Technical Manual: Plastic Pipe Used in Embankment Dams: Best Practices for Design, Construction, Problem Identification and Evaluation, Inspection, Maintenance, Renovation, and Repair

Main Content
Cover photo for the document: Technical Manual: Plastic Pipe Used in Embankment Dams: Best Practices for Design, Construction, Problem Identification and Evaluation, Inspection, Maintenance, Renovation, and Repair
This technical manual provides the procedures and guidance for “best practices” concerning the design, construction, problem identification and evaluation, inspection, maintenance, renovation, and repair associated with plastic pipe used in embankment dams.The manual provides in-depth analyses of loading conditions, structural design, and hydraulic design of plastic pipe, and is intended for use by personnel familiar with embankment dams, drains, siphons, and conduits, such as designers, inspectors, construction oversight personnel, and dam safety engineers.
TamañoPublication Date
Technical Manual: Plastic Pipe Used in Embankment Dams: Best Practices for Design, Construction, Problem Identification and Evaluation, Inspection, Maintenance, Renovation, and Repair
noviembre 1, 2007
Icon for file of type application/pdfTechnical Manual
7.39Mnoviembre 1, 2007
Icon for file of type text/plainTechnical Manual
516.12Knoviembre 1, 2007
Icon for file of type application/pdfTechnical Manual - Cover-Chapter 4 - Chapter / Section Number: Part 1
3.42Mnoviembre 1, 2007
Icon for file of type text/plainTechnical Manual - Cover-Chapter 4 - Chapter / Section Number: Part 1
297.52Knoviembre 1, 2007
Icon for file of type application/pdfTechnical Manual - Chapter 5-Appendix B - Chapter / Section Number: Part 2
4.11Mnoviembre 1, 2007
Icon for file of type text/plainTechnical Manual - Chapter 5-Appendix B - Chapter / Section Number: Part 2
218.88Knoviembre 1, 2007
Back to Top