Procedure Memorandum No. 52 (PM 52) provides guidelines for the mapping of impacted areas landward of levee systems. PM 52 provides mapping alternatives associated with accredited, non-accredited, and de-accredited levee systems based on the urbanization of the impacted area. PM 52 also establishes a nationally consistent process for notifying communities, non-community levee system owners and operators, and other stakeholders. Sample letters that can be used for the notifications are provided as attachments to PM 52.
|
|
| Resource File: | View / Download / Print (pdf 1638K) |
This is a large file and may take considerable time to download on slower connections. Consider adding this to your Bookshelf and then using the "CD on Demand" feature upon checkout instead.
|
| 508 Accessible Format: | View / Download / Print (txt 43K) |
Download Plug-in
Some of the links on this page require a plug-in to view them. Links to the plug-ins are available below.