No-rise Certification for Floodways

Main Content

National Flood Insurance Program (NFIP) Policy Index

Definition/Description

Any project in a floodway must be reviewed to determine if the project will increase flood heights. An engineering analysis must be conducted before a permit can be issued. The community's permit file must have a record of the results of this analysis, which can be in the form of a No-rise Certification. This No-rise Certification must be supported by technical data and signed by a registered professional engineer. The supporting technical data should be based on the standard step-backwater computer model used to develop the 100-year floodway shown on the Flood Insurance Rate Map (FIRM) or Flood Boundary and Floodway Map (FBFM).

NFIP Requirement

Other Applicable NFIP Regulations

Guidance

  • IS-9 Managing Floodplain Development Through The National Flood Insurance Program (NFIP) (pages 5-22, 5-23, and 7-59) (PDF 8MB, TXT 1MB) (entire document)

Related Keywords

Special Topic Resources

Last Updated: 
08/16/2013 - 14:36
Back to Top