Mission Essential Function (MEF) and Primary Mission Essential Function (PMEF) WorkshopTraining for Continuity Managers Welcome Name Position Office Organization Unit 1 -Introduction Introduction Name Position Office Organization Unit 1 -Introduction Administrative Information ..Daily schedule ..Restroom locations ..Breaks and lunch ..Emergency exit routes ..Dining facilities ..Pagers/cell phones ..Telephone messages ..Course evaluation Unit 1 -Introduction Participant Introductions ..Introduce yourself by providing: ..Your name and departments or agencies ..Your roles within the Department or Agency (D/A) Continuity Program Unit 1 -Introduction Agenda ..Day 1: ..Unit 1: Welcome and Introduction ..Unit 2: MEF/PMEF Development Process ..Day 2: ..Unit 3: Continuity Communications Architecture (CCA) ..Unit 4: Readiness Reporting System (RRS) ..Unit 5: Briefing for Department and Agency (D/A) Continuity Coordinators ..Unit 6: Course Evaluation Unit 1 -Introduction Course Materials ..The Student Manual is the participants’main reference for the course. It includes: ..All course content ..Activities and supporting materials ..Job aids / references (CD) Unit 1 -Introduction Workshop Purpose ..Establish a familiarization briefing on MEF and PMEF identification for D/A Continuity Managers ..MEF:The limited set of D/A functions that must be continued throughout, or resumed rapidly after, a disruption of normal activities. ..PMEF:Those D/A MEFs which must be performed in order to support the performance of NEFs before, during, and in the aftermath of an emergency. ..Provide training on the formalized process for D/A submission of potential PMEFs that are consistent and supportive of the NEF: ..Include a standardized checklist to allow D/As to assess their PMEFs through a risk management process ..Include guidance on how the PMEFs link to/support NEFs Unit 1 -Introduction D/A Required Actions ..Within 90 days after Department of Homeland Security’s (DHS) guidance, review and revise MEFs and identify and submit potential PMEFs to the Interagency Board (IAB) ..Within 30 days after validation of D/A PMEFs and annually thereafter, ensure key leaders and support staff are provided familiarization training of department or agency PMEFs and MEFs ..Within 180 days after validation of D/A PMEFs, ensure PMEF and MEF interdependencies are coordinated internally, at the interagency level, and with private sector partners Key Considerations ..The continuous performance of essential functions must be guaranteed with the right people, the right resources, and the right planning. Continuity cannot be an afterthought for organizations as they strive to perform essential functions ..Executive D/As will incorporate the following key continuity concepts in developing specific operational procedures to ensure a robustcontinuity capability: ..An understanding of essential functions ..Consideration of risk management ..Clear lines of authority ..Necessary communications capability ..Adequate facilities ..Ample security ..Thoughtful preparedness ..Integration with incident management (as required) Unit 1 -Introduction Essential Functions and IAB Process Chapter 2 of the Implementation Plan and Attachment C of the National Continuity Coordinator’s memorandum dated September 27, 2007, describes in detail a new effort to identify D/A MEFs and PMEFs ..This process is a refinement of an effort begun in 2005 and willbuild upon it to produce a more refined and synchronized set of MEFs and PMEFs ..Many of the PMEFs identified by departments and agencies in 2005 may have been part of the larger set of MEFs ..The Implementation Plan requires a new process to identify D/A MEFs and PMEFs Unit 1 -Introduction Workshop Pre-test ..Please complete the MEF/PMEF Workshop Pre-test Unit 1 -Introduction Summary and Transition ..This unit: ..Introductions ..Course materials ..Purpose ..Goals ..Workshop Pre-test ..Next Unit: ..MEF/PMEF Process Unit 1 -Introduction Summary and Transition Questions? Unit 1 -Introduction MEF/PMEF Process Name Position Office Organization Unit 2 –MEF/PMEF Process National Continuity Policy ..National Security and Homeland Security Presidential Directives ..National Security Presidential Directive –51 (NSPD-51) ..Homeland Security Presidential Directive–20 (HSPD-20) ..SUBJECT: National Continuity Policy ..Released May 9, 2007 ..Presidential Decision Directive 67 (PDD 67) dated October 21, 1998, Enduring Constitutional Government and Continuity of Government Operations, including all Annexes thereto, is hereby revoked Unit 2 –MEF/PMEF Process Key Continuity Documents ..National Continuity Policy (NSPD-51/HSPD-20) dated May 9, 2007 ..SupersedesPDD 67 dated October 21, 1998 ..National Continuity Policy Implementation Plan dated September 27, 2007 ..Federal Continuity Directive (FCD 1) dated November 2007 ..SupersedesFPC 65 dated June 15, 2004 ..Federal Continuity Directive (FCD 2) dated November 2007 ..National Continuity Coordinator Memo dated September 27, 2007 Unit 2 –MEF/PMEF Process NSPD-51/HSPD-20 Purpose ..This directive establishes a comprehensive national policy on the continuity of Federal Government structures and operations and a single National Continuity Coordinator responsible for coordinating the development and implementation of Federal continuity policies. Unit 2 –MEF/PMEF Process NSPD-51/HSPD-20 Purpose (cont.) ..This policy establishes “National Essential Functions,” prescribes continuity requirements for all executive departments and agencies, and provides guidance for State, local, territorial, and tribal governments, and private sector organizations in order to ensure a comprehensive and integrated national continuity program that will enhance the credibility of our national security posture and enable a more rapid and effective response to and recovery from a national emergency. Unit 2 –MEF/PMEF Process The Ultimate Goal of Continuity ..The ultimate goal of continuity in the Executive Branch is the continuation of the eight NEFs which are the critical responsibilities of the Federal Government needed to lead and sustain the Nation ..The Federal Government’s ability to successfully execute its NEFs at all times, and especially during a crisis, is not an independent capability. The Federal Government relies upon key partners at all levels of government and in the private sector Unit 2 –MEF/PMEF Process Implementation Plan ..The NCPIP directs more than 75 critical actions, many of which have been initiated already, to ensure the effectiveness and survivability of our national continuity capability through any circumstance Unit 2 –MEF/PMEF Process Unit 2 –MEF/PMEF Process Goals and Objectives•Goal #1 –To understand the transformation of continuity. oObjective 1A–To understand the history of continuity and the President’s vision. oObjective 1B–To understand our Nation’s continuity concept of operations and key considerations. oObjective 1C–To understand continuity roles and responsibilities. Unit 2 –MEF/PMEF Process Goals and Objectives •Goal #2 –To establish and ensure continuity of national priorities. oObjective 2A–To identify continuity partners and functions. oObjective 2B–To identify Mission Essential Functions. oObjective 2C–To identify Primary Mission Essential Functions. oObjective 2D–To establish