Risk Management Series Building Design for Homeland Security Student Manual January 2004 FEMA E 1 5 5 E155/ January 2004 RISK MANAGEMENT SERIES Building Design for Homeland Security PROVIDING PROTECTION TO PEOPLE AND BUILDINGS Student Manual www.fema.gov Any opinions, findings, conclusions, or recommendations expressed in this publication do not necessarily reflect the views of FEMA. Additionally, neither FEMA or any of its employees makes any warrantee, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, product, or process included in this publication. Users of information from this publication assume all liability arising from such use. BACKGROUND AND ACKNOWLEDGMENTS BACKGROUND The Federal Emergency Management Agency (FEMA) developed the Building Design for Homeland Security Course (E155), to provide needed information on how to mitigate the effects of potential terrorist attacks. The purpose of E155 is to familiarize students with assessment methodologies available to identify the relative level of risk for various threats, including blast and chemical, biological, or radiological. The students will be introduced to FEMA 426 and will be asked to provide cost-effective mitigation measures for a range of manmade hazards. The primary target audience for this course includes engineers, architects, and building officials. ACKNOWLEDGMENTS Principal Authors: Michael Chipley, UTD, Inc. Michael Kaminskas, UTD, Inc. Contributors: Milagros Kennett, FEMA, Project Officer, Risk Management Series Publications Dan Bondroff, EMI Training Specialist Eric Letvin, Greenhorne & OMara, Inc., Consultant Project Manager Christopher Arnold, Building Systems Development, Inc. Dwight Johnson, All About Training Instruction System Designer Gina Wightman, All About Training Instruction System Designer Deb Daly, Greenhorne & OMara, Inc. Wanda Rizer, Greenhorne & OMara, Inc. Julie Liptak, Greenhorne & OMara, Inc. BACKGROUND AND ACKNOWLEDGMENTS This course was prepared under contract to FEMA. It will be revised periodically, and comments and feedback to improve future editions are welcome. Please send comments and feedback by e-mail to riskmanagementseriespubs@dhs.go v BACKGROUND AND ACKNOWLEDGMENTS AGENDA Day 1 Instructor 8:30 a.m. Unit I Introduction and Course Michael Chipley, Ph.D. Overview 10:00 a.m. Break Eric Letvin, Esq. 10:15 a.m. Unit II Asset Value Assessment Eric Letvin, Esq. 11:30 a.m. Lunch Eric Letvin, Esq. 12:30 p.m. Unit III Threat/Hazard Assessment Michael Chipley, Ph.D. 1:45 p.m. Break Eric Letvin, Esq. 2:00 p.m. Unit IV Vulnerability Assessment Michael Kaminskas, P.E. 3:45 p.m. Break Eric Letvin, Esq. 4:00 p.m. Unit V Risk Assessment/Risk Eric Letvin, Esq. Management 4:45 p.m. Day 1 Wrap-up and Day 2 Forecast Eric Letvin, Esq. 5:00 p.m. Dinner Eric Letvin, Esq. AGENDA Day 2 Instructor 8:30 a.m. Day 1 Review and Day 2 Overview Eric Letvin, Esq. 8:45 a.m. Unit V Risk Assessment/Risk Michael Chipley, Ph.D. Management (continued) 9:15 a.m. Unit VI Explosive Blast Michael Kaminskas, P.E. 10:15 a.m. Break Eric Letvin, Esq. 10:30 a.m. Unit VII Chemical, Biological, and Michael Chipley, Ph.D. Radiological Measures 11:30 a.m. Lunch Eric Letvin, Esq. 12:30 p.m. Written Exam Michael Chipley, Ph.D. Michael Kaminskas, P.E. 1:00 p.m. Written Exam Review Michael Chipley, Ph.D. Michael Kaminskas, P.E. 1:30 p.m. Break Eric Letvin, Esq. 1:45 p.m. Unit VIII Site and Layout Design Chris Arnold, FAIA Guidance 3:30 p.m. Break Eric Letvin, Esq. 3:45 p.m. Unit VIII Site and Layout Design Chris Arnold, FAIA Guidance (continued) 4:30 p.m. Day 2 Wrap-up and Day 3 Forecast Eric Letvin, Esq. 5:00 p.m. Dinner Eric Letvin, Esq. AGENDA Day 3 8:30 a.m. Day 2 Review and Day 3 Overview 8:45 a.m. Unit IX Building Design Guidance 10:15 a.m. Break 10:30 a.m. Unit IX Building Design Guidance (continued) 11:30 a.m. Lunch 12:30 p.m. Unit X Electronic Security Systems 1:15 p.m. Break 1:30 p.m. Unit XI Finalization of Case Study Results [Goal is to brief building owner on prioritized recommendations and justifications for security work.] 2:15 p.m. Break 2:30 p.m. Unit XI Presentation of Group Case Study Results and Discussion (continued) [Assumes 6 teams and 10 minutes per team to present and 5 minutes per team to discuss.] 4:00 p.m. Unit XII Course Wrap-up 5:00 p.m. Adjourn Instructor Eric Letvin, Esq. Michael Kaminskas, P.E. Eric Letvin, Esq. Michael Kaminskas, P.E. Eric Letvin, Esq. Eric Letvin, Esq. Eric Letvin, Esq. Michael Chipley, Ph.D. Michael Kaminskas, P.E. Eric Letvin, Esq. Michael Chipley, Ph.D. Michael Kaminskas, P.E. Eric Letvin, Esq. Eric Letvin, Esq. Unit I: Introduction and Course Overview U n i t I COURSE TITLE Building Design for Homeland Security UNIT TITLE Introduction and Course Overview OBJECTIVES 1. Describe the goal, objectives, and agenda for the course 2. Describe and find material in the course reference manual and student activity handout SCOPE This unit will cover the following topics: 1. 1. Welcome and Opening Remarks 2. 2. Instructor Introductions 3. 3. Administrative Information 4. 4. Student Introductions 5. 5. Course Overview 6. 6. Course Materials 7. 7. Activity: Become familiar with Case Study materials REFERENCES 1. FEMA 426, Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings 2. Case Study, Hazardville Information Company (HIC) This page intentionally left blank UNIT I CASE STUDY ACTIVITY: HAZARDVILLE INFORMATION COMPANY (HIC) CASE STUDY OVERVIEW Requirements Turn to the Appendix A Case Study materials in the Student Manual and briefly peruse the document. Read the "familiarization" questions on the following worksheet, and as a group, complete the worksheet. Use only the Case Study data to answer worksheet questions. Information has been limited in an effort to focus the activity. Question Answer Page # in Case Study 1. What are the major transportation nodes in the surrounding area? A major interstate highway is located within 1/4 mile of the HIC Headquarters. A-3, A-28 A- 30 CSX Transportation and Norfolk-Southern Railway maintain a transportation corridor about 1/2 mile from HIC. There appear to be no restrictions on the material carried along these rail lines. Two airports are in the vicinity of HIC. One is a major international airport approximately 8 miles away. The other is a small, but busy general aviation airport approximately 2 miles away. Unit I: Introduction and Course Overview Page # in Case Question Answer Study 2. What life safety assets are A-16, A-17, A-27 available, and what are their response times? 3. Who are the buildings primary A-1, A-2 occupants and visitors? Unit I: Introduction and Course Overview Question Answer Page # in Case Study 4. What hazards may affect HIC? A-5, A-6, A-28 A- 30 5. What are the prevalent weather/wind conditions at HIC? A-6 6. What are the critical functions of HIC? A-21 24 Unit I: Introduction and Course Overview Page # in Case Question Answer Study 7. What are the components of A-12 A-19 HICs critical utility infrastructure? 8. What are the components of A-11, A-12, A-16 HICs critical building infrastructure? This page intentionally left blank Unit II: Asset Value Assessment U ni t II COURSE TITLE Building Design for Homeland Security UNIT TITLE Asset Value Assessment OBJECTIVES 1. Identify the assets of a building or site that can be affected by a threat or hazard 1. 2. Explain the components used to determine the value of an asset 2. 3. Determine the critical assets of a building or site 3. 4. Provide a numerical rating for the asset and justify the basis for the rating SCOPE The following topics will be covered in this unit: 1. 1. The core functions and critical infrastructure listed on the threat- vulnerability matrix. 2. 2. Various approaches to determine asset value Federal Emergency Management Agency, Department of Defense, Department of Justice, and Veterans Affairs. 3. 3. A rating scale and how to use it to determine an asset value. 4. 4. Activity: Identify the assets to consider in the case study and determine the asset value for each asset of interest. REFERENCES 1. FEMA 426, Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings, pages 1-10 to 1-14 2. Case Study Hazardville Information Company This page intentionally left blank UNIT II CASE STUDY ACTIVITY: ASSET VALUE RATINGS Asset value is the degree of debilitating impact that would be caused by the incapacity or destruction of a buildings assets. Page 1-13 of FEMA 426 provides an Asset Value Scale (Table 1-1) to quantify asset value, as well as definitions of the ratings. Table 1-2 on page 1-14 of FEMA 426 provides a format to summarize the value of the major categories of a buildings assets. Requirements Referring to the HIC Case Study, answer the following questions: Identifying Building Core Functions 1. 1. What are HICs primary services or outputs? 2. 2. What critical activities take place at HIC? 3. 3. Who are the buildings primary occupants and visitors? 4. 4. What inputs from external organizations are required for HICs success? Identifying Building Assets and Quantifying Asset Values Refer to Table 1-2 in FEMA 426 and use the descriptions of these asset categories in the HIC Case Study. Consider the questions on page 1-11 in FEMA 426 and rate HICs assets as: . Very High (10) . High (8-9) . Medium High (7) . Medium (5-6) . Medium Low (4) . Low (2-3) . Very Low (1) HIC Critical Functions Asset Rating Asset Value Numeric Value Rationale 1. Administrative Medium Low 4 Redundancy and staff skills that can be replaced. Senior managers and financial systems in the same area make the function a key area to protect. Low to medium economic cost to replace. 2. Engineering/IT Technicians Medium 5 Staff skills that can be replaced, but require specialized expertise. Key equipment and resources may not be replaceable. High economic cost to replace. 3. Loading Dock/Warehouse Asset Value Numeric Value Rationale 4. Data Center 5. Communications 6. Security 7. Housekeeping HIC Critical Infrastructure Asset Rating This page intentionally left blank Asset Value Numeric Value Rationale 1. Site 2. Architectural 3. Structural Systems 4. Envelope Systems 5. Utility Systems Asset Value Numeric Value Rationale 6. Mechanical Systems 7. Plumbing and Gas Systems 8. Electrical Systems 9. Fire Alarm Systems 10. IT/Communications Systems Unit III: Threat/Hazard Assessment U nit III COURSE TITLE Building Design for Homeland Security UNIT TITLE Threat/Hazard Assessment OBJECTIVES 1. Identify the threats and hazards that may impact a building or site 1. 2. Define each threat and hazard using the Department of Defense methodology 2. 3. Provide a numerical rating for the threat or hazard and justify the basis for the rating 3. 4. Define the Design Basis Threat and Levels of Protection SCOPE The following topics will be covered in this unit: 1. 1. From what offices is threat and hazard information available. 2. 2. The spectrum of event profiles for terrorism and technological hazards from FEMA 386-7. 3. 3. The five components used by DoD to define a threat and how it can be applied to the Homeland Security Advisory System. 4. 4. Various approaches to determine threat rating Federal Emergency Management Agency, Department of Defense, Department of Justice, and Veterans Affairs. 5. 5. A rating scale and how to use it to determine a threat rating. 6. 6. Activity: Identify the threats and hazards to consider in the Case Study. As an absolute minimum, consider explosive blast and agents (chemical, biological, and radiological). Determine the threat rating for the minimum threat/hazards. REFERENCES 1. FEMA 426, Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings, pages 1-1 to 1-18 2. Case Study Hazardville Information Company This page intentionally left blank UNIT III CASE STUDY ACTIVITY: THREAT/HAZARD RATINGS After assets that need to be protected are determined, an assessment is performed to identify the threats and hazards that could cause harm to the building and the inhabitants of the building. Hazards are categorized into two groups: natural and manmade. While natural hazards could logically be expected to affect the HIC, the Case Study only describes the threat from explosive blast and from chemical, biological, and/or radiological "agents." The result of this assessment is a "Threat Rating." The threat rating is a subjective judgment of a threat based on existence, capability, history, intentions, and targeting. The rating scale is a scale of 1 to 10, with 1 a very low probability of a terrorist attack and 10 a very high probability. Requirements Refer to the HIC Case Study data and GIS portfolio and complete the following worksheets. Each student will interpret the HIC threat information and should have a number close to the value shown. Any function with key IT systems connected to the Internet should get high cyber values. Functions that are susceptible to blast should get high numbers. A CBR attack will impact the entire facility. HIC Critical Functions Threat Rating Function Cyber Attack Armed Attack Vehicle Bomb CBR Attack Rationale 1. Administration 6 3 6 4 Local and international groups with the capability, intentions, and targeting expertise are known to be in the area. 2. Engineering/IT Technicians 5 3 6 4 Local and international groups with the capability, intentions, and targeting expertise are known to be Function Cyber Attack Armed Attack Vehicle Bomb CBR Attack Rationale in the area. 3. Loading Dock/Warehousing 4. Data Center 5. Communications 6. Security 7. Housekeeping HIC Infrastructure Threat Rating This page intentionally left blank Function Cyber Attack Armed Attack Vehicle Bomb CBR Attack Rationale 1. Site Function Cyber Attack Armed Attack Vehicle Bomb CBR Attack Rationale 2. Architectural 3. Structural 4. Envelope Systems 5. Utility Systems 6. Mechanical Systems 7. Plumbing and Gas Systems 8. Electrical Systems 9. Fire Alarm Systems Function Cyber Attack Armed Attack Vehicle Bomb CBR Attack Rationale 10. IT/Communications Systems Unit IV: Vulnerability Assessment U nit IV COURSE TITLE Building Design for Homeland Security UNIT TITLE Vulnerability Assessment OBJECTIVES 1. Explain what constitutes a vulnerability 1. 2. Identify vulnerabilities using the Building Vulnerability Assessment Checklist 2. 3. Understand that an identified vulnerability may indicate that an asset is vulnerable to more than one threat or hazard and that mitigation measures may reduce vulnerability to one or more threats or hazards 3. 4. Provide a numerical rating for the vulnerability and justify the basis for the rating SCOPE The following topics will be covered in this unit: 1. 1. Review types of vulnerabilities, especially single-point vulnerabilities and tactics possible under threats/hazards for which there are no mitigation measures. 2. 2. Various approaches and considerations to determine vulnerabilities Federal Emergency Management Agency, Department of Defense, Department of Justice, and Veterans Affairs. 3. 3. A rating scale and how to use it to determine a vulnerability rating. 4. 