Record of Environmental Consideration See 44 Code of Federal Regulation Part 10. Proiect NamelNumber: EOR 2139 Bradley Elementary School-Building B / PW 13331 Project Location: 2401 Humanity Street, New Orleans, Louisiana, Orleans Parish 70122 (N29.99228, W"90.05436 Project Description: Project activities include replacing 228 LF of vinyl base, 792 SF of 5/8" drywall & studs, 1,101 SF of5/8" drywall ceiling, (11) 48" (1) suspended fluorescent tube light, 1,032 SF of 12" VT flooring, 50 LF of24" D insulated air duct, and (1) 42 circuit, 1 phase outdoor, panel board. Hazard Mitigation will be achieved by compliance with codes and standards and good construction practices. D (Short version) All consultation and agreements implemented to comply with the National Historic Preservation Act, Endangered Species Act, and Executive Orders 11988, 11990 and 12898 are completed and no other laws apply. . o State administering agency requires consistency review. Are project conditions required? 0 YES (see section V) 0 NO (Review Concluded) Record of Environmental Consideration 3 08/30/06 Comments: This project is located within the Louisiana Coastal Management Zone. La DNR has detennined that receipt of federal assistance is consistent with the Louisiana Coastal Resource Program. Projects within the Coastal Zone may still require a Coastal Use Pennit or other authorization from DNR. Projects may be coordinated by contacting LA DNR at 1-800-276-4019. Correspondence/Consultation/References: F. Fish and Wildlife Coordination Act 181 Project does not affect, control, or modifY a waterwaylbody of water. (Review Concluded) o Project affects, controls or modifies a waterwaylbody of water. o Coordination with USFWS conducted o No Recommendations offered by USFWS. (Review Concluded) o Recommendations provided by USFWS. Are project conditions required? 0 YES (see section V) 0 NO (Review Concluded) Comments: Project is not in or adjacent to any waterways ofthe U.S. Correspondence/Consultation/References: G. Clean Air Act 181 Project will not result in pennanent air emissions. (Review Concluded) o Project is located in an attainment area. (Review Concluded) o Project is located in a non-attainment area. o Coordination required with applicable state administering agency.. Are project conditions required? 0 YES (see section V) 0 NO (Review Concluded) Comments: Project will not result in pennanent air emissions. CorrespondenCe/Consultation/References: H. Farmland Protection Policy Act 181 Project does not affect designated prime or unique farmland. (Review Concluded) o Project causes unnecessary or irreversible conversion ofdesignated prime or unique farmland. o Coordination with Natural Resource Conservation Commission required. o Farmland Conversion Impact Rating, Fonn AD-1 006, completed. Are project conditions required? 0 YES (see section V) 0 NO (Review Concluded) Comments: None Correspondence/Consultation/References: I. Migratory Bird Treaty Act o Project not located within a flyway zone. (Review Concluded) rgJ Project located within a flyway zone. rgJ Project does not have potential to take migratory birds. (Review Concluded) Are project conditions required? 0 Yes (see section V) rgJ No (Review Concluded) o Project has potential to take migratory birds o Contact made with USFWS Are project conditions required? 0 YES (see section V) 0 NO (Review Concluded) Comments: See letter from Don Fairley to Mr. Russ Watson with USF&WS, dated 09/14/2005. Specifically, FEMA has detennined that restoration projects funded with federal resources will not have adverse impacts on migratory birds or other fish and wildlife reserves. These detenninations are based on the understanding that the conditions outlined in the Louisiana Endangered Species Summary are met. Correspondence/Consultation/References: http://pacificflyway.govlDocuments/Mississippi map.pdf, J. Magnuson-Stevens Fishery Conservation and Management Act 181 Project not located in or near Essential Fish Habitat. (Review Concluded) D Project located in or near Essential Fish Habitat. D Project does not adversely affect Essential Fish Habitat. (Review Concluded) Are project conditions required? D Yes (see section V) D No (Review Concluded) D Project adversely affects Essential Fish Habitat (FEMA detenninationlUSFWSINMFS concurrence on file) D NOAA Fisheries provided no recommendation(s) (Review Concluded). Are project conditions required? D Yes (see section V) D No