roles, responsibilities, and actions for the Nation’s senior continuity officials. Unit 2 –MEF/PMEF Process •Goal #3 –To ensure continuity readiness procedures and metrics. oObjective 3A–To establish a Continuity Program Management Cycle. oObjective 3B–To establish continuity requirements and metrics. oObjective 3C–To establish roles, responsibilities, and actions for continuity officials. Goals and Objectives Unit 2 –MEF/PMEF Process Goals and Objectives•Goal #4 –To promote interoperability. oObjective 4A–To promote interoperability among the branches of the Federal Government. oObjective 4B–To promote interoperability among Federal, State, local, territorial, and tribal governments. oObjective 4C–To promote interoperability between the private sector critical infrastructure owners and operators and the government. National Continuity Policy Unit 2 –MEF/PMEF Process Text Box: Sets forth a new vision to ensure the continuity of our government Establishes: A national policy on continuity of Federal Government structures and operations A single National Continuity Coordinator The National Essential Functions Provides g ..Sets forth a new vision to ensure the continuity of our government ..Establishes: ..A national policy on continuity of Federal Government structures and operations ..A single National Continuity Coordinator ..The National Essential Functions ..Provides guidance for State, local, territorial, and tribal governments and private sector organizations ..The old organizational framework has changed ..Pursuant to NSPD-51/HSPD-20, and with this National Continuity Policy Implementation Plan, the President directs the Executive Branch to reorient itself and to utilize an integrated, overlapping national continuity conceptin order to ensure the preservation of our government and the continuing performance of essential functions Unit 2 –MEF/PMEF Process Text Box: Transformation of Continuity Transformation of Continuity bush1 Image: Whitehouse Unit 2 –MEF/PMEF Process Text Box: Fully Integrated Continuity Planning Fully Integrated Continuity Planning Text Box: This Implementation Plan directs that continuity planning occur simultaneously as functions are developed and executed ..Continuity responsibility and planning is no longer a separate, compartmented function of an independent cell of a few planners in each government D/A ..This Implementation Plan directs that continuity planning occur simultaneously as functions are developed and executed Federal Continuity Directive 2 (FCD 2) ..FCD 2 provides D/As guidance on: ..Identification of their MEFs and potential PMEFs ..Assessment of their essential functions through a risk management process ..A formalized process for submission of D/As’potential PMEFs that are supportive of the NEFs ..Processes for conducting a BPA and BIA for each of the potential PMEFs Unit 2 –MEF/PMEF Process MEF/PMEF Submission Requirements ..D/As will follow the process outlined in FCD 2 to identify theirMEFs and potential PMEFs ..D/As will conduct a BPA for each of their MEFs to identify the inputs, outputs, resources, systems, facilities, expertise, authorities, and internal and external interdependencies ..Materials must be submitted to the DHS within 90 days of receiving DHS submission guidance: ..Agency Memorandum ..PMEF Narrative Sheets ..MEF/PMEF Workbook consisting of Excel-format worksheets Unit 2 –MEF/PMEF Process MEF/PMEF Submission Process ..Unclassified MEFs and potential PMEFs should be submitted in both a paper and electronic copy on a compact disc (CD) to: US Department of Homeland Security Federal Emergency Management Agency (FEMA) National Continuity Programs ATTN: Federal Branch (James Opaczewski) 500 C Street, SW, Room 515 Washington, DC 20472 ..The Agency Memorandum should be submitted using a portable document format (pdf) file. The MEF/PMEF Workbook information will be submitted in the electronic spreadsheet format provided to facilitate the transfer of the information into the RRS. ..Classified MEFs and potential PMEFs should be submitted in classified paper and classified electronic copy on CD, and coordinated through FEMA Document Control at (202) 646-4629. ..There is the expectation that once the BIA is completed on PMEFs, the data would be classified. That level of classification should be determined by each department and agency submitting the information. ..EMAIL questions to: FEMA-pmefsubmissions@dhs.gov. Unit 2 –MEF/PMEF Process Unit 2 –MEF/PMEF Process Text Box: The NEFs will be the primary focus of the President and the national leadership during and following an emergency These are categories of functions performed by one or more departments and agencies They are not new authorities, requirements ..The NEFs will be the primary focus of the President and the national leadership during and following an emergency ..These are categories of functions performed by one or more departments and agencies ..They are not new authorities, requirements or functions (These were included in the Memorandum issued in 2005 from Frances Fragos Townsend, Assistant to the President for Homeland Security) Text Box: National Essential Functions (NEF) National Essential Functions (NEF) cap_buyusa-gov_trans Unit 2 –MEF/PMEF Process National Essential Functions1.Ensuring the continued functioning of our form of government under the Constitution, including the functioning of the three separate branches of government; 2.Providing leadership visible to the Nation and the world and maintaining the trust and confidence of the American people; 3.Defending the Constitution of the United States against all enemies, foreign and domestic, and preventing or interdicting attacks against the United States or its people, property, or interests; 4.Maintaining and fostering effective relationships with foreign nations; Unit 2 –MEF/PMEF Process National Essential Functions5.Protecting against threats to the homeland and bringing to justice perpetrators of crimes or attacks against the United States or its people, property, or interests; 6.Providing rapid and effective response to and recovery from the domestic consequences of an attack or other incident; 7.Protecting and stabilizing the Nation’s economy and ensuring public confidence in its financial systems; and 8.Providing for critical Federal Government services that address the national health, safety, and welfare needs of the United States. PMEF Submission Package Workbook ..Organizational Information Worksheet ..MEF IdentificationWorksheet 1 ..MEF IdentificationWorksheet 2 ..MEF Business Process Analysis (BPA) Worksheet ..MEF Business Process Elements Worksheet ..Potential PMEF Screening Worksheet ..PMEF Candidate Worksheet ..PMEF Business Impact Analysis (BIA) Worksheet ..Supporting Remarks Worksheet Unit 2 –MEF/PMEF Process Workbook References & Definitions ..The last three tabs in the Excel Workbook provides information to assist in the preparation of the worksheets ..These tabs include the following: ..NEF & ESF Reference List ..Definitions ..Impact values and Hazard List Unit 2 –MEF/PMEF Process Federal Government Partnerships Unit 2 –MEF/PMEF Process Text Box: While this Implementation Plan is primarily directed at the Executive Branch of the Federal Government, continuity cannot occur without the commitment