Resource Record Details
Procedure Memorandum No. 42 - Quality Control Requirements in the DFIRM Process
This Procedure Memorandum provides Federal Emergency Management Agency (FEMA) staff, contractors, and mapping partners with guidance for seven quality control reviews to be performed during the Pre-Preliminary and Post-Preliminary Phases of the Digital Flood Insurance Rate Map (DFIRM) production process. The original memo was issued on June 20, 2007, which was later revised and re-issued on December 1, 2008. The revised PM42 only partially supersedes the original PM42, therefore, both memos are effective for their relevant sections.
Document Details:
|
|
| Resource File: | View / Download / Print (pdf 556K) |
| 508 Accessible Format: | View / Download / Print (txt 4K) |
Chapter / Section Records
| Chapter / Section Title: | PM 42 Quality Assurance Process |
| Chapter / Section Number: | Quality Assurance Process |
| Resource File: | View / Download / Print (pdf 80K) |
| 508 Accessible Format: | View / Download / Print (txt 1K) |
| Chapter / Section Title: | PM 42 Implementation Guide |
| Chapter / Section Number: | Implementation Guide (11x17) |
| Resource File: | View / Download / Print (pdf 688K) |
| 508 Accessible Format: | View / Download / Print (txt 15K) |
|
|
| Resource File: | View / Download / Print (pdf 266K) |
| 508 Accessible Format: | View / Download / Print (txt 7K) |
Download Plug-in
Some of the links on this page require a plug-in to view them. Links to the plug-ins are available below.


My Bookshelf