4. Activity: Identify the vulnerabilities present in the Case Study. As an absolute minimum, consider threats/hazards associated with explosive blast and agents (chemical, biological, and radiological). Determine the vulnerability rating for each asset threat/hazard pairs of interest. REFERENCES 1. FEMA 426, Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings, Chapter 1 2. Case Study Hazardville Information Company This page intentionally left blank UNIT IV CASE STUDY ACTIVITY: VULNERABILITY RATING Vulnerability is any weakness that can be exploited by an aggressor or, in a non-terrorist threat environment, make an asset susceptible to hazard damage. Vulnerabilities may include: . Critical functions or systems that lack redundancy and if damaged would result in immediate organization disruption or loss of capability ("Single-Point Vulnerability") . Redundant systems feeding into a single critical node . Critical components of redundant systems collocated . Inadequate capacity or endurance in post-attack environment Vulnerability rating requires identifying and rating the vulnerability of each asset-threat pair. In-depth vulnerability assessment of a building evaluates specific design and architectural features and identifies all vulnerabilities of the building functions and building systems. Requirement For an example of how a specific asset is assessed, answer the following questions and record relevant observations on the following table regarding the HIC site and building. Determine what, if any, vulnerability exists: Section Vulnerability Questions Guidance Observations 1.16 Does adjacent surface parking on site maintain a minimum stand-off distance? The specific stand-off distance needed is based upon the design basis threat bomb size and the building construction. For initial screening, consider using 25 meters (82 feet) as a minimum, with more distance needed for There is no adjacent parking per se, but there is one parking lot or area that any tenant or visitor to the office park can use. Stand-off distance to the front unreinforced masonry or wooden walls. Reference: GSA PBS-100 parking lot is less than the 82 feet screening value. Cars or trucks can drive up to the loading dock in the rear. Section Vulnerability Questions Guidance Observations 1.19 Do site landscaping and street furniture provide hiding places? Minimize concealment opportunities by keeping landscape plantings (hedges, shrubbery, and large plants with heavy ground cover) and street furniture (bus shelters, benches, trash receptacles, mailboxes, newspaper vending machines) away from the building to permit observation of intruders and prevent hiding of packages. If mail or express boxes are used, the size of the openings should be restricted to prohibit the insertion of packages. Reference: GSA PBS- 100 2.15 Are critical assets (people, activities, building systems and components) located close to any main entrance, vehicle circulation, parking, maintenance area, loading dock, or interior parking? Are the critical building systems and components hardened? Critical building components include: emergency generator, including fuel systems, day tank, fire sprinkler, and water supply; normal fuel storage; main switchgear; telephone distribution and main switchgear; fire pumps; building control centers; uninterruptible power supply (UPS) systems controlling critical functions; main refrigeration and ventilation systems if critical to building operation; elevator machinery and controls; shafts for stairs, elevators, and utilities; and critical distribution feeders for emergency power. Evacuation and rescue require emergency systems to remain operational during a disaster and they should be located away from attack locations. Primary and back-up systems should be separated to reduce the risk of both being impacted by a single incident if collocated. Utility systems should be located at least 50 feet from loading docks, front entrances, and parking areas. One way to harden critical building systems and components is to enclose them within hardened walls, floors, and ceilings. Do not place them near high risk areas where they can receive collateral damage. Reference: GSA PBS-100 Section Vulnerability Questions Guidance Observations 2.16 Are high value or critical assets located as far into the interior of the building as possible and separated from the public areas of the building? Critical assets, such as people and activities, are more vulnerable to hazards when on an exterior building wall or adjacent to uncontrolled public areas inside the building. Reference: GSA PBS-100 4.2 Is there less than 40 percent fenestration openings per structural bay? Is the window system design on the exterior faade balanced to mitigate the hazardous effects of flying glazing following an explosive event? (glazing, frames, anchorage to supporting walls, etc.) The performance of the glass will similarly depend on the materials. Glazing may be single pane or double pane, monolithic or laminated, annealed, heat strengthened, or fully tempered. The percent fenestration is a balance between protection level, cost, the architectural look of the building within its surroundings, and building codes. One goal is to keep fenestration to below 40 percent of the building envelope vertical surface area, but the process must balance differing requirements. A blast engineer may prefer no windows; an architect may favor window curtain walls; building codes require so much fenestration per square footage of floor area; fire codes require a prescribed window opening area if the window is a designated escape route; and the building owner has cost concerns. Ideally, an owner would want 100 percent of the glazed area to provide the design protection level against the postulated explosive threat (design basis threat weapon size at the expected standoff distance). However, economics and geometry may allow 80 percent to 90 percent due to the statistical differences in the manufacturing process for glass or Section Vulnerability Questions Guidance Observations the angle of incidence of the blast wave upon upper story windows (4th floor and higher). Reference: GSA PBS-100 HIC Critical Functions Vulnerability Rating Requirement Refer to the HIC Case Study and rate the vulnerability of the following asset- threat/hazard pairs. Function Cyber Attack Armed Attack Vehicle Bomb CBR Attack 1. Administration 8 8 10 8 2. Engineering/IT Technicians 8 8 8 8 3. Loading Dock/ Warehousing 4. Data Center 5. Communications 6. Security 7. Housekeeping HIC Infrastructure Vulnerability Rating Refer to the HIC Case Study and rate the vulnerability of the following asset- threat/hazard pairs. Function Cyber Attack Armed Attack Vehicle Bomb CBR Attack 1. Site 2. Architectural 3. Structural Systems 4. Envelope Systems 5. Utility Systems 6. Mechanical Systems 7. Plumbing and Gas Systems 8. Electrical Systems 9. Fire Alarm Systems 10. IT/Communications Systems Unit V: Risk Assessment/Risk Management U ni t V COURSE TITLE Building Design for Homeland Security UNIT TITLE Risk Assessment/Risk Management OBJECTIVES 1. Explain what constitutes risk 1. 2. Evaluate risk using the Threat-Vulnerability Matrix to capture assessment information 2. 3. Provide a numerical rating for risk and justify the basis for the rating 3. 4. Identify top risks for asset threat/hazard pairs that should receive measures to mitigate vulnerabilities and reduce risk SCOPE The following topics will be covered in this unit: 1. 1. Definition of risk and the various components to determine a risk rating. 2. 2. The FEMA 426 approach to determining risk. 3. 3. A rating scale and how to use it to determine a risk rating. One or more specific examples will be used to focus students on the following activity. 4. 4. The relationships between high risk, the need for mitigation measures, and the need to identify a Design Basis Threat and Level of Protection. 5. 5. Activity: Determine the risk rating for the asset threat/hazard pairs of interest. Identify the top three risk ratings for the Case Study. REFERENCES 1. FEMA 426, Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings, Chapter 1 2. Case Study Hazardville Information Company This page intentionally left blank UNIT V CASE STUDY ACTIVITY: RISK RATING One approach to conducting a risk assessment is to assemble the results of the asset value assessment, the threat assessment, and the vulnerability assessment, and determine a numeric value of risk for each asset-threat/hazard pair using the following formula: Risk = Asset Value x Threat Rating x Vulnerability Rating Requirement Use the following tables to summarize the HIC asset, threat, and vulnerability assessments conducted in the previous three unit activities. Then use the formula above to determine the risk rating for each asset-threat/hazard pair identified under Critical Functions and under Critical Infrastructure. Using Figure 1-13 of FEMA 426, make a determination of the available risk management options. Critical Functions Function Cyber Attack Armed Attack Vehicle Bomb CBR Attack 1. Administration Risk Rating 192 96 192 128 Asset Value 4 4 4 4 Threat Rating 6 3 6 4 Vulnerability Rating 8 8 8 8 2. Engineering/IT Technicians Risk Rating 200 120 240 160 Asset Value 5 5 5 5 Threat Rating 5 3 6 4 Vulnerability Rating 8 8 8 8 3. Loading Dock/ Warehouse Risk Rating Asset Value Threat Rating Vulnerability Rating Unit V: Risk Assessment/Risk Management 4. Data Center Risk Rating Asset Value Threat Rating Vulnerability Rating 5. Communications Risk Rating Asset Value Threat Rating Vulnerability Rating 6. Security Risk Rating Asset Value Threat Rating Vulnerability Rating 7. Housekeeping Risk Rating Asset Value Threat Rating Vulnerability Rating Critical Infrastructure This page intentionally left blank Infrastructure Cyber Attack Armed Attack Vehicle Bomb CBR Attack 1. Site Risk Rating Asset Value Threat Rating Vulnerability Rating 2. Architectural Risk Rating Asset Value Threat Rating Vulnerability Rating 3. Structural Systems Risk Rating Asset Value Threat Rating Vulnerability Rating Unit V: Risk Assessment/Risk Management Infrastructure Cyber Attack Armed Attack Vehicle Bomb CBR Attack 4. Envelope Systems Risk Rating Asset Value Threat Rating Vulnerability Rating 5. Utility Systems Risk Rating Asset Value Threat Rating Vulnerability Rating 6. Mechanical Systems Risk Rating Asset Value Threat Rating Vulnerability Rating 7. Plumbing and Gas Systems Risk Rating Asset Value Threat Rating Vulnerability Rating 8. Electrical Systems Risk Rating Asset Value Threat Rating Vulnerability Rating 9. Fire Alarm Systems Risk Rating Asset Value Threat Rating Vulnerability Rating 10. IT/Communications Systems Risk Rating Asset Value Threat Rating Vulnerability Rating Unit VI: Explosive Blast U nit VI COURSE TITLE Building Design for Homeland Security UNIT TITLE Explosive Blast OBJECTIVES 1. Explain the basic physics involved during an explosive blast event, whether by terrorism or technological accident 1. 2. Explain building damage and personnel injury resulting from the blast effects upon a building 2. 3. Perform an initial prediction of blast loading and effects based upon incident pressure SCOPE The following topics will be covered in this unit: 1. 1. Time-pressure regions of a blast event and how these change with distance from the blast 2. 2. Difference between incident pressure and reflected pressure 3. 3. Differences between peak pressure and peak impulse and how these differences affect building components 4. 4. Building damage and personal injuries generated by blast wave effects 5. 5. Levels of protection used by the Department of Defense and the General Services Administration 6. 6. The nominal range-to-effect chart [minimum stand-off in feet versus weapon yield in pounds of TNT-equivalent] for an identified level of damage or injury 7. 7. The benefits of stand-off distance 8. 8. Approaches to predicting blast loads and effects, including one using incident pressure REFERENCES 1. FEMA 426, Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings 2. Case Study Hazardville Information Company This page intentionally left blank UNIT VI CASE STUDY ACTIVITY: EXPLOSIVES ENVIRONMENT AND STAND-OFF DISTANCE AND THE EFFECTS OF BLAST The requirements in this Units activity are intended to provide a check on learning about explosive blast. Requirement 1. 1. In the empty cells in the table below, identify whether the adjacent description defines incident pressure or reflected pressure. .2. Refer to Figure 4-5 in FEMA 426 (page 4-11) to answer the following questions regarding the explosives environment: . What is the minimum stand-off distance from a 100-pound bomb explosion to eliminate the danger of glass breakage and severe wounds (without fragment retention film)? . What damage will be sustained at 400 feet from a 5,000-pound bomb explosion? .3. Refer to Figure 4-10 and Table 4-3 in FEMA 426 (pages 4-17 and 4-19, respectively) to answer the following questions regarding the explosives environment. . What is the minimum stand-off required to limit the incident pressure to under 0.5 psi for a 100-pound bomb? . What incident pressure would be expected at 500 feet from a 500-pound bomb and what is the approximate damage? Definition Type of Pressure Characterized by an almost instantaneous rise from atmospheric pressure to peak overpressure. When it impinges on a structure that is not parallel to the direction of the waves travel, the pressure wave is reflected and reinforced. This page intentionally left blank Unit VII: Chemical, Biological, Radiological (CBR) Measures Uni t VII COURSE TITLE Building Design for Homeland Security UNIT TITLE Chemical, Biological, and Radiological (CBR) Measures OBJECTIVES 1. Explain the five possible protective actions for a building and its occupants 1. 2. Compare filtration and collection mechanisms and applicability to the particles present in chemical, biological, and radiological agents 2. 3. Explain the key issues with CBR detection 3. 4. Identify the indications of CBR contamination SCOPE This unit will cover the following topics: 1. 1. Five protective actions for a building and its occupants: evacuation; sheltering in place; personal protective equipment; air filtration and pressurization; and exhausting and purging 2. 2. Air filtration and cleaning principles and its application 3. 3. CBR detection technology currently available 4. 4. Indications of CBR contamination that do not use technology REFERENCES 1. FEMA 426, Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings, pages 5-1 to 5-36 1. 2. FEMA 426, Appendix C, Chemical, Biological, and Radiological Glossary 2. 3. Case Study Hazardville Information Company This page intentionally left blank Course Title: Building Design for Homeland Security UNIT VII CASE STUDY ACTIVITY: CHEMICAL, BIOLOGICAL AND RADIOLOGICAL (CBR) CONSIDERATIONS The requirements in this Units activity are intended to provide a check on learning about the nature of chemical, biological, and radiological agents. Requirement 1. Review the HIC case study and name the prevalent CBR threat(s) to the HIC. Refer to Table 5-1 on page 5-12 of FEMA 426 and answer the following questions: 1. 