and dedication of many others who play integral roles in ensuring our homeland security. Thos While this Implementation Plan is primarily directed at the Executive Branch of the Federal Government, continuity cannot occur without the commitment and dedication of many others who play integral roles in ensuring our homeland security. Those partners include the following: ..Federal Government: Legislative Branch, Executive Branch (including all D/As), and Judicial Branch ..State, local, territorial and tribal governments ..Private Sector Critical Infrastructure Owners Government Functions Unit 2 –MEF/PMEF Process Text Box: Government Functions are the collective functions of executive departments and agencies as defined by the Constitution, statute, regulation, presidential direction or other legal authority and the functions of the legislative and judicial branch Government Functions are the collective functions of executive departments and agencies as defined by the Constitution, statute, regulation, presidential direction or other legal authority and the functions of the legislative and judicial branches. The activities of State, local, territorial, tribal governments, and private sector organizations often support Federal Government functions, particularly in the protection of critical infrastructure and key resources (CI/KR). Identify Government Functions Unit 2 –MEF/PMEF Process Text Box: Review documents such as statutes, regulations, presidential direction, other legal authorities, and mission statements ..Review documents such as statutes, regulations, presidential direction, other legal authorities, and mission statements ..Completion of this process results in the list of your Government Functions Mission Essential Functions MEFs are described as the limited set of department-and agency-level government functions that must be continued throughout or resumed rapidly after a disruption of normal activities. Unit 2 –MEF/PMEF Process Mission Essential Functions Unit 2 –MEF/PMEF Process Text Box: MEFs are those functions that enable an organization to provide vital services, exercise civil authority, maintain the safety of the general public, and sustain the industrial/economic base during disruption of normal operations MEFs serve as ke ..MEFs are those functions that enable an organization to provide vital services, exercise civil authority, maintain the safety of the general public, and sustain the industrial/economic base during disruption of normal operations ..MEFs serve as key continuity planning factors for D/As to determine appropriate staffing, communications, information, facilities, training, and other requirements Unit 2 –MEF/PMEF Process Process for MEF IdentificationIdentification of MEFs requires an objective review of D/A functions that delineates those time-sensitive and/or critical activities that must be sustained in an emergency. Much of the process described in the NCP IP will build upon the previous effort to produce a more refined and synchronized set of MEFs and PMEFs. MEF Initial Screening Aid Unit 2 –MEF/PMEF Process BPA for Essential Functions ..As required per the Implementation Plan: ..Departments or agencies will conduct a Business Process Analysis (BPA) ..A successful BPA will identify gaps within a department or agency and areas where more than one department or agency has responsibilities ..Identifying gaps provides departments and agencies an opportunity to fill the gap and ensure successful execution of essential functions Unit 2 –MEF/PMEF Process MEF Identification Worksheet 1 ..Before a government function can be considered a MEF, it must meet the legal test as outlined in the National Continuity Policy Implementation Plan ..MEF IdentificationWorksheet 1 ..Screens each government function to confirm it is legally directed ..Addresses interdependency requirements ..Identifies partners required for each function by D/A name Unit 2 –MEF/PMEF Process Unit 2 –MEF/PMEF Process MEF Identification Worksheet 1Test for legal authorities, identify interdependencies and beginBPADetermine the legal authorities that support the missionIdentify all interdependencies that are related to the Government Function Worksheet 1 Activity ..Using your Organizational Survey sheets complete the worksheet Unit 2 –MEF/PMEF Process MEF Identification Worksheet 2 ..Analyzes whether the function must be performed under all circumstances either uninterrupted, with minimal interruption, or will require immediate execution in an emergency ..Addresses specific time sensitivity considerations ..Must be validated by the D/A Continuity Coordinator ..Upon completion of this worksheet: ..D/As have identified the information required to establish theirMEFs ..May begin the BPA for each MEF to further assist in identifying potential PMEFs Unit 2 –MEF/PMEF Process Unit 2 –MEF/PMEF Process MEF Identification Worksheet 2Test for mission criticality and time sensitivityDetermine criticality of Government FunctionsDetermine the time sensitivity for the mission to be completedD/A Continuity Coordinator Review Point Worksheet 2 Activity ..Using your Organizational Survey sheets complete the worksheet Unit 2 –MEF/PMEF Process MEF Identification and Analysis ..Conduct a MEF Business Process Analysis (BPA) to identify and map functional processes, workflows, activities, personnel expertise, systems, data, and facilities inherent to the execution of each identified MEF (i.e., define how each MEF is performed and executed with a business process flow map), which must be performed under all circumstances ..Identify those MEFs that provide vital interdependent support to a MEF performed by another Federal executive department or agency or an Emergency Support Function (ESF) under the National Response Framework (NRF) Unit 2 –MEF/PMEF Process MEF BPA Worksheet ..Lists inputs required to perform the function and function outputs ..Identify key elements in the business process flow ..Analyze interagency MEF/PMEF support ..Identify internal and external interdependent partnerships ..Is reviewed by the D/A Continuity Coordinator for approval and validation Unit 2 –MEF/PMEF Process Unit 2 –MEF/PMEF Process MEF BPA WorksheetAnalyze BPA to include four pillars and interdependenciesAnalyze the Business Process Flow for the MEF and the linkage for identified interdependenciesAfter Business Process Analysis and Interdependencies have been considered, map process flowsD/A Continuity Coordinator Review Point Key Elements for Components of the BPA ..After conducting the MEF BPA each MEF will require further analysis to indentify key supporting elements ..MEF Business Process Flow: ..Should be inserted and mapped into the proper location within the MEF business process flow ..Should include all elements that will ensure execution of their associated MEF Unit 2 –MEF/PMEF Process RequiredOutputsCommsCapabilitiesFacilities AnalysisStaffing ProcessLeadership AnalysisIdentify InputsContinuity PartnersContinuity PartnersContinuity PartnersContinuity PartnersRequiredOutputsCommsCapabilitiesFacilities AnalysisStaffing ProcessLeadership AnalysisIdentify InputsContinuity PartnersContinuity PartnersContinuity PartnersContinuity PartnersInclude allinternal and externalinterdependencies Analyze BPA to include four pillars and