Environmental Assessment for Autumn Woods Drainage Improvement Project, Southaven, DeSoto County, Mississippi (February 2011)

Main Content
The City of Southaven has applied for funding under FEMA’s Hazard Mitigation Grant Program for assistance with the construction of the Autumn Woods subdivision stormwater drainage improvement project. In accordance with the National Environmental Policy Act (NEPA) and FEMA’s NEPA implementing regulations at 44 CFR Part 10, an Environmental Assessment (EA) for the project was finalized in February 2010. Because the scope of the proposed project has changed, a draft Supplemental EA has been prepared.
SizePublication Date
Icon for file of type text/plainAppendix A - Figures
665.00B
Icon for file of type application/pdfAppendix A - Figures
746.84K
Icon for file of type text/plainAppendix C - Resource Agency Correspondence
490.00B
Icon for file of type application/pdfAppendix C - Resource Agency Correspondence
3.97M
Icon for file of type text/plainAppendix D - 8-step
5.58K
Icon for file of type application/pdfAppendix D - 8-step
52.28K
Icon for file of type text/plainEnvironmental Assessment for Autumn Woods Drainage Improvement Project, Southaven, DeSoto County, Mississippi (February 2011)
39.17K
Icon for file of type application/pdfEnvironmental Assessment for Autumn Woods Drainage Improvement Project, Southaven, DeSoto County, Mississippi (February 2011)
173.52K
Icon for file of type text/plainAppendix B - Drawings
473.00B
Icon for file of type application/pdfAppendix B - Drawings
0.99M
Back to Top