substantial improvement started or the building permit date. If the building was substantially damaged, enter the actual month, day, and year that substantial damage occurred. Substantial improvement includes buildings that have incurred “substantial damage” regardless of the actual repair work performed. The agent must obtain and submit a statement from a community official before the building can be considered substantially damaged. If the policy is for a manufactured (mobile) home or travel trailer located outside a manufactured (mobile) home park or subdivision, enter the date of permanent placement of the manufactured (mobile) home. See the Rating section of this manual for rules for manufactured (mobile) homes located in manufactured (mobile) home parks and subdivisions. Compare the date of construction or substantial improvement with the effective date of the initial FIRM to determine if the building was constructed Pre- or Post- the effective date of the initial FIRM. • Substantial Improvement Exception For new applications, renewal applications, and endorsements when making a rating correction concerning a substantial improvement to a Pre-FIRM building where the improvement is an addition to the building and it meets the conditions of Pre-FIRM construction, found on pages RATE 15-16 of this manual, the producer should complete the Construction Data section of the Application as follows: a. Enter the date of construction for the Pre-FIRM part of the building (not the date of construction of the addition). This date will be shown as the construction date on the declarations page. b. Do not respond to the question IS BUILDING POST-FIRM CONSTRUCTION? Instead, complete the top part of this section as follows: "Substantial Improvement but continues to be Pre-FIRM." c. Supply the elevation data for the ADDITION. d. Complete the remainder of both parts of the Construction Data section in the usual manner. If a policyholder elects to use the normal Post-FIRM rating for substantial improvement, the producer must complete Part 2 of the Application as indicated. 2. Elevation Information Elevation information must be completed in the second part of the Construction Data section. • Post-FIRM Construction Check YES if the building is Post-FIRM construction or substantial improvement; otherwise, check NO. • Building Diagram Number and Lowest Adjacent Grade Provide the building diagram number and lowest adjacent grade from the Elevation Certificate (EC). NOTE: Elevation Certificates certified on or after January 1, 2007, must be submitted on the new EC form. The EC must meet all photo requirements described on pages CERT 1-2 of this manual. An EC submitted without the required photographs is not considered valid for rating. The lowest adjacent grade is not required for buildings without estimated BFE located in AO and unnumbered A and V zones. Policies rated using the Floodproofing Certificate do not require either the lowest adjacent grade or the diagram number. In communities that participate in the NFIP’s Community Rating System (CRS), building elevation information may be available from the community office in charge of building permits or floodplain management. APP 5 October 1, 2006 • Elevation Information for Buildings in the Course of Construction When the building is in the course of construction, the elevation information provided by the surveyor on the EC must be based on the proposed architectural plans. The NFIP requires the agent to describe and rate the structure based on the proposed plans. Buildings in the course of construction are to be rated the same as completed construction. A renewal application and a new EC are required at renewal time. For example, if the building is elevated and the proposed plans show an enclosure, the building must be described as elevated with an enclosure. The only exception is when an EC was prepared in the course of construction, and the surveyor was able to provide all elevation information required on the EC. • Lowest Floor Elevation and Related Items Use the eight building diagrams on pages CERT 18-19 to determine the correct lowest floor. See pages LFG 1-7 for information about determining the lowest floor for rating. When entering elevation data, drop hundredths of a foot and show only tenths of a foot. For example, if the elevation difference is 10.49’, enter 10.4’; do not round up to 10.5’. • Wave Height Adjustment In Zones V, V1-V30, and VE, if NO is checked for the question about Effects of Wave Action, refer to page RATE 29 for guidelines for FIRMS with wave heights. • Floodproofing If YES is checked for Floodproofed and the FIRM zone entered in the Community section of the Application is V, V1-V30, or VE, the Application must be submitted to the NFIP for underwriting and rating. For all other zones, refer to pages RATE 30-31 for elevation difference and rating guidelines. • Elevation Certification Enter the elevation certification date for all new business applications. M. Coverage and Rating Check desired coverage against the “Amount of Insurance Available” table on page RATE 1. Then enter the limits, indicate the rates and rate type, and add additional charges/credits, i.e., deductible reduction/increase, ICC Premium, CRS Premium Discount, Probation Surcharge (if any), and Federal Policy Fee. Calculate the Total Prepaid Amount. N. Signature The producer must sign the Application and is responsible for the completeness and accuracy of the information provided on it. Enter the date of application (month/day/year). The waiting period is added to this date to determine the policy effective date of the policy listed in the Policy Term section. A check or money order for the Total Prepaid Amount, payable to the NFIP, must accompany the application. A credit card payment by VISA, MasterCard, Diner’s Club, or American Express will also be acceptable if a disclaimer form, signed by the insured, is submitted with the Flood Insurance Application. The