2. What size filtration unit (MERV) is required to filter out 75 percent of Legionella and dust particulates (1 to 3 microns) inside the HIC? 2. 3. What range of MERV is required to remove 85 percent of smoke particles greater than 0.3 micron in size? 3. 4. What mitigation measure can be used in the HVAC systems to destroy bacteria and viruses? This page intentionally left blank Unit VIII: Site and Layout Design Guidance Unit VIII COURSE TITLE Building Design for Homeland Security UNIT TITLE Site and Layout Design Guidance OBJECTIVES 1. 1. Explain the concerns of land use as applied to threats and hazards due to terrorism and technological accidents 2. 2. Identify site planning concerns that can create, reduce, or eliminate vulnerabilities and understand the concept of "Layers of Defense" 3. 3. Compare the pros and cons of barrier mitigation measures that increase stand-off or create controlled access zones 4. 4. Identify the positive and negative aspects of mitigation approaches for entry control and vehicle access, signage, parking, loading docks, lighting, and site utilities 5. 5. Explain the basic concepts of Crime Prevention Through Environmental Design (CPTED) and its applicability to building security against terrorism 6. 6. Apply these concepts to an existing site or building and identify mitigation measures needed to reduce vulnerabilities SCOPE This unit will cover the following topics: 1. 1. Land use considerations both outside and inside the property line 2. 2. Site planning issues to include site design, layout and form, vehicular and pedestrian circulation, and landscape and urban design 3. 3. Creating stand-off distance using perimeter controls, non-exclusive zones, and exclusive zones along with the design concepts and technology to consider 4. 4. Design considerations and mitigation measures for building security REFERENCES 1. Course Goal and Objectives 1. 2. FEMA 426, Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings Chapter 2 2. 3. Unit VIII Visuals This page intentionally left blank UNIT VIII CASE STUDY ACTIVITY: SITE AND LAYOUT DESIGN GUIDANCE The Building Vulnerability Assessment Checklist in FEMA 426 can be used as a screening tool for preliminary design vulnerability assessment. The checklist includes questions that determine if critical systems will continue to function to enhance deterrence, detection, denial, and damage limitation, and emergency systems function during a threat or hazard situation. Requirement Assign sections of the checklist to the group member who is most knowledgeable and qualified to perform an assessment of the assigned area. Refer to the HIC case study and to the GIS portfolio to determine answers to the questions. Then review results to identify vulnerabilities and possible mitigation measures. 1. 1. Complete the following components of the Building Vulnerability Assessment Checklist which address site and layout. 2. 2. Upon completion of these portions of the checklist, refer back to the site risk rating determined in Unit V Case Study Activity and, based on this detailed analysis, decide if the rating is accurate. 3. 3. Select mitigation measures to reduce vulnerability and associated risk from the site and layout perspective. 4. 4. Estimate the new risk ratings for high risk asset-threat pairs based on the recommended mitigation measures. Section Vulnerability Questions Guidance Observations 1.1 What major structures surround the facility (site or building(s))? What critical infrastructure, government, military, or recreation facilities are in the local area that impact transportation, utilities, and collateral damage (attack at this facility impacting the other major structures or attack on the major structures impacting this facility)? Critical infrastructure to consider includes: Telecommunications infrastructure Facilities for broadcast TV, cable TV; cellular networks; newspaper offices, production, and distribution; radio stations; satellite base stations; telephone trunking and switching stations, including critical cable routes and major rights-of-way Electric power systems Power plants, especially nuclear facilities; transmission and distribution system components; fuel distribution, delivery, and storage Section Vulnerability Questions Guidance Observations Gas and oil facilities Hazardous material facilities, oil/gas pipelines, and storage facilities Banking and finance institutions Financial institutions (banks, credit unions) and the business district; note schedule business/financial district may follow; armored car services Transportation networks Airports: carriers, flight paths, and airport layout; location of air traffic control towers, runways, passenger terminals, and parking areas Bus Stations: Pipelines: oil; gas Trains/Subways: rails and lines, railheads/rail yards, interchanges, tunnels, and cargo/passenger terminals; note hazardous material transported Traffic: interstate highways/roads/tunnels/ bridges carrying large volumes; points of congestion; note time of day and day of week Trucking: hazardous materials cargo loading/unloading facilities; truck terminals, weigh stations, and rest areas Waterways: dams; levees; berths and ports for cruise ships, ferries, roll-on/roll-off cargo vessels, and container ships; international (foreign) flagged vessels (and cargo) Water supply systems Pipelines and process/treatment facilities, dams for water collection; wastewater treatment Government services Federal/state/local government offices post offices, law enforcement stations, fire/rescue, town/city hall, local mayors/governors residences, judicial offices and courts, military installations (include type-active, Reserves, National Guard) Section Vulnerability Questions Guidance Observations Emergency services Backup facilities, communications centers, Emergency Operations Centers (EOCs), fire/Emergency Medical Service (EMS) facilities, Emergency Medical Centers (EMCs), law enforcement facilities The following are not critical infrastructure, but have collateral damage potential to consider: Agricultural facilities: chemical distribution, storage, and application sites; crop spraying services; farms and ranches; food processing, storage, and distribution facilities Commercial/manufacturing/in d-ustrial facilities: apartment buildings; business/corporate centers; chemical plants (especially those with Section 302 Extremely Hazardous Substances); factories; fuel production, distribution, and storage facilities; hotels and convention centers; industrial plants; raw material production, distribution, and storage facilities; research facilities and laboratories; shipping, warehousing, transfer, and logistical centers Events and attractions: festivals and celebrations; open- air markets; parades; rallies, demonstrations, and marches; religious services; scenic tours; theme parks Health care system components: family planning clinics; health department offices; hospitals; radiological material and medical waste transportation, storage, and disposal; research facilities and laboratories, walk-in clinics Political or symbolically significant sites: embassies, consulates, landmarks, monuments, political party and Section Vulnerability Questions Guidance Observations special interest groups offices, religious sites Public/private institutions: academic institutions, cultural centers, libraries, museums, research facilities and laboratories, schools Recreation facilities: auditoriums, casinos, concert halls and pavilions, parks, restaurants and clubs (frequented by potential target populations), sports arenas, stadiums, theaters, malls, and special interest group facilities; note congestion date and times for shopping centers References: FEMA 386-7, FEMA SLG 101, DOJ NCJ181200 1.2 Does the terrain place the building in a depression or low area? Depressions or low areas can trap heavy vapors, inhibit natural decontamination by prevailing winds, and reduce the effectiveness of in-place sheltering. Reference: USAF Installation Force Protection Guide 1.3 In dense, urban areas, does curb lane parking place uncontrolled parked vehicles unacceptably close to a building in public rights-of-way? Where distance from the building to the nearest curb provides insufficient setback, restrict parking in the curb lane. For typical city streets, this may require negotiating to close the curb lane. Setback is common terminology for the distance between a building and its associated roadway or parking. It is analogous to stand-off between a vehicle bomb and the building. The benefit per foot of increased stand-off between a potential vehicle bomb and a building is very high when close to a building and decreases rapidly as the distance increases. Note that the July 1, 1994, Americans with Disabilities Act Standards for Accessible Design states that required handicapped parking shall be located on the shortest accessible route of travel from adjacent parking to an accessible entrance. Section Vulnerability Questions Guidance Observations Reference: GSA PBS-P100 1.4 Is a perimeter fence or other types of barrier controls in place? The intent is to channel pedestrian traffic onto a site with multiple buildings through known access control points. For a single building, the intent is to have a single visitor entrance. Reference: GSA PBS-P100 1.5 What are the site access points to the site or building? The goal is to have at least two access points one for passenger vehicles and one for delivery trucks due to the different procedures needed for each. Having two access points also helps if one of the access points becomes unusable, then traffic can be routed through the other access point. Reference: USAF Installation Force Protection Guide 1.6 Is vehicle traffic separated from pedestrian traffic on the site? Pedestrian access should not be endangered by car traffic. Pedestrian access, especially from public transportation, should not cross vehicle traffic if possible. Reference: GSA PBS- P100 and FEMA 386-7 1.7 Is there vehicle and pedestrian access control at the perimeter of the site? Vehicle and pedestrian access control and inspection should occur as far from facilities as possible (preferably at the site perimeter) with the ability to regulate the flow of people and vehicles one at a time. Control on-site parking with identification checks, security personnel, and access control systems. Reference: FEMA 386-7 1.8 Is there space for inspection at the curb line or outside the protected perimeter? What is the minimum distance from the inspection location to the building? Design features for the vehicular inspection point include: vehicle arrest devices that prevent vehicles from leaving the vehicular inspection area and prevent tailgating. If screening space cannot be provided, consider other design features such as: hardening and alternative location for vehicle search/ inspection. Reference: GSA PBS-P100 Section Vulnerability Questions Guidance Observations 1.9 Is there any potential access to the site or building through utility paths or water runoff? Eliminate potential site access through utility tunnels, corridors, manholes, stormwater runoff culverts, etc. Ensure covers to these access points are secured. Reference: USAF Installation Force Protection Guide Unknown without a more detailed on-site assessment. 1.10 What are the existing types of vehicle anti-ram devices for the site or building? Are these devices at the property boundary or at the building? Passive barriers include bollards, walls, hardened fences (steel cable interlaced), trenches, ponds/basins, concrete planters, street furniture, plantings, trees, sculptures, and fountains. Active barriers include pop-up bollards, swing arm gates, and rotating plates and drums, etc. Reference: GSA PBS-P100 1.11 What is the anti-ram buffer zone stand-off distance from the building to unscreened vehicles or parking? If the recommended distance for the postulated threat is not available, consider reducing the stand-off required through structural hardening or manufacturing additional stand- off through barriers and parking restrictions. Also consider relocation of vulnerable functions within the building or to a more hazard-resistant building. More stand-off should be used for unscreened vehicles than for screened vehicles that are searched. Reference: GSA PBS P-100 1.12 Are perimeter barriers capable of stopping vehicles? Will the vehicle barriers at the perimeter and building maintain access for emergency responders, including large fire apparatus? Anti-ram protection may be provided by adequately designed: bollards, street furniture, sculpture, landscaping, walls, and fences. The anti-ram protection must be able to stop the threat vehicle size (weight) at the speed attainable by that vehicle at impact. If the anti-ram protection cannot absorb the desired kinetic energy, consider adding speed controls (serpentines or speed bumps) to limit the speed at impact. If the resultant speed is still too great, the anti-ram protection should be improved. Reference: Military Handbook 1013/14 and GSA PBS P-100 1.13 Does site circulation The intent is to use site circulation to minimize vehicle Section Vulnerability Questions Guidance Observations prevent high-speed approaches by vehicles? speeds and eliminate direct approaches to structures. Reference: GSA PBS-P100 1.14 Are there offsetting vehicle entrances from the direction of a vehicles approach to force a reduction of speed? Single or double 90-degree turns effectively reduce vehicle approach speed. Reference: GSA PBS-P100 1.15 Is there a minimum setback distance between the building and parked vehicles? Adjacent public parking should be directed to more distant or better-protected areas, segregated from employee parking and away from the building. Some publications use the term setback in lieu of the term stand-off. Reference: GSA PBS-P100 1.16 Does adjacent surface parking on-site maintain a minimum stand-off distance? The specific stand-off distance needed is based upon the design basis threat bomb size and the building construction. For initial screening, consider using 25 meters (82 feet) as a minimum with more distance needed for unreinforced masonry or wooden walls. Reference: GSA PBS-P100 1.17 Do stand-alone, above ground parking garages provide adequate visibility across as well as into and out of the parking garage? Pedestrian paths should be planned to concentrate activity to the extent possible. Limiting vehicular entry/exits to a minimum number of locations is beneficial. Stair tower and elevator lobby design shall be as open as code permits. Stair and/or elevator waiting areas should be as open to the exterior and/or the parking areas as possible and well lighted. Impact-resistant, laminated glass for stair towers and elevators is a way to provide visual openness. Potential hiding places below stairs should be closed off; nooks and crannies should be avoided, and dead-end parking areas should be eliminated. Reference: GSA PBS-P100 1.18 Are garage or service area Control internal building