Definition/Description
Any project in a floodway must be reviewed to determine if the project will increase flood heights. An engineering analysis must be conducted before a permit can be issued. The community's permit file must have a record of the results of this analysis, which can be in the form of a No-rise Certification. This No-rise Certification must be supported by technical data and signed by a registered professional engineer. The supporting technical data should be based on the standard step-backwater computer model used to develop the 100-year floodway shown on the Flood Insurance Rate Map (FIRM) or Flood Boundary and Floodway Map (FBFM).
NFIP Requirement
Other Applicable NFIP Regulations
-
- (c) (10)
- (d) (2)
Guidance
-
IS-9 Managing Floodplain Development Through The National Flood Insurance Program (NFIP) (pages 5-22, 5-23, and 7-59) (PDF 8MB, TXT 1MB) (entire document)
Related Keywords
Special Topic Resources
-
-
Encroachment Review (5-21 to 5-24)
-
Example No-Rise Certification (5-23)
-