Skip to content

Resource Record Details


Procedure Memorandum No. 53, Guidance for Notification and Mapping of Expiring Provisionally Accredited Levee Designations

Resource Record Cover Image Thumbnail - pl_memo53.jpg Procedure Memorandum No. 53 (PM 53) provides procedures for the mapping of impacted areas landward of Provisionally Accredited Levee (PAL) systems when the 24-month data and documentation submittal period expires. PM 53 also provides guidelines for sending written notifications to communities, levee system owners, and other stakeholders when a PAL period is about to expire. A sample letter that can be used for this notification is provided as an attachment to PM 53.


Document Details:
Media Type: File
Availability: Online
Language: English
Resource File: View / Download / Print  (pdf 733K)
508 Accessible Format: View / Download / Print  (txt 20K)

Media Type: File
Availability: Online
Language: English
Description/Comment: Provisionally Accredited Levee (PAL) Expiration Date Fact Sheet
Resource File: View / Download / Print  (pdf 84K)
508 Accessible Format: View / Download / Print  (txt 15K)

Download Plug-in

Some of the links on this page require a plug-in to view them. Links to the plug-ins are available below.

Click Here to Download Adobe Acrobat Reader Adobe Acrobat (PDF)