parking, underground parking Section Vulnerability Questions Guidance Observations entrances for employee- permitted vehicles protected by suitable anti- ram devices? Coordinate this protection with other anti-ram devices, such as on the perimeter or property boundary to avoid duplication of arresting capability. garages, and access to service areas and loading docks in this manner with proper access control or eliminate the parking altogether. The anti-ram device must be capable of arresting a vehicle of the designated threat size at the speed attainable at the location. Reference: GSA PBS- P100 1.19 Do site landscaping and street furniture provide hiding places? Minimize concealment opportunities by keeping landscape plantings (hedges, shrubbery, and large plants with heavy ground cover) and street furniture (bus shelters, benches, trash receptacles, mailboxes, newspaper vending machines) away from the building to permit observation of intruders and prevent hiding of packages. If mail or express boxes are used, the size of the openings should be restricted to prohibit the insertion of packages. Reference: GSA PBS-P100 1.20 Is the site lighting adequate from a security perspective in roadway access and parking areas? Security protection can be successfully addressed through adequate lighting. The type and design of lighting, including illumination levels, is critical. Illuminating Engineering Society of North America (IESNA) guidelines can be used. The site lighting should be coordinated with the CCTV system. Reference: GSA PBS-P100 1.21 Are line-of-sight perspectives from outside the secured boundary to the building and on the property along pedestrian and vehicle routes integrated with landscaping and green space? The goal is to prevent the observation of critical assets by persons outside the secure boundary of the site. For individual buildings in an urban environment, this could mean appropriate window treatments or no windows for portions of the building. Section Vulnerability Questions Guidance Observations Once on the site, the concern is to ensure observation by a general workforce aware of any pedestrians and vehicles outside normal circulation routes or attempting to approach the building unobserved. Reference: USAF Installation Force Protection Guide 1.22 Do signs provide control of vehicles and people? The signage should be simple and have the necessary level of clarity. However, signs that identify sensitive areas should generally not be provided. Reference: GSA PBS-P100 1.23 Are all existing fire hydrants on the site accessible? Just as vehicle access points to the site must be able to transit emergency vehicles, so too must the emergency vehicles have access to the buildings and, in the case of fire trucks, the fire hydrants. Thus, security considerations must accommodate emergency response requirements. Reference: GSA PBS-P100 2 Architectural 2.1 Does the site and architectural design incorporate strategies from a Crime Prevention Through Environmental Design (CPTED) perspective? The focus of CPTED is on creating defensible space by employing: 1. Natural access controls: Design streets, sidewalks, and building entrances to clearly indicate public routes and direct people away from private/restricted areas Discourage access to private areas with structural elements and limit access (no cut-through streets) Loading zones should be separate from public parking 2. Natural surveillance: Design that maximizes visibility of people, parking areas, and building entrances: doors and windows that look out on to streets and parking areas Shrubbery under 2 feet in height for visibility Lower branches of existing trees kept at least 10 feet off ground Pedestrian-friendly sidewalks Section Vulnerability Questions Guidance Observations and streets to control pedestrian and vehicle circulation Adequate nighttime lighting, especially at exterior doorways 3. Territorial reinforcement: Design that defines property lines Design that distinguishes private/restricted spaces from public spaces using separation, landscape plantings; pavement designs (pathway and roadway placement); gateway treatments at lobbies, corridors, and door placement; walls, barriers, signage, lighting, and "CPTED" fences "Traffic-calming" devices for vehicle speed control 4. Target hardening: Prohibit entry or access: window locks, deadbolts for doors, interior door hinges Access control (building and employee/visitor parking) and intrusion detection systems 5. Closed circuit television cameras: Prevent crime and influence positive behavior, while enhancing the intended uses of space. In other words, design that eliminates or reduces criminal behavior and at the same time encourages people to "keep an eye out" for each other. Reference: GSA PBS-P100 and FEMA 386-7 2.2 Is it a mixed-tenant building? Separate high-risk tenants from low-risk tenants and from publicly accessible areas. Mixed uses may be accommodated through such means as separating entryways, controlling access, and hardening shared partitions, as well as through special security operational countermeasures. Reference: GSA PBS-P100 2.3 Are pedestrian paths planned to concentrate activity to aid in detection? Site planning and landscape design can provide natural surveillance by concentrating pedestrian activity, limiting entrances/exits, and eliminating concealment opportunities. Also, prevent pedestrian access to Section Vulnerability Questions Guidance Observations parking areas other than via established entrances. Reference: GSA PBS-P100. 2.4 Are there trash receptacles and mailboxes in close proximity to the building that can be used to hide explosive devices? The size of the trash receptacles and mailbox openings should be restricted to prohibit insertion of packages. Street furniture, such as newspaper vending machines, should be kept sufficient distance (10 meters or 33 feet) from the building, or brought inside to a secure area. References: USAF Installation Force Protection Guide, DoD Minimum Antiterrorism Standards for Buildings 5 Utility Systems 5.1 What is the source of domestic water? (utility, municipal, wells, lake, river, storage tank) Is there a secure alternate drinking water supply? Domestic water is critical for continued building operation. Although bottled water can satisfy requirements for drinking water and minimal sanitation, domestic water meets many other needs flushing toilets, building heating and cooling system operation, cooling of emergency generators, humidification, etc. Reference: FEMA 386-7 Unknown without a more detailed on-site assessment. 5.2 Are there multiple entry points for the water supply? If the building or site has only one source of water entering at one location, the entry point should be secure. Reference: GSA PBS-P100 Unknown without a more detailed on-site assessment. 5.3 Is the incoming water supply in a secure location? Ensure that only authorized personnel have access to the water supply and its components. Reference: FEMA 386-7 Unknown without a more detailed on-site assessment. 5.4 Does the building or site have storage capacity for domestic water? How many gallons and how long will it allow operations to continue? Operational facilities will require reliance on adequate domestic water supply. Storage capacity can meet short-term needs and use water trucks to replenish for extended outages. Reference: Physical Security Assessment for Department of Veterans Affairs Facilities. Unknown without a more detailed assessment. 5.5 What is the source of water for the fire suppression system? (local utility company lines, storage tanks with The fire suppression system water may be supplied from the domestic water or it may have a separate source, separate storage, or nonpotable alternate sources. Unknown without a more detailed on-site assessment. Section Vulnerability Questions Guidance Observations utility company backup, lake, or river) Are there alternate water supplies for fire suppression? For a site with multiple buildings, the concern is that the supply should be adequate to fight the worst case situation according to the fire codes. Recent major construction may change that requirement. Reference: FEMA 386-7 5.6 Is the fire suppression system adequate, code- compliant, and protected (secure location)? Standpipes, water supply control valves, and other system components should be secure or supervised. Reference: FEMA 386-7 5.7 Do the sprinkler/standpipe interior controls (risers) have fire- and blast- resistant separation? Are the sprinkler and standpipe connections adequate and redundant? Are there fire hydrant and water supply connections near the sprinkler/standpipe connections? The incoming fire protection water line should be encased, buried, or located 50 feet from high risk areas. The interior mains should be looped and sectionalized. Reference: GSA PBS-P100 Unknown without a more detailed on-site assessment. 5.8 Are there redundant fire water pumps (e.g., one electric, one diesel)? Are the pumps located apart from each other? Collocating fire water pumps puts them at risk for a single incident to disable the fire suppression system. Reference: GSA PBS-P100 and FEMA 386- 7 Unknown without a more detailed on-site assessment. 5.9 Are sewer systems accessible? Are they protected or secured? Sanitary and stormwater sewers should be protected from unauthorized access. The main concerns are backup or flooding into the building, causing a health risk, shorting out electrical equipment, and loss of building use. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 5.10 What fuel supplies do the building rely upon for critical operation? Typically, natural gas, propane, or fuel oil are required for continued operation. Section Vulnerability Questions Guidance Observations Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 5.11 How much fuel is stored on the site or at the building and how long can this quantity support critical operations? How is it stored? How is it secured? Fuel storage protection is essential for continued operation. Main fuel storage should be located away from loading docks, entrances, and parking. Access should be restricted and protected (e.g., locks on caps and seals). References: GSA PBS- P100 and Physical Security Assessment for the Department of Veterans Affairs Facilities 5.12 Where is the fuel supply obtained? How is it delivered? The supply of fuel is dependent on the reliability of the supplier. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 5.13 Are there alternate sources of fuel? Can alternate fuels be used? Critical functions may be served by alternate methods if normal fuel supply is interrupted. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 5.14 What is the normal source of electrical service for the site or building? Utilities are the general source unless co-generation or a private energy provider is available. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 5.15 Is there a redundant electrical service source? Can the site or buildings be fed from more than one utility substation? The utility may have only one source of power from a single substation. There may be only single feeders from the main substation. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 5.16 How may service entry points does the site or building have for electricity? Electrical supply at one location creates a vulnerable situation unless an alternate source is available. Ensure disconnecting requirements according to NFPA 70 (National Fire Protection Association, National Electric Code) are met for multiple service entrances. Reference: Physical Security Unknown without a more detailed on-site assessment. Section Vulnerability Questions Guidance Observations Assessment for the Department of Veterans Affairs Facilities 5.17 Is the incoming electric service to the building secure? Typically, the service entrance is a locked room, inaccessible to the public. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 5.18 What provisions for emergency power exist? What systems receive emergency power and have capacity requirements been tested? Is the emergency power co-located with the commercial electric service? Is there an exterior connection for emergency power? Besides installed generators to supply emergency power, portable generators or rental generators available under emergency contract can be quickly connected to a building with an exterior quick disconnect already installed. Testing under actual loading and operational conditions ensures the critical systems requiring emergency power receive it with a high assurance of reliability. Reference: GSA PBS-P100 5.19 By what means does the main telephone and data communications interface the site or building? Typically communication ducts or other conduits are available. Overhead service is more identifiable and vulnerable Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 5.20 Are there multiple or redundant locations for the telephone and communication service? Secure locations of communications wiring entry to the site or building are required. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 5.21 Does the fire alarm system require communication with external sources? By what method is the alarm signal sent to the Typically, the local fire department responds to an alarm that sounds at the station or is transmitted over phone lines by an auto dialer. An intermediary control center Section Vulnerability Questions Guidance Observations responding agency: telephone, radio, etc? Is there an intermediary alarm monitoring center? for fire, security, and/or building system alarms may receive the initial notification at an on-site or off-site location. This center may then determine the necessary response and inform the responding agency. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 5.22 Are utility lifelines aboveground, underground, or direct buried? Utility lifelines (water, power, communications, etc.) can be protected by concealing, burying, or encasing. Reference: GSA PBS-P100 and FEMA 386-7 Unit IX: Building Design Guidance U nit IX COURSE TITLE Building Design for Homeland Security UNIT TITLE Building Design Guidance OBJECTIVES 1. Explain architectural considerations to mitigate impacts from blast effects and transmission of chemical, biological, and radiological agents from exterior and interior incidents 1. 2. Identify key elements of building structural and non-structural systems for mitigation of blast effects 2. 3. Compare and contrast the benefit of building envelope, mechanical system, electrical system, fire protection system, and communication system mitigation measures, including synergies and conflicts 3. 4. Apply these concepts to an existing building or building conceptual design and identify mitigation measures needed to reduce vulnerabilities SCOPE The following topics will be covered in this unit: 1. 1. Architectural considerations, including building configuration, space design, and special situations 2. 2. Building structural and nonstructural considerations with emphasis on progressive collapse, loads and stresses, and good engineering practices 3. 