Unit Objectives Explain building security design issues to a building owner for consideration prior to a renovation or new construction. Explain the identification process to arrive at the high risk asset Ð threat/hazard pairs. Justify the recommended mitigation measures, explaining the benefits in reducing the risk for the high risk situations of interest. Hazardville Information Company Company _ Functions _ Infrastructure Threats/Hazards _ Design Basis Threat _ Level of Protection Vulnerabilities _ Impact _ Mitigation Report Hazardville Information Company IT services and support _ 130 employees Two story building in small corporate office park Located in suburban area of major metropolitan city "Neighbors" include: _ Offices _ Industry _ Road, Rail, Air traffic HIC 5-Mile Building Radius HIC Local Imagery HIC Site Imagery HIC HazMat Sites HIC Emergency Response HIC Functional Layout HIC Car Bomb Blast Effects HIC Truck Bomb Blast Effects HIC Truck Bomb Blast Effects HIC Building Data HIC Mechanical Systems HIC Mechanical Systems HIC Mechanical Systems HIC Electrical Systems HIC Mechanical and Electrical Room HIC Physical Security HIC IT HIC Emergency Response Threats/Hazards Design Basis Threat Explosive Blast: Car Bomb 250 lb TNT equivalent. Truck Bomb 5,000 lb TNT equivalent (Murrah Federal Building class weapon) Chemical: Large quantity gasoline spill and toxic plume from the adjacent tank farm, small quantity (tanker truck and rail car size) spills of HazMat materials (chlorine) Biological: Anthrax delivered by mail or in packages, smallpox distributed by spray mechanism mounted on truck or aircraft in metropolitan area Radiological: Small "dirty" Bomb detonation within the 10-mile radius of the HIC building Level of Protection GSA Interagency Security Criteria Level II Building Ð between 11-150 employees; 2,500 to 80,000 sq ft _ Perimeter Security _ Entry Security _ Interior Security _ Administrative Procedures _ Blast/Setback Standards Levels of Protection Levels of Protection Level of Protection Level of Protection (continued) Unit XI Case Study Activity Finalization and Presentation of Group Results Purpose _ Groups finalize their assessments _ Decide on high priority risk concerns _ Determine appropriate mitigation measures _ Present findings to class Requirements Based on findings from previous 10 activities, complete the worksheet table Prepare to present conclusions and justify decisions to class in a 5- to 7- minute presentation Vulnerability/Mitigation Car Bomb Blast/Site Protect front entrance from car bomb blast Ð 82 foot stand-off _ Use planters, plinth walls, landscaping _ FRF film on windows or replace with laminated glass _ Consider closing in overhang area Truck Bomb/Site Protect rear parking area from truck bomb _ Use chain link gate, vehicle pop barriers, pre-screening away from building Vulnerability/Mitigation Chemical/Mechanical-HVAC Install emergency shut down switch, protect outside air intake Evaluate carbon filters for chlorine type spills Upgrade filters to MERV 11 to remove gasoline plume and other particulates Biological/Mechanical-HVAC Evaluate UVGI Evaluate a standalone mailroom on separate HVAC zone Radiological/Site Install emergency shut down switch on HVAC Upgrade filters to MERV 11 to remove radioactive particulates Vulnerability/Mitigation Other Significant Vulnerabilities/Mitigations Blast/Site Separate front lobby from interior office space with security door if primary mail entry point is the lobby area Distribute internal functions for redundancy Evaluate other utility connections/distribution capability for redundant feed to the building Blast/Structural and Building Strengthen overhead anchorage elements _ Heaters Vulnerability/Mitigation Blast or Armed Attack/Mechanical Fire sprinklers _ Install enunciator panel and go to zones, dual stage in data center, clean agents versus water Chill water _ Install backup piping to primary air handling units Install exhaust fan in UPS room (lead acid batteries) Place bollards around or relocate natural gas meters Blast or Armed Attack/Electrical Primary Bus _ Separate Computer Center Bus from Support Bus Place bollards or fencing around transformers Increase size of generator fuel tank Vulnerability/Mitigation Cyber Attack and Blast/IT Systems Store backup tapes/data at least 10 miles away Identify alternate telecom carrier circuits and availability Conduct full extended load test of emergency power/UPS system Blast and Armed Attack/Physical Security Raise height of rear perimeter fencing Evaluate installing a small Security Operations Center and increase monitoring/awareness of exterior Upgrade CCTV system to digital and DVR and install additional cameras to view front parking, lobby, and loading dock Vulnerability/Mitigation Blast and CBR/Emergency Operations/Disaster Recovery Install mass notification system Post shelter and evacuation procedures Identify rally point at site away from building Use computer data center for shelter-in-place Acquire personal protective evacuation hoods