disclaimer will state that cancellation of a policy due to a billing dispute will be permitted only for a billing error or fraud. If the credit card information is taken over the telephone by the producer, the producer may sign the authorization form on behalf of the payor only after having read the disclaimer to the payor. V. COMPLETING PART 2 OF THE FLOOD INSURANCE APPLICATION FORM After completing Part 1 of the Flood Insurance Application, the producer must complete all relevant items in Part 2 of the Application for the following risks: • Post-FIRM construction located in Zones A1-A30, AE, AH, AO, A, V1-V30, VE, and V. • Pre-FIRM construction using optional Post- FIRM rating located in Zones A1-A30, AE, AH, AO, A, V1-V30, VE, and V. Part 2 of the Application collects information about risk factors affecting the building, occupancy information, and elevation data APP 6 October 1, 2006 APP 9 October 1, 2006 APP 10 October 1, 2006 APP 11 October 1, 2006 V. RATING STEPS A. Determine the exact location of the building and/or contents to be insured. IF THE MAILING ADDRESS DIFFERS FROM THE PROPERTY ADDRESS, USE THE PROPERTY ADDRESS ONLY. B. Determine if the building is located in an eligible community. Not all communities participate in the NFIP. There is NO COVERAGE available in nonparticipating communities. If you are uncertain, call the NFIP insurer, consult a local community official, or check the NFIP Community Status Book online (http://www.fema.gov/fema/csb.shtm). C. Determine the NFIP program phase (Emergency or Regular) and the community in which the property is located. Some communities may be eligible for premium discounts under the Community Rating System (CRS). See the CRS Section for a list of eligible communities, the corresponding discounts, and an example showing how to apply the CRS discount. D. Determine the location of the contents in the building. E. Determine the date of construction as described below. • Date of Construction—Buildings For flood insurance purposes, the date of construction for buildings under the NFIP must be determined in order to establish whether the building is Pre- FIRM or Post-FIRM construction. The start of construction or substantial improvement for insurance purposes means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. For the Coastal Barrier Resources System, the start of construction or substantial improvement, for insurance purposes, must be determined in accordance with the documentation requirements set forth by the Coastal Barrier Resources Act (CBRA). (See the Coastal Barrier Resources System Section.) • Date of Construction—Manufactured (Mobile) Homes/Travel Trailers The date of construction for a manufactured (mobile) home is different from a standard building and depends upon the location of the manufactured (mobile) home. For manufactured (mobile) homes located in manufactured (mobile) home parks or subdivisions, the date of construction is the date facilities were constructed for servicing the manufactured (mobile) home site, or the date of the permit, provided that construction began within 180 days of the permit date. This rule applies to all manufactured (mobile) homes even if the manufactured (mobile) home is rated and classified as single family. For manufactured (mobile) homes not located in manufactured (mobile) home parks or subdivisions, but located on individually owned lots or tracts of land, the date of construction is the date the manufactured (mobile) home was permanently affixed to the site or the permit date if affixed to the site within 180 days of the date of permit. • Pre-FIRM Construction For the purpose of determining insurance rates, buildings for which the start of construction or substantial improvement was on or before December 31, 1974, or before the effective date of the initial FIRM for the community, are considered Pre-FIRM construction. However, for insurance purposes, manufactured (mobile) homes that are located or placed in existing manufactured (mobile) home parks or subdivisions, or expansions to existing manufactured (mobile) home parks or subdivisions, are considered Pre-FIRM. All historic buildings are considered Pre-FIRM as long as the building meets the definition of a historic building. (See the Definitions Section.) RATE 15 May 1, 2005 Pre-FIRM buildings that are substantially improved may continue being rated as Pre-FIRM if certain conditions are satisfied. Pre-FIRM rating is applicable ONLY when ALL of the following conditions are met: - The building must be Pre-FIRM. - The substantial improvement must be an ADDITION to the building. (This condition excludes substantial improvements made as interior remodeling or repair projects.) - The ADDITION and extension must be next to and in contact with the existing building. (This condition does not apply to substantial improvements consisting of the construction of additional floors.) - An Elevation Certificate must be submitted to the NFIP Underwriting Unit with the application or renewal. The Elevation Certificate must verify that the lowest floor elevation of the ADDITION is at or above the applicable base flood elevation in effect at the time the addition is started. NOTE: Elevation Certificates certified on or after January 1, 2007, must be submitted on the new Elevation Certificate form. The Elevation Certificate must meet all photo requirements described on pages CERT 1-2 of this manual. An Elevation Certificate submitted without the required photographs is not considered valid for rating. If all of the above conditions are satisfied, the entire building is eligible for Pre-FIRM rates. (Except for some V-Zone risks and some manufactured [mobile] home risks, Post-FIRM rates provide less costly coverage and, therefore, the coverage may be rated using the lower Post-FIRM rates.) If the above conditions are not satisfied, the entire building MUST be rated as Post-FIRM. • Post-FIRM Construction For insurance rating purposes, buildings for which the start of construction or substantial improvement was after December 31, 1974, or on or after the effective date of the initial FIRM for the community, whichever is later, are considered Post-FIRM construction. This would include all manufactured (mobile) homes located in either new manufactured (mobile) home parks or subdivisions or outside of existing manufactured (mobile) home parks or subdivisions. VI. PREMIUM CALCULATION A. Emergency Program 1. Determine Occupancy Type: Residential or Non-Residential. 