A City Engineer measures the level of ice and water, East Dike, Fargo

Main Content
Fargo, N.D., March 27, 2009 -- A Fargo City Engineer measures the latest level of ice and water in the East Dike in Fargo, North Dakota where a  make-ship levee is being built on the banks of the Red River.  The Red River is expected to crest on Saturday at over 43 feet. Photo by Patsy Lynch/FEMA
Fargo, N.D., March 27, 2009 -- A Fargo City Engineer measures the latest level of ice and water in the East Dike in Fargo, North Dakota where a make-ship levee is being built on the banks of the Red River. The Red River is expected to crest on Saturday at over 43 feet. Photo by Patsy Lynch/FEMA - Location: Fargo, ND
Back to Top