-USAF-01:  USAF Civil Air Patrol (CAP) to provide imagery support to Region 1. \r\n","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8747635b-a245-42bd-8602-3783160ac793","hash":"b3737947bbfd30b43ed64d01f43d91e7fdeb7ac7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-USAF01","maAmendNumber":1,"actionId":473982,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-07-31T00:00:00.000Z","dateRequired":"2024-07-30T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-08-01T00:00:00.000Z","obligationAmount":1317.06,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1317.06,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1317.06,"maPriority":"High","assistanceRequested":"Amendment #1 to add funds in the amount of $1317.06 as per attached email.  Change PM to Daniel Carpenter.\r\nRequest United States Air Auxiliary/Civil Air Patrol provide CAP LNO support at the FEMA NRCC in response to HC Lee.  This MA replaces ME-23090401-DOD-USAF-01 and increases the cost to $5000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ca1f4a97-2b8f-44c9-aa66-d77800208a76","hash":"e33ffc38c8c98b2a7c02a4dd99e0cac2b301c580","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-USAF01","maAmendNumber":0,"actionId":447562,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Request United States Air Auxiliary/Civil Air Patrol provide CAP LNO support at the FEMA NRCC in response to HC Lee.  This MA replaces ME-23090401-DOD-USAF-01 and increases the cost to $5000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a8ebe724-ba6e-4aef-ae8d-7c8198a07bb8","hash":"356bed39e96076012aa1a5fa7da6ae5fa8bfab5a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-OPS03","maAmendNumber":2,"actionId":449859,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-13T00:00:00.000Z","dateRequired":"2023-10-13T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-23T00:00:00.000Z","dateObligated":"2023-10-13T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment #2:  de-obligate funds and close out with no expenses incurred. \r\n----------------------------------------------\r\nAmendment #1: Extend POP date to 9/23/23 with no additional funding.\r\n-----------------------------------------------\r\nThis is a reissue of MA-23090401-DOD-OPS-02:  Requesting DOD provide Westover ARB Incident Support Base (ISB) in support of Tropical Cyclone Lee Response.","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Defense (DOD) will provide and support a facility to function as a FEMA Incident Support Base (ISB) as required in support of FEMA disaster response operations.\r\nInitial installation requirements may include, but are not limited to, the following:\r\n- Staging for up to 75 tractor trailer trucks to pre-stage commodities.\r\n- Permit FEMA to provide equipment and supplies for FEMA use. This property and other removable property will remain FEMA property in the exclusive control and authority of\r\nFEMA and will be removed by FEMA upon termination of the FOS mission assignment.\r\n- DOD is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to 24-hour security and escort services for incoming tractor trailers, wrap around services to include dumpster, port-o-johns, hand washing station, and light towers if necessary.\r\nAdditional notes from FEMA:   \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"62280415-4491-4d0a-9995-f47e2ef31503","hash":"cd44f8ebe8b231518a6061144b93485e373f6a86","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-OPS03","maAmendNumber":1,"actionId":447722,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-17T00:00:00.000Z","dateRequired":"2023-09-17T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-23T00:00:00.000Z","dateObligated":"2023-09-17T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #1: Extend POP date to 9/23/23 with no additional funding.\r\n\r\n-----------------------------------------------\r\n\r\nThis is a reissue of MA-23090401-DOD-OPS-02:  Requesting DOD provide Westover ARB Incident Support Base (ISB) in support of Tropical Cyclone Lee Response.","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Defense (DOD) will provide and support a facility to function as a FEMA Incident Support Base (ISB) as required in support of FEMA disaster response operations.\r\nInitial installation requirements may include, but are not limited to, the following:\r\n- Staging for up to 75 tractor trailer trucks to pre-stage commodities.\r\n- Permit FEMA to provide equipment and supplies for FEMA use. This property and other removable property will remain FEMA property in the exclusive control and authority of\r\nFEMA and will be removed by FEMA upon termination of the FOS mission assignment.\r\n- DOD is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to 24-hour security and escort services for incoming tractor trailers, wrap around services to include dumpster, port-o-johns, hand washing station, and light towers if necessary.\r\nAdditional notes from FEMA:   \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"ef7606bb-0158-4a05-a74c-ad72d24a5f85","hash":"6043937ab85d30669324cbb4c4922311a6b31c5f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-OPS03","maAmendNumber":0,"actionId":447637,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-11T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"This is a reissue of MA-23090401-DOD-OPS-02:  Requesting DOD provide Westover ARB Incident Support Base (ISB) in support of Tropical Cyclone Lee Response.","statementOfWork":"As directed by and in coordination with FEMA, Dept. of Defense (DOD) will provide and support a facility to function as a FEMA Incident Support Base (ISB) as required in support of FEMA disaster response operations.\r\nInitial installation requirements may include, but are not limited to, the following:\r\n- Staging for up to 75 tractor trailer trucks to pre-stage commodities.\r\n- Permit FEMA to provide equipment and supplies for FEMA use. This property and other removable property will remain FEMA property in the exclusive control and authority of\r\nFEMA and will be removed by FEMA upon termination of the FOS mission assignment.\r\n- DOD is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to 24-hour security and escort services for incoming tractor trailers, wrap around services to include dumpster, port-o-johns, hand washing station, and light towers if necessary.\r\nAdditional notes from FEMA:   \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency.\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"9fc2185e-e3ec-48bb-a848-8197e9a39a40","hash":"d705aea14a8ec9b093d49e7a2de2cddf419d10f8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-OPS02","maAmendNumber":3,"actionId":457315,"maType":"FOS","supportFunction":0,"priority":"Normal","region":1,"stt":"ME","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-01-30T00:00:00.000Z","dateRequired":"2024-01-26T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-23T00:00:00.000Z","dateObligated":"2024-01-30T00:00:00.000Z","obligationAmount":-603.37,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-603.37,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-603.37,"maPriority":"Normal","assistanceRequested":"Amendment #3: De-obligate $603.37 IAW ULO.\r\nAmendment #2:  De-obligate $2,000. \r\n---------------------------------\r\nAmendment #1: Extend POP date to 9/23/23 with no additional funding.\r\n-----------------------------------\r\nThis is a reissue of MA-23090401-DOD-OPS- 01:  Request Defense Coordinating Element (DCO/DCE) (including as necessary additional supporting augmented staff) assistance at the RRCC or other locations specified by FEMA in support of response operations in Region 1.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"33edc4b7-f4df-4433-a02d-18b6450fe8b0","hash":"ce30d5ebe0edd13fd69a2b296acf7911402b9109","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-OPS02","maAmendNumber":2,"actionId":451715,"maType":"FOS","supportFunction":0,"priority":"Normal","region":1,"stt":"ME","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-11-03T00:00:00.000Z","dateRequired":"2023-11-03T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-23T00:00:00.000Z","dateObligated":"2023-11-08T00:00:00.000Z","obligationAmount":-2000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2000,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2000,"maPriority":"Normal","assistanceRequested":"Amendment #2:  De-obligate $2,000. \r\n---------------------------------\r\nAmendment #1: Extend POP date to 9/23/23 with no additional funding.\r\n-----------------------------------\r\nThis is a reissue of MA-23090401-DOD-OPS- 01:  Request Defense Coordinating Element (DCO/DCE) (including as necessary additional supporting augmented staff) assistance at the RRCC or other locations specified by FEMA in support of response operations in Region 1.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8b22b7ea-c488-4a9a-925a-e1f008c8cc4d","hash":"fd70d1fc41388309c1d7ecf312a5759de9959565","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-OPS02","maAmendNumber":1,"actionId":447680,"maType":"FOS","supportFunction":0,"priority":"Normal","region":1,"stt":"ME","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-17T00:00:00.000Z","dateRequired":"2023-09-17T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-23T00:00:00.000Z","dateObligated":"2023-09-17T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #1: Extend POP date to 9/23/23 with no additional funding.\r\n-----------------------------------\r\nThis is a reissue of MA-23090401-DOD-OPS- 01:  Request Defense Coordinating Element (DCO/DCE) (including as necessary additional supporting augmented staff) assistance at the RRCC or other locations specified by FEMA in support of response operations in Region 1.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"28a2983f-afec-47f5-a440-9b3413178615","hash":"256200e7e20cb2fe0489e8e3297630319bfb3a9e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-OPS02","maAmendNumber":0,"actionId":447597,"maType":"FOS","supportFunction":0,"priority":"Normal","region":1,"stt":"ME","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-11T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-23T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"This is a reissue of MA-23090401-DOD-OPS- 01:  Request Defense Coordinating Element (DCO/DCE) (including as necessary additional supporting augmented staff) assistance at the RRCC or other locations specified by FEMA in support of response operations in Region 1.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of FEMA disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a0f6fec2-a744-402b-ad1e-ab5fe65f7486","hash":"c7e9ec365fe401fc28620a6d680b79913873ccd8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-OPS01","maAmendNumber":1,"actionId":449797,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":1,"stt":"ME","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-10-12T00:00:00.000Z","dateRequired":"2023-10-12T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-10-12T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 1 to de-obligate funding and close mission, per OFA request. And change PM to Danny Carpenter\r\nActivate DOD to NRCC to support FEMA response operations including the activation of a DOD SAR SME if/when deemed necessary.  This MA replaces ME-23090401-DOD-OPS-01\r\nwith no change in funding or POP.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"43fb3d6b-d358-482e-bfce-cff39a324bcc","hash":"e5a6356a4dc7ee55f6b4c97306c6a7ba4a4939aa","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOD-OPS01","maAmendNumber":0,"actionId":447536,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":1,"stt":"ME","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Life Sustaining","assistanceRequested":"Activate DOD to NRCC to support FEMA response operations including the activation of a DOD SAR SME if/when deemed necessary.  This MA replaces ME-23090401-DOD-OPS-01\r\nwith no change in funding or POP.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"8e46c63c-5416-4d7d-96b6-f15c962d2148","hash":"4a48fcd7ac1e2a858cd932bbda184a7e90764d3c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOC-NOAA03","maAmendNumber":0,"actionId":447661,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":104616,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":104616,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":104616,"maPriority":"High","assistanceRequested":"This is a reissue of MA-23090401-DOC-NOAA-02:  NOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of an incident and cascading effects","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\n\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\n\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3683f91d-2a37-446a-a3e0-386f559867e7","hash":"e2bbfb52df0f3cf44a09e6498bd9f58e39596757","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOC-NOAA02","maAmendNumber":0,"actionId":447686,"maType":"FOS","supportFunction":5,"priority":"Normal","region":1,"stt":"ME","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"This is a reissue of MA-23090401-DOC-NOAA-01:  Activate NOAA NWS support to RRCC.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested, to support disaster operations.\r\n\r\nThis may include but is not limited to, the following:\r\n - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n - National Weather Service (NWS) Hurricane Liaison Team (HRT)\r\n - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e7518412-a40d-44f0-9eb7-3c4d10a8d294","hash":"0736d8795788a309accb965d9da098bad9c7ea5e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDOC-NOAA01","maAmendNumber":0,"actionId":447540,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate NOAA to NRCC to support FEMA disaster operations. This MA replaces ME-23090401-DOC-NOAA-01 and increases the cost to $5,000 with no change in POP. ","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the NRCC to support disaster operations\r\nThis may include but is not limited to, the following:\r\n    - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n    - National Weather Service (NWS) Hurricane Liaison Team (HLT)\r\n    - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n    - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\nADDITIONAL NOTES from FEMA:\r\n  - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8870208e-7408-42d8-b129-ef98836e25d5","hash":"eb9342b8ab7295483396db937c142e9771c37255","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDLA01","maAmendNumber":1,"actionId":452063,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2023-11-08T00:00:00.000Z","dateRequired":"2023-11-08T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-11-08T00:00:00.000Z","obligationAmount":-3744.14,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3744.14,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3744.14,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $3,744.14 per Oct QULO response and change PM to Christel Lugo.\r\nActivate DLA liaisons to NRCC. This MA replaces ME-23090401-DLA-01and increases the cost to $5000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"71dcbdf0-903e-4637-8dcd-ef84964e2c82","hash":"9f9f5aa5334c9e14caa365bb9a43a4cb0e963dfc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDLA01","maAmendNumber":0,"actionId":447515,"maType":"FOS","supportFunction":7,"priority":"High","region":1,"stt":"ME","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate DLA liaisons to NRCC. This MA replaces ME-23090401-DLA-01and increases the cost to $5000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2d6ebceb-0103-4bcc-9758-909edf0f40f8","hash":"2f6871172b5adb4420520b1b3107699fe77dd177","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-USCG02","maAmendNumber":1,"actionId":457587,"maType":"FOS","supportFunction":9,"priority":"Normal","region":1,"stt":"ME","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-01-30T00:00:00.000Z","dateRequired":"2024-01-30T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-01-30T00:00:00.000Z","obligationAmount":-9715.94,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-9715.94,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-9715.94,"maPriority":"Normal","assistanceRequested":"Amendment #1: De-obligate $9,715.94 IAW ULO.\r\n\r\nThis is a reissuance of MA-23090401-DHS-USCG-01:  Deploy USCG liaison officer(s) to RRCC under ESF-9.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"6a819de3-d4b0-4d46-8281-204bc49274b8","hash":"abdeb44d8762b3b972fffc6d600067034e3c9940","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-USCG02","maAmendNumber":0,"actionId":447603,"maType":"FOS","supportFunction":9,"priority":"Normal","region":1,"stt":"ME","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"This is a reissuance of MA-23090401-DHS-USCG-01:  Deploy USCG liaison officer(s) to RRCC under ESF-9.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n  - USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n  - USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n  - Other USCG SMEs, as applicable\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f4021e3d-a334-4fe1-89f2-77335f531994","hash":"28f4ce518f2673374ef336fa75363b098e88a69e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-USCG01","maAmendNumber":1,"actionId":451455,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-11-01T00:00:00.000Z","dateRequired":"2023-11-01T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-11-02T00:00:00.000Z","obligationAmount":-19881.74,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-19881.74,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-19881.74,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $19,881.74 as indicated by billing support provided by USCG. Also changing PM to Danny Carpenter.\r\nActivate USCG liaison(s) to NRCC.  This MA replaces ME-23090401-DHS-USCG-01 and increases the cost to $20,000 with no change in the POP.\r\n","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"63870cd5-f38f-483f-925f-926ecbbfd014","hash":"6e769334c491303a5d5835ba9cee565fa2f754a9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-USCG01","maAmendNumber":0,"actionId":447510,"maType":"FOS","supportFunction":5,"priority":"High","region":1,"stt":"ME","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Activate USCG liaison(s) to NRCC.  This MA replaces ME-23090401-DHS-USCG-01 and increases the cost to $20,000 with no change in the POP.\r\n","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9af2d200-2094-4092-b4ff-465c43b81cdb","hash":"4eb79ee334995f059621321ce134a0878d60c727","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-CISA03","maAmendNumber":2,"actionId":457541,"maType":"FOS","supportFunction":14,"priority":"Normal","region":1,"stt":"ME","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-01-30T00:00:00.000Z","dateRequired":"2024-01-30T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-01-30T00:00:00.000Z","obligationAmount":-84.45,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-84.45,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-84.45,"maPriority":"Normal","assistanceRequested":"Amendment #2: De-obligate $84.45 and close out IAW ULO.\r\nAmendment #1:  De-obligate $2,764.67.\r\n---\r\nThis is a reissue of MA-23090401-DHS-CISA-02:  Activate CISA-14 LNOs to RRCC.\r\n","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"60221c2f-6855-44ad-9241-762f7d3f4410","hash":"83e0bab65bb49e08a7cfdcc201c6e5f9a0c2e196","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-CISA03","maAmendNumber":1,"actionId":451734,"maType":"FOS","supportFunction":14,"priority":"Normal","region":1,"stt":"ME","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-11-03T00:00:00.000Z","dateRequired":"2023-11-03T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-11-14T00:00:00.000Z","obligationAmount":-2764.67,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2764.67,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2764.67,"maPriority":"Normal","assistanceRequested":"Amendment #1:  De-obligate $2,764.67.\r\n---\r\nThis is a reissue of MA-23090401-DHS-CISA-02:  Activate CISA-14 LNOs to RRCC.\r\n","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e3997660-4b4b-475b-85de-2124c1d28cdc","hash":"32f38023b8f33d1bcf1ab8da1a79a2f7a8a0463b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-CISA03","maAmendNumber":0,"actionId":447644,"maType":"FOS","supportFunction":14,"priority":"Normal","region":1,"stt":"ME","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-13T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-09-13T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"This is a reissue of MA-23090401-DHS-CISA-02:  Activate CISA-14 LNOs to RRCC.\r\n","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial SME)  \r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"92238dd5-51c6-424a-b8ea-6d1527f7f11d","hash":"5be46cf1de50aab38c78f129b768f2a0291f1cc7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-CISA02","maAmendNumber":1,"actionId":451733,"maType":"FOS","supportFunction":2,"priority":"High","region":1,"stt":"ME","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-11-03T00:00:00.000Z","dateRequired":"2023-11-03T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-11-07T00:00:00.000Z","obligationAmount":-2140.87,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2140.87,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2140.87,"maPriority":"High","assistanceRequested":"Amendment #1:  De-obligate $2,140.87.\r\n----------------------------\r\nThis is a reissue of MA-23090401-DHS-CISA-01:  Activate CISA ESF-2 to the RRCC.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"30ab0e8c-5058-4702-964f-3a7d8f971fb0","hash":"ac7ebfdf08d699dadbf1edff64681f0ff8da31e5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-CISA02","maAmendNumber":0,"actionId":447633,"maType":"FOS","supportFunction":2,"priority":"High","region":1,"stt":"ME","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-12T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"This is a reissue of MA-23090401-DHS-CISA-01:  Activate CISA ESF-2 to the RRCC.","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities to support ESF-2 in disaster operations.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c6e81445-5baa-415e-a296-3034e70ef1cd","hash":"5de73fbcb20e9b71161e7883cdcfba23bab4fd46","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-CISA01","maAmendNumber":2,"actionId":476399,"maType":"FOS","supportFunction":2,"priority":"High","region":1,"stt":"ME","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-08-23T00:00:00.000Z","dateRequired":"2024-08-23T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-08-27T00:00:00.000Z","obligationAmount":-1967.9,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1967.9,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1967.9,"maPriority":"High","assistanceRequested":"Amendment #2: De-obligate $1,967.90 per July QULO\r\nAmendment #1: De-obligate $100 per Oct QULO and change PM to Christel Lugo.\r\nActivate CISA ESF-2 to NRCC. This MA replaces ME-23090401-DHS-CISA-01 and increases the cost to $3000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"44dfba5e-8b03-4ce8-8098-6282d7199eb6","hash":"1bf7c65dda10d9930df2e20f521b51787157edb1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-CISA01","maAmendNumber":1,"actionId":452071,"maType":"FOS","supportFunction":2,"priority":"High","region":1,"stt":"ME","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-11-08T00:00:00.000Z","dateRequired":"2023-11-08T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-11-08T00:00:00.000Z","obligationAmount":-100,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-100,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-100,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $100 per Oct QULO and change PM to Christel Lugo.\r\nActivate CISA ESF-2 to NRCC. This MA replaces ME-23090401-DHS-CISA-01 and increases the cost to $3000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"5a3d237b-d9b1-43c2-bbf6-ad879454f399","hash":"6b47bd917fcf344344529130b4caeda4c9e1e3cf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMEDHS-CISA01","maAmendNumber":0,"actionId":447566,"maType":"FOS","supportFunction":2,"priority":"High","region":1,"stt":"ME","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-14T00:00:00.000Z","popStartDate":"2023-09-14T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-09-14T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate CISA ESF-2 to NRCC. This MA replaces ME-23090401-DHS-CISA-01 and increases the cost to $3000 with no change in POP.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"71713600-f88f-4892-bfb5-35f8ca94d13f","hash":"7fc5ee8ec1b7a8cd54da3787b1cef81bbce35355","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMECOE-NAD01","maAmendNumber":2,"actionId":461249,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"ME","agencyId":"COE-NAD","agency":"COE NORTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-03-12T00:00:00.000Z","dateRequired":"2024-03-12T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-03-21T00:00:00.000Z","obligationAmount":-14609.13,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-14609.13,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-14609.13,"maPriority":"Normal","assistanceRequested":"Amendment #2:  De-obligate and close-out IAW agency final billing.\r\n--------------------------------------\r\nAmendment #1:  Add additional funding for staffing increase.\r\nThis is a reissue of MA-23090401-COE-NAD-01:  Activate ESF-3, USACE to the RRCC, IOF, JFO, or other facilities. \r\n","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9b605108-abc0-4a5c-a473-99ab28f4f43c","hash":"740c1564541459fdb2e4d835be3edee1eb15cfd3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMECOE-NAD01","maAmendNumber":1,"actionId":447691,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"ME","agencyId":"COE-NAD","agency":"COE NORTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-09-16T00:00:00.000Z","dateRequired":"2023-09-16T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":13500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":13500,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":13500,"maPriority":"Normal","assistanceRequested":"Amendment #1:  Add additional funding for staffing increase.\r\nThis is a reissue of MA-23090401-COE-NAD-01:  Activate ESF-3, USACE to the RRCC, IOF, JFO, or other facilities. \r\n","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9931d100-b6b7-4f46-9092-e62a42dc0afa","hash":"e83139931c58e808e37e6a1791bba983aa65ac1b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMECOE-NAD01","maAmendNumber":0,"actionId":447641,"maType":"FOS","supportFunction":3,"priority":"Normal","region":1,"stt":"ME","agencyId":"COE-NAD","agency":"COE NORTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-12T00:00:00.000Z","popStartDate":"2023-09-11T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":13500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":13500,"maPopStartDate":"2023-09-11T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":13500,"maPriority":"Normal","assistanceRequested":"This is a reissue of MA-23090401-COE-NAD-01:  Activate ESF-3, USACE to the RRCC, IOF, JFO, or other facilities. \r\n","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.  \r\n\r\nSupport may include, but is not limited to, the following:\r\n   - USACE support to RRCC \r\n   - USACE support to National and/or Regional IMAT \r\n   - USACE modeling and/or National Hurricane Program support\r\n  -  USACE Local Government Liaison(s)\r\n   - USACE support to ESF #15 External Affairs\r\n   - USACE SME(s)\r\n  -  Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n  - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements\r\n\r\nThis mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations.  Those costs are not considered in this initial estimate.  Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA.  \r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"11424729-3c30-4174-b90d-5c875bf7603b","hash":"bde2a207e710faba866fbe40e117b49f680f129b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMECOE-LRD01","maAmendNumber":3,"actionId":474152,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"ME","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-07-31T00:00:00.000Z","dateRequired":"2024-07-31T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-08-01T00:00:00.000Z","obligationAmount":-600000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-600000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-600000,"maPriority":"High","assistanceRequested":"Amendment #3: De-obligate $600,000 IAW USACE ULO validation for 01JUL2024 and change FEMA PM to Craig Beaulac.\r\nAmendment #2: De-obligate $200,000 IAW agency request dated 20 March 2024.\r\nAmendment #1:  Partial closeout request from USACE and de-obligation of $1,000,000. \r\n-------------------------------------------------\r\nThis is a reissuance of MA-23090401-COE-LRD-01:  Pre-position temporary emergency power resources to Region 1.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\nInitial requirement is for two type IV temporary power support assets.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e02d940e-6b20-43fa-8b5c-c0961559726e","hash":"a8e0750b33db1f349396e9449afd18f97acfa667","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMECOE-LRD01","maAmendNumber":2,"actionId":462226,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"ME","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2024-03-21T00:00:00.000Z","dateRequired":"2024-03-21T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2024-03-25T00:00:00.000Z","obligationAmount":-200000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-200000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-200000,"maPriority":"High","assistanceRequested":"Amendment #2: De-obligate $200,000 IAW agency request dated 20 March 2024.\r\n-------------------------------------------------\r\nAmendment #1:  Partial closeout request from USACE and de-obligation of $1,000,000. \r\n-------------------------------------------------\r\nThis is a reissuance of MA-23090401-COE-LRD-01:  Pre-position temporary emergency power resources to Region 1.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\nInitial requirement is for two type IV temporary power support assets.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"420e85cf-ceb4-48fb-8df1-3a11b8779b44","hash":"f7a2f095a064e6ed8d3512f3fc8130b0a91a7b0a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMECOE-LRD01","maAmendNumber":1,"actionId":448844,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"ME","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2023-10-03T00:00:00.000Z","dateRequired":"2023-10-03T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-10-04T00:00:00.000Z","obligationAmount":-1000000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1000000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1000000,"maPriority":"High","assistanceRequested":"Amendment #1:  Partial closeout request from USACE and de-obligation of $1,000,000. \r\n-------------------------------------------------\r\nThis is a reissuance of MA-23090401-COE-LRD-01:  Pre-position temporary emergency power resources to Region 1.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\nInitial requirement is for two type IV temporary power support assets.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d4bdb7fc-935b-4856-9683-933012012d80","hash":"520c3be4d7c655e5bbcdb9441bbb41d74108b7d4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMECOE-LRD01","maAmendNumber":0,"actionId":447657,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"ME","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-13T00:00:00.000Z","popStartDate":"2023-09-12T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-16T00:00:00.000Z","obligationAmount":4600000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":4600000,"maPopStartDate":"2023-09-12T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":4600000,"maPriority":"High","assistanceRequested":"This is a reissuance of MA-23090401-COE-LRD-01:  Pre-position temporary emergency power resources to Region 1.","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. \r\nInitial requirement is for two type IV temporary power support assets.\r\nAssets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC).  FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks).  \r\nWork includes providing personnel and equipment at the Federal/State staging area.  When directed by FEMA, USACE will conduct generator pre-installation operations.  USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f367dae4-e101-47f5-bb4c-bccc89ccbe44","hash":"df231b4ab8edd6c3605a4d6a3cf06b56d3f3a8bf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMECOE-HQ01","maAmendNumber":1,"actionId":452845,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"ME","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2023-11-20T00:00:00.000Z","dateRequired":"2023-11-20T00:00:00.000Z","popStartDate":"2023-09-15T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-11-20T00:00:00.000Z","obligationAmount":-21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-21000,"maPopStartDate":"2023-09-15T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-21000,"maPriority":"High","assistanceRequested":"Amendment 1 to de-obligate $21k per OFA request. And change PM to Lisa Dodson. \r\nActivate USACE to the NRCC or other facilities to support disaster operations. This MA replaces ME-23090401-COE-HQ-01 with no change in funding or POP.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\n\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"8e896556-172c-4862-98fb-411bb4006485","hash":"8fac8beacf21ff007f22b717faeabea571d5432a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023090401","incidentName":"Tropical Cyclone Lee","incidentType":"Hurricane","disasterNumber":3598,"declarationType":"EM","declarationTitle":"HURRICANE LEE","maId":"3598EMMECOE-HQ01","maAmendNumber":0,"actionId":447531,"maType":"FOS","supportFunction":3,"priority":"High","region":1,"stt":"ME","agencyId":"COE-HQ","agency":"COE HEADQUARTERS","authority":"Stafford Act","dateReceived":"2023-09-15T00:00:00.000Z","dateRequired":"2023-09-15T00:00:00.000Z","popStartDate":"2023-09-15T00:00:00.000Z","popEndDate":"2023-09-20T00:00:00.000Z","dateObligated":"2023-09-15T00:00:00.000Z","obligationAmount":21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":21000,"maPopStartDate":"2023-09-15T00:00:00.000Z","maPopEndDate":"2023-09-20T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":21000,"maPriority":"High","assistanceRequested":"Activate USACE to the NRCC or other facilities to support disaster operations. This MA replaces ME-23090401-COE-HQ-01 with no change in funding or POP.","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the NRCC, or other facilities in support of disaster operations.\r\n\r\nActivation may include, but is not limited to, the following:\r\n- USACE support to NRCC\r\n- USACE support to National IMAT\r\n- USACE support to ESF #15 External Affairs\r\n- USACE SME(s)\r\n- Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF)\r\n- USACE modeling and/or National Hurricane Program support\r\n- Contract or OFA audit support to ensure costs incurred under USACE MA meet all Stafford Act and regulatory requirements.