3. Design issues for the building envelope, including wall design, window design, door design, and roof system design with approaches to define levels of protection 4. 4. Mechanical system design issues, including interfacing with operational procedures, emergency plans, and training 5. 5. Other building systems design consideration for electrical, fire protection, communications, electronic security, entry control, and physical security that mitigate the effects of a threat or hazard 6. 6. Do an Activity that encompasses identified high risk pairs (asset threat/hazard) in the threat-vulnerability matrix developed for the Case Study and select mitigation measures that reduce vulnerability and associated risk from the building perspective REFERENCES 1. FEMA 426, Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings, pages 3-1 to 3-46 and 3-48 to 3-52; Checklist at end of Chapter 1 1. 2. FEMA 427, Primer for Design of Commercial Buildings to Mitigate Terrorist Attacks 2. 3. FEMA 430, Primer for Incorporating Building Security Components in Architectural Design 3. 4. Case Study Hazardville Information Company UNIT IX CASE STUDY ACTIVITY: BUILDING DESIGN GUIDANCE In this Unit, the emphasis will be upon providing a balanced building envelope that is a defensive layer against the terrorist tactic of interest and avoiding situations where one incident affects more than one building system. The Building Vulnerability Assessment Checklist in FEMA 426 can be used as a screening tool for preliminary building design vulnerability assessment. Requirement Assign sections of the checklist to the group member who is most knowledgeable and qualified to perform an assessment of the assigned area. Refer to the HIC Case Study and to the vulnerability portfolio to determine answers to the questions. Then review results to identify vulnerabilities and possible mitigation measures. 1. 1. Complete the following components of the Building Vulnerability Assessment Checklist that address building design. 2. 2. Upon completion of these portions of the checklist, refer back to the risk ratings determined in Unit V Case Study Activity and, based on this more detailed analysis, decide if the rating is accurate. 3. 3. Select mitigation measures to reduce vulnerability and associated risk from building design. 4. 4. Estimate the new risk ratings for high risk asset-threat pairs based on the recommended mitigation measures. Section Vulnerability Questions Guidance Observations 2.5 Do entrances avoid significant queuing? If queuing will occur within the building footprint, the area should be enclosed in blast- resistant construction. If queuing is expected outside the building, a rain cover should be provided. For manpower and equipment requirements, collocate or combine staff and visitor entrances. Reference: GSA PBS- P100 2.6 Does security screening cover all public and private areas? Are public and private Retail activities should be prohibited in non-secured areas. However, the Public Building Cooperative Use Act of 1976 encourages retail and mixed uses to create open and inviting Unknown without a more detailed on-site assessment. Section Vulnerability Questions Guidance Observations activities separated? Are public toilets, service spaces, or access to stairs or elevators located in any non-secure areas, including the queuing area before screening at the public entrance? buildings. Consider separating entryways, controlling access, hardening shared partitions, and special security operational countermeasures. References: GSA PBS-P100 and FEMA 386-7 2.7 Is access control provided through main entrance points for employees and visitors? (lobby receptionist, sign-in, staff escorts, issue of visitor badges, checking forms of personal identification, electronic access control systems) Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 2.8 Is access to private and public space or restricted area space clearly defined through the design of the space, signage, use of electronic security devices, etc.? Finishes and signage should be designed for visual simplicity. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 2.9 Is access to elevators distinguished as to those that are designated only for employees and visitors? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 2.10 Do public and employee entrances include space for possible future installation of access These include walk-through metal detectors and x-ray devices, identification check, electronic access card, search stations, and turnstiles. Section Vulnerability Questions Guidance Observations control and screening equipment? Reference: GSA PBS-P100 2.11 Do foyers have reinforced concrete walls and offset interior and exterior doors from each other? Consider for exterior entrances to the building or to access critical areas within the building if explosive blast hazard must be mitigated. Reference: U.S. Army TM 5-853 2.12 Do doors and walls along the line of security screening meet requirements of UL752 "Standard for Safety: Bullet-Resisting Equipment"? If the postulated threat in designing entrance access control includes rifles, pistols, or shotguns, then the screening area should have bullet-resistance to protect security personnel and uninvolved bystanders. Glass, if present, should also be bullet- resistant. Reference: GSA PBS- P100 Unknown without a more detailed on-site assessment. 2.13 Do circulation routes have unobstructed views of people approaching controlled access points? This applies to building entrances and to critical areas within the building. References: USAF Installation Force Protection Guide and DoD UFC 4-010-01 2.14 Is roof access limited to authorized personnel by means of locking mechanisms? References: GSA PBS-P100 and CDC/NIOSH, Pub 2002-139 Unknown without a more detailed on-site assessment. 2.15 Are critical assets (people, activities, building systems and components) located close to any main entrance, vehicle circulation, parking, maintenance area, loading dock, or interior parking? Are the critical building systems and components hardened? Critical building components include: Emergency generator including fuel systems, day tank, fire sprinkler, and water supply; Normal fuel storage; Main switchgear; Telephone distribution and main switchgear; Fire pumps; Building control centers; Uninterruptible Power Supply (UPS) systems controlling critical functions; Main refrigeration and ventilation systems if critical to building operation; Elevator machinery and controls; Shafts for stairs, elevators, and utilities; Critical distribution feeders for emergency power. Evacuation and rescue require emergency systems to remain operational during a disaster and they should Section Vulnerability Questions Guidance Observations be located away from attack locations. Primary and backup systems should be separated to reduce the risk of both being impacted by a single incident if collocated. Utility systems should be located at least 50 feet from loading docks, front entrances, and parking areas. One way to harden critical building systems and components is to enclose them within hardened walls, floors, and ceilings. Do not place them near high-risk areas where they can receive collateral damage. Reference: GSA PBS-P100 2.16 Are high-value or critical assets located as far into the interior of the building as possible and separated from the public areas of the building? Critical assets, such as people and activities, are more vulnerable to hazards when on an exterior building wall or adjacent to uncontrolled public areas inside the building. Reference: GSA PBS-P100 2.17 Is high visitor activity away from critical assets? High-risk activities should also be separated from low-risk activities. Also, visitor activities should be separated from daily activities. Reference: USAF Installation Force Protection Guide 2.18 Are critical assets located in spaces that are occupied 24 hours per day? Are assets located in areas where they are visible to more than one person? Reference: USAF Installation Force Protection Guide Unknown without a more detailed on-site assessment. 2.19 Are loading docks and receiving and shipping areas separated in any direction from utility rooms, utility mains, and service entrances including electrical, telephone/data, fire detection/alarm systems, fire suppression water Loading docks should be designed to keep vehicles from driving into or parking under the building. If loading docks are in close proximity to critical equipment, consider hardening the equipment and service against explosive blast. Consider a 50- foot separation distance in all directions. Reference: GSA PBS- P100 Section Vulnerability Questions Guidance Observations mains, cooling and heating mains, etc.? 2.20 Are mailrooms located away from building main entrances, areas containing critical services, utilities, distribution systems, and important assets? Is the mailroom located near the loading dock? The mailroom should be located at the perimeter of the building with an outside wall or window designed for pressure relief. By separating the mailroom and the loading dock, the collateral damage of an incident at one has less impact upon the other. However, this may be the preferred mailroom location. Off- site screening stations or a separate delivery processing building on site may be cost- effective, particularly if several buildings may share one mailroom. A separate delivery processing building reduces risk and simplifies protection measures. Reference: GSA PBS- P100 2.21 Does the mailroom have adequate space available for equipment to examine incoming packages and for an explosive disposal container? Screening of all deliveries to the building, including U.S. mail, commercial package delivery services, delivery of office supplies, etc. Reference: GSA PBS-P100 2.22 Are areas of refuge identified, with special consideration given to egress? Areas of refuge can be safe havens, shelters, or protected spaces for use during specified hazards. Reference: FEMA 386-7 2.23 Are stairwells required for emergency egress located as remotely as possible from high-risk areas where blast events might occur? Are stairways maintained with positive pressure or are there other smoke control systems? Consider designing stairs so that they discharge into other than lobbies, parking, or loading areas. Maintaining positive pressure from a clean source of air (may require special filtering) aids in egress by keeping smoke, heat, toxic fumes, etc. out of the stairway. Pressurize exit stairways in accordance with the National Model Building Code. References: GSA PBS-P100 and CDC/NIOSH, Pub 2002-139 Unknown without a more detailed on-site assessment . Section Vulnerability Questions Guidance Observations 2.24 Are enclosures for emergency egress hardened to limit the extent of debris that might otherwise impede safe passage and reduce the flow of evacuees? Egress pathways should be hardened and discharge into safe areas. Reference: FEMA 386-7 Unknown without a more detailed on-site assessment. 2.25 Do interior barriers differentiate level of security within a building? Reference: USAF Installation Force Protection Guide 2.26 Are emergency systems located away from high- risk areas? The intent is to keep the emergency systems out of harms way, such that one incident takes out all capability both the regular systems and their backups. Reference: FEMA 386-7 2.27 Is interior glazing near high-threat areas minimized? Is interior glazing in other areas shatter resistant? Interior glazing should be minimized where a threat exists and should be avoided in enclosures of critical functions next to high-risk areas. Reference: GSA PBS-P100 Unknown without more detailed on-site assessment. 2.28 Are ceiling and lighting systems designed to remain in place during hazard events? When an explosive blast shatters a window, the blast wave enters the interior space, putting structural and nonstructural building components under loads not considered in standard building codes. It has been shown that connection criteria for these systems in high seismic activity areas resulted in much less falling debris that could injure building occupants. Mount all overhead utilities and other fixtures weighing 14 kilograms (31 pounds) or more to minimize the likelihood that they will fall and injure building occupants. Design all equipment mountings to resist forces of 0.5 times the equipment weight in any direction and 1.5 times the equipment weight in the downward direction. This Unknown without a more detailed on-site assessment. Section Vulnerability Questions Guidance Observations standard does not preclude the need to design equipment mountings for forces required by other criteria, such as seismic standards. Reference: DoD Minimum Antiterrorism Standards for Buildings 3 Structural Systems 3.1 What type of construction? What type of concrete & reinforcing steel? What type of steel? What type of foundation? The type of construction provides an indication of the robustness to abnormal loading and load reversals. A reinforced concrete moment-resisting frame provides greater ductility and redundancy than a flat-slab or flat-plate construction. The ductility of steel frame with metal deck depends on the connection details and pre-tensioned or post- tensioned construction provides little capacity for abnormal loading patterns and load reversals. The resistance of load- bearing wall structures varies to a great extent, depending on whether the walls are reinforced or un-reinforced. A rapid screening process developed by FEMA for assessing structural hazards identifies the following types of construction with a structural score ranging from 1.0 to 8.5. A higher score indicates a greater capacity to sustain load reversals. Wood buildings of all types - 4.5 to 8.5 Steel moment- resisting frames -3.5 to 4.5 Braced steel frames - 2.5 to 3.0 Light metal buildings - 5.5 to 6.5 Steel frames with cast-in- place concrete shear walls - 3.5 to 4.5 Steel frames with unreinforced masonry infill walls - 1.5 to 3.0 Concrete moment- resisting frames - 2.0 to 4.0 Concrete shear wall buildings - 3.0 to 4.0 Section Vulnerability Questions Guidance Observations Concrete frames with unreinforced masonry infill walls - 1.5 to 3.0 Tilt-up buildings - 2.0 to 3.5 Precast concrete frame buildings -1.5 to 2.5 Reinforced masonry - 3.0 to 4.0 Unreinforced masonry - 1.0 to 2.5 References: FEMA 154 and Physical Security Assessment for the Department of Veterans Affairs Facilities 3.2 Do the reinforced concrete structures contain symmetric steel reinforcement (positive and negative faces) in all floor slabs, roof slabs, walls, beams and girders that may be subjected to rebound, uplift and suction pressures? Do the lap splices fully develop the capacity of the reinforcement? Are lap splices and other discontinuities staggered? Do the connections possess ductile details? Is special shear reinforcement, including ties and stirrups, available to allow large post-elastic behavior? Reference: GSA PBS-P100 Unknown without a more detailed on-site assessment. 