interdependencies Unit 2 –MEF/PMEF Process MEF Business Process ElementsAnalyze the Business Process Flow for the MEF and list the Key elements supporting each component of the BPA based on the internal or external interdependencyFor each identified MEF list the Key Elements supporting each component of the BPA by interdependency Worksheet 3 and 4 Activity ..Using your Organizational Survey sheets complete the worksheets Unit 2 –MEF/PMEF Process MEF Support to NEFs ..Once the MEFs have been identified with the key elements mapped, the process for selecting PMEFs can begin ..Linking PMEFs to a NEF requires D/As to identify the most critical functions that must continue during an emergency ..PMEFs are identified by D/A MEFs which must be performed in order to support the performance of the NEFs before, during, and in the aftermath of an emergency ..PMEFs need to be continuous or resumed within 12 hours after an event and maintained for up to 30 days or until normal operations can be resumed Unit 2 –MEF/PMEF Process Primary Mission Essential Functions PMEFs are those D/A MEFs, validated by the National Continuity Coordinator, which must be performed in order to support the performance of the NEFs before, during, and in the aftermath of an emergency. PMEFs are those functions that need to be continuous or resumed within 12 hours after an event and maintained for up to 30 days or until normal operations can be resumed. Unit 2 –MEF/PMEF Process PMEF Initial Screening Aid Unit 2 –MEF/PMEF Process Potential PMEF Screening Worksheet ..Provides a screening test to identify whether a MEF is a candidate for PMEF consideration ..Analyzes which NEFs are supported by each potential PMEF and if the function must be continued within 12 hours of an interruption ..Upon completion of the worksheet, D/A’s will have identified the required information to establish PMEFs Unit 2 –MEF/PMEF Process Unit 2 –MEF/PMEF Process Potential PMEF Screening WorksheetMark appropriate block(s) (MEFs and PMEFs can support multiple NEFs) Determine the time period for which it must be performedCan be Federal or non-Federal entities, and Identify all interdependenciesDetermine NEF linkage and validate time required to accomplish MEF. D/A Continuity Coordinator Review Point Worksheet 5 Activity ..Using your Organizational Survey sheets complete the worksheet Unit 2 –MEF/PMEF Process Identify PMEF Candidates ..Upon MEF approval by each D/A head, potential PMEFs must be developed ..Each Continuity Coordinator will prepare a preliminary identification of potential PMEFs that support NEFs ..To achieve this result, the D/A clearly and succinctly articulates a PMEF statement that embodies the specificity of the organizational mission and consists of one or more MEFs that are linked to NEF execution Unit 2 –MEF/PMEF Process Identify Candidate PMEF Statements ..The PMEF statement should identify the following: ..The organizational action or role required ..The conditions under which the function would be performed ..The scope of operations ..The standard of performance ..With the statement identify those MEFs that are linked to the NEFsand support the candidate PMEF statement ..This is the worksheet that clearly identifies the specific Maximum Tolerable Downtime (MTD) for each PMEF Unit 2 –MEF/PMEF Process Determine NEF linkage and identify PMEF candidates. Unit 2 –MEF/PMEF Process PMEF Candidate WorksheetPrepare your PMEF Statement based on D/A organizational mission and relating to the MEFS linked to NEFsfrom the previous worksheetDetermine the Maximum Tolerable DowntimeCan be Federal or non-Federal entities, and Identify all interdependenciesD/A Continuity Coordinator Review Point Worksheet 6 Activity ..Using your Organizational Survey sheets complete the worksheet Unit 2 –MEF/PMEF Process Candidate PMEF Narrative Sheet ..Supporting your Excel workbook with your PMEF candidates, each D/A will prepare a Candidate PMEF Narrative Sheet which will include the following: ..Organization and Point of Contact ..PMEF Statement ..PMEF Description ..Implications if not performed ..Supporting MEF(s) linked to this PMEF and the NEFs ..Identify supported NEFs ..Identify Maximum Tolerable Downtime (MTD) ..Identify interdependent partnerships Unit 2 –MEF/PMEF Process Unit 2 –MEF/PMEF Process IAB Process for BPA and BIA ..IAB conducts a BPA for interagency PMEF processes ..IAB maps and analyzes interagency interdependencies ..IAB conducts NEF-specific BIA to include identifying alternatives and work-arounds ..IAB submits NEF BPA and BIA to NCC ..NCC uses findings to manage and lead continuity program The IAB conducts BPA and BIA ..The IAB will conduct a BPA to identify and map interagency PMEF processes, workflows, activities, expertise, systems, data, and facilities inherent to the interagency execution of each NEF ..The IAB will conduct NEF-specific BIAs to: ..identify single points of failure(s) ..define the impact of downtime ..define potential work-around(s) Unit 2 –MEF/PMEF Process PMEF Identification and BIA ..An interagency board (IAB), established by the NCC, conducts a review of submitted potential PMEFs and validates their relationship to the NEFs. A risk management methodology (i.e., BIA or BPA) will be used to ensure that the PMEFs are appropriate and relevant ..The immediacy of maintaining or recovering essential functions capability is driven by the results of the MEF and NEF BPA and the NEF BIA ..Subsequently, the described risk management approach requires an emphasis on the geographic dispersion, redundancies, and survivability of leadership, staff, and infrastructure Unit 2 –MEF/PMEF Process PMEF Business Impact Analysis (BIA) ..Once the IAB and the D/A has completed a joint review of the potential PMEFs and the NCC has approved the PMEFs, a BIA will be conducted by the D/A to support the IAB process ..D/As consider the following during the BIA: ..Potential threats and hazards ..Consider vulnerabilities and identify potential points of failure ..Assess the likelihood of the hazard or threat occurring ..Consider the impact, potential downtime, and mandated recovery times ..Provide a stoplight analysis (red, yellow, green) ..Develop a mitigation strategy to minimize risk to the NEF ..Continuity Coordinator reviews and validates the BIA Unit 2 –MEF/PMEF Process Perform impact analysis and develop risk mitigation strategies. Unit 2 –MEF/PMEF Process PMEF Impact Analysis WorksheetConsider potential threats and hazardsAssess vulnerability and determine potential points of failureConsider likelihood of occurrenceAnalyze the impact of the PMEF failure on the supported NEFPrepare a mitigation strategy for identified risks to supported NEFsProvide a ‘stoplight assessment’ (Red, Yellow, Green) of the impact analysisD/A Continuity Coordinator Review Point Worksheet 7 Activity ..Using your Organizational Survey sheets complete the worksheet Unit 2 –MEF/PMEF Process National Essential Functions In accordance with NSPD-51 / HSPD-20, the eight NEFs represent the overarching responsibilities of the Federal Government to lead and sustain the Nation and shall be the primary focus of the Federal Government leadership during and in the aftermath of an emergency. Unit 2 –MEF/PMEF Process Ensuring Continuation of EFs The interdependencies of the key partners and the functions of continuity. Independent government entities at all levels and individual private sector companies are intimately connected and work together in critical partnership to ensure continuation of essential functions. Unit 2 –MEF/PMEF Process Continuity Program Management Cycle Unit 2 –MEF/PMEF Process Plans and ProceduresEvaluations, After Action Reports, and Lessons LearnedTest, Training, and ExerciseDevelop Corrective Action Plans Unit 2 –MEF/PMEF Process D/A Roles, Responsibilities, and Actions1.On an ongoing basis, ensure performance of department or agency Primary Mission Essential Functions. 