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"732270cb-fdcd-4487-b02b-c85267639e9e","hash":"3219ccd9a2266378b70b82b6af7e06b633ee26e3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"SC23082403DOD-USAF01","maAmendNumber":1,"actionId":465080,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"SC","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-04-26T00:00:00.000Z","dateRequired":"2024-04-26T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-09T00:00:00.000Z","dateObligated":"2024-04-30T00:00:00.000Z","obligationAmount":-9096.98,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-9096.98,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-9096.98,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $9,096.98 per 4/1/2024 ULO report.\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support for SC","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"50f4e8f0-85ef-43e1-a47d-7de8aafaeebc","hash":"7e8d0f6dc4d289ff2472cef991fb660feb2b7921","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"SC23082403DOD-USAF01","maAmendNumber":0,"actionId":445768,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"SC","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-09T00:00:00.000Z","dateObligated":"2023-08-30T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-09T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial support for SC","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"840ebf1d-44bb-4881-b08e-e8f597da1b36","hash":"3bf6f130a0c89ae55792fbe743c1f635c94643ab","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"SC23082403DOC-NOAA01","maAmendNumber":1,"actionId":445981,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"SC","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-08-31T00:00:00.000Z","dateObligated":"2023-09-02T00:00:00.000Z","obligationAmount":-57313,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-57313,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-08-31T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-57313,"maPriority":"High","assistanceRequested":"Amendment #1 to de-obligate all funds and close the MA.  This MA has been replaced by 3597EMSCDOC-NOAA-01.\r\nNOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of an incident and cascading effects from Hurricane Idalia in the state of South Carolina. ","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ca0d65ee-2fdf-4978-8168-e9ae6c5b0ece","hash":"42d51f82b277deca9f74ecc98d0327202836a9da","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"SC23082403DOC-NOAA01","maAmendNumber":0,"actionId":445637,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"SC","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-02T00:00:00.000Z","dateObligated":"2023-08-29T00:00:00.000Z","obligationAmount":57313,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":57313,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-08-31T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":57313,"maPriority":"High","assistanceRequested":"NOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of an incident and cascading effects from Hurricane Idalia in the state of South Carolina. ","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\n\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\n\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1794ed32-3240-465a-807c-eb637b412cd2","hash":"5f9ea87021bced45c96b1708432dec9d8275bd89","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NC23082403DOD-USAF01","maAmendNumber":1,"actionId":465752,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"NC","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-05-06T00:00:00.000Z","dateRequired":"2024-05-02T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2024-05-06T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $10,000.00 per 4/1/2024 QULO report.\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support for NC","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"0269722c-f688-4717-a80c-b33e0caf4ced","hash":"87599587ac46b8101ab8bbf7711edae411948597","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"NC23082403DOD-USAF01","maAmendNumber":0,"actionId":445759,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"NC","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-08-30T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial support for NC","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ac02dbbe-9ab1-405e-9f83-b3f5ab7e35d6","hash":"0bbc9665a57692664faa66c29ae1f2d2b2dfafb7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2020030901","incidentName":"COVID-19 Pandemic","incidentType":"Biological","disasterNumber":4521,"declarationType":"DR","declarationTitle":"COVID-19 PANDEMIC","maId":"4521DRNEDOD01","maAmendNumber":9,"actionId":476709,"maType":"DFA","supportFunction":5,"priority":"Normal","region":7,"stt":"NE","agencyId":"DOD","agency":"~~AMENDMENT - DOD","authority":"Stafford Act","dateReceived":"2024-08-28T00:00:00.000Z","dateRequired":"2024-08-28T00:00:00.000Z","popStartDate":"2020-04-14T00:00:00.000Z","popEndDate":"2020-08-21T00:00:00.000Z","dateObligated":"2024-08-29T00:00:00.000Z","obligationAmount":-376,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-376,"maPopStartDate":"2020-04-14T00:00:00.000Z","maPopEndDate":"2020-08-21T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-376,"maPriority":"Normal","assistanceRequested":"Title 32-Amendment #9-Request de-obligation of ($376.00) per 7-01-24 quarterly ULO.\r\nTitle 32-Amendment #8-Request de-obligation of ($60.00) per 1-01-24 quarterly ULO.\r\nTitle 32-Amendment #7-Request de-obligation of ($1,860.82) per 10-1-23 quarterly ULO; change PM to Robert Stegner.\r\nTitle 32-Amendment #6-Request de-obligation of ($55,182.09) per NGB.\r\nTitle 32-Amendment #5-Request de-obligation of ($8,085,426.91) per NGT32 January 2022 ULO report. Funds will be restored when the final bill amount is provided by NGB; change PM to Adrian Walker \r\nTitle 32-Amendment #4 In accordance with Presidential Memo dated June 2,2020, POP is extended to 8/21/2020 with no cost increase and decrease personnel cap to 500.  While MA scope of work remains unchanged, see attached for further justification for extension\r\nAmendment #3: Amend to extend Period of Performance to 6/24/2020; to include any required quarantine and leave time.  No Additional funding needed. \r\nAmendment #2: Amend to De-Obligate ($614,295.00)\r\nAmendment #1: Amend to extend Period of Performance to 5/31/2020. No additional funding needed. \r\nDoD provide personnel and equipment to assist state to execute protective measures to mitigate disaster operations for COVID-19 in State of Nebraska. This is for reimbursement of Title 32 Forces.\r\nInitial requests for emergency protective measures capability from the DoD should be for no more than 1000 personnel with command and control, support personnel and equipment to begin on April 14, 2020 and end on May 28, 2020 unless otherwise specified in writing.  Requests that exceed this threshold will incur additional time for sourcing and additional cost.  Additional capability may be requested via MATO or amendment to this MA as appropriate. Cost Estimate: $17,063,640 (Personnel &amp; Projected O&amp;M Costs). Requested Resource Activation DoD. 14 April -28 May, 2020. \r\n ","statementOfWork":"NOTE: SOW DOES NOT FIT IN FULL, SEE ATTACHMENT\r\nConsistent with President Trumps Memorandum Providing Federal Support for Governors Use of the National Guard to Respond to COVID-19, dated April 14, 2020 to assist the State of Nebraska to respond to the threats and hazards caused by COVID-19, FEMA requests DoD provide essential assistance support to the State of Nebraska Pursuant to Section 3 of President Trumps Memorandum, FEMA can fully reimburse DoD for this support, to include pay and allowances, if DoD requests that States order National Guard Forces to perform duty to fulfill this mission assignment. The Department of Defense (DOD) will execute these mission assignments as directed by and in coordination with FEMA, and will: \r\nProvide essential assistance to meet the immediate threats to life resulting from the COVID-19 outbreak as authorized by Sections 403 (42 U.S.C. 5170b) of the Robert T. Stafford Disaster Relief and Emergency Assistance Act, Public Law 93-288, as amended, 42 U.S.C. 5121 et seq., to support COVID-19 operations in Nebraska. National Guard units under state control will execute critical missions to save lives and protect the public health and safety. \r\nSafety and security missions, not to include law enforcement activities, are authorized as part of this mission assignment. Purchase of commodities, with the exception of commodities required for sustainment, is not authorized as part of this mission assignment. These missions, if necessary, should be handled through separate mission assignments. \r\nFEMA can offer 100% reimbursement for this support, including pay and allowances, if it is executed with National Guard personnel under Title 32 pursuant to Section 3 of the Presidents April 14, 2020 proclamation on Providing Federal Support for Governors Use of the National Guard to Respond to COVID-19. \r\nDoD will deploy with appropriate command and control, support personnel, and equipment as required. Contracting for sustainment and lodging to sustain the personnel is authorized, as required. \r\nAll local, State, and non-DoD national assets are exhausted or do not have the capacity to meet this requirement. \r\nInitial Cost Estimate and Cost Breakout* \r\nInitial Cost: $17,050,000 \r\nMA Cost Based on: $550/soldier/day x # soldiers x 31 days &#61; Total Reimbursable Authority \r\n550 x1000 x 31&#61;$17,050,000 \r\nEmergency Protective Measures: \r\nAs appropriate, Emergency Protective Measures to be performed by DoD personnel include but are not limited to: \r\n- Management, control and reduction of immediate threats to public health and safety; \r\nManning of Emergency Operation Centers \r\nPlanning to support State COVID-19 response operations \r\nDisinfection of eligible public facilities \r\nTechnical assistance to state, tribal, territorial or local governments on emergency management and control of immediate threats to public health and safety. \r\n","id":"0cdde588-9b8e-4740-a74f-4c395858da45","hash":"541d5ddbcf1aa37d80b34d033e008399f74091a3","lastRefresh":"2024-08-29T13:24:42.553Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA23082403DOD-USAF01","maAmendNumber":1,"actionId":465090,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"GA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-04-26T00:00:00.000Z","dateRequired":"2024-04-26T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2024-04-30T00:00:00.000Z","obligationAmount":-1524.76,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1524.76,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1524.76,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $1,524.76 PER 4/1/2024 ULO report.\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support for the state of Georgia.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b22e6c64-cdc9-422c-a2e1-d5e52442cba5","hash":"0a4c6f8e48a20a7db9fd46cf10065800211eb50a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA23082403DOD-USAF01","maAmendNumber":0,"actionId":445677,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"GA","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-08-29T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial support for the state of Georgia.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a9a6f7a2-9b9c-4d44-90f7-53975f02a279","hash":"3233a094cc76ce1af9eceb85259a1a91df792730","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA23082403DOC-NOAA01","maAmendNumber":1,"actionId":459156,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"GA","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-02-16T00:00:00.000Z","dateRequired":"2024-02-16T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-02T00:00:00.000Z","dateObligated":"2024-02-21T00:00:00.000Z","obligationAmount":-56594.79,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-56594.79,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-56594.79,"maPriority":"High","assistanceRequested":"Amendment 1:  De-obligate $56,594.79 as indicated on the 01-01-20204 QULO response. Also changing PM to Daniel Carpenter. \r\nNOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of an incident and cascading effects from Hurricane Idalia in the state of Georgia.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"252de115-abfa-4831-83bb-50432c0b4632","hash":"9b7b7ca0170b33e51745372a9161afae25070276","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"GA23082403DOC-NOAA01","maAmendNumber":0,"actionId":445638,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"GA","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-02T00:00:00.000Z","dateObligated":"2023-08-29T00:00:00.000Z","obligationAmount":57313,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":57313,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":57313,"maPriority":"High","assistanceRequested":"NOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of an incident and cascading effects from Hurricane Idalia in the state of Georgia.","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\n\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\n\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"517a99dc-d4c0-4293-97a6-f876295b3f4b","hash":"58ca1973b01882886a4fd085ff5636119023730e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403USDA-FS02","maAmendNumber":1,"actionId":446203,"maType":"FOS","supportFunction":4,"priority":"High","region":4,"stt":"FL","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-12T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-13420,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-13420,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-13420,"maPriority":"High","assistanceRequested":"Amendment 1.  De-obligate $13,420.00 and close.  MA has been re-issued as 4734DR-FL-USDA-FS- 01\r\n\r\nActivate USFS to the RRCC, IOF JFO or other facilities in support of response operations.","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"32e7ef0f-243b-40bd-b057-f2bfafdfd095","hash":"ba09b01604ff4c608f448d7d910b045f3d12390d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403USDA-FS02","maAmendNumber":0,"actionId":445766,"maType":"FOS","supportFunction":4,"priority":"High","region":4,"stt":"FL","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-12T00:00:00.000Z","dateObligated":"2023-08-30T00:00:00.000Z","obligationAmount":13420,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":13420,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":13420,"maPriority":"High","assistanceRequested":"Activate USFS to the RRCC, IOF JFO or other facilities in support of response operations.","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d90649d4-b852-4048-95d1-beaba2acafad","hash":"40b0d9db5368f668d8c9f409b3655e0406fdd142","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403USDA-APH01","maAmendNumber":1,"actionId":446208,"maType":"FOS","supportFunction":11,"priority":"High","region":4,"stt":"FL","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment #1 - de-obligate $5000.00 and close. MA replaced with MA 4734DR-FL-USDA-APH-02\r\nUSDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1925ced9-4815-4594-ad10-bb091e900947","hash":"436177f9438aeaad5f658bfd345994bc7893e6a4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403USDA-APH01","maAmendNumber":0,"actionId":445570,"maType":"FOS","supportFunction":11,"priority":"High","region":4,"stt":"FL","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-08-28T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-08-28T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"USDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"764844f2-26bd-4b06-b46f-5b3118fbbe40","hash":"17bff23bbab9c28eaa690ce4a6b36874b700c171","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403HHS-ASPR01","maAmendNumber":3,"actionId":446116,"maType":"FOS","supportFunction":8,"priority":"High","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-11T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-4469451,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4469451,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4469451,"maPriority":"High","assistanceRequested":"Amendment #3 to deobligate $4,469,451.00 and close. MA is replaced by MA 4734DR-FL-HHS-ASPR- 03\r\n Amendment #2 - Extend projected end date to 09/11/2023, missed in previous amendment\r\nAmendment #1 - Add additional funding of $4,394,451.00\r\nActivation for appropriate HHS personnel to perform the functions of ESF 8 in the RRCC, IOF, JFO, Incident Management Assistance Team (IMAT), Preliminary Damage Assessment (PDA) Team, or other teams and locations to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Health and Human Services (HHS) will provide appropriate personnel to RRCC, IOF, JFO, or other teams, LNOs, SMEs, and facilities as requested.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual). Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).   \r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"d119aadb-0f68-4618-a8f1-b352ec6cbbc1","hash":"2f4219a61a19d90b3dcece5775465bed954e60d7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403HHS-ASPR01","maAmendNumber":2,"actionId":445760,"maType":"FOS","supportFunction":8,"priority":"High","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-11T00:00:00.000Z","dateObligated":"2023-08-30T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"Amendment #2 - Extend projected end date to 09/11/2023, missed in previous amendment\r\nAmendment #1 - Add additional funding of $4,394,451.00\r\nActivation for appropriate HHS personnel to perform the functions of ESF 8 in the RRCC, IOF, JFO, Incident Management Assistance Team (IMAT), Preliminary Damage Assessment (PDA) Team, or other teams and locations to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Health and Human Services (HHS) will provide appropriate personnel to RRCC, IOF, JFO, or other teams, LNOs, SMEs, and facilities as requested.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual). Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).   \r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"737ac06e-b79d-4e54-8437-d81006cc1876","hash":"d8c5b7eb4cf84c8d475a42131580b1ac32e09638","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403HHS-ASPR01","maAmendNumber":1,"actionId":445661,"maType":"FOS","supportFunction":8,"priority":"High","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-29T00:00:00.000Z","obligationAmount":4394451,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":4394451,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":4394451,"maPriority":"High","assistanceRequested":"Amendment #1 - Add additional funding of $4,394,451.00\r\nActivation for appropriate HHS personnel to perform the functions of ESF 8 in the RRCC, IOF, JFO, Incident Management Assistance Team (IMAT), Preliminary Damage Assessment (PDA) Team, or other teams and locations to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Health and Human Services (HHS) will provide appropriate personnel to RRCC, IOF, JFO, or other teams, LNOs, SMEs, and facilities as requested.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual). Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).   \r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"462d9991-f739-436b-aeb0-f46cba69deea","hash":"8d20b0f55ea616c7b25ec5eee1a366f06006681f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403HHS-ASPR01","maAmendNumber":0,"actionId":445473,"maType":"FOS","supportFunction":8,"priority":"High","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-08-27T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-28T00:00:00.000Z","obligationAmount":75000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":75000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-11T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":75000,"maPriority":"High","assistanceRequested":"Activation for appropriate HHS personnel to perform the functions of ESF 8 in the RRCC, IOF, JFO, Incident Management Assistance Team (IMAT), Preliminary Damage Assessment (PDA) Team, or other teams and locations to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, Health and Human Services (HHS) will provide appropriate personnel to RRCC, IOF, JFO, or other teams, LNOs, SMEs, and facilities as requested.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual). Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).   \r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. \r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"516fa264-2f1f-471c-a341-f561660146be","hash":"889e6d14f1807dd6579552320e7c20f724c382a6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403GSA01","maAmendNumber":1,"actionId":446112,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-28T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15000,"maPriority":"High","assistanceRequested":"Amendment #1 - De-obligate $15,000.00 and close.  MA replaced with 4734DR-FL-GSA- 02\r\nActivate GSA to RRCC, IOF, JFO, staging, or other teams and facilities as requested.\r\nVirtual Support approved at this time. Reserve the ability to pull to the RRCC and/or deploy to field.\r\n","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations. Virtual support currently approved but subject to change. Activities may include, but are not limited to, the following: - ESF-7 support - Emergency leasing services for needed space/facilities as requested by FEMA - GSA Lease Contracting Officers (LCOs) and others as needed -MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). -Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. -All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. -Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. -The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency -MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2cfa64e0-3d6f-4b50-ab22-b7b67f52527f","hash":"49922df32949ecfcca8d74f12b32b80d24ca47c2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403GSA01","maAmendNumber":0,"actionId":445502,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-08-28T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-28T00:00:00.000Z","dateObligated":"2023-08-28T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, staging, or other teams and facilities as requested.\r\nVirtual Support approved at this time. Reserve the ability to pull to the RRCC and/or deploy to field.\r\n","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations. Virtual support currently approved but subject to change. Activities may include, but are not limited to, the following: - ESF-7 support - Emergency leasing services for needed space/facilities as requested by FEMA - GSA Lease Contracting Officers (LCOs) and others as needed -MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). -Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. -All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. -Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. -The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency -MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1c5f38a2-c6da-49a3-984a-ea36489bfd6e","hash":"4b9db35ce34bad50e9adc8c1dc5f793f2c9876e6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403FCC01","maAmendNumber":1,"actionId":446223,"maType":"FOS","supportFunction":2,"priority":"High","region":4,"stt":"FL","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-61100,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-61100,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-61100,"maPriority":"High","assistanceRequested":"Amendment #1 - De-obligate -$61,100.00  MA replaced with 4734DR-FL-FCC- 01.\r\nFCC Cell survey management coordination, initial up to 2 teams","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will deploy cell survey teams and equipment to determine the impact to public safety and EAS communications systems in the affected area and identify surviving and non-working systems in support of disaster operations. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"54252220-edd5-45a6-a70a-7229bcf1285a","hash":"83f193ec2f4883729b4b78d5eeec54d23dce8de1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403FCC01","maAmendNumber":0,"actionId":445562,"maType":"FOS","supportFunction":2,"priority":"High","region":4,"stt":"FL","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2023-08-28T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-08-29T00:00:00.000Z","obligationAmount":61100,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":61100,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":61100,"maPriority":"High","assistanceRequested":"FCC Cell survey management coordination, initial up to 2 teams","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will deploy cell survey teams and equipment to determine the impact to public safety and EAS communications systems in the affected area and identify surviving and non-working systems in support of disaster operations. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f5b21706-919a-4c21-97d4-2378217dc730","hash":"69081a6542507ae71d9b7c405a3c2936987f4424","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403EPA02","maAmendNumber":1,"actionId":446088,"maType":"FOS","supportFunction":10,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment  #1 De-obligate $10,000.00.  MA replaced with 4734DR-FL-EPA- 03. \r\n Activate EPA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations. MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement. Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"dde3d1d6-ca67-4c81-8f71-1788646dcb74","hash":"e11ca18520fc3ccc708c1a062f6f1a17f98d472f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403EPA02","maAmendNumber":0,"actionId":445475,"maType":"FOS","supportFunction":10,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-08-28T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-31T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Activate EPA to RRCC, IOF, JFO, or other teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations. MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement. Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"5009e39f-facd-404a-8461-c6bf7840ceb1","hash":"6e07ddf86ff17e10fdc97b666232e1c39a1d5de7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403EPA01","maAmendNumber":2,"actionId":446068,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-13T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-170102,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-170102,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-170102,"maPriority":"High","assistanceRequested":"Amendment #2 deobligate $170102.00 and close. Replaced on MA 4734DR-FL-EPA- 02\r\nAmendment #1 - Add additional funds of $150102.00 and projected extend end date to 09/13/2023.\r\nActivate EPA Water SME to identify needs &amp; facilitate information flow to support disaster operations \r\n","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations. MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n(refer Federal Personal Property Management Manual) Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2). The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, \r\nand that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"70956c33-b65e-4c95-b64d-685525dec383","hash":"851b1734ca91c6686bbd05c68664fd135ee2f20f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403EPA01","maAmendNumber":1,"actionId":445872,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-08-30T00:00:00.000Z","dateRequired":"2023-08-30T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-13T00:00:00.000Z","dateObligated":"2023-08-30T00:00:00.000Z","obligationAmount":160102,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":160102,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":160102,"maPriority":"High","assistanceRequested":"Amendment #1 - Add additional funds of $150102.00 and projected extend end date to 09/13/2023.\r\nActivate EPA Water SME to identify needs &amp; facilitate information flow to support disaster operations \r\n","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations. MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n(refer Federal Personal Property Management Manual) Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2). The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, \r\nand that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"7a1fae03-0971-4db3-9489-5326417337d2","hash":"9519ce8da0a6044c62820eb0fc58377c6f9bb1f4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403EPA01","maAmendNumber":0,"actionId":445379,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-08-27T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-28T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Activate EPA Water SME to identify needs &amp; facilitate information flow to support disaster operations","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations. MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n(refer Federal Personal Property Management Manual) Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2). The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, \r\nand that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"30e14f9d-177f-4134-9157-e58b20da7770","hash":"a79cb418aa9d370ed22c5d17298833679d74a9b7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOT01","maAmendNumber":1,"actionId":446095,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"High","assistanceRequested":"Amendment #1.  De-obligate $20,000.00 and close.  MA replaced with 4734DR-FL-DOT- 02.   Activate DOT to RRCC. IOF, JFO, or other teams and facilities as requested.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or other teams and facilities as requested. Funding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"cf8fe6ed-addd-4f48-97bd-deeaf41b04ba","hash":"d139354bd5b73bf459c4d1cb180c02de3fa52205","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOT01","maAmendNumber":0,"actionId":445497,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-08-28T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-28T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Activate DOT to RRCC. IOF, JFO, or others teams and facilities as requested","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to RRCC, IOF, JFO, or other teams and facilities as requested. Funding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA. - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"24913bb8-0737-47ad-9680-6e3c486f4a75","hash":"197dfcd36c08e4c4da258ee284dc066ec717679e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOJ-ATF02","maAmendNumber":2,"actionId":446184,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-06T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-1435000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1435000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1435000,"maPriority":"Lifesaving","assistanceRequested":"Amendment #2.  De-obligate $1,435,000.00 and close.  MA has been re-issued as 4734DR-FL-DOJ-ATF-02\r\nAmendment #1  - Add additional funds of $147,000.00 and extend projected end date to 09/06/2023\r\nDepartment of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST), LNOs to State EOC and RRCC, Incident/Management Teams and Mobile Command Vehicle/ (MCV)Mobile Bunk Houses (MBH) as required to provide force protection in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, the Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST) Incident Management personnel, Management Support Team personnel, RRCC LNOs and State EOC LNOs as required to incident supervision, coordination and force protection in support of disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e696e10d-6172-4e3f-be98-d1a05116460e","hash":"974a7a10bf612ffcb1135c93474744ebdd88f3dd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOJ-ATF02","maAmendNumber":1,"actionId":445874,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-08-30T00:00:00.000Z","dateRequired":"2023-08-30T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-06T00:00:00.000Z","dateObligated":"2023-08-30T00:00:00.000Z","obligationAmount":147000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":147000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":147000,"maPriority":"Lifesaving","assistanceRequested":"Amendment #1  - Add additional funds of $147,000.00 and extend projected end date to 09/06/2023\r\nDepartment of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST), LNOs to State EOC and RRCC, Incident/Management Teams and Mobile Command Vehicle/ (MCV)Mobile Bunk Houses (MBH) as required to provide force protection in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, the Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST) Incident Management personnel, Management Support Team personnel, RRCC LNOs and State EOC LNOs as required to incident supervision, coordination and force protection in support of disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"225fe9e7-7988-44b6-bd96-11357a4dc94c","hash":"6c38a3a677bee055e70f8b1d7a95a3c996893081","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOJ-ATF02","maAmendNumber":0,"actionId":445721,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-29T00:00:00.000Z","obligationAmount":1288000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1288000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1288000,"maPriority":"Lifesaving","assistanceRequested":"Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST), LNOs to State EOC and RRCC, Incident/Management Teams and Mobile Command Vehicle/ (MCV)Mobile Bunk Houses (MBH) as required to provide force protection in support of disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, the Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST) Incident Management personnel, Management Support Team personnel, RRCC LNOs and State EOC LNOs as required to incident supervision, coordination and force protection in support of disaster operations.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3cfa480d-03d5-4fe9-84f4-8dbf9e305647","hash":"82d146e0c97b2d4c7e98603f23fda18de0aaf98c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOD-USAF03","maAmendNumber":1,"actionId":446225,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment 1.  De-obligate $5,000.00 and close.  MA has been re-issued as 4734DR-FL-DOD-USAF- 03-00.\r\n\r\nCAP LNO to FL AOB for aerial imagery following landfall of Idalia across Florida for damage assessment determination.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide personnel to the RRCC, IOF, JFO or other locations to support disaster operations.\r\n\r\nSupport may include but is not limited to the following:\r\n- CAP Liaison Officers\r\n\r\nADDITIONAL NOTES from FEMA:\r\n MA task orders (MATOs) will be issued by FEMA&#39;s AOB at the RRCC or FL SEOC to provide specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- The CAP LNO should report to the FL SEOC (2555 Shumard Oak Blvd, Tallahassee, FL 32399) with appropriate equipment to fully execute all required tasks.\r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n The missionassigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n\r\nLNO deployment notification and locations should be requested with the National CAP Liaison as soon as practicable.\r\n\r\nThe MA/MATO should specify if 24-hour ops are needed and/or additional specialties/personnel are needed.\r\n\r\nOps longer than 7-days, may require on-station relief of personnel.