3.3 Are the steel frame connections moment connections? Is the column spacing minimized so that reasonably sized members will resist the design loads and increase the redundancy of the system? A practical upper level for column spacing is generally 30 feet. Unless there is an overriding architectural requirement, a practical limit for floor-to-floor heights is generally less than or equal to 16 feet. Reference: GSA PBS-P100 Unknown without a more detailed on-site assessment. Section Vulnerability Questions Guidance Observations What are the floor-to-floor heights? 3.4 Are critical elements vulnerable to failure? The priority for upgrades should be based on the relative importance of structural or non- structural elements that are essential to mitigating the extent of collapse and minimizing injury and damage. Primary Structural Elements provide the essential parts of the buildings resistance to catastrophic blast loads and progressive collapse. These include columns, girders, roof beams, and the main lateral resistance system. Secondary Structural Elements consist of all other load bearing members, such as floor beams, slabs, etc. Primary Nonstructural Elements consist of elements (including their attachments) which are essential for life safety systems or elements which can cause substantial injury if failure occurs, including ceilings or heavy suspended mechanical units. Secondary Nonstructural Elements consist of all elements not covered in primary nonstructural elements, such as partitions, furniture, and light fixtures. Reference: GSA PBS- P100 Unknown without a more detailed on-site assessment. 3.5 Will the structure suffer an unacceptable level of damage resulting from the postulated threat (blast loading or weapon impact)? The extent of damage to the structure and exterior wall systems from the bomb threat may be related to a protection level. The following is for new buildings: Level of Protection Below Antiterrorism Standards Severe damage. Section Vulnerability Questions Guidance Observations Frame collapse/massive destruction. Little left standing. Doors and windows fail and result in lethal hazards. Majority of personnel suffer fatalities. Very Low Level Protection Heavy damage. Onset of structural collapse. Major deformation of primary and secondary structural members, but progressive collapse is unlikely. Collapse of non- structural elements. Glazing will break and is likely to be propelled into the building, resulting in serious glazing fragment injuries, but fragments will be reduced. Doors may be propelled into rooms, presenting serious hazards. Majority of personnel suffer serious injuries. There are likely to be a limited number (10 percent to 25 percent) of fatalities. Low Level of Protection Moderate damage, unrepairable. Major deformation of non- structural elements and secondary structural members and minor deformation of primary structural members, but progressive collapse is unlikely. Glazing will break, but fall within 1 meter of the wall or otherwise not present a significant fragment hazard. Doors may fail, but they will rebound out of their frames, presenting minimal hazards. Majority of personnel suffer significant injuries. There may be a few (<10 percent) fatalities. Medium Level Protection Minor damage, repairable. Minor deformations of non-structural elements and secondary structural members and no permanent deformation in primary structural members. Glazing will break, but will remain in the window frame. Doors will stay in frames, but will not be reusable. Some minor Section Vulnerability Questions Guidance Observations injuries, but fatalities are unlikely. High Level Protection Minimal damage, repairable. No permanent deformation of primary and secondary structural members or non-structural elements. Glazing will not break. Doors will be reusable. Only superficial injuries are likely. Reference: DoD UFC 4-010-01 3.6 Is the structure vulnerable to progressive collapse? Is the building capable of sustaining the removal of a column for one floor above grade at the building perimeter without progressive collapse? In the event of an internal explosion in an uncontrolled public ground floor area does the design prevent progressive collapse due to the loss of one primary column? Do architectural or structural features provide a minimum 6-inch standoff to the internal columns (primary vertical load carrying members)? Are the columns in the Design to mitigate progressive collapse is an independent analysis to determine a systems ability to resist structural collapse upon the loss of a major structural element or the systems ability to resist the loss of a major structural element. Design to mitigate progressive collapse may be based on the methods outlined in ASCE 7-98 (now 7- 02). Designers may apply static and/or dynamic methods of analysis to meet this requirement and ultimate load capacities may be assumed in the analyses. Combine structural upgrades for retrofits to existing buildings, such as seismic and progressive collapse, into a single project due to the economic synergies and other cross benefits. Existing facilities may be retrofitted to withstand the design level threat or to accept the loss of a column for one floor above grade at the building perimeter without progressive collapse. Note that collapse of floors or roof must not be permitted. Reference: GSA PBS-P100 Unknown without a more detailed on-site assessment. unscreened internal spaces designed for an unbraced length equal to two floors, or three floors where there are two levels of parking? 3.7 Are there adequate redundant load paths in the structure? Special consideration should be given to materials that have inherent ductility and that are better able to respond to load Unknown without a more detailed on-site assessment. reversals, such as cast in place reinforced concrete, reinforced masonry, and steel construction. Careful detailing is required for material such as pre-stressed concrete, pre-cast concrete, and masonry to adequately respond to the design loads. Primary vertical load carrying members should be protected where parking is inside a facility and the building superstructure is supported by the parking structure. Reference: GSA PBS-P100 3.8 Are there transfer girders supported by columns within unscreened public spaces or at the exterior of the building? Transfer girders allow discontinuities in columns between the roof and foundation. This design has inherent difficulty in transferring load to redundant paths upon loss of a column or Unknown without a more detailed on-site assessment. the girder. Transfer beams and girders that, if lost, may cause progressive collapse are highly discouraged. Reference: GSA PBS-P100 3.9 What is the grouting and reinforcement of masonry (brick and/or concrete masonry unit (CMU)) exterior walls? Avoid unreinforced masonry exterior walls. Reinforcement can run the range of light to heavy, depending upon the stand-off distance available and postulated design threat. Unknown without a more detailed on-site assessment. Reference: GSA PBS-P100 recommends fully grouted and reinforced CMU construction where CMU is selected. Reference: DoD Minimum Antiterrorism Standards for Buildings states "Unreinforced masonry walls are prohibited for the exterior walls of new buildings. A minimum of 0.05 percent vertical reinforcement with a maximum spacing of 1,200 mm (48 in) will be provided. For existing buildings, implement mitigating measures to provide an equivalent level of protection." [This is light reinforcement and based upon the recommended stand-off distance for the situation.] 3.10 Will the loading dock design limit damage to adjacent areas and vent explosive force to the exterior of the building? Design the floor of the loading dock for blast resistance if the area below is occupied or contains critical utilities. Reference: GSA PBS-P100 3.11 Are mailrooms, where packages are received and opened for inspection, and unscreened retail spaces designed to mitigate the effects of a blast on primary vertical or lateral bracing members? Where mailrooms and unscreened retail spaces are located in occupied areas or adjacent to critical utilities, walls, ceilings, and floors, they should be blast- and fragment- resistant. Methods to facilitate the venting of explosive forces and gases from the interior spaces to the outside of the structure may include blow-out panels and window system designs that provide protection from blast pressure applied to the outside, but that readily fail and vent if exposed to blast pressure on the inside. Reference: GSA PBS-P100 4 Building Envelope 4.1 What is the designed or estimated protection level of the exterior walls against the postulated explosive threat? The performance of the faade varies to a great extent on the materials. Different construction includes brick or stone with block backup, steel stud walls, precast panels, or curtain wall with glass, stone, or metal panel elements. Shear walls that are essential to the lateral and vertical load bearing system and that also function as exterior walls should be considered primary structures and should resist the actual blast loads predicted from the threats specified. Where exterior walls are not designed for the full design loads, special consideration should be given to construction types that reduce the potential for injury. Reference: GSA PBS-P100 4.2 Is there less than 40 % fenestration openings per structural bay? Is the window system design on the exterior faade balanced to mitigate the hazardous effects of flying glazing following an explosive event? (glazing, frames, anchorage to supporting walls, etc.) Do the glazing systems with a 1/2-inch (3/4-inch better) bite contain an application of structural silicone? Is the glazing laminated or is it protected with an anti- shatter (fragment retention) film? If an anti- shatter film is used, is it a minimum of a 7-mil thick film, or specially manufactured 4mil thick film? The performance of the glass will similarly depend on the materials. Glazing may be single pane or double pane, monolithic or laminated, annealed, heat strengthened or fully tempered. The percent fenestration is a balance between protection level, cost, the architectural look of the building within its surroundings, and building codes. One goal is to keep fenestration to below 40 percent of the building envelope vertical surface area, but the process must balance differing requirements. A blast engineer may prefer no windows; an architect may favor window curtain walls; building codes require so much fenestration per square footage of floor area; fire codes require a prescribed window opening area if the window is a designated escape route; and the building owner has cost concerns. Ideally, an owner would want 100 percent of the glazed area to provide the design protection level against the postulated explosive threat (design basis threat weapon size at the expected stand-off distance). However, economics and geometry may allow 80 percent to 90 percent due to the statistical differences in the manufacturing process for glass or the angle of incidence of the blast wave upon upper story windows (4th floor and higher). Reference: GSA PBS-P100 4.3 Do the walls, anchorage, and window framing fully develop the capacity of the glazing material selected? Are the walls capable of withstanding the dynamic reactions from the Government produced and sponsored computer programs coupled with test data and recognized dynamic structural analysis techniques may be used to determine whether the glazing either survives the specified threats or the post damage performance of the glazing protects the occupants. A Unknown without a more detailed on-site assessment. windows? Will the anchorage remain attached to the walls of the building during an explosive event without failure? Is the faade connected to back- up block or to the structural frame? Are non- bearing masonry walls reinforced? breakage probability no higher than 750 breaks per 1,000 may be used when calculating loads to frames and anchorage. The intent is to ensure the building envelope provides relatively equal protection against the postulated explosive threat for the walls and window systems for the safety of the occupants, especially in rooms with exterior walls. Reference: GSA PBS-P100 4.4 Does the building contain ballistic glazing? Does the ballistic glazing meet the requirements of UL 752 Bullet-Resistant Glazing? Does the building contain security-glazing? Glass-clad polycarbonate or laminated polycarbonate are two types of acceptable glazing material. If windows are upgraded to bullet-resistant, burglar- resistant, or forced entry-resistant, ensure that doors, ceilings, and floors, as applicable, can resist the same for the areas of concern. Reference: GSA PBS-P100 Unknown without a more detailed on-site assessment. Does the security-glazing meet the requirements of ASTM F1233 or UL 972, Burglary Resistant Glazing Material? Do the window assemblies containing forced entry resistant glazing (excluding the glazing) meet the requirements of ASTM F 588? 4.5 Do non-window openings, such as mechanical vents and exposed plenums, provide the same level of protection required for the exterior wall? In-filling of blast over-pressures must be considered through non- window openings such that structural members and all mechanical system mountings and attachments should resist these interior fill pressures. Unknown without a more detailed on-site assessment. These non-window openings should also be as secure as the rest of the building envelope against forced entry. Reference: GSA PBS-P100 6 Mechanical Systems (HVAC and CBR) 6.1 Where are the air intakes and exhaust louvers for the building? (low, high, or midpoint of the building structure) Are the intakes and exhausts accessible to the public? Air intakes should be located on the roof or as high as possible. Otherwise secure within CPTED- compliant fencing or enclosure. The fencing or enclosure should have a sloped roof to prevent the throwing of anything into the enclosure near the intakes. Reference: GSA PBS-P100 states that air intakes should be on the fourth floor or higher and, on buildings with three floors or less, they should be on the roof or as high as practical. Locating intakes high on a wall is preferred over a roof location. Reference: DoD UFC 4-010-01 states that, for all new inhabited buildings covered by this document, all air intakes should be located at least 3 meters (10 feet) above the ground. Reference: CDC/NIOSH, Pub 2002-139 states: "An extension height of 12 feet (3.7 m) will place the intake out of reach of individuals without some assistance. Also, the entrance to the intake should be covered with a sloped metal mesh to reduce the threat of objects being tossed into the intake. A minimum slope of 45 is generally adequate. Extension height should be increased where existing platforms or building features (i.e., loading docks, retaining walls) might provide access to the outdoor air intakes". Reference: LBNL PUB-51959: Exhausts are also a concer n during an outdoor release, especially if exhaust fans are not in continuous operation, due to wind effects and chimney effects (air movement due to differential temperature). 