Record of Environmental Consideration See 44 Code of Federal Regulation Part 10. Project NamelNumber: st. Joseph Street Call Center Phone System / PW 14019 Project Location: 625 St. Joseph Street, New Orleans, Louisiana Orleans Parish 70165 (N29.9441, W-90.07118) Project Description: Project activities include removing and replacing workstations, switch boards, and the complete phone system which includes the call distribution system and 30 Meridian phones. The complete phone system was located in the basement. Hazard mitigation will be accomplished through a proposal to relocate the phone system to the third floor ofthe St. Joseph Street building. Documentation Reg uirements D No Documentation Required (Review Concluded) D (Short version) All consultation and agreements implemented to comply with the National Historic Preservation Act, Endangered Species Act, and Executive Orders 11988, 11990 and 12898 are completed and no other laws apply. (Review Concluded) [8J (Long version) All applicable laws and executive orders were reviewed. compliance is attached to this REC. Additional information for National Environmental Policy Act (NEP A) Determination ~~~~~~~-'~[J Statutorily excluded fromi"fEPA review. (Reyiew Concludedr) ~~D Programmatic Categorical Exclusion -Category (Review Concluded) D Categorical Exclusion -Category D No Extraordinary Circumstances exist. Are project conditions required? D Yes (see section V) D No (Review Concluded) D Extraordinary Circumstances exist (See Section IV). D Extraordinary Circumstances mitigated. (See Section IV comments) Are project conditions required? D Yes (see section V) D No (Review Concluded) D Environmental Assessment D Supplemental Environmental Assessment (Reference EA or PEA in comments) [8J Environmental Impact Statement Comment: Although this project would have qualified as a CATEX (xv and xvi) under 44 CFR part 10.8 (dX2), this project meets the defmition ofcritical infrastructure (Utilities and Wastewater Treatment Plants) under the Alternative Arrangements for NEPA compliance. This project has conditions and requires mitigation under the other EHP laws which are listed under the NEPA level of environmental review in the project worksheet. Any changes to this approved scope of work will require submission to, and evaluation and approval by, the state and FEMA prior to initiation of any work, for compliance with the National Environmental Policy Act. The applicant is required to obtain and comply with all local, state and federal permits and requirements. Non-compliance with the requirements noted above may jeopardize the receipt of federal funding. Reviewer and Approvals D Project is Non-Compliant (See attached documentation justifying selection). FEMA Environmental Reviewer. Name: Perry J. Boudreaux, Environmental Specialist Signature ~LĄ: . Date_~9/-=2=O/-=2=OO~6,----___-----=. FEMA Regional Environmental Officer or delegated approving official. Name: Howard R. Bush, ELO Signature ~~?.......-;z . Date_------"9..:....:/2=O:..:....:I2=O:....::;O-=-6____~ I. Compliance Review for Environmental Laws (other than NEP A) A. National Historic Preservation Act 181 Not type ofactivity with potential to affect historic properties. ~la=in"':-:=in'-'c':::.:0c'::mm===e:-cn=ts==c=_-----. No Adverse Effect Detennination (FEMA findingiSHPO/THPO concurrence on file). Are project conditions required? D Yes (see section V) D No