Reviewer Name: Adam Borden, Env. Specialist Project Name/Env. Database #: Arabi Preschool FEMA-1603/1607-DR-LA PW#12876 Parish: St. Bernard Record ofEnvironmental Consideration REVISED FOR FEMA ENVIRONMENTAL -LOUISIANA ~ 2006 See 44 Code of Federal Regulation Part 10 Project Name/Number: Arabi Preschool / PW# 12876 FIPS#087-04449-00 Project Location: 100Llama Dr,Arabi, LA70032 Latitude: 29.96484, Longitude: -89.99115 Project Description: Heavy rains and high winds from Hurricane Katrina (DR-1603) caused significant exterior and interior damage to Arabi Preschool ofthe St. Bernard Parish School Board. This pw reimburses the eligible applicantfor replacement ofthe building within pre-disaster footprint. The new building will be replaced according to codes and standards upgrades. All work will be performed in apreviously disturbed area with no indication ofnearby waterways or other bodies of watex Documentation Requirements • (Short version) All consultation and agreements implemented to comply with the National Historic Preservation Act, Endangered Species Act, and Executive Orders 11988, 11990 and 12898 are completed and no other laws apply. (Review Concluded) ^ (Long version) All applicable laws and executive orders were reviewed. Additional information for compliance is attached tothis REC and/or included inproject files, asapplicable. National Environmental Policy Act (NEPA) Determination • Statutorily excluded from NEPA review. (Review Concluded) • Programmatic Categorical Exclusion -Category (Reference PCE in comments) (Review Concluded) • Categorical Exclusion -Category CD No Extraordinary Circumstances exist. Are project conditions required? • Yes (see section V) • No (Review Concluded) LJ Extraordinary Circumstances exist (See Section IV). • Extraordinary Circumstances mitigated. (See Section IV comments) Are project conditions required? • Yes (see section V) • No (Review Concluded) Environmental Assessment • Supplemental Environmental Assessment (Reference EA or PEA in comments) ^ Environmental Impact Statement Comments: This project meets the criteria for an Alternative Arrangement (Permanent Schools) type ofproject. This project has conditions and requires mitigation under the other Environmental and Historic Preservation (EHP) laws which are listed under the NEPA level ofenvironmental review in the project worksheet. Any changes to this approved scope of work will require submission to, and evaluation and approval by, the state and FEMA prior to initiation ofany work, for compliance with the National Environmental Policy Act. The applicant is required toobtain and comply with all local, state and federal permits and requirements. Non-compliance with the requirements noted above may jeopardize the receipt of federal funding. Reviewer and Approvals D Project is Non-Compliant (See attached documentation justifying selection). Record of Environmental Consideration (Version 08/25/06) Reviewer Name: Adam Borden, Env. Specialist Project Name/Env. Database #: Arabi Preschool FEMA-1603/1607-DR-LA PW012876 Parish: St. Bernard FEMA Environmental Reviewer: Name: Adam Bordeii, rdeil, FEMA- FEMA-FEMA-Environmental EnvironmentalEnvironmental Specialist SpecialistSpecialist ,IL— /LX.^, nate g-Q&vjz, Signature. FEMA Regional Environmental Officer or Delegated Approving Official: Name: Howard R. Bush, Environmental Liason Officer ?• 2r.&