6.2 Is roof access limited to authorized personnel by means of locking mechanisms? Is access to mechanical areas similarly controlled? Roofs are like entrances to the building and are like mechanical rooms when HVAC is installed. Adjacent structures or landscaping should not allow access to the roof. References: GSA PBS-P100, CDC/NIOSH Pub 2002-139, and LBNL Pub 51959 Unknown without a more detailed on-site assessment. 6.3 Are there multiple air intake locations? Single air intakes may feed several air handling units. Indicate if the air intakes are localized or separated. Installing low-leakage dampers is one way to provide the system separation when necessary. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 6.4 What are the types of air filtration? Include the efficiency and number of filter modules for each of the main air handling systems. Is there any collective protection for chemical, biological, and radiological contamination designed into the building? MERV Minimum Efficiency Reporting Value HEPA High Efficiency Particulate Air Activated charcoal for gases Ultraviolet C for biologicals Consider mix of approaches for optimum protection and cost- effectiveness. Reference: CDC/NIOSH Pub 2002-139 6.5 Is there space for larger filter assemblies on critical air handling systems? Air handling units serving critical functions during continued operation may be retrofitted to provide enhanced protection during emergencies. However, upgraded filtration may have negative effects upon the overall air handling system operation, such as increased pressure drop. Reference: CDC/NIOSH Pub 2002-139 Unknown without a more detailed on-site assessment. 6.6 Are there provisions for air monitors or sensors for Duct mounted sensors are usually found in limited cases in laboratory areas. Sensors Unknown without a more detailed on-site assessment. chemical or biological agents? generally have a limited spectrum of high reliability and are costly. Many different technologies are undergoing research to provide capability. Reference: CDC/NIOSH Pub 2002-139 6.7 By what method are air intakes and exhausts closed when not operational? Motorized (low-leakage, fast- acting) dampers are the preferred method for closure with fail-safe to the closed position so as to support in-place sheltering. References: CDC/NIOSH Pub 2002-139 and LBNL Pub 51959 Unknown without a more detailed on-site assessment. 6.8 How are air handling systems zoned? What areas and functions do each of the primary air handling systems serve? Understanding the critical areas of the building that must continue functioning focuses security and hazard mitigation measures. Applying HVAC zones that isolate lobbies, mailrooms, loading docks, and other entry and storage areas from the rest of the building HVAC zones and maintaining negative pressure within these areas will contain CBR releases. Identify common return systems that service more than one zone, effectively making a large single zone. Conversely, emergency egress routes should receive positive pressurization to ensure contamination does not hinder egress. Consider filtering of the pressurization air. References: CDC/NIOSH Pub 2002-139 and LBNL Pub 51959 Unknown without a more detailed on-site assessment. 6.9 Are there large central air handling units or are there multiple units serving separate zones? Independent units can continue to operate if damage occurs to limited areas of the building. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 6.10 Are there any redundancies in the air handling system? Can critical areas be served from other units if Redundancy reduces the security measures required compared to a non-redundant situation. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. a major system is disabled? 6.11 Is the air supply to critical areas compartmentalized? Similarly, are the critical areas or the building as a whole, considered tight with little or no inleakage? During chemical, biological, and radiological situations, the intent is to either keep the contamination localized in the critical area or prevent its entry into other critical, non-critical, or public areas. Systems can be cross-connected through building openings (doorways, ceilings, partial wall), ductwork leakage, or pressure differences in air handling system. In standard practice, there is almost always some air carried between ventilation zones by pressure imbalances, due to elevator piston action, chimney effect, and wind effects. Smoke testing of the air supply to critical areas may be necessary. References: CDC/NIOSH Pub 2002-139 and LBNL Pub 51959 Unknown without a more detailed on-site assessment. 6.12 Are supply, return, and exhaust air systems for critical areas secure? Are all supply and return ducts completely connected to their grilles and registers and secure? Is the return air not ducted? The air systems to critical areas should be inaccessible to the public, especially if the ductwork runs through the public areas of the building. It is also more secure to have a ducted air handling system versus sharing hallways and plenums above drop ceilings for return air. Non-ducted systems provide greater opportunity for introducing contaminants. References: CDC/NIOSH Pub 2002-139 and LBNL Pub 51959 Unknown without a more detailed on-site assessment. 6.13 What is the method of temperature and humidity control? Is it localized or centralized? Central systems can range from monitoring only to full control. Local control may be available to override central operation. Of greatest concern are systems needed before, during, and after an incident that may be unavailable due to temperature and humidity exceeding operational limits (e.g., main telephone switch room). Reference: DOC CIAO Vulnerability Assessment Framework 1.1 6.14 Where are the building automation control centers and cabinets located? Are they in secure areas? How is the control wiring routed? Access to any component of the building automation and control system could compromise the functioning of the system, increasing vulnerability to a hazard or precluding their proper operation during a hazard incident. The HVAC and exhaust system controls should be in a secure area that allows rapid shutdown or other activation based upon location and type of attack. References: FEMA 386-7, DOC CIAO Vulnerability Assessment Framework 1.1 and LBNL Pub 51959 Unknown without a more detailed on-site assessment. 6.15 Does the control of air handling systems support plans for sheltering in place or other protective approach? The micro-meteorological effects of buildings and terrain can alter travel and duration of chemical agents and hazardous material releases. Shielding in the form of sheltering in place can protect people and property from harmful effects. To support in-place sheltering, the air handling systems require the ability for authorized personnel to rapidly turn off all systems. However, if the system is properly filtered, then keeping the system operating will provide protection as long as the air handling system does not distribute an internal release to other portions of the building. Reference: CDC/NIOSH Pub 2002-139 Unknown without a more detailed on-site assessment. 6.16 Are there any smoke evacuation systems installed? Does it have purge capability? For an internal blast, a smoke removal system may be essential, particularly in large, open spaces. The equipment should be located away from high-risk areas, the system controls and wiring should be protected, and it should be connected to emergency power. This exhaust capability can be built into areas with significant risk on internal events, such as lobbies, loading docks, and mailrooms. Consider filtering of the exhaust to capture CBR contaminants. References: GSA PBS-P100, CDC/NIOSH Pub 2002-139, and LBNL Pub 51959 6.17 Where is roof-mounted equipment located on the roof? (near perimeter, at center of roof) Roof-mounted equipment should be kept away from the building perimeter. Reference: U.S. Army TM 5-853 Unknown without a more detailed on-site assessment. 6.18 Are fire dampers installed at all fire barriers? Are all dampers functional and seal well when closed? All dampers (fire, smoke, outdoor air, return air, bypass) must be functional for proper protection within the building during an incident. Reference: CDC/NIOSH Pub 2002-139 6.19 Do fire walls and fire doors maintain their integrity? The tightness of the building (both exterior, by weatherization to seal cracks around doors and windows, and internal, by zone ducting, fire walls, fire stops, and fire doors) provides energy conservation benefits and functional benefits during a CBR incident. Reference: LBNL Pub 51959 Unknown without a more detailed on-site assessment. 6.20 Do elevators have recall capability and elevator emergency message capability? Although a life-safety code and fire response requirement, the control of elevators also has benefit during a CBR incident. The elevators generate a piston effect, causing pressure differentials in the elevator shaft and associated floors that can force contamination to flow up or down. Reference: LBNL Pub 51959 6.21 Is access to building information restricted? Information on building operations, schematics, procedures, plans, and specifications should be strictly controlled and available only to authorized personnel. References: CDC/NIOSH Pub 2002-139 and LBNL Pub 51959 6.22 Does the HVAC maintenance staff have the proper training, procedures, and preventive maintenance schedule to ensure CBR equipment is functional? Functional equipment must interface with operational procedures in an emergency plan to ensure the equipment is properly operated to provide the protection desired. The HVAC system can be operated in different ways, depending upon an external or internal release and where in the building an internal release occurs. Thus maintenance and security staff must have the training to properly operate the HVAC system under different circumstances, even if the procedure is to turn off all air movement equipment. Reference: CDC/NIOSH Pub 2002-139 and LBNL Pub 51959 Unknown without a more detailed on-site assessment. 7 Plumbing and Gas Systems 7.1 What is the method of water distribution? Central shaft locations for piping are more vulnerable than multiple riser locations. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 7.2 What is the method of gas distribution? (heating, cooking, medical, process) Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 7.3 Is there redundancy to the main piping distribution? Looping of piping and use of section valves provide redundancies in the event sections of the system are damaged. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 7.4 What is the method of heating domestic water? What fuel(s) is used? Single source of hot water with one fuel source is more vulnerable than multiple sources and multiple fuel types. Domestic hot water availability is an operational concern for many building occupancies. Reference: Physical Security Unknown without a more detailed on-site assessment. Assessment for the Department of Veterans Affairs Facilities 7.5 Where are gas storage tanks located? (heating, cooking, medical, process) How are they piped to the distribution system? (above or below ground) The concern is that the tanks and piping could be vulnerable to a moving vehicle or a bomb blast either directly or by collateral damage due to proximity to a higher-risk area. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 7.6 Are there reserve supplies of critical gases? Localized gas cylinders could be available in the event of damage to the central tank system. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 8 Electrical Systems 8.1 Are there any transformers or switchgears located outside the building or accessible from the building exterior? Are they vulnerable to public access? Are they secured? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 8.2 What is the extent of the external building lighting in utility and service areas and at normal entryways used by the building occupants? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 8.3 How are the electrical rooms secured and where are they located relative to other higher risk areas, starting with the main electrical distribution room at the service entrance? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 8.4 Are critical electrical systems co-located with other building systems? Are critical electrical systems located in areas outside of secured electrical areas? Is security system wiring located separately from electrical and other service systems? Collocation concerns include rooms, ceilings, raceways, conduits, panels, and risers. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 8.5 How are electrical distribution panels serving branch circuits secured or are they in secure locations? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 8.6 Does emergency backup power exist for all areas within the building or for critical areas only? How is the emergency power distributed? Is the emergency power system independent from the normal electrical service, particularly in critical areas? There should be no single critical node that allows both the normal electrical service and the emergency backup power to be affected by a single incident. Automatic transfer switches and interconnecting switchgear are the initial concerns. Emergency and normal electrical equipment should be installed separately, at different locations, and as far apart as possible. Reference: GSA PBS-P100 8.7 How is the primary electrical system wiring distributed? Is it co- located with other major utilities? Central utility shafts may be subject to damage, especially if there is only one for the building. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. Is there redundancy of distribution to critical areas? 9 Fire Alarm Systems 9.1 Is the building fire alarm system centralized or localized? How are alarms annunciated, both locally and centrally? Are critical documents and control systems located in a secure yet accessible location? Fire alarm systems must first warn building occupants to evacuate for life safety. Then they must inform the responding agency to dispatch fire equipment and personnel. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 9.2 Where are the fire alarm panels located? Do they allow access to unauthorized personnel? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 9.3 Is the fire alarm system stand-alone or integrated with other functions such as security and environmental or building management systems? What is the interface? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities 9.4 Do key fire alarm system components have fire- and blast-resistant separation? This is especially necessary for the fire command center or fire alarm control center. The concern is to similarly protect critical components as described in Items 2.19, 5.7, and 10.3. Unknown without a more detailed on-site assessment. 9.5 Is there redundant off- premises fire alarm reporting? Fire alarms can ring at a fire station, at an intermediary alarm monitoring center, or autodial someone else. See Items 5.21 and 10.5. 10 Communications and IT Systems 10.1 Where is the main telephone distribution room and where is it in relation to higher risk areas? Is the main telephone distribution room secure? One can expect to find voice, data, signal, and alarm systems to be routed through the main telephone distribution room. Reference: FEMA 386-7 10.2 Does the telephone system have an UPS (uninterruptible power supply)? What is its type, power rating, operational duration under load, and location? (battery, on-line, filtered) Many telephone systems are now computerized and need a UPS to ensure reliability during power fluctuations. The UPS is also needed to await any emergency power coming on line or allow orderly shutdown. Reference: DOC CIAO Vulnerability Assessment Framework 1.1 Unknown without a more detailed on-site assessment. 10.3 Where are communication systems wiring closets located? (voice, data, signal, alarm) Are they co- located with other utilities? Are they in secure areas? Concern is to have separation distance from other utilities and higher-risk areas to avoid collateral damage. Security approaches on the closets include door alarms, closed circuit television, swipe cards, or other logging notifications to ensure only authorized personnel have access to these closets. Reference: FEMA 386-7 Unknown without a more detailed on-site assessment. 10.4 How is communications system wiring distributed? (secure chases and risers, accessible public areas) The intent is to prevent tampering with the systems. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 10.5 Are there redundant communications systems available? Critical areas should be supplied with multiple or redundant means of communications. Power outage phones can provide redundancy as they connect directly to the local commercial telephone switch off site and not through the building telephone switch in the main telephone distribution room. A base radio communication system with antenna can be installed in stairwells, and portable sets distributed to floors. References: GSA PBS-P100 and FEMA 386-7 10.6 Where are the main distribution facility, data centers, routers, firewalls, and servers located and are they secure? Where are the secondary and/or intermediate distribution facilities and are they secure? Concern is collateral damage from manmade hazards and redundancy of critical functions. Reference: DOC CIAO Vulnerability Assessment Framework 1.1 10.7 What type and where are the WAN (wide area network) connections? Critical facilities should have two Minimum-Points-of-Presence (MPOPs) where the telephone companys outside cable terminates inside the building. It is functionally a service entrance connection that demarcates where the telephone companys property stops and the building owners property begins. The MPOPs should not be collocated and they should connect to different telephone company central offices so that the loss of one cable or central office does not reduce capability. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 10.8 What type, power rating, and location of the UPS (uninterruptible power supply)? (battery, on-line, filtered) Consider that UPS should be found at all computerized points from the main distribution facility to individual data closets and at critical personal computers/terminals. Are the UPS also connected to emergency power? Critical LAN sections should also be on backup power. Reference: DOC CIAO Vulnerability Assessment Framework 1.1 10.9 What type of LAN (local area network) cabling and physical topology is used? (Category (Cat) 5, Gigabit Ethernet, Ethernet, Token Ring) The physical topology of a network is the way in which the cables and computers are connected to each other. The main types of physical topologies are: Bus (single radial where any damage on the bus affects the whole system, but especially all portions downstream) Star (several computes are connected to a hub and many hubs can be in the network the hubs can be critical nodes, but the other hubs continue to function if one fails) Ring (a bus with a continuous connection - least used, but can tolerate some damage because if the ring fails at a single point it can be rerouted much like a looped electric or water system) The configuration and the availability of surplus cable or spare capacity on individual cables can reduce vulnerability to hazard incidents. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 10.10 For installed radio/wireless systems, what are their types and where are they located? (RF (radio frequency), HF (high frequency), VHF (very high frequency), MW (medium wave) Depending upon the function of the wireless system, it could be susceptible to accidental or intended jamming or collateral damage. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 10.11 Do the IT (Information Technology computer) systems meet requirements of confidentiality, integrity, Ensure access to terminals and equipment for authorized personnel only and ensure system up-time to meet operational needs. Reference: DOC CIAO and availability? Vulnerability Assessment Framework 1.1 10.12 Where is the disaster recovery/mirroring site? A site with suitable equipment that allows continuation of operations or that mirrors (operates in parallel to) the existing operation is beneficial if equipment is lost during a natural or manmade disaster. The need is based upon the criticality of the operation and how quickly replacement equipment can be put in place and operated. Reference: DOC CIAO Vulnerability Assessment Framework 1.1 10.13 Where is the back-up tape/file storage site and what is the type of safe environment? (safe, vault, underground) Is there redundant refrigeration in the site? If equipment is lost, data are most likely lost, too. Backups are needed to continue operations at the disaster recovery site or when equipment can be delivered and installed. Reference: DOC CIAO Vulnerability Assessment Framework 1.1 Unknown without a more detailed on-site assessment. 10.14 Are there any SATCOM (satellite communications) links? (location, power, UPS, emergency power, spare capacity/capability) SATCOM links can serve as redundant communications for voice and data if configured to support required capability after a hazard incident. Reference: DOC CIAO Vulnerability Assessment Framework 1.1 Unknown without a more detailed on-site assessment. 10.15 Is there a mass notification system that reaches all building occupants? (public address, pager, cell phone, computer override, etc.) Will one or more of these systems be operational under hazard conditions? (UPS, emergency power) Depending upon building size, a mass notification system will provide warning and alert information, along with actions to take before and after an incident if there is redundancy and power. Reference: DoD UFC 4-010-01 10.16 Do control centers and their designated alternate locations have equivalent or reduced capability for voice, data, mass notification, etc.? (emergency operations, security, fire alarms, building automation) Do the alternate locations also have access to backup systems, including emergency power? Reference: GSA PBS-P100 11 Equipment Operations and Maintenance 11.1 Are there composite drawings indicating location and capacities of major systems and are they current? (electrical, mechanical, and fire protection; and date of last update) Do updated O&M (operation and maintenance) manuals exist? Within critical infrastructure protection at the building level, the current configuration and capacity of all critical systems must be understood to ensure they meet emergency needs. Manuals must also be current to ensure operations and maintenance keeps these systems properly functioning. The system must function during an emergency unless directly affected by the hazard incident. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 11.2 Have critical air systems been rebalanced? If so, when and how often? Although the system may function, it must be tested periodically to ensure it is performing as designed. Balancing is also critical after initial construction to set equipment to proper performance per the design. Rebalancing may only occur during renovation. Reference: CDC/NIOSH Pub 2002-139 Unknown without a more detailed on-site assessment. 11.3 Is air pressurization monitored regularly? Some areas require positive or negative pressure to function properly. Pressurization is critical in a hazardous environment or Unknown without a more detailed on-site assessment. emergency situation. Measuring pressure drop across filters is an indication when filters should be changed, but also may indicate that low pressures are developing downstream and could result in loss of expected protection. Reference: CDC/NIOSH Pub 2002-139 11.4 Does the building have a policy or procedure for periodic recommissioning of major M/E/P (Mechanical/Electrical/Plu mbing) systems? Recommissioning involves testing and balancing of systems to ascertain their capability to perform as described. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 11.5 Is there an adequate operations and maintenance program including training of facilities management staff? If O&M of critical systems is done with in-house personnel, management must know what needs to be done and the workforce must have the necessary training to ensure systems reliability. Reference: CDC/NIOSH Pub 2002-139 Unknown without a more detailed on-site assessment. 11.6 What maintenance and service agreements exist for M/E/P systems? When an in-house facility maintenance work force does not exist or does not have the capability to perform the work, maintenance and service contracts are the alternative to ensure critical systems will work under all conditions. The facility management staff requires the same knowledge to oversee these contracts as if the work was being done by in-house personnel. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 11.7 Are backup power systems periodically tested under load? Loading should be at or above maximum connected load to ensure available capacity and automatic sensors should be tested at least once per year. Periodically (once a year as a minimum) check the duration of capacity of backup systems by Unknown without a more detailed on-site assessment. running them for the expected emergency duration or estimating operational duration through fuel consumption, water consumption, or voltage loss. Reference: FEMA 386-7 11.8 Is stairway and exit sign lighting operational? The maintenance program for stairway and exit sign lighting (all egress lighting) should ensure functioning under normal and emergency power conditions. Expect building codes to be updated as emergency egress lighting is moved from upper walls and over doorways to floor level as heat and smoke drive occupants to crawl along the floor to get out of the building. Signs and lights mounted high have limited or no benefit when obscured. Reference: FEMA 386- 7 13 Security Master Plan 13.1 Does a written security plan exist for this site or building? When was the initial security plan written and last revised? Who is responsible for preparing and reviewing the security plan? The development and implementation of a security master plan provides a roadmap that outlines the strategic direction and vision, operational, managerial, and technological mission, goals, and objectives of the organizations security program. Reference: DOC CIAO Vulnerability Assessment Framework 1.1 13.2 Has the security plan been communicated and disseminated to key management personnel and departments? The security plan should be part of the building design so that the construction or renovation of the structure integrates with the security procedures to be used during daily operations. Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 13.3 Has the security plan been Reference: Physical Security Assessment for the Department of Unknown without a more detailed on-site benchmarked or compared against related organizations and operational entities? Veterans Affairs Facilities assessment. 13.4 Has the security plan ever been tested and evaluated from a cost-benefit and operational efficiency and effectiveness perspective? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 13.5 Does it define mission, vision, short-long term security program goals and objectives? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 13.6 Are threats, vulnerabilities, risks adequately defined and security countermeasures addressed and prioritized relevant to their criticality and probability of occurrence? Reference: DOC CIAO Vulnerability Assessment Framework 1.1 Unknown without a more detailed on-site assessment. 13.7 Has a security implementation schedule been established to address recommended security solutions? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 13.8 Have security operating and capital budgets been addressed, approved and established to support the plan? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 13.9 What regulatory or industry guidelines/standards were followed in the preparation of the security plan? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 13.10 Does the security plan address existing security Reference: Physical Security Assessment for the Department of Unknown without a more detailed on-site conditions from an administrative, operational, managerial and technical security systems perspective? Veterans Affairs Facilities assessment. 13.11 Does the security plan address the protection of people, property, assets, and information? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 13.12 Does the security plan address the following major components: access control, surveillance, response, building hardening and protection against biological, chemical, radiological and cyber-network attacks? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 13.13 Has the level of risk been identified and communicated in the security plan through the performance of a physical security assessment? Reference: Physical Security Assessment for the Department of Veterans Affairs Facilities Unknown without a more detailed on-site assessment. 13.14 When was the last security assessment performed? Who performed the security risk assessment? Reference: DOC CIAO Vulnerability Assessment Framework 1.1 Unknown without a more detailed on-site assessment. 13.15 Were the following areas of security analysis addressed in the security master plan: Asset Analysis: Does the security plan identify and prioritize the assets to be protected in accordance to their location, control, current value, and This process is the input to the building design and what mit