2.On an ongoing basis, incorporate continuity requirements into daily department and agency operations. 3.On an ongoing basis, ensure the department or agency has continuity plans for dealing with a national or localized emergency situation and ensuring the continued performance of all PMEFs in support of the NEFs, as well as continued performance of MEFs and other essential functions. Unit 2 –MEF/PMEF Process 4.Within 30 days, appoint a senior accountable official, at the Assistant Secretary or equivalent level, as the Continuity Coordinator for the department or agency. 5.Within 30 days and annually thereafter, submit a report to the NCC certifying that the department or agency has a continuity capability plan that includes the items in Paragraph 11 of NSPD-51/ HSPD-20 (see Box 12). 6.On an ongoing basis, consistent with sections 11(e) and 19(c) of NSPD-51/HSPD- 20, plan, program, and budget for secure continuity communications capabilities. D/A Roles, Responsibilities, and Actions Unit 2 –MEF/PMEF Process 7.Within 90 days after DHS’guidance, review and revise MEFs and identify and submit potential PMEFs. 8.Within 30 days after validation of department and agency PMEFs and annually thereafter, ensure key leaders and support staff are provided familiarization training of department or agency PMEFs and MEFs. 9.Within 180 days after validation of department and agency PMEFs, ensure PMEF and MEF interdependencies are coordinated internally, at the interagency level. D/A Roles, Responsibilities, and Actions Unit 2 –MEF/PMEF Process 10.On an ongoing basis, participate in DHS’s National Exercise Program. 11.On an ongoing basis, incorporate OMB Circular A-11 guidance, or other OMB guidance on continuity as provided, when developing continuity budgets. 12.As required, submit Continuity Readiness Reports, and other reports as requested, through the Readiness Reporting System. D/A Roles, Responsibilities, and Actions Summary and Transition ..This unit: ..Introduction to the NCPIP ..Introduction to FCD 2 ..Over view of MEF/PMEF Process ..Introduction to electronic worksheets ..Activities on MEF/PMEF development ..Roles, responsibilities, and actions ..Next Unit: ..Continuity Communications Architecture (CCA) Unit 2 –MEF/PMEF Process Summary and Transition Questions? Unit 2 –MEF/PMEF Process Continuity Communications Architecture (CCA) and PMEF Analysis Name Position Office Organization Unit 3 –Continuity Communications Architecture (CCA) Collaboration with NCS ..NCPIP calls for DHS to produce a FCD within 60 days of issuance ..DHS/FEMA must provide guidance to D/As on MEF/PMEF identification process ..NSPD-51/HSPD-20 directs NCS to develop a CCA ..The CCA must be directly linked to the MEF/PMEFs that it is designed to support ..NCPIP calls for DHS to measure and report D/A capabilities to support PMEFs ..NCS CCA, if directly linked to PMEFs, will enable DHS to accomplish this task by providing assessments of continuity communications capabilities Unit 3 –Continuity Communications Architecture (CCA) Introduction to CCA ..Overall Objective ..Ensure communications among D/As to support the NEFs under all types of national emergency situations ..Requirement ..Identify communications capability gaps that prevent successful execution of the D/A PMEFs that support the NEFs ..Planned Three-Phased Approach ..Document the as-is CCA ..Assess the as-is CCA for gaps in capabilities ..Propose a to-be CCA to close the gaps Unit 3 –Continuity Communications Architecture (CCA) The CCA Model Unit 3 –Continuity Communications Architecture (CCA) Infrastructure•Communications•Computing/Storage Platforms•System Applications•Communications Types•Security•FacilitiesOperations/Business•Types of Information•D/As•MEFs•Automation Needs•PMEFs•NEFs•Partner Organizations-what the D/As must do in any given Scenario-the capabilities possessed by the D/AsEnvironment/Situation-the situations under which the D/As must operate•Geographic Locations•Scenarios•Effects CCA Data Collection Toolset ..CCA data collection toolset considers common methods for capturing D/A PMEF data using menus and drop-down lists ..Common format for capturing PMEFs and PMEF descriptions ..Direct association of PMEFs to the NEFs they support ..Standardized D/A organizational names and hierarchical relationships ..Unambiguous association of partner D/As for each PMEF ..Standardized list of types of required information exchanges Unit 3 –Continuity Communications Architecture (CCA) Unit 3 –Continuity Communications Architecture (CCA) Framework for CCA AnalysisComms DevicesTypes of InformationD/AsMEFs/PMEFsNEFsCommunications TypesScenariosEffectsSecurityComms DevicesSecurityTypes of InformationD/AsMEFs/PMEFsNEFsCommunications TypesGeographic LocationsEnvironment/SituationOps/BusinessInfrastructureOps/BusinessInfrastructureResponsible D/APartner OrganizationAssessments ofConnectivity, Interoperability, & CompatibilityComms ApplicationsComms Applications Analytical Interdependencies ..CCA-PMEF data needs considerations in PMEF data collection ..CCA methodology requires standardized set of PMEF data to establish continuity communications needs ..CCA-PMEF analytical tools facilitate cross-D/A analysis ..What D/As need information from which other D/As to enable execution of their PMEFs ..What information needed by one D/A is or is not being provided by another D/A ..With which organizations can a D/A exchange information and with which D/As can they not Unit 3 –Continuity Communications Architecture (CCA) PMEF Documentation Process ..Specific steps to be followed ..Each D/A should identify all of its MEFs ..For each MEF, each D/A should identify which NEFs that MEF supports (supporting candidate PMEFs) ..For each MEF (not just the PMEFs), each D/A should identify ..Its partner D/As (or other organizations) from whom it needsinformation to accomplish the MEF ..And, in what form(s) (e.g., voice, video, email, etc.) that information is needed ..Its partner D/As (or other organizations) to whom it providesinformation as a result of its MEF ..And, in what form(s) (e.g., voice, video, email, etc.) that information is provided Unit 3 –Continuity Communications Architecture (CCA) Notional Conventions –PMEF Model Unit 3 –Continuity Communications Architecture (CCA) Department / AgencyTwo D/As have both identified an identical partner relationshipA provides information to B; B requires information from AABTwo D/As have identified an inconsistentpartner relationshipA provides information to B; B makes no reference to needing information from AABA provides information to B; B provides information to AABB requires information from A; A does not provide information to