Reviewer Name: Adam Borden, Env. Specialist Project NamefEnv. Database No: Moton Elementary School FEMA-1603/1607-DR-LA PWIH3610 Parish: Orleans Record of Environmental Consideration REVISED FOR FEMA ENVIRONMENTAL -WUISIANA -2006 See 44 Code of Federal Regulation Part 10 Project NamelNumber: Moton Elementary School / PW# 1361 0 FIPS#033-UA9M2-00 Project Location: 3000 Abundance Street, New Orleans, LA 70126 Latitude: 29.98852, Longitude: -90.03934 Project Description: Heavy rains and high winds from Hurricane Katrina (DR-1603) caused significant exterior and interior damage to Moton Elementary School of the Recovery School District This pw reimburses the eligible applicant for replacement of interior components, lighting, window/frames, wallboard, doors, ceiling tiles, flooring, mechanical/electrical systems, countertops/cabinetry, and lavatory components/plumbing. Cleaning activities such as power washing are also associated with this PW. The new building material will be replaced according to codes and standards upgrades. All work will be performed in a previously disturbed area with no indication of nearby waterways or other bodies of water. Documentation Requirements D (Short version) All consultation and agreements implemented to comply with the National Historic Preservation Act, Endangered Species Act, and Executive Orders 11988, 11990 and 12898 are completed and no other laws apply. (Review Concluded) ~ (Long version) AU applicable laws and executive orders were reviewed. Additional information for compliance is attached to this REC and/or included in project files, as applicable. National Environmental Policy Act (NEPAl Determination o Statutorily excluded from NEPA review. (Review Concluded) D Programmatic Categorical Exclusion -Category (Reference PCE in comments) (Review Concluded) D Categorical Exclusion -Category D No Extraordinary Circumstances exist. Are project conditions required? D Yes (see section V) D No (Review Concluded) D Extraordinary Circumstances exist (See Section IV). D Extraordinary Circumstances mitigated. (See Section IV comments) Are project conditions required? 0 Yes (see section V) D No (Review Concluded) D Environmental Assessment D Supplemental Environmental Assessment (Reference EA or PEA in comments) ~ Environmental Impact Statement Comments: This project meets the criteria for an Alternative Arrangement (Permanent Schools) type of project. This project has conditions and requires mitigation under the other Environmental and Historic Preservation (EHP) laws which are listed under the NEPA level of environmental review in the project worksheet. Any changes to this approved scope of work will require submission to, and evaluation and approval by, the state and FEMA prior to initiation of any work, for compliance with the National Environmental Policy Act. The applicant is required to obtain and comply with alliocal, state and federal permits and requirements. Non-compliance with the requirements noted above may jeopardize the receipt of federal fundin . Reviewer and Approvals D Project is Non-Compliant (See attached documentation justifying selection). Record of Environmental Consideration (Version 08/29/06) Reviewer Name: Adam Borden, Env, Specialist Project NamelEnv, Database No: Moton Elementary School FEMA·1603/1607·DR·LA PW#I3610 Parish: Orleans FEMA Environmental Reviewer: Name: Adam Borden, F=~nm7Speci;r Signature ~~d ~ate_---"t"'---~.)--_1..!.._-_tJ_"""6"""_!, FEMA Regional Environmental Officer or Delegated Approving Official: Name: Howard R. Bush, Environmental Liason Officer Signature ~~ ,C"? Date __i_,_;2_9_.,,----"-__---' I. Compliance Review for Environmental Laws (other than NEPAl A. National Historic Preservation Act (NHP A) 181 Not type of activity with potential to affect historic properties. D Activity meets Programmatic Agreement, December 3, 2004. Appendix A: Are project conditions required? D Yes (see Section V) D No D Programmatic Agreement not applicable, must conduct standard Section 106 Review. HISTORIC BUILDINGS AND STRUCTURES 181 No historic properties that are listed or 45/50 years or older in project area.