2. Calculate premium using appropriate rates. 3. Apply appropriate deductible factor if an Optional Deductible is selected. 4. Add Federal Policy Fee. B. Regular Program 1. Determine if the property to be insured is Pre-FIRM or Post-FIRM. A Pre-FIRM premium table for standard risk, single family property is located on page RATE 11. 2. Determine Zone. 3. Determine Occupancy: Single Family, 2-4 Family, Other Residential, Non-Residential, or Manufactured (Mobile) Home. 4. Determine Building Type (including basement or enclosure, if any): one floor, two floors, three or more floors, split level, or manufactured (mobile) home on foundation. 5. Determine if building has basement (or enclosed area below an elevated building): none, finished, or unfinished. 6. Determine Elevation Difference. 7. Calculate premium using the appropriate rates. 8. Apply appropriate deductible factor if an Optional Deductible is selected. RATE 16 October 1, 2006 RATE 33 October 1, 2006 RATE 34 October 1, 2006 RATE 35 October 1, 2006 RATE 36 October 1, 2006 RATE 37 October 1, 2006 RATE 38 October 1, 2006 RATE 39 October 1, 2006 RATE 40 October 1, 2006 RATE 41 October 1, 2006 RATE 42 October 1, 2006 RATE 43 October 1, 2006 RATE 44 October 1, 2006 RATE 45 October 1, 2006 RATE 46 October 1, 2006 2. If more than one additional mortgagee or disaster assistance agency exists, provide the requested information on the producer's letterhead. H. Property Location 1. Check YES if the location of the property being insured is the same as the address entered in the "Insured’s Mailing Address" section. Leave the rest of this section blank unless there is more than one building at the property location. 2. If more than one building is at the location of the insured property, use this section to specifically identify the building to be insured. Briefly describe the building or submit a sketch showing the location of insured buildings to assist the NFIP in matching the policy number to the specific building insured. 3. If NO, provide the address or location of the property to be insured. 4. If the insured's mailing address is a post office box or rural route number, give the street address, legal description, or geographic location of the property. I. Community 1. Enter the name of the county or parish where the property is located. 2. Check YES if the property is located in an unincorporated area of a county; otherwise, check NO. 3. Enter the community identification number, map panel number, and revision suffix for the community where the property is located. Use the FIRM in effect and that has been published at the time of presentment of premium and completion of application. Community number and status may be obtained by calling the writing company, consulting a local community official, or referencing the NFIP Community Status Book online at www.fema.gov/fema/csb.shtm. 4. Enter the Flood Insurance Rate Map zone. J. Building and Contents Complete all required information in this section. 1. Check building occupancy: Single Family, 2-4 Family, Other Residential, or Non- Residential (incl. Hotel/Motel). 2. Enter date of construction. 3. Check building type. If the building has a basement or enclosure, count the base ment or enclosure as a floor. If the building type is a manufactured (mobile) home/ travel trailer on foundation, enter the make, model, and serial number in the block at the bottom of this section. 4. Check the “Y” box (YES) or the “N” box (NO) for “CONDO UNIT” and “TOWNHOUSE/ROWHOUSE CONDO UNIT.” 5. Check location of building’s contents. (Contents located entirely in a basement are not eligible for contents-only coverage.) 6. Check YES if the building is the insured's principal residence; otherwise, check NO. 7. Using normal company practice, estimate the replacement cost value and enter the value in the space provided. Include the cost of the building foundation when determining the replacement cost value. K. Notice If the answer to either question A or question B is YES, this risk is not eligible for the Preferred Risk Policy. L. Premium 1. Enter the coverage selected, and the premium, from the appropriate table on the back of the application form. 2. Add the $50.00 Probation Surcharge, if applicable. Deduct $1.00 if this is an application for a townhouse/rowhouse condominium unit. M. Signature The producer must sign the Preferred Risk Policy Application and is responsible for the completeness and accuracy of the information provided on it. Enter the date of application (month/day/year). The waiting period is added to this date to determine the policy effective date of the policy listed in the Policy Term section. A check or money order for the Total Prepaid Amount, payable to the NFIP, must accompany the application. A credit card payment by VISA, MasterCard, Diner’s Club, or American Express will also be acceptable if a disclaimer form, signed by the insured, is submitted with the Preferred Risk Policy Application. The disclaimer will state that cancellation of a policy due to a billing dispute will be permitted only for a billing error or fraud. If the credit card information is taken over the telephone by the producer, the producer may sign the authorization form on behalf of the payor only after having read the disclaimer to the payor. PRP 5 October 1, 2005 PRP 6 October 1, 2006 PRP 7 October 1, 2006 END 13 October 1, 2006 END 14 October 1, 2006 CN 9 October 1, 2006 CN 10 October 1, 2006