BABNo relationship between D/As identified by either D/AABA made no mention of B; B made no mention of A Summary and Transition ..This unit: ..CCA and PMEF Analysis ..Identification of interdependent communication requirements ..Next Unit: ..Readiness Reporting System (RRS) Unit 3 –Continuity Communications Architecture (CCA) Summary and Transition Questions? Unit 3 –Continuity Communications Architecture (CCA) Readiness Reporting System (RRS) and PMEF Analysis Name Position Office Organization Unit 4 –Readiness Reporting System (RRS) PMEF Long Term Vision Timeline Unit 4 –Readiness Reporting System (RRS) IAB provides D/A with shortcomings and validated PMEF(s) IAB provides D/A with shortcomings and validated PMEF(s) D/A ensure coordination of resources, PMEF interdependenciesD/A ensure coordination of resources, PMEF interdependencies180 days 180 daysDHS submits candidate PMEFs to IABDHS submits candidate PMEFs to IABNCP Implementation Plan issued27 Sep 07NCP Implementation Plan issued27 Sep 07IAB analyzes PMEF candidate packagesIAB analyzes PMEF candidate packages 2nd Qtr/FY08DHS transfers data from candidate PMEFs submission process into RRS Spiral 1 fields/reportsDHS transfers data from candidate PMEFs submission process into RRS Spiral 1 fields/reportsRRS Spiral 2 developmentRRS Spiral 2 development Text Box: Phase I Phase I Text Box: Phase II Phase II Text Box: Phase III Phase III Phase I ..Distribution of National Continuity Policy Implementation Plan ..NCP creates and distributes Federal Continuity Directive -1 & 2 (FCD 1 & 2) ..NCP provides training to Department/Agencies (D/A) on Mission Essential Function (MEF) and PMEF identification/ development process and FCD –1 & 2 ..NCP provides guidance and training to D/A on candidate PMEFs submission process ..D/A submits candidate PMEFs to Department of Homeland Security and Interagency Board (IAB) Unit 4 –Readiness Reporting System (RRS) Phase I (Continued) ..IAB compiles and analyzes PMEF candidate packages ..IAB provides National Essential Function (NEF) Business Process Analysis (BPA) Mapping and Business Impact Analysis (BIA) Reports to the National Continuity Coordinator (NCC) with findings and recommendations for mitigation, risk reduction, and risk management actions for each NEF ..NCC reviews and approves BPA/BIA findings to manage and lead the Federal Government Continuity Program efforts ..IAB provides D/A with shortcomings and approved/validated PMEF(s) Unit 4 –Readiness Reporting System (RRS) Phase II ..D/As address shortcomings, findings, and recommendations provided by IAB ..Within 180 days after validation of PMEFs, D/As ensure PMEF and MEF interdependencies are coordinated internally, at the interagency level, and with private sector partners ..D/As coordinate and obtain needed resources to perform PMEFs Unit 4 –Readiness Reporting System (RRS) Phase III ..Readiness Reporting System (RRS) Spiral 1: ..A multi level stand-alone MS Access database that uses CDs to record updates: ..Serves as a repository of continuity data in accordance with the National Continuity Policy Implementation Plan ..Reports current individual D/A continuity status ..Shows continuity element to PMEF relationships ..Shows PMEF to National Essential Function (NEF) relationships ..Depicts order of succession information ..Depicts D/A facility information ..Assists with validation through the collection and analysis of exercise and inspection data ..Will be replaced by a web-based system (Spiral 2) in 2009 Unit 4 –Readiness Reporting System (RRS) Phase III (Continued) ..RRS Spiral 2: ..Being developed as a fully integrated web-based tool that will: ..Provide Federal Executive Boards (FEB), Federal Executive Associations (FEA), and D/As a means for defining and measuring continuity of operations current readiness status to the National Command Authority (NCA) ..Provide D/As a means to associate PMEF with NEF ..Provide a means to assess a D/As capability to perform their PMEFs in support of NEFs in case of COOP activation ..Provide gap analysis and assist D/As in prioritizing resource requirements ..Identify trends in continuity status and linkages/interdependencies of D/As ..Provide a mechanism to track key officials and orders of succession Unit 4 –Readiness Reporting System (RRS) May 07 Jun 08 June 07 July 07 Aug07 Sept 07 Oct 07 Nov07 Dec 07 Jan 08 Feb 08 Mar 08 Apr 08 May 08 Jul 08 Aug08 Sep08 Oct 08 Nov 08 Dec08 Jan 09 Feb09 Mar09 Apr 09 May 09Jun 09Jul 09RRS Spiral 1Spiral 1 Delivered (August 31, 2007) Spiral 1 Develop Test Scripts (September 5 –September 28, 2007) Spiral 1 OGAT (October 1–November 30, 2007) Spiral 1 Phased Release (December 2007 –March 31, 2008) RRS Spiral 1 OperationalArchitecture Decision (October 31, 2007) Spiral 2 Delivered (July 16, 2008) Spiral 2 OGAT (August 14 –November 5, 2008) Security Testing 1-8 (November 6 – December 17, 2008) NSA Testing December 18, 08 –May 6, 2009Sprint 1Sprint 2Sprint 3Sprint 4Sprint 5Sprint 6Sprint 7Spiral 2 Deployment (May 7 –July 1, 2009) Spiral 2 Operational (July 1, 2009) User InterfaceBuild PMEFQuestionnaireOrganizational ManagementReadiness AssessmentEssential FunctionsSmart ClientReportsOracle ConversionWorking Group 6 –COOP Questionnaire(December 12) Working Group 1 -Intro to RRS(July 26) Working Group 3 –Performance Metrics(September 20) Working Group 4 –Performance Metrics (October 25) Working Group 5 –Essential Functions(November 20) Working Group 2 –Organization Mgt.(August 16) Working Group 7 –COOP Questionnaire(January 24) Working Group 8 –TT&E(February 21) Working Group 9 –Trend Analysis(March 20) Working Group 10 –Current Readiness(April 24) Working Group 11 –Operational View(May 22) Working Group 12 –Reports(June 19) RRS Spiral 2RRS TimelineUnit 4 –Readiness Reporting System (RRS) Summary and Transition ..This unit: ..Phased approach for RRS and PMEF data capture ..Discussion on RRS Spiral 1 and RRS Spiral 2 ..Next Unit: ..Briefing for Continuity Coordinators Unit 4 –Readiness Reporting System (RRS) Summary and Transition Questions? Unit 4 –Readiness Reporting System (RRS) Briefing for Continuity Coordinators Name Position Office Organization Unit 5 –Briefing for Continuity Coordinators Unit 5 –Briefing for Continuity Coordinators What is Needed? ..A program to maintain a comprehensive and effective continuity capability composed of Continuity of Operations and Continuity of Government programs in order to ensure the preservation of our form of government under the Constitution and the continuing performance of National Essential Functions under all conditions Purpose of this Workshop ..Provide training on the formalized process for D/A (D/A) submission of potential Primary Mission Essential Functions (PMEF) that support the National Essential Functions (NEF), which includes a review of: ..Interdependencies ..Government Functions ..Mission Essential Functions ..Interagency Board (IAB) submission requirements Unit 5 –Briefing for Continuity Coordinators Lessons Learned ..The lessons we now have from such catastrophic events as the attacks of September 11, 2001, and Hurricane Katrina in 2005, demonstrate the need to reemphasize continuity as a “good business practice”to be incorporated into day-to-day planning in order to reduce vulnerability and ensure continuity Unit 5 –Briefing