\r\n","id":"151f9fbe-1d26-46df-934d-73d833e5b0e2","hash":"15ebc87ee1fe247cac68bc6515f9413b7bfd73e3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOD-USAF03","maAmendNumber":0,"actionId":445791,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-08-30T00:00:00.000Z","dateRequired":"2023-08-30T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-08-30T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"CAP LNO to FL AOB for aerial imagery following landfall of Idalia across Florida for damage assessment determination.","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide personnel to the RRCC, IOF, JFO or other locations to support disaster operations.\r\n\r\nSupport may include but is not limited to the following:\r\n- CAP Liaison Officers\r\n\r\nADDITIONAL NOTES from FEMA:\r\n MA task orders (MATOs) will be issued by FEMA&#39;s AOB at the RRCC or FL SEOC to provide specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- The CAP LNO should report to the FL SEOC (2555 Shumard Oak Blvd, Tallahassee, FL 32399) with appropriate equipment to fully execute all required tasks.\r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n The missionassigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n\r\nLNO deployment notification and locations should be requested with the National CAP Liaison as soon as practicable.\r\n\r\nThe MA/MATO should specify if 24-hour ops are needed and/or additional specialties/personnel are needed.\r\n\r\nOps longer than 7-days, may require on-station relief of personnel.\r\n","id":"2e062e86-c16b-42b0-b104-6a69d14d04ef","hash":"3605348809e4df962b2be2996294dda08118a1f3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOD-USAF01","maAmendNumber":1,"actionId":446215,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"High","assistanceRequested":"Amendment #1.  De-obligate $20,000.00 and close.  MA replaced with 4734DR-FL-DOD-USAF-04.\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support for Florida, requesting on-site LNO","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations. Support may include, but is not limited to, the following: - Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata) - Transportation of personnel and/or light cargo - Damage assessment imagery/observations, which may include previously collected imagery - Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or delivered on digital media - Fully mission ready CAP liaison and/or imagery collection management support* - Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c55849c5-f5cd-4884-8acf-b751ffd7ad89","hash":"08c46df883d025cde89f2df3e9a843c84fea4016","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOD-USAF01","maAmendNumber":0,"actionId":445675,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-08-29T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial support for Florida, requesting on-site LNO","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations. Support may include, but is not limited to, the following: - Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata) - Transportation of personnel and/or light cargo - Damage assessment imagery/observations, which may include previously collected imagery - Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or delivered on digital media - Fully mission ready CAP liaison and/or imagery collection management support* - Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"85f9f3e7-0362-431f-aa51-96e2aeb4f0b7","hash":"1c708e220cc516777a69edd824dd7cc8ea425a66","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOD-OPS02","maAmendNumber":1,"actionId":446100,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment #1 - deobligate $10,000.00 and closed. MA replaced by MA 4734DR-FL-DOD-OPS- 01\r\nAs requested by and in coordination with FEMA, DOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison.","statementOfWork":"As directed by and in coordination with FEMA, DOD will provide Defense Coordination Officer(s) with supporting staff element(s) (DCO/DCE) to the RRCC, Region IV Joint Field Office, IOF, or other locations, to provide DOD regional knowledge, requirements validation, and liaison, including as necessary State/Emergency Preparedness Liaison SEPLO/EPLO teams. Supporting staff element, augmentees, Joint Regional Medical Planning Officer (JRMPO), as mission required/requested. MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). All equipment and supply purchases must be coordinated with FEMA. Prior Federal Approving Official (FAO) approval is necessary to ensure reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157 and MA Policy 104-010-2. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9a408a14-edb9-49b8-b848-f8abe402cb73","hash":"63106562d357bcfecf17d7f9443af513a10df0c6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOD-OPS02","maAmendNumber":0,"actionId":445460,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-08-27T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-28T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"As requested by and in coordination with FEMA, DOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison.","statementOfWork":"As directed by and in coordination with FEMA, DOD will provide Defense Coordination Officer(s) with supporting staff element(s) (DCO/DCE) to the RRCC, Region IV Joint Field Office, IOF, or other locations, to provide DOD regional knowledge, requirements validation, and liaison, including as necessary State/Emergency Preparedness Liaison SEPLO/EPLO teams. Supporting staff element, augmentees, Joint Regional Medical Planning Officer (JRMPO), as mission required/requested. MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). All equipment and supply purchases must be coordinated with FEMA. Prior Federal Approving Official (FAO) approval is necessary to ensure reimbursement. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies. MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157 and MA Policy 104-010-2. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e87acad7-0f72-4f01-b294-7f18ee00fdec","hash":"52cd621b30e5b0b7eb7a2b726d38939b71a40e4f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOD-OPS01","maAmendNumber":1,"actionId":446178,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment #1 - De-obligate $10,000.00 and close. MA replaced with 4734DR-FL-DOD-OPS-03\r\nProvide Maxwell AFB, AL as a FEMA Incident Support Base/Federal Staging Area/Federal Teams Staging Facility (ISB/FSA/FTSF) in support of response and recovery operations. To support forward distribution of supplies/equipment to affected areas as required. Provide marshaling area / hardstand for trucks, trailers, other equipment and personnel.","statementOfWork":"Request Maxwell AFB as a FEMA Incident Support Base/Federal Staging Area (ISB/FSA) with the following requirements: hardstand to stage trucks/trailers/equipment/personnel for processing, cross loading, and forward movement as required. Provide life safety and lifesaving requirements as required by FEMA. - Be prepared to provide EPLO LNO to serve as liaison between the base and FEMA. MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual) Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2). The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a0da001c-5481-47fa-8e79-30b78c59c058","hash":"2b67930b80e6cef50cc0299ec7b29d6f9b3c6e07","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DOD-OPS01","maAmendNumber":0,"actionId":445474,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-08-27T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-28T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Provide Maxwell AFB, AL as a FEMA Incident Support Base/Federal Staging Area/Federal Teams Staging Facility (ISB/FSA/FTSF) in support of response and recovery operations. To support forward distribution of supplies/equipment to affected areas as required. Provide marshaling area / hardstand for trucks, trailers, other equipment and personnel.","statementOfWork":"Request Maxwell AFB as a FEMA Incident Support Base/Federal Staging Area (ISB/FSA) with the following requirements: hardstand to stage trucks/trailers/equipment/personnel for processing, cross loading, and forward movement as required. Provide life safety and lifesaving requirements as required by FEMA. - Be prepared to provide EPLO LNO to serve as liaison between the base and FEMA. MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual) Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2). The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"03b9c736-7a32-4be8-b881-59b1f29030d8","hash":"4513de92f19bd68d90c6ee7667cdaa28e251f58e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DHS-USCG03","maAmendNumber":1,"actionId":446167,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"High","assistanceRequested":"Amendment #1 De-obligate $20,000.00 and close.  MA has been re-issued as 4734DR-FL-DHS-USCG-03\r\nActivate USCG to the RRCC, IOF JFO or other facilities in support of response operations.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n- USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n- USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n- Other USCG SMEs, as applicable\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"960a7979-e819-4ee8-a528-51efdbf72e2d","hash":"02f770b804566c8e44cb6cebe447f9b40c068c8e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DHS-USCG03","maAmendNumber":0,"actionId":445727,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-29T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Activate USCG to the RRCC, IOF JFO or other facilities in support of response operations.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n- USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n- USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n- Other USCG SMEs, as applicable\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"83ca3e94-e380-48ed-ba44-a2caeff6f3f9","hash":"0e9947eafa73feb3f6d187410fed51774445e535","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DHS-FPS01","maAmendNumber":1,"actionId":446180,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-06T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-12500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-12500,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-12500,"maPriority":"High","assistanceRequested":"Amendment 1.  De-obligate $12,500.00 and close.  MA has been re-issued as 4734DR-FL-DHS-FPS-03\r\nProvide security officers as required by the field security manager and regional security officer (RSO) at various venues in support of disaster operations. ","statementOfWork":"At the direction of, and in coordination with FEMA security personnel, FPS will provide appropriate physical security to\r\nsupport response and recovery operations in the various venues in Region 4. Security of FEMA facilities will be based\r\non FEMA security standards, policies and practices. For FPS accounting purposes this MA and associated funds are intended\r\nto fund FEMA task orders for the period specified or until funds are exhausted. Any time extensions or additional\r\nfunding requirements will be processed utilizing an RRF including new POP (period of performance) dates, cost\r\nestimate and justification. This information will be provided by FEMA Security in coordination with FPS personnel and\r\napproved by the FCO or his/her designee. Equipment purchases are not authorized under this mission assignment.\r\n- MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration\r\nof assignment (s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required\r\nfor reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are\r\nreceived, services are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA\r\nCFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing,\r\nULO Validation, or additional justification has been provided.","id":"ee9d39f1-a454-4a5c-9639-3a8ec5432526","hash":"530c95b8792c8682ce1d1d31690415a6f400db81","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DHS-FPS01","maAmendNumber":0,"actionId":445763,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-06T00:00:00.000Z","dateObligated":"2023-08-29T00:00:00.000Z","obligationAmount":12500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":12500,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":12500,"maPriority":"High","assistanceRequested":"Provide security officers as required by the field security manager and regional security officer (RSO) at various venues in support of disaster operations","statementOfWork":"At the direction of, and in coordination with FEMA security personnel, FPS will provide appropriate physical security to\r\nsupport response and recovery operations in the various venues in Region 4. Security of FEMA facilities will be based\r\non FEMA security standards, policies and practices. For FPS accounting purposes this MA and associated funds are intended\r\nto fund FEMA task orders for the period specified or until funds are exhausted. Any time extensions or additional\r\nfunding requirements will be processed utilizing an RRF including new POP (period of performance) dates, cost\r\nestimate and justification. This information will be provided by FEMA Security in coordination with FPS personnel and\r\napproved by the FCO or his/her designee. Equipment purchases are not authorized under this mission assignment.\r\n- MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration\r\nof assignment (s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required\r\nfor reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are\r\nreceived, services are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA\r\nCFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing,\r\nULO Validation, or additional justification has been provided.","id":"a5378cfa-5200-4595-b94d-5adb6932f572","hash":"bd87373b83ba25143bfecf126969f1942c128e83","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DHS-CISA01","maAmendNumber":1,"actionId":446109,"maType":"FOS","supportFunction":14,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"High","assistanceRequested":"Amendment #1 - deobligate $10,000.00 and close. This is replaced by MA 4734DR-FL-DHS-CISA-03\r\nActivate CISA-14 LNOs to RRCC, JFO, IOF","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations. Support may include, but is not limited to, the following: - ESF-14 coordination and delivery of products and services - ESF-5 regarding critical physical and cyber infrastructure - Analysis of impacts to Lifelines and National Critical Infrastructure CISA liaisons may include representatives from - Integrated Operations Division (ESF14) - Infrastructure Security Division (Infrastructure SME) - National Risk Management Center (Geospatial SME) ADDITIONAL NOTES from FEMA: - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"16a07fad-cc2c-4fae-86b1-2a7d0f325f12","hash":"7dafc2d2b182f03ef991776e1d06fdb29b0fd284","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DHS-CISA01","maAmendNumber":0,"actionId":445381,"maType":"FOS","supportFunction":14,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-08-27T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-28T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Activate CISA-14 LNOs to RRCC, JFO, IOF","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations. Support may include, but is not limited to, the following: - ESF-14 coordination and delivery of products and services - ESF-5 regarding critical physical and cyber infrastructure - Analysis of impacts to Lifelines and National Critical Infrastructure CISA liaisons may include representatives from - Integrated Operations Division (ESF14) - Infrastructure Security Division (Infrastructure SME) - National Risk Management Center (Geospatial SME) ADDITIONAL NOTES from FEMA: - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"701b8e5a-7fcb-4611-8217-f5d5e1324470","hash":"cc119a0d09e7edd666858ecaf2b819ab8777b5a1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DHS-CBP02","maAmendNumber":1,"actionId":446199,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"DHS-CBP","agency":"DHS-CBP (CUST/BORDER PROTECTI","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2026-08-29T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-110000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-110000,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-110000,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 1.  De-obligate $110,000.00 and close.  MA has been re-issued as 4734DR-FL-DHS-CBP-03\r\nCBP-AMO provide Marine, Rotary, and/or Fixed-Wing asset support ","statementOfWork":"As directed by and in coordination with FEMA, U.S. Customs and Border Protection (CBP), Air and Marine Operations (AMO) will provide appropriate aircraft, marine vessels, personnel, or other assets to support disaster operations.\r\n\r\nRequested support may include, but is not limited to, the following:\r\n- Logistics (passenger, commodity, and equipment transport)\r\n- Aerial imaging (still or full-motion video) for situational awareness\r\n- Reconnaissance\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- Initial request is for two UH-60s, with one being hoist capable.\r\n--- MA task orders (MATOs) will be issued by FEMA&#39;s AOBD at the RRCC or FL SEOC for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- A CPB LNO should report to the FL SEOC (2555 Shumard Oak Blvd, Tallahassee, FL 32399) with appropriate equipment (i.e., laptop) to fully execute all required tasks.\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"bbc6486e-48ea-4d86-aacb-6b496dcc2dfd","hash":"1d3dc0ced963ae78df33fe9aabef2e2106b8c9bc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403DHS-CBP02","maAmendNumber":0,"actionId":445810,"maType":"FOS","supportFunction":0,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"DHS-CBP","agency":"DHS-CBP (CUST/BORDER PROTECTI","authority":"Stafford Act","dateReceived":"2023-08-30T00:00:00.000Z","dateRequired":"2026-08-29T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-08-30T00:00:00.000Z","obligationAmount":110000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":110000,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":110000,"maPriority":"Life Sustaining","assistanceRequested":"CBP-AMO provide Marine, Rotary, and/or Fixed-Wing asset support ","statementOfWork":"As directed by and in coordination with FEMA, U.S. Customs and Border Protection (CBP), Air and Marine Operations (AMO) will provide appropriate aircraft, marine vessels, personnel, or other assets to support disaster operations.\r\n\r\nRequested support may include, but is not limited to, the following:\r\n- Logistics (passenger, commodity, and equipment transport)\r\n- Aerial imaging (still or full-motion video) for situational awareness\r\n- Reconnaissance\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- Initial request is for two UH-60s, with one being hoist capable.\r\n--- MA task orders (MATOs) will be issued by FEMA&#39;s AOBD at the RRCC or FL SEOC for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- A CPB LNO should report to the FL SEOC (2555 Shumard Oak Blvd, Tallahassee, FL 32399) with appropriate equipment (i.e., laptop) to fully execute all required tasks.\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"a5b5ad10-4562-4a24-aa19-276b41e534d9","hash":"cc5b8f8bcf457405aa784e8c98d4fa13da79d761","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403COE-SAD01","maAmendNumber":2,"actionId":446106,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-115500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-115500,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-115500,"maPriority":"High","assistanceRequested":"Amendment #2  - deobligate $115,500.00 and close . Replaced with MA 4734DR-FL-COE-SAD-01\r\nAmendment #1 - Add additional funding of $94,500.00 for additional SMEs\r\nActivate USACE to the RRCC, IOF, JFO, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations. Support may include, but is not limited to, the following: - USACE support to RRCC - USACE support to National and/or Regional IMAT - USACE modeling and/or National Hurricane Program support - USACE Local Government Liaison(s) - USACE support to ESF #15 External Affairs - USACE SME(s) - Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF) - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements This mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA. ADDITIONAL NOTES from FEMA: - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4eddf678-8088-4d54-9756-20f856f2792d","hash":"79f6656a986e20ec730b21ddeace992eb996353f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403COE-SAD01","maAmendNumber":1,"actionId":445709,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-29T00:00:00.000Z","obligationAmount":94500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":94500,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":94500,"maPriority":"High","assistanceRequested":"Amendment #1 - Add additional funding of $94,500.00 for additional SMEs\r\nActivate USACE to the RRCC, IOF, JFO, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations. Support may include, but is not limited to, the following: - USACE support to RRCC - USACE support to National and/or Regional IMAT - USACE modeling and/or National Hurricane Program support - USACE Local Government Liaison(s) - USACE support to ESF #15 External Affairs - USACE SME(s) - Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF) - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements This mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA. ADDITIONAL NOTES from FEMA: - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d2ec7468-529b-4392-a650-68b91d892555","hash":"62de48cd26aea70a831e2bc6a6747768e7a07cd2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403COE-SAD01","maAmendNumber":0,"actionId":445380,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-08-27T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-28T00:00:00.000Z","obligationAmount":21000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":21000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":21000,"maPriority":"High","assistanceRequested":"Activate USACE to the RRCC, IOF, JFO, or other facilities","statementOfWork":"As directed by and in coordination with FEMA, the US Army Corps of Engineers (USACE) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations. Support may include, but is not limited to, the following: - USACE support to RRCC - USACE support to National and/or Regional IMAT - USACE modeling and/or National Hurricane Program support - USACE Local Government Liaison(s) - USACE support to ESF #15 External Affairs - USACE SME(s) - Infrastructure Systems Recovery Support Function (IS-RSF) Field Coordinator (under NDRF) - Contract or OFA audit support to ensure costs incurred under USACE MAs meet all Stafford Act and regulatory requirements This mission assignment may also fund other site-specific personnel and non-mission specific administrative and management support at a Recovery Field Office (RFO) or other USACE node locations. Those costs are not considered in this initial estimate. Costs would vary based on the magnitude and duration of the response and recovery operations as authorized by FEMA. ADDITIONAL NOTES from FEMA: - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. - All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f3288be0-c174-4071-850d-fea69997aaa9","hash":"e8b330f0ba4c5fa0b36c974bf4444d2a934fc229","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403COE-LRD01","maAmendNumber":2,"actionId":446186,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":-7021405,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-7021405,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-7021405,"maPriority":"High","assistanceRequested":"Amendment #2 -  De-obligate $7,021,405.00 and close.  MA replaced with 4734DR-FL-COE-LRD-01. \r\nAmendment #1 - Add additional funding of $5,221,405.00 to increase the Temp Power PRT to a TYPE II\r\nUSACE preposition Type IV temporary emergency power resources to Maxwell AFB ISB.\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. Initial requirement is for Type IV temporary power support assets, adjusted as needed. Assets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks). Work includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"89caa29d-a047-476d-8966-3533988a371c","hash":"5b7081cfc2e0293f35c827392762e2961fed1c2e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403COE-LRD01","maAmendNumber":1,"actionId":445697,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2023-08-29T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-29T00:00:00.000Z","obligationAmount":5221405,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5221405,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5221405,"maPriority":"High","assistanceRequested":"Amendment #1 - Add additional funding of $5,221,405.00 to increase the Temp Power PRT to a TYPE II\r\nUSACE preposition Type IV temporary emergency power resources to Maxwell AFB ISB.\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. Initial requirement is for Type IV temporary power support assets, adjusted as needed. Assets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks). Work includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"03990396-bd4b-4e01-872e-d7cd8324770c","hash":"dd1e2cb2969d475796cdff2af88a6536add5ff86","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":null,"declarationType":"SU","declarationTitle":null,"maId":"FL23082403COE-LRD01","maAmendNumber":0,"actionId":445511,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"COE-LRD","agency":"COE, LAKES & RIVER DIVISION","authority":"Stafford Act","dateReceived":"2023-08-28T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-08-28T00:00:00.000Z","obligationAmount":1800000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1800000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1800000,"maPriority":"High","assistanceRequested":"USACE preposition Type IV temporary emergency power resources to Maxwell AFB ISB.\r\n\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Army Corps of Engineers (USACE) will pre-position temporary power support assets for emergency power generation to the affected area in support of disaster operations. Initial requirement is for Type IV temporary power support assets, adjusted as needed. Assets provided by FEMA will be returned to the Distribution Center (DC)/Remote Storage Site (RSS) stock Fully Mission Capable (FMC). FEMA will supply or coordinate the acquisition of generators and associated Bill of Materials (BOM) (e.g. wires, connectors and load banks). Work includes providing personnel and equipment at the Federal/State staging area. When directed by FEMA, USACE will conduct generator pre-installation operations. USACE is responsible for providing personnel and/or equipment necessary to accomplish the mission including but not limited to Subject Matter Experts, members of the Planning and Response Team (PRT), 249th Engineer Battalion, DTOS and ACI contractor. ADDITIONAL NOTES from FEMA: --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2802e781-8ddf-4cd8-9b5b-1acea0e36811","hash":"c3a64777d510cc53aaff458de02edbde31eb0e4b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4738,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4738DRGATREAS01","maAmendNumber":0,"actionId":448030,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"GA","agencyId":"TREAS","agency":"DEPT OF TREASURY","authority":"Stafford Act","dateReceived":"2023-09-21T00:00:00.000Z","dateRequired":"2023-09-25T00:00:00.000Z","popStartDate":"2023-09-21T00:00:00.000Z","popEndDate":"2023-11-08T00:00:00.000Z","dateObligated":"2023-09-22T00:00:00.000Z","obligationAmount":34422.08,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":34422.08,"maPopStartDate":"2023-09-21T00:00:00.000Z","maPopEndDate":"2023-11-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":34422.08,"maPriority":"High","assistanceRequested":"BOC 2501 (SCF) IRS to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA Internal Revenue Services will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMAs disaster operations.\r\nTREAS - IRS will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"c6d2056b-8a39-409b-a01c-ce566ac95e96","hash":"3aba4ffb94fcdf113fbb37cc406433469c0aca14","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4738,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4738DRGAGSA01","maAmendNumber":1,"actionId":474345,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"GA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-02T00:00:00.000Z","dateRequired":"2024-08-02T00:00:00.000Z","popStartDate":"2023-09-08T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2024-08-06T00:00:00.000Z","obligationAmount":-15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15000,"maPopStartDate":"2023-09-08T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15000,"maPriority":"High","assistanceRequested":"Amendment #1 - De-obligate $15,000.00 per QULO Report 7/1/2024\r\nActivate GSA to RRCC, IOF, JFO, staging, or other teams and facilities as requested. Virtual Support approved at this time. Reserve the ability to pull to the RRCC and/or deploy to field. ","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations. Virtual support currently approved but subject to change.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"202af1ce-5673-48d0-856d-d65c4ad6cb50","hash":"512b78910fb36ee9a8f78ea1da2087439060b16c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4738,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4738DRGAGSA01","maAmendNumber":0,"actionId":446764,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"GA","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-09-08T00:00:00.000Z","dateRequired":"2023-09-08T00:00:00.000Z","popStartDate":"2023-09-08T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-09-08T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2023-09-08T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"High","assistanceRequested":"Activate GSA to RRCC, IOF, JFO, staging, or other teams and facilities as requested. Virtual Support approved at this time. Reserve the ability to pull to the RRCC and/or deploy to field. ","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the RRCC, IOF, JFO, or other teams and facilities as requested in support of disaster operations. Virtual support currently approved but subject to change.\r\nActivities may include, but are not limited to, the following:\r\n- ESF-7 support\r\n- Emergency leasing services for needed space/facilities as requested by FEMA\r\n- GSA Lease Contracting Officers (LCOs) and others as needed\r\n-MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n-Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n-MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2c3e22b4-b0ee-45a6-84e9-59c8061b3d92","hash":"998443ee8ff10ea3ebb6d4ea3632a352bceebda4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4738,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4738DRGADHS-CISA01","maAmendNumber":2,"actionId":464967,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"GA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-04-25T00:00:00.000Z","dateRequired":"2024-04-25T00:00:00.000Z","popStartDate":"2023-09-21T00:00:00.000Z","popEndDate":"2023-11-08T00:00:00.000Z","dateObligated":"2024-04-25T00:00:00.000Z","obligationAmount":-8085.29,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-8085.29,"maPopStartDate":"2023-09-21T00:00:00.000Z","maPopEndDate":"2023-11-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-8085.29,"maPriority":"Normal","assistanceRequested":"SCF - Amendment #2 - De-obligate $8,085.29 per 4/1/2024 QULO\r\nSCF - Amendment #1 - De-obligate $19,441.93 per DHS-CISA October QULO report response\r\nBOC 2501 (SCF) DHS-CISA to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Cybersecurity and Infrastructure Security Agency will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMAs disaster operations.\r\nCISA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"6fd90c4d-5340-4025-9ee1-c2032e5fa974","hash":"41ecf9a8f08f4f94aa7836fb9c33bfe39185c24e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4738,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4738DRGADHS-CISA01","maAmendNumber":1,"actionId":452056,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"GA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-11-08T00:00:00.000Z","dateRequired":"2023-11-08T00:00:00.000Z","popStartDate":"2023-09-21T00:00:00.000Z","popEndDate":"2023-11-08T00:00:00.000Z","dateObligated":"2023-11-08T00:00:00.000Z","obligationAmount":-19441.93,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-19441.93,"maPopStartDate":"2023-09-21T00:00:00.000Z","maPopEndDate":"2023-11-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-19441.93,"maPriority":"Normal","assistanceRequested":"SCF - Amendment #1 - De-obligate $19,441.93 per DHS-CISA October QULO report response\r\nBOC 2501 (SCF) DHS-CISA to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Cybersecurity and Infrastructure Security Agency will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMAs disaster operations.\r\nCISA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"00f1bcb2-2d87-4792-9050-2b68482bb28a","hash":"37489a395df47e70a57bb732c08d22b0b10a5954","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4738,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4738DRGADHS-CISA01","maAmendNumber":0,"actionId":448093,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"GA","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-21T00:00:00.000Z","dateRequired":"2023-09-25T00:00:00.000Z","popStartDate":"2023-09-21T00:00:00.000Z","popEndDate":"2023-11-08T00:00:00.000Z","dateObligated":"2023-09-22T00:00:00.000Z","obligationAmount":34422.08,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":34422.08,"maPopStartDate":"2023-09-21T00:00:00.000Z","maPopEndDate":"2023-11-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":34422.08,"maPriority":"Normal","assistanceRequested":"BOC 2501 (SCF) DHS-CISA to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Cybersecurity and Infrastructure Security Agency will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMAs disaster operations.\r\nCISA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"4faf1d19-1045-4bfa-92b2-15df0dd3b56e","hash":"b3da67271c4e31e6fa596c4e5d95bd0ffefcacf6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4738,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4738DRGACOE-SAD01","maAmendNumber":2,"actionId":469621,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"GA","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2024-06-11T00:00:00.000Z","dateRequired":"2024-06-11T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2024-04-01T00:00:00.000Z","dateObligated":"2024-06-12T00:00:00.000Z","obligationAmount":-34429.66,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-34429.66,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2024-04-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-34429.66,"maPriority":"Normal","assistanceRequested":"Amendment #2- De-obligate $34,429.66 and close MA per OFA request\r\nAmendment #1 - Extend projected end date to 04/01/2024.