June 12, 2001 MEMORANDUM FOR: Doug Bellomo, P.E., Project Officer Eastern Studies Team Bill Blanton, Project Officer Central Studies Team Mike Grimm, Project Officer Western Studies Team FROM: [Original Signed] Matthew B. Miller, P.E., Chief Hazards Study Branch SUBJECT: Procedure Memorandum 23 – Procedures for Making Changes to FEMA Document Control Procedures Manual Background: The FEMA Document Control Procedures Manual is used by FEMA and MCC staff as guidance for processing standard and non-standard documents for FEMA-contracted studies and restudies, community-initiated map revisions, conditional and final map revisions based on conditions other than fill, conditional and final map revisions based on fill, conditional and final map amendments, Letters of Determination Review, and special conversions. The Manual also provides procedures and sample documents for use in tracking community compliance and documenting communities' entry into the NFIP. Issue: Up-to-date, accurate content and processing requirements are needed if FEMA and MCC staff are to use the Manual as guidance. In July 2000, significant changes were made to the Manual to include current content and processing requirements, including recent initiatives (e.g., LOMA 2000, MCC-generated letters). Subsequent to the distribution of hard copies of the Manual, a pdf version was posted at http://www.floodmaps.net/guidance/index.htm. To ensure that the pdf version of the Manual is kept current, a procedure for making significant changes to the pdf version of the Manual is required. New Procedure: The procedure to be followed by FEMA and MCC staff in making changes to the Manual are presented in the flowchart entitled “Document Control Procedures Manual Revision Process” (Attachment A). Significant changes may be made by first issuing a Procedure Memorandum. Other minor changes may be made by directly revising the Manual, as indicated in Attachment A. When a Procedure Memorandum is deemed necessary, the Procedure Memorandum Concurrence and Routing form (Attachment B) shall be used. Attachments cc: See distribution list Procedure Memo 23 – Procedures for Making Changes to FEMA Document Control Procedures Manual Document Control Procedures Manual Revision Process (Attachment A) FEMA or MCC identifies changes in processing procedures and/or document content that affect the Document Control Procedures Manual. Appropriate MCC proposed changes in coordination with FEMA Project Officer (PO). Is Procedure Memorandum Needed? No Yes MCC prepares draft Procedure Memorandum summarizing change(s) in procedures and document content; routes the memorandum to the other MCCs for comments; and addresses comments received. MCC sends draft Procedure Memorandum to FEMA PO for review and comment. FEMA PO annotates changes (if any) and sends draft memo to other POs using the Procedure Memorandum Concurrence & Routing form (see Attachment B). PO notifies MCC of changes requested during the PO review and requests that a final draft be created. Complete package returned to PO for final routing using the Procedure Memorandum Concurrence & Routing form. (If no changes are requested during the PO review process, this step may be skipped.) A B Procedure Memo 23 – Procedures for Making Changes to FEMA Document Control Procedures Manual A If no changes are required, last reviewing PO sends package to Chief, Hazards Study Branch for review and signature. B Chief, Hazards Study Branch signs Procedure Memorandum and sends package to Procedure Memorandum Coordinator. All digital files are also to be sent to the Procedure Memorandum Coordinator. Procedure Memorandum Coordinator distributes electronic and hard copies of Procedure Memorandum; posts to Floodmaps.net site; and coordinates with Flood Hazard Mapping website Work Group to ensure materials are posted on fema.gov site as well. Authoring MCC revises appropriate sections of MS Word version of Manual and adds date to footer. Authoring MCC posts revised section(s) of MS Word version of Manual on “Draft Documents For Review” section of Floodmaps.net site and sends e-mail notification to FEMA and MCC staff. Authoring MCC incorporates comments from FEMA and MCC reviewers; posts pdf version of revised section(s) of Manual on Floodmaps.net site and fema.gov site; and sends e-mail notification to FEMA and MCC staff. Authoring MCC distributes hard copies of revised section(s) of Manual if requested by FEMA. FEMA website development team forwards updated file(s) for posting on Flood Hazard Mapping website (www.fema.gov/mit/tsd) Update of Manual complete Procedure Memo 23 – Procedures for Making Changes to FEMA Document Control Procedures Manual Attachment B Procedure Memorandum Concurrence & Routing Date: Routing: 1. Bill Blanton, MT-TS-HS 2. Doug Bellomo, MT-TS-HS 3. Mike Grimm, MT-TS-HS 4. Matt Miller, MT-TS-HS (concur) (concur) (concur) (sign) Remarks: From: [Project Officer] Hazards Study Branch Federal Insurance Administration and Mitigation Directorate Room xxx, FCP 202/646-xxxx Procedure Memo 23 – Procedures for Making Changes to FEMA Document Control Procedures Manual Distribution List FEMA Operations and Technical Services Division (electronic distribution only) • Mike Buckley • Phil Myers • Matt Miller • Katie Paulson • Fred Sharrocks • Max Yuan • Doug Bellomo • Helen Cohn • Bill Blanton • Cynthia Croxdale • Mike Grimm • Agnes De Coca • Mark Crowell • Anne Flowers • Allyson Lichtenfels • Cecelia Lynch • Sally Magee • Kathy Miller • John Magnotti • Jay Scruggs Federal Insurance Administration and Mitigation Directorate • Bob Shea • Joe Coughlin FEMA Regional Offices • Kevin Merli, Region I • Frank Pagano, Region VI • Mike Dabney, Region II • Bob Bissell, Region VII • Tom Majusiak, Region III • Steve Olsen, Region VIII • Todd Davison, Region IV • Sally Ziolkowski, Region IX • Stuart Rifkind, Region V • Carl Cook, Region X Office of the Associate Director • Paul Loyd Program Support and Assessment Division • Margaret Lawless Outreach and Community Assessment Division • Donna Dannels • Mike Robinson • Bill Lesser Congressional and Intergovernmental Affairs Division • Fran McCarthy Flood Map Production Coordination and Map Service Center Contractors • Zekrollah Momeni, D&D • Vince DiCamillo, PBS&J • Fernando Pasquel, MBJ • Brenda Walguarnery, ZAI