for Continuity Coordinators A Katrina Success Story ..National Finance Center paid half a million Federal workers on time during Hurricane Katrina without delays: ..Surged work force before landfall allowing them to complete payroll processing for federal employees ..Shut down operations and deployed to backup locations ..Backup data was trucked out of the New Orleans facility ..Advance deployment team moved to backup sites ..Within a 50-hour period, they began catch-up processing Unit 5 –Briefing for Continuity Coordinators What is Continuity Planning? ..Continuity planning is simply the good business practice of ensuring the execution of essential functions through all circumstances ..Establish and ensure continuity of national priorities ..Identify those services that must be continued during an emergency ..Planning for the execution of essential functions must be integrated into daily operations, functions, plans, and mission areas ..Utilize Continuity Program Management Cycle to ensure continuity Unit 5 –Briefing for Continuity Coordinators Why is Continuity Planning Critical? ..The ultimate goal of continuity in the Executive Branch is the continuation of the eight National Essential Functions (NEF) which are the critical responsibilities of the Federal Government needed to lead and sustain the Nation ..The Federal Government’s ability to successfully execute its NEFs at all times, and especially during a crisis, is not an independent capability. The Federal Government relies upon key partners at all levels of government and in the private sector Unit 5 –Briefing for Continuity Coordinators SofL Roles and Responsibilities ..President ..Leads the activities of the Federal Government for Enduring Constitutional Government ..The National Continuity Coordinator (NCC) ..The Assistant to the President for Homeland Security and Counterterrorism (APHS/CT) is the NCC ..Responsible for overseeing the Continuity Policy Coordination Committee (CPCC) Unit 5 –Briefing for Continuity Coordinators Departments and Agencies Actions ..On a ongoing basis, ensure performance of D/A PMEFs ..Within 90 days after Department of Homeland Security’s (DHS) guidance, review/revise MEFs and submit potential PMEFs to the Interagency Board (IAB) ..Within 30 days after validation of D/A PMEFs and annually thereafter, ensure key leaders and support staff are provided familiarization training on PMEFs and MEFs ..Within 180 days after validation of D/A PMEFs, ensure PMEF and MEF interdependencies are coordinated Unit 5 –Briefing for Continuity Coordinators MEF/PMEF Identification Timeline DHS/FEMA briefings on MEFs/PMEFs & FCD Unit 5 –Briefing for Continuity Coordinators NCP IP issued27 Sep 07NCP IP issued27 Sep 07D/A Continuity Coordinatorappointed26 Oct 07D/A Continuity Coordinatorappointed26 Oct 07Certify D/A has Continuity Capability Plan 26 Oct 07Certify D/A has Continuity Capability Plan 26 Oct 0730 days30 daysMEF/PMEFBriefing for D/A Continuity Coordinatorsby 25 Nov 07MEF/PMEFBriefing for D/A Continuity Coordinatorsby 25 Nov 0730 days30 daysFCD issued on Continuity Requirements including MEFs25 Nov 07FCD issued on Continuity Requirements including MEFs25 Nov 07FCD issued on D/A PMEF assessment and submission25 Nov 07FCD issued on D/A PMEF assessment and submission25 Nov 0790 daysWithin 90 days after DHS guidance, D/As review, revise MEFs and identify and submit potential PMEFs to DHSWithin 90 days after DHS guidance, D/As review, revise MEFs and identify and submit potential PMEFs to DHSCAG and IAB created26 Oct 07CAG and IAB created26 Oct 0730 days30 daysDHS submits compiled MEFs and potential PMEFs to IABDHS submits compiled MEFs and potential PMEFs to IAB Implementation Plan Unit 5 –Briefing for Continuity Coordinators ..The means by which the National Continuity Policy is translated into action and is intended to be a comprehensive and integrated list of directives for the Federal Executive Branch in order to ensure the effectiveness and survivability of our national continuity capability ..Describes how the Executive Branch will utilize thorough preparation and a continuous Continuity Program Management cycle to analyze and execute programs, policies and procedures to ensure continuity Essential Functions ..The critical activities that are performed by organizations, especially after a disruption of normal activities ..There are three categories of essential functions: ..National Essential Functions (NEF) ..Primary Mission Essential Functions (PMEF) ..Mission Essential Functions (MEF) Unit 5 –Briefing for Continuity Coordinators Unit 5 –Briefing for Continuity Coordinators Implementation Plan Goals ..Goal #1 –To understand the transformation of continuity ..Goal #2 –To establish and ensure continuity of national priorities ..Goal #3 –To ensure continuity readiness procedures and metrics ..Goal #4 –To promote interoperability Unit 5 –Briefing for Continuity Coordinators Goals and Objectives ..Goal #2 –To establish and ensure continuity of national priorities ..Objective 2A–To identify continuity partners and functions ..Objective 2B–To identify Mission Essential Functions ..Objective 2C–To identify Primary Mission Essential Functions ..Objective 2D–To establish roles, responsibilities, and actions for the Nation’s senior continuity officials Continuity Capability ..An organization’s continuity capability –its ability to perform its essential functions continuously –rests upon key components or pillars, which are in turn built on the foundation of continuity planning and continuity program management Unit 5 –Briefing for Continuity Coordinators An organization’s resiliency is directly related to its continuity capability Continuity Partners ..Continuity cannot occur without the commitment and dedication of many others who play integral roles in ensuring our homeland security. Those partners include the following: ..Federal Government ..State, local, territorial and tribal governments ..Private Sector Critical Infrastructure Owners Unit 5 –Briefing for Continuity Coordinators Government Functions ..Government Functions are the collective functions of executive departments and agencies as defined by the Constitution, statute, regulation, presidential direction or other legal authority and the functions of the legislative and judicial branches Unit 5 –Briefing for Continuity Coordinators Mission Essential Functions ..MEFs are described as the limited set of department- and agency-level government functions that must be continued throughout or resumed rapidly after a disruption of normal activities Unit 5 –Briefing for Continuity Coordinators MEF Initial Screening Aid Unit 5 –Briefing for Continuity Coordinators Unit 5 –Briefing for Continuity Coordinators Primary Mission Essential Functions ..PMEFs are those D/A MEFs, validated by the National Continuity Coordinator, which must be performed in order to support the performance of the NEFs before, during, and in the aftermath of an emergency ..PMEFs are those functions that need to be continuous or resumed within 12 hours after an event and maintained for up to 30 days or until normal operations can be resumed PMEF Initial Screening Aid Unit 5 –Briefing for Continuity Coordinators National Essential Functions ..In accordance with NSPD-51 / HSPD-20, the eight NEFs