Environmental Assessment for Several Communication Tower Projects, Statewide, Mississippi (September 2011)

Main Content

Following Hurricane Katrina, Congress appropriated funds for a grant to the State of Mississippi for an interoperable communications system. The funds are being administered by FEMA under the Mississippi Interoperable Communications Grant Program to be used for the construction of several communications towers across the state. The purpose of the MSWIN is to establish a better communications network for State system users,varying from public safety to governmental executive and administrative personnel to road maintenance crews. The MSWIN network would also be used extensively during life threatening conditions and emergency situations. This Environmental Assessment has been prepared in accordance with the National Environmental Policy Act (NEPA) of 1969, the President’s Council on Environmental Quality regulations implementing NEPA (40 Code of Federal Regulations (CFR) Parts 1500-1508), and FEMA’s regulations implementing NEPA (44 CFR Part 10).

SizePublication Date
Icon for file of type text/plainBooneville FONSI
5.34K
Icon for file of type application/pdfBooneville FONSI
168.84K
Icon for file of type text/plainTunica FONSI
5.96K
Icon for file of type application/pdfTunica FONSI
186.30K
Icon for file of type text/plainDratf EA Booneville, MS (Sept 2011)
61.29K
Icon for file of type application/pdfDratf EA Booneville, MS (Sept 2011)
3.60M
Icon for file of type text/plainEnvironmental Assessment for Several Communication Tower Projects, Statewide, Mississippi (September 2011)
62.34K
Icon for file of type application/pdfEnvironmental Assessment for Several Communication Tower Projects, Statewide, Mississippi (September 2011)
2.93M
Icon for file of type text/plainDraft EA for Tunica, MS - Chapter / Section Number: Draft EA for Tunica EA (september
61.65K
Icon for file of type application/pdfDraft EA for Tunica, MS - Chapter / Section Number: Draft EA for Tunica EA (september
3.05M
Back to Top