\r\nProvide USACE Reemployed Annuitant Cadre personnel to work on program projects for buildings and equipment, roads and bridges, electric cooperatives and others as needed. DR-4738-GA deploying personnel as HM 406 Specialists, or any other role as deemed necessary by field leadership.","statementOfWork":"As requested by and in coordination with FEMA, USACE and or Reemployed Annuitant Cadre (RAC) will deploy personnel to the State of Georgia in support of Hurricane Idalia Recovery Efforts. USACE Reemployed Annuitant (RA) personnel will serve as either Public Assistance Mitigation Site Inspectors (STSP), Public Assistance Mitigation Engineer or any other position as deemed necessary by the Hazard Mitigation Branch Director and/or the Hazards and Performance Analysis Group Supervisor.\r\nTasks to be Performed, but not limited to:\r\n1. Applying policy and procedure to Applicant briefings, recovery scoping meetings, site inspections and follow up meetings.\r\n2. Inspect and evaluate damaged facilities to determine areas for potential mitigation during repair, reconstruction with adherence to engineering best practices and the model ordinances and codes.\r\n3. Provide technical assistance to Public Assistance staff (PA) in identifying and developing hazard mitigation proposals.\r\n4. Provide technical assistance to PA staff by reviewing PA Projects for sound mitigation opportunities/techniques.\r\n5. Provide technical assistance on compliance with codes, specifications, standards and regulations.\r\n6. Provide technical support to stakeholders on Benefit Cost Analysis (BCA) utilizing the FEMA approved BCA tool.\r\nUSACE is responsible for providing personnel and/or equipment necessary to accomplish the mission, and/or may issue a subtasking\r\nto another Federal agency for that support.\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"40b58b57-9cd4-4ec6-9a3a-160ea5d942e8","hash":"5708e5b8cfc8d1400440795b5fb817b067478b63","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4738,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4738DRGACOE-SAD01","maAmendNumber":1,"actionId":454488,"maType":"FOS","supportFunction":3,"priority":"Normal","region":4,"stt":"GA","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-12-15T00:00:00.000Z","dateRequired":"2023-12-15T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2024-04-01T00:00:00.000Z","dateObligated":"2023-12-15T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2024-04-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #1 - Extend projected end date to 04/01/2024.\r\nProvide USACE Reemployed Annuitant Cadre personnel to work on program projects for buildings and equipment, roads and bridges, electric cooperatives and others as needed. DR-4738-GA deploying personnel as HM 406 Specialists, or any other role as deemed necessary by field leadership.","statementOfWork":"As requested by and in coordination with FEMA, USACE and or Reemployed Annuitant Cadre (RAC) will deploy personnel to the State of Georgia in support of Hurricane Idalia Recovery Efforts. USACE Reemployed Annuitant (RA) personnel will serve as either Public Assistance Mitigation Site Inspectors (STSP), Public Assistance Mitigation Engineer or any other position as deemed necessary by the Hazard Mitigation Branch Director and/or the Hazards and Performance Analysis Group Supervisor.\r\nTasks to be Performed, but not limited to:\r\n1. Applying policy and procedure to Applicant briefings, recovery scoping meetings, site inspections and follow up meetings.\r\n2. Inspect and evaluate damaged facilities to determine areas for potential mitigation during repair, reconstruction with adherence to engineering best practices and the model ordinances and codes.\r\n3. Provide technical assistance to Public Assistance staff (PA) in identifying and developing hazard mitigation proposals.\r\n4. Provide technical assistance to PA staff by reviewing PA Projects for sound mitigation opportunities/techniques.\r\n5. Provide technical assistance on compliance with codes, specifications, standards and regulations.\r\n6. Provide technical support to stakeholders on Benefit Cost Analysis (BCA) utilizing the FEMA approved BCA tool.\r\nUSACE is responsible for providing personnel and/or equipment necessary to accomplish the mission, and/or may issue a subtasking\r\nto another Federal agency for that support.\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"bff3f907-81d8-40be-8921-0300722deb10","hash":"d77be0d6c755cf8d6f956e01692d1f216f88b0f3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4738,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4738DRGACOE-SAD01","maAmendNumber":0,"actionId":450077,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"GA","agencyId":"COE-SAD","agency":"COE SOUTH ATLANTIC DIVISION","authority":"Stafford Act","dateReceived":"2023-10-17T00:00:00.000Z","dateRequired":"2023-10-31T00:00:00.000Z","popStartDate":"2023-10-17T00:00:00.000Z","popEndDate":"2023-12-30T00:00:00.000Z","dateObligated":"2023-10-20T00:00:00.000Z","obligationAmount":204000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":204000,"maPopStartDate":"2023-10-17T00:00:00.000Z","maPopEndDate":"2024-04-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":204000,"maPriority":"Normal","assistanceRequested":"Provide USACE Reemployed Annuitant Cadre personnel to work on program projects for buildings and equipment, roads and bridges, electric cooperatives and others as needed. DR-4738-GA deploying personnel as HM 406 Specialists, or any other role as deemed necessary by field leadership.","statementOfWork":"As requested by and in coordination with FEMA, USACE and or Reemployed Annuitant Cadre (RAC) will deploy personnel to the State of Georgia in support of Hurricane Idalia Recovery Efforts. USACE Reemployed Annuitant (RA) personnel will serve as either Public Assistance Mitigation Site Inspectors (STSP), Public Assistance Mitigation Engineer or any other position as deemed necessary by the Hazard Mitigation Branch Director and/or the Hazards and Performance Analysis Group Supervisor.\r\nTasks to be Performed, but not limited to:\r\n1. Applying policy and procedure to Applicant briefings, recovery scoping meetings, site inspections and follow up meetings.\r\n2. Inspect and evaluate damaged facilities to determine areas for potential mitigation during repair, reconstruction with adherence to engineering best practices and the model ordinances and codes.\r\n3. Provide technical assistance to Public Assistance staff (PA) in identifying and developing hazard mitigation proposals.\r\n4. Provide technical assistance to PA staff by reviewing PA Projects for sound mitigation opportunities/techniques.\r\n5. Provide technical assistance on compliance with codes, specifications, standards and regulations.\r\n6. Provide technical support to stakeholders on Benefit Cost Analysis (BCA) utilizing the FEMA approved BCA tool.\r\nUSACE is responsible for providing personnel and/or equipment necessary to accomplish the mission, and/or may issue a subtasking\r\nto another Federal agency for that support.\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"319557fa-625d-4b52-864b-f57bd669d433","hash":"521c15e395a388a527953622994beb3d9706eb63","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLVA02","maAmendNumber":0,"actionId":446159,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate VA to NRCC\r\nThis MA replaces MA 3596EM-FL-VA-01","statementOfWork":"As directed by and in coordination with FEMA, Veterans Affairs (VA) will provide appropriate personnel to the NRCC other teams and facilities to support disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n-- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n-- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n-- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n-- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n-- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency\r\n-- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"f7499997-97de-4522-a162-84c458c7736b","hash":"26384b9df8d297bb7f5f00346e7dc93e5dc069ce","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLVA01","maAmendNumber":0,"actionId":446840,"maType":"FOS","supportFunction":15,"priority":"Normal","region":4,"stt":"FL","agencyId":"VA","agency":"VA (VETERANS AFFAIRS)","authority":"Stafford Act","dateReceived":"2023-09-09T00:00:00.000Z","dateRequired":"2023-09-10T00:00:00.000Z","popStartDate":"2023-09-09T00:00:00.000Z","popEndDate":"2023-10-24T00:00:00.000Z","dateObligated":"2023-09-09T00:00:00.000Z","obligationAmount":34422.08,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":34422.08,"maPopStartDate":"2023-09-09T00:00:00.000Z","maPopEndDate":"2023-10-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":34422.08,"maPriority":"Normal","assistanceRequested":"(SCF) Requesting External Affairs Staff support for DR4734FL.","statementOfWork":"As directed by and in coordination with FEMA Veterans Affairs will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMAs disaster operations.\r\nVA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\n\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"dfe9d725-0771-434c-975b-58620b349190","hash":"36156c57fce676f4de7a46aeca69cee9b5ec5bcd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-RD01","maAmendNumber":2,"actionId":463103,"maType":"FOS","supportFunction":20,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-RD","agency":"USDA-RURAL DEVELOPMENT","authority":"Stafford Act","dateReceived":"2024-04-09T00:00:00.000Z","dateRequired":"2024-04-01T00:00:00.000Z","popStartDate":"2023-09-07T00:00:00.000Z","popEndDate":"2024-06-02T00:00:00.000Z","dateObligated":"2024-04-10T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-07T00:00:00.000Z","maPopEndDate":"2024-06-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 2. Extend POP to 06/02/2024. No additional funding needed. PM Change to Emily Hinton\r\nAmendment 1. Extend POP to 05/03/2024. No additional funding needed. Change PM to Angela Barton.\r\n(RSF) As directed by and in coordination with FEMA, the United States Department of Agriculture (USDA) will provide appropriate personnel to the JFO, JRO, or other teams and/or facilities to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, US Department of Agriculture (USDA) provides appropriate personnel in support of FEMA disaster operations. Initial activation of the USDA to provide federal coordination with the appropriate Recovery Support Function (RSF) primary and support agencies, other Federal Agencies, and SLTT partners as directed by FEMA. USDA to provide specific expertise to create and deliver a Recovery Needs Assessment (RNA) and subsequent recovery strategies in conjunction with RSFs to deliver support to affected communities. USDA will provide recovery needs assessments and strategy coordination by using the spectrum of technical expertise and programs offered: loans, grants and loan guarantees to help create jobs and support economic development and essential services such as housing; health care; first responder services and equipment; water, electric and communications infrastructure; promote economic development by supporting loans to businesses through banks, credit unions and community managed lending pools; offer technical assistance and information to help agricultural producers and cooperatives recover and improve the effectiveness of their operations; and help rural residents buy or rent safe, affordable housing and make health and safety repairs to their homes. USDA will also provide specific expertise and support the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO) or their deputies throughout the development and completion of the RNA and recovery products. The RNA will include recovery strategies that support SLTT partners goals and objectives for a holistic and resilience recovery. The USDA Advisor/Field Coordinator designated, in consultation with the National Coordinator, may request additional support via Subject Matter Experts from pertinent Primary and Supporting agencies to support, on an operation by operation basis. USDA will participate in Interagency Recovery Coordination meetings and strategic work session required to complete the different RSF areas of the Recovery Needs Assessment, contributing USDA Rural programs specific data and information so the RNA is an interdependent assessment that fully addresses impacts of disaster, and provides recovery outcomes that are real solutions. The USDA Advisors will contribute through collaboration to integrated plans that address rural communities sector related solutions, and mitigation opportunities as well as opportunities for resilience and sustainability.\r\nCosts would vary based on the requirements and duration of the disaster recovery operations as authorized by FEMA.\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual) Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency MA shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"ec5c92c5-5cf5-4453-aa92-240bc9aedbd5","hash":"49e05e28d99e69c9a7d9fac3b78533373c067ed6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-RD01","maAmendNumber":1,"actionId":453022,"maType":"FOS","supportFunction":20,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-RD","agency":"USDA-RURAL DEVELOPMENT","authority":"Stafford Act","dateReceived":"2023-11-29T00:00:00.000Z","dateRequired":"2023-11-24T00:00:00.000Z","popStartDate":"2023-09-07T00:00:00.000Z","popEndDate":"2024-05-03T00:00:00.000Z","dateObligated":"2023-12-01T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-07T00:00:00.000Z","maPopEndDate":"2024-06-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment 1. Extend POP to 05/03/2024. No additional funding needed. Change PM to Angela Barton.\r\n(RSF) As directed by and in coordination with FEMA, the United States Department of Agriculture (USDA) will provide appropriate personnel to the JFO, JRO, or other teams and/or facilities to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, US Department of Agriculture (USDA) provides appropriate personnel in support of FEMA disaster operations. Initial activation of the USDA to provide federal coordination with the appropriate Recovery Support Function (RSF) primary and support agencies, other Federal Agencies, and SLTT partners as directed by FEMA. USDA to provide specific expertise to create and deliver a Recovery Needs Assessment (RNA) and subsequent recovery strategies in conjunction with RSFs to deliver support to affected communities. USDA will provide recovery needs assessments and strategy coordination by using the spectrum of technical expertise and programs offered: loans, grants and loan guarantees to help create jobs and support economic development and essential services such as housing; health care; first responder services and equipment; water, electric and communications infrastructure; promote economic development by supporting loans to businesses through banks, credit unions and community managed lending pools; offer technical assistance and information to help agricultural producers and cooperatives recover and improve the effectiveness of their operations; and help rural residents buy or rent safe, affordable housing and make health and safety repairs to their homes. USDA will also provide specific expertise and support the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO) or their deputies throughout the development and completion of the RNA and recovery products. The RNA will include recovery strategies that support SLTT partners goals and objectives for a holistic and resilience recovery. The USDA Advisor/Field Coordinator designated, in consultation with the National Coordinator, may request additional support via Subject Matter Experts from pertinent Primary and Supporting agencies to support, on an operation by operation basis. USDA will participate in Interagency Recovery Coordination meetings and strategic work session required to complete the different RSF areas of the Recovery Needs Assessment, contributing USDA Rural programs specific data and information so the RNA is an interdependent assessment that fully addresses impacts of disaster, and provides recovery outcomes that are real solutions. The USDA Advisors will contribute through collaboration to integrated plans that address rural communities sector related solutions, and mitigation opportunities as well as opportunities for resilience and sustainability.\r\nCosts would vary based on the requirements and duration of the disaster recovery operations as authorized by FEMA.\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual) Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency MA shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"62f2f0d7-8bae-4cf4-bb60-d64a30225c0d","hash":"435fb0bd79243e2e627193057961de7bf54ac626","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-RD01","maAmendNumber":0,"actionId":446692,"maType":"FOS","supportFunction":20,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-RD","agency":"USDA-RURAL DEVELOPMENT","authority":"Stafford Act","dateReceived":"2023-09-07T00:00:00.000Z","dateRequired":"2023-09-07T00:00:00.000Z","popStartDate":"2023-09-07T00:00:00.000Z","popEndDate":"2023-12-07T00:00:00.000Z","dateObligated":"2023-09-08T00:00:00.000Z","obligationAmount":150000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":150000,"maPopStartDate":"2023-09-07T00:00:00.000Z","maPopEndDate":"2024-06-02T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":150000,"maPriority":"Normal","assistanceRequested":"(RSF) As directed by and in coordination with FEMA, the United States Department of Agriculture (USDA) will provide appropriate personnel to the JFO, JRO, or other teams and/or facilities to support disaster operations.","statementOfWork":"As directed by and in coordination with FEMA, US Department of Agriculture (USDA) provides appropriate personnel in support of FEMA disaster operations. Initial activation of the USDA to provide federal coordination with the appropriate Recovery Support Function (RSF) primary and support agencies, other Federal Agencies, and SLTT partners as directed by FEMA. USDA to provide specific expertise to create and deliver a Recovery Needs Assessment (RNA) and subsequent recovery strategies in conjunction with RSFs to deliver support to affected communities. USDA will provide recovery needs assessments and strategy coordination by using the spectrum of technical expertise and programs offered: loans, grants and loan guarantees to help create jobs and support economic development and essential services such as housing; health care; first responder services and equipment; water, electric and communications infrastructure; promote economic development by supporting loans to businesses through banks, credit unions and community managed lending pools; offer technical assistance and information to help agricultural producers and cooperatives recover and improve the effectiveness of their operations; and help rural residents buy or rent safe, affordable housing and make health and safety repairs to their homes. USDA will also provide specific expertise and support the Federal Coordinating Officer (FCO) and Federal Disaster Recovery Officer (FDRO) or their deputies throughout the development and completion of the RNA and recovery products. The RNA will include recovery strategies that support SLTT partners goals and objectives for a holistic and resilience recovery. The USDA Advisor/Field Coordinator designated, in consultation with the National Coordinator, may request additional support via Subject Matter Experts from pertinent Primary and Supporting agencies to support, on an operation by operation basis. USDA will participate in Interagency Recovery Coordination meetings and strategic work session required to complete the different RSF areas of the Recovery Needs Assessment, contributing USDA Rural programs specific data and information so the RNA is an interdependent assessment that fully addresses impacts of disaster, and provides recovery outcomes that are real solutions. The USDA Advisors will contribute through collaboration to integrated plans that address rural communities sector related solutions, and mitigation opportunities as well as opportunities for resilience and sustainability.\r\nCosts would vary based on the requirements and duration of the disaster recovery operations as authorized by FEMA.\r\nADDITIONAL NOTES from FEMA:\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual) Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency MA shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"12dc2c42-bdf8-42cd-835b-676ebb90662a","hash":"c01317daf7f5d775f7095021459bafc94d805285","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-FS03","maAmendNumber":1,"actionId":458755,"maType":"FOS","supportFunction":4,"priority":"High","region":4,"stt":"FL","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-13T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-02-21T00:00:00.000Z","obligationAmount":-5760.35,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5760.35,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5760.35,"maPriority":"High","assistanceRequested":"Amendment #1: De-Obligation of $5,760.35. As Confirmed by the URLO Report. Change PM to Kevin Stewart.\r\nActivate USFS to the NRCC. This MA replaces MA 3596EM-FL-USDA-FS-0100","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"96969d7f-0535-4045-8a0c-f2882f449a5f","hash":"123a2fa5d9eb7da66323ac5f306c1748f82bc9bd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-FS03","maAmendNumber":0,"actionId":446220,"maType":"FOS","supportFunction":4,"priority":"High","region":4,"stt":"FL","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":10012,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10012,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10012,"maPriority":"High","assistanceRequested":"Activate USFS to the NRCC. This MA replaces MA 3596EM-FL-USDA-FS-0100","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c74f3cd4-3609-4a1c-aa88-5b609c5b7654","hash":"2aa31dc12e93a194328d3a703d47595df8370192","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-FS01","maAmendNumber":1,"actionId":465178,"maType":"FOS","supportFunction":4,"priority":"High","region":4,"stt":"FL","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2024-04-26T00:00:00.000Z","dateRequired":"2024-04-26T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-12T00:00:00.000Z","dateObligated":"2024-04-30T00:00:00.000Z","obligationAmount":-12184.47,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-12184.47,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-12184.47,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $12,184.47 per 4/1/2024 ULO report.\r\nActivate USFS to the RRCC, IOF JFO or other facilities in support of response operations.  This is a re-issue of FL-23082403-USDA-FS-02\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f2fd954a-8f3d-4f6a-9a64-368f347572a2","hash":"347f21727709d822ad63f1cc94c114d3b1c2d747","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-FS01","maAmendNumber":0,"actionId":446191,"maType":"FOS","supportFunction":4,"priority":"High","region":4,"stt":"FL","agencyId":"USDA-FS","agency":"USDA-FS (STATE/PRIV FORESTRY)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-12T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":13420,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":13420,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-12T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":13420,"maPriority":"High","assistanceRequested":"Activate USFS to the RRCC, IOF JFO or other facilities in support of response operations.  This is a re-issue of FL-23082403-USDA-FS-02\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Forest Service (USFS) will provide appropriate personnel to the RRCC, IOF, JFO, or other facilities in support of disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a16ad74b-5109-440e-82c3-d1871157aa81","hash":"b15ee5c2c0164cc3bc7466f2899271570af02460","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-FBC01","maAmendNumber":1,"actionId":448031,"maType":"FOS","supportFunction":15,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-FBC","agency":"USDA-FARM PROD/CONSV BUS CTR","authority":"Stafford Act","dateReceived":"2023-09-21T00:00:00.000Z","dateRequired":"2023-09-21T00:00:00.000Z","popStartDate":"2023-09-06T00:00:00.000Z","popEndDate":"2023-09-21T00:00:00.000Z","dateObligated":"2023-09-22T00:00:00.000Z","obligationAmount":-15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15000,"maPopStartDate":"2023-09-06T00:00:00.000Z","maPopEndDate":"2023-09-21T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15000,"maPriority":"Normal","assistanceRequested":"Amendment 1.  De-obligate $15,000.00 per agency request. And close the mission . \r\nRequesting USDA congressional subject matter experts in support of DR4734 FL ","statementOfWork":"As directed by and in coordination with FEMA, USDA will provide subject matter expert(s) to support the functions of ESF #15 by providing public messaging assistance during disaster operations.\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c4e7e084-ac4a-4931-b8c6-8b32f3320ed8","hash":"b86a273170f97f79ef0d1540499e0b18696690d3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-FBC01","maAmendNumber":0,"actionId":446493,"maType":"FOS","supportFunction":15,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-FBC","agency":"USDA-FARM PROD/CONSV BUS CTR","authority":"Stafford Act","dateReceived":"2023-09-07T00:00:00.000Z","dateRequired":"2023-09-06T00:00:00.000Z","popStartDate":"2023-09-06T00:00:00.000Z","popEndDate":"2023-10-06T00:00:00.000Z","dateObligated":"2023-09-07T00:00:00.000Z","obligationAmount":15000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15000,"maPopStartDate":"2023-09-06T00:00:00.000Z","maPopEndDate":"2023-09-21T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15000,"maPriority":"Normal","assistanceRequested":"Requesting USDA congressional subject matter experts in support of DR4734 FL ","statementOfWork":"As directed by and in coordination with FEMA, USDA will provide subject matter expert(s) to support the functions of ESF #15 by providing public messaging assistance during disaster operations.\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e239fbf7-1995-4a3b-b248-7fe418ea908b","hash":"a263d80742cd9f33a82bd71b20514642a6dafeeb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-APH02","maAmendNumber":1,"actionId":451606,"maType":"FOS","supportFunction":11,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-3982.94,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3982.94,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3982.94,"maPriority":"Normal","assistanceRequested":"Amendment #1 - De-obligate funds in the amount of $3,982.94\r\n\r\nUSDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested\r\nThis replaces previous MA FL-23082403-USDA-APH-01","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4de1ae3a-02a1-4327-833b-0cf01abaf08b","hash":"6306f2c341be18aa9348b514af98f39f8a9ddb86","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-APH02","maAmendNumber":0,"actionId":446194,"maType":"FOS","supportFunction":11,"priority":"Normal","region":4,"stt":"FL","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"USDA liaison(s) to the RRCC, IOF, JFO, or other FEMA teams or facilities as requested\r\nThis replaces previous MA FL-23082403-USDA-APH-01","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or facilities in support of disaster operations.\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a1663fbf-7416-4f08-a688-aea92a6bf359","hash":"c2f55f6c9529af1d7906c22bd52971ccaa74fb13","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-APH01","maAmendNumber":1,"actionId":451085,"maType":"FOS","supportFunction":11,"priority":"High","region":4,"stt":"FL","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-10-26T00:00:00.000Z","dateRequired":"2023-10-26T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-10-27T00:00:00.000Z","obligationAmount":-2669.24,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2669.24,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2669.24,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate all remaining funds of $2,669.24 and change PM to Charissa Keller.\r\nUSDA liaison(s) to the NRCC, FEMA teams, or other facilities. This MA replaces MA_3596EM-FL-USDA-APH-01. \r\n","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"5910472b-f2f3-4504-826e-28b4c98dfc65","hash":"cf4c593a6e7e8408ab7014e358a9b9481d6b048a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLUSDA-APH01","maAmendNumber":0,"actionId":446069,"maType":"FOS","supportFunction":11,"priority":"High","region":4,"stt":"FL","agencyId":"USDA-APH","agency":"USDA-APHIS (ANIM/PLANT HEALTH","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"USDA liaison(s) to the NRCC, FEMA teams, or other facilities. This MA replaces MA_3596EM-FL-USDA-APH-01. \r\n","statementOfWork":"As directed by and in coordination with FEMA, US Dept of Agriculture (USDA) will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f3b4a075-c70f-48ef-887e-4c25d56a4c8e","hash":"25d7fd5e6e30ba96f9b83f79d2850ba70f6b3242","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLTREAS02","maAmendNumber":2,"actionId":448268,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"TREAS","agency":"DEPT OF TREASURY","authority":"Stafford Act","dateReceived":"2023-09-25T00:00:00.000Z","dateRequired":"2023-09-25T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-09-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"(SCF) Amendment #2 - As per SCF project manager, personnel are no longer needed they are mission complete change of POP to 9/30\r\n(SCF) Amendment #1 - De-obligate $1,932,672.40 in excess funds to adjust to current staffing needs. \r\n(SCF) IRS to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Internal Revenue Service will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nIRS will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ce45cb81-d10d-4006-a19f-81b0b104e90d","hash":"cdd659547699ebc106da327d5e423947322f0833","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLTREAS02","maAmendNumber":1,"actionId":446691,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"TREAS","agency":"DEPT OF TREASURY","authority":"Stafford Act","dateReceived":"2023-09-07T00:00:00.000Z","dateRequired":"2023-09-07T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-10-24T00:00:00.000Z","dateObligated":"2023-09-08T00:00:00.000Z","obligationAmount":-1932672.4,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1932672.4,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1932672.4,"maPriority":"High","assistanceRequested":"(SCF) Amendment #1 - De-obligate $1,932,672.40 in excess funds to adjust to current staffing needs. \r\n(SCF) IRS to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Internal Revenue Service will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nIRS will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d7545a6b-a43a-4f16-97d9-68415fc244d6","hash":"b6c5e7278605d269239118a64dad74493f0d15a5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLTREAS02","maAmendNumber":0,"actionId":446023,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"TREAS","agency":"DEPT OF TREASURY","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-09-02T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-10-24T00:00:00.000Z","dateObligated":"2023-08-31T00:00:00.000Z","obligationAmount":2621114,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2621114,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2621114,"maPriority":"High","assistanceRequested":"(SCF) IRS to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Internal Revenue Service will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nIRS will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ad160c12-1f70-458a-8c51-e5df54f2dcfc","hash":"5a49e443e352f31855d5e7b8602b87ec0a76e190","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLSBA02","maAmendNumber":3,"actionId":474406,"maType":"FOS","supportFunction":20,"priority":"High","region":4,"stt":"FL","agencyId":"SBA","agency":"SMALL BUSINESS ADMINISTRATION","authority":"Stafford Act","dateReceived":"2024-08-02T00:00:00.000Z","dateRequired":"2024-08-02T00:00:00.000Z","popStartDate":"2024-03-04T00:00:00.000Z","popEndDate":"2024-07-03T00:00:00.000Z","dateObligated":"2024-08-03T00:00:00.000Z","obligationAmount":-31208.37,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-31208.37,"maPopStartDate":"2024-03-04T00:00:00.000Z","maPopEndDate":"2024-07-03T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-31208.37,"maPriority":"High","assistanceRequested":"Amendment #3 - Per QULO Report 7-1-2024 de-obligate a total of $164,708.37.  This amendment will de-obligate $31,208.37 for fund code 06. The remaining $133,500.00 for fund 6D will be de-obligated on the next amendment.\r\nAmendment #2: Add additional funding of $53,766.00 and extend projected end date to 07/03/2024 \r\nAmendment #1: De-obligate $42.00 per 4/1/2024 ULO report.\r\nActivate the United States Small Business Administration (SBA) to provide appropriate Recovery Support Function (RSF) personnel in support of the National Disaster Recovery Framework (NDRF) and FEMA post-disaster recovery operations for DR-4734-FL Hurricane Idalia.","statementOfWork":"As directed by, and in coordination with FEMA, SBA will provide support to the Economic RSF (ERSF) Field Coordinator through onsite and virtual support to the FEMA led Interagency Recovery Coordination efforts and through engagement with community stakeholders. The SBA Field Coordinator will provide federal coordination and connections to the RSF coordinating, \r\nprimary, and supporting agencies, other Federal Agencies, state, local, and tribal partners, and the private sector as directed by FEMA. The support will be for Hurricane Idalia (Florida) in the federally declared areas.\r\nRecovery products may include, but are not limited to:\r\n&#xfffd;\tA Recovery Needs Assessment\r\n&#xfffd;\tDevelopment of Recovery Strategy (format TBD)\r\n&#xfffd;\tStakeholder and state and local partner engagements and/or trainings which may include small meetings as well as larger Economic Recovery Workshops, as determined to be valuable by stakeholders and SBA.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).  \r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.  \r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, \r\ndocumentation is necessary to ensure reimbursement (refer to Federal Personal Property Management Manual).\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"ba370b8e-1b06-4c34-bac1-af195957c27c","hash":"5946f82ecd7c8e17677754c3afc6a0e643548afe","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLSBA02","maAmendNumber":2,"actionId":466392,"maType":"FOS","supportFunction":20,"priority":"High","region":4,"stt":"FL","agencyId":"SBA","agency":"SMALL BUSINESS ADMINISTRATION","authority":"Stafford Act","dateReceived":"2024-05-09T00:00:00.000Z","dateRequired":"2024-05-09T00:00:00.000Z","popStartDate":"2024-03-04T00:00:00.000Z","popEndDate":"2024-07-03T00:00:00.000Z","dateObligated":"2024-05-13T00:00:00.000Z","obligationAmount":53766,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":53766,"maPopStartDate":"2024-03-04T00:00:00.000Z","maPopEndDate":"2024-07-03T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":53766,"maPriority":"High","assistanceRequested":"Amendment #2: Add additional funding of $53,766.00 and extend projected end date to 07/03/2024 \r\nAmendment #1: De-obligate $42.00 per 4/1/2024 ULO report.