represent the overarching responsibilities of the Federal Government to lead and sustain the Nation and shall be the primary focus of the Federal Government leadership during and in the aftermath of an emergency Unit 5 –Briefing for Continuity Coordinators Unit 5 –Briefing for Continuity Coordinators National Essential Functions1.Ensuring the continued functioning of our form of government under the Constitution, including the functioning of the three separate branches of government; 2.Providing leadership visible to the Nation and the world and maintaining the trust and confidence of the American people; 3.Defending the Constitution of the United States against all enemies, foreign and domestic, and preventing or interdicting attacks against the United States or its people, property, or interests; 4.Maintaining and fostering effective relationships with foreign nations; Unit 5 –Briefing for Continuity Coordinators National Essential Functions5.Protecting against threats to the homeland and bringing to justice perpetrators of crimes or attacks against the United States or its people, property, or interests; 6.Providing rapid and effective response to and recovery from the domestic consequences of an attack or other incident; 7.Protecting and stabilizing the Nation’s economy and ensuring public confidence in its financial systems; and 8.Providing for critical Federal Government services that address the national health, safety, and welfare needs of the United States. Continuation of Essential Functions ..The interdependencies of the key partners and the functions of continuity ..Independent government entities at all levels and individual private sector companies are intimately connected and work together in critical partnership to ensure continuation of essential functions Unit 5 –Briefing for Continuity Coordinators Methodology Unit 5 –Briefing for Continuity Coordinators Review organizational functions to determine MEFs (consider legal authorities, survey lines of business, determine time criticality andidentify partners) •D/A Continuity Coordinator confirms identified MEF with D/AheadReview organizational functions to determine MEFs (consider legal authorities, survey lines of business, determine time criticality andidentify partners) •D/A Continuity Coordinator confirms identified MEF with D/AheadConduct a Business Process Analysis (BPA) for each identified MEF: 1.Outline key processes that impact the ability to complete the MEF2.Identify internal and external interdependencies3.Ensure the MEF interdependencies are inserted into the flow map4.D/A Continuity Coordinator approves BPA package with D/A headConduct a Business Process Analysis (BPA) for each identified MEF: 1.Outline key processes that impact the ability to complete the MEF2.Identify internal and external interdependencies3.Ensure the MEF interdependencies are inserted into the flow map4.D/A Continuity Coordinator approves BPA package with D/A headJoint effort between NCC and D/A Continuity Coordinator to identifyand confirm MEF(s) that must serve as PMEF(s) Joint effort between NCC and D/A Continuity Coordinator to identifyand confirm MEF(s) that must serve as PMEF(s) Business Process Analysis (BPA) ..The method of examining, identifying, and mapping the functional processes, workflows, activities, personnel expertise, systems, data, and facilities inherent to the execution of a function or requirement ..When preparing the BPA for your organization consider the following: ..The four pillars of continuity capability (leadership, staff, facilities and communications) ..Necessary resources ..External interdependencies ..Internal interdependencies Unit 5 –Briefing for Continuity Coordinators Business Impact Analysis (BIA) ..The method of identifying the affects of failing to perform a function or requirement ..BIAs prepared for PMEF should consider the following: ..Potential single points of failure(s) that may adversely affect the execution of the interagency PMEF support to the NEFs ..The impact of delayed PMEF recovery on NEF execution ..Potential PMEF process alternatives/work-around solutions ..Risk management options shall include policy development, business process reengineering, asset dispersion, continuity systems design redundancy, and other relevant options Unit 5 –Briefing for Continuity Coordinators Continuity Program Management Cycle Plans and ProceduresEvaluations, After Action Reports, and Lessons LearnedTest, Training, and ExerciseDevelop Corrective Action Plans Deliverables ..D/As will provide the IAB the following in their PMEF candidate package: ..D/A Memorandum ..PMEF Narrative Sheet ..Completed Excel Workbook template outlining Business Process Analysis (paper and electronic) ..D/A approved PMEFs and supporting worksheets will be loaded intoRRS for processing, it is critical that the format of the spreadsheets not be modified ..Other supporting documents as needed Unit 5 –Briefing for Continuity Coordinators Process for PMEF Identification Unit 5 –Briefing for Continuity Coordinators IAB conducts BPA to identify and map interagency PMEF processesto the interagency execution of the NEFIAB conducts BPA to identify and map interagency PMEF processesto the interagency execution of the NEFIAB conducts further detailed PMEF BPA to identify and map interagency PMEF interdependencies required to support the NEFIAB conducts further detailed PMEF BPA to identify and map interagency PMEF interdependencies required to support the NEFIAB conducts a detailed BIA to identify single points of failure, impactof PMEF downtime, mandated recovery times and mitigation strategyIAB conducts a detailed BIA to identify single points of failure, impactof PMEF downtime, mandated recovery times and mitigation strategyIAB submits final NEF BPA Mapping and BIA Reports to the NCC with findings and recommendationsIAB submits final NEF BPA Mapping and BIA Reports to the NCC with findings and recommendationsNCC reviews BPA/BIA findings to manage and lead the FederalGovernment Continuity program efforts as the NCC NCC reviews BPA/BIA findings to manage and lead the FederalGovernment Continuity program efforts as the NCC Next Steps ..D/As will identify MEFs and potential PMEFs to DHS ..DHS submits compiled MEFs and potential PMEFs to IAB ..IAB submits MEFs and potential PMEFs to NCC for approval ..NCC approves PMEFs ..D/As complete BIA based on approved PMEFs ..D/As ensure key leaders are trained on MEFs and PMEFs ..D/As ensure PMEF and MEF interdependencies are coordinated Unit 5 –Briefing for Continuity Coordinators Summary and Transition ..This unit: ..Briefing that was provided to D/A Continuity Coordinators ..Next Unit: ..Course evaluation Unit 5 –Briefing for D/A Continuity Coordinators Summary and Transition Questions? Unit 5 –Briefing for D/A Continuity Coordinators Course Evaluation Name Position Office Organization Unit 6 –Course Evaluation Workshop Post-test ..Please complete the MEF/PMEF Workshop Post-test Unit 6 –Course Evaluation Participant Observation Form ..Please complete and submit the Observation Form to assist course developers in planning future course enhancements ..Names are optional Unit 6 –Course Evaluation Summary and Transition Questions? Unit 6 –Course Evaluation NCP Point of Contacts Unit 6 –Course Evaluation