Record of Environmental Consideration See 44 Code of Federal Regulation Part 10. Project NameINumber: 1 st District Police Station I PW 9270 Project Location: 501 North Rampart Street, New Orleans, Louisiana Orleans Parish 70112 (N29.95919, W -90.07000) Project Description: Project activities include removing and replacing 216 square feet vinyl wall covering, 96 square feet resilient floor tiles, 18 linear feet ofresilient wall base, 10 square feet laminated glass, repairing the hardware on three sets of French doors, and repairing emergency generator which includes cleaning out the tank and repairing the fuel line. Hazard mitigation will be accomplished by installing surface mounted door bolts at head and sill of inactive door to prevent wind from blowing the inactive door open, and raising the emergency generator up to a total height of5 feet by installing a concrete curb on top of existing concrete slab. Documentation Requirements D No Documentation Required (Review Concluded) D (Short version) All consultation and agreements implemented to comply with the National Historic Preservation Act, Endangered Species Act, and Executive Orders 11988, 11990 and 12898 are completed and no other laws apply. (Review Concluded) [gJ (Long version) All applicable laws and executive orders were reviewed. Additional information for compliance is attached to this REC. National Environmental Policy Act (NEPAl Determination D Statutorily excluded from NEP A review. (Review Concluded) D Programmatic Categorical Exclusion -Category (Review Concluded) D Categorical Exclusion -Category D No Extraordinary Circumstances exist. Are project conditions required? D Yes (see section V) D No (Review Concluded) D Extraordinary Circumstances exist (See Section IV). Extraordinary Circumstances mitigated. (See Section IV comments) Are project conditions required? D Yes (see section V) D No (Review Concluded) D Environmental Assessment D Supplemental Environmental Assessment (Reference EA or PEA in comments) [gJ Environmental Impact Statement Comment: This project meets the criteria for an Alternative Arrangement (Pennanent Police and Fire Stations) type of project. This project has conditions and requires mitigation under the other ERP laws which are listed under the NEPA level ofenvironmental review in the project worksheet. Any changes to this approved scope of work will require submission to, and evaluation and approval by, the state and FEMA prior to initiation ofany work, for compliance with the National Environmental Policy Act. The applicant is required to obtain and comply with all local, state and federal pennits and requirements. Non-compliance with the requirements noted above may jeopardize the receipt offederal funding. Reviewer and Approvals o Project is Non-Compliant (See attached documentation justifYing selection). FEMA Environmental Reviewer. Name: Perry 1. Boudreaux, Environmental Specialist Signature~~ (~ • Date_-=8/..=,2=51..=,20=O=6'---___-----' FEMA Regional Environmental Officer or delegated approving officiaL Name: Howard R. Bush, ELO Signature cp.::::;;;;?-~ ,7""""""" • Date._---->:8"-"/2=5;!...!/2=O..:::..06~___~ I. Compliance Review for Environmental Laws (other than NEPA) A. National Historic Preservation Act [81 Not type ofactivity with potential to affect historic properties. (Review Concluded) o Applicable executed Programmatic Agreement December 3, 2004 o Activity meets Programmatic Allowance Are project conditions required? 0 Yes (see section V) 0 No (Review Concluded) HISTORIC BUILDINGS AND STRUCTURES [81 No historic properties that are listed or 45150 years or older in project area.