\r\nActivate the United States Small Business Administration (SBA) to provide appropriate Recovery Support Function (RSF) personnel in support of the National Disaster Recovery Framework (NDRF) and FEMA post-disaster recovery operations for DR-4734-FL Hurricane Idalia.","statementOfWork":"As directed by, and in coordination with FEMA, SBA will provide support to the Economic RSF (ERSF) Field Coordinator through onsite and virtual support to the FEMA led Interagency Recovery Coordination efforts and through engagement with community stakeholders. The SBA Field Coordinator will provide federal coordination and connections to the RSF coordinating, \r\nprimary, and supporting agencies, other Federal Agencies, state, local, and tribal partners, and the private sector as directed by FEMA. The support will be for Hurricane Idalia (Florida) in the federally declared areas.\r\nRecovery products may include, but are not limited to:\r\n&#xfffd;\tA Recovery Needs Assessment\r\n&#xfffd;\tDevelopment of Recovery Strategy (format TBD)\r\n&#xfffd;\tStakeholder and state and local partner engagements and/or trainings which may include small meetings as well as larger Economic Recovery Workshops, as determined to be valuable by stakeholders and SBA.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).  \r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.  \r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, \r\ndocumentation is necessary to ensure reimbursement (refer to Federal Personal Property Management Manual).\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"2c5028f6-4a4e-4806-9fe7-1067f08b0907","hash":"a6c2cf32b61691d8f04cb1d0adcf458b5330e5dd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLSBA02","maAmendNumber":1,"actionId":465155,"maType":"FOS","supportFunction":20,"priority":"High","region":4,"stt":"FL","agencyId":"SBA","agency":"SMALL BUSINESS ADMINISTRATION","authority":"Stafford Act","dateReceived":"2024-04-26T00:00:00.000Z","dateRequired":"2024-04-26T00:00:00.000Z","popStartDate":"2024-03-04T00:00:00.000Z","popEndDate":"2024-06-02T00:00:00.000Z","dateObligated":"2024-04-30T00:00:00.000Z","obligationAmount":-42,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-42,"maPopStartDate":"2024-03-04T00:00:00.000Z","maPopEndDate":"2024-07-03T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-42,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $42.00 per 4/1/2024 ULO report.\r\nActivate the United States Small Business Administration (SBA) to provide appropriate Recovery Support Function (RSF) personnel in support of the National Disaster Recovery Framework (NDRF) and FEMA post-disaster recovery operations for DR-4734-FL Hurricane Idalia.","statementOfWork":"As directed by, and in coordination with FEMA, SBA will provide support to the Economic RSF (ERSF) Field Coordinator through onsite and virtual support to the FEMA led Interagency Recovery Coordination efforts and through engagement with community stakeholders. The SBA Field Coordinator will provide federal coordination and connections to the RSF coordinating, \r\nprimary, and supporting agencies, other Federal Agencies, state, local, and tribal partners, and the private sector as directed by FEMA. The support will be for Hurricane Idalia (Florida) in the federally declared areas.\r\nRecovery products may include, but are not limited to:\r\n&#xfffd;\tA Recovery Needs Assessment\r\n&#xfffd;\tDevelopment of Recovery Strategy (format TBD)\r\n&#xfffd;\tStakeholder and state and local partner engagements and/or trainings which may include small meetings as well as larger Economic Recovery Workshops, as determined to be valuable by stakeholders and SBA.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).  \r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.  \r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, \r\ndocumentation is necessary to ensure reimbursement (refer to Federal Personal Property Management Manual).\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"ea2f41d0-3e60-413a-8e0a-956a91e83a41","hash":"e365753a6882736ba805f1139998ed92604e1c7a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLSBA02","maAmendNumber":0,"actionId":459938,"maType":"FOS","supportFunction":20,"priority":"High","region":4,"stt":"FL","agencyId":"SBA","agency":"SMALL BUSINESS ADMINISTRATION","authority":"Stafford Act","dateReceived":"2024-02-27T00:00:00.000Z","dateRequired":"2024-02-26T00:00:00.000Z","popStartDate":"2024-03-04T00:00:00.000Z","popEndDate":"2024-06-02T00:00:00.000Z","dateObligated":"2024-02-29T00:00:00.000Z","obligationAmount":163542,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":163542,"maPopStartDate":"2024-03-04T00:00:00.000Z","maPopEndDate":"2024-07-03T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":163542,"maPriority":"High","assistanceRequested":"Activate the United States Small Business Administration (SBA) to provide appropriate Recovery Support Function (RSF) personnel in support of the National Disaster Recovery Framework (NDRF) and FEMA post-disaster recovery operations for DR-4734-FL Hurricane Idalia.","statementOfWork":"As directed by, and in coordination with FEMA, SBA will provide support to the Economic RSF (ERSF) Field Coordinator through onsite and virtual support to the FEMA led Interagency Recovery Coordination efforts and through engagement with community stakeholders. The SBA Field Coordinator will provide federal coordination and connections to the RSF coordinating, \r\nprimary, and supporting agencies, other Federal Agencies, state, local, and tribal partners, and the private sector as directed by FEMA. The support will be for Hurricane Idalia (Florida) in the federally declared areas.\r\nRecovery products may include, but are not limited to:\r\n&#xfffd;\tA Recovery Needs Assessment\r\n&#xfffd;\tDevelopment of Recovery Strategy (format TBD)\r\n&#xfffd;\tStakeholder and state and local partner engagements and/or trainings which may include small meetings as well as larger Economic Recovery Workshops, as determined to be valuable by stakeholders and SBA.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).  \r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.  \r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, \r\ndocumentation is necessary to ensure reimbursement (refer to Federal Personal Property Management Manual).\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided","id":"97606ec6-44c2-4557-a35c-86e7d2e5c1fc","hash":"595eaf66314c0211921bad8cbde815527da282c8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLSBA01","maAmendNumber":1,"actionId":451605,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"SBA","agency":"SMALL BUSINESS ADMINISTRATION","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"Normal","assistanceRequested":"Amendment #1 - De-obligate funds in the amount of $5,000.00\r\nActivate SBA to the NRCC. This MA replaces 3596EMFL-SBA-01","statementOfWork":"As directed by and in coordination with FEMA, Small Business Administration (SBA) will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been\r\nprovided.","id":"0b49edea-5ef3-4081-b093-6d1cdf97c89b","hash":"620b8c3884f8d3fbd53d880f428872457063458c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLSBA01","maAmendNumber":0,"actionId":446110,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"SBA","agency":"SMALL BUSINESS ADMINISTRATION","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Activate SBA to the NRCC. This MA replaces 3596EMFL-SBA-01","statementOfWork":"As directed by and in coordination with FEMA, Small Business Administration (SBA) will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and\r\nsupported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional\r\nobligations may be withheld if no invoicing, ULO Validation, or additional justification has been\r\nprovided.","id":"eca67f95-c601-44a0-9843-4728d7e959c9","hash":"175bff47e1789fe510b91cd2ee94574b07906a55","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLNGA01","maAmendNumber":1,"actionId":451593,"maType":"FOS","supportFunction":9,"priority":"Normal","region":4,"stt":"FL","agencyId":"NGA","agency":"NATL GEOSPATIAL-INTELLIGENCY","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-42343.01,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-42343.01,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-42343.01,"maPriority":"Normal","assistanceRequested":"Amendment # 1 - De-obligate funds in the amount of $42,343.01\r\n\r\nNGA Geospatial Intelligence (GEOINT) support to the FEMA Urban Search and Rescue (US&amp;R) Red Incident Support Team.\r\nThis MA replaces MA 3596EM-FL-NGA-01","statementOfWork":"As directed by and in coordination with FEMA, National Geospatial-Intelligence Agency (NGA) will deploy Geospatial Analyst Team(s) to assist the Urban Search &amp; Rescue (US&amp;R) Incident Support Team and deployed task forces in support of the TC Idalia response.\r\nSupport may include, but is not limited to, the following:\r\n- MGST Trailer\r\n- NGA analysts to provide analytical expertise\r\n- NGA operational support staff including contractors to support operations, satellite communications, and sheltering and feeding of NGA staff (a total of 3 personnel to provide mobile GEOINT)\r\nNGA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"4f9cdb0d-45b8-4fc1-a96b-727b3e0460dc","hash":"c5f1d19c00edbe35d9f63be74a4f32ba120f5068","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLNGA01","maAmendNumber":0,"actionId":446224,"maType":"FOS","supportFunction":9,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"NGA","agency":"NATL GEOSPATIAL-INTELLIGENCY","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":49000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":49000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":49000,"maPriority":"Normal","assistanceRequested":"NGA Geospatial Intelligence (GEOINT) support to the FEMA Urban Search and Rescue (US&amp;R) Red Incident Support Team.\r\nThis MA replaces MA 3596EM-FL-NGA-01","statementOfWork":"As directed by and in coordination with FEMA, National Geospatial-Intelligence Agency (NGA) will deploy Geospatial Analyst Team(s) to assist the Urban Search &amp; Rescue (US&amp;R) Incident Support Team and deployed task forces in support of the TC Idalia response.\r\nSupport may include, but is not limited to, the following:\r\n- MGST Trailer\r\n- NGA analysts to provide analytical expertise\r\n- NGA operational support staff including contractors to support operations, satellite communications, and sheltering and feeding of NGA staff (a total of 3 personnel to provide mobile GEOINT)\r\nNGA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"68ab96ad-4db0-467e-8bbd-6b16a5371981","hash":"63ecb696fbcab9f1648835d8fdc68e8a3af83b56","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLHUD01","maAmendNumber":0,"actionId":446097,"maType":"FOS","supportFunction":6,"priority":"High","region":4,"stt":"FL","agencyId":"HUD","agency":"HUD (ADMIN SUPPORT OFFICES)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate HUD to NRCC or other teams and facilities. ","statementOfWork":"As directed by and in coordination with FEMA, Housing &amp; Urban Development (HUD) will provide appropriate personnel to NRCC or other teams and facilities as requested to support disaster operations. \r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c41bffbd-4459-480a-b542-af9b29145167","hash":"5b8e77b60f7a5d355a74fd3f51ccb6d0e8a46464","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLHHS-ASPR04","maAmendNumber":0,"actionId":446128,"maType":"FOS","supportFunction":8,"priority":"High","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":12500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":12500,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":12500,"maPriority":"High","assistanceRequested":"Activate HHS to NRCC.This MA replaces 3596EM-FL-HHS-ASPR- 01. ","statementOfWork":"As directed by and in coordination with FEMA, Health &amp; Human Services (HHS) will provide appropriate personnel to the NRCC and other teams/facilities to support FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"131cecca-2913-4d0b-85d1-5c47ce1d853f","hash":"2796a98fb44cd23ebddd7c0f847526be89467e13","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLHHS-ASPR03","maAmendNumber":1,"actionId":447978,"maType":"FOS","supportFunction":8,"priority":"Normal","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-09-20T00:00:00.000Z","dateRequired":"2023-09-20T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-11-01T00:00:00.000Z","dateObligated":"2023-09-20T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-11-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #1 - Extend projected end date to 11/01/2023\r\nActivate HHS for FOS pre-landfall staging and support of appropriate HHS personnel to perform the functions of ESF-8 capabilities in the RRCC, IOF, JFO, Incident Management Assistance Team (IMAT), Preliminary Damage Assessment (PDA) Team, or other public health/medical teams and subject matter experts at various locations to support disaster operations. \r\nReplaces previous MA FL-23082403-HHS-ASPR-01\r\n","statementOfWork":"Support R4 IMAT, pre-landfall staging and support of appropriate HHS personnel to perform the functions of ESF-8 capabilities in the RRCC, IOF, JFO, Incident Management Assistance Team (IMAT), Preliminary Damage Assessment (PDA) Team, or other public health/medical teams and subject matter experts at various locations to support disaster operations. Cost estimate for seven days follows:\r\nIncremental Personnel Compensation Costs (Object Class 11): $23,909.40\r\nTravel and Transportation of Personnel (Object Class 21): $50,332.00\r\nTransportation of Things (Object Class 22): $0\r\nOther Contractor services (Object Class 25): $0\r\nSupplies and Materials (Object Class 26): $0\r\nTOTAL COST $74,241.40","id":"98dda50d-fc07-463f-8246-93a0dca048d1","hash":"3b108ea9d47fe625280ca2589566bac10aad5bc8","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLHHS-ASPR03","maAmendNumber":0,"actionId":446074,"maType":"FOS","supportFunction":8,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-11T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":4469451,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":4469451,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-11-01T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":4469451,"maPriority":"Normal","assistanceRequested":"Activate HHS for FOS pre-landfall staging and support of appropriate HHS personnel to perform the functions of ESF-8 capabilities in the RRCC, IOF, JFO, Incident Management Assistance Team (IMAT), Preliminary Damage Assessment (PDA) Team, or other public health/medical teams and subject matter experts at various locations to support disaster operations. \r\nReplaces previous MA FL-23082403-HHS-ASPR-01\r\n","statementOfWork":"Support R4 IMAT, pre-landfall staging and support of appropriate HHS personnel to perform the functions of ESF-8 capabilities in the RRCC, IOF, JFO, Incident Management Assistance Team (IMAT), Preliminary Damage Assessment (PDA) Team, or other public health/medical teams and subject matter experts at various locations to support disaster operations. Cost estimate for seven days follows:\r\n\r\nIncremental Personnel Compensation Costs (Object Class 11): $23,909.40\r\nTravel and Transportation of Personnel (Object Class 21): $50,332.00\r\nTransportation of Things (Object Class 22): $0\r\nOther Contractor services (Object Class 25): $0\r\nSupplies and Materials (Object Class 26): $0\r\nTOTAL COST $74,241.40","id":"f81a2c1e-ae64-424b-97a8-8dcf587d234f","hash":"265cd0722ee1dfadfe65b18ceb72953995ac8235","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLHHS-ASPR02","maAmendNumber":1,"actionId":447169,"maType":"DFA","supportFunction":8,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-09-12T00:00:00.000Z","dateRequired":"2023-09-12T00:00:00.000Z","popStartDate":"2023-08-31T00:00:00.000Z","popEndDate":"2023-10-05T00:00:00.000Z","dateObligated":"2023-09-14T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-31T00:00:00.000Z","maPopEndDate":"2023-10-05T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Life Sustaining","assistanceRequested":"Amendment 01: Amend to extend to 10/05/2023 no additional funds at this time. \r\nState of Florida requests DMATs with billeting package and DMAT cache to support and augment Florida&#39;s Medical System. To provide health and medical care within the healthcare infrastructure for individuals impacted by Hurricane Idalia. Initial request is for 2","statementOfWork":"In support of Florida Department of Health as directed by FEMA, HHS will provide and execute lifesaving and life-sustaining Federal ESF-8 public health and medical assets, personnel, and associated equipment caches in support of the 2023 Idalia response. Assets to be supported by HHS Incident Management Team (IMT), engaging personnel and necessary equipment caches.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual)\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"1e6e8df2-0d1c-4b74-bf6f-b6974d83a4fb","hash":"6b8bd4c20ad5ab0ec69d6dcb180ff0746d446782","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLHHS-ASPR02","maAmendNumber":0,"actionId":446071,"maType":"DFA","supportFunction":8,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-31T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":1706980,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":426745,"fedCostShareAmt":1280235,"maPopStartDate":"2023-08-31T00:00:00.000Z","maPopEndDate":"2023-10-05T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":426745,"maFedCostShareAmount":1280235,"maPriority":"Life Sustaining","assistanceRequested":"State of Florida requests DMATs with billeting package and DMAT cache to support and augment Florida&#39;s Medical System. To provide health and medical care within the healthcare infrastructure for individuals impacted by Hurricane Idalia. Initial request is for 2","statementOfWork":"In support of Florida Department of Health as directed by FEMA, HHS will provide and execute lifesaving and life-sustaining Federal ESF-8 public health and medical assets, personnel, and associated equipment caches in support of the 2023 Idalia response. Assets to be supported by HHS Incident Management Team (IMT), engaging personnel and necessary equipment caches.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual)\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"16d3ac34-8544-4e1d-8eb1-638364d7619f","hash":"2e32bb9cbcf3539fe0f9880a6ab9657ba01e7eaf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLHHS-ASPR01","maAmendNumber":0,"actionId":446036,"maType":"DFA","supportFunction":8,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"HHS-ASPR","agency":"HHS-ASPR (ASST SEC/PREP-RESP)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-30T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-14T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":2005206,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":501301.5,"fedCostShareAmt":1503904.5,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-14T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":501301.5,"maFedCostShareAmount":1503904.5,"maPriority":"Life Sustaining","assistanceRequested":"Health and Medical Task Forces (HMTF) and appropriate equipment to provide clinical care.  Initial request is for 2 teams","statementOfWork":"In support of the Florida Department of Health and as directed by FEMA, HHS will provide and execute lifesaving and life sustaining Federal ESF-8 public health and medical assets, personnel and associated equipment caches in support of the 2023 Idalia response. Assets to be supported by HHS Incident Management Team (IMT), engaging personnel and necessary equipment caches.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. (refer Federal Personal Property Management Manual)\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2).\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2eab499c-68d7-41b1-981e-2d06f4e9ecb7","hash":"a895218b35ce65be4618b53c3c2fd1bb8cc4c9ab","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLGSA03","maAmendNumber":1,"actionId":465130,"maType":"FOS","supportFunction":15,"priority":"Normal","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-04-26T00:00:00.000Z","dateRequired":"2024-04-26T00:00:00.000Z","popStartDate":"2023-09-09T00:00:00.000Z","popEndDate":"2023-10-24T00:00:00.000Z","dateObligated":"2024-04-30T00:00:00.000Z","obligationAmount":-104844.5,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-104844.5,"maPopStartDate":"2023-09-09T00:00:00.000Z","maPopEndDate":"2023-10-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-104844.5,"maPriority":"Normal","assistanceRequested":"(SCF) Amendment #1: De-obligate $104,844.50 per 4/1/2024 QULO report.\r\n(SCF) Requesting External Affairs support for DR 4734 FL","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMAs disaster operations. GSA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022. \r\n Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF). \r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"ac5e2f46-7a25-4389-9e64-1f68fd30ab86","hash":"75a1d63a9ec848c6cfec93639d981c6426d87d31","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLGSA03","maAmendNumber":0,"actionId":446838,"maType":"FOS","supportFunction":15,"priority":"Normal","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-09-09T00:00:00.000Z","dateRequired":"2023-09-11T00:00:00.000Z","popStartDate":"2023-09-09T00:00:00.000Z","popEndDate":"2023-10-24T00:00:00.000Z","dateObligated":"2023-09-09T00:00:00.000Z","obligationAmount":104844.5,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":104844.5,"maPopStartDate":"2023-09-09T00:00:00.000Z","maPopEndDate":"2023-10-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":104844.5,"maPriority":"Normal","assistanceRequested":"(SCF) Requesting External Affairs support for DR 4734 FL","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMAs disaster operations. GSA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022. \r\n Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF). \r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nAll equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement. \r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency. \r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"09e7e102-8f4e-4b73-be93-fa3157e0f489","hash":"d4c8d4683c549b26380428622e80b94f4ad5a179","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLGSA01","maAmendNumber":1,"actionId":464903,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2024-04-25T00:00:00.000Z","dateRequired":"2024-04-25T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-04-29T00:00:00.000Z","obligationAmount":-2639.09,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2639.09,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2639.09,"maPriority":"High","assistanceRequested":"Amendment 1: De-obligate $2,639.09 per the OFA&#39;s response to the 04-01-2024 QULO and change PM to Christel Lugo. \r\nActivate GSA to NRCC, or other teams and facilities as requested. This MA replaces 3596EM-FL-GSA- 01.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n - ESF7 support\r\n - Emergency leasing services for needed space/facilities as requested by FEMA\r\n - GSA Lease Contracting Officers (LCOs) and others as needed\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d1084042-02a3-4452-a7e7-5c3718ed030a","hash":"cf5f15ff51f9a531fd7ba0ae8316cc736ca81c49","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLGSA01","maAmendNumber":0,"actionId":446093,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"GSA","agency":"GSA (GEN SERVICE ADMIN)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate GSA to NRCC, or other teams and facilities as requested. This MA replaces 3596EM-FL-GSA- 01.","statementOfWork":"As directed by and in coordination with FEMA, General Services Administration (GSA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested in support of disaster operations.\r\nActivities may include, but are not limited to, the following:\r\n - ESF7 support\r\n - Emergency leasing services for needed space/facilities as requested by FEMA\r\n - GSA Lease Contracting Officers (LCOs) and others as needed\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"bb278470-d292-4ca7-a9e5-f3384723d598","hash":"77e36d45c7c3263e1f862ebfbaf1254667548f53","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLFCC01","maAmendNumber":0,"actionId":446162,"maType":"FOS","supportFunction":2,"priority":"High","region":4,"stt":"FL","agencyId":"FCC","agency":"FCC (FED COMMUNICATIONS COMM) ","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":61100,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":61100,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":61100,"maPriority":"High","assistanceRequested":"FCC Cell survey management coordination, initial up to 2 teams.  This replaces FL-23082403-FCC-01.","statementOfWork":"As directed by and in coordination with FEMA, Federal Communications Commission (FCC) will deploy cell survey teams and equipment to determine the impact to public safety and EAS communications systems in the affected area and identify surviving and non-working systems in support of disaster operations.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9c20d4b8-e0f1-4266-b796-5b092df838a8","hash":"2429aa24dcd4d29183b6d0696feb2b6c20b5b698","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLEPA06","maAmendNumber":0,"actionId":446169,"maType":"FOS","supportFunction":10,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"EPA to NRCC or other teams and facilities as requested. \r\nThis MA replaces 3596EM-FL-EPA- 01. ","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nFunding for EPA command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"337060eb-a5e4-4922-8bf1-e83866a1a88f","hash":"91b8bec9ba140e002d94bc81dffc68c984691559","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLEPA05","maAmendNumber":0,"actionId":446272,"maType":"DFA","supportFunction":10,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-29T00:00:00.000Z","dateObligated":"2023-09-02T00:00:00.000Z","obligationAmount":59567,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":14891.75,"fedCostShareAmt":44675.25,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-29T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":14891.75,"maFedCostShareAmount":44675.25,"maPriority":"High","assistanceRequested":"Assess post land fall oil and hazardous material releases. Teams consist of two personnel each.\r\nThis MA replaces 3596EM-FL-EPA-03 ","statementOfWork":"Hazard Assessment Teams to assess oil and hazardous material releases post Hurricane Idalia landfall as a means to protect life safety of responders and citizens of Florida.\r\nTeams will deploy and stage post landfall with capability to conduct assessment. In support of State request, as directed by and in coordination with FEMA, Environmental Protection Agency, (EPA) will conduct oil and hazardous materials field operations, to assess hazardous materials and oil releases, orphaned containers and/or fixed facilities in support of FEMA disaster operations. These necessary emergency protective measures will mitigate actual and potential threats to public health and safety. Assess oil and hazardous material releases, orphaned containers and/or fixed facilities post landfall of Hurricane Idalia as a means to protect life safety of responders and citizens. In support of State request, as directed by and in coordination with FEMA, Environmental Protection Agency, (EPA) will conduct oil and hazardous materials field operations to assess oil.\r\nand hazardous material releases and orphaned containers and/or fixed facilities in support of FEMA disaster operations. \r\nThese necessary emergency protective measures will\r\nmitigate actual and potential threats to public health and safety. Teams will deploy and stage post landfall with capability to conduct assessment.  The mission assigned agency.\r\nis responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation.\r\nmaintained by the respective agency. \r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still\r\noperationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"af471cbe-7cb8-4dfa-99f7-d047f6413aa9","hash":"95c598f1b86ff83eb09d28a37599c419731c463a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLEPA04","maAmendNumber":0,"actionId":446124,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-10-04T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-10-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Water/Wastewater SME to NRCC - EPA Mission Assignment. This MA replaces 3596EMFL-EPA-02\r\n","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will deploy appropriate personnel to provide water and wastewater expertise to the NRCC, or other teams and facilities as requested to support disaster operations.\r\nEPA will coordinate with USACE/ESF-3 as appropriate.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency.\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157.\r\nFor MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3a1ef70e-d695-4226-af29-114cbc144f7e","hash":"38484948d730478096600ce3d4a245b6d38b5e2c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLEPA03","maAmendNumber":0,"actionId":446064,"maType":"FOS","supportFunction":10,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"Activate EPA to RRCC, IOF, JFO, or other teams and facilities as requested.  This replaces FL-23082403-EPA-02, adds additional funding of $10,000.00 and extends end date to 09/27/2023","statementOfWork":"As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO, or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to support disaster operations.\r\n- MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- All equipment and supply purchases must be coordinated with FEMA. Prior FAO approval is necessary to ensure reimbursement.\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies.\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"bc6c6a2b-552b-4fbc-a593-7e6dcf5f2c95","hash":"5651a176627657f801fcf1726a5ea880fc8ce6f3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLEPA02","maAmendNumber":0,"actionId":446058,"maType":"FOS","supportFunction":3,"priority":"High","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-30T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-13T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":170102,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":170102,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-13T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":170102,"maPriority":"High","assistanceRequested":"Activate EPA Water SME to identify needs &amp; facilitate information flow to support disaster operations.\r\nThis replaces MA FL-23082403-EPA-01-01","statementOfWork":" As directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will provide appropriate personnel to RRCC, IOF, JFO,\r\n or other regional, state, tribal, territorial, or local teams, including Rapid Needs Assessment Teams, and/or facilities as requested to supportassignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n All equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation is necessary to ensure\r\n reimbursement.\r\n (refer Federal Personal Property Management Manual) Activation of agency command center(s), if required, must be coordinated with FEMA as a\r\n separate MA. Work that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR\r\n 206.208(c)(2). The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are\r\n provided,\r\n and that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days\r\n with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may\r\n be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n","id":"baccaa8c-0d80-4920-9826-e97c56dd53a1","hash":"dc2f7cb68f109bbf5e0d96f57b8c70bf976241b1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLEPA01","maAmendNumber":1,"actionId":446279,"maType":"DFA","supportFunction":10,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-29T00:00:00.000Z","dateObligated":"2023-09-02T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-29T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Lifesaving","assistanceRequested":"Amendment #1 - Correct end date mis-entered previously, correct end date shoud be 09/29/2023.\r\nState of Florida requests Landfill Strike Teams to support and augment debris disposal and management operations in response to hurricane Idalia. This MA replaces 3596EM-FL-EPA-04.","statementOfWork":"In support of Florida request, as directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will conduct oil and hazardous materials field operations, including assessment, mitigation, cleanup and disposal of hazardous materials and oil and response to orphaned containers and/or fixed facilities in support of FEMA disaster operations. These necessary emergency protective measures will mitigate actual and potential threats to public health and safety. In close coordination with FEMA, EPA response operations may also include the following: household hazardous waste identification, collection, and disposal evaluating and monitoring immediate public health and safety threats or hazards resulting from debris removal operations The assistance may include response to eliminate or lessen immediate threats to lives, public health, or safety emanating from actual or potential releases and/or discharges; Support of field personnel by EPA personnel deployed virtually; providing specialized expertise related to oil/hazmat impacts or release; conducting damage assessment of oil/hazmat impact via air, soil, and/or water; contractor oversight; and/or response, removal, mitigation, staging or disposal oversight of actual and potential oil discharges and releases of hazardous materials. EPA will coordinate activities involving contaminated debris with USACE as appropriate. Actions may include support by any special teams requested by the Federal on Scene Coordinator (FOSC) and in coordination with FEMA, as well as special technical assets of all ESF #10 support agencies. EPA is responsible for providing personnel and/or equipment necessary to accomplish the mission. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.  Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.  The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency   MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"6e7a085c-e679-4ba2-b378-e51348706b84","hash":"5b5b5f6a9b6a7f4a2831d9ad979e2355adf1c0cc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLEPA01","maAmendNumber":0,"actionId":446034,"maType":"DFA","supportFunction":10,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"EPA","agency":"EPA (ENVIRON. PROTECTION AGY)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-30T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":255288,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":63822,"fedCostShareAmt":191466,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-29T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":63822,"maFedCostShareAmount":191466,"maPriority":"Lifesaving","assistanceRequested":"State of Florida requests Landfill Strike Teams to support and augment debris disposal and management operations in response to hurricane Idalia. This MA replaces 3596EM-FL-EPA-04.","statementOfWork":"In support of Florida request, as directed by and in coordination with FEMA, Environmental Protection Agency (EPA) will conduct oil and hazardous materials field operations, including assessment, mitigation, cleanup and disposal of hazardous materials and oil and response to orphaned containers and/or fixed facilities in support of FEMA disaster operations. These necessary emergency protective measures will mitigate actual and potential threats to public health and safety. In close coordination with FEMA, EPA response operations may also include the following: household hazardous waste identification, collection, and disposal evaluating and monitoring immediate public health and safety threats or hazards resulting from debris removal operations The assistance may include response to eliminate or lessen immediate threats to lives, public health, or safety emanating from actual or potential releases and/or discharges; Support of field personnel by EPA personnel deployed virtually; providing specialized expertise related to oil/hazmat impacts or release; conducting damage assessment of oil/hazmat impact via air, soil, and/or water; contractor oversight; and/or response, removal, mitigation, staging or disposal oversight of actual and potential oil discharges and releases of hazardous materials. EPA will coordinate activities involving contaminated debris with USACE as appropriate. Actions may include support by any special teams requested by the Federal on Scene Coordinator (FOSC) and in coordination with FEMA, as well as special technical assets of all ESF #10 support agencies. EPA is responsible for providing personnel and/or equipment necessary to accomplish the mission. MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.  Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.  The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency   MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"0fa2062b-6dcd-47a1-a367-b3b878d7469c","hash":"c15ef8987cf5f4275c705e885e5608cab194e63f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOT02","maAmendNumber":2,"actionId":465129,"maType":"FOS","supportFunction":1,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-04-26T00:00:00.000Z","dateRequired":"2024-04-26T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2024-04-30T00:00:00.000Z","obligationAmount":-12990.26,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-12990.26,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-12990.26,"maPriority":"Normal","assistanceRequested":"Amendment #2 - De-obligate $12,990.26 per 4/1/2024 QULO report.\r\nAmendment #1 - Correct start date from 08/28/2023 to 08/27/2023\r\nActivate DOT to RRCC. IOF, JFO, or others teams and facilities as requested. This replaces FL-23082403-DOT-01.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate (max 3) personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d3f12286-b874-4f17-a87a-d152dea081e0","hash":"04c7ddbb9c236e2711e622be54f1cf0b10afd48d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOT02","maAmendNumber":1,"actionId":446508,"maType":"FOS","supportFunction":1,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-09-06T00:00:00.000Z","dateRequired":"2023-09-06T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-09-06T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendmennt #1 - Correct start date from 08/28/2023 to 08/27/2023\r\nActivate DOT to RRCC. IOF, JFO, or others teams and facilities as requested. This replaces FL-23082403-DOT-01.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate (max 3) personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"61bbace8-2114-4c4c-94f4-c103e5e0eaf9","hash":"6d6a72824ee2377638fd433a67ecf3377c6dfabe","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOT02","maAmendNumber":0,"actionId":446089,"maType":"FOS","supportFunction":1,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"Normal","assistanceRequested":"Activate DOT to RRCC. IOF, JFO, or others teams and facilities as requested. This replaces FL-23082403-DOT-01.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate (max 3) personnel to RRCC, IOF, JFO, or others teams and facilities as requested.\r\n\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9669c444-bb2e-45b4-b2e2-6f60913ccf8d","hash":"62a4dc470c9b9e8e4b4f7cec402b32b6ecdecf4f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOT01","maAmendNumber":2,"actionId":464855,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-04-25T00:00:00.000Z","dateRequired":"2024-04-25T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-04-25T00:00:00.000Z","obligationAmount":-3194.45,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3194.45,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3194.45,"maPriority":"High","assistanceRequested":"Amendment 2 to deobligate $3,194.45 per QULO. Change PM to Daniel Carpenter.\r\nAmendment #1: De-Obligation of $6,200.00. As Confirmed by the ULO Report. Change PM to Kevin Stewart.\r\nActivate DOT to NRCC.\r\nThis MA Replaces 3596EM-FL-DOT-01 and extends the POP to 30 days.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"01479f97-4aaf-4051-a7cf-905017e3419c","hash":"bdf0004fe13a068b9cf18d61e10e9b93d4267e86","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOT01","maAmendNumber":1,"actionId":458754,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-13T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-02-21T00:00:00.000Z","obligationAmount":-6200,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-6200,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-6200,"maPriority":"High","assistanceRequested":"Amendment #1: De-Obligation of $6,200.00. As Confirmed by the ULO Report. Change PM to Kevin Stewart.\r\nActivate DOT to NRCC.\r\nThis MA Replaces 3596EM-FL-DOT-01 and extends the POP to 30 days.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f58dae63-dba9-481e-b5b9-c04f95e09be0","hash":"491fa095e5914f72ffb9ff15bfc25cac18c85aa7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOT01","maAmendNumber":0,"actionId":445942,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DOT","agency":"DOT (DEPT OF TRANSPORT-S/E)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-04T00:00:00.000Z","obligationAmount":14800,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":14800,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":14800,"maPriority":"High","assistanceRequested":"Activate DOT to NRCC.\r\nThis MA Replaces 3596EM-FL-DOT-01 and extends the POP to 30 days.\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Transportation (DOT) will provide appropriate personnel to NRCC, or others teams and facilities as requested.\r\nFunding for DOT command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"60dc84b7-85f8-47c4-88c0-fd9c8ab9c145","hash":"e1f79c1aeea98e5502fd17a7c6cf89b23aaacfff","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOJ-ATF02","maAmendNumber":1,"actionId":474405,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2024-08-02T00:00:00.000Z","dateRequired":"2024-08-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-28T00:00:00.000Z","dateObligated":"2024-08-03T00:00:00.000Z","obligationAmount":-440000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-440000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-440000,"maPriority":"Lifesaving","assistanceRequested":"Amendment #1 - De-obligate $440,000.00 per QULO Report 7/1/2024\r\nDepartment of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST), LNOs to State EOC and RRCC, Incident/Management Teams and Mobile Command Vehicle/ (MCV)Mobile Bunk Houses (MBH) as required to provide force protection in support of disaster operations. This is a re-issue of FL-23082403-DOJ-ATF-02. ","statementOfWork":"As directed by and in coordination with FEMA, the Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST) Incident Management personnel, Management Support Team personnel, RRCC LNOs and State EOC LNOs as required to incident supervision, coordination and force protection in support of disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"68bfb904-07c8-47f5-b5b2-1c1c4975f2c9","hash":"51a065ddcce5d2ca1f96019d9b9c5bdd6f65736d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOJ-ATF02","maAmendNumber":0,"actionId":446142,"maType":"FOS","supportFunction":13,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"DOJ-ATF","agency":"DOJ-ATF (ALCOHOL,TOBACCO,FIRE","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-28T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":1435000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":1435000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":1435000,"maPriority":"Lifesaving","assistanceRequested":"Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST), LNOs to State EOC and RRCC, Incident/Management Teams and Mobile Command Vehicle/ (MCV)Mobile Bunk Houses (MBH) as required to provide force protection in support of disaster operations. This is a re-issue of FL-23082403-DOJ-ATF-02. ","statementOfWork":"As directed by and in coordination with FEMA, the Department of Justice/ATF will provide Federal Law enforcement officer (FLEO) Law Enforcement Strike Teams (LEST) Incident Management personnel, Management Support Team personnel, RRCC LNOs and State EOC LNOs as required to incident supervision, coordination and force protection in support of disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b9ae8ac5-2729-422f-8d2e-f16d001c3d55","hash":"c5d219202b5a8746e2a1bfffeeca61607b912822","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOI-WCF01","maAmendNumber":1,"actionId":451583,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-3000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-3000,"maPriority":"Normal","assistanceRequested":"Amendment #1 - De-obligate funds in the amount of $3,000.00\r\n\r\nActivate DOI to NRCC. This MA replaces MA 3596EMFL-DOI-WCF-01\r\n","statementOfWork":"As directed by and in coordination with FEMA, DOI will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA response operations.\r\nFunding for DOI command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"cb77e3a5-632d-496c-b4c0-54e65958a538","hash":"64a2ab879f337062b7e5ee5599309a66d6043934","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOI-WCF01","maAmendNumber":0,"actionId":446081,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOI-WCF","agency":"DOI-WCF (DEPT MANAGEMENT)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate DOI to NRCC. This MA replaces MA 3596EMFL-DOI-WCF-01\r\n","statementOfWork":"As directed by and in coordination with FEMA, DOI will provide appropriate personnel to the NRCC, FEMA teams, or other facilities in support of FEMA response operations.\r\nFunding for DOI command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d02963bc-3208-4986-889b-4f00d1fdcf5a","hash":"b095c0336953b7b5cfbd3f30553ea293b2eda79d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOI-NPS01","maAmendNumber":1,"actionId":458767,"maType":"FOS","supportFunction":9,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"DOI-NPS","agency":"DOI-NPS (NATL PARK SVC)","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-13T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-02-21T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Lifesaving","assistanceRequested":"Amendment #1: De-Obligation of $10,000. As Confirmed by the ULO Report. Change PM to Kevin Stewart.\r\nDOI/NPS representative(s) as part of the Federal Search and Rescue Coordination Group (FSARCG) in support of TC Idalia operations. This MA replaces 3596EM-FL-DOI-NPS- 01. ","statementOfWork":"As directed by and in coordination with FEMA, DOI/NPS will provide personnel to support the Federal Search &amp; Rescue Coordination Group (FSARCG) mission and will direct deployment of an FSARCG representative to a location determined by the FEMA Urban Search and Rescue (US&amp;R) Incident Support Team (IST).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3cb84279-31c2-477a-b790-ac80f72d9091","hash":"905c95b2fe275c56cf9a9efa845a541b4aa230b6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOI-NPS01","maAmendNumber":0,"actionId":446130,"maType":"FOS","supportFunction":9,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"DOI-NPS","agency":"DOI-NPS (NATL PARK SVC)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Lifesaving","assistanceRequested":"DOI/NPS representative(s) as part of the Federal Search and Rescue Coordination Group (FSARCG) in support of TC Idalia operations. This MA replaces 3596EM-FL-DOI-NPS- 01. ","statementOfWork":"As directed by and in coordination with FEMA, DOI/NPS will provide personnel to support the Federal Search &amp; Rescue Coordination Group (FSARCG) mission and will direct deployment of an FSARCG representative to a location determined by the FEMA Urban Search and Rescue (US&amp;R) Incident Support Team (IST).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"cad96dfc-811e-48ba-907c-29f21b2f2a60","hash":"c38ec07cf58204663fbe18c883ee112b9ba940a4","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOE-OE02","maAmendNumber":1,"actionId":458753,"maType":"FOS","supportFunction":12,"priority":"High","region":4,"stt":"FL","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-13T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2024-02-21T00:00:00.000Z","obligationAmount":-7382.41,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-7382.41,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-7382.41,"maPriority":"High","assistanceRequested":"Amendment #1: De-Obligation of $7,382.41. As Confirmed by the ULO Report. Change PM to Kevin Stewart.\r\nActivate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested to include virtual support. This replaces FL-23082403-DOE-01.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e98a35ab-54cb-4869-8c4b-0aaf3931040a","hash":"c9cb60e4312182673aa3278bda57beeb6dc25c46","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOE-OE02","maAmendNumber":0,"actionId":446175,"maType":"FOS","supportFunction":12,"priority":"High","region":4,"stt":"FL","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-15T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-15T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"High","assistanceRequested":"Activate DOE to RRCC. IOF, JFO, or other team(s) &amp; facilities as requested to include virtual support. This replaces FL-23082403-DOE-01.","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the RRCC, IOF, JFO, SEOC, or other team(s) or facilities as requested to perform the functions of ESF-12 in support of disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2e0268a5-3ee4-4085-a26f-3a433f4aab2f","hash":"7d2fae9ebe593cab4e430ddf44823d78cf851d71","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOE-OE01","maAmendNumber":1,"actionId":464900,"maType":"FOS","supportFunction":12,"priority":"High","region":4,"stt":"FL","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2024-04-25T00:00:00.000Z","dateRequired":"2024-04-25T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-04-25T00:00:00.000Z","obligationAmount":-10844.19,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10844.19,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10844.19,"maPriority":"High","assistanceRequested":"Amendment 1 to deobligate  $10,844.19 per QULO. Change PM to Daniel Carpenter.\r\nActivate DOE to the NRCC. This MA replaces MA_3596EM-FL-DOE-OE- 01. ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the NRCC to perform the functions of ESF-12 in support disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"5ed4a0b9-378f-4568-bfb8-03ea1030284b","hash":"5c9e4015c1d6cf52046cb07360c569e77adf6c48","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOE-OE01","maAmendNumber":0,"actionId":446094,"maType":"FOS","supportFunction":12,"priority":"High","region":4,"stt":"FL","agencyId":"DOE-OE","agency":"DOE-OE (ELEC DELIVERY / ENERG","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":19380,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":19380,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":19380,"maPriority":"High","assistanceRequested":"Activate DOE to the NRCC. This MA replaces MA_3596EM-FL-DOE-OE- 01. ","statementOfWork":"As directed by and in coordination with FEMA, Dept of Energy (DOE) will provide appropriate personnel to the NRCC to perform the functions of ESF-12 in support disaster operations\r\nFunding for DOE command center(s), if authorized by FEMA, will be provided under a separate MA.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"41e5484d-7c69-44bf-b6ad-89db48b350a6","hash":"17e759bdd897764caf4db980af4c6c686ade2bcf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-USAF04","maAmendNumber":1,"actionId":465101,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-04-26T00:00:00.000Z","dateRequired":"2024-04-26T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2024-04-29T00:00:00.000Z","obligationAmount":-4527.02,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4527.02,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4527.02,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $4,527.02 per 4/1/2024 QULO report.\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support for FL.  This replaces FL-23082403-DOD-USAF-01.   ","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- Fully mission ready CAP liaison and/or imagery collection management support*\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"227f47d2-87fc-4ced-8feb-c3337add0f38","hash":"e9e0359123960a052fa08c6fd396a128eb7eaca5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-USAF04","maAmendNumber":0,"actionId":446201,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"High","assistanceRequested":"USAF Auxiliary, Civil Air Patrol (CAP) aerial support for FL.  This replaces FL-23082403-DOD-USAF-01.   ","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- Fully mission ready CAP liaison and/or imagery collection management support*\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"0a6d3c0b-f9f4-4d51-a5be-fe6759b43ed2","hash":"2e429dd4959cf568876025f3d32083170a5362bf","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-USAF03","maAmendNumber":1,"actionId":465086,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-04-26T00:00:00.000Z","dateRequired":"2024-04-26T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2024-04-29T00:00:00.000Z","obligationAmount":-5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-5000,"maPriority":"High","assistanceRequested":"Amendment #1: De-obligate $5,000.00 per 4/1/2024 ULO report.\r\nCAP LNO to FL AOB for aerial imagery following landfall of Idalia across Florida for damage assessment determination.  This is a re-issue of FL-23082403-DOD-USAF-03.\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide personnel to the RRCC, IOF, JFO or other locations to support disaster operations.\r\nSupport may include but is not limited to the following:\r\n- CAP Liaison Officers\r\nADDITIONAL NOTES from FEMA:\r\n MA task orders (MATOs) will be issued by FEMA&#39;s AOB at the RRCC or FL SEOC to provide specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- The CAP LNO should report to the FL SEOC (2555 Shumard Oak Blvd, Tallahassee, FL 32399) with appropriate equipment to fully execute all required tasks.\r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n The missionassigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\nLNO deployment notification and locations should be requested with the National CAP Liaison as soon as practicable.\r\nThe MA/MATO should specify if 24-hour ops are needed and/or additional specialties/personnel are needed.\r\nOps longer than 7-days, may require on-station relief of personnel.\r\n","id":"d268a51b-261c-438b-8eb5-41553f0a100b","hash":"7048156b614825effe8597555bf77dcf93eaeea6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-USAF03","maAmendNumber":0,"actionId":446200,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-08T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-08T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"CAP LNO to FL AOB for aerial imagery following landfall of Idalia across Florida for damage assessment determination.  This is a re-issue of FL-23082403-DOD-USAF-03.\r\n","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide personnel to the RRCC, IOF, JFO or other locations to support disaster operations.\r\nSupport may include but is not limited to the following:\r\n- CAP Liaison Officers\r\nADDITIONAL NOTES from FEMA:\r\n MA task orders (MATOs) will be issued by FEMA&#39;s AOB at the RRCC or FL SEOC to provide specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- The CAP LNO should report to the FL SEOC (2555 Shumard Oak Blvd, Tallahassee, FL 32399) with appropriate equipment to fully execute all required tasks.\r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n The missionassigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\nLNO deployment notification and locations should be requested with the National CAP Liaison as soon as practicable.\r\nThe MA/MATO should specify if 24-hour ops are needed and/or additional specialties/personnel are needed.\r\nOps longer than 7-days, may require on-station relief of personnel.\r\n","id":"e2520753-4cd9-4e8e-a7a3-fa21a14b8227","hash":"3116f40645d438177f3a45f56fb871f0d93d091a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-USAF01","maAmendNumber":1,"actionId":465220,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-04-29T00:00:00.000Z","obligationAmount":-2859.98,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2859.98,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2859.98,"maPriority":"High","assistanceRequested":"Amendment 1 to deobligate  $2,859.98 per QULO and OFA request.  Change PM to Daniel Carpenter. \r\nActivate CAP LNO to NRCC\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support.  This MA replaces 4734DRFL-DOD-USAF-01","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ea23c889-115b-4bbd-a8f3-74b9b113f50d","hash":"5a36e542b1f700773c6f3d96995b218f7cf8643a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-USAF01","maAmendNumber":0,"actionId":446129,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-USAF","agency":"DOD-USAF (OPS / MAINTANCE)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"High","assistanceRequested":"Activate CAP LNO to NRCC\r\nUSAF Auxiliary, Civil Air Patrol (CAP) aerial support.  This MA replaces 4734DRFL-DOD-USAF-01","statementOfWork":"As directed by and in coordination with FEMA, US Air Force Auxiliary/Civil Air Patrol (CAP) will provide aircraft, vehicles, and/or personnel in support of FEMA disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n- Aerial/ground imaging (video, still photography, imagery, 2D/3Ddata)\r\n- Transportation of personnel and/or light cargo\r\n- Damage assessment imagery/observations, which may include previously collected\r\nimagery\r\n- Geo-tagged or georeferenced imagery, up-loadable to FEMA-provided FTP website or\r\ndelivered on digital media\r\n- CAP liaison and/or imagery collection management support\r\n- Airborne communications relay (repeater) missions in support of FEMA Urban Search &amp; Rescue/Life-Safety\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e1b04483-e0bc-483b-b544-67e295172151","hash":"8be5c74224ab2fe581510253608fd6f63d5b1734","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-OPS04","maAmendNumber":1,"actionId":451555,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-15500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-15500,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-15500,"maPriority":"Normal","assistanceRequested":"Amendment # 1 - De-obligate funds in the amount of $15,500.00\r\nActivate DOD to NRCC to support FEMA response operations.  This MA replaces 3596EMFL-DOD-OPS-01\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"061b8d72-eee6-4d88-a381-5ed25a110193","hash":"fd10f9f12b98ee0cf275812b097b8948a2edeced","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-OPS04","maAmendNumber":0,"actionId":446211,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":15500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":15500,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":15500,"maPriority":"Normal","assistanceRequested":"Activate DOD to NRCC to support FEMA response operations.  This MA replaces 3596EMFL-DOD-OPS-01\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Defense (DOD) will provide appropriate personnel to the NRCC or other facilities in support of FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"cd8ea33f-e36d-41ee-8184-8e296af3de69","hash":"965417e6d70db5149d366373eecb94563b0f23cc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-OPS03","maAmendNumber":1,"actionId":451580,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-31T00:00:00.000Z","popEndDate":"2023-09-18T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-08-31T00:00:00.000Z","maPopEndDate":"2023-09-18T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Normal","assistanceRequested":"Amendment # 1 - De-obligate funds in the amount of $10,000\r\nProvide Maxwell AFB as a FEMA Incident Support Base/Federal Staging Area/Federal Teams Staging Facility (ISB/FSA/FTSF) in support of response and recovery operations. To support forward distribution of supplies/equipment to affected areas as required. Provide marshaling area / hardstand for trucks, trailers, other equipment and personnel. This request replaces MA FL-23082403-DOD-OPS-01 and extends end date to 09/18/2023","statementOfWork":"Request Maxwell AFB as a FEMA Incident Support Base/Federal Staging Area (ISB/FSA) with the following requirements: hardstand\r\nto stage trucks/trailers/equipment/personnel for processing, cross loading, and forward movement as required.\r\nProvide life safety and lifesaving requirements as required by FEMA.\r\n- Be prepared to provide EPLO LNO to serve as liaison between the base and FEMA.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of\r\nassignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for\r\nreimbursement.\r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation\r\nis necessary to ensure reimbursement. (refer Federal Personal Property Management Manual)\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement,\r\nper 44 CFR 206.208(c)(2).\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received,\r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin\r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO\r\nValidation, or additional justification has been provided.","id":"65676216-25b4-47b9-bfb7-19e26b2c1853","hash":"b6562c08b136a5a842813ac6676d72cd075f9b21","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-OPS03","maAmendNumber":0,"actionId":446187,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-31T00:00:00.000Z","popEndDate":"2023-09-18T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-31T00:00:00.000Z","maPopEndDate":"2023-09-18T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Provide Maxwell AFB as a FEMA Incident Support Base/Federal Staging Area/Federal Teams Staging Facility (ISB/FSA/FTSF) in support of response and recovery operations. To support forward distribution of supplies/equipment to affected areas as required. Provide marshaling area / hardstand for trucks, trailers, other equipment and personnel. This request replaces MA FL-23082403-DOD-OPS-01 and extends end date to 09/18/2023","statementOfWork":"Request Maxwell AFB as a FEMA Incident Support Base/Federal Staging Area (ISB/FSA) with the following requirements: hardstand\r\nto stage trucks/trailers/equipment/personnel for processing, cross loading, and forward movement as required.\r\nProvide life safety and lifesaving requirements as required by FEMA.\r\n- Be prepared to provide EPLO LNO to serve as liaison between the base and FEMA.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of\r\nassignment(s).\r\nAgencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for\r\nreimbursement.\r\nAll equipment and supply purchases must be coordinated with a FEMA Project Manager. If approved, documentation\r\nis necessary to ensure reimbursement. (refer Federal Personal Property Management Manual)\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement,\r\nper 44 CFR 206.208(c)(2).\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received,\r\nservices are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin\r\n#157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO\r\nValidation, or additional justification has been provided.","id":"0aa9f229-b61b-4525-ada5-c0c0483ca774","hash":"c569fb8a96e1fd9c6c632be418b03615ed75e10f","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-OPS02","maAmendNumber":1,"actionId":451578,"maType":"FOS","supportFunction":9,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-8786.73,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-8786.73,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-8786.73,"maPriority":"Normal","assistanceRequested":"Amendment #1 - De-obligate funds in the amount of $8,786.73\r\n\r\nDOD representative(s) as part of the Federal Search and Rescue Coordination Group (FSARCG) in support of TC Idalia operations. This MA replaces 3596EM-FL-DOD-OPS- 02. ","statementOfWork":"As directed by and in coordination with FEMA, DOD will provide personnel to support the Federal Search &amp; Rescue Coordination Group (FSARCG) mission and will direct deployment of an FSARCG representative to a location determined by the FEMA Urban Search and Rescue (US&amp;R) Incident Support Team (IST).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"eecc1759-7210-4156-8f7e-6ff8c7cd468e","hash":"8e5c70f7dc9bd9a9fac99218ad92a0367ff4dce7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-OPS02","maAmendNumber":0,"actionId":446119,"maType":"FOS","supportFunction":9,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"DOD representative(s) as part of the Federal Search and Rescue Coordination Group (FSARCG) in support of TC Idalia operations. This MA replaces 3596EM-FL-DOD-OPS- 02. ","statementOfWork":"As directed by and in coordination with FEMA, DOD will provide personnel to support the Federal Search &amp; Rescue Coordination Group (FSARCG) mission and will direct deployment of an FSARCG representative to a location determined by the FEMA Urban Search and Rescue (US&amp;R) Incident Support Team (IST).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"79955c03-1620-428c-8e33-5ece4f44abfa","hash":"d7fce67d1f06815cd1b13d77c9b53dfb52b56113","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-OPS01","maAmendNumber":3,"actionId":464939,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-04-26T00:00:00.000Z","dateRequired":"2024-04-25T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-28T00:00:00.000Z","dateObligated":"2024-04-29T00:00:00.000Z","obligationAmount":-2479,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-2479,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-2479,"maPriority":"Normal","assistanceRequested":"Amendment #3 - De-obligate $2,479.00 per 4/1/2024 Q-ULO Validation Report.\r\nAmendment #2 - De-obligate $4,091.64 per Q-ULO Validation Report. Change PM to Kevin Stewart.\r\nAmendment # 1 - De-obligate funds in the amount of $7,844.39.\r\nAs requested by and in coordination with FEMA, DOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison.\r\nReplaces previous MA FL-23082403-DOD-OPS-02 and add additional funding of $10,000.00","statementOfWork":"As directed by and in coordination with FEMA, DOD will provide Defense Coordination Officer(s) with supporting staff element(s) (DCO/DCE) to the RRCC, Region IV Joint Field Office, IOF, or other locations, to provide DOD regional knowledge, requirements validation, and liaison, including as necessary State/Emergency Preparedness Liaison SEPLO/EPLO teams. Supporting staff element, augmentees, Joint Regional Medical Planning Officer (JRMPO), as mission required/requested.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAll equipment and supply purchases must be coordinated with FEMA. Prior Federal Approving Official (FAO) approval is necessary to ensure reimbursement.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157 and MA Policy 104-010-2. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"b8bc690b-de18-4281-8a13-2a02a110d60d","hash":"005b52aba8645fe9d217bf20b3233187c91879c1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-OPS01","maAmendNumber":2,"actionId":457938,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2024-02-02T00:00:00.000Z","dateRequired":"2024-02-02T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-28T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":-4091.64,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4091.64,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4091.64,"maPriority":"Normal","assistanceRequested":"Amendment #2 - De-obligate $4,091.64 per Q-ULO Validation Report. Change PM to Kevin Stewart.\r\nAmendment # 1 - De-obligate funds in the amount of $7,844.39.\r\nAs requested by and in coordination with FEMA, DOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison.\r\nReplaces previous MA FL-23082403-DOD-OPS-02 and add additional funding of $10,000.00","statementOfWork":"As directed by and in coordination with FEMA, DOD will provide Defense Coordination Officer(s) with supporting staff element(s) (DCO/DCE) to the RRCC, Region IV Joint Field Office, IOF, or other locations, to provide DOD regional knowledge, requirements validation, and liaison, including as necessary State/Emergency Preparedness Liaison SEPLO/EPLO teams. Supporting staff element, augmentees, Joint Regional Medical Planning Officer (JRMPO), as mission required/requested.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAll equipment and supply purchases must be coordinated with FEMA. Prior Federal Approving Official (FAO) approval is necessary to ensure reimbursement.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157 and MA Policy 104-010-2. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"9166f788-3882-41e8-8fca-ba4b9c51ba3f","hash":"713f65c00ffcd87ef9dd6ace5ff429d0de20ec21","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-OPS01","maAmendNumber":1,"actionId":451586,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-28T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-7844.39,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-7844.39,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-7844.39,"maPriority":"Normal","assistanceRequested":"Amendment # 1 - De-obligate funds in the amount of $7,844.39.\r\nAs requested by and in coordination with FEMA, DOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison.\r\nReplaces previous MA FL-23082403-DOD-OPS-02 and add additional funding of $10,000.00","statementOfWork":"As directed by and in coordination with FEMA, DOD will provide Defense Coordination Officer(s) with supporting staff element(s) (DCO/DCE) to the RRCC, Region IV Joint Field Office, IOF, or other locations, to provide DOD regional knowledge, requirements validation, and liaison, including as necessary State/Emergency Preparedness Liaison SEPLO/EPLO teams. Supporting staff element, augmentees, Joint Regional Medical Planning Officer (JRMPO), as mission required/requested.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAll equipment and supply purchases must be coordinated with FEMA. Prior Federal Approving Official (FAO) approval is necessary to ensure reimbursement.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157 and MA Policy 104-010-2. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"22fa1435-4a38-4db5-8d05-861aff15f5bf","hash":"d5bceef7b10c0f7d4cd22802a49e41e6ff672af6","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOD-OPS01","maAmendNumber":0,"actionId":446098,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DOD-OPS","agency":"DOD (OPS/MAINT DEFENSE WIDE)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-28T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"Normal","assistanceRequested":"As requested by and in coordination with FEMA, DOD will provide a Defense Coordinating Officer/Element (DCO/E) supporting staff and services and back up Defense Coordinating Officer/Element (DCO/E) supporting staff and services as required/requested. Regional and State Emergency Preparedness Liaison Officers (REPLOS and SEPLOS) to the RRCC, IOF, or other locations to provide DOD regional knowledge, requirements validation, and liaison.