Reviewer Name: Adam Bordeo, Eov. Specialist Project NamelEov. Database No: Armstroog Elemeotary Scbool, Bulldiog A FEMA-1603l1607-DR·LA PW#12921 rarisb: Orleaos Record of Environmental Consideration REVISED FOR FEMA ENVIRONMENTAL --LOUISIANA -1006 See 44 Code of Federal Regulation Part 10 Project NamelNumber: Armstrong Elementary School, Building A 1PW# 12921 FIPS#033-UA9M2-00 Project Location: 5909 St. Claude Ave., New Orleans, LA 70117 Latitude: 29.96059, Longitude: -90.01241 Project Description: Heavy rains and high winds from Hurricane Katrina (DR-1603) caused significant exterior and interior damage Armstrong Elementary School, Building A ofthe Recovery School District. This pw reimburses the eligible applicant for replacement/cleaning of interior components such as flooring, doors, electricaVaiarms systems, drywall, lavatory equipment, roofing, cabinets, and light fixtures. The new building material will be replaced according to codes and standards upgrades. All work will be performed in a previously disturbed area with no indication ofnearby waterways or other bodies ofwater. Documentation Requirements o (Short version) All consultation and agreements implemented to comply with the National Historic Preservation Act, Endangered Species Act, and Executive Orders 11988, 11990 and 12898 are completed and no other laws apply. (Review Concluded) ~ (Long version) All applicable laws and executive orders were reviewed. Additional information for compliance is attached to this REC and/or included in project files, as applicable. National Environmental Policy Act (NEPAl Determination o Statutorily excluded from NEPA review. (Review Concluded) o Programmatic Categorical Exclusion -Category (Reference PCE in comments) (Review Concluded) ~ Categorical Exclusion -Category xv ~ No Extraordin Circumstances exist. Are project conditions required? Yes (see section V)-O-No HCReview Concluded) o Extraordinary Circumstances exist (See Section IV). o Extraordinary Circumstances mitigated. (See Section IV comments) Are project conditions required? 0 Yes (see section V) 0 No (Review Concluded) o Environmental Assessment o Supplemental Environmental Assessment (Reference EA or PEA in comments) o Environmental Impact Statement Comments: Based on information provided by the applicant, this action is categorically excluded from the preparation of an Environmental Impact Statement or Environmental Assessment under 44 CFR part 10.8 (d)(2)(xv). Any changes to the scope of work will require re-submission through the state to FEMA and requires re-evaluation for compliance with national environmental policies. The applicant is responsible for obtaining and complying with all local, state and federal permits. Non-compliance with this requirement may jeopardize receiPt offederal funds. Reviewer and Approvals o Project is Non-Compliant (See attached documentation justifying selection). 1Reviewer: __,_F_ttentru Specialist Signature ---'t.....-____________Date _'-/-I_~_--t)_7_+__------'Record ofEnvironmental Consideration (Version 01112/07) Reviewer Name: Adam Borden, Env. Specialist Project NamelEnv. Database No: Armstrong Elementary School, Building A FEMA·1603/1607-DR·LA PW#12921 Parish: Orleans FEMA Regional Environmental Officer or Delegated Approving Official: Name: Howard R. Bush, Environmental Liason Officer Signature p:::::;;;;;?-~ I. Compliance Review for Environmental Laws (other than NEP A) A. National Historic Preservation Act (NHPA) D Not type of activity with potential to affect historic properties. 181 Activity meets Programmatic Agreement, December 3,2004. Appendix A: II-A2, II-A4, II-BI, II-H, II·CI, II-C2, II-B2, II-DI, II-AI, II-D2, II·EI Are project conditions required? 181 Yes (see Section V) D No D Programmatic Agreement not applicable, must conduct standard Section 106 Review. mSTORIC BUILDINGS AND STRUCTURES 181 No historic properties that are listed or 45150 years or older in project area. (Review Concluded) D Building or structure listed or 45150 years or older in project area and activity not exempt from review. D Determination of No Historic Properties Affected (FEMA findingiSHPOffHPO concurrence on file) Are project conditions required? D Yes (see Section V) D No (Review Concluded) D Determination ofHistoric Properties Affected (FEMA findingiSHPOffHPO concurrence on file) D Property a National Historic Landmark and National Park Service was provided early notification during the consultation process. If not, explain in comments D No Adverse Effect Determination (FEMA fmdingiSHPOffHPO concurrence on file). Are project conditions required? D Yes (see Section V) D No (Review Concluded) D Adverse Effect Determination (FEMA fmdingiSHPOffHPO concurrence on file) D Resolution of Adverse Effect completed. (MOA on file) Are project conditions required Dyes (see Section V) D No (Review Concluded) ARCHEOLOGICAL RESOURCES 181 Project affects only previously disturbed ground. (Review Concluded) D Project affects undisturbed ground. D Project area has no potential for presence of archeological resources D Determination ofno historic properties affected (FEMA fmdingiSHPOI'I'HPO concurrence or _~________ consultation on tile). Are project conditions required? D Yes (see Section V) D No (Review Concluded) D Likely to adversely affect species or designated critical habitat D Formal consultation concluded. (Biological Assessment and Biological Opinion on file) Are project conditions required? D YES (see Section V) D NO (Review Concluded) Comments: Project is located in an urban or previously developed area. Neither listed species nor their habitat occur in or near this site, thus FEMA finds there win be no effect to threatened or endangered species. CorrespondenceiConsultlltioniRejerences: USFWS emergency consultation provisions determined in letters dated September 15, 2005 for Katrina. C. Coastal Barrier Resources Act 121 Project is not on or connected to CBRA Unit or Otherwise Protected Area (Review Concluded), D Project is on or connected to CBRA Unit or Otherwise Protected Area. (FEMA determinationlUSFWS consultation on file) D Proposed action an exception under Section 3505.a.6 (Review Concluded) D Proposed action not excepted under Section 3505.a.6. Are project conditions required? D YES (see Section V) D NO (Review Concluded) Comments: Project is not within a CBRA zone. CorrespondenceiConsultlJtioniRejerences: Louisiana Coastal Barrier Resource System Maps referenced 01112/07. D. Clean Water Act ~Project would not affect any waters ofthe U.S. (Review Concluded) D Project would affect waters, including wetlands, ofthe U.s. D Project exempted as in kind replacement or other exemption. (Review Concluded) D Project requires Section 404/401l0r Section 9/10 (Rivers and Harbors Act) permit, including qualification under Nationwide Permits. Are project conditions required? D YES (see Section V) D NO (Review Concluded) Comments: No jurisdictional waters ofthe U.S., including wetlands, occur in or near the project area. CorrespondenceiConsultationiRejerences: USFWS National Wetlands Inventory map (http://www.fws.gov/nwil) queried on 01112/07. E. Coastal Zone Management Act D Project is not located in a coastal zone area and does not affect a coastal zone area (Review concluded) 121 Project is located in a coastal zone area and/or affects the coastal zone 121 State administering agency does not require consistency review. (Review Concluded). D State administering agency requires consistency review. Are project conditions required? D YES (see Section V) D NO (Review Concluded) Reviewer Name: Adam Borden, Env. Specialist Project Name/Env. Database No: Armstrong Elementary School, Building A FEMA-I603/1607-DR-LA PW1#1l921 Parish: Orleans Comments: This project is located within the Louisiana Coastal Management Zone. LA Department ofNatural Resources (DNR) has determined that receipt of federal assistance is consistent with the Louisiana Coastal Resource Program. Projects within the coastal zone may still require a coastal use permit or other authorization from DNR. Projects may be coordinated by contacting LA DNR at 1-800-276-4019. Co"espondenceiConsuitationIReferences: LDNR Louisiana Coastal Zone map 2002. F. Fish and Wildlife Coordination Act 1 18I Project does not affect, control, or modify a waterwaylbody of water. (Review Concluded) ! o Project affects controls or modifies a waterwaylbody ofwater. o Coordination with USFWS conducted D No Recommendations offered by USFWS. (Review Concluded) I o Recommendations provided by USFWS. f ! Are project conditions required? 0 YES (see Section V) 0 NO (Review Concluded) I G. Clean Air Act o Project will not result in permanent air emissions. (Review Concluded) I 18I Project is located in an attainment area. (Review Concluded) f o Project is located in a non-attainment area. o Coordination required with applicable state administering agency. i I Are project conditions required? 0 YES (see section V) 0 NO (Review Concluded) I 1 I I I I i I I I I Comments: No streams or water bodies are located in or near the project area. Co"espondencelConsultationIRe!erences: Louisiana Map (http://wwwlamap.doa.louisiana.govD queried 01/12/07. Comments: This project involves the demolition or renovation of a public structure. Regardless ofthe asbestos content, the applicant is responsible for ensuring that renovation or demolition activities are coordinated with the Louisiana Department of Environmental Quality (LDEQ) in accordance with the LDEQ "Seventh Amended Declaration of Emergency and Administrative Order" dated August 28,2006, and the LESHAP protocol dated March 1,2006, incorporating the provisions ofEPA's National Emission Standards for Hazardous Air Pollutants (NESHAP) and the Louisiana Administrative Code (LAC) 33.m.5I5I and Chapter 27. Should Asbestos Containing Materials (ACMs) be present at the project site, the applicant is also responsible for ensuring proper disposal in accordance with the previously referenced administrative orders. Co"espondencelConsultlltionIRejerences: EPA Region 6 Non-attainment Map. H. Farmland Protection Policy Act 18I Project does not affect designated prime or unique farmland. (Review Concluded) o Project causes unnecessary or irreversible conversion ofdesignated prime or unique farmland. o Coordination with Natural Resource Conservation Commission required. o Farmland Conversion Impact Rating, Form AD-I006, completed. Are project conditions required? 0 YES (see section V) 0 NO (Review Concluded) Comments: The project site is in a developed urbanized area and Farmland Protection Policy Act (FPPA) is precluded. No prime or unique farmland present. Co"espondencelConsultationIRe!erences: National Resource Conservation Service, Web Soil Survey I(htto:/lwebsoilsurvev.nrcs.usda.e:ov/appl )referenced 01112/07. I. Migratory Bird Treaty Act o Project not located within a flyway zone. (Review Concluded) 18I Project located within a flyway zone. 18I Project does not have potential to take migratory birds. (Review Concluded) Are project conditions required? D Yes (see section V) 18I No (Review Concluded) o Project has potential to take migratory birds. D Contact made with USFWS Are project conditions required? D YES (see section V) D NO (Review Concluded) Comments: The site is an existing disturbed area with little value to migratory birds and would not be included in the USFWS migratory bird management program. Com!spondence/Consultation/Re/erences: USFWS guidance letter dated September 15,2005 for Katrina Reviewtr Name: Adam Borden, Env. Specialist Project NamelEnv. Database No: Armstrong Elementary Scbool, Building A I FEMA-t603/J607-DR-LA PW1#11911 Parisb: Orleans I 1 t I J. Magnuson-Stevens Fishery Conservation and Management Act 181 Project not located in or near Essential Fish Habitat. (Review Concluded) o Project located in or near Essential Fish Habitat. o Project does not adversely affect Essential Fish Habitat.