To speed up hydraulic processing a cache was added to the Flood Model that stores depth grids for each reach before they are merged at the end of the hydraulics process. Subsequently calculating a Stream Network with a different Drainage Area yields a different synthetic stream network with different reach indices, which match up correctly with depth grids generated by a new hydraulics run, but incorrectly with the previous depth grids, which are not overwritten.
As a workaround, prior to performing Delineate Floodplain, a user should navigate to the cache of depth grids from the previous run in the Study Region's subdirectory folder called Hydraulics and delete it:

For additional information, the HAZUS User's Manuals and guidance materials are available for download from the HAZUS Resources on this site.
Need Additional Help?Last Modified: Monday, 21-Sep-2009 15:00:44 EDT