Spanish Fort Bluff Stabilization Project, City Of Spanish Fort, Alabama (August 2006)

Main Content
The City of Spanish Fort applied for FEMA Hazard Mitigation Grant Program funds to reduce the erosion of a bluff from water runoff and mass movements, which threatens several residential structures. Bluff stabilization is needed to reduce future property damages and nearby road closures associated with erosion, slumping, and landslides. To comply with the National Environmental Policy Act and its implementing regulations, an Environmental Assessment and FONSI were prepared to evaluate the potential environmental impacts of the proposed project.
SizePublication Date
Icon for file of type application/pdfFigure 2
2.22M
Icon for file of type application/pdfAppendix D - Preliminary Design Plans - Chapter / Section Number: Preliminary Design Plans
0.98M
Icon for file of type application/pdfAppendix C - Photos - Chapter / Section Number: Photos
2.96M
Icon for file of type text/plainAppendix A -FONSI - Chapter / Section Number: FONSI
8.36K
Icon for file of type application/pdfAppendix A -FONSI - Chapter / Section Number: FONSI
117.08K
Icon for file of type application/pdfAppendix B - Agency Correspondence - Chapter / Section Number: Agency Correspondence
2.15M
Icon for file of type text/plainSpanish Fort Bluff Stabilization Project, City Of Spanish Fort, Alabama (August 2006)
120.73K
Icon for file of type application/pdfSpanish Fort Bluff Stabilization Project, City Of Spanish Fort, Alabama (August 2006)
646.58K
Icon for file of type application/pdfFigure 4
17.35M
Icon for file of type application/pdfFigure 1
27.91M
Icon for file of type application/pdfFigure 3
3.47M
Back to Top