\r\nReplaces previous MA FL-23082403-DOD-OPS-02 and add additional funding of $10,000.00","statementOfWork":"As directed by and in coordination with FEMA, DOD will provide Defense Coordination Officer(s) with supporting staff element(s) (DCO/DCE) to the RRCC, Region IV Joint Field Office, IOF, or other locations, to provide DOD regional knowledge, requirements validation, and liaison, including as necessary State/Emergency Preparedness Liaison SEPLO/EPLO teams. Supporting staff element, augmentees, Joint Regional Medical Planning Officer (JRMPO), as mission required/requested.\r\nMA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\nAll equipment and supply purchases must be coordinated with FEMA. Prior Federal Approving Official (FAO) approval is necessary to ensure reimbursement.\r\nWork that falls within the statutory authority of the performing Federal agency is not eligible for FEMA reimbursement, per 44 CFR 206.208(c)(2). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\nThe mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agencies.\r\nMAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157 and MA Policy 104-010-2. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"cd3b2253-ed90-4b05-bc34-492fa16ad4d3","hash":"868891dd44b6e4a2b493e7c6a8dd6a619831113e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOC-NOAA03","maAmendNumber":0,"actionId":446216,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate NOAA to NRCC to support FEMA disaster operations.  This MA replaces 3596EM-FL-DOC-NOAA-0100\r\n","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic and Atmospheric Administration (NOAA) will provide appropriate personnel to the NRCC to support disaster operations\r\nThis may include but is not limited to, the following:\r\n    - National Weather Service (NWS) Meteorologist(s) and/or Hydrologist(s)\r\n    - National Weather Service (NWS) Hurricane Liaison Team (HLT)\r\n    - National Ocean Service (NOS) Personnel with coastal resource and management expertise\r\n    - Support to ESF-5 to provide meteorological onsite expertise, coordination, and analysis\r\nADDITIONAL NOTES from FEMA:\r\n  - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"cd53a59e-932a-48ae-8eee-4b293992d58e","hash":"e6ac3cd1f24299d73cb5cc4f38dd9b74c06d8128","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOC-NOAA02","maAmendNumber":1,"actionId":458766,"maType":"FOS","supportFunction":10,"priority":"High","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-13T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-02-21T00:00:00.000Z","obligationAmount":-4913.99,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4913.99,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4913.99,"maPriority":"High","assistanceRequested":"Amendment #1: De-Obligation of $4,913.99. As Confirmed by the URLO Report. Change PM to Kevin Stewart.\r\nNOAA Identification of Pollution Targets This MA replaces 3596EM-FL-DOC-NOAA- 03. \r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Commerce/National Oceanic and Atmospheric Administration (NOAA) will identify potential pollution target(s) in support of disaster  operations. \r\n   \r\nSupport may include, but is not limited to, determining location of oil &amp; hazmat release(s) or debris posing threats to life safety, the environment, and/or maritime transportation systems.\r\n MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n The missionassigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"22985d8e-d7d5-4a31-ba2b-82eb9c285bdb","hash":"22a634caccf8f423babc1cf371bac8d189344b61","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOC-NOAA02","maAmendNumber":0,"actionId":446170,"maType":"FOS","supportFunction":10,"priority":"High","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":4913.99,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":4913.99,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":4913.99,"maPriority":"High","assistanceRequested":"NOAA Identification of Pollution Targets This MA replaces 3596EM-FL-DOC-NOAA- 03. \r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Commerce/National Oceanic and Atmospheric Administration (NOAA) will identify potential pollution target(s) in support of disaster  operations. \r\n   \r\nSupport may include, but is not limited to, determining location of oil &amp; hazmat release(s) or debris posing threats to life safety, the environment, and/or maritime transportation systems.\r\n MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n The missionassigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"937bdf1e-105e-466c-b443-8c6640ec8949","hash":"f47d7850fbc2c198043f19b7ee2dc94b49589c2e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOC-NOAA01","maAmendNumber":1,"actionId":458885,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-14T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-02-21T00:00:00.000Z","obligationAmount":-52058.24,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-52058.24,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-52058.24,"maPriority":"High","assistanceRequested":"Amendment 1: De-obligate $52,058.24 per Quarterly ULO Validation Report. Change PM to Kevin Stewart.\r\nNOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of an incident and cascading effects in the state of Florida from Hurricane Idalia. This MA replaces 3596EMFL-DOC-NOAA-02\r\n","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"90fc2fba-7b58-411a-a661-2b6afbbc3b27","hash":"44c1ab40a5af8049633b16207a077fc433354e50","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOC-NOAA01","maAmendNumber":0,"actionId":446150,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOC-NOAA","agency":"DOC-NOAA (NATL OCEANIC/ATMOSO","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":57313,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":57313,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":57313,"maPriority":"High","assistanceRequested":"NOAA aircraft, survey crew, and remote sensing equipment to provide information regarding the nature and extent of an incident and cascading effects in the state of Florida from Hurricane Idalia. This MA replaces 3596EMFL-DOC-NOAA-02\r\n","statementOfWork":"As directed by and in coordination with FEMA, National Oceanic &amp; Atmospheric Administration (NOAA) will provide support which may include, but is not limited to, rapidly collecting, processing, and distributing high resolution, geo-rectified aerial imagery and/or Light Detection and Ranging (LIDAR) data in support of disaster operations.\r\nNOAA personnel will participate in Interagency Remote Sensing Coordination Cell (IRSCC) planning meetings, provide technical and operational planning expertise to facilitate aerial survey planning, and coordinate survey operations with other agencies (via the IRSCC, if activated).\r\nNOAA is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\nADDITIONAL NOTES from FEMA:\r\n - MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n - Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n - All equipment and supply purchases must be coordinated with FEMA Project Manager.  If approved, documentation is necessary to ensure reimbursement. \r\n - Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n - The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n - MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"bda27520-fde2-426e-ac37-7609ff02cfb4","hash":"0a7815d7c98defbd77eb289a8f64afef03208bf5","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOC-NIST01","maAmendNumber":1,"actionId":450219,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOC-NIST","agency":"DOC-NATL INST STND/TECH (WCF)","authority":"Stafford Act","dateReceived":"2023-10-18T00:00:00.000Z","dateRequired":"2023-10-18T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-10-19T00:00:00.000Z","obligationAmount":-48065.93,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-48065.93,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-48065.93,"maPriority":"High","assistanceRequested":"Amendment 1. De-obligate $48,065.93 per agency request. Change PM to Scott Schaefer.\r\nDOC/NIST surface level observations acquired using ARA resources. The observations are Wind Speed. These data are provided shortly after landfall and help narrow down the areas with greatest impacts. Impacts guide field support (i.e., USAR and DSA) and help with the damage assessment process. The data are delivered electronically via email.  This MA replaces 3596EMFL-DOC-NIST-01\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Commerce/National Institute of Standards and Technology (DOC/NIST) will provide situation awareness in support of disaster operations. \r\nSupport may include, but is not limited to, utilization of ARA resources to acquire the following:\r\n  - wind speed (gust and mean)\r\n  - wind direction\r\n  - atmospheric pressure\r\nAreas to be covered include, but are not limited to, are regions impacted by Hurricane Idalia in Florida.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"523aee7b-27e3-4eb4-97cb-652131e7670c","hash":"20b58805270af43447cf0ec1bde02895bdeeda52","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOC-NIST01","maAmendNumber":0,"actionId":446113,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DOC-NIST","agency":"DOC-NATL INST STND/TECH (WCF)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-09-04T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":48065.93,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":48065.93,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":48065.93,"maPriority":"High","assistanceRequested":"DOC/NIST surface level observations acquired using ARA resources. The observations are Wind Speed. These data are provided shortly after landfall and help narrow down the areas with greatest impacts. Impacts guide field support (i.e., USAR and DSA) and help with the damage assessment process. The data are delivered electronically via email.  This MA replaces 3596EMFL-DOC-NIST-01\r\n","statementOfWork":"As directed by and in coordination with FEMA, Dept of Commerce/National Institute of Standards and Technology (DOC/NIST) will provide situation awareness in support of disaster operations. \r\nSupport may include, but is not limited to, utilization of ARA resources to acquire the following:\r\n  - wind speed (gust and mean)\r\n  - wind direction\r\n  - atmospheric pressure\r\nAreas to be covered include, but are not limited to, are regions impacted by Hurricane Idalia in Florida.\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"6af567c0-ace3-4635-a4b9-d5c60bf2adbe","hash":"850762f662d05e77734279ac12bd5cddf30cb21b","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOC-EDA01","maAmendNumber":2,"actionId":475722,"maType":"FOS","supportFunction":20,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOC-EDA","agency":"DOC-EDA (ECONOMIC DEV ADMIN)","authority":"Stafford Act","dateReceived":"2024-08-15T00:00:00.000Z","dateRequired":"2024-08-15T00:00:00.000Z","popStartDate":"2023-09-08T00:00:00.000Z","popEndDate":"2024-10-31T00:00:00.000Z","dateObligated":"2024-08-16T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-09-08T00:00:00.000Z","maPopEndDate":"2024-10-31T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"Amendment #2: Extend projected end date to 10/31/2024\r\nAmendment 1. Extend POP to 05/03/2024. Add $211,227.80 in additional funding. Change PM to Angela Barton.\r\n(RSF) Activate Department of Commerce (DOC) Economic development Administration (EDA) to provide appropriate Recovery Support Function (RSF) personnel in support of the National Disaster Recovery Framework (NDRF) and FEMA post disaster recovery operations for DR4734FL.\r\nHurricane Idalia","statementOfWork":"As directed by, and in coordination with FEMA, EDA will serve as an Economic RSF (ERSF) Field Coordinator through virtual and in person support to the FEMA led Interagency Recovery Coordination efforts. The ESRF Field Coordinator will provide federal coordination and connections to the appropriate RSF primary and support agencies, other Federal Agencies, and STTL partners as directed by FEMA. The support will be for the Florida State Hurricane in the federally declared areas. Deliverables will likely include: A Recovery Needs Assessment A Recovery Options Strategy Document (format TBD) Stakeholder engagement which may include small meetings as well as larger Economic Recovery Workshops, as determined to be valuable by stakeholders and ERSF. \r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e83f58bb-0b68-47da-ae70-c8a8b2956143","hash":"ee923de6b05ae042c399c36524bba83f19ae1aa1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOC-EDA01","maAmendNumber":1,"actionId":452961,"maType":"FOS","supportFunction":20,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOC-EDA","agency":"DOC-EDA (ECONOMIC DEV ADMIN)","authority":"Stafford Act","dateReceived":"2023-11-29T00:00:00.000Z","dateRequired":"2023-11-24T00:00:00.000Z","popStartDate":"2023-09-08T00:00:00.000Z","popEndDate":"2024-05-03T00:00:00.000Z","dateObligated":"2023-11-30T00:00:00.000Z","obligationAmount":211227.8,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":211227.8,"maPopStartDate":"2023-09-08T00:00:00.000Z","maPopEndDate":"2024-10-31T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":211227.8,"maPriority":"Normal","assistanceRequested":"Amendment 1. Extend POP to 05/03/2024. Add $211,227.80 in additional funding. Change PM to Angela Barton.\r\n(RSF) Activate Department of Commerce (DOC) Economic development Administration (EDA) to provide appropriate Recovery Support Function (RSF) personnel in support of the National Disaster Recovery Framework (NDRF) and FEMA post disaster recovery operations for DR4734FL.\r\nHurricane Idalia","statementOfWork":"As directed by, and in coordination with FEMA, EDA will serve as an Economic RSF (ERSF) Field Coordinator through virtual and in person support to the FEMA led Interagency Recovery Coordination efforts. The ESRF Field Coordinator will provide federal coordination and connections to the appropriate RSF primary and support agencies, other Federal Agencies, and STTL partners as directed by FEMA. The support will be for the Florida State Hurricane in the federally declared areas. Deliverables will likely include: A Recovery Needs Assessment A Recovery Options Strategy Document (format TBD) Stakeholder engagement which may include small meetings as well as larger Economic Recovery Workshops, as determined to be valuable by stakeholders and ERSF. \r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"fec975cd-00dd-4253-a87c-a08cb9a553c1","hash":"794b32246e4d6a56654ae73088aa36423b537a12","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDOC-EDA01","maAmendNumber":0,"actionId":446847,"maType":"FOS","supportFunction":20,"priority":"Normal","region":4,"stt":"FL","agencyId":"DOC-EDA","agency":"DOC-EDA (ECONOMIC DEV ADMIN)","authority":"Stafford Act","dateReceived":"2023-09-08T00:00:00.000Z","dateRequired":"2023-10-01T00:00:00.000Z","popStartDate":"2023-09-08T00:00:00.000Z","popEndDate":"2023-12-08T00:00:00.000Z","dateObligated":"2023-09-09T00:00:00.000Z","obligationAmount":532648.6,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":532648.6,"maPopStartDate":"2023-09-08T00:00:00.000Z","maPopEndDate":"2024-10-31T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":532648.6,"maPriority":"Normal","assistanceRequested":"(RSF) Activate Department of Commerce (DOC) Economic development Administration (EDA) to provide appropriate Recovery Support Function (RSF) personnel in support of the National Disaster Recovery Framework (NDRF) and FEMA post disaster recovery operations for DR4734FL.\r\nHurricane Idalia","statementOfWork":"As directed by, and in coordination with FEMA, EDA will serve as an Economic RSF (ERSF) Field Coordinator through virtual and in person support to the FEMA led Interagency Recovery Coordination efforts. The ESRF Field Coordinator will provide federal coordination and connections to the appropriate RSF primary and support agencies, other Federal Agencies, and STTL partners as directed by FEMA. The support will be for the Florida State Hurricane in the federally declared areas. Deliverables will likely include: A Recovery Needs Assessment A Recovery Options Strategy Document (format TBD) Stakeholder engagement which may include small meetings as well as larger Economic Recovery Workshops, as determined to be valuable by stakeholders and ERSF. \r\nADDITIONAL NOTES from FEMA:\r\nMA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\nActivation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. The mission assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"db0a36a0-42dc-4dfd-9dd5-cfef4493364d","hash":"3e607cbfcfd9e379421f9516052ac28959440e70","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDLA01","maAmendNumber":1,"actionId":451584,"maType":"FOS","supportFunction":7,"priority":"Normal","region":4,"stt":"FL","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-4120.55,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4120.55,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4120.55,"maPriority":"Normal","assistanceRequested":"Amendment #1 - De-obligate funds in the amount of $4,120.55\r\nActivate DLA liaisons to NRCC. This MA replaces 3596EM-FL-DLA- 01. ","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"38aa228d-5701-4eb1-af4b-8e629c1844cd","hash":"a8fd1516b4190f8bc23e42ebcb0255d23b1cedbd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDLA01","maAmendNumber":0,"actionId":446076,"maType":"FOS","supportFunction":7,"priority":"High","region":4,"stt":"FL","agencyId":"DLA","agency":"DOD-DLA (DEF LOGISTIC AGY-WCF)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"Normal","assistanceRequested":"Activate DLA liaisons to NRCC. This MA replaces 3596EM-FL-DLA- 01. ","statementOfWork":"As directed by and in coordination with FEMA, Defense Logistics Agency (DLA) will provide appropriate personnel to NRCC or other teams and facilities as requested in support of disaster operations. Representatives may include, but are not limited to, Team Leads, Subsistence Specialists, Fuel/Energy Specialists, Clothing &amp; Textiles Specialists, Construction &amp; Equipment Specialists, Distribution Specialists, and Logistics Planners. \r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e0deae2a-feb0-4f4f-bec4-631d91991370","hash":"46194fb8a8d413b7286eeb58873149890d01fe61","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHSMGMT01","maAmendNumber":1,"actionId":448214,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DHSMGMT","agency":"DHS-MGMT (DEPT MGMT & OPS)","authority":"Stafford Act","dateReceived":"2023-09-25T00:00:00.000Z","dateRequired":null,"popStartDate":"2023-08-31T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-09-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-31T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"(SCF)Amendment 1:  As per SCF project manager, personnel are no longer needed they are mission complete as of 9/30\r\n(SCF) DHS-MGMT to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Department of Homeland will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#39;s disaster operations.\r\nDHS-MGMT will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e565ce2f-8135-4514-8ec9-df45b4bfdaf0","hash":"44bc1ff60c2e83ab4bdb3e9eeb8288d735a79f14","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHSMGMT01","maAmendNumber":0,"actionId":446209,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DHSMGMT","agency":"DHS-MGMT (DEPT MGMT & OPS)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":null,"popStartDate":"2023-08-31T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":34423,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":34423,"maPopStartDate":"2023-08-31T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":34423,"maPriority":"High","assistanceRequested":"(SCF) DHS-MGMT to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Department of Homeland will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#39;s disaster operations.\r\nDHS-MGMT will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"40188008-1391-4817-b231-4837437545dd","hash":"76a8c6f37e1d076dd590f1cd1af860fd9863b0cd","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-USCG04","maAmendNumber":1,"actionId":476040,"maType":"DFA","supportFunction":9,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-08-20T00:00:00.000Z","dateRequired":"2024-08-20T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2024-08-21T00:00:00.000Z","obligationAmount":-4377353,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":-1094338.25,"fedCostShareAmt":-3283014.75,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":-1094338.25,"maFedCostShareAmount":-3283014.75,"maPriority":"Life Sustaining","assistanceRequested":"Amendment # 1 De-obligate $4,377,353.00 and close per USCG POC\r\nState of Florida requests USCG inland SAR to perform rescue operations.\r\nThis MA replaces 3596EM-FL-DHS-USCG-03","statementOfWork":"In support of Florida request, as directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide Catastrophic Incident\r\n Search and Rescue (CISAR) capability for catastrophic incidents, as defined by the CISAR Addendum and/or CG Addendum to the United States National Search and Rescue Supplement (NSS), to support STT disaster operations. USCG will provide resources appropriate to conduct lifesaving Search and Rescue missions for sustained, large-scale rescue operations. Resources will be tasked by MATO.\r\n USCG is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n ADDITIONAL NOTES from FEMA:\r\n --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and\r\n that costs are reasonable and supported by documentation maintained by the respective agency\r\n --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still\r\n operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been\r\n provided.\r\n -- Federal regulation prohibits FEMA from mission assigning other Federal agencies (OFA) for work falling within the OFAs independent authority.\r\n See 44 CFR 206.208(c)(2). Federal regulation also prohibits FEMA from reimbursing an OFA for carrying out work under its independent authority.\r\n See 44 CFR 206.8(b). Funding under this mission assignment and any resulting mission assignment task orders will be limited to work performed\r\n outside of the OFAs independent authority.\r\n","id":"715cae8c-aa58-4b5f-ade3-ec1011314962","hash":"1a617ea4a117d2c8e2f176479112831be52011ef","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-USCG04","maAmendNumber":0,"actionId":446212,"maType":"DFA","supportFunction":9,"priority":"Life Sustaining","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-08-30T00:00:00.000Z","popStartDate":"2023-08-29T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-09-03T00:00:00.000Z","obligationAmount":4377353,"sttCostSharePct":0.25,"fedCostSharePct":0.75,"sttCostShareAmt":1094338.25,"fedCostShareAmt":3283014.75,"maPopStartDate":"2023-08-29T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0.25,"maFedCostSharePct":0.75,"maSttCostShareAmount":1094338.25,"maFedCostShareAmount":3283014.75,"maPriority":"Life Sustaining","assistanceRequested":"State of Florida requests USCG inland SAR to perform rescue operations.\r\nThis MA replaces 3596EM-FL-DHS-USCG-03","statementOfWork":"In support of Florida request, as directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide Catastrophic Incident\r\n Search and Rescue (CISAR) capability for catastrophic incidents, as defined by the CISAR Addendum and/or CG Addendum to the United States National Search and Rescue Supplement (NSS), to support STT disaster operations. USCG will provide resources appropriate to conduct lifesaving Search and Rescue missions for sustained, large-scale rescue operations. Resources will be tasked by MATO.\r\n USCG is responsible for providing personnel and/or equipment necessary to accomplish the mission.\r\n ADDITIONAL NOTES from FEMA:\r\n --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and\r\n that costs are reasonable and supported by documentation maintained by the respective agency\r\n --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still\r\n operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been\r\n provided.\r\n -- Federal regulation prohibits FEMA from mission assigning other Federal agencies (OFA) for work falling within the OFAs independent authority.\r\n See 44 CFR 206.208(c)(2). Federal regulation also prohibits FEMA from reimbursing an OFA for carrying out work under its independent authority.\r\n See 44 CFR 206.8(b). Funding under this mission assignment and any resulting mission assignment task orders will be limited to work performed\r\n outside of the OFAs independent authority.\r\n","id":"3547471e-faf9-4a7f-bc14-88742cc7c360","hash":"1d5054c22dfef67ba96aab3381ddd8ada84ae5b9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-USCG03","maAmendNumber":1,"actionId":451523,"maType":"FOS","supportFunction":0,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-28T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-20000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-20000,"maPriority":"Normal","assistanceRequested":"Amendment #1 - De-obligate funds in the amount of $20,000.00\r\nActivate USCG to the RRCC, IOF JFO or other facilities in support of response operations. This is a re-issue of FL-23082403-DHS-USCG-03.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n- USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n- USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n- Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e6e55371-de6e-4360-92c7-2a9d0f3de87b","hash":"c2d5423507d1efc1ede88bb66db821eb7cb5cb77","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-USCG03","maAmendNumber":0,"actionId":446140,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-28T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":20000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":20000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-28T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":20000,"maPriority":"Normal","assistanceRequested":"Activate USCG to the RRCC, IOF JFO or other facilities in support of response operations. This is a re-issue of FL-23082403-DHS-USCG-03.","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the RRCC, IOF, JFO, or other locations to support disaster operations. This may include but is not limited to the following:\r\n- USCG Liaison Officers (RRCC, IOF, JFO, STT EOC)\r\n- USCG ESF Watch Officers (typically ESFs -1 (Maritime Transportation System (MTS)), -9 (SAR), and -10 (Oil/Hazmat))\r\n- Other USCG SMEs, as applicable\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"fb52e53b-c13c-429f-b0cd-7fcd1f6cad18","hash":"44686af642da6a8f4b0ff50190d3b833bf272c6c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-USCG02","maAmendNumber":1,"actionId":451570,"maType":"FOS","supportFunction":9,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-10000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-10000,"maPriority":"Normal","assistanceRequested":"Amendment #1 - De-obligate funds in the amount of $10,000.00\r\n\r\nUSCG representative(s) as part of the Federal Search and Rescue Coordination Group (FSARCG) in support of TC Idalia operations. This MA replaces 3596EM-FL-DHS-USCG- 02. ","statementOfWork":"As directed by and in coordination with FEMA, US Coast Guard (USCG) will provide personnel to support the Federal Search &amp; Rescue Coordination Group (FSARCG) mission and will direct deployment of an FSARCG representative to a location determined by the FEMA Urban Search and Rescue (US&amp;R) Incident Support Team (IST).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3129b91d-bf59-4e10-a105-7f2dd052e9ab","hash":"a01743f3a093f9bfc457c409ddabe2781bb0e755","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-USCG02","maAmendNumber":0,"actionId":446121,"maType":"FOS","supportFunction":9,"priority":"Lifesaving","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-08-29T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"USCG representative(s) as part of the Federal Search and Rescue Coordination Group (FSARCG) in support of TC Idalia operations. This MA replaces 3596EM-FL-DHS-USCG- 02. ","statementOfWork":"As directed by and in coordination with FEMA, US Coast Guard (USCG) will provide personnel to support the Federal Search &amp; Rescue Coordination Group (FSARCG) mission and will direct deployment of an FSARCG representative to a location determined by the FEMA Urban Search and Rescue (US&amp;R) Incident Support Team (IST).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"09f04942-c205-4700-b6f7-c8fb247e86f7","hash":"3ddd8f2b12406fbf9b89ecb42698c8f1256c3899","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-USCG01","maAmendNumber":1,"actionId":458737,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-13T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-02-21T00:00:00.000Z","obligationAmount":-4358.2,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4358.2,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4358.2,"maPriority":"High","assistanceRequested":"Amendment #1: De-Obligation of $4,358.20.  As Confirmed by the URLO Report. Change PM to Kevin Stewart.\r\nActivate USCG liaison(s) to NRCC.  This MA replaces 3596EFL-DHS-USCG-01\r\n","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ca3ac650-354e-4613-96d6-8bb9e0d6c349","hash":"03d58a2e6e5d8208cff4316006c6fdc881c156c2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-USCG01","maAmendNumber":0,"actionId":446105,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-USCG","agency":"DHS-USCG (COAST GUARD -OP EX)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate USCG liaison(s) to NRCC.  This MA replaces 3596EFL-DHS-USCG-01\r\n","statementOfWork":"As directed by and in coordination with FEMA, U.S. Coast Guard (USCG) will provide appropriate personnel to the NRCC, or other facility as requested, to support disaster operations. \r\nThis may include but is not limited to the following:\r\n  - USCG Liaison Officers (NRCC)\r\n  - USCG ESF Watch Officers, typically ESF -1 (Maritime Transportation System (MTS), ESF-9 (SAR), and ESF-10 (Oil/Hazmat)\r\n  - Other USCG SMEs, as requested\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ffa1e8c4-f2a4-42dd-984e-e8fe765dea06","hash":"737ed0bf6c343ed59421515018d9095fc984278d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-TSA02","maAmendNumber":2,"actionId":465460,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-TSA","agency":"DHS-TSA (AVIATION SECURITY)","authority":"Stafford Act","dateReceived":"2024-04-30T00:00:00.000Z","dateRequired":"2024-04-30T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-05-07T00:00:00.000Z","obligationAmount":-954.25,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-954.25,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-954.25,"maPriority":"High","assistanceRequested":"Amendment #2 - De-obligate $954.25 to close MA per email from TSA. Also changing the PM to Christel Lugo.\r\nAmendment #1 - De-obligate $4,045.75 per Q-ULO Validation Report. Change PM to Kevin Stewart.\r\nActivate TSA to the NRCC. This MA replaces 3596EMFL-DHS-TSA-01\r\n","statementOfWork":"As directed by and in coordination with FEMA, Transportation Security Administration (TSA) will provide appropriate personnel to NRCC to support FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n.","id":"f1c297da-ca29-40a8-aeac-c3f33c21ee5f","hash":"bc3798558572a77c1ee95c736f610a6e130b1bf3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-TSA02","maAmendNumber":1,"actionId":457937,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-TSA","agency":"DHS-TSA (AVIATION SECURITY)","authority":"Stafford Act","dateReceived":"2024-02-02T00:00:00.000Z","dateRequired":"2024-02-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":-4045.75,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-4045.75,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-4045.75,"maPriority":"High","assistanceRequested":"Amendment #1 - De-obligate $4,045.75 per Q-ULO Validation Report. Change PM to Kevin Stewart.\r\nActivate TSA to the NRCC. This MA replaces 3596EMFL-DHS-TSA-01\r\n","statementOfWork":"As directed by and in coordination with FEMA, Transportation Security Administration (TSA) will provide appropriate personnel to NRCC to support FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n.","id":"809ee3d3-71ac-4efe-b67b-374d2fcddde3","hash":"8322c7aa23fe6407a71457010ddfc66921a04dc1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-TSA02","maAmendNumber":0,"actionId":446059,"maType":"FOS","supportFunction":1,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-TSA","agency":"DHS-TSA (AVIATION SECURITY)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":5000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":5000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":5000,"maPriority":"High","assistanceRequested":"Activate TSA to the NRCC. This MA replaces 3596EMFL-DHS-TSA-01\r\n","statementOfWork":"As directed by and in coordination with FEMA, Transportation Security Administration (TSA) will provide appropriate personnel to NRCC to support FEMA disaster operations.\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA.  If approved, documentation is necessary to ensure reimbursement. \r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.   \r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.\r\n.","id":"c20d5204-ee42-428f-ac65-c4c5a5ff5510","hash":"d919f97d7bad245f02f3bfe65a190c107ca6081a","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-TSA01","maAmendNumber":2,"actionId":452555,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-TSA","agency":"DHS-TSA (AVIATION SECURITY)","authority":"Stafford Act","dateReceived":"2023-11-15T00:00:00.000Z","dateRequired":"2023-11-15T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-11-17T00:00:00.000Z","obligationAmount":-172111,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-172111,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-172111,"maPriority":"Normal","assistanceRequested":"(SCF) Amendment #2 - De-obligate $172,111.00 and close per SCF POC\r\n(SCF)Amendment 1:  As per SCF project manager, personnel are no longer needed they are mission complete as of 9/30\r\n(SCF) TSA to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Transportation Security Administration will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nTSA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"0a49e4ef-ad9e-4f60-97e5-aca09e1e5a14","hash":"4402ede5c643bdf9c0602592152d4ea35d2570e7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-TSA01","maAmendNumber":1,"actionId":448267,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-TSA","agency":"DHS-TSA (AVIATION SECURITY)","authority":"Stafford Act","dateReceived":"2023-09-25T00:00:00.000Z","dateRequired":"2023-09-25T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-09-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"(SCF)Amendment 1:  As per SCF project manager, personnel are no longer needed they are mission complete as of 9/30\r\n(SCF) TSA to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Transportation Security Administration will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nTSA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"370bc22c-98d4-4eec-8fc2-c9001398145b","hash":"05d3b875b4bc8a497f0be9f21600c4d57ba384e1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-TSA01","maAmendNumber":0,"actionId":445997,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-TSA","agency":"DHS-TSA (AVIATION SECURITY)","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-09-02T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-08-31T00:00:00.000Z","obligationAmount":172111,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":172111,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":172111,"maPriority":"Normal","assistanceRequested":"(SCF) TSA to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Transportation Security Administration will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nTSA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"16cd1541-f736-49fe-aa27-5022f1a8618e","hash":"bf7db4f98fa10d13234a7336513ee2e64b0ef3a2","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-MGA01","maAmendNumber":2,"actionId":451625,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-MGA","agency":"DHS-MGA (DEPT MGMT/OPS)","authority":"Stafford Act","dateReceived":"2023-11-02T00:00:00.000Z","dateRequired":"2023-11-02T00:00:00.000Z","popStartDate":"2023-08-31T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-34423,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-34423,"maPopStartDate":"2023-08-31T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-34423,"maPriority":"Normal","assistanceRequested":"Amendment #2 - De-obligate funds in the amount of $34,423.00 to close this Mission Assignment.\r\n\r\n(SCF)Amendment 1:  As per SCF project manager, personnel are no longer needed they are mission complete as of 9/30\r\n(SCF) DHS-IA to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Department of Homeland will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nDHS-MGMT will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"463c194f-fc62-415b-bb62-a665addb55b1","hash":"e0ca6cd1b1289d7001a13a12de9e6c0c7f099f39","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-MGA01","maAmendNumber":1,"actionId":448240,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-MGA","agency":"DHS-MGA (DEPT MGMT/OPS)","authority":"Stafford Act","dateReceived":"2023-09-25T00:00:00.000Z","dateRequired":"2023-09-25T00:00:00.000Z","popStartDate":"2023-08-31T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-09-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-31T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"(SCF)Amendment 1:  As per SCF project manager, personnel are no longer needed they are mission complete as of 9/30\r\n(SCF) DHS-IA to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Department of Homeland will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nDHS-MGMT will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"74161cbb-2345-43d6-be0c-8f5d29a7a26e","hash":"8d5538ac25a70bebaf4f6fcc3bbf9d8d5a146b08","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-MGA01","maAmendNumber":0,"actionId":446147,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-MGA","agency":"DHS-MGA (DEPT MGMT/OPS)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-02T00:00:00.000Z","popStartDate":"2023-08-31T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":34423,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":34423,"maPopStartDate":"2023-08-31T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":34423,"maPriority":"Normal","assistanceRequested":"(SCF) DHS-IA to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Department of Homeland will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\n\r\nDHS-MGMT will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\n\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ffeffbc3-38e8-4409-b4c6-4c3ded3470f3","hash":"12ab8e07ced7e6daacb169cee11551c82101c337","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-ICE01","maAmendNumber":6,"actionId":468774,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-ICE","agency":"DHS-ICE (IMMIG / CUST ENFORCE","authority":"Stafford Act","dateReceived":"2024-06-04T00:00:00.000Z","dateRequired":"2024-06-04T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2024-06-06T00:00:00.000Z","obligationAmount":-1025.12,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1025.12,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1025.12,"maPriority":"Normal","assistanceRequested":"Amendment #6 - De-obligate $1,025.12 per OFA request.\r\nAmendment #5 - De-obligate $19,000.00 per 4/1/2024 QULO report\r\nAmendment #4 - De-obligate $55,000.00 per Quarterly ULO Validation Report. Change PM to Kevin Stewart.Change \r\nAmendment #3 - De-obligate funds in the amount of $90,272.48\r\n(SCF)Amendment#2 - As per SCF project manager, personnel are no longer needed they are mission complete as of 9/30\r\nAmendment #1 - Add additional funding of $34,423.00, additional staff\r\n(SCF) ICE to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Immigration Customs and Enforcement will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nICE will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ad80d0cf-c80a-4d1f-b874-2ed947a63567","hash":"7054aa2983891087d23bad8b05905c053196d85c","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-ICE01","maAmendNumber":5,"actionId":465279,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-ICE","agency":"DHS-ICE (IMMIG / CUST ENFORCE","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-29T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2024-04-30T00:00:00.000Z","obligationAmount":-19000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-19000,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-19000,"maPriority":"Normal","assistanceRequested":"Amendment #5 - De-obligate $19,000.00 per 4/1/2024 QULO report\r\nAmendment #4 - De-obligate $55,000.00 per Quarterly ULO Validation Report. Change PM to Kevin Stewart.Change \r\nAmendment #3 - De-obligate funds in the amount of $90,272.48\r\n(SCF)Amendment#2 - As per SCF project manager, personnel are no longer needed they are mission complete as of 9/30\r\nAmendment #1 - Add additional funding of $34,423.00, additional staff\r\n(SCF) ICE to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Immigration Customs and Enforcement will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nICE will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"6ac75888-3812-4f94-b0c0-d002cd0db95a","hash":"1b1afeb2e2fa8bf56d7deceb9a91b934c09be6ad","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-ICE01","maAmendNumber":4,"actionId":458926,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-ICE","agency":"DHS-ICE (IMMIG / CUST ENFORCE","authority":"Stafford Act","dateReceived":"2024-02-21T00:00:00.000Z","dateRequired":"2024-02-14T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2024-02-21T00:00:00.000Z","obligationAmount":-55000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-55000,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-55000,"maPriority":"Normal","assistanceRequested":"Amendment #4 - De-obligate $55,000.00 per Quarterly ULO Validation Report. Change PM to Kevin Stewart.Change \r\nAmendment #3 - De-obligate funds in the amount of $90,272.48\r\n(SCF)Amendment#2 - As per SCF project manager, personnel are no longer needed they are mission complete as of 9/30\r\nAmendment #1 - Add additional funding of $34,423.00, additional staff\r\n(SCF) ICE to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Immigration Customs and Enforcement will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nICE will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"86e14936-ddf3-4c5b-8a44-6da2e1e4c6f4","hash":"b0d8ef7db7e8f047ee1c3b4ede96e2abc882550d","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-ICE01","maAmendNumber":3,"actionId":451519,"maType":"FOS","supportFunction":5,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-ICE","agency":"DHS-ICE (IMMIG / CUST ENFORCE","authority":"Stafford Act","dateReceived":"2023-11-01T00:00:00.000Z","dateRequired":"2023-11-01T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-90272.48,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-90272.48,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-90272.48,"maPriority":"Normal","assistanceRequested":"Amendment #3 - De-obligate funds in the amount of $90,272.48\r\n\r\n(SCF)Amendment#2 - As per SCF project manager, personnel are no longer needed they are mission complete as of 9/30\r\nAmendment #1 - Add additional funding of $34,423.00, additional staff\r\n(SCF) ICE to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Immigration Customs and Enforcement will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nICE will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"e101f052-4d54-4b0b-9c7b-39d9740ea370","hash":"d4793d8e8ef1d7aad4e4673c7762ba622e15e050","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-ICE01","maAmendNumber":2,"actionId":448251,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-ICE","agency":"DHS-ICE (IMMIG / CUST ENFORCE","authority":"Stafford Act","dateReceived":"2023-09-25T00:00:00.000Z","dateRequired":"2023-09-25T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-09-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"Normal","assistanceRequested":"(SCF)Amendment#2 - As per SCF project manager, personnel are no longer needed they are mission complete as of 9/30\r\nAmendment #1 - Add additional funding of $34,423.00, additional staff\r\n(SCF) ICE to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Immigration Customs and Enforcement will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nICE will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d60421f6-cbc9-4456-bd66-2928a0027a75","hash":"537879b6b40ecf39d3947b5e3c23bea5e91d8589","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-ICE01","maAmendNumber":1,"actionId":446176,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-ICE","agency":"DHS-ICE (IMMIG / CUST ENFORCE","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-02T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-09-02T00:00:00.000Z","obligationAmount":34423,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":34423,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":34423,"maPriority":"Normal","assistanceRequested":"Amendment #1 - Add additional funding of $34,423.00, additional staff\r\n(SCF) ICE to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Immigration Customs and Enforcement will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nICE will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"dae47a3e-0005-4843-8be6-9a042ce2496e","hash":"7b73f926f0a431b64451e97ac5b77d94a7c768d0","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-ICE01","maAmendNumber":0,"actionId":445993,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-ICE","agency":"DHS-ICE (IMMIG / CUST ENFORCE","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-09-02T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-08-31T00:00:00.000Z","obligationAmount":172111,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":172111,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":172111,"maPriority":"Normal","assistanceRequested":"(SCF) ICE to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Immigration Customs and Enforcement will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nICE will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"59fdef45-29ff-4fe5-824a-15f2554f68fd","hash":"a8cce1602bd9cd6bd252ae3fbf565cf430365e8e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-FPS03","maAmendNumber":0,"actionId":446174,"maType":"FOS","supportFunction":0,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-01T00:00:00.000Z","popStartDate":"2023-09-01T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":12500,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":12500,"maPopStartDate":"2023-09-01T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":12500,"maPriority":"High","assistanceRequested":"Provide security officers as required by the field security manager and regional security officer (RSO) at various venues in support of disaster operations.  This is a re-issue of FL-23082403-DHS-FPS-01.\r\n","statementOfWork":"At the direction of, and in coordination with FEMA security personnel, FPS will provide appropriate physical security to\r\nsupport response and recovery operations in the various venues in Region 4. Security of FEMA facilities will be based\r\non FEMA security standards, policies and practices. For FPS accounting purposes this MA and associated funds are intended\r\nto fund FEMA task orders for the period specified or until funds are exhausted. Any time extensions or additional\r\nfunding requirements will be processed utilizing an RRF including new POP (period of performance) dates, cost\r\nestimate and justification. This information will be provided by FEMA Security in coordination with FPS personnel and\r\napproved by the FCO or his/her designee. Equipment purchases are not authorized under this mission assignment.\r\n- MA task orders may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration\r\nof assignment (s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required\r\nfor reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are\r\nreceived, services are provided, and that costs are reasonable and supported by documentation maintained by the respective\r\nagency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA\r\nCFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing,\r\nULO Validation, or additional justification has been provided.","id":"73e82d51-f12f-46c2-a489-e6cc40053f4e","hash":"8b1395c3128a4dd42d101f216f7281de4bcb181e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-FPS01","maAmendNumber":1,"actionId":448217,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2023-09-25T00:00:00.000Z","dateRequired":"2023-09-25T00:00:00.000Z","popStartDate":"2023-08-31T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-09-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-31T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"(SCF) Amendment 1 As per SCF project manager, personnel are no longer needed they are mission complete change of POP to 9/30\r\n(SCF) DHS-FPS to provide DHS/FEMA with additional staff to augment existing cadres","statementOfWork":"As directed by and in coordination with FEMA, Department of Homeland Federal Protective Service will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#39;s disaster operations.\r\nDHS-FPS will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"03da1fdc-2a7e-4261-a18f-a919746f8fff","hash":"3473cfaf0b18bab5d0e8b6e4036084373d66eeb9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-FPS01","maAmendNumber":0,"actionId":446165,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-FPS","agency":"DHS-FPS (FED PROTECT SVCS)","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-09-02T00:00:00.000Z","popStartDate":"2023-08-31T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":104845,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":104845,"maPopStartDate":"2023-08-31T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":104845,"maPriority":"High","assistanceRequested":"(SCF) DHS-FPS to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, Department of Homeland Federal Protective Service will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#39;s disaster operations.\r\nDHS-FPS will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"567aeefb-c389-4ed4-8783-0ee69881df4e","hash":"9fce87edf558309cf27cd04e93f4e7aa170cceb1","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA05","maAmendNumber":2,"actionId":465278,"maType":"FOS","supportFunction":2,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-29T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-06T00:00:00.000Z","dateObligated":"2024-04-30T00:00:00.000Z","obligationAmount":-555.64,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-555.64,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-555.64,"maPriority":"Normal","assistanceRequested":"Amendment #2- De-obligate $555.64 per 4/1/2024 QULO report.\r\nAmendment #1 - De-obligate funds in the amount oof $628.00\r\nActivate MARC/DOC to the RRCC, IOF, JFO, other FEMA teams or facilities. ESF 2. This MA replaces 3596EM-FL-DHS-CISA-03","statementOfWork":"As directed by and in coordination with FEMA, CISA MARC will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or\r\nfacilities in support of disaster operations\r\n ADDITIONAL NOTES from FEMA:\r\n --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and\r\n that costs are reasonable and supported by documentation maintained by the respective agency\r\n --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still\r\n operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been\r\n provided.","id":"30b2261d-81c5-42c8-a97a-f6a2c90776e3","hash":"ee62f42e1a74ad9a45d4579d215fa2918604f349","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA05","maAmendNumber":1,"actionId":451543,"maType":"FOS","supportFunction":2,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-11-01T00:00:00.000Z","dateRequired":"2023-11-01T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-06T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-628,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-628,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-628,"maPriority":"Normal","assistanceRequested":"Amendment #1 - De-obligate funds in the amount oof $628.00\r\nActivate MARC/DOC to the RRCC, IOF, JFO, other FEMA teams or facilities. ESF 2. This MA replaces 3596EM-FL-DHS-CISA-03","statementOfWork":"As directed by and in coordination with FEMA, CISA MARC will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or\r\nfacilities in support of disaster operations\r\n ADDITIONAL NOTES from FEMA:\r\n --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and\r\n that costs are reasonable and supported by documentation maintained by the respective agency\r\n --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still\r\n operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been\r\n provided.","id":"7c6a9f92-1ec2-4428-a53e-f44b1cbca34f","hash":"74dff85850b4b5edd367bea311ab7f46f6642bae","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA05","maAmendNumber":0,"actionId":446102,"maType":"FOS","supportFunction":2,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-01T00:00:00.000Z","dateRequired":"2023-08-30T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-06T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-06T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate MARC/DOC to the RRCC, IOF, JFO, other FEMA teams or facilities. ESF 2. This MA replaces 3596EM-FL-DHS-CISA-03","statementOfWork":"As directed by and in coordination with FEMA, CISA MARC will provide appropriate personnel to the RRCC, IOF, JFO, or other FEMA teams or\r\nfacilities in support of disaster operations\r\n ADDITIONAL NOTES from FEMA:\r\n --- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n --- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n --- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n --- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n --- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and\r\n that costs are reasonable and supported by documentation maintained by the respective agency\r\n --- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still\r\n operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been\r\n provided.","id":"5d6bace2-1167-4cdb-8521-3210e7d89bda","hash":"0cd99518d5464c03f1157a41a8dccedd2bb94330","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA04","maAmendNumber":1,"actionId":451541,"maType":"FOS","supportFunction":14,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-11-01T00:00:00.000Z","dateRequired":"2023-11-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-680.69,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-680.69,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-680.69,"maPriority":"Normal","assistanceRequested":"Amendment #1 - De-obligate funds in the amount of $680.69\r\nActivate CISA-14 LNO to NRCC. This MA replaces 3596EM-FL-DHS-CISA- 02.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial and Infrastructure analyst SME)  \r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"0efaf8be-5aa5-45f2-94d3-203621c14692","hash":"2d831088e539a36337536e0c7a50f4eb14d0a449","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA04","maAmendNumber":0,"actionId":446115,"maType":"FOS","supportFunction":14,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":3000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":3000,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":3000,"maPriority":"Normal","assistanceRequested":"Activate CISA-14 LNO to NRCC. This MA replaces 3596EM-FL-DHS-CISA- 02.","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC or other facilities in support of disaster operations.\r\nSupport may include, but is not limited to, the following:\r\n - ESF-14 coordination and delivery of products and services\r\n - ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure \r\nCISA liaisons may include representatives from  \r\n - Integrated Operations Division (ESF14)\r\n - Infrastructure Security Division (Infrastructure SME) \r\n - National Risk Management Center (Geospatial and Infrastructure analyst SME)  \r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"6e5c5c2d-c157-4288-8852-8fa910d1952d","hash":"505e579645da3d0a231df340ac5062bc212587fb","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA03","maAmendNumber":2,"actionId":457952,"maType":"FOS","supportFunction":14,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-02-02T00:00:00.000Z","dateRequired":"2024-02-02T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":-1931.58,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-1931.58,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-1931.58,"maPriority":"Normal","assistanceRequested":"Amendment #2 - De-obligate $1,931.58 per ULO Validation Report. Change PM to Kevin Stewart.\r\nAmendment #1 - De-obligate funds in the amount of $6,084.60\r\nActivate CISA-14 LNOs to RRCC, JFO, IOF, this replaces previous MA FL-23082403-DHS-CISA-01","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\n\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"c26235f8-a91d-43c2-ac04-631f00d0ec1e","hash":"d3429d9073f804df00e73b580d041fa744dae80e","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA03","maAmendNumber":1,"actionId":451532,"maType":"FOS","supportFunction":14,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-11-01T00:00:00.000Z","dateRequired":"2023-11-01T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-6084.6,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-6084.6,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-6084.6,"maPriority":"Normal","assistanceRequested":"Amendment #1 - De-obligate funds in the amount of $6,084.60\r\nActivate CISA-14 LNOs to RRCC, JFO, IOF, this replaces previous MA FL-23082403-DHS-CISA-01","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\n\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"ae457739-c39f-48fc-b1db-9d6d7d1e46a6","hash":"df617e3add8a7f216e9647b5950afad56e9ba191","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA03","maAmendNumber":0,"actionId":446096,"maType":"FOS","supportFunction":14,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-28T00:00:00.000Z","popStartDate":"2023-08-27T00:00:00.000Z","popEndDate":"2023-09-04T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":10000,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":10000,"maPopStartDate":"2023-08-27T00:00:00.000Z","maPopEndDate":"2023-09-04T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":10000,"maPriority":"Normal","assistanceRequested":"Activate CISA-14 LNOs to RRCC, JFO, IOF, this replaces previous MA FL-23082403-DHS-CISA-01","statementOfWork":"As directed by and in coordination with FEMA, DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the RRCC, JFO, IOF, or other teams and facilities in support of disaster operations.\r\n\r\nSupport may include, but is not limited to, the following:\r\n- ESF-14 coordination and delivery of products and services\r\n- ESF-5 regarding critical physical and cyber infrastructure\r\n- Analysis of impacts to Lifelines and National Critical Infrastructure\r\n\r\nCISA liaisons may include representatives from\r\n- Integrated Operations Division (ESF14)\r\n- Infrastructure Security Division (Infrastructure SME)\r\n- National Risk Management Center (Geospatial SME)\r\n\r\nADDITIONAL NOTES from FEMA:\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement.\r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"3bddc3f3-42ca-4ba9-97d4-f82e61b9a890","hash":"8ee83f4d4431c559a6f229afc47e0a12e62b9ef7","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA02","maAmendNumber":2,"actionId":457949,"maType":"FOS","supportFunction":2,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-02-02T00:00:00.000Z","dateRequired":"2024-02-02T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2024-02-05T00:00:00.000Z","obligationAmount":-324.73,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-324.73,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-324.73,"maPriority":"Normal","assistanceRequested":"Amendment #2 - De-obligate $324.73 per ULO Validation Report. Change PM to Kevin Stewart.\r\nAmendment #1 - De-obligate funds in the amount of $6,947.42\r\nActivate CISA ESF-2 to NRCC.  This MA replaces 3596EMFL-DHS-CISA-01\r\n","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"84b08a51-7f0b-4c40-ace3-913d77a031cb","hash":"9dd30f04bf4858529ff754079a9aafea7c366067","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA02","maAmendNumber":1,"actionId":451529,"maType":"FOS","supportFunction":2,"priority":"Normal","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-11-01T00:00:00.000Z","dateRequired":"2023-11-01T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-6947.42,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-6947.42,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-6947.42,"maPriority":"Normal","assistanceRequested":"Amendment #1 - De-obligate funds in the amount of $6,947.42\r\nActivate CISA ESF-2 to NRCC.  This MA replaces 3596EMFL-DHS-CISA-01\r\n","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"dc6cb0ec-5e5a-4815-a45e-989025581e07","hash":"2cae7d74f140996d2e4c1e3c4805d536557df7cc","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA02","maAmendNumber":0,"actionId":446035,"maType":"FOS","supportFunction":2,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-08-31T00:00:00.000Z","popStartDate":"2023-08-28T00:00:00.000Z","popEndDate":"2023-09-27T00:00:00.000Z","dateObligated":"2023-09-01T00:00:00.000Z","obligationAmount":9919,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":9919,"maPopStartDate":"2023-08-28T00:00:00.000Z","maPopEndDate":"2023-09-27T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":9919,"maPriority":"Normal","assistanceRequested":"Activate CISA ESF-2 to NRCC.  This MA replaces 3596EMFL-DHS-CISA-01\r\n","statementOfWork":"As directed by and in coordination with FEMA,  DHS Cybersecurity &amp; Infrastructure Security Agency (CISA) will provide appropriate personnel to the NRCC to support ESF-2 in disaster operations.\r\n- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s). \r\n- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement. \r\n- All equipment and supply purchases must be coordinated with FEMA Project Manager. If approved, documentation is necessary to ensure reimbursement. \r\n- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA. \r\n- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency \r\n- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a119e077-c5d5-4fba-96c3-d366bff08dc4","hash":"25ab4ab0619eb1d056ba4efe9fae805638c0c689","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA01","maAmendNumber":3,"actionId":465315,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2024-04-29T00:00:00.000Z","dateRequired":"2024-04-29T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2024-04-30T00:00:00.000Z","obligationAmount":-16650.04,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-16650.04,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-16650.04,"maPriority":"High","assistanceRequested":"(SCF) Amendment 3: De-obligate $16.650.04 per 4/1/2024 QULO report.\r\n(SCF) Amendment 2 De-obligate funds in the amount of $277,642.57\r\n(SCF)Amendment 1 As per SCF project manager, personnel are no longer needed they are mission complete change of POP to 9/30\r\n(SCF) DHS-CISA to provide DHS/FEMA with additional staff to augment existing cadres","statementOfWork":"As directed by and in coordination with FEMA, Cybersecurity and Infrastructure Security Agency will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nCISA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"2d0bf049-c614-4ec3-9524-90edb5c9fff6","hash":"0d2851d7d8e03518a098d49627d98db3da9a2e75","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA01","maAmendNumber":2,"actionId":451510,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-11-01T00:00:00.000Z","dateRequired":"2023-11-01T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-11-03T00:00:00.000Z","obligationAmount":-277642.57,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":-277642.57,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":-277642.57,"maPriority":"High","assistanceRequested":"(SCF) Amendment 2 De-obligate funds in the amount of $277,642.57\r\n\r\n(SCF)Amendment 1 As per SCF project manager, personnel are no longer needed they are mission complete change of POP to 9/30\r\n(SCF) DHS-CISA to provide DHS/FEMA with additional staff to augment existing cadres","statementOfWork":"As directed by and in coordination with FEMA, Cybersecurity and Infrastructure Security Agency will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nCISA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"bc802d3f-9474-401d-b450-35c1c37f1748","hash":"c835a045c622863463ab2f10bcabd5a037ded5c9","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA01","maAmendNumber":1,"actionId":448216,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-09-25T00:00:00.000Z","dateRequired":"2023-09-25T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-09-30T00:00:00.000Z","dateObligated":"2023-09-26T00:00:00.000Z","obligationAmount":0,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":0,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":0,"maPriority":"High","assistanceRequested":"(SCF)Amendment 1 As per SCF project manager, personnel are no longer needed they are mission complete change of POP to 9/30\r\n(SCF) DHS-CISA to provide DHS/FEMA with additional staff to augment existing cadres","statementOfWork":"As directed by and in coordination with FEMA, Cybersecurity and Infrastructure Security Agency will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nCISA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"f87439aa-a57b-4bed-a3dd-70ebe8746126","hash":"4f3275f4c7c699f5c7fb9c398af507aea9eb5052","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CISA01","maAmendNumber":0,"actionId":446013,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-CISA","agency":"DHS-CISA (INFRA PROT/INFO SEC","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-09-02T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-10-16T00:00:00.000Z","dateObligated":"2023-08-31T00:00:00.000Z","obligationAmount":344221,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":344221,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-09-30T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":344221,"maPriority":"High","assistanceRequested":"(SCF) CISA to provide DHS/FEMA with additional staff to augment existing cadres. ","statementOfWork":"As directed by and in coordination with FEMA, Cybersecurity and Infrastructure Security Agency will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#xfffd;s disaster operations.\r\nCISA will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\n\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"a8da34dd-2c6a-4022-86d9-db8cb249da57","hash":"a614f8f97e1648a7643b9f6fa6fbb2111fe3e8c3","lastRefresh":"2024-08-27T18:24:53.439Z"},{"incidentId":"2023082403","incidentName":"R04 Tropical System in West Carib/Gulf ","incidentType":"Tropical Storm","disasterNumber":4734,"declarationType":"DR","declarationTitle":"HURRICANE IDALIA","maId":"4734DRFLDHS-CIS02","maAmendNumber":0,"actionId":446024,"maType":"FOS","supportFunction":5,"priority":"High","region":4,"stt":"FL","agencyId":"DHS-CIS","agency":"DHS-CIS (IMMIGRAT EXAMIN FEES","authority":"Stafford Act","dateReceived":"2023-08-31T00:00:00.000Z","dateRequired":"2023-09-02T00:00:00.000Z","popStartDate":"2023-08-30T00:00:00.000Z","popEndDate":"2023-10-24T00:00:00.000Z","dateObligated":"2023-08-31T00:00:00.000Z","obligationAmount":2621114,"sttCostSharePct":0,"fedCostSharePct":1,"sttCostShareAmt":0,"fedCostShareAmt":2621114,"maPopStartDate":"2023-08-30T00:00:00.000Z","maPopEndDate":"2023-10-24T00:00:00.000Z","maSttCostSharePct":0,"maFedCostSharePct":1,"maSttCostShareAmount":0,"maFedCostShareAmount":2621114,"maPriority":"High","assistanceRequested":"(SCF) USCIS to provide DHS/FEMA with additional staff to augment existing cadres.","statementOfWork":"As directed by and in coordination with FEMA, United States Citizenship and Immigration Services will provide Surge Capacity Force personnel consisting of permanent agency staff willing to deploy for a field assignment to augment FEMA&#39;s disaster operations.\r\nUSCIS will provide employees who have been identified as Surge Capacity Force (SCF) members at specified tier (Tier 3 or Tier 4) in accordance with standards in the DHS Surge Capacity Force Program Interim Guide, dated August 2022.\r\nNOTE: Agencies do not receive advances of funds from FEMA to pay for mission assigned activities. FEMA must receive and approve a request for payment for mission assignment work, accompanied by supporting documentation, to process reimbursement from the Disaster Relief Fund (DRF).\r\nADDITIONAL NOTES from FEMA:\r\n--- MA task orders (MATOs) may be issued by FEMA for specific requirements, personnel, location(s), date(s), and duration of assignment(s).\r\n--- Agencies will be reimbursed for all eligible expenses pursuant to 44 CFR. Supporting documentation is required for reimbursement.\r\n--- All equipment and supply purchases must be coordinated with FEMA. If approved, documentation is necessary to ensure reimbursement.\r\n--- Activation of agency command center(s), if required, must be coordinated with FEMA as a separate MA.\r\n--- The mission-assigned agency is responsible for ensuring that all activity is properly authorized, goods are received, services are provided, and that costs are reasonable and supported by documentation maintained by the respective agency\r\n--- MAs shall be considered for closure after 180 days with no financial activity in accordance with FEMA CFO Bulletin #157. For MAs still operationally open, requests for additional obligations may be withheld if no invoicing, ULO Validation, or additional justification has been provided.","id":"d23ec1ac-bf08-4005-8833-9e04a2d4181d","hash":"bfe290210bcd4150e0224020373b226040dcd242","lastRefresh":"